120507_207 CHANGE RESPONSE t:\12144 state bank of bottineau\5 - supplementary documents\5a - addendums\addendum 3\206 addendum 3 270214.doc
ADDENDUM NOTICE TO CONTRACTORS This Addendum is prepared to supplement information presented in the Drawings and Project Manual dated February 10, 2014 for the above referenced project. All additions, changes, omissions and conditions listed herein shall become an integral part of the Contract Documents.
**PLEASE NOTE: BIDDING LOCATION HAS CHANGED** PROCUREMENT AND CONTRACTING REQUIREMENTS
1. SECTION 00 1113 – ADVERTISEMENT FOR BIDS o Change first paragraph to read as follows:
“Sealed proposals for Construction of an approximately 11,300 square foot new bank facility for the State Bank of Bottineau will be received by the Owner to the attention of Mr. Pat Artz, Bank President at the State Bank of Bottineau, 103 11th St E, Bottineau, ND 58318, until 2:00 PM local time on Tuesday, March 4, 2014. Bids will be opened and read aloud.”
2. SECTION 00 2113 – INSTRUCTIONS TO BIDDERS o Delete paragraph 1.16 A.
The OWNER will be responsible for providing Builder’s Risk Insurance, not the G.C. SPECIFICATIONS
1. SECTION 07 4213 – METAL WALL PANELS o Add attached section in its entirety.
APPROVED EQUALS The following products have been approved for use on this project. All approved products must still meet all product specifications as listed in the product specification section.
Section Material ID or description Basis of Design Approved Equal
08 5200 Wood Windows Marvin Clad Ultimate Casement
Jeld-Wen
09 3000 <CER TILE10,20,21> Ceramica Colli Wow Series by Maline Tile
Timeless by UnicomStarker
DRAWINGS
1. A611 – CASEWORK DETAILS o See attached detail 3.1.
Modified cubby for better constructability. Detail is similar at all cubby locations. 2. A702 – CEILING DETAILS
o See attached detail 3.2. Modified overall wood ceiling dimensions to correspond with standard 8’-0” plank length.
JLG Architects
Eric Hoffer 2705 4th Avenue NW Minot, ND 58703 p. 701.852.4178 f. 701.852.4179 [email protected]
JLG 12144 - State Bank of Bottineau
RE: addendum 3
Issued: February 27, 2014
Addendum 3
CIVIL ITEMS 1. None
STRUCTURAL ITEMS
1. Masonry veneer lintels shall have a bearing of 1" per foot of span each end, 6" minimum. Lintel angles which have not been shown otherwise to be as follows for each 4" of wall thickness:
o Spans to 4'-0" - 3 1/2" x 3 1/2" x 1/4" angle o 4'-0" to 6'-0" - 4" x 3 1/2" x 1/4" angle o 6'-0" to 8'-0" - 5" x 3 1/2" x 5/16" angle o 8'-0" to 10'-0" - 6"x4"x3/8" angle (L.L.V.)
MECHANICAL ITEMS
1. See attached mechanical addendum
ELECTRICAL ITEMS 1. See attached electrical addendum
ATTACHMENTS
1. SECTION 07 4213 METAL WALL PANELS 2. Drawing 3.1 Modified Cubby Detail 3. Drawing 3.2 Modified wood ceiling detail 4. Mechanical Addendum M2 (8 pages) 5. Electrical Addendum E2 (1 page) 6. Current Plan Holder List
END OF ADDENDUM
State Bank of Bottineau 07 4213 - 1JLG 12144 METAL WALL PANELS
SECTION 07 4213 - METAL WALL PANELS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Manufactured metal panels for soffits, with related flashings and accessory components.
1.02 RELATED REQUIREMENTS
A. Section 07 9005 - Joint Sealers.
1.03 REFERENCE STANDARDS
A. ASTM B209 - Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate; 2010.
B. ASTM B209M - Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate [Metric];2010.
1.04 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements, for submittal procedures.
B. Shop Drawings: Indicate dimensions, layout, joints, construction details, methods of anchorage.
C. Samples: Submit two samples of wall panel, 2 inch (50 mm) by 2 inch (50 mm) in size illustrating finishcolor, sheen, and texture.
1.05 QUALITY ASSURANCE
A. Manufacturer Qualifications: Company specializing in manufacturing the products specified in thissection with minimum three years of documented experience.
B. Installer Qualifications: Company specializing in manufacturing the products specified in this sectionwith minimum three years of documented experience.
1.06 DELIVERY, STORAGE, AND HANDLING
A. Protect panels from accelerated weathering by removing or venting sheet plastic shipping wrap.
B. Store prefinished material off ground and protected from weather. Prevent twisting, bending, orabrasion, and provide ventilation to stored materials. Slope metal sheets to ensure drainage.
C. Prevent contact with materials that may cause discoloration or staining of products.
1.07 WARRANTY
A. See Section 01 7800 - Closeout Submittals, for additional warranty requirements.
B. Correct defective work within a 25 year period after Substantial Completion for degradation of panelfinish, including color fading caused by exposure to weather.
C. Correct defective Work within a five year period after Substantial Completion, including defects in watertightness and integrity of seals.
State Bank of Bottineau 07 4213 - 2JLG 12144 METAL WALL PANELS
PART 2 PRODUCTS
2.01 MANUFACTURERS
A. Manufacturers:1. Centria: www.centria.com.2. Metal Sales Manufacturing Corporation : www.metalsales.us.com.3. Petersen Aluminum Corporation: www.pac-clad.com.4. Substitutions: See Section 01 6000 - Product Requirements.
2.02 MANUFACTURED METAL PANELS
A. Soffit Panel System: Factory fabricated prefinished metal panel system, site assembled.1. Provide soffit panels.2. Design and size components to withstand dead and live loads caused by positive and negative
wind pressure acting normal to plane of wall.3. Design Pressure: In accordance with applicable codes.4. Maximum Allowable Deflection of Panel: 1/90 of span.5. Movement: Accommodate movement within system without damage to components or
deterioration of seals, movement within system; movement between system and perimetercomponents when subject to seasonal temperature cycling; dynamic loading and release of loads;and deflection of structural support framing.
6. Drainage: Provide positive drainage to exterior for moisture entering or condensation occurringwithin panel system.
7. Fabrication: Formed true to shape, accurate in size, square, and free from distortion or defects;pieces of longest practical lengths.
8. Corners: Factory-fabricated in one continuous piece with minimum 18 inch (450 mm) returns.9. Exterior Finish: Panel manufacturer's standard polyvinylidene fluoride (PVDF) coating, top coat
over epoxy primer.10. Exterior Panel Back Coating: Panel manufacturer's standard polyester wash coat.
B. Soffit Panels:1. Basis of Design: PAC-750 fully vented by PAC-CLAD.2. Profile: Style as indicated.3. Panel Width: 12 inches.4. Material: Precoated aluminum sheet, minimum 0.032 inch (0.8 mm) thick.5. Color: As selected by Architect from manufacturer's full line.
C. Internal and External Corners: Same material, thickness, and finish as exterior sheets; profile to suitsystem; shop cut and factory mitered to required angles.
D. Expansion Joints: Same material, thickness and finish as exterior sheets; 22 gage (0.8 mm thick);manufacturer's standard brake formed type, of profile to suit system.
E. Trim: Same material, thickness and finish as exterior sheets; brake formed to required profiles.
F. Anchors: Galvanized steel.
State Bank of Bottineau 07 4213 - 3JLG 12144 METAL WALL PANELS
2.03 MATERIALS
A. Precoated Aluminum Sheet: ASTM B209 (ASTM B209M), 3105 alloy, O temper, smooth surface texture;continuous-coil-coated on exposed surfaces with specified finish coating and on panel back withspecified panel back coating.
2.04 ACCESSORIES
A. Gaskets: Manufacturer's standard type suitable for use with system, permanently resilient.
B. Sealants: As specified in Section 07 9005.
C. Fasteners: Manufacturer's standard type to suit application; with soft neoprene washers, steel, hot dipgalvanized. Fastener cap same color as exterior panel.
D. Bituminous Paint: Asphalt base.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that framing members are ready to receive panels.
3.02 INSTALLATION
A. Install panels on soffits in accordance with manufacturer's instructions.
B. Protect surfaces in contact with cementitious materials and dissimilar metals with bituminous paint.Allow to dry prior to installation.
C. Fasten panels to structural supports; aligned, level, and plumb.
D. Locate joints over supports. Lap panel ends minimum 2 inches (50 mm).
E. Provide expansion joints where indicated.
F. Use concealed fasteners unless otherwise approved by Architect.
G. Seal and place gaskets to prevent weather penetration. Maintain neat appearance.
3.03 TOLERANCES
A. Maximum Offset From True Alignment Between Adjacent Members Butting or In Line: 1/16 inch (1.6mm).
B. Maximum Variation from Plane or Location Indicated on Drawings: 1/4 inch (6 mm).
3.04 CLEANING
A. Remove site cuttings from finish surfaces.
B. Clean and wash prefinished surfaces with mild soap and water; rinse with clean water.
END OF SECTION
MAIN F.F.E.
100' - 0"
3/4" X 3/4" METALREVEALS - TYP
SOLID WD TRIM@ BASE
3/4" WD VENEERPANELS OVER WDFRAMING
3/4"
1/2"
11" 3/4"
1'-1"
1 1/
2"
3/4
"
1/2"
1'-0
1/4
"
1/2"
1 1/
2"
2 1/2"1'-2
"
<QUARTZ PNL-1> OVER1/2" WD VENEER CASEWORK-POLISH ALL EXPOSED FACESOF QUARTZ MATERIAL
<QUARTZ CTOP-1>
NOTE: SHADED AREAS INDICATEQUARTZ PANELS OR COUNTERTOP MATERAL. DETAIL SIMILARAT ALL CUBBY LOCATIONSTHROUGHOUT PROJECT.
EXPOSED FACES & EDGESTO BE STAINED AND FINISHED..
PROJECTDATE
SHEET NO.FROM SHEET NO.
ISSUED FOR:
State Bank of BottineauState Bank of Bottineau
Bottineau, ND
JLG 1214402/27/14
3.1A611
ADDENDUM 3
1" = 1'-0"1
TYPICAL CUBBY DETAIL
TRUSS BEARING
112' - 0"
7A702
3 3/4" 11 7/8" 5'-6 1/4" 11 7/8" 3 3/4"
2'-4"
1'-2
"
3'-6"
1'-3 5/8" 1'-3 5/8" CROWN MOLDING- TO BE STAINED
WD BLOCKING- REF STRUCT
6" MTL STUDS- REF STRUCT
3-5/8" MTL STUDS- REF STRUCT
<GYP BD-1>
<GYP BD-1>
WD CEILINGSYSTEM - REFSPEC
GYB BD WALLBEYOND - TO BEPAINTED
<CLG PNL-30>
33
3/4" 8'-0" 3/4"
PROJECTDATE
SHEET NO.FROM SHEET NO.
ISSUED FOR:
State Bank of BottineauState Bank of Bottineau
Bottineau, ND
JLG 1214402/27/14
3.2A702
ADDENDUM 3
1" = 1'-0"1
MODIFIED WOOD CEILING DETAIL
ADDENDUM #M-2
Page 1 of 3
February 27, 2014
State Bank of BottineauBottineau, North DakotaProject No. 13043
PRAIRIE ENGINEERING, P.C.1905 17TH ST SEMINOT, NORTH DAKOTA
THIS ADDENDUM SHALL BECOME A PART OF THE PLANS AND SPECIFICATIONS AND ITSRECEIPT SHALL BE NOTED ON THE BID FORM.
ATTACHMENTS: This Addendum includes the following attached Drawings:
1. ADD M2.12. ADD M2.23. ADD M2.34. ADD M2.45. ADD M2.5
ITEM #1. MECHANICAL DRAWING CLARIFICATION
A. The M.C. shall identify each piping system and assure cross connections between differentsystems are not allowed. This applies to connections from one side of a similar system to theother side causing a short cycle.
ITEM #2. GLYCOL CLARIFICATION
A. The hot-water heating system fluid shall be a minimum 25 percent propylene glycol for freezeprotection to 13°F.
B. The Geothermal Heat Pump system fluid shall be a minimum 25 percent propylene glycol forfreeze protection to 13°F.
C. Glycol Basis for design: Dow Chemical Dowfrost Propylene Glycol.
ITEM #3. REVERSE OSMOSIS WATER SYSTEM
A. The Mechanical Contractor shall provide a Culligan Model AC-30 Reverse Osmosis Systemwith a 25 Gallon Storage Tank. Storage Tank shall be compatible for use with ReverseOsmosis water systems.
B. The Reverse Osmosis System and Storage Tank shall be installed on a G.C. provided 4”concrete pad. Coordinate the size and location of the 4” concrete pad with the G.C.
State Bank of Bottineau Addendum M-2Bottineau, North Dakota February 27, 2014Project No. 13043
Page 2 of 3
ITEM #4. WATER SOFTENER WATER SYSTEM
A. The Mechanical Contractor shall provide a Culligan Model HCE-120-2 water softener systemwith a 24”X5” Brine Tank.
B. The Water Softener Water System with Brine Tank shall be installed on a G.C. provided 4”concrete pad. Coordinate the size and location of the 4” concrete pad with the G.C.
ITEM #5. PROVIDE 2” FLOOR DRAIN IN MEN 110, WOMEN 11, MEN 118, WOMEN 119,WOMEN 131 & MEN 133
A. Provide 2” floor drains in all toilet rooms. Provide a 2” waste drain with p-trap from floordrains to the closest waste drain of adequate size. Provide a 1 ½” vent pipe serving the floordrain waste pipe to the closest vent pipe of adequate size. See attached drawings.
ITEM #6. CONDENSATE DRAIN PIPING
A. Tie the Main floor west side heat pump condensate drain in the tail piece of the lavatory locatedin Men 133. See attached drawings.
ITEM #7. STORM SEWER CONNECTION CLARIFICATION
A. The 6” RC piping shall be moved to the North mechanical chase. The normal RC pipe shall beran to below grade and extend 5’-0” outside of the building line. See attached drawings.
B. Change the sump drain and vent pipe as shown on the attached drawings.
ITEM #8. IT SERVER ROOM 009 HEAT PUMP CHANGE
A. Heat Pump 2/HP024 shall be increase in sized to a size 030 Water to Air Heat Pump with labelchanged to 2/HP030.
B. Provide 1” HPS and 1” HPR to 2/HP030. Change ductwork size and increase air flow to thediffusers as indicated on the attached drawings.
ITEM #9. TYPE “J” GRILLE CHANGE
A. Change all 22”X22” Type “J” return air grilles to Price model 530FF filter grilles.
ITEM #10. GEOTHERMAL SYSTEM SECTION 232200 SITE CONDITIONS PARAGRAPHCLARIFICATION
A. The following geological information is provided to the drilling contractor as a general guide asto what may be found in the bore holes, actual conditions will vary. This information wasgathered from the ND State Water Commission Mapservice website.
a) 0-18 feet - yellow clay
State Bank of Bottineau Addendum M-2Bottineau, North Dakota February 27, 2014Project No. 13043
Page 3 of 3
b) 18-120 feet – silty sandy clayc) 120-205 feet - clay
B. Geothermal Well location: Bottineau County, SW 1/4 SW ¼ NE ¼ Sec. 25 Twp. 162 N. Rg 76W.
CONTINGENT UPON MEETING ALL SPECIFICATIONS, FOLLOWING ITEMS AREACCEPTABLE FOR BIDDING:
Paragraph Item238100 Water to Air Heat Pumps by York/JCI238100 Water to Water Heat Pumps by York/JCI
2"ø WFRWFS
M.C. TO EXTEND 4" BUILDING WASTE DRAIN 5-0" OUTSIDE OFTHE BUILDING LINE. G.C. TO EXTEND TO SAN. SEWER.
PROVIDE 5'-0" MIN. OF EARTH COVER. COORDINATE INVERT &ALIGNMENT WITH G.C.
4"ø
11/
2"ø
SAN CW
M.C. TO EXTEND 1 1/2" CW DOMESTIC WATER SUPPLY 5'-0" OUTSIDE OFTHE BUIDNG LINE. G.C. TO EXTEND TO WATER MAIN. PROVIDE 8'-0" MIN.OF EARTH COVER. COORDINATE PIPE ELEVATION & ALIGNMENT WITHG.C.
RC
6"ø
M.C. TO EXTEND 6" RC PIPE 5'-0" OUTSIDE OF THE BUIDNG LINE. G.C.TO EXTEND TO STORM SEWER. PROVIDE 5'-0" MIN. OF EARTHCOVER. COORDINATE PIPE ELEVATION & ALIGNMENT WITH G.C.
PRO
JECT
DA
TE
SHEE
TFR
OM
SHEE
T
ISSU
EDFO
R:
Stat
eB
ank
ofB
ottin
eau
Stat
eB
ank
ofBo
ttinu
eau
Bot
tinea
u,ND
PE13
043
02/2
7/14
ADD
M2.
1
1/8" = 1'-0"1 MECHANICAL SITE PLAN (ADD M-2)
1/WTW060
6" RC UP
P-7
P-2P-1
HPRHPR
CW
CWCW
CW
HWRHWS
HPSHPR
HWRHWS
HPR
HPS
HWSHWR
HPS
HPR
VT
VT
VT
VT
HPR HPS
CWHW
SANSANSAN
SAN
SAN
SAN
CW
HW
CW
VT
VT
RHW
RO HPRHPSCWHW
CW
RO
ROHPRHWSHWR
HPS
SAN
HPSHPR HPS
HPRRO
CW
CW
HW
WH-1P-8
HPRHPR
1 1/2"ø
1 1/2"ø1/2"ø
1/2"
ø
1"ø 1"ø
3"ø3"ø
1 1/4"ø1 1/4"ø
3/4"ø3/4"ø
1 1/4"ø1 1/4"ø
WATER METER. PROVIDEBALL VALVES & UNION ONEACH SIDE OF METER1 1/2" CW WATER SUPPLY
1/2"ø
1/2"ø
1/2"ø
1/2"ø
SURGETANK
2/HP030
ET-3
ET-1 ET-2
M.C. SHALL PROVIDE ACULLIGAN MDL. HCE-120-2WATER SOFTNER SYSTEM
M.C. SHALL PROVIDE A CULLIGAN MDL.AC-30 REVERSE OSMOSIS SYSTEM
WITH 25 GALLON STORAGE TANK.
3/4"ø
1 1/4"ø1 1/4"ø
3/4"
ø
11/
4"ø
11/
4"ø
11/
4"ø
11/
4"ø
3"ø
3"ø
3"ø
2"ø3/4"ø
3/4"
ø 3/4"
ø
21/
2"ø
21/
2"ø
3/4"ø3/4"ø 1"ø
1"ø
1/2"ø1/2"ø
3"ø
3"ø
3"ø
3"ø
3"ø
3"ø
3"ø
1/2"ø
3"ø
3"ø
3"ø
3/4"ø 3/4"ø1"ø 1 1/4"ø1"ø
1"ø1/2"ø
005
009
010
011
002
1 1/2"ø
2" F.D.
2" F.D.
2" F.D.
2" F.D.2" F.D.
PRO
JECT
DA
TE
SHEE
TFR
OM
SHEE
T
ISSU
EDFO
R:
Stat
eB
ank
ofB
ottin
eau
Stat
eB
ank
ofBo
ttinu
eau
Bot
tinea
u,ND
PE13
043
02/2
7/14
ADD
M2.
2
1/4" = 1'-0"1
PARTIAL LOWER LEVEL PIPING PLAN(ADD M-2)
5/HP024
6/HP030
7/HP0098/HP036 9/HP009
10/HP018
15/HP00614/HP018
13/HP03012/HP018
11/HP024
COND COND CONDCOND
CO
ND
CO
ND
COND
COND CONDCOND
HPS
HPSHPR
HPSHPR
HPR
HPS
HPS
3/4"ø
3/4"
ø
3/4"
ø3/
4"ø
1/2"ø
1/2"ø
VTHW
CWRHW
CWHW
RHWCW
HWVT
HW
CW
RH
W
1/2"ø1"ø
3/4"ø 2"ø
1"ø
3/4"ø4" VTR
3" VTR2"ø
VT
FPH-13/4" CW
HPR
FPH-13/4" CW
1"ø1"ø
3/4"
ø
3/4"ø 3/4"ø
3/4"
ø3/4"ø
3/4"ø
3/4"ø3/4"ø
3/4"
ø3/
4"ø
1"ø1"ø
3/4"
ø3/
4"ø
1 1/4"ø1 1/4"ø
1/2"ø1/2"ø
1/2"ø 1/2"ø1"ø1"ø
21/
2"ø
11/
4"ø
1"ø1"ø
11/
2"ø
21/
2"ø
2 1/2"ø3/4"ø3/4"ø
3/4"ø 3/4"ø 3/4"ø
3/4"
ø
3/4"
ø
3/4"
ø
2 1/2"ø
11/
4"ø
1 1/4"ø 1"ø
6" RD-16" RD-2
1/2"ø 1/2"ø
1/2"
ø
RO RO
RO
L-1 WC-1
S-2
S-2S-2
WC-1
L-1
WC-1WC-1
L-1S-1
MS-1
S-2
L-1
3/4"ø3/4"ø3/4"ø
EWC-1
11/
2"ø
3/4"ø
1/2" CWDROP
1-1/2" SANITARY,1-1/2" VT FOR
EWC-1
3" SUMP DRAIN DOWNSPOUTNOZZLE 12" AFG
3" SUMP VT FRESH AIR FITTING24" AFG
104
103
124
116A 116B
117
126
125
123 122121
120119
118
128
127
129130132
133 131
136
137 135
134
6" RC DOWNSPOUTNOZZLE 12" AFG
2" F.D.
2" F.D.
2" F.D.
TIE DRAIN INTO TAILPIECE OF LAV DRAIN
2" F.D.
PRO
JECT
DA
TE
SHEE
TFR
OM
SHEE
T
ISSU
EDFO
R:
Stat
eB
ank
ofB
ottin
eau
Stat
eB
ank
ofBo
ttinu
eau
Bot
tinea
u,ND
PE13
043
02/2
7/14
ADD
M2.
3
1/8" = 1'-0"1 MAIN LEVEL PIPING PLAN (ADD M-2)
D175 CFM
D175 CFM
D200 CFM
18"x10"
6"x6"
6"x6"
8"x8
"
8"x8
"
8"x8
"8"
x8"
6"x4"
8"x1
0"
10"x10"
6"x8"
6"x8"
12"x10"
12"x10"
1/HP018
60 CFM
G12"X6"
L12"X6
"
B250 CFM B
250 CFM
B250 CFM
B250 CFM
J22"X22"
14"x10"
12"x10"8"x8"
8"x8"
8"x8" 8"x8"
18"x10"
5"x5" 8"x6"
5"x5"
8"x6
"
8"x8
"10
"x6"
8"x8
"
8"x6"
B150 CFM
F6"X6"
F6"X6"
2/HP030
4/HP018
B150 CFM
B150 CFM
K12"X12"
K12"X12"
8"x6"
150 CFM
150 CFM
8"x6"
8"x6"
10"x8"
12"x10"
10"x10"
10"x8"
10"x8"10"x8"
12"x
10" I
16"X16"6"x4"
50 CFM
I16"X16"
6"x4
"
8"x6"
8"x6
"
10"x10"50 CFM
3/HP018
12"x10"
I12"X12"I
12"X12"
50 CFM
M12"X12"
M12"X12"
10"x8"
B150 CFM B
150 CFM
12"x10"
10"x10"10"x8"
6"x6"
75 CFM75 CFM
GENERAL NOTES:1. PROVIDE TURNING VANES IN ALL 90 DEG. ELBOWS.2. PROVIDE HIGH EFFICIENCY TAKE-OFF ON ALL BRANCH DUCTS.
008
007
006005
002
012
010
001
004003
011
PRO
JECT
DA
TE
SHEE
TFR
OM
SHEE
T
ISSU
EDFO
R:
Stat
eB
ank
ofB
ottin
eau
Stat
eB
ank
ofBo
ttinu
eau
Bot
tinea
u,ND
PE13
043
02/2
7/14
ADD
M2.
4
1/8" = 1'-0"1 LOWER LEVEL HVAC PLAN (ADD M-2)
Stat
eB
ank
ofB
ottin
eau
Stat
eB
ank
ofB
ottin
ueau
Bot
tinea
u,N
D
PE13
043
02/2
7/14
ADD
M2.
5
Page 1 of 1
ADDENDUM E-2
February 27, 2014State Bank of BottineauBottineau, North DakotaProject #13043
PRAIRIE ENGINEERING, P.C.1905 17th Street SEMINOT, NORTH DAKOTA
THIS ADDENDUM SHALL BECOME A PART OF THE PLANS ANDSPECIFICATIONS AND ITS RECEIPT SHALL BE NOTED ON THE BID FORM.
SPECIFICATION ITEM#1. Section 270528 Voice/Data Rough-In
A. Delete Paragraph 1.1-B2
SPECIFICATION ITEM#2. Section 274133 TV Signal Cabling
A. 1.1-C Description of system: They system shall have the capability todistribution signals supplied by the local cable company ONLY.
B. Delete 2.2; 2.3; 2.6; and 2.7.
C. Part 3: Clarification: Installation shall be a home run cable from each locationback to the demark point where splitters shall be provided to distribute theserving utility’s signal.
ADDENDUM E1 CLARIFICATION: There are two separate PA systems in the building. TheConference room system and the Lobby System.
A. The conference room system shall not use the specified amplifier. Instead itshall use an Atlas Sound Model #PA1001G mounted to the projector mountingrod and taking input from the projector sound output. A secondary input toamplifier shall be the 1/8” phone jack in the cabinet (no RCA).
B. The Lobby system shall incorporate the specified amplifier located in the ITRoom. A remote source jack (1/8” phone) and a remote volume control shall bemounted on the column behind the teller line, adjacent the DMX lightingcontroller.
DRAWING ITEM #1. Include in price of electrical contract for removal of existing overheadservice lateral and utility pole that feeds the existing building. Otter Tail Power Company willremove pole and service lateral, electrical contractor shall include this cost in electrical bid.Contact Otter Tail Power Company for costs associated with removal of these items.
Printed: 2/27/2014
Plan Holders List PROJECT: JLG 12144 - State Bank of Bottineau
Owner Name: Pat Artz
Contractor Contract: Single or Multi-Prime
Bids Due (date/time): March 4th @ 2:00pm
Bids Due Location: 103 11th St E, Bottineau, ND
58318
PreBid WalkThru: None
Notice for Bids:
Mailed By:
Printed By:
Refundable Deposit: 250.00$
OWNER
State Bank of Bottineau Pat Artz x 2 2-12-14
ARCHITECT
JLG Architects Eric Hoffer 2705 4th ave NW Minot ND 58703 701-837-0302 701-852-4179 [email protected] 1 2-12-14
CONSULTANTS
civil Wold Engineering Matt Johnson
915 11th St E
Bottineau, ND 58318 701-228-2292 701-228-3938 [email protected] x 1 2-12-14
mechanical Prairie Engineering Tony Benham
1905 17th St SE
Minot, ND 58701 701-852-6363 701-839-7085 [email protected] x 1 2-12-14
structural CW Structural Mike Bentz
1000 E. Calgary Ave. Suite 2
Bismarck, ND 58503 701-204-0574 [email protected] x 1 2-12-14
electrical Prairie Engineering Bradly Gulbranson
1906 17th St SE
Minot, ND 58701 701-852-6363 701-839-7086 [email protected] x 1 2-12-14
CITY
City of Bottineau Clayton Parrill (building inspector) 1 2-25-14
CITY EXCHANGES
Bismark/Mandan [email protected] x
Fargo/Moorehead [email protected] x
Grand Forks [email protected] x
Minot [email protected] x 1 2-12-14
Sioux Falls, SD [email protected] x
Minneapolis/St Paul [email protected] xWilliston [email protected] xRapid City, SD [email protected] x
Dickinson [email protected] x
ADDITIONAL EXCHANGES
McGraw Hill [email protected] x
Reed Construction [email protected] x
GENERAL
David Parrill Construction David Parrill PO Box 347, Bottineau ND 58318 520-870-4514 [email protected] x 1 2-12-14
Northwest Contracting, Inc Wayne Doln 701-255-7727 [email protected] x 1 2-12-14
Boondocks Construction Adam Norling 218-689-1299 [email protected] x
OutContact# Drawing
Set (Full)E-mailAddress
Electronic/
FTP OnlyPhone Fax InPlanholders
Printed: 2/27/2014
OutContact# Drawing
Set (Full)E-mailAddress
Electronic/
FTP OnlyPhone Fax InPlanholders
Mike Swanson Mike Swanson 701-208-0705 [email protected] x 1 2-14-14
Mattson Construction Jerome Gruenberg 701-852-3293 [email protected] x
Rolac Construction Brian LaCount (701) 839-6525 [email protected] x
Comstock Construction Chad Mack 4511 15th Ave N, Fargo ND, 58102 701.277.3274 701-277-3256 [email protected] x 1 2-14-14
Pro-Mark Services Mandy Grant 45 21st ave E, Suite C 701-356-2618 701-356-2619 [email protected] x
Hight Construction Jay Hight PO Box 458, Minot ND 58702-5819 701-839-5819 1 2-18-14 2-26-14
First Dakota Enterprises Jedrey Baumann
1223 Sale Barn Road, PO Box 910,
Fort Pierre, SD 57532 605-223-9600 605-223-9511jedrey.baumann@firstdakotaenterprise
s.com x
T and J Plumbing Paul Milbrath 228-3994 [email protected] x
Bottineau Plumbing and Heating Donn Peck 228-2333 [email protected] x 1 2-24-14
Metigoshe Refrigeration Dean Oakland 263-5408 [email protected] x
Mowbray and Son Travis Mowbray 701-852-1491 [email protected] x
Minot Plumbing/Heating Dean Eman 701-838-8612 [email protected] x
C&C Plumbing Jamie Latch 701-852-8464 [email protected] x
FD Walsh's inc Debra Walsh
9976 County Road 49
Bottineau, ND 58318 701-228-3525 701-228-3525 [email protected] x 1 2-13-14
M.K. Electric Mike Foster 316 8th St E, Bottineau, ND 58318 701-228-3254 [email protected] x 1 2-18-14
Home and Electric Solutions Karsten Bartsch [email protected]
m x
Electric Solutions Chris Bristol 263-1548 [email protected] x
R and D Electric Dwight Tolstad 263-7015 [email protected] x
Wheeler Contracting Kevin Wheeler 321 66th Ave SW, Minot, ND 58701 (701) 852-5584 [email protected] 1 2-14-14
Outdoor Designs Brian Glintz 263-7168 or 7070 [email protected] x
EllieAnn's Susan Brandlord 228-2728 [email protected] x
St. Michaels Furniture Evan St. Michel 228-2208 [email protected] x
Troy Olson Troy Olson 228-2019 [email protected] x
Mikkelsen Aggregate Monte Mikkelsen 228-2233 [email protected] x
Indigo Sign Co. 852-0331 [email protected] x
Northern Exposure Lois Raymo 228-2343 [email protected] x
Bottineau Lumber Gayle College 228-3172 [email protected] x
Whetter Construction Joe Whetter 228-3416 [email protected] x
Lynnes Construction John Lynnes 201-1113 [email protected] x
Joe Grandbois Joe Grandbois 228-4444 [email protected] x
Profession Concrete Services Bruce Bullinger 228-2454 [email protected] x
Commercial Glass Todd 701-340-8728 [email protected] x
Pecks Spray Foam Rob Peck 701-201-0015 [email protected] x
TOTAL SETS PRINTED 18
MECHANICAL
ELECTRICAL
SUB CONTRACTORS / SUPPLIERS