GROUP TECHNOLOGY
April 22, 2023 2
April 22, 2023 3
HISTORY OF GROUP TECHNOLOGY
•In 1925, R.Flanders presented a paper at American Society of Mechanical Engineers (USA) in which he described a way of organizing manufacturing at Jones and Lamson Machine Company.•In 1937, A.Sokolovskiy (USSR) proposed that parts having similar configuration can be produced by standard sequences. •In 1949, A.Korling (Sweden) presented a paper called “Group Production”. In this paper he described how to decentralize the work into independent groups.•H.Optiz in Germany developed the well-known parts classification and coding system for machined parts that bears his name.•In the United States, the first application of group technology was at the Langston D1-vision of Harris-Intertype in New Jersey around 1969.
April 22, 2023 4
April 22, 2023 5
April 22, 2023 6
April 22, 2023 7
April 22, 2023 8
April 22, 2023 9
April 22, 2023 10
April 22, 2023 11
April 22, 2023 12
April 22, 2023 13
April 22, 2023 14
April 22, 2023 15
April 22, 2023 16
April 22, 2023 17
April 22, 2023 18
April 22, 2023 19
April 22, 2023 20
April 22, 2023 21
April 22, 2023 22
April 22, 2023 23
April 22, 2023 24
PRODUCTION FLOW ANALYSIS (PFA)
Production Flow Analysis is the method of identifying part families and associated machine groupings that uses the information contained on production route sheet rather than on part drawings (Design)
Strategy:1. Parts having similar design having different manufacturing
routes.2. Parts having different design having similar manufacturing
routes.
April 22, 2023 25
PROCEDURES IN PFA
DATA COLLECTION
SORTATION OF PROCESS ROUTES
PFA CHART
CLUSTER ANALYSIS
April 22, 2023 26
April 22, 2023 27
April 22, 2023 28
April 22, 2023 29
April 22, 2023 30
April 22, 2023 31
April 22, 2023 32
April 22, 2023 33
April 22, 2023 34
April 22, 2023 35
April 22, 2023 36
April 22, 2023 37
April 22, 2023 38
April 22, 2023 39
April 22, 2023 40
April 22, 2023 41
April 22, 2023 42
April 22, 2023 43
April 22, 2023 44
April 22, 2023 45
April 22, 2023 46
April 22, 2023 47
April 22, 2023 48
April 22, 2023 49
1. Grouping of parts and machines into families.
2. Arranging the machines into group technology cell.
Grouping parts and machines by Rank Order Clustering:The rank order clustering technique is specifically applicable in production flow analysis. It is an efficient and easy-to-use algorithm for grouping machines into cells.
April 22, 2023 50
April 22, 2023 51
1x28+0x27+0x26+1x25+0x24+0x23+0x22+1x21+0x20= 256+32+2= 290
April 22, 2023 52
April 22, 2023 53
April 22, 2023 54
April 22, 2023 55
April 22, 2023 56
April 22, 2023 57
April 22, 2023 58
ARRANGING MACHINES IN A G.T CELL
After part-machine groupings have he en identified by rank
order clustering or other method. the next problem is to
organize the machines into the most logical arrangement. Two
simple yet effective methods suggested by Hollier
April 22, 2023 59
FROM
TO
1 2 3 4
1 0 5 0 25
2 30 0 0 15
3 10 40 0 0
4 10 0 0 0
FROM
TO From Sum
1 2 3 4
1 0 5 0 25 30
2 30 0 0 15 45
3 10 40 0 0 50
4 10 0 0 0 10
To sum
50 45 0 40
April 22, 2023 60
FROM
TO From Sum
1 2 4
1 0 5 25 30
2 30 0 15 45
4 10 0 0 10
To sum
40 05 40
FROM
TO From Sum
1 4
1 0 25 25
4 10 0 10
To sum 10 25
April 22, 2023 61
Tie breaker rules:Minimum “To sum” value machine should be place at the beginning of the sequence.a) If a tie occurs between minimum "To" sums or minimum
"From" sums, then the machine with the minimum "From/To" ratio is selected.
b) If both "To" and "From" sums are equal for a selected machine, it is passed over and the machine with the next lowest sum is selected.
c) If a minimum "To" sum is equal to a minimum "From" sum, then both machines are selected and placed at the beginning and end of the sequence, respectively.
Result:3 2 1 4
April 22, 2023 62
FROM
TO From Sum
From/To sum
1 2 3 4
1 0 5 0 25 30 0.60
2 30 0 0 15 45 1.0
3 10 40 0 0 50 Infinity
4 10 0 0 0 10 0.25
To sum
50 45 0 40 135
In Hollier method II, High “From/To” ratio machine should be place at the beginning.
April 22, 2023 63
Performance Measures for Alternative Machine Sequence in II GT
Number of in-sequence move = 40+30+25= 95Number of backtracking move = 5+10= 15 Percentage of in-sequence move = 95/135 = 70.4%Percentage of backtracking move = 15/135 = 11.1%