Mike Stasiuk, P.Eng.Engineering CoordinatorJanuary 18, 2018

2018 Capital ConstructionCEA Partnering With Industry Symposium

City of Fort Saskatchewan Budget Process

• Two phase budgeting

• Phase 1: Design budget based on Class 5 estimate

• Phase 2: Construction budget based on Class 2 estimate developed during Phase 1

City Hall Space Development

• $700,000 – Design & Construction

• Scope includes design and construction of open-concept work space

Turner Park Playground Replacement

• $130,000 – Design & Construction

• Replacement of playground structure to meet CSA standards

Bulk Water Station Modernization

• $37,500 - Design

• Improvements to the existing Bulk Water Station

Local Road Rehabilitation

• $60,000 - Construction

• Rehabilitation of various streets and locations throughout Fort Saskatchewan

Neighbourhood Rehabilitation

• $2,000,000 - Design and Construction

• Rehabilitating a section of “Old Fort” to bring underground and surface infrastructure up to current standards

Water Reservoir Lifecycle Renewal

• $56,250 - Design

• Renewal of the water reservoir infrastructure over the next 3 years

Sump Pump Retrofit Program

• $300,000 - Construction

• Connecting homes to storm services to protect public and private property from water damage

Water Meter Replacement Project

• $2,900,000 (over 3 years) – Design & Construction

• Remote monitoring and monthly billing, includes meters and tower system

Point Aux Pins Road Upgrade

• $400,000 - Design and Construction

River Road Re-Alignment

• $400,000 - Design & Construction

Clover Park Secondary Access

• $500,000 - Design & Construction

119 Street & Highway 15 Intersection

Improvement (Pending)

• $2,000,000 - Construction

Questions?