Page 1: Henderson Mine Site

Henderson Mine Site

Page 2: Henderson Mine Site

Henderson Mine

Page 3: Henderson Mine Site

Central Campus

Shaft CollarElev 10,400 ft

Shaft BottomElev 7,500 ft

LA Ramp

Primary Access Ramp3600 ft

Central CampusElev. 6,750 ft(4200 mwe)

Secondary Access Ramp3200 ft

Fresh air Exhaust air

To crusher

Harrison Mt.Elev. 12,300 ft

UNO

Page 4: Henderson Mine Site

Central CampusElev. 6750 ft(4200 mwe)

Midway CampusElev. 5825 ft(5100 mwe)

Lower CampusElev. 4900 ft(6000 mwe)

EarthLab/GeoscienceArea

Deep Access

Internal Shaft

Page 5: Henderson Mine Site

Preliminary Cost Estimates(Excluding UNO)

Page 6: Henderson Mine Site

Preliminary Time Schedule(Excluding UNO)

Page 7: Henderson Mine Site

UNO Preliminary Cost Estimates

Page 8: Henderson Mine Site

Equipment and Excavation Techniques

Page 9: Henderson Mine Site

2.3.1 Conventional Development

Basic drilling cycle for drill and blast drifting and tunneling:

•Surveying and setup•Drilling•Charging•Blasting•Ventilation•Scaling•Mucking•Scaling•Bolting

Page 10: Henderson Mine Site

3 Boom Drill Jumbo

Page 11: Henderson Mine Site

LHD

Page 12: Henderson Mine Site

Development Haul Truck

Page 13: Henderson Mine Site

Raise Drill Operating Cycle

Page 14: Henderson Mine Site

Sandvik TamrockRock World, 2/2001

Drilling the ventilation raises at the Kiruna Mine, 1998

Page 15: Henderson Mine Site

Shaft Widening by Drill and Blast

Page 16: Henderson Mine Site

Shaft Boring Machine (Wirth)

V-mole method

Raise bored pilot hole 1.8 to 2.4 m diameter.

Ream shaft to up to 8.5 m diameter.

Limited by maximum length raise bored hole, currently 1,300 m.

7.5 m day average