ICT 2011 Reliability Assessment and Construction Plan Evaluation
Entergy Transmission SummitAugust 11, 2010SheratonNew Orleans, Louisiana
SPP.org 2
Overview
• Background
• Scope
• Draft Construction Plan
• Results
SPP.org 3
Background
• Reliability Assessment is performed pursuant to Entergy’s Open Access Transmission Tariff (OATT) Attachment K.
• Objectives:
• Assess of the ability of the Entergy transmission system to perform according to the Planning Criteria.
• Evaluate the Construction Plan’s ability to mitigate any performance deficiencies found.
• Provide basis for development of the Base Plan.
SPP.org 4
Background
SPP.org 5
Background
• Draft report was made available for stakeholder review and comment
• Posted on Entergy’s OASIS July 1, 2010
• Presentation made at LTTIWG July 21, 2010
• Final report is posted on Entergy’s OASIS.
• Detailed spreadsheets not included in report are posted on Entergy’s oasis
• Background models, data, and other information is posted on Entergy’s oasis
SPP.org 6
Entergy Planning Criteria
• Planning Criteria
• NERC Planning Standards
• SERC Supplements
• Entergy’s Local Planning Criteria
• Entergy’s Business Practices (Planning Guidelines)
• Posted on Entergy’s OASIS
• NERC Planning Standards being revised
SPP.org 7
Reliability Assessment Scope
• Models (2009 Series Update 1)
• Near-Term Period: Summer & Winter 2012 & 2016
• Longer-Term Period: Summer 2019
• Construction Plan Projects
1. Initial Scan: Approved Projects from 2010-12 Construction Plan (CP)
2. CP Evaluation: Approved and Proposed Projects from 2011-13 CP
• System Intact Review – Category A
• Contingency Scan – Category B
• Breaker-to-Breaker analysis
• ICT’s 100MW rule (Bus-to-Bus analysis)
SPP.org 8
Reliability Assessment Scope (cont)
• Sensitivities
• Specific Load Pocket Criteria
• Low Hydro Sensitivity
SPP.org 9
Entergy’s Draft Construction Plan 2011-2013
• May 7, 2010: Original Draft Posted
• July 28, 2010: Update 1 Posted
• 2 New Projects (1 replaced)
• 2 Delayed Projects
• 5 projects changed from Proposed to Approved
• 2010 BP and 2010-12 CP Differences Report
• No differences
SPP.org 10
Map Legend
Year Color Key
Overloads and Low VoltagesPlanned Upgrade from
Entergy’s Draft Construction Plan
Other Notes
Solution being investigated
Annotations
Contingency Scan Results with Entergy’s Draft Construction Plan Projects Included
Key to Map Highlights
SPP.org
Arkansas CPE Results
11
Brandon Hentschel
SPP.org 12
(2015)Calico Rock-Melbourne - Upgrade 161kV Line
(2016) Norfork-Calico Rock : Upgrade 161 kV Line
Holland Bottoms Project
SPP.org 13
(2019)Truman-Truman West- Upgrade 161 kV Line
SPP.org 14
Clarksdale op-guide
Helena Op-guide
(2016)AECC L&D 2 to Gillett: Construct new 115 kV Line
SPP.org 15
(2016)AECC L&D 2 to Gillett: Construct new 115 kV Line
SPP.org 16
(2016)Hot Springs Hamilton (Albright) - Bismarck: Construct new 115 kV Line and convert Bismarck and Mountain Pine South to ring bus stations. Add capacitor bank at Milton
SPP.org 17
(2019)Mayflower - Morgan 115 kV Line: Upgrade
(2016) NLR Westgate - NLR Levy: Reconductor 115 kV Line
(2016) NLR Levy - NLR Dixie: Reconductor 115 kV line
SPP.org 18
SPP.org 19
(2016) Monticello East to Reed construct new 115 kV line
SPP.org 20
(2016)Ebony SS 161 kV (Phase 2): Install, 24 MVAR capacitor bank
(2016)Getwell Area Improvements
SPP.org 21
Low Hydro
• Simulate reduced availability of SPA hydro units during summer peak (2012, 2016, and 2019)
• Conway (Arkansas) Area
• Little Rock
• Truman
SPP.org 22
Low Hydro (cont)
SPP.org 23
Low Hydro (cont)
SPP.org 24
Load Pocket Criteria
• 2016 Summer
• Application of Specific Load Pocket Criteria
• Western
• Amite South
• Downstream of Gypsy (DSG)
• G-1, N-1
• No new problems identified.
SPP.org
Mississippi CPE Results
25
Eric Burkey
SPP.org 26
(2016)Getwell Area Improvements:•Construct new 230 kV line from Getwell to new Senatobia Industrial 230-115 kV substation.•Add new 230-115 kV autotransformer at new Senatobia Industrial substation.•Cut in Senatobia to Sardis 115 kV line into new substation.
SPP.org 27
(2013)Ray Braswell - Wyndale 115kV Line
SPP.org 28
(2013)Ray Braswell - Wyndale 115kV Line
(2017)Braswell to Forest Hill 115 kV
Line Upgrade
(2014)Rankin Industrial – Airport 115 kV Line Upgrade
(Target)Upgrade South Jackson - East Jackson 115kV line
SPP.org 29
(2016)Lake Village Bagby to Reed 115
kV Line Upgrade
SPP.org
Louisiana CPE Results
30
James Lyle
SPP.org 31
Vatican-Scott 138kV
(2015)Vatican 138 kV Substation: Cut in Scott to Acadia 138 kV line to Vatican 138 kV, and add breakers at Vatican.
SPP.org 32
(2019) Champagne – Add 138kV Capacitor Bank
SPP.org 33
(2015) Port Hudson – Zachary REA 69kV Upgrade Line
(2014) Jackson – Tejac 69kV Line
(2014) McManus to Brady Heights – Upgrade 69kV Line
(2015) Port Hudson – 69kV Area Improvement
SPP.org 34
(2015) Coly Area Improvement – Upgrade 230/69kV Autotransformers
(2015) Port Hudson – Zachary REA 69kV Upgrade Line
(2014) McManus to Brady Heights – Upgrade 69kV Line
(2014) Jackson – Tejac 69kV Line
SPP.org 35
(2015) St. James – Add 230kV Capacitor Bank
(2016) Sorrento Upgrade 138/115kV Auto & upgrade Gonzales-Sorrento 138kV Line
SPP.org 36
Valcherie – Waterford 230kV
(2018) Raceland – Cut Waterford to Valentine 230kV line in/out of Raceland
SPP.org 37
Cleco Project: Var support
SPP.org 38
(2016) Mt. Olive to Arcadia – Construct new 230kV line (Operate at 115kV)
SPP.org 39
(2016) Mt. Olive to Arcadia – Construct new 230kV line (Operate at 115kV)
(2019) Arcadia to Sailes – Construct new 230kV line (Operate at 115kV)
SPP.org 40
Lake Charles Bulk Transformers
(2017) LC Bulk: Construct 230kV facilities & add 230/69kV Autotransformer
SPP.org 41
Chlomal - Lacassine
Canal-LA - Mossville
SPP.org
Texas CPE Results
42
Eddie Filat
SPP.org 43
Create normally open point at Batson
SPP.org 44
Create normally open point at Batson
SPP.org 45
Transfer of load from Atlantic Bulk 69 kV to the 230 kV system at Gulfway.
SPP.org 46
(2016) China – Stowell 138 kV Line
South Beaumont to Lovells Lake
SPP.org 47
(2016) Conroe Area Switching Station
SPP.org 48
(2015) Upgrade Jacinto-Splendora 138 kV Line
SPP.org 49
(2012) New Caney capacitor bank expansion
(2018) Expand cap bank at Dayton Bulk