STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
For State Fiscal Years 2014-2017
MAY 2013
Jerry Wray, Director
Ohio Department of Transportation
1980 West Broad Street
Columbus, Ohio 43223
THE OHIO DEPARTMENT OF TRANSPORTATION
WWW.TRANSPORTATION.OHIO.GOV
ODOT 2014-2017 STIP Page 1
Table of Contents
INTRODUCTION AND OVERVIEW OF THE STIP ........................................................................................... 2
Section 1: STIP DEVELOPMENT PROCESS & PUBLIC INVOLVEMENT........................................................... 8
Section 2: ONGOING MAINTENANCE OF THE STIP .................................................................................... 8
Section 3: AIR QUALITY CONFORMITY .................................................................................................... 10
Section 4: ENVIRONMENTAL JUSTICE .................................................................................................... 17
Section 5: SFY 2012-2015 STIP STATUS ................................................................................................... 24
Section 6: ODOT CAPTIAL PROGRAMS .................................................................................................... 26
Section 7: TRANSIT ................................................................................................................................. 34
Section 8: OPERATION AND MAINTENANCE ........................................................................................... 35
Section 9: FINANCE ................................................................................................................................ 36
List of Tables
Table 1: OHIO AIR QUALITY AREAS - ATTAINMENT STATUS .................................................................... 13
Table 2: OHIO 2014-2017 STIP/TIP AIR QUALITY CONFORMITY STRATEGY .............................................. 14
Table 3: ENVIRONMENTAL JUSTICE ANALYSIS......................................................................................... 23
Table 4: SFY 2012-2013 PROGRAM BY ODOT DISTRICT ........................................................................... 24
Table 5: REGIONALLY SIGNIFICANT PROJECTS......................................................................................... 25
Table 6: FHWA EASTERN FEDERAL LANDS HIGHWAY DIVISION PROJECT LIST.......................................... 31
Table 7: GUIDE TO DOCUMENTS ............................................................................................................ 32
Table 8: CAPITAL PROGRAM BUDGET ..................................................................................................... 35
Table 9: NEW ADVANCED CONSTRUCTION BY STATE FISCAL YEAR .......................................................... 40
Table 10: 2014 STIP LONG TERM ADVANCED CONSTRUCTION PROJECT SUMMARY................................ 41
Table 11: STIP FISCAL ANALYSIS .............................................................................................................. 45
List of Maps & Charts
Map 1: OHIO MPO BOUNDARIES .............................................................................................................. 3
Map 2: ODOT DISTRICT MAP .................................................................................................................... 4
Map 3: OHIO AIR QUALITY AREAS........................................................................................................... 15
Map 4: 1997 8-HOUR OZONE STANDARD ............................................................................................... 16
Map 5: STATE ENVIRONMENTAL JUSTICE – LOW INCOME ...................................................................... 19
Map 6: STATE ENVIRONMENTAL JUSTICE WITH PROJECTS – LOW INCOME ............................................ 20
Map 7: STATE ENVIRONMENTAL JUSTICE – MINORITY POPULATION ...................................................... 21
Map 8: STATE ENVIRONMENTAL JUSTICE WITH PROJECTS – MINORITY POPULATION............................. 22
Chart 1: ODOT BIENNIUM CAPTIAL BUDGET BY PROGRAM..................................................................... 33
Chart 2: ODOT REVENUE BY SOURCE ...................................................................................................... 44
List of Appendices
Appendix 1: 2014-2017 STATEWIDE LINE ITEMS ...................................................................................... 47
Appendix 2: ENVIRONMENTAL JUSTICE .................................................................................................. 52
Appendix 3: PUBLIC INVOLVEMENT PROCESS ......................................................................................... 80
Appendix 4: 2012-2015 STIP CARRY FORWARD LIST ............................................................................... 84
Appendix 5: 2014-2017 STIP PROJECT LIST AND GUIDE......................................................................... 126
ODOT 2014-2017 STIP Page 2
INTRODUCTION AND OVERVIEW OF THE STIP
The Statewide Transportation Improvement Program (STIP) is a coordination and funding document developed by state and local governments and authorities in the Metropolitan Planning Organizations (MPOs). The STIP is a four year document that identifies the funding for and scheduling of transportation projects and programs. This document provides an overview of Ohio’s STIP for Fiscal Years (FY) 2014 through 2017 (July 1, 2013 through June 30, 2017). Included herein are details on federal and state requirements and regulations. The STIP has two main purposes. First, it presents the fiscally balanced, multimodal, transportation program for the state of Ohio including projects funded with federal, state, and local resources. Second, it serves as the reference document required for use by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) in approving the use of federal funds for transportation projects in Ohio. The STIP is also designed to document how decisions are made regarding which projects will be funded to ensure an integrated statewide transportation plan; and how the Ohio Department of Transportation (ODOT) will manage the use of those funds over the course of the period covered by the STIP. Finally, the STIP is designed to document analyses of the overall transportation program that demonstrates how the group of projects meets constraints and regulations required by federal law. Analysis of the implications of this program for low income and minority persons in our region (environmental justice) and the impact of the program for air quality are required. The relationship to other federal regulations is also discussed. The requirement for a STIP for all areas of the State was originally established under the federal Intermodal Surface Transportation Act (ISTEA) of 1991 and was reestablished in the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) that was enacted by Congress and signed into law on August 10, 2005. SAFETEA-LU stipulates that the capital and non-capital transportation projects proposed for funding under Title 23 (highways) and Title 49 (transit) of the U.S. Code as well as all regionally significant transportation projects requiring an action by FHWA or FTA must be on the STIP in order to be eligible for funding. The requirements for the STIP continue under the Moving Ahead for Progress in the 21st Century Act (MAP-21) signed into law on July 6, 2012. In general, the STIP is developed with inclusion of the State’s 17 Metropolitan Planning Organizations’ (as shown in Map 1) Transportation Improvement Programs (TIPs) in their entirety and the inclusion of the non-metropolitan projects, developed in consultation with local governments in accordance with ODOT’s Rural Consultation Process. Only transportation projects and phases that use federal aid or projects of regional significance are required to be included in the STIP.
ODOT 2014-2017 STIP Page 3
Map 1
ODOT 2014-2017 STIP Page 4
Map 2
ODOT District Map
ODOT 2014-2017 STIP Page 5
Federal Requirements The requirements and regulations for the STIP and the MPO TIPs are summarized below and addressed within this document. MAP-21: On July 6, 2012, the Moving Ahead for Progress in the 21st Century Act (MAP-21) was signed into law. It builds on and refines many of the highway, transit, bike and pedestrian programs and policies established in 1991. MAP-21 creates a streamlined, performance-based, multimodal program to address the many challenges facing the U.S. transportation system. These challenges include improving safety, maintaining infrastructure condition, reducing traffic congestion, improving efficiency of the system and freight movement, protecting the environment, and reducing delays in project delivery. Map 21 continues the requirements for a STIP that was originally established in 1991. For additional information, visit http://www.fhwa.dot.gov/map21/. Time Period: The STIP shall cover no less than a four year period and be updated at least every four years. The financial tables and project tables included in this document cover State FYs 2014-2017. ODOT and the MPOs have established a two year update cycle. Public Involvement: The STIP process shall provide opportunity for public review and comment on the STIP. Section 1 of this document summarizes the public participation process. Detailed discussion regarding public involvement that took place for the 2014-2017 STIP is located in Appendix 3. Specific Project Information: The STIP is responsible to list capital and non-capital surface transportation projects that use a variety of federal funds or regionally significant projects requiring FHWA or FTA action. For each project, or project phase, the STIP shall include sufficient descriptive material including work type, termini, length, total estimated cost, estimated amount of federal funds, and responsible agency. Occasionally, line items may be used for projects that are not considered to be of appropriate scale for individual identification. The detailed project listing organized by county, route, and section in Appendix 5 provides complete detail for each project. Consistency with the Transportation Plan: Each project or project phase in the STIP shall be consistent with ODOT’s Transportation Plan, ACCESS OHIO, as reestablished under MAP-21. Financial Plan: The STIP shall include a financial plan including system-level estimates of costs and revenue sources that are reasonably expected to be available to adequately operate and maintain Federal-aid highways and public transportation. Section 9 of this document discusses the expected financial resources and Table 9 summarizes the STIP fiscal balance. Air Quality Conformity: The conformity process assures that federally supported highways and transit activities identified in Transportation Plans, Programs (this STIP) and projects are consistent with the purpose of the State Air Quality Implementation Plan (SIP). In Section 3 you will find detailed information on Ohio’s air quality. Environmental Justice: The STIP shall document that the implementation of the Statewide Transportation Improvement Program does not disproportionally affect targeted populations. ODOT’s Environmental Justice Analyses is documented in Section 4. Additional map analysis is available in Appendix 2.
ODOT 2014-2017 STIP Page 6
Self-Certification: ODOT certifies to FHWA and FTA that its comprehensive planning process is conducted in accordance with the following federal regulations:
1. 23 U.S.C. 134 and 135, 49 U.S.C. 5303 and 5304, and this part; 2. Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C. 2000d-1) and 49 CFR part
21; 3. 49 U.S.C. 5332, prohibiting discrimination on the basis of race, color, creed, national
origin, sec, or age in employment or business opportunity; 4. Section 1101(b) of the SAFETEA-LU (Pub. L. 109-59) and 49 CFR part 26 regarding the
involvement of disadvantaged business enterprises in USDOT funded projects; 5. 23 CFR part 230, regarding implementation of an equal employment opportunity program
on Federal and Federal-Aid highway construction contracts; 6. The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.)
and 49 CFR parts 27, 37, and 38; 7. Sections 174 and 176 (c) and (d) of the Clean Air Act, as amended (42 U.S.C. 7504, 7506
(c) and (d)) and 40 CFR part 93; 8. The Older Americans Act, as amended (42 U.S.C. 6101), prohibiting discrimination on the
basis of age in programs or activities receiving Federal financial assistance; 9. Section 324 of title 23 U.S.C., regarding the prohibition of discrimination based on gender;
and 10. Section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794) and 49 CFR part 27
regarding discrimination against individuals with disabilities.
ODOT 2014-2017 STIP Page 7
OHIO’S TRANSPORTATION SYSTEM Highways
� Ohio is a single day’s drive from 60 percent of U.S. and Canadian population. � Ohio has the nation’s 4th largest interstate system with 6,700 lane miles. � Ohio has the nation’s 2nd largest total number of bridges with 43,412. � Trucks moved 936 million tons of freight on Ohio’s roadways valued at $1.67 trillion in
2007. Maritime
� 716 miles of navigable waterways are along the Ohio border. � Ohio is 8th in the Nation for total water tonnage moved. � Ohio’s maritime ports and river terminals handle over 103 million tons of commodities
valued at $11 billion worth of cargo per year. � Ohio annually moves more freight by water than flows through the Panama Canal. � Ohio’s 26 ports have a $6.5 billion annual impact on the state’s economy.
Public Transit � Ohio has the 12th highest transit ridership in the nation. � Ohio has 27 urban and 34 rural transit systems. � Ohio’s transit systems provide an estimated 500,000 rides each work day.
Freight Rail � Ohio is 4th in the nation with 5,286 total active rail miles. � Ohio has intermodal connections to both CSX National Gateway and Norfolk Southern
Heartland Corridor. � Ohio has the 6th largest number of railroad companies. � Ohio is 8th in the U.S. for rail tons originating by state.
Aviation � Ohio has 157 public use general aviation airports. � Ohio’s six commercial airports average 11 million passengers each year. � Ohio’s aviation industry contributes over $10 billion in economic activity and helps create
more than 142,000 jobs in the state.
Bicycle/Pedestrian � Ohio has more than 3,000 miles of designated bike paths � Ohio has an estimated 4 million bicycle owners � Cleveland is the 39th best city for biking, according to Bicycling Magazine � Columbus is ranked 20th in the nation for miles of multi-use paths
ODOT 2014-2017 STIP Page 8
1. STIP DEVELOPMENT PROCESS AND PUBLIC INVOLVEMENT In carrying out a continuing, cooperative, and comprehensive planning effort, ODOT is responsible to represent the state’s perspective in the consensus building process that leads towards identification of statewide transportation needs, solutions, and priorities. This is completed by ongoing evaluations of existing programs and diagnosis of established needs and priorities. Continual coordination between ODOT, MPOs, transit authorities, local governments, and other stake holders through active public participation is an important element in preparation for the STIP. Consultation with the non-metropolitan areas’ local government officials is an integral part of the development of ODOT’s rural projects. In the metropolitan areas, the MPOs collaborate with ODOT and local governments in the solicitation projects. Public participation is conducted after the draft STIP is prepared and is completed prior to the submittal of the STIP to FHWA and FTA. Details of the public participation process are available in Appendix 3. Draft STIP A draft STIP is prepared that considers all information received from ODOT, local governments, MPOs, transit authorities, and the general public. This draft is fiscally balanced for the statewide programs. In April the draft STIP is made available for a two week period for public review and comment in various locations throughout the state. During the public review period ODOT will host Open Houses statewide for all interested parties to attend and provide comment. Final STIP After the public review period all comments received will be reviewed and considered for inclusion into the Final STIP. If no new major corrections have been made, the STIP will be submitted to FHWA and FTA. FHWA will coordinate the air quality conformity review and approval with the U.S. EPA. 2. ONGOING MAINTENANCE OF THE STIP The STIP is a dynamic schedule of agreed upon priority programs and projects that ODOT and its partners will work to accomplish over the next four years. The STIP is reviewed regularly and adjustments are made based upon the ability of resources to accomplish the projects, the costs for the projects, and the changing needs of the transportation system. ODOT may make minor changes to the STIP (defined below) through administrative modifications and all other changes through a formal amendment process. The following procedures are applicable for processing changes (both administrative modifications and formal amendments) to the STIP. In accordance with the provisions of 23 CFR (Code of Federal Regulations) 450, TIPs developed by MPOs are incorporated into the STIP and therefore subject to these procedures. Amendments and Administrative Modification Procedures In accordance with 23 CFR 450.216(c), projects in any of the four years of the STIP may be moved to any of the other four years of the STIP subject to the project selection requirements of 23 CFR 450.222. Such modifications do not require approval, provided expedited project
ODOT 2014-2017 STIP Page 9
selection procedures have been adopted in accordance with 23 CFR 450.332 and the required interagency consultation or coordination is accomplished and documented. Definitions Administrative Modifications are minor changes to the STIP/ TIP that:
• Revise a project description without significant change to the project scope or conflict with the environmental document;
• Revise the project phase funding amount within 20 percent of the cost listed in the STIP for transit projects;
• Revise the project phase funding amount listed in the STIP within the following limits for highway projects:
Current Project Phase Cost Change in Project Phase Cost $1-$999,999 50 percent of the phase cost $1,000,000-$4,999,999 30 percent of the phase cost $5,000,000 and above 20 percent of the phase cost
• Change the source of funds (change from state to federal or change in type of federal funds);
• Change a project lead agency;
• Split or combine individually listed projects as long as independent utility and logical termini are maintained;
• Change the funding type(s) for individual statewide line items.
Administrative modifications can be processed in accordance with these procedures and the procedures described in 23 CFR 450 and 49 CFR 613, provided that:
• It does not affect the air quality conformity determination, including timely implementation of Transportation Control Measures (TCMs), and
• It does not impact financial constraint.
Amendments or formal amendments are all other modifications to the STIP/TIP that are not Administrative Modifications. Procedures: Administrative Modifications:
Each MPO may elect to adopt procedures for administrative modifications which are the same as the procedures described above or more restrictive. An MPO may elect not to process any TIP changes as administrative modifications and as a result all changes would be processed as amendments. Each MPO-approved administrative modification will be forwarded to ODOT Office of Systems Planning and Program Management through the appropriate ODOT District office for approval on behalf of the Governor. The MPO Board may delegate approval of Administrative Modifications to the MPO’s Executive Director. If the MPO Board delegates approval of Administrative Modifications to the Executive Director, the MPO will need to provide copies of the delegation to ODOT.
ODOT 2014-2017 STIP Page 10
Once approved by ODOT, on behalf of the Governor, the Administrative Modification will be incorporated into Ohio's STIP and no Federal action will be required. ODOT will notify the MPO of the approved administrative modification, and provide a copy of the approved administrative modification to FHWA and FTA.
Amendments (Formal Amendments):
Amendments to the Ohio STIP must be developed in accordance with the provisions of 23 CFR 450.326 and/or 23 CFR 450.216, and approved by the Federal agencies (FHWA and FTA) in accordance with 23 CFR 450.220. Each approved MPO TIP amendment will be forwarded to ODOT Office of Systems Planning and Program Management through the appropriate ODOT District office for approval on behalf of the Governor. Once approved by ODOT, on behalf of the Governor, ODOT will forward the amendment to FHWA or FTA for federal approval according to the established submittal schedule. Once approved by FHWA or FTA, the amendment will be incorporated into Ohio's STIP.
Dispute Resolution: If a question arises on the interpretation of the definition of an administrative action (administrative modification or formal amendment), ODOT, the MPO, FHWA, and FTA (the parties) will consult with each other to resolve the question. If after consultation, the parties disagree on the definition of what constitutes an administrative modification, the final decision rests with FTA for transit projects and FHWA for highway projects. Statewide Line Items Projects that are not considered to be of appropriate scale for individual identification in a given year may be grouped by function, work type, and/or geographical area. In non-attainment areas these projects must be consistent with the “exempt project” classifications. In addition, projects that are not regionally significant may be grouped in one line item or identified individually in the STIP. Appendix 1 is a table outlining ODOT’s available statewide line items.
3. AIR QUALITY CONFORMITY
The US Environmental Protection Agency (US EPA) establishes National Ambient Air Quality Standards (NAAQS) for the entire United States. US EPA has established standards for a variety of pollutants, including transportation sector related ozone, carbon monoxide, particulate matter, and nitrogen dioxide pollutants. US EPA, through its partner state air quality agencies, monitors actual localized (regional) pollutant levels to assure that all areas of the nation are meeting and maintain the national air quality standards. If, through US EPA’s monitoring, a particular region of the nation is identified as not meeting an individual air quality standard, US EPA designates the region as a Nonattainment Area. Following a nonattainment designation, the affected state and region are required to develop a plan recording the pollution reduction strategies that will be implemented to enable the region to meet and maintain the air quality standard. This plan is referenced as a State Implementation Plan (SIP). The SIP quantifies needed pollutant emission contributions from three principal sectors of
ODOT 2014-2017 STIP Page 11
the economy – transportation, industry, and consumer activity. Once an area subsequently begins meeting the standard, US EPA re-designates the affected region as a Maintenance Area. Ohio includes designated nonattainment and maintenance areas for four separate US EPA air quality standards: 1997 8-Hour Ozone, 2008 8-Hour Ozone, Annual Small Particulates (PM2.5), and Daily Small Particulates (PM2.5) (Refer to Table 1 and Map 3 below). The 1997 8-Hour Ozone standard is set to be revoked effective July 20, 2013 (Refer to Map 4). After this standard is revoked three air quality areas (Toledo, Youngstown, and Lima) will no longer be considered air quality areas. Joint US EPA and US DOT regulations, embodied in 40 CFR 93, establish and define the linkage between transportation system investments and the SIP process for meeting and maintaining the national air quality standards. The regulations identify a process called Transportation Conformity, whereby US DOT funded or approved projects in air quality nonattainment and maintenance areas are analyzed to demonstrate their consistency with the SIP. The conformity process assures that federally supported highway and transit activities identified in Transportation Plans, Programs (this STIP), and projects “are consistent with (conform to) the purpose of the state air quality implementation plan (SIP). Conformity to the purpose of the SIP means that transportation activities will not cause new air quality violations, worsen existing violations, or delay timely attainment of the relevant national ambient air quality standards (NAAQS).” US DOT must issue a formal Conformity Determination for nonattainment and maintenance area MPO Transportation Plans and the STIP (inclusive of MPO TIPs) concurrent with approving the STIP and prior to approving federal funding for “regionally significant” (capacity additions) transportation system improvement projects identified in the STIP. Conformity for MPO Transportation Plans and Programs (this STIP) is established based on analyses of estimated aggregate regional emissions of vehicles traveling the transportation networks documented in Transportation Plans and the STIP. The aggregate Plan/STIP networks emissions (pollution) estimates are then compared to maximum allowable emission thresholds identified in the SIP. Conformity is demonstrated when the Plan/STIP emissions are below the SIP emissions thresholds. Project level conformity analyses are performed separately and are typically documented federally required environmental publications. Ohio’s Ozone and PM2.5 nonattainment and maintenance areas are concentrated around Ohio’s major metropolitan regions. The areas’ geography boundaries, however, include both counties that are within the boundaries of an Ohio MPO and non-MPO area (rural) counties. This geography results in projects necessitating air quality conformity analyses being recorded in both the MPO TIPS and in non-MPO counties, the STIP. Similarly, the resulting conformity analyses combine both MPO and non-MPO geography and data inputs to develop emissions data needed to provide complete geographic coverage for each Ohio nonattainment/maintenance area conformity demonstration. ODOT and the affected MPOs engage in extensive consultation and coordination to complete the conformity demonstrations. The complete air quality conformity documentation for each Ohio nonattainment/maintenance area is included in the affected MPO TIP. See Table 1 below identifying the nonattainment/maintenance areas and the affected MPOs. Every MPO that has air quality nonattainment or maintenance geography inside the organizations planning boundary is required to show conformity for each Transportation Plan update and TIP. The latest conformity analysis performed for a MPO’s Transportation Plan is typically utilized for the TIP air quality analysis given that no projects have changed the year open for construction during the TIP time period. Twelve MPOs will rely on previous emissions analysis from the last
ODOT 2014-2017 STIP Page 12
Transportation Plan update (Cincinnati, Dayton, Lima, Parkersburg, Springfield, Toledo, Steubenville, Wheeling, Akron, Canton, Youngstown, and Cleveland). Four of these emissions analysis will occur in the second half of FY 2014 (Akron, Canton, Youngstown, and Cleveland). MORPC (Columbus) and LCATS (Newark) will perform a new air quality analysis for their FY 2014-2017. One of Ohio’s MPOs does not have any air quality nonattainment or maintenance areas within their geography (Mansfield). Sandusky has a small air quality area within their planning boundary; however, it’s covered by the Cleveland air quality analysis. Huntington is an air quality area; but, because of a SIP mobile sources insignificance finding, they are not required to demonstrate conformity for the TIP. Note: ODOT consulted electronically with its District partners to identify regionally significant projects for non-MPO areas. ODOT Districts 4, 5, 6, 8, 9, 10, and 11 all confirmed that no regionally significant projects in their rural air quality geographies are programmed for 2014-2017.
ODOT 2014-2017 STIP Page 13
Table 1 OHIO AIR QUALITY AREAS - ATTAINMENT STATUS
Air Quality Area Geography MPOOzone
1997 Standard
Ozone
2008 Standard
Annual PM2.5
1997 Standard
24 Hr PM2.5
2006 Standard
Canton Stark Co. SCATS Maintenance Nonattainment Nonattainment
Cleveland-Akron Ashtabula Co. non-MPO Maintenance Nonattainment
Ashtabula Co. (P)
Ashtabula Twp .non-MPO Nonattainment
Cuyahoga Co. NOACA Maintenance Nonattainment Nonattainment Nonattainment
Geauga Co. NOACA Maintenance Nonattainment
Lake Co. NOACA Maintenance Nonattainment Nonattainment Nonattainment
Lorain Co. NOACA Maintenance Nonattainment Nonattainment Nonattainment
Medina Co. NOACA Maintenance Nonattainment Nonattainment Nonattainment
Portage Co. AMATS Maintenance Nonattainment Nonattainment Nonattainment
Summit Co. AMATS Maintenance Nonattainment Nonattainment Nonattainment
Cincinnati Butler Co. OKI Maintenance Nonattainment Nonattainment
Clermont Co. OKI Maintenance Nonattainment Nonattainment
Clinton Co. non-MPO Maintenance Nonattainment
Hamilton Co. OKI Maintenance Nonattainment Nonattainment
Warren Co. OKI Maintenance Nonattainment Nonattainment
Columbus-Newark Delaware Co. MORPC Maintenance Nonattainment Nonattainment
Fairfield Co. non-MPO Maintenance Nonattainment Nonattainment
Franklin Co. MORPC Maintenance Nonattainment Nonattainment
Knox Co. non-MPO Maintenance Nonattainment
Licking Co. LCATS Maintenance Nonattainment Nonattainment
Madison Co. non-MPO Maintenance Nonattainment
Coshocton Co. (P)
Franklin Twp.non-MPO Nonattainment
Dayton-Springfield Clark Co. CCS-TCC Maintenance Nonattainment
Greene Co. MVRPC Maintenance Nonattainment
Miami Co. MVRPC Maintenance
Montgomery Co. MVRPC Maintenance Nonattainment
Huntington-Ashland-
Ironton
Adams Co (P)
Monroe Twp.,
Sprigg Twp.
non-MPO Nonattainment1
Gallia Co (P)
Cheshire Twp .non-MPO Nonattainment
1
Lawrence Co. KYOVA Nonattainment1
Scioto Co. non-MPO Nonattainment1
Lima Allen Co. LACRPC Maintenance
Parkersburg-Marietta Washington Co. WWW Maintenance Nonattainment1
Steubenville-Weirton Jefferson Co. BHJ Maintenance Nonattainment Nonattainment
Toledo Lucas Co. TMACOG Maintenance
Wood Co. TMACOG Maintenance
Wheeling-Bridgeport Belmont Co. Bel-O-Mar Maintenance Nonattainment
Youngstown Columbiana Co. non-MPO Maintenance
Mahoning Co. Eastgate Maintenance
Trumbull Co. Eastgate Maintenance
Pollutant/Attainment Status
1. US EPA regional motor vehicle emissions insignificant findings - Oct. 23, 2009. Areas exempt from regional transportation conformity.
Project level conformity requirement remains.
ODOT 2014-2017 STIP Page 14
Ohio 2014-2017 STIP/TIP Air Quality Conformity Strategy Existing
Conformity
Determination
Pending T-Plan
Conformity
Dates
2014-2017 TIP Conformity
StrategyComments
Akron 1/3/13 6/15/13 Previous Emissions Analyses
AMATS T-Plan Update scheduled for a 6/15/13 conformity action / 14-17 TIP
consistent with T-Plan
Canton 7/1/11 6/15/13 Previous Emissions Analyses
SCATS T-Plan Update scheduled for a 6/15/13 conformity action / 14-17 TIP
consistent with T-Plan
Cincinnati 8/1/12 Previous Emissions Analyses
OKI 2040 T-Plan Amendment #1 2/19/2013 conformity determination is
consistent with 14-17 TIP
Cleveland 1/3/13 6/15/13 Previous Emissions Analyses
NOACA T-Plan Update scheduled for a 6/15/13 conformity action / 14-17 TIP
consistent with T-Plan
Columbus 6/26/12 New Emissions Analyses
New emissions analysis wil l be conducted for plan amendment and 14-17 TIP
(concurrently)
Dayton 6/26/12 Previous Emissions Analyses MVRPC 14-17 TIP consistent with 6/26/12 T-Plan conformity analyses
Huntington 7/1/11 Ohio - NA Ohio PM 2.5 SIP insignificance finding
Lima 7/1/11 N/A Previous Emissions AnalysesLACRPC's quadrennial T-Plan update due 8/24/13. 1997 Ozone standard
revocation date 7/20/13.
Mansfield N/A N/A
Newark 6/26/12 New Emissions Analyses New emissions analysis wil l be consistent with 14-17 TIP
Parkersburg 2/25/13 Previous Emissions Analyses WWW 14-17 TIP consistent with 2/25/13 T-Plan conformity analyses
Sandusky N/A N/A
Springfield 6/26/12 Previous Emissions Analyses CCS-TCC 14-17 TIP consistent with 6/26/12 T-Plan conformity analyses
Toledo 7/1/11 Previous Emissions Analyses TMACOG 14-17 TIP consistent with 7/1/11 conformity analyses
Steubenvi lle 7/12/12 Previous Emissions Analyses BHJ 14-17 TIP consistent with 5/22/12 T-Plan conformity analyses
Wheel ing 7/3/12 Previous Emissions Analyses Bel-O-Mar 14-17 TIP consistent with 7/3/12 T-Plan conformity analyses
Youngstown 7/1/11 6/15/13 Previous Emissions Analyses
Eastgate's T-Plan Update scheduled for a 6/15/13 conformity action / 14-17 TIP
consistent with T-Plan
Table 2
ODOT 2014-2017 STIP Page 15
Map 3
ODOT 2014-2017 STIP Page 16
Map 4
ODOT 2014-2017 STIP Page 17
4. ENVIRONMENTAL JUSTICE
Environmental Justice (EJ) is “the fair treatment and meaningful involvement of all people regardless of race, color, national origin, or income with respect to the development, implementation and enforcement of environmental laws, regulations and policies. Fair treatment means that no group of people, including racial, ethnic, or socio-economic groups should bear a disproportionate share of the negative environmental consequences resulting from industrial, municipal, and commercial operations or the execution of federal, state, local and tribal programs and policies.” Through the Intermodal Surface Transportation Efficiency Act (ISTEA) and continuing with the Transportation Equity Act for the 21 Century (TEA-21), the law requires evaluation of the effect of transportation programs, projects and policies on low income and minority populations. The three basic principles of EJ are to:
1. Ensure public involvement of low-income and minority groups in decision making. 2. Prevent disproportionately high and adverse impacts of decisions on low-income or
minority groups. 3. Assure low income and minority groups receive proportionate share of benefits.
In general, this means that for any program or activity for which federal funds will be used the agency receiving the federal funds must make a meaningful effort to involve low income and minority populations in the decision-making process. The agency must evaluate the nature, extent and incidence of favorable and adverse human health or environmental impacts of the program or activity upon minority and/or low income populations. Identifying Target Populations Typically low income and minority populations are spread throughout the regional area and state but are likely to be located in concentrated locations or neighborhoods. These areas should have a significantly higher percentage of low income and minority populations than the regional or state wide average. These areas can then be identified as “target areas”. For the purposes of the STIP, ODOT identified counties having higher percentages of low income or minority populations than the statewide average percentage. The following maps (Map 5 and 6- low income and Map 7 and 8- minority) show the Ohio counties with target populations for low income and minority populations. ODOT used data from the 2010 census data for minority data and the 2007-2011 American Community Survey (ACS) data to determine targeted counties.
Public Involvement of Targeted Populations The general public has several opportunities to be involved in ODOT’s program decision making process. Planning and project level studies provide opportunities for public input and comment on initial decisions and specific project development activities. Special attention is given in ODOT’s Public Involvement Process to these populations in advertising and public involvement activities. Specific details of these efforts are outlined in Appendix 3.
ODOT 2014-2017 STIP Page 18
Analysis Ohio is a very diverse state in terms of population density, traffic volume, number of miles of roadway, and other demographic, socio-economic, and physical factors. As an example, counties with large metropolitan cities typically have higher overall minority populations than more rural counties. This makes any comparison of projects between areas and the distribution of benefits difficult. In its analysis, ODOT evaluated targeted areas and totaled projects by county and ODOT district. This included the physical factor of total lane miles by ODOT district for the state highway system. These are some of the key factors used in making highway maintenance decisions.
The percentage of the statewide population considered low income is 14.75 percent and a minority is 17.30 percent. Fifty-four (54) percent of the total STIP investment will be focused in the seven counties that exceed the statewide average for minority population. Also, the highest minority percentage is in Cuyahoga County which is projected to receive the highest amount of project funding. Sixty-nine (69) percent of the funding and fifty-four (54) percent of the projects will be focused in counties with the low income percentage exceeding the statewide average. Eighty-seven (87) percent of transit funding is focused in low income communities. Eighty-four (84) percent of transit funds are concentrated in counties with a high minority population, targeting populations that rely more heavily on public transportation. For those ODOT districts with a population exceeding the statewide average for low income, fifty-four (54) percent of the lane miles are being improved. A review of the information presented in Table 3 and on Maps 5 - 8 confirms the diversity in the region. Appendix 2 shows the breakdown of the analysis by each specific county.
The MPO’s are responsible to demonstrate in their TIPs the analysis of their regional areas. Their analysis shows a more distinct picture of the impacts of projects due to the detailed block-group census data that is used in their analysis.
Conclusion ODOT has reviewed the targeted population areas, and the projects scheduled in those areas within the four year STIP. Based upon this review and the map analysis shown in Appendix 2, ODOT believes that a reasonable distribution of benefits is scheduled to be made with this program of projects. This includes all projects, transit, maintenance and new construction. In addition, ODOT could not identify any “disproportionate burden” on any targeted population in Ohio from projects listed in this STIP. The review of the EJ impacts of the specific projects is or will be evaluated and addressed through mitigation, minimization, or avoidance as part of the project development and NEPA processes.
ODOT 2014-2017 STIP Page 19
Map 5
ODOT 2014-2017 STIP Page 20
Map 6
ODOT 2014-2017 STIP Page 21
Map 7
ODOT 2014-2017 STIP Page 22
Map 8
ODOT 2014-2017 STIP Page 23
Table 3
ENVIRONMENTAL JUSTICE ANALYSIS Broken down by ODOT Districts
* Red highlighted values indicate the percentage is greater than the statewide average. Low Income Statewide Average = 14.75% Minority Statewide Average = 17.30%. Note: All projects in the STIP (highway and transit) were included in the analysis.
District Projects
% Total
Projects Total Cost
% Total
Cost
Project
Lane
Miles
% of Project
Lane Miles
to Total
% Project
Lane Miles to
District Lane
Miles
District
Lane Miles
% of
District
Lane Miles
State %
Low
Income
County %
Low
Income
State %
Minority
County %
Minority
1 158 4.09% $448,539,245.02 4.11% 868.68 4.25% 24.96% 3,479.94 7.05% 2.81% 13.41% 1.51% 8.42%
2 287 7.43% $937,211,883.55 8.58% 1,365.93 6.68% 35.58% 3,838.67 7.78% 7.98% 16.23% 6.98% 16.70%
3 436 11.28% $582,381,962.40 5.33% 2,166.68 10.59% 45.54% 4,757.74 9.64% 6.74% 12.15% 4.46% 9.40%
4 454 11.75% $1,289,043,462.51 11.80% 1,761.67 8.61% 35.00% 5,032.99 10.20% 14.49% 15.05% 11.96% 14.66%
5 242 6.26% $435,764,876.40 3.99% 2,296.87 11.23% 61.54% 3,732.25 7.56% 4.58% 13.62% 1.86% 6.48%
6 342 8.85% $1,333,409,139.23 12.21% 2,726.78 13.33% 56.15% 4,856.66 9.84% 14.40% 15.29% 19.77% 24.38%
7 408 10.56% $768,316,355.24 7.03% 2,223.02 10.87% 47.46% 4,683.88 9.49% 8.95% 14.47% 8.75% 16.62%
8 467 12.09% $1,338,397,181.63 12.25% 1,835.51 8.97% 39.00% 4,706.23 9.54% 14.01% 13.07% 17.78% 19.44%
9 259 6.70% $362,459,941.76 3.32% 1,104.92 5.40% 29.11% 3,795.06 7.69% 4.42% 18.95% 0.98% 4.90%
10 241 6.24% $282,900,194.26 2.59% 1,830.05 8.95% 45.54% 4,018.17 8.14% 3.17% 20.77% 0.63% 4.71%
11 233 6.03% $414,041,652.41 3.79% 1,090.50 5.33% 32.30% 3,375.83 6.84% 3.81% 15.21% 0.99% 4.61%
12 337 8.72% $2,730,340,218.38 25.00% 1,184.56 5.79% 38.49% 3,077.37 6.24% 14.64% 15.33% 24.35% 30.32%
Total 3,864 100% $10,922,806,112.79 100% 20,455.17 100% 49,354.79 100% 100% 100%
ODOT 2014-2017 STIP Page 24
5. FY 2012-2015 STIP STATUS Over the past two years, ODOT has implemented most of the projects which were included in the 2012-2015 STIP. Some projects were delayed (due to funding, environmental impacts, etc.), some were canceled, and some had schedules adjusted due to changing conditions. During FYs 2012-2013 of the 2012-2015 STIP, a total of 11 “regionally significant” projects or those projects $25 million or greater (as defined by ODOT for FHWA projects) went to construction. These 11 projects totaled over $742 million in contract awards. A list of regionally significant projects and current implementation status is contained within Table 5 of this document. The complete picture of Fiscal Year 2013 will not be known until the conclusion of the current fiscal year, when the FY 2014-2017 STIP is approved. Table 4 is a summary of the FY 2012-2013 construction contracts sold and the estimated FY 2013 final program. The table shows the number of construction projects sold and total contract dollars by ODOT District. In Appendix 4, ODOT has provided a table of projects that are listed in the 2012-2015 STIP and are expected to obtain Federal Authorization in 2013 but will not be awarded until 2014. If Federal Authorization is not obtained, these projects will be added to the 2014-2017 STIP by administrative modification or by amendment following the guidance of FHWA.
Table 4
SFY 2012 -2013 PROGRAM BY ODOT DISTRICT
FY 2012 FY 2013
District Projects Total Funds District Projects Total Funds
1 49 $56,640,584 1 37 $96,754,280
2 83 $120,028,076 2 99 $204,278,978
3 93 $138,887,700 3 107 $112,781,805
4 123 $171,540,955 4 141 $295,680,775
5 78 $89,248,119 5 79 $94,042,470
6 78 $310,675,480 6 83 $318,471,985
7 82 $85,488,661 7 100 $219,659,388
8 108 $183,516,683 8 105 $302,870,737
9 72 $149,559,522 9 78 $63,898,686
10 116 $84,263,144 10 79 $64,630,480
11 104 $107,573,737 11 77 $118,437,296
12 69 $192,738,028 12 69 $180,497,626
Total 1,055 $1,690,160,688 Total 1,054 $2,072,004,504
The information furnished in this table is from queries of the ODOT Ellis Program Management
data table on February 28, 2013.
Information reflects construction contract letting information only. Figures do not include costs
associated with preliminary development, detailed design, right of way acquisition, or contract
administration.
ODOT 2014-2017 STIP Page 25
Table 5
Regionally Significant Projects Awarded SFY 2012 - 2013* Regional Significance is defined by ODOT as $25M or Greater for FHWA projects
Dist County Project Name (ie CRS)
Contract
Estimate/
Award
Primary Work CategoryAward
SFYStatus
Estimated/
Actual
Completion
Date
FHWA
6 Franklin FRA IR 270 2.60 (Recon) $80,002,299 Major Rehabilitation 2012 Construction 07/31/14
6 Morrow MRW IR 71 12.190 $42,036,977 Major Widening 2012 Construction 10/31/13
12 Lake LAK IR 090 13.10 $59,682,003 Major Rehabilitation 2012 Construction 08/15/14
12 Cuyahoga CUY COLUMBUS RD LIFT BRDG $30,323,619 Bridge Repair 2012 Construction 11/30/14
9 Lawrence LAW Ironton/Russell Brdg New $81,266,742 Bridge Replacement 2012 Construction 06/30/16
6 Delaware DEL IR 71 11.500 $49,724,484 Major Widening 2012 Construction 10/31/14
7 Montgomery MOT IR 75 12.00 $125,564,985 New Construction 2013 Construction 09/01/17
8 Hamilton HAM IR 75 2.30 $90,790,431 Major Reconstruction 2013 Construction 07/15/16
4 Ashtabula ATB IR 0090 07.56 $68,001,343 Major Rehabilitation 2013 Construction 09/30/16
1 Allen ALL IR 75 5.53 $63,207,743 Major Rehabilitation 2013 Construction 10/31/14
6 Morrow MRW IR 71 3.170 $51,800,000 Major Widening 2013 Construction 10/01/15
2 Ottawa OTT-SR2-Mine Investigate/Implmnt $28,000,000 Mine Investigation 2013 Advertising 05/15/14
2 Lucas LUC SR 2 18.62 Bridge Rehab $38,650,000 Bridge Repair 2013 Advertising 11/01/15
4 Summit SUM IR 0271 02.33 $53,200,000 Major Rehabilitation 2013 Advertising 09/30/15
12 Cuyahoga CUY IR 077 09.50 Deck $28,000,000 Bridge Deck Replacement 2013 Advertising 06/01/17
15 Total Projects $890,250,626 Total Dollars
FTA
12 Cuyahoga GCRTA Mayfield Station $13,299,600 Transit 2012 06/30/15
8 Hamilton SORTA Cincinnati Streetcar $11,067,500 Transit 2013 04/30/16
2 Total Projects $24,367,100 Total Dollars
ODOT 2014-2017 STIP Page 26
6. ODOT CAPITAL PROGRAMS ODOT divides the funding received from the state legislature and the U.S. Congress into specific capital programs. Below is a brief description of each of the programs. In-depth descriptions of the programs, eligibility, and evaluation criteria are available in various publications as noted. Table 7 lists the web links for each publication mentioned. Figure 1 shows the budget of each program. District Pavement
The state highway system in Ohio is divided into three categories: the priority system, the general system, and the urban system. The priority system includes interstate routes and four-lane divided highways; the urban system contains non-priority system routes within cities; and the general system makes up the remainder of the state system, generally two-lane highways. ODOT has set pavement condition goals for each system. Each ODOT District maintains a fiscally constrained multi-year work plan tailored to achieve the pavement condition goals. To view the district multi-year work plan and the pavement goals, visit the ODOT District Pavement/Bridge Work Plans at: http://www.dot.state.oh.us/Divisions/Planning/SPPM/SystemsPlanning/Pages/DistrictPavementBridgWorkPlans.aspx District Bridge
Approximately one-third of Ohio’s bridges are under ODOT’s maintenance responsibility. ODOT has set bridge condition goals that focus on the bridges critical structural elements. Each District maintains a fiscally constrained six-year plan tailored to achieve the bridge condition goals. TRAC/Major New
The Transportation Review Advisory Council (TRAC) was established by the Ohio General Assembly in 1997and charged with developing and overseeing a project selection process for major new transportation capacity projects. These are projects costing more than $12 million which add transportation capacity or reduce congestion, and are critical to the mobility, economic development, and quality of life of the citizens of Ohio. The TRAC has nine members and is chaired by the Director of the Ohio Department of Transportation. Six members are appointed by the Governor and one each by the Speaker of the Ohio House of Representatives and the President of the Ohio Senate. Members have overlapping terms. In accordance with the law, the Director of Transportation biennially provides the TRAC with a report on the money available for new construction for the following four-year period. The Director provides funds for new construction only after assuring that system preservation needs have been met. The use of the new construction funds is the responsibility of the TRAC, but the TRAC does not have authority over other aspects of the Department of Transportation. Funding applications are accepted annually. Major Bridge
The Major Bridge program was established in 2002 to provide funding for the rehabilitation or replacement of the largest and/or most complex structures carrying a state, U.S., or Interstate route which meet the major bridge criteria. There are currently 185 structures that are eligible for this program in the state of Ohio. For additional information on the major bridge program, refer to the ODOT Program Resource Guide or visit the ODOT Major Bridge website at http://www.dot.state.oh.us/Divisions/Planning/SPPM/MajorPrograms/Pages/MajorBridge.aspx.
ODOT 2014-2017 STIP Page 27
Priority System Major Rehabilitation
The purpose of this program is to provide funding for major rehabilitation projects on the priority system to restore the structural integrity and functional characteristics of the pavement. Projects are prioritized based upon system analyses. For additional information, please refer to the ODOT Program Resource Guide or visit the ODOT Priority System Major Rehabilitation website at http://www.dot.state.oh.us/Divisions/Planning/SPPM/MajorPrograms/Pages/MajorRehab.aspx. Safety
ODOT’s Highway Safety Program focuses on high-crash, sever-crash, and congested locations on any public road in Ohio. The program is administered by the Office of Systems Planning and Program Management in conjunction with District Safety Review Teams located in each region of the state. Each year ODOT prioritizes safety locations using state-of-the-art statistical methodologies to identify roadway locations and safety improvements with the highest potential for reducing crashes. District offices are required to study these locations to identify improvements through an Annual Safety Work Plan. ODOT also prioritizes locations for review and funding assistance based on local and regional rankings developed by local governments and MPOs. For more information on the safety programs see the ODOT Program Resource Guide. Amish Buggy Program
Creating a safer transportation environment in which horse drawn buggies and motor vehicles can share state highways is the purpose of this program. Eligible locations are determined by buggy/motorized vehicle crash data from the previous five years. Activities include paved shoulders, buggy pull-off areas, and buggy climbing lanes. Additional information is located at http://www.dot.state.oh.us/Divisions/Planning/SPPM/MajorPrograms/Pages/AmishBuggy.aspx. Aviation
The ODOT Office of Aviation is responsible for state aviation programs in Ohio. These programs include Airport Planning and Engineering, Grants Administration, Airport Pavement and Airport Safety Inspections, Airspace Protection, Aircraft Registration, Aviation Education Publications, and Enforcement of Ohio Aviation Laws. For additional information on the aviation program see the ODOT Program Resource Guide or visit the ODOT Office of Aviation website at http://www.dot.state.oh.us/Divisions/Operations/Aviation/Pages/default.aspx. County Bridge, Safety & Surface Transportation
ODOT allocates federal funds to the County Engineers Association of Ohio (CEAO) which manages these three programs. Each program has a separate project selection process and each county is eligible for these programs. The County Bridge Program funds bridge replacements and rehabilitation projects. In 2005 ODOT designated specific funds for safety, so the county programs were expanded to include a separate County Highway Safety Program, although many safety projects were previously funded under the Surface Transportation Program. The County Surface Transportation Program funds roadway related construction and study projects. For more details on these programs see the ODOT Program Resource Guide.
ODOT 2014-2017 STIP Page 28
Transportation Alternatives
Transportation Alternatives eligible categories are: Bicycle & Pedestrian facilities; Safe routes for non-drivers; Environmental mitigation; Conversion and use of abandoned railroad corridors; Community Improvements such as construct turnouts, overlooks and viewing areas, preservation of historic transportation facilities and archaeological activities. ODOT allocates transportation alternative funds to the MPOs and keeps the remainder for a statewide project selection process. For details on the ODOT program and eligible projects see the ODOT Program Resource Guide. For information on the MPO Transportation Alternatives Programs see the individual MPO TIP. Federal Lands Access Program
The Federal Lands Access Program is administered and funded through the Eastern Federal Lands Highways Division (EFLHD) of FHWA. The goal of the program is to improve transportation facilities that provide access to, are adjacent to, or are located within federal lands. The program emphasis is on high-use recreation sites and economic generators. Projects are cooperatively selected and managed by ODOT, EFLHD, and the County Engineers Association of Ohio (CEAO). Funds may be used for planning, research, engineering, design, preventive maintenance, rehabilitation, restoration, construction, and reconstruction of highways, roads, parkways, transit facilities, adjacent vehicular parking areas, provisions for pedestrians and bicycles, acquisition of scenic easements, environmental mitigation, and rest areas. The list of EFLHD projects programed for the State of Ohio is listed in Table 6. For additional information, visit: http://www.dot.state.oh.us/Divisions/Planning/SPPM/MajorPrograms/Pages/ForestHighway.aspx. Geological Site Management
This ODOT program provides funding to repair land-slides and slips, rock falls, underground mine voids, and erosion projects. It includes reactive and proactive repair work. Research and experience shows that repairs done in the early stages of a problem can significantly reduce costs by avoiding a major failure. Additional information on this program may be found by visiting http://www.dot.state.oh.us/Divisions/Planning/SPPM/MajorPrograms/Pages/Geotechnical.aspx. Local Major Bridge
The Local Major Bridge Program provides federal funds to local governments for replacement or rehabilitation of ‘local major’ bridges. A major bridge is defined as a bridge that has greater than 35,000 square foot deck area or that is a lift or moveable structure. Currently, there are about 52 bridges statewide that have a local government owner and meet the definition of a local major bridge. These bridges are eligible for funding under this special program because of the high cost to rehabilitate or replace these bridges. Additional information on this program may be found in the ODOT Program Resource Guide. Maintenance
Routine maintenance of the state highway system is the main responsibility of the ODOT county garages. Each garage has a County Work Plan which details the work needed to maintain Ohio’s roadside conditions and for preventive maintenance activities. Examples of roadside conditions are guardrail, pavement repair, and brush cutting. Preventive Maintenance includes raised pavement makers, lighting, and mowing.
ODOT 2014-2017 STIP Page 29
MPO & Large City
Ohio’s seventeen MPOs and five large cities, with populations between 25,000 and 49,999, (Findlay, Lancaster, Marion, Wooster, and Zanesville) receive annual federal fund budget allocations for financing local government sponsored surface transportation improvement projects within their regions. Each MPO and Large City establishes and maintains its own project selection processes and criteria. For more information on each MPO program see the TIP for that MPO area. The Large City programs of projects are recorded in this STIP. For additional information on this program see the ODOT Program Resource Guide. Municipal Bridge
The Municipal Bridge Program provides federal funds to municipal corporations and Regional Transit Authorities for bridge replacement or bridge rehabilitation projects. A funding limit of $2.5 million per project is set. ODOT will provide up to 80% of eligible costs for construction only. Currently, there are about 1,300 bridges statewide that have a municipal owner and meet the Federal definition of a bridge (20 feet or greater). Additional information on this program may be found in the ODOT Program Resource Guide. Noise Wall
ODOT allocates design and construction funding for Type II noise walls (new noise walls for communities that predate the freeway and desire a noise wall) and noise wall maintenance/replacement projects. For a community to be eligible for a Type II noise wall, a noise wall must be feasible and reasonable in accordance with 23CFR772, and the community must have completed application and petition forms for ODOT approval. Noise wall maintenance/replacement projects involve replacing noise walls that have met their life expectancy or coating aged noise walls for aesthetic purposes. Projects are selected and managed by the ODOT Office of Environmental Services in consultation with the Districts. For additional information on this program refer to the ODOT Program Resource Guide. Metro Parks
The Ohio Parks and Recreation Association manages this program which provides funds for park drives or roads within the boundaries of township or county parks and access roads from the parks to the state highway system. For additional information on this program refer to the ODOT Program Resource Guide or visit the ODOT Metro Parks Program website at http://www.dot.state.oh.us/Divisions/Planning/LocalPrograms/Pages/MetroParksProgram.aspx Rail
Rail programs in Ohio are the responsibility of the Ohio Rail Development Commission (ORDC), which was formed by the Ohio General Assembly in 1994. The ORDC members are appointed by the Governor and the General Assembly. The Commission administers rail freight, passenger, and safety programs. One of the safety programs which directly impact the highway system is described below. For additional information, visit the ORDC’s website at: http://rail.ohio.gov.
ODOT 2014-2017 STIP Page 30
Rail Safety Program
This program is administered by the ORDC to address the safety of highway-railroad grade crossings by improving the warning systems. It includes adding flashing lights, or gates and lights, at grade crossings and improving the existing electronics at crossings with antiquated systems. The individual railroad companies are an integral part of the program, both in funding and contracting for the work. More details can be found in the ODOT Program Resource Guide. Rest Areas
The goal of this program is the optimization of the agency’s 92 rest areas on the state highway system using generally accepted planning criteria in an effort to increase efficiencies through the reduction of both excess facilities and maintenance and operating expenses. For a list of Ohio’s rest areas, visit ODOT’s Office of Facilities Ohio’s Rest Area System’s website at http://www.dot.state.oh.us/Divisions/Facilities/Facilities/RestAreas/Pages/default.aspx. Safe Routes to School
This program was created by SAFETEA-LU. The purpose of this program is to provide a safer and more appealing environment for children to walk or ride their bikes to school. The funding is for a variety of engineering, education, enforcement, encouragement, and evaluation projects to address the overall safety and health benefits of walking or riding bikes to school. For additional information on this program refer to the ODOT Program Resource Guide or visit the program website at http://www.dot.state.oh.us/saferoutes. Small City
This program provides federal funds to cities with populations between 5,000 and 24,999 outside of MPO areas. Funds are available for constructions costs of transportation projects. For details on this program and selection criteria see the ODOT Program Resource Guide.
ODOT 2014-2017 STIP Page 31
Table 6
Last Printed:10Dec12 Actual Dates and Amounts are Indicated with an Astrick
OH - Ohio
STATEFY
AWARDCOUNTY
NAME OF PARK, REFUGE,
FOREST OR PARTNERNAME DESCRIPTION
PARTNER/
REGION
RECOVERY ACT
FUNDED
PROJECT
CONTRACT VALUEANTICIPATED
ADVERTISEMENT
ANTICIPATED
COMPLETION
DATE
PROJECT STAGE
OH FY2013 Summit & Cuyahoga Cuyahoga Valley National Park CUVA_004P_007 Replace &/or Rehab of 3 bridges carrying
Cuyahoga Valley Line Railway (Str No.
6160-004P, 007P,013P)
NPS_MW No Between $1,000,000
and $5,000,000
11/21/2012 8/23/2013 In Design
OH FY2013 Summit & Cuyahoga Cuyahoga Valley National Park CUVA_011P_012P_013P Replacement or Rehab of 3 bridges
carrying Cuyahoga Valley Line Railway
(Str No 6160-011P,012P,013P)
NPS_MW No Between $1,000,000
and $5,000,000
11/21/2012 9/27/2013 In Design
OH FY2012 Summit, Cuyahoga,
Stark, Ross, Ottawa
CUVA, JAGA, HOCU, PEVI,
WIHO
MWR_PMS_OH(1) Ohio National Parks Pavement Preservation NPS_MW No Between $1,000,000
and $5,000,000
4/23/2012 * 12/3/2012 Under Construction
Federal Highway Administration
Eastern Federal Lands Highway Division
Active Projects List
ODOT 2014-2017 STIP Page 32
Table 7
GUIDE TO DOCUMENTS
Resource Web Address ODOT’s Construction Cost Outlook and Forecast
http://www.dot.state.oh.us/Divisions/Planning/Estimating/TrendsAndForecasts/Inflation%20Forecast%20(Construction%20Cost%20Outlook-January%202013).pdf
ODOT’s Policy http://www.dot.state.oh.us/policy/Pages/default.aspx
ODOT’s Rural Consultation Process
http://www.dot.state.oh.us/Divisions/Planning/LocalPrograms/Rural%20Consultation%20Process%20Documents/2012%20Rural%20Local%20Consultation%20Process%20.pdf
ODOT Program Resource Guide
http://www.dot.state.oh.us/Divisions/Planning/LocalPrograms/Documents/ODOT%20Program%20Resource%20Guide.pdf
Status of Public Transit in Ohio
http://www.dot.state.oh.us/Divisions/Planning/Transit/Documents/Programs/Publication/StatusOfPublicTransitinOhio2012.pdf
TRAC Policies and Procedures
http://www.dot.state.oh.us/trac/Documents/TRAC%20Policies%20and%20Procedures%2006.2.2011.pdf
Ohio Rail Commission http://rail.ohio.gov
ODOT 2014-2017 STIP Page 33
Chart 1
ODOT 2014-2017 STIP Page 34
7. TRANSIT
Public Transit in Ohio
The ODOT’s Office of Transit administers many programs using a variety of funding sources: federal, state, and local. The FTA is the major source of federal funding for both the urban and rural transit systems. Transit systems receive federal assistance for capital, operating, and planning expenses based on a FTA formula. FTA also offers discretionary grant opportunities, and ODOT offers a discretionary program to the urban systems through the Ohio Transit Preservation Partnership Program. These state programs involve both the rural and urban transit systems: Elderly and Disabled Transit Fare Assistance; Ohio Public Transportation Grant Program; and the Ohio Technical Assistance Program. Transit does not have a dedicated source of state funding. Local funds are derived from boards of county commissioners, municipalities, fares, local levies, and contract revenue, among other sources. MAP-21 and Transit
On July 6, 2012, President Obama signed into law MAP-21. This law, which took effect on October 1, 2012, reauthorized surface transportation programs including the FTA programs through federal FY 2014. This reauthorization amends the Federal Transit Laws codified in 49 USC Chapter 53. MAP-21 consolidated, repealed, or revised several of the existing transit programs in order to improve efficiency and track key goals and objectives. Similar to the highway programs, the decline of federal funding sources has placed an emphasis on the restoration and replacement of the nation’s aging public transportation infrastructure. These are just a couple of the changes under MAP-21: The New Freedom program was merged with Section 5310 to become the Enhanced Mobility of Seniors and Individuals with Disabilities program. The Jobs Access and Reverse Commute (JARC) program was repealed; however, JARC activities are eligible under Sections 5307 (Urban Public Transit) and 5311 (Rural Public Transit). FY2013 Apportionments and 2010 Census
The following FY2014-2017 STIP estimates are based on the new program structure, formulas, and authorized funding levels provided with MAP-21. These estimates take into account the 2010 census data which includes the designation of new urbanized areas. There are three transit systems that moved from rural to urban as a result of the 2010 census:
• Delaware County is now part of the Columbus urbanized area.
• Medina County is part of both the Cleveland urbanized area and Akron urbanized area.
• Warren County is part of the Cincinnati and Dayton urbanized areas.
Ohio also has two systems that moved from urban back to rural with their populations falling below 50,000:
• Sandusky is in Erie County.
• Washington County is no longer part of the Parkersburg urbanized area.
ODOT 2014-2017 STIP Page 35
CAPITAL PROGRAM FY 2014 FY2015
Amish Buggy $1 $1
Aviation $2 $2
Bridge $260 $272
Alternatives $11 $11
Geologic Site Management $17 $18
Local $303 $303
Major Bridge $78 $82
Metro Parks $7 $7
Noise Wal ls Retro Fit $5 $6
Pavement $695 $727
Planning & Research $20 $21
Rai l Safety Program $15 $15
Rest Areas $10 $10
Safety $102 $102
FTA TF to FHWA - (MPOs) $3 $3
Transit GRF Funding $7 $7
Transit FTA Funding $32 $32
Transit Operational - Urban $6 $6
Transit Preservation Partnership $14 $14
Rai l ( GRF & State Special Revenue) $5 $5
TOTAL PRESERVATION $1,593 $1,644
Major New $154 $129
GRAND TOTAL $1,747 $1,773
With the most recent census, Ohio has 27 urban systems and 34 rural systems. For more information on each of these transit systems, see the Status of Public Transit in Ohio published by the ODOT Office of Transit (see Table 7). 8. OPERATION AND MAINTENANCE
Under the federal definition, operation and maintenance refers to the total function of the transportation system. Before considering expansion of the transportation system (additional lanes or new facilities), states must demonstrate that the existing transportation system is being maintained to acceptable performance levels and that the system is operating efficiently. ODOT routinely conducts analyses on the state highway system to determine the operating levels and the pavement conditions. Goals are established for pavement performance for each of the three state highway systems. Funds are allocated under the District Pavement and Bridge programs based upon the conditions of each District’s systems as it relates to the statewide system goals. The Capital Program Budgets detailed in Table 8 indicate the funding levels allocated towards preservation and new capacity to the existing transportation system. As shown in the table, the majority of ODOT’s funding is designated for maintenance or preservation of the existing state highway system. The only program which adds new capacity to the state highway system is the Major New Construction/TRAC program. ODOT accounts for additional operating costs, such as payroll, snow and ice removal, salt, mowing, etc., prior to establishing the Capital Program Budgets. ODOT has budgeted $750 million in SFY 2014 and $769 million in SFY 2015 for these operating costs.
Table 8
Capital Program Budget ($ Millions)
ODOT 2014-2017 STIP Page 36
9. FINANCE The STIP is a financially responsible and fiscally constrained program focused on ODOT’s goal to achieve a steady state of manageable and predictable conditions on Ohio’s transportation system and within the preservation budget. The guidance on Statewide Transportation Planning and Programming (23 U.S.C. 135) provides that projects in the STIP must be consistent with metropolitan TIPs and must reflect expected funding and priorities for programming. The program shall include a project, or an identified phase of a project, only if full funding can reasonably be anticipated to be available within the time period contemplated for its completion. Each of Ohio’s seventeen MPOs biennially develops a four-year TIP for their area. In each of these TIPs, the projects planned for financing with federal funds made available for use by these MPOs have previously been reviewed and determined to be within reasonable expected federal funding levels, as required. ODOT considers the TIPs to be in reasonable fiscal balance. The potential for financing the state sponsored projects in these TIPs and the state share of the local government sponsored projects, where applicable, is addressed here in conjunction with the analysis of the financing needs of the non-MPO projects. ODOT receives funds from the federal motor fuel tax through the following MAP-21 core funding programs: National Highway Performance Program (NHPP), Surface Transportation Program (STP), Congestion Mitigation and Air Quality Improvement Program (CMAQ), Highway Safety Improvement Program (HSIP), Railway-Highway Crossings (set-aside from HSIP), and Transportation Alternatives. State funding sources include the state motor fuel tax, heavy truck registrations, General Revenue Fund, and miscellaneous sources, such as oversize/overweight permits and cell tower leases. Figure 2 shows each source’s proportionate share of ODOT’s revenue. State Transportation Budget
Under ODOT’s budgeting philosophy, the top priority is to fund debt service payments owed from past bond issuances, then secondly, basic departmental operations such as payroll, routine roadway maintenance, and snow and ice removal. The third priority is for system preservation, both pavements and bridges. There are additional programs for freeway reconstruction and major bridge rehabilitation and replacement. Without this sustained level of funding, the system would deteriorate quickly. The next priorities are safety, other state programs (such as geological site management, Amish buggy, and railroad safety). Funding local programs, including MPO allocations and county pavement and bridge, are the next priorities. The last priority in the budgeting process is Major New construction or major capacity addition projects. The ODOT program budgets in Figure 1 reflect these priorities. There were basic assumptions used in preparing ODOT’s budget for the 2014/2015 biennium:
• Slight growth in Motor Fuel consumption, 1.0% in FY 2014 and 2015.
• Federal Highway Revenues for FY14 at MAP-21 levels and zero growth thereafter.
• Highway bond debt payments (state and federal) will be approximately $300 M for FY 2014 and $296 M in FY 2015.
ODOT 2014-2017 STIP Page 37
• State bond appropriations will be $100 M in 2014 and $120 M in 2015 and federal bonds will be $96 M in 2014 and $97 M in FY 2015.
• Payroll will decrease by 1% in FY 2014 and increases by 3% in FY 2015.
• Capital Preservation and Safety programs are funded at $1.13 B in FY 2014 and $1.18 B in FY 2015.
• Total Capital program will be $1.7 B in FY 2014 and FY 2015. The largest portion of the budget is designated for preservation of the existing system and safety improvements. The recently passed federal reauthorization bill, MAP-21, provides federal funding through September 30, 2014. Financial Analysis
The objective of the fiscal analysis is to show that the aggregate federal and state funding demand is within the total federal and state funding available each year, taking into consideration that federal funds specifically dedicated for a certain project or types of projects cannot be used to cover other project funding shortfalls. The analysis reflects that the STIP program is within ODOT’s federal and state funding capacity. It should be noted that while the STIP is based on state fiscal years which start July 1, federal apportionments are normally made on October 1, the start of each federal fiscal year. In the fiscal analysis this three month delay in receipt of federal apportionments is considered inconsequential because of prior year carry-overs, federal advance construction provisions, and the other funding flexibility provided under MAP-21. Overview and Assumptions
Projections of future state revenue, future federal apportionments, and obligation limitations are one step required for the fiscal analysis. Determining projects scheduled for each fund type is another required step. The project listing included in this document is for all eighty-eight counties in the state. The individual MPO TIPs include the project lists for their respective areas. The fiscal analysis summarizes federal and state funding demand by year for all ODOT and MPO programs. The following additional factors were also taken into consideration:
• Federal bonds are called Grant Anticipated Revenue Vehicles (GARVEE). The debt is issued in anticipation of the receipt of Federal-aid grant reimbursements in subsequent years. The bond funds are considered revenue and the debt service to repay the bonds are treated as project commitments or expenses to the overall program.
• “Block” Federal is not a specific funding type. It is a practice at ODOT to reserve federal and state funds in each project area for future Change Orders and unanticipated Preliminary Engineering and Right-of-Way modifications on projects. Each ODOT program reserves funds based upon the historic need in their program.
• Continued spending authority under MAP-21 contains provisions allowing transferability of funds between the core programs: National Highway Performance Program (NHPP),
ODOT 2014-2017 STIP Page 38
Congestion Mitigation (CMAQ), Highway Safety Improvement Program (HSIP), Transportation Alternatives (TA), and the Surface Transportation Program (STP). Transfers are completed if the needs within ODOT’s program require the core apportionments to be moved.
Flexible Federal Funding
Under provisions of MAP-21, Surface Transportation Program (STP) funds have the most open eligibility of the conventional federal funds and may be used on projects which are also eligible under other fund types. In addition, up to 50 percent of funds in the core programs (NHPP, CMAQ, HSIP and TA) can be transferred between programs each year. General Procedures
To demonstrate that this STIP is in reasonable financial balance, the aggregate federal and state share for all projects within MPO areas and non-MPO areas (including those projects sponsored by ODOT and local governments) was totaled by federal funding program and by year and compared to projected available funding. The National Highway Performance Program, Congestion Mitigation (CMAQ), Highway Safety Improvement Program (HSIP), Transportation Alternatives (TA), and Surface Transportation Program (STP) are federal core programs and are evaluated jointly in consideration of the flexible funding provisions of MAP-21. In conducting the financial analysis, the various federal programs (Highway Planning and Research and Metropolitan Planning) funding categories were analyzed individually as these funds cannot be used to finance other projects. Each funding program budget is shown with the corresponding project demand estimates. The federal funding legislation contains discretionary programs. States apply for funding from each program for specific projects. Each program has separate funding eligibility. Funds are only available to states if the specific projects are selected for funding. The only funds accounted for in the analysis are those previously designated for a project. States do not receive an allocation of these funds; therefore, the project demand estimates and the funding budgets are the same for the discretionary funding programs. Transit funding was also established by MAP-21. The key difference is that most funding programs allocate the specific amounts to the individual transit system, not to the states for further allocation to the systems. These include Sections 5303, 5304, 5307, 5337, and 5339. Some of these programs are direct allocations and some have individual application processes. Section 5310 funds are allocated to each state to fund vehicles for Specialized Transportation programs. The states receive Section 5311 funds for further distribution to rural transit systems. There are individual application processes for Section 5316 and 5317. In most cases, the program budget and the project demand estimate are the same. Fiscal Constraint Table Assumptions
Table 9 below reflects that the STIP is in yearly fiscal balance from both the state and federal funding perspective. There are several assumptions which are reflected in this table. Payroll costs and other agency operational expenses, including State Bond Debt Service have been subtracted from the State Funds designated for project funding. These funds are used to match
ODOT 2014-2017 STIP Page 39
federal funds and to fund other projects. The Local Match is the cumulated amount from all local governments committed to match federal and state dollars for projects included in this STIP. ODOT policy requires evaluation of the inflation rates and adjustment of project cost estimates, as necessary, every six months. Given current economic indicators, an inflation rate of 5.7% in calendar year (CY) 2013 is anticipated. However, due to greater uncertainty in CY 2014 a high-range forecast of 10% is predicted. Inflation is predicted to peak in CY 2015 at 5.9% with a gradual decline in CY 2016 (4.5%) and CY 2017 (4.0%). Beyond CY 2017, a long-run construction cost inflation rate of 4.0% is expected. (See the January 2013 Construction Cost Outlook and Forecast link in Table 7). The federal budgets used for this analysis are the apportionments from MAP-21 with an additional one percent growth per year through FY 2017. MAP-21 reauthorization was passed in July 2012 and provides apportionments through September 30, 2014. Innovative Finance
Using innovative financing tools allows ODOT the ability to develop and create innovative approaches to build, manage, maintain, and operate our transportation infrastructure. These tools assist ODOT in reducing costs, enhancing efficiency, and generating revenue. Types of innovative financing currently utilized by ODOT include Advance Construction and Public-Private-Partnerships (P3’s). Advance Construction
ODOT utilizes advance construction for the management of fund appropriations and obligation limitation provided by FHWA. Advance construction allows the department to gain federal authorization to begin federally eligible activities without obligating funding. At the time of authorization, FHWA is confirming that ODOT has followed all requirements necessary to execute a federal agreement. By placing the funds into advance construction, FHWA is not guaranteeing funding for the project but is indicating that the activities would be eligible. ODOT places most of its projects in advance construction at the time of authorization. There are some exceptions based on the expiration of funds and legislative requirements. The advance construction is placed into two groups. The first group is identified as short term. This group is used for projects in which the funding will be converted as project expenditures take place and are exhausted by the completion of the federally eligible activities. By utilizing advance construction, ODOT can convert its appropriations and obligation limitation for costs that are currently being incurred and maintain a balance throughout the federal fiscal year. The second group is identified as long term. This group is used primarily for GARVEE bonds and MPO or CEAO SIB (State Infrastructure Bank) loans that are utilized and managed by ODOT (see Table 9 for the Long Term Project List). The GARVEE bonds are retired utilizing future federal funding received through the active and future highway authorization bills. Prior to the bond sale, the entire amount of the bond is put into advance construction on the projects being funded with its proceeds. These amounts are then converted over an 8 to 12 year period to retire the bonds. These payments are made on either a level principal or level interest payment schedule depending on the bond structure. The SIB loans are loans taken out by a local sponsor, which are being paid off utilizing federal MPO or CEAO funding. These loans have a typical repayment term of 10 years and are
ODOT 2014-2017 STIP Page 40
paid down using a level principal amortization schedule. These loans typically have two annual payments due. At the designated payment dates, advance construction is converted in the amount of the federal participating principal and interest due. The short term advance construction rises and falls throughout the federal fiscal year based on ODOT’s needs for each program utilizing federal funds. At the beginning of each federal fiscal year (October 1), the balance is typically at its lowest of the year. Agreements are consistently authorized throughout the federal fiscal year with the advance construction balance typically peaking in June. ODOT also consistently converts advance construction to obligated funds throughout the federal fiscal year for costs as they are incurred. In June the amount being converted begins exceeding the amount of new advance construction. This is based on the peak of construction season and the requirement to use obligation limitation prior to the close of the federal fiscal year. The long term advance construction balance is based upon the sales of bonds or the establishment of a new SIB loan. The bonds are typically sold every 12 to 18 months based on ODOT’s needs. The long term advance construction peaks in bond sale year and is reduced as the bond retirement payments are made. Table 9 below shows the actual new advance construction totals for State Fiscal Year 2012 through 2013 and the estimated advance construction totals for State Fiscal Year 2014 and 2015 for both short term and long term. Table 9
New Advance Construction by State Fiscal Year
Actual Estimated
State Fiscal Year 2012 2013* 2014 2015
Short Term AC $1,445,333,450 $816,225,338 $1,153,543,697 $1,385,309,378
Long Term AC $19,407,327 $158,112,123 $113,640,000 $243,497,375
Total AC $1,464,740,778 $974,337,461 $1,267,183,697 $1,628,806,753
* SFY 2013 through 1/31/2012 - Date from Finance (3/29/2013)
ODOT 2014-2017 STIP Page 41
Ohio Department of Transportation - Long Term AC Project Summary as of 3/29/2013 - Table 1 of 2
STIP Estimate Amount - Award by SFY
Dist PID MPO Cnty Project Name (ie CRS)
Award
Date
SFY
2014
SFY
2015
SFY
2016
SFY
2017 Total Debt Service
Garvee Bond - Fund 045 - Longterm AC
1 89029 LACRPC ALL ALL IR 75-0.21 11/25/13 $56,000,000 $56,000,000 $10,290,000
2 93604 TMACOG LUC LUC IR 75 2.75 Pav Reconst 05/19/14 $15,000,000 $15,000,000 $2,756,250
8 82976 OKI HAM HAM IR 275 10.57 10/07/13 $25,000,000 $25,000,000 $4,593,750
6 25594 MORPC FRA FRA IR 70 3.41 04/01/15 $10,000,000 $10,000,000 $1,837,500
6 93496 MORPC FRA FRA IR 71 0.000 04/01/15 $25,000,000 $25,000,000 $4,593,750
6 93497 MORPC FRA FRA IR 71 9.780 04/01/15 $45,000,000 $45,000,000 $8,268,750
12 80418 NOACA CUY CUY IR 271 00.00 Addlane 02/15/15 $125,700,000 $125,700,000 $23,097,375
8 82288 OKI HAM HAM IR 75 12.60 10/01/15 $21,900,000 $21,900,000 $4,024,125
Sub-total $96,000,000 $205,700,000 $21,900,000 $0 $323,600,000 $59,461,500
Debt Service by SFY $17,640,000 $37,797,375 $4,024,125 $0 $59,461,500
Sub-total Long Term AC (Fund 045) $113,640,000 $243,497,375 $25,924,125 $0 $383,061,500
SIB Loan - Fund 212 - Longterm AC
9 92753 KYOVA LAW LAW New Intermodal Cargo Dock 07/01/14 $2,080,000 $2,080,000 $318,077
Sub-total $0 $2,080,000 $0 $0 $2,080,000 $318,077
Debt Service by SFY $318,077 $0 $0 $318,077
Sub-total Long Term AC (Fund 212) $0 $2,398,077 $0 $0 $2,398,077
Total Long Term AC (Fund o45 & 212) $113,640,000 $245,895,452 $25,924,125 $0 $385,459,577
Table 10
ODOT 2014-2017 STIP Page 42
Ohio Department of Transportation - Long Term AC Project Summary as of 3/29/2013 - Table 2 of 2
Advance Construction Conversions by SFY
Dist PID MPO Cnty Project Name (ie CRS)
Award
Date Totals 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027
Garvee Bond - Fund 045 - Longterm AC
1 89029 LACRPC ALL ALL IR 75-0.21 11/25/13 $66,290,000 $0 $3,780,000 $7,413,000 $7,217,000 $7,021,000 $6,825,000 $6,629,000 $6,433,000 $6,237,000 $6,041,000 $5,845,000 $2,849,000
2 93604 TMACOG LUC LUC IR 75 2.75 Pav Reconst 05/19/14 $17,756,250 $0 $1,012,500 $1,985,625 $1,933,125 $1,880,625 $1,828,125 $1,775,625 $1,723,125 $1,670,625 $1,618,125 $1,565,625 $763,125
8 82976 OKI HAM HAM IR 275 10.57 10/07/13 $29,593,750 $0 $1,687,500 $3,309,375 $3,221,875 $3,134,375 $3,046,875 $2,959,375 $2,871,875 $2,784,375 $2,696,875 $2,609,375 $1,271,875
6 25594 MORPC FRA FRA IR 70 3.41 04/01/15 $11,837,500 $0 $0 $675,000 $1,323,750 $1,288,750 $1,253,750 $1,218,750 $1,183,750 $1,148,750 $1,113,750 $1,078,750 $1,043,750 $508,750
6 93496 MORPC FRA FRA IR 71 0.000 04/01/15 $29,593,750 $0 $0 $1,687,500 $3,309,375 $3,221,875 $3,134,375 $3,046,875 $2,959,375 $2,871,875 $2,784,375 $2,696,875 $2,609,375 $1,271,875
6 93497 MORPC FRA FRA IR 71 9.780 04/01/15 $53,268,750 $0 $0 $3,037,500 $5,956,875 $5,799,375 $5,641,875 $5,484,375 $5,326,875 $5,169,375 $5,011,875 $4,854,375 $4,696,875 $2,289,375
12 80418 NOACA CUY CUY IR 271 00.00 Addlane 02/15/15 $148,797,380 $0 $0 $8,484,750 $16,639,538 $16,199,588 $15,759,638 $15,319,688 $14,879,738 $14,439,788 $13,999,838 $13,559,888 $13,119,938 $6,394,988
8 82288 OKI HAM HAM IR 75 12.60 10/01/15 $25,924,130 $0 $0 $0 $1,478,250 $2,899,013 $2,822,363 $2,745,713 $2,669,063 $2,592,413 $2,515,763 $2,439,113 $2,362,463 $2,285,813 $1,114,163
Sub-total $383,061,510 $0 $6,480,000 $26,592,750 $41,079,788 $41,444,601 $40,312,001 $39,179,401 $38,046,801 $36,914,201 $35,781,601 $34,649,001 $28,716,401 $12,750,801 $1,114,163
SIB Loan - Fund 212 - Longterm AC
9 92753 KYOVA LAW LAW New Intermodal Cargo Dock 07/01/14 $2,398,077 $133,226 $266,453 $266,453 $266,453 $266,453 $266,453 $266,453 $266,453 $266,453 $133,226
Sub-total $2,398,077 $133,226 $266,453 $266,453 $266,453 $266,453 $266,453 $266,453 $266,453 $266,453 $133,226 $0 $0 $0 $0
Totals $385,459,587 $133,226 $6,746,453 $26,859,203 $41,346,241 $41,711,054 $40,578,454 $39,445,854 $38,313,254 $37,180,654 $35,914,827 $34,649,001 $28,716,401 $12,750,801 $1,114,163
Table 10 Continued
ODOT 2014-2017 STIP Page 43
Public-Private-Partnerships (P3’s)
With the passage of House Bill 114, ODOT has joined many other states in embracing Public-Private-Partnerships (P3’s) for delivery of public projects and services. P3’s can provide numerous benefits in the finance, design, construction, maintenance and operation of transportation facilities. ODOT is currently pursuing the development of the following P3 projects.
One of the first P3 projects for ODOT is the Innerbelt Bridge over the Cuyahoga River on Interstate 90 in downtown Cleveland (PID 82119). The demolition of the existing Interstate 90 Innerbelt Bridge and construction of the new eastbound bridge is the second phase of the Innerbelt Corridor projects in Cleveland. This project is being procured as a Design Build Finance (DBF). DBF is a P3 procurement comprised of a design build approach with construction risk financing provided as private debt or “gap financing” which is repaid over time by ODOT. For this project, the gap financing will be repaid in full during the first quarter of Fiscal Year 2016. The DBF approach will allow construction to begin in late 2013 or early 2014 advancing the project two to three years.
The Portsmouth Bypass project in Scioto County (PID 19415) is a new roadway east of Portsmouth, connecting U.S. Route 52 east of New Boston to U.S. Route 23 north of Lucasville. This project is being procured as a Design Build Finance Operate and Maintain (DBFOM) with availability payments. DBFOM with availability payments combines the complete spectrum of equity finance and delivery. The project is currently programmed using traditional funding sources; however, ODOT is considering using other financing tools such as the project being financed by the private partner with a combination of private debt and equity along with Transportation Infrastructure Finance and Innovation Act (TIFIA) loans through FHWA. ODOT would repay the private partner using availability payments for the capital and operations costs over a thirty year period provided the transportation facility meets the performance specifications of the public-private agreement.
The Brent Spence Bridge project (PIDs 89068 and 89077) replaces the 50 year old structure which carries Interstate 71 and Interstate 75 north and south over the Ohio River in the Cincinnati, Ohio, and Covington, Kentucky, region. The National Bridge Inventory lists the Brent Spence Bridge as functionally obsolete due to capacity, sight distance, and safety concerns. This project is in the early stages of development; however, ODOT anticipates that it will be delivered as a DBFOM project that will include private debt and equity, TIFIA loans, and toll revenue.
Conclusion
The fiscal summary confirms that this STIP is in fiscal constraint as to these federal funding categories and to overall state highway funding demand as presented in the following table. The aggregate funding demand each year is within available funding levels.
ODOT 2014-2017 STIP Page 44
Chart 2
ODOT 2014-2017 STIP Page 45
Table 11
Ohio Department of Transportation - 2014 through 2017 STIP Fiscal Analysis as of 03/24/2013
Line # Type Budget Est'd Balance Estimates Budget Est'd Balance Estimates Budget Est'd Balance Estimates Budget Est'd Balance Estimates Budget Est'd Balance Estimates
Federal Flexible
1 STP $304,628,230 -$74,857,453 $379,485,683 $307,674,512 -$147,529,459 $455,203,971 $310,751,257 -$43,668,794 $354,420,051 $313,858,770 -$102,132,838 $415,991,607 $1,236,912,768 -$368,188,544 $1,605,101,312
2 National Highw ay Performance Program $712,651,911 $673,150,219 $39,501,692 $719,778,430 $647,105,968 $72,672,462 $726,976,215 $142,957,741 $584,018,474 $734,245,977 $481,958,042 $252,287,934 $2,893,652,533 $1,945,171,970 $948,480,562
3 Interstate Maintenance -$175,029,529 $175,029,529 -$241,684,904 $241,684,904 -$327,549,839 $327,549,839 -$224,446,346 $224,446,346 -$968,710,618 $968,710,618
4 National Highw ay System -$112,791,369 $112,791,369 -$107,582,202 $107,582,202 -$205,847,067 $205,847,067 -$83,218,391 $83,218,391 -$509,439,029 $509,439,029
5 Bridge $29,164,058 -$106,403,883 $135,567,942 $29,455,699 -$133,106,009 $162,561,708 $29,750,256 -$57,313,432 $87,063,688 $30,047,758 -$49,536,164 $79,583,922 $118,417,772 -$346,359,488 $464,777,259
6 CMAQ $92,593,514 $17,680,164 $74,913,351 $93,519,450 -$11,350,513 $104,869,963 $94,454,644 $25,991,920 $68,462,725 $95,399,190 $22,920,346 $72,478,844 $375,966,798 $55,241,916 $320,724,883
7 Highw ay Safety Imp Prog $72,124,436 -$29,879,668 $102,004,104 $72,845,681 $10,033,189 $62,812,491 $73,574,137 $39,568,654 $34,005,484 $74,309,879 $68,406,087 $5,903,792 $292,854,133 $88,128,262 $204,725,871
8 Penalty Transfer $24,466,410 $7,252,620 $17,213,790 $24,711,074 $4,350,856 $20,360,218 $24,958,185 $14,606,623 $10,351,562 $25,207,767 $25,207,767 $99,343,436 $51,417,866 $47,925,570
9 Redistributed Funds $1,764,635 $1,764,635 $1,782,282 $1,782,282 $1,800,105 $1,800,105 $1,818,106 $1,818,106 $7,165,128 $7,165,128
10 Garvee Bond - Fund 045 - Longterm AC $96,000,000 $96,000,000 $97,000,000 -$108,700,000 $205,700,000 $110,000,000 $88,100,000 $21,900,000 $187,000,000 $187,000,000 $490,000,000 $166,400,000 $323,600,000
11 SIB Loan - Fund 212 - Longterm AC -$1,664,000 $1,664,000 -$1,664,000 $1,664,000
12 Fund 212 State -$416,000 $416,000 -$416,000 $416,000
13 SIB Loans Debt Service N/A -$3,033,000 $3,033,000 N/A -$3,360,000 $3,360,000 N/A -$2,109,000 $2,109,000 N/A -$470,000 $470,000 N/A -$8,972,000 $8,972,000
14 Garvee Bond Debt Service N/A -$136,000,000 $136,000,000 N/A -$138,000,000 $138,000,000 N/A -$138,000,000 $138,000,000 N/A -$126,000,000 $126,000,000 N/A -$538,000,000 $538,000,000
Federal Appropriation Changes Needed
15 Un-Assigned Federal N/A -$1,328,800 $1,328,800 N/A -$10,956,164 $10,956,164 N/A -$14,243,488 $14,243,488 N/A -$11,973,400 $11,973,400 N/A -$38,501,852 $38,501,852
16 Un-Assigned Federal Labor N/A -$2,269,974 $2,269,974 N/A -$242,421 $242,421 N/A -$17,140,076 $17,140,076 N/A -$400,686 $400,686 N/A -$20,053,157 $20,053,157
17 Not Grouped N/A N/A N/A N/A N/A
18 Non-Federal N/A -$150,931 $150,931 N/A -$569,495 $569,495 N/A -$4,328,110 $4,328,110 N/A -$2,335,964 $2,335,964 N/A -$7,384,501 $7,384,501
Sub-Totals Federal Flexible $1,333,393,195 $58,103,031 $1,275,290,164 $1,346,767,127 -$241,888,872 $1,588,655,999 $1,372,264,798 -$497,174,764 $1,869,439,563 $1,461,887,446 $186,796,558 $1,275,090,888 $5,514,312,567 -$494,164,047 $6,008,476,614
State/Local Match Program 002/042/Labor/Local Match
19 State Funds (002) $430,000,000 $15,127,738 $414,872,262 $429,000,000 $139,375,851 $289,624,149 $450,000,000 $159,695,181 $290,304,819 $423,000,000 $195,483,673 $227,516,327 $1,732,000,000 $509,682,442 $1,222,317,558
20 State Bonds $100,000,000 $25,535,736 $74,464,264 $120,000,000 $80,000,000 $40,000,000 $171,000,000 $168,283,685 $2,716,315 $191,000,000 $191,000,000 $582,000,000 $464,819,421 $117,180,579
21 Labor - State Match $33,012,557 $33,012,557 $25,152,044 $25,152,044 $18,864,151 $18,864,151 $100,369,438 $100,369,438 $177,398,190 $177,398,190
22 Labor - Local Match $2,835,174 $2,835,174 $7,059,510 $7,059,510 $2,564,636 $2,564,636 $1,353,941 $1,353,941 $13,813,262 $13,813,262
23 Local Match $164,136,325 $164,136,325 $218,929,773 $218,929,773 $191,629,653 $191,629,653 $96,510,085 $96,510,085 $671,205,837 $671,205,837
Grand Totals State/Local/GRF $729,984,056 $40,663,474 $689,320,582 $800,141,327 $219,375,851 $580,765,476 $834,058,441 $327,978,866 $506,079,575 $812,233,465 $386,483,673 $425,749,792 $3,176,417,289 $974,501,863 $2,201,915,426
Sub-Totals Fed Flex/State/Local Match (Above) $2,063,377,251 $98,766,505 $1,964,610,746 $2,146,908,455 -$22,513,021 $2,169,421,475 $2,206,323,239 -$169,195,899 $2,375,519,138 $2,274,120,911 $573,280,231 $1,700,840,680 $8,690,729,856 $480,337,816 $8,210,392,040
Other Federal
24 Earmarks / High Priority $30,824,279 $30,824,279 $27,092,177 $27,092,177 $19,196,498 $19,196,498 $1,427,335 $1,427,335 $78,540,289 $78,540,289
25 Appalachian Hw ys $140,000,000 $139,198,144 $801,856 -$68,501,641 $68,501,641 -$1,337,145 $1,337,145 -$1,337,145 $1,337,145 $140,000,000 $68,022,213 $71,977,787
26 Highw ay Planning (2%) $19,295,487 $10,196,102 $9,099,385 $19,488,442 $19,488,442 $19,683,327 $19,683,327 $19,880,160 $19,880,160 $78,347,416 $69,248,031 $9,099,385
27 Statew ide Research (25%) $6,431,829 $6,431,829 $6,496,147 $6,496,147 $6,561,109 $6,561,109 $6,626,720 $6,626,720 $26,115,805 $26,115,805
28 Recreations Trails $1,686,229 $1,686,229 $1,703,091 $1,703,091 $1,720,122 $1,720,122 $1,737,323 $1,737,323 $6,846,766 $6,846,766
29 Metro Planning $11,093,682 $314,574 $10,779,108 $11,204,619 $11,204,619 $11,316,665 $11,316,665 $11,429,832 $11,429,832 $45,044,798 $34,265,690 $10,779,108
30 RR Hazard Elimination $8,644,604 $8,644,604 $8,731,050 $8,731,050 $8,818,360 $8,818,360 $8,906,544 $8,906,544 $35,100,557 $35,100,557
31 TAP/Enhancements $26,165,137 $5,025,401 $21,139,736 $26,426,788 -$6,573,104 $32,999,892 $26,691,056 $11,085,242 $15,605,814 $26,957,966 $19,677,445 $7,280,521 $106,240,946 $29,214,984 $77,025,963
32 National Historic Covered Bridge $909,258 $909,258 $779,078 $779,078 $1,688,337 $1,688,337
33 National Corridor Boarder $3,434,618 $3,434,618 $3,434,618 $3,434,618
34 Other Federal
Sub-Totals $248,485,123 $163,378,825 $85,106,299 $101,921,392 -$35,650,635 $137,572,027 $93,987,136 $49,566,449 $44,420,687 $76,965,880 $58,556,836 $18,409,044 $521,359,532 $235,851,475 $285,508,057
Federal Discretionary
35 Emergency Relief $7,787,376 $7,787,376 $28,318,626 $28,318,626 $36,106,001 $36,106,001
36 Trans & Community Sys Pres (TCSP) $363,043 $363,043 $363,043 $363,043
37 Innovative Bridge $183,200 $183,200 $183,200 $183,200
38 Scenic Byw ay $917,031 $917,031 $917,031 $917,031
39 Ferry Boat $766,453 $766,453 $766,453 $766,453
40 FHWA Transfer to ODOT $1,632,089 $1,632,089 $1,632,089 $1,632,089
Sub-Totals Discretionary Programs $10,732,161 $766,453 $9,965,708 $29,235,657 $29,235,657 $39,967,818 $766,453 $39,201,365
Grand Totals FHWA $2,322,594,535 $262,911,782 $2,059,682,752 $2,278,065,504 -$58,163,655 $2,336,229,159 $2,300,310,376 -$119,629,450 $2,419,939,825 $2,351,086,791 $631,837,067 $1,719,249,725 $9,252,057,206 $716,955,744 $8,535,101,462
Prior SFY Carry Forw ard Balance N/A $262,911,782 $204,748,127 $85,118,677
Fiscal Year Balance $262,911,782 $204,748,127 $85,118,677 $716,955,744
SFY 2014 SFY 2015 SFY 2016 SFY 2017 4 Year STIP
ODOT 2014-2017 STIP Page 46
Table 11 Continued
Transit Funding by Line Item
5307 - Urban Formula Program
41 5307 - Urban Formula Program $124,270,814 $124,270,814 $121,932,935 $121,932,935 $139,301,935 $139,301,935 $116,488,541 $116,488,541 $501,994,225 $501,994,225
5309 - Capital Investment Program
42 5309 / 0001 - Bus & Bus Facility $72,000 $72,000 $72,000 $72,000
43 5309 / 0002 - Fixed Guidew ay Modernization
44 5309 / 0003 - New Starts
45 5309 / 0004 - Small Starts
46 5309 / 0005 - Urban Circulator
47 5309 / 0006 - Livability
48 5309 / 0007 - TIGER
49 5309 / 0008 - TIGGER
50 5309 / 0009 - State of Good Repairs
Sub-Totals $72,000 $72,000 $72,000 $72,000
5310 - Enhanced Mobility - 2nd Line is Line Item Projects
51 5310 - Enhanced Mobility $4,839,533 $4,839,533 $4,888,954 $4,888,954 $3,083,823 $3,083,823 $3,083,823 $3,083,823 $15,896,134 $15,896,134
52 5310 - Enhanced Mobility $5,900,000 $5,900,000 $5,900,000 $5,900,000 $5,900,000 $5,900,000 $5,900,000 $5,900,000 $23,600,000 $23,600,000
5311 - Rural Transit Program
53 5311 - Rural Transit Program $21,000,000 $21,000,000 $21,000,000 $21,000,000 $21,000,000 $21,000,000 $21,000,000 $21,000,000 $84,000,000 $84,000,000
5316 - Job Access Reverse Commute Program - 2nd Line is Line Item Projects
54 5316 - Job Access Reverse Commute Program $39,209 $39,209 $39,209 $39,209
55 5316 - Job Access Reverse Commute Program $2,000,000 $2,000,000 $2,000,000 $2,000,000 $4,000,000 $4,000,000
5317 - New Freedom Program - 2nd Line is Line Item Projects
56 5317 - New Freedom Program $25,117 $25,117 $700,000 $700,000 $725,117 $725,117
57 5317 - New Freedom Program $1,400,000 $1,400,000 $1,400,000 $1,400,000
5337 - "State of Good Repair"
58 5337 / 0001 - State of Good Repair $30,000,000 $14,544,501 $15,455,499 $30,000,000 $7,484,501 $22,515,499 $30,000,000 $2,493,200 $27,506,800 $30,000,000 $2,996,873 $27,003,127 $120,000,000 $27,519,074 $92,480,926
59 5337 / 0002 - Fixed Guidew ay Modernization $800,000 $800,000 $5,800,000 $5,800,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000 $16,600,000 $16,600,000
Sub-Totals $30,800,000 $14,544,501 $16,255,499 $35,800,000 $7,484,501 $28,315,499 $35,000,000 $2,493,200 $32,506,800 $35,000,000 $2,996,873 $32,003,127 $136,600,000 $27,519,074 $109,080,926
5339 - "Bus and Bus Facilities"
60 5339 / 0002 - Bus & Bus Facilities $10,100,000 $466,552 $9,633,448 $10,100,000 $428,960 $9,671,040 $10,100,000 $1,118,245 $8,981,755 $10,100,000 $368,245 $9,731,755 $40,400,000 $2,382,002 $38,017,998
Transit State/Local Match
61 Local Match - 0001 - Farebox Revenue - Local $56,564,806 $56,564,806 $58,165,057 $58,165,057 $2,925,496 $2,925,496 $10,715,474 $10,715,474 $128,370,833 $128,370,833
62 Local Match - 0002 - Local Dedicated - Tax $294,448,395 $294,448,395 $260,926,334 $260,926,334 $213,411,455 $213,411,455 $119,323,250 $119,323,250 $888,109,433 $888,109,433
63 Local Match - 0003 - Local Other $320,798,257 $320,798,257 $331,859,888 $331,859,888 $302,768,471 $302,768,471 $315,868,371 $315,868,371 $1,271,294,986 $1,271,294,986
64 GRF Funds $3,027,856 $62,997 $2,964,859 $3,027,856 $102,910 $2,924,946 $3,027,856 $122,966 $2,904,890 $3,027,856 $118,066 $2,909,790 $12,111,424 $406,939 $11,704,485
Sub-Totals $674,839,313 $62,997 $674,776,316 $653,979,134 $102,910 $653,876,224 $522,133,278 $122,966 $522,010,312 $448,934,951 $118,066 $448,816,885 $2,299,886,676 $406,939 $2,299,479,737
Sub-Totals $875,213,987 $15,074,050 $860,139,937 $856,373,023 $8,016,371 $848,356,653 $736,519,036 $3,734,411 $732,784,625 $640,507,315 $3,483,184 $637,024,131 $3,108,613,361 $30,308,015 $3,078,305,346
Prior SFY Carry Forw ard Balance N/A $15,074,050 $23,090,421 $26,824,831
Fiscal Year Balance $15,074,050 $23,090,421 $26,824,831 $30,308,015
Line # Legend
8 "OPDS Penalty Transfer from IM Funds:" = $24.2M Penalty transfer funds added back to IM until ODPS projects identified in 2010 through 2013 and funded accordingly.
10 "Garvee Bond" = Bonds sold w ith Federal backing. Federal Funds not on projects but authroized federal and associated Garveee Bond Debt service paid w ith Federal. See Garvee bond debt Service Line.
14 "Garvee Bond Debt Service" = Debt Service paid in federal for bonds to sell projects associated w ith the "Garvee Bond" line show n above.
15-16 "Un-Assigned Federal" - Federal SAC codes but no Federal billing fund yet assigned (ie SACs 4PF7, 4BK7, TRAN, TRTR, etc.)
22-23 "Local Match" = Budget matches estimates in that the local guarantees the source of funding based on the entire revenue sources for specific projects. (SACs LNTP, 4BG6, 4BG7, & 4BG9)
25 Appalachia Highw ay = Budget in 2014 is show ing estimated carryforw ard balance from prior SFYs.
42-50 Section 5309 "Transit Capital Investment Program": Includes $6M/Yr Statew ide Earmark Estimate and Transit SAFETEA-LU Earmarks (Funds estimates to grow 1% in 2010 & 2011)
52 5310 "Transit Urban Formula Program" Line Item Projects = Ellis projects 90741, 90742, 95065 & 95066 for Line Item Budgets of $5,900,000 per Year 2014-2017 respectively.
53 5311 "Rural Transit Program" Line Item Projects = Ellis projects 90737, 90738, 95056 & 95057 for Line Item Budgets of $21,000,000 per Year 2014-2017 respectively.
55 5316 "Job Access Reverse Commute" Line Item Projects = Ellis projects 90745 & 90746 for Line Item Budgets of $2,000,000 per Year 2014-2015 respectively.
57 5317 "New Freedom Program" Line Item Projects = Ellis projects 90750 & 90752 for Line Item Budgets of $1,400,000 per Year 2014-2015 respectively.
Note: Garvee Bond, State Bond used Business Plan for Budgets. Also used Business Plan for Garvee Debt Service Estimates.
ODOT 2014-2017 STIP Page 47
APPENDIX 1
2014-2017 STATEWIDE LINE ITEMS
ODOT 2014-2017 STIP Page 48
APPENDIX 1
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) State Fiscal Years 2014-2017 Line Items Total Project Cost for Each Fiscal Year
STIP
REFERENCE
ID
COUNTY-
ROUTE-
SECTION
STATEWIDE LINE
ITEMSDEFINITION
TOTAL
PROJECT
COST (000'S)
TYPE OF
FEDERAL
FUNDS
STW Line
Item 000001ALL SYSTEMS AMISH BUGGY
ODOT targets projects on priority state routes
and off-road trails adjacent to priority state
routes that improve safety for motorists and
horse drawn vehicles. The priority state routes
were identified and selected based on ODOT
buggy/ motorized vehicle crash data.
$300 STP
STW Line
Item 000002ALL SYSTEMS
APPALACHIAN
DEVELOPMENT
LOCAL ACCESS
The Ohio Department of Development manages
this federal program. Local nonprofit or local
governments may apply for funding for local
access roads serving industrial, commercial,
residential, recreational and educational areas;
funds can pay for preliminary engineering,
right of way and/or construction which will
improve economic development opportunities.
$1,000APL
TAP
STW Line
Item 000003ALL SYSTEMS BRIDGE INSPECTION
Annual series of inspections are conducted on
state highway system bridges. Some inspections
are completed by ODOT District personnel and
others completed by multiple inspection
contracts.
$1,000BR
STP
STW Line
Item 000004ALL SYSTEMS
BRIDGE
MAINTENANCE
ACTIVITIES
ODOT completes numerous small projects
which are planned, designed and constructed
quickly to maintain the structures on the
highway system. These projects include bridge
painting, sealing, and repairs from vehicle
crashes.
$750 STP
STW Line
Item 000005ALL SYSTEMS
BRIDGE
REHABILITATION,
RECONSTRUCTION &
REPLACEMENT
The need for reconstruction or rehabilitation of
a particular bridge structure may be
accelerated by weather or other conditions
requiring quick action by ODOT. This covers
bridge work on state highways or eligible local
routes.
$5,000BR
STP
STW Line
Item 000006
LOCAL
SYSTEMS
CEAO PROGRAM
ADMINISTRATION
ODOT allocates federal funds to the counties for
safety and preservation programs. This covers
the County Engineers Association of Ohio's costs
for administrating the program.
$375 STP
STW Line
Item 000007ALL SYSTEMS
EMERGENCY RELIEF
PROJECTS
When an emergency occurs, usually weather
related, and an individual local area is
devastated it is necessary to take prompt action.
Covers ODOT emergency categories A, B & C.
$2,500
IM
NH
STP
BR
ER
ODOT 2014-2017 STIP Page 49
STIP State Fiscal Years 2014-2017 Line Items (Continued) Total Project Cost for Each Fiscal Year
STIP
REFERENCE
ID
COUNTY-
ROUTE-
SECTION
STATEWIDE LINE
ITEMSDEFINITION
TOTAL
PROJECT
COST (000'S)
TYPE OF
FEDERAL
FUNDS
STW Line
Item 000008ALL SYSTEMS
ENVIRONMENTAL
MITIGATION
The National Environments Policy Act (NEPA)
in certain situations require the mitigation of
environmental impacts from transportation
improvement projects. Some mitigation
activities are not initially attached to any
specific project.
$1,000STP
NHPP
STW Line
Item 000009ALL SYSTEMS
FEDERAL
DISCRETIONARY
PROGRAMS
Several programs are funded on the national
level, interstate maintenance, covered bridge,
ferry boat, and innovative bridge. The funding
for these programs is appropriated late in the
federal fiscal year and is required to be
authorized prior to the end of that year.
$3,000
IMD
DCB
FBD
INB
NCPD
SB
TCSP
STW Line
Item 000010ALL SYSTEM
FOREST
HIGHWAYS/PUBLIC
LANDS
This program is administered and funded
through the Eastern Federal Lands Highways
Division (EFLHD) of FHWA. The program
emphasis is on high-use recreation sites and
economic generators. Projects are cooperatively
selected and managed by ODOT, EFLHD, and
the County Engineers Associations of Ohio
(CEAO). Funds may be used for planning,
research, engineering, design, preventive
maintenance, rehabilitation, restoration,
construction, and reconstruction of highways,
roads, parkways, transit facilities, adjacent
vehicular parking areas, provisions for
pedestrians and bicycles, acquisition of scenic
easements, environmental mitigation and rest
areas.
$1,750 FH
PLH
STW Line
Item 000011ALL SYSTEM
GEOLOGIC SITE
ASSESSMENT
ODOT provides construction funding for the
remediation of landslide, rock fall, underground
mine, erosion and sinkhole sites. Eligible
activities include both preventive site mitigation
and reactive repair. To be eligible, a project
must be identified on the District Geologic Site
Inventory and have undergone a Cost to
Benefit analysis to determine if the site is a
viable project.
$1,000
IM
NH
STP
NHPP
STW Line
Item 000012ALL SYSTEMS
HIGHWAY
MAINTENANCE
ACTIVITIES
ODOT completes numerous small projects
which are planned, designed and constructed
quickly to maintain the highway system. These
projects include mowing, lighting, signing,
guardrail, city maintenance contracts, spot
safety improvements, traffic signals, patching
and pavement markings; in addition other
projects are also considered important
pavement and structure maintenance activities;
such as, shoulder work and spot pavement
repair.
$1,500
IM
NH
STP
ODOT 2014-2017 STIP Page 50
STIP State Fiscal Years 2014-2017 Line Items (Continued) Total Project Cost for Each Fiscal Year
STIP
REFERENCE
ID
COUNTY-
ROUTE-
SECTION
STATEWIDE LINE
ITEMSDEFINITION
TOTAL
PROJECT
COST (000'S)
TYPE OF
FEDERAL
FUNDS
STW Line
Item 000014ALL SYSTEMS
HIGHWAY
RESURFACING,
REHABILITATION, &
IMPROVEMENTS
Highway Resurfacing, Rehabilitation, &
Improvements - The need for resurfacing or
rehabilitation on a particular highway may be
accelerated by weather or other conditions
requiring quick action by ODOT. This covers
basic resurfacing on any level highway:
interstate, US route, or state route; and any
number of lanes, two-, four- or more lanes;
divided or undivided. Also covered are highway
restoration, rehabilitation, shoulder
improvements, addition of medians, and the
widening of narrow pavement lanes.
$5,000
IM
NH
STP
NHPP
STW Line
Item 000015ALL SYSTEMS
HIGHWAY SAFETY
PROGRAM
Highway Safety - ODOT targets specific safety
concerns for hazard elimination which can
require quick action. These projects include
vertical and horizontal alignment, signalizations
and intersection channelization.
$6,000
IM
NH
STP
HSIP
NHPP
STW Line
Item 000016
LOCAL
SYSTEMS
LOCAL GOVERNMENT
PROGRAMS
Local Government Programs - Like ODOT, the
county paving and bridge programs complete
numerous small projects which are planned,
designed, and constructed quickly to maintain
the local systems.
$5,000
BR
HRRR
HSIP
STP
STW Line
Item 000017ALL SYSTEMS
LOCAL PLANNING
AGENCIES
Local Planning Agencies (LPAs) - ODOT
occasionally provides guidance and information
to local planning agencies outside of MPO areas,
but which are outside of the Highway Planning
and Research program.
$50 STP
STW Line
Item 000018ALL SYSTEMS
NATIONAL
RECREATIONAL
TRAILS
National Recreational Trails Program -
Nationally funded program which is
coordinated by the Ohio Department of Natural
Resources. The funding for this program is
appropriated by the U.S. Congress on an annual
basis. Therefore funding is not committed to
individual trail projects outside of the current
year.
$2,000 NRT
STW Line
Item 000019ALL SYSTEMS
OHIO DEPARTMENT
OF PUBLIC SAFETY
402 SAFETY
PROGRAM
ACTIVITIES
Ohio Department of Public Safety – 402 Safety
Program – Specific funding is set aside by
SAFEETEA-LU for this program which is
administered by the Ohio Department of Public
Safety.
$2,000 STP
STW Line
Item 000020ALL SYSTEMS
RAIL GRADE
SEPARATION
PROGRAM
Rail Grade Separation Program - This program
was created by Governor Taft in 2002. The
funding of specific crossing for separation may
happen outside of the usual schedule to
address safety concerns
$3,000 STP
CMAQ
ODOT 2014-2017 STIP Page 51
STIP State Fiscal Years 2014-2017 Line Items (Continued) Total Project Cost for Each Fiscal Year
STIP
REFERENCE
ID
COUNTY-
ROUTE-
SECTION
STATEWIDE LINE
ITEMSDEFINITION
TOTAL
PROJECT
COST (000'S)
TYPE OF
FEDERAL
FUNDS
STW Line
Item 000021
ALL SYSTEMS
EXCEPT
INTERSTATE
RAIL HIGHWAY
CROSSING SAFETY
Rail Highway Crossing Safety - This program
funds rail grade crossing protection
improvements. Projects are selected by Ohio
Rail Development Commission and the Ohio
Public Utilities Commission with the work being
performed by the railroad companies.
$2,000 STP
HSIP
STW Line
Item 000022ALL SYSTEMS
RIDESHARE
PROGRAM
Rideshare Program - This is a statewide
program which provides funding to regional
coordination agencies.
$2,000STP
CMAQ
STW Line
Item 000023ALL SYSTEMS
RIGHT-OF-WAY
HARDSHIP AND
PROTECTIVE BUYING
Right-of-way Hardship and Protective Buying -
Prior to the completion of a transportation
system improvement environmental
assessment which would determine exactly
which properties need to be purchase under
the right-of-way phase, an individual property
becomes available. When ODOT is reasonably
certain the property will be required for the
planned improvement the property may be
purchase ahead of the complete right-of-way
plan approval.
$1,000
NH
STP
NHPP
STW Line
Item 000024ALL SYSTEMS
SAFE ROUTES TO
SCHOOL
This program includes activities which improve
the ability of primary and middle school
students to walk and bicycle to school safely.
Activities included both education and
construction programs.
$1,000 TAP
STW Line
Item 000025
ALL TRANSIT
SYSTEMS
SPECIALIZED
TRANSPORTATION
PROGRAMS
Specialized Transportation Program - ODOT
provides funding vehicles ad related
equipment for special services for the elderly
and people with disabilities. The local agencies
which participate in this program operate on
calendar year basis and the federal program
funding appropriations are made on an annual
basis.
$5,500 5310
STW Line
Item 000026ALL SYSTEMS
TRANSPORTATION
ALTERNATIVES
PROGRAM
Transportation Alternatives - The local
sponsoring agency funds the preliminary
engineering for a project once it is selected. The
timing for the actual construction phase in not
within ODOT’s control following selection.
$3,000 TAP
STW Line
Item 000027N/A
DEISEL EMISSIONS
REDUCTION GRANT
PROGRAM
Ohio EPA administers the DERG program. This
is a biennium budget for 2012-2013 focused
on reducing mobile source diesel emissions.
Phase Type Other.
$10,000 CMAQ
STW Line
Item 000028ALL SYSTEMS
NOISE WALL
PROGRAM
ODOT allocates design and construction
funding for Type II noise walls (new noise walls
for communities that predate the freeway and
desire a noise wall) and noise wall
maintenance/replacement projects.
$1,000
IM
STP
NHPP
ODOT 2014-2017 STIP Page 52
APPENDIX 2
ENVIRONMENTAL JUSTICE
ODOT 2014-2017 STIP Page 53
APPENDIX 2
2014-2017 STIP ENVIRONMENTAL JUSTICE ANALYSIS BY COUNTY
County Projects
% Total
Projects Total Cost % Total Cost
State % Low
Income
County %
Low Income1
State %
Minority
County %
Minority2
ADA 27 0.79% $32,750,311.58 0.29% 0.39% 22.82% 0.03% 2.34%
ALL 51 1.48% $121,470,324.10 1.26% 1.11% 18.02% 0.86% 16.22%
ASD 16 0.47% $24,572,705.00 0.27% 0.45% 14.59% 0.07% 2.72%
ATB 23 0.67% $57,869,624.00 0.62% 1.02% 17.18% 0.37% 7.35%
ATH 39 1.14% $67,432,410.28 0.62% 1.06% 31.53% 0.27% 8.20%
AUG 33 0.96% $29,932,272.87 0.29% 0.20% 7.19% 0.05% 2.15%
BEL 48 1.40% $128,166,700.45 1.07% 0.57% 14.15% 0.21% 5.96%
BRO 31 0.90% $31,337,920.57 0.35% 0.33% 12.20% 0.06% 2.48%
BUT 72 2.10% $94,882,717.00 0.86% 2.74% 12.82% 2.58% 13.98%
CAR 10 0.29% $21,055,629.27 0.19% 0.24% 13.85% 0.03% 2.20%
CHP 16 0.47% $9,082,422.03 0.10% 0.36% 15.07% 0.11% 5.26%
CLA 71 2.07% $66,763,085.67 0.67% 1.38% 16.91% 0.95% 13.66%
CLE 36 1.05% $42,804,598.50 0.39% 1.14% 9.64% 0.41% 4.11%
CLI 18 0.52% $19,653,115.00 0.21% 0.37% 14.77% 0.11% 5.32%
COL 40 1.16% $65,227,504.63 0.63% 1.00% 15.90% 0.24% 4.53%
COS 22 0.64% $56,244,344.71 0.51% 0.37% 16.71% 0.05% 2.96%
CRA 21 0.61% $42,542,433.00 0.39% 0.39% 14.78% 0.06% 2.80%
CUY 193 5.62% $2,494,997,440.05 26.02% 13.03% 17.10% 23.34% 36.40%
DAR 22 0.64% $22,481,580.70 0.20% 0.36% 11.48% 0.06% 2.22%
DEF 10 0.29% $11,964,892.00 0.13% 0.29% 12.61% 0.14% 7.25%
DEL 42 1.22% $80,542,950.99 1.05% 0.46% 4.53% 0.90% 10.27%
ERI 38 1.11% $53,064,839.02 0.48% 0.57% 12.60% 0.50% 12.99%
FAI 30 0.87% $70,373,213.25 0.58% 0.99% 11.46% 0.72% 9.80%
FAY 10 0.29% $25,145,714.00 0.23% 0.32% 18.52% 0.08% 5.37%
FRA 170 4.95% $1,068,250,680.24 9.47% 11.86% 17.37% 17.92% 30.75%
FUL 12 0.35% $27,235,400.00 0.25% 0.26% 10.31% 0.11% 5.06%
GAL 29 0.84% $39,032,175.00 0.38% 0.37% 20.19% 0.08% 5.26%
GEA 30 0.87% $54,731,300.00 0.49% 0.45% 8.01% 0.14% 3.08%
GRE 54 1.57% $63,969,177.00 0.57% 1.18% 12.79% 1.10% 13.56%
GUE 28 0.82% $62,399,880.58 0.58% 0.41% 17.07% 0.08% 3.99%
HAM 168 4.89% $918,693,672.03 8.34% 7.55% 15.92% 12.52% 31.16%
HAN 20 0.58% $233,953,767.00 2.17% 0.53% 11.94% 0.25% 6.62%
HAR 10 0.29% $11,444,245.00 0.09% 0.34% 18.59% 0.05% 3.33%
HAS 16 0.47% $26,565,013.07 0.24% 0.19% 20.10% 0.03% 4.08%
HEN 18 0.52% $33,487,056.16 0.29% 0.20% 11.69% 0.07% 4.81%
HIG 23 0.67% $41,356,677.39 0.41% 0.45% 17.29% 0.08% 3.55%
HOC 18 0.52% $19,890,345.00 0.21% 0.27% 15.73% 0.04% 2.52%
HOL 13 0.38% $21,402,015.68 0.19% 0.37% 14.72% 0.03% 1.27%
HUR 19 0.55% $21,594,786.37 0.20% 0.53% 15.01% 0.15% 5.15%
JAC 17 0.49% $29,239,504.80 0.17% 0.46% 23.21% 0.05% 2.88%
JEF 53 1.54% $98,293,155.52 0.90% 0.69% 16.94% 0.28% 8.08%
KNO 18 0.52% $35,310,821.95 0.32% 0.45% 12.98% 0.10% 3.26%
ODOT 2014-2017 STIP Page 54
2014-2017 STIP
ENVIRONMENTAL JUSTICE ANALYSIS BY COUNTY (Continued)
County Projects
% Total
Projects Total Cost % Total Cost
State % Low
Income
County %
Low Income1
State %
Minority
County %
Minority2
LAK 84 2.45% $160,860,209.33 1.36% 1.16% 8.47% 0.87% 7.53%
LAW 46 1.34% $38,683,733.33 0.40% 0.65% 17.45% 0.13% 4.14%
LIC 61 1.78% $115,348,992.59 1.11% 1.13% 11.61% 0.57% 6.79%
LOG 13 0.38% $14,447,026.90 0.15% 0.41% 14.93% 0.11% 4.66%
LOR 90 2.62% $150,588,259.24 1.21% 2.39% 13.61% 2.30% 15.25%
LUC 129 3.76% $489,463,024.10 4.18% 5.11% 19.51% 5.76% 26.02%
MAD 17 0.49% $35,065,277.00 0.33% 0.24% 10.45% 0.20% 9.37%
MAH 89 2.59% $201,614,177.75 1.69% 2.40% 17.05% 2.40% 20.09%
MAR 22 0.64% $27,033,608.00 0.27% 0.69% 18.52% 0.30% 8.93%
MED 13 0.38% $96,950,718.98 0.82% 0.74% 7.17% 0.33% 3.88%
MEG 80 2.33% $17,272,478.04 0.17% 0.30% 21.33% 0.03% 2.61%
MER 14 0.41% $11,359,472.00 0.10% 0.22% 8.81% 0.05% 2.58%
MIA 13 0.38% $84,783,632.40 0.78% 0.69% 11.26% 0.29% 5.64%
MOE 53 1.54% $23,989,750.00 0.26% 0.16% 18.13% 0.01% 1.94%
MOT 23 0.67% $491,279,602.55 4.86% 4.99% 16.00% 7.00% 26.14%
MRG 136 3.96% $23,526,397.00 0.21% 0.18% 19.46% 0.05% 6.80%
MRW 11 0.32% $11,911,921.00 0.11% 0.25% 11.89% 0.04% 2.30%
MUS 35 1.02% $63,733,627.37 0.58% 0.85% 16.92% 0.30% 7.03%
NOB 14 0.41% $15,439,300.00 0.14% 0.12% 16.32% 0.03% 3.91%
OTT 21 0.61% $36,085,427.00 0.32% 0.25% 10.22% 0.07% 3.52%
PAU 9 0.26% $9,291,760.00 0.10% 0.16% 13.47% 0.04% 4.32%
PER 14 0.41% $18,489,494.64 0.18% 0.38% 17.65% 0.04% 2.13%
PIC 14 0.41% $23,675,500.00 0.29% 0.40% 13.11% 0.15% 5.46%
PIK 22 0.64% $50,467,734.84 0.43% 0.38% 22.49% 0.05% 3.41%
POR 50 1.46% $85,138,425.97 0.82% 1.33% 14.31% 0.63% 7.73%
PRE 15 0.44% $22,705,110.00 0.20% 0.26% 10.26% 0.05% 2.43%
PUT 11 0.32% $14,752,476.00 0.14% 0.13% 6.31% 0.07% 4.31%
RIC 68 1.98% $104,389,194.34 0.97% 0.96% 13.40% 0.78% 12.54%
ROS 22 0.64% $19,621,193.78 0.11% 0.76% 17.53% 0.36% 9.26%
SAN 16 0.47% $14,751,375.00 0.13% 0.49% 13.62% 0.27% 8.80%
SCI 33 0.96% $106,995,500.47 0.98% 1.00% 21.78% 0.22% 5.60%
SEN 19 0.55% $20,253,800.00 0.18% 0.46% 14.09% 0.18% 6.28%
SHE 22 0.64% $24,381,292.66 0.23% 0.35% 12.03% 0.13% 5.32%
STA 74 2.15% $197,545,799.49 1.78% 3.01% 13.58% 2.12% 11.29%
SUM 116 3.38% $573,867,614.30 5.27% 4.68% 14.49% 5.27% 19.43%
TRU 71 2.07% $159,751,821.00 1.46% 2.05% 16.35% 1.16% 11.03%
TUS 21 0.61% $36,332,675.43 0.35% 0.76% 13.71% 0.16% 3.44%
UNI 14 0.41% $18,072,896.00 0.17% 0.19% 6.63% 0.19% 7.10%
VAN 11 0.32% $12,250,615.00 0.10% 0.16% 9.11% 0.05% 3.42%
VIN 9 0.26% $6,266,000.00 0.09% 0.17% 20.84% 0.01% 2.07%
WAR 37 1.08% $94,063,437.44 0.88% 0.78% 6.29% 1.01% 9.53%
WAS 44 1.28% $51,142,642.66 0.49% 0.55% 15.14% 0.11% 3.53%
ODOT 2014-2017 STIP Page 55
2014-2017 STIP
ENVIRONMENTAL JUSTICE ANALYSIS BY COUNTY (Continued)
County Projects
% Total
Projects Total Cost % Total Cost
State % Low
Income
County %
Low Income1
State %
Minority
County %
Minority2
WAY 45 1.31% $47,811,029.45 0.44% 0.71% 10.59% 0.25% 4.35%
WIL 13 0.38% $13,654,622.29 0.12% 0.25% 11.40% 0.08% 4.05%
WOO 53 1.54% $288,396,978.00 2.17% 0.95% 13.30% 0.45% 7.22%
WYA 13 0.38% $22,506,237.92 0.19% 0.10% 7.74% 0.03% 3.06%
Total 3,435 100% $10,623,220,282.72 100% 100% 100%
1. Percentage of the county's population that is low income
2. Percentage of the county's population that is a minority
* Red highlighted values indicate the percentage is greater than the statewide average.
ODOT 2014-2017 STIP Page 56
ODOT 2014-2017 STIP Page 57
ODOT 2014-2017 STIP Page 58
ODOT 2014-2017 STIP Page 59
ODOT 2014-2017 STIP Page 60
ODOT 2014-2017 STIP Page 61
ODOT 2014-2017 STIP Page 62
ODOT 2014-2017 STIP Page 63
ODOT 2014-2017 STIP Page 64
ODOT 2014-2017 STIP Page 65
ODOT 2014-2017 STIP Page 66
ODOT 2014-2017 STIP Page 67
ODOT 2014-2017 STIP Page 68
ODOT 2014-2017 STIP Page 69
ODOT 2014-2017 STIP Page 70
ODOT 2014-2017 STIP Page 71
ODOT 2014-2017 STIP Page 72
ODOT 2014-2017 STIP Page 73
ODOT 2014-2017 STIP Page 74
ODOT 2014-2017 STIP Page 75
ODOT 2014-2017 STIP Page 76
ODOT 2014-2017 STIP Page 77
ODOT 2014-2017 STIP Page 78
ODOT 2014-2017 STIP Page 79
ODOT 2014-2017 STIP Page 80
APPENDIX 3
PUBLIC INVOLVEMENT PROCESS 2014-2017 STIP
April 2013
ODOT 2014-2017 STIP Page 81
APPENDIX 3: PUBLIC INVOLVEMENT Public Involvement The public involvement activities for the FY 2014-2017 STIP have followed the procedures established in ODOT’s Public Involvement Policy. Public Involvement is a key component in STIP development. The Environmental Justice regulations also require meaningful effort to involve low income and minority populations in the processes established to make the decision about the use of federal funds. The draft 2014-2017 STIP along with the seventeen MPO TIPs, which included Transportation Plan air quality conformity documentation, were made available for public review and comment at thirty locations statewide from April 8, 2013 through April 19, 2013. The draft STIP was also made available at http://www.dot.state.oh.us/Divisions/Planning/STIP/Pages/comments.aspx for review and comment. Legal advertisements were placed in all of Ohio’s eighty-eight counties to announce the public review period for the draft STIP including the Call & Post African-American Newspaper in the Cincinnati, Cleveland and Columbus areas. An advertisement was also circulated in the Ohio Township Association Newsletter, Grassroot Clippings. Media releases were completed in each District to aide in statewide awareness. Webpages and Facebook were also utilized in several Districts and Central Office to provide a way for the public to access the STIP information and provide comments in an easily accessible electronic format. The district offices and MPOs held over thirty open houses/public meetings statewide to provide the public the opportunity to view and comment on the draft STIP. Tables were set up incorporating a variety of visualization techniques at the various public meetings including: laptops to view the draft STIP and TIPs; display maps detailing projects and locations; environmental justice and air quality conformity maps; and large display photos for regionally significant projects. Maps, booklets, comment sheets, and general information were readily available for the public to take home to review. District and MPO personnel were on hand to answer questions and provide information. Comments that were received ranged from complimenting the host on the facility set up to more detailed project specific questions. The deadline for comments was April 22, 2013. Each comment and question received was answered in a timely manner by District personnel with either an email or a letter. All STIP public involvement information is kept on file (including the various maps, handouts, comments and responses) and is available to view upon request.
ODOT 2014-2017 STIP Page 82
Example Media Release
Ohio Department of Transportation • News Release
DIVISION OF COMMUNICATIONS 1980 West Broad Street • Columbus, Ohio 43223
www.transportation.ohio.gov
Draft Statewide Transportation Improvement Program Available for Comment
COLUMBUS (Friday, April 5, 2013) – The Ohio Department of Transportation (ODOT) today announced the draft Statewide Transportation Improvement Program is available for comment. The program identifies highway and transit maintenance, new capacity, bicycle and other transportation-related projects that will be implemented throughout the state over the next four years. The draft documents will be available for public review and comment at 30 locations statewide during the review period of April 8-19, 2013 during normal business hours. These locations consist of the Planning and Engineering Administrator's Office in each of the 12 ODOT District Offices, the ODOT Central Office Division of Planning, located in Columbus, and each of the 17 Ohio Metropolitan Planning Organization Offices. For additional information and locations of Open Houses please visit the program’s website at: http://www.dot.state.oh.us/Divisions/Planning/STIP/Pages/comments.aspx Any comments concerning the Statewide Transportation Improvement Program may be submitted by email to [email protected] or mail to: Mrs. Jennifer Townley, Acting Deputy Director Division of Planning Ohio Department of Transportation Mail Stop # 3260 1980 West Broad Street Columbus, Ohio 43223
Written comments must be received by the close of business on April 22, 2013
For more information, contact: Steve Faulkner, ODOT Press Secretary, at 614-644-7101, [email protected] or your local ODOT District Communications Office
ODOT 2014-2017 STIP Page 83
Example Legal Notice
ODOT 2014-2017 STIP Page 84
APPENDIX 4
2012-2015 STIP CARRY FORWARD LIST
ODOT 2014-2017 STIP Page 85
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
1 07/12/12 2013 FHWA 1 77305 LACRPC ALL ALL Shawnee Rd.
Study corridor and make recommendations to improve geometrics,
ingress/egress, ease congestion and upgrade traffic control devices as necessary.
Also, replace existing structure over the Ottawa River with a new wider
structure. Primary Work Category: Intersection Improvement Termini:
Shawnee Road from Zurmehly Rd. to Adgate Rd. & Ft. Amanda Rd. from
Breezewood Ln. to Buckeye Rd.
ALLEN COUNTY ENGINEERCO Air Quality
Exempt0 RW Acquis 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $125,000 $0 $965,000 $665,000 $8,342,750 2012AM07ID0891FDRW
1 RW RW Serv 2013 4B77 Federal L20E STP RURAL <200K $72,000
1 RW RW Serv 2013 4BG7 Local Match 002 Local Match $18,000
1 RW Utl Remb 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $750,000
2 07/12/12 2013 FHWA 1 84557 Findlay HAN HAN US 224 11.81
Replace deficient bridge that carries US224 over IR75. Modify interchange ramps
to accommdate profile adjustments and widening of the bridge. Replace the
approach pavment on both sides of the interchange with new concrete
pavement. The approaches will Primary Work Category: Bridge Replacement
Termini: From CR300 (Northridge Rd.) to Broad Avenue.
ODOT SPONSORING
AGENCY0 RW Acquis 2013 4PF7 Federal L010 INTERSTATE MAINTENANCE $495,000 $0 $650,000 $1,070,791 $17,600,327 2012AM07ID0892FDRW
2 RW Acquis 2013 4PS7 State 002 State Funds (S,O) $55,000
2 RW RW Serv 2013 4PF7 Federal L01E INTERSTATE MAINTENANCE $22,500
2 RW RW Serv 2013 4PF7 Federal L01E INTERSTATE MAINTENANCE $22,500
2 RW RW Serv 2013 4PS7 State 002 State Funds (S,O) $2,500
2 RW RW Serv 2013 4PS7 State 002 State Funds (S,O) $2,500
2 RW Utl Remb 2015 4PF7 Federal L01E INTERSTATE MAINTENANCE $45,000
2 RW Utl Remb 2015 4PS7 State 002 State Funds (S,O) $5,000
3 06/04/12 2014 FHWA 1 84686 LACRPC D01 D01 RPM FY14
REPLACE RAISED PAVEMENT MARKER CASTINGS AND/OR LENSES AS NEEDED ON
VARIOUS ROUTES Primary Work Category: Raised Pavement Markers
Termini: VARIOUS ROUTES AND SECTIONS THROUGHOUT DISTRICT ONE
ODOT SPONSORING
AGENCY0 CO CO Engr 2014 LABR State 002 State Funds (S,O) $21,565 $0 $237,215 $0 $237,215 2012MODID0176FDCO
3 CO CO Contr 2014 4CP7 State 002 State Funds (S,O) $215,650
4 01/17/13 2014 FHWA 1 85093 PUTPUT US 224/SR 108/694
12.13/1.68
Grind and resurface the 2-lane pavements with asphalt concrete: On US224 from
the ECL of Kalida to the CSX RR spur at log point 21.39 in Ottawa; On SR108 from
the bridge south of SR613 to just south of the intersection with CR E; and, On
SR694 from the WC Primary Work Category: Resurfacing, Undivided System
Termini: On US224, SR108, SR694 as described below.
ODOT SPONSORING
AGENCY12.18 CO CO Engr 2014 LABR Federal L25E STP RURAL <5K $112,442 $0 $2,340,044 $0 $2,340,044 2012AM09ID1481FDCO
4 CO CO Engr 2014 LABR State 002 State Funds (S,O) $28,110
4 CO CO Engr 2014 LABR Federal L20E STP RURAL <200K $57,743
4 CO CO Engr 2014 LABR State 002 State Funds (S,O) $14,436
4 CO CO Contr 2014 4PF7 Federal L20E STP RURAL <200K $577,434
4 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $144,358
4 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $1,124,417
4 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $281,104
5 07/01/11 2014 FHWA 1 85095 HAR HAR SR 31-5.00
Abandon in place the existing culvert by filling it in with grout. Place a new
culvert to the south of it to better align with drainage. Provide clear zone
grading. Primary Work Category: Culvert Construction/Reconstr/Repair
Termini: APPROXIMATELY 2.59 MILES NORTH OF JUCNTION SR 273
ODOT SPONSORING
AGENCY0 CO CO Contr 2013 4PS7 State 002 State Funds (S,O) $205,603 $0 $226,163 $0 $226,163 2012stipID0098STCO
5 CO CO Engr 2013 LABR State 002 State Funds (S,O) $20,560
6 07/12/12 2013 FHWA 1 87005 Findlay HAN HAN IR 75 14.39
[SEPTEMBER, 2012 PROGRAMMATIC IS FOR A RW ACQUISITION TURNKEY
SERVICES CONTRACT AND A RW APPRAISAL REVIEW CONTRACT.] MAJOR NEW
WIDENING AND RECONSTRUCTION OF IR 75. BEGIN RECONSTRUCTION AT
BEGINING OF OLD CONCRETE PAVEMENT (LOG 14.39). BEGIN WIDENING A
Primary Work Category: Major Widening Termini: FROM APPROXIMATELY 0.8
MILES SOUTH OF US 68/IR 75 INTERCHANGE TO THE SOUTHERN LIMIT OF THE
SPEED CHANGE LANES AT CR 99 INTERCHANGE
ODOT SPONSORING
AGENCY6 PE Dtl Dsgn 2013 4RC7 Federal L05E NATIONAL HIGHWAY SYSTEM $200,000 $683,894 $6,250,000 $683,894 $162,198,201 2012AM07ID0894FDPE
6 PE Dtl Dsgn 2013 4RA7 State 002 State Funds (S,O) $50,000
6 PE Env PE 2013 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $2,312,000
6 PE Env PE 2013 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $1,852,885
6 PE Env PE 2013 4BD7 State 002 State Funds (S,O) $578,000
6 PE Env PE 2013 4BD7 State 002 State Funds (S,O) $463,221
6 PE Env PE 2013 4BK7 Federal $80,000
6 PE Env PE 2013 4BD7 State 002 State Funds (S,O) $20,000
6 PE Env PE 2013 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $8,000
6 PE Env PE 2013 4BD7 State 002 State Funds (S,O) $2,000
7 07/12/12 2013 FHWA 1 87005 Findlay HAN HAN IR 75 14.39
[SEPTEMBER, 2012 PROGRAMMATIC IS FOR A RW ACQUISITION TURNKEY
SERVICES CONTRACT AND A RW APPRAISAL REVIEW CONTRACT.] MAJOR NEW
WIDENING AND RECONSTRUCTION OF IR 75. BEGIN RECONSTRUCTION AT
BEGINING OF OLD CONCRETE PAVEMENT (LOG 14.39). BEGIN WIDENING A
Primary Work Category: Major Widening Termini: FROM APPROXIMATELY 0.8
MILES SOUTH OF US 68/IR 75 INTERCHANGE TO THE SOUTHERN LIMIT OF THE
SPEED CHANGE LANES AT CR 99 INTERCHANGE
ODOT SPONSORING
AGENCY6 RW Acquis 2013 4RC7 Federal L05E NATIONAL HIGHWAY SYSTEM $7,200,000 $0 $14,900,000 $683,894 $162,198,201 2012AM07ID0894FDRW
7 RW Acquis 2013 4RA7 State 002 State Funds (S,O) $1,800,000
7 RW RW Serv 2013 4RC7 Federal $560,000
7 RW RW Serv 2013 4RC7 Federal $160,000
7 RW RW Serv 2013 4RA7 State 002 State Funds (S,O) $140,000
7 RW RW Serv 2013 4RA7 State 002 State Funds (S,O) $40,000
7 RW Utl Remb 2014 4RC7 Federal L05E NATIONAL HIGHWAY SYSTEM $4,000,000
7 RW Utl Remb 2014 4RA7 State 002 State Funds (S,O) $1,000,000
8 04/11/13 2014 FHWA 1 87191 DEFDEF/PAU SR 15/111/637
0.00/21.65
Grind and resurface with asphlat concrete on SR15, SR111 and SR637. The section
from bridge number DEF-15-2165 to Shubert Road will be Micro surfaced to
improve friction. Primary Work Category: Resurfacing, Undivided System
Termini: SR15:Williams CL to US24 and from Bridge @ DEF-15-2165 to Shubert
Road; SR111:SR637 to the Defiance CL; and, SR637:SR613 to SR111.
ODOT SPONSORING
AGENCY23.6 CO CO Engr 2014 LABR Federal L25E STP RURAL <5K $73,866 $0 $3,181,539 $0 $3,181,539 2012AM11ID1809FDCO
8 CO CO Engr 2014 LABR State 002 State Funds (S,O) $18,466
8 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $2,462,185
ODOT 2014-2017 STIP Page 86
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
8 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $615,546
8 CO CO Contr 2014 4PF7 Federal L20E STP RURAL <200K $8,914
8 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $2,228
9 07/01/11 2014 FHWA 1 88854 WYA WYA SR 199 13.39
REPLACE TWIN ELIPTICAL CONCRETE CULVERTS, CLEAR ZONE GRADING Primary
Work Category: Culvert Construction/Reconstr/Repair Termini: 0.70 MILES
SOUTH OF SR 103
ODOT SPONSORING
AGENCY0 CO CO Contr 2013 4PS7 State 002 State Funds (S,O) $233,920 $0 $287,421 $0 $287,421 2012stipID0148STCO
9 CO CO Engr 2013 LABR State 002 State Funds (S,O) $23,392
10 07/01/11 2013 FHWA 1 90949 LACRPC ALLALL Lima Wayne/High
Streets
Modify High Street to a one-way, one lane operation between Metcalf Street
and Central Avenue. Implement "complete streets" features. Convert Wayne
Street to a two-way operation between Jameson Avenue and Central Avenue.
(AKA - Phase 3 of the ALL-Traff Primary Work Category: Section Improvement
Termini: High Street from Metcalf Street to Central Avenue AND Wayne Street
from Jameson Avenue to Central Avenue.
LIMACO Air Quality
Exempt2 PE Dtl Dsgn 2012 4BD7 State 002 State Funds (S,O) $21,333 $0 $160,000 $0 $206,667 2012stipID0018FDDD
10 PE Dtl Dsgn 2012 4BK7 Federal L20E STP RURAL <200K $85,334
10 PE Dtl Dsgn 2012 LNTP Local Match LNTP Non Traditional Local Match $53,333
11 07/12/12 2013 FHWA 1 90952 PAUPAU SRTS Paulding
Sidewalks
S.R.T.S. project. Add new sidewalks along Water Street from Jackson Street to
Baldwin Street, along Emerald Road from Johnson Road to the school and along
North Main Street from Baldwin Street to Miles Street. Add new sidewalk at
missing sections on Car Primary Work Category: Add Sidewalks Termini:
Village Streets near the Paulding Elementary and Middle school.
PAULDING 0 PE Dtl Dsgn 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $87,300 $0 $103,500 $0 $995,939 2012AM07ID0896FDEN
11 PE Env PE 2012 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $16,200
12 07/12/12 2013 FHWA 1 90952 PAUPAU SRTS Paulding
Sidewalks
S.R.T.S. project. Add new sidewalks along Water Street from Jackson Street to
Baldwin Street, along Emerald Road from Johnson Road to the school and along
North Main Street from Baldwin Street to Miles Street. Add new sidewalk at
missing sections on Car Primary Work Category: Add Sidewalks Termini:
Village Streets near the Paulding Elementary and Middle school.
PAULDING 0 RW Acquis 2012 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $17,300 $0 $17,300 $0 $995,939 2012AM07ID0896FDRW
13 07/01/11 2013 FHWA 1 90953 HANHAN SRTS Donnell
Middle School
Construct sidewalk / trail along Lima Avenue from Logan Avenue to Lake
Cascades Parkway. Provide enhanced visibility crosswalk at the Lima Ave/Lake
Cascades Pkwy intersection, including pavement marking, signage and advanced
warning signs. Extend sidewa Primary Work Category: S.R.T.S School Travel
Plan Termini: Along Lima Ave. from Logan Ave. to Lake Cascades Parkway.
Also, along Lake Cascades Pkwy, McPherson Ave. and S. West St.
Findlay, City of 0 CO CO Contr 2012 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $268,800 $0 $295,680 $0 $358,250 2012stipID0078FDCO
13 CO CO Engr 2012 LABR Local Match 002 Local Match $26,880
14 07/01/11 2013 FHWA 1 90953 HANHAN SRTS Donnell
Middle School
Construct sidewalk / trail along Lima Avenue from Logan Avenue to Lake
Cascades Parkway. Provide enhanced visibility crosswalk at the Lima Ave/Lake
Cascades Pkwy intersection, including pavement marking, signage and advanced
warning signs. Extend sidewa Primary Work Category: S.R.T.S School Travel
Plan Termini: Along Lima Ave. from Logan Ave. to Lake Cascades Parkway.
Also, along Lake Cascades Pkwy, McPherson Ave. and S. West St.
Findlay, City of 0 PE Dtl Dsgn 2012 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $26,880 $0 $40,320 $0 $358,250 2012stipID0080FDENDD
14 PE Env PE 2012 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $13,440
15 01/17/13 2013 FHWA 1 93589 PAUPAU SRTS Antwerp
Phase II
Add new sidewalk along the west side of Harrmann Road from the Antwerp
School to Canal Road and along the north side of Canal Road from Harrmann
Road westerly to Koos Drive. Primary Work Category: Add Sidewalks
Termini: Harrmann Road and Canal Road in the Village of Antwerp
Antwerp, Village of 0 PE Dtl Dsgn 2014 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $2,000 $0 $15,000 $0 $202,000 2012AM09ID1480FDPE
15 PE Env PE 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $10,000
15 PE Env PE 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $3,000
16 10/13/11 2013 FHWA 2 75107 TMACOG LUCLUC McCord Grade
Separation
McCord Rd grade separation at Norfolk-Southern Rail Road. Perform necessary
related work. Originally PID 23116. (MPO fund 80/20 county match; GSP fund
90%, 5% county, 5% RR). Primary Work Category: Railroad Grade Separation
Termini: McCord Rd Grade separartion at NS RR
LUCAS COUNTY ENGINEERCO Air Quality
Exempt0 RW Acquis 2012 4BG7 Local Match 002 Local Match $75,000 $2,500,000 $4,830,000 $4,658,771 $46,459,980 2012AM03ID0067FDRW
16 RW Acquis 2012 4F27 Federal L40E CMAQ $1,350,000
16 RW Acquis 2012 4BG7 Local Match 002 Local Match $75,000
16 RW RW Serv 2012 4F27 Federal L400 CMAQ $450,000
16 RW RW Serv 2012 4BG7 Local Match 002 Local Match $25,000
16 RW RW Serv 2012 4BG7 Local Match 002 Local Match $25,000
16 RW Utl Remb 2013 4BG7 Local Match 002 Local Match $16,500
16 RW Utl Remb 2013 4BG7 Local Match 002 Local Match $16,500
16 RW Utl Remb 2013 4F27 Federal L40E CMAQ $297,000
17 11/08/11 2013 FHWA 2 76032 TMACOG LUCLUC IR 75 6.70 widening
study
A PE study for the widening and reconstruction of LUC-75 from Lagrange St to I-
280; perform necessary related work. Original agreement 12655 is thru step 4 of
the major PDP process. Primary Work Category: Major Widening Termini:
From Lagrange St to I-280 in the city of Toledo
DISTRICT 2 PRODUCTION 1.7 PE Dtl Dsgn 2012 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $1,600,000 $2,477,225 $3,477,225 $2,477,225 $48,477,225 2012MODID0047FDPE
17 PE Dtl Dsgn 2012 4BD7 State 002 State Funds (S,O) $400,000
17 PE PE Engr 2011 4BD7 State 002 State Funds (S,O) $200,000
17 PE PE Engr 2011 4BK7 Federal L050 NATIONAL HWY SYST $800,000
18 07/01/11 2013 FHWA 2 77801 TMACOG WOO WOO IR 75 0.000
Major reconstruction of the exisitng 2 lanes in each direction and widening by
adding a new third lane in each direction for a total of three lanes in each
direction. Widen mainline bridges. Perform necessary related work. (See PID
25521). See PID 87005 Primary Work Category: Major Reconstruction
Termini: From Hancock County line to I-475 in Perrysburg
DISTRICT 2 PRODUCTION 20 PE Env PE 2012 4BD7 State 002 State Funds (S,O) $200,000 $77,275 $22,078,275 $77,275 $166,479,275 2012stipID0384FDEN
18 PE Env PE 2012 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $800,000
18 PE Env PE 2012 4BK7 Federal L01E INTERSTATE MAINTENANCE $900,000
18 PE Env PE 2012 4BD7 State 002 State Funds (S,O) $100,000
ODOT 2014-2017 STIP Page 87
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
19 11/08/11 2013 FHWA 2 80526 SENSEN Sarah St Quiet Zone
Earmark
SAFETEA-LU funded project in the City of Tiffin to improve Sarah St, which runs
parallel to Greenfield St., to allow residents of the area to travel from their
homes to Market (SR-18) and Perry St (SR-101) without having to drive through
the center of th Primary Work Category: Section Improvement Termini: City
of Tiffin, Heidelberg College Campus, Sarah Street, RR crossings with SR-18 and
SR-101.
TIFFIN 0.05 PE Pln Stdy 2011 4R47 Federal HY10 Hi Priority Projects Sec 1702 "House" $500,000 $0 $501,000 $0 $1,976,700 2012MODID0070FDPE
19 PE Review 2011 LABR State 002 State Funds (S,O) $1,000
20 07/01/11 2013 FHWA 2 86843 TMACOG LUCLUC US 20 10.12
(Central/H-Syl)
A safety funded project to design, acquire land, and build raised medians and
exclusive right turn lanes on all four approaches of the intersection of US-20
(Central Ave) and Holland-Sylvania including signal plan and lighting plan;
perform necessary rela Primary Work Category: Turn Lane Addition Termini:
At the intersection of Central Ave (US-20) and Holland-Sylvania
DISTRICT 2 PRODUCTIONCO Air Quality
Nonexempt5 RW Acquis 2012 4HJ7 Federal LS30 HIGHWAY SAFETY IMP PROG $1,665,000 $0 $2,150,000 $298,007 $5,235,007 2012stipID0271FDACSV
20 RW Acquis 2012 4BC7 State 002 State Funds (S,O) $185,000
20 RW RW Serv 2012 4HJ7 Federal LS30 HIGHWAY SAFETY IMP PROG $270,000
20 RW RW Serv 2012 4BC7 State 002 State Funds (S,O) $30,000
21 07/01/11 2013 FHWA 2 87670 TMACOG WOOWOO SR 65 04.38 Slide
Repair
A district allocation funded project to repair slide on SR-65 (SB between
Roadway and Maumee River) @ SLM 4.38 between TR205 (Benshoter) and TR-42
(Weston). GSM program did not approve project for funding. Perform necessary
related work. Primary Work Category: Slide Repair Termini: On WOO-65 SB
@ SLM 4.38 between TR205 (Benshoter) and TR-42 (Weston)
DISTRICT 2 PRODUCTIONCO Air Quality
Exempt0 PE Dtl Dsgn 2014 4PF7 Federal L25E STP RURAL <5K $160,000 $31,919 $232,919 $31,919 $2,713,919 2012stipID0412FDDD
21 PE Dtl Dsgn 2014 4PS7 State 002 State Funds (S,O) $40,000
22 07/01/11 2014 FHWA 2 89254 TMACOG LUC LUC Wheeling St Bridge
A municipal bridge program funded project to replace the existing Wheeling St
bridge over Otter Creek, located about 950 feet north of Starr Ave in the City of
oregon; perform necessary related work. Primary Work Category: Bridge
Replacement Termini: City of Oregon, over Otter Creek north of Starr Ave
Oregon, City ofCO Air Quality
Exempt0 CO CO Engr 2014 4R87 Federal L01E INTERSTATE MAINTENANCE $52,000 $0 $720,000 $0 $720,000 2012stipID0281FDCO
22 CO CO Engr 2014 LNTP Local Match LNTP Non Traditional Local Match $13,000
22 CO CO Contr 2014 4R87 Federal L01E INTERSTATE MAINTENANCE $524,000
22 CO CO Contr 2014 LNTP Local Match LNTP Non Traditional Local Match $131,000
23 07/01/11 2013 FHWA 2 90141 WILWIL SR 576 17.72 Bridge
Rehab
A district allocation funded project to rehabilitate a bridge by replacing
bituminous wearing surface with Micro-Silica Concrete, replacing deck edges
and railings, rehabing abutments to semi integral, replacing approach slabs and
approach pavement, patch Primary Work Category: Bridge Repair Termini:
SR-576 bridge over west branch Saint Joseph River in Williams County
DISTRICT 2 PRODUCTIONCO Air Quality
Exempt0 PE Dtl Dsgn 2012 4PS7 State 002 State Funds (S,O) $5,000 $0 $50,175 $175 $600,175 2012stipID0373FDENDD
23 PE Dtl Dsgn 2012 4PF7 Federal L25E STP RURAL <5K $20,000
23 PE Env PE 2012 4PS7 State 002 State Funds (S,O) $5,000
23 PE Env PE 2012 4PF7 Federal L25E STP RURAL <5K $20,000
24 07/01/11 2013 FHWA 2 90259 TMACOG LUC LUC SR 246 2.00 Safety
A safety funded project to start the preliminary engineering/environmental
process for the improvements of Dorr St (SR-246) in the City of Toledo between
Byrne Rd and Secor Rd; funding for later phases of development is contingent
upon the outcome of alte Primary Work Category: Preliminary Development
Termini: City of Toledo, Dorr St (SR-246) from Byrne to Secor
TOLEDOCO Air Quality
Nonexempt0 RW Acquis 2013 4BC7 State 002 State Funds (S,O) $112,000 $0 $1,500,000 $0 $4,888,000 2012stipID0239FDACSV
24 RW Acquis 2013 LNTP Local Match LNTP Non Traditional Local Match $112,000
24 RW Acquis 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $896,000
24 RW RW Serv 2013 4BC7 State 002 State Funds (S,O) $38,000
24 RW RW Serv 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $304,000
24 RW RW Serv 2013 LNTP Local Match LNTP Non Traditional Local Match $38,000
25 07/01/11 2013 FHWA 2 90692 TMACOG LUCLUC US 20 15.54
(Reynolds Rd)
A TMACOG funded project to construct bioswale on Reynolds Rd (US 20) north of
Southwyck Blvd; perform necessary related work. Primary Work Category:
Landscaping Termini: City of Toledo, north of Southwyck Blvd.
TOLEDOCO Air Quality
Exempt0 CO CO Contr 2013 4TC7 Federal L22E STP ENHANCEMENT $466,184 $0 $641,000 $0 $641,000 2012stipID0272FDCO
25 CO CO Contr 2013 LNTP Local Match LNTP Non Traditional Local Match $116,546
25 CO CO Engr 2013 LNTP Local Match LNTP Non Traditional Local Match $11,654
25 CO CO Engr 2013 4TC7 Federal L22E STP ENHANCEMENT $46,616
26 07/01/11 2013 FHWA 2 90988 OTTOTT SRTS Put-in-Bay
Infrastruct.
A SRTS funded project to build strategies 1, 3, 5, 9, 12 and 14. These startegies
involve complete missing sidewalk link on west side of Concord Ave (1),
construct bike parking area with new bike racks (3), establish primary school
crosswalks on Catawba A Primary Work Category: Signs Termini: Village of
Put-in-Bay
PUT-IN-BAYCO Air Quality
Exempt0 PE Dtl Dsgn 2012 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $8,750 $0 $8,750 $0 $68,906 2012stipID0305FDDD
27 01/13/12 2013 FHWA 2 90991 HENHEN SR 109 18.02 Major
Brdg Repl
A major bridge funded project to replace existing narrow bridge with a new
wider bridge; perform necessary related work. Primary Work Category: Bridge
Replacement Termini: HEN-109 Bridge over Maumee River (Damascus Bridge)
DISTRICT 2 PRODUCTIONCO Air Quality
Exempt0 PE Dtl Dsgn 2013 4BU7 Federal L25E STP RURAL <5K $600,000 $0 $1,000,000 $0 $17,620,000 2012AM04ID0304FDPE
27 PE Dtl Dsgn 2013 4BT7 State 002 State Funds (S,O) $150,000
27 PE Env PE 2012 4BU7 Federal L25E STP RURAL <5K $200,000
27 PE Env PE 2012 4BT7 State 002 State Funds (S,O) $50,000
28 04/12/12 2013 FHWA 2 91593 TMACOG WOOWOO SR 64 0.00 BG
signal upgrade
A safety funded project to add back-plates, battery backup UPS and LED street
name signs to 7 signalized intersection within Bowling Green, Ohio. This project
also includes other minor intersection upgrades; perform necessary related
work. Primary Work Category: Signals Termini: The project starts at I-75 and
ends at Thurstin/Manville Ave.
0 2 PE Dtl Dsgn 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $15,000 $0 $16,000 $0 $179,900 2012AM06ID0622FDPE
29 10/13/11 2013 FHWA 2 92079 TMACOG WOOWOO IR75 17.56/19.03
Bridge Widn
A Major New funded project to widen the existing 2 twin bridges: one over the
Toussaint Creek and the second is over the CSX RR to accomodate the widening
of I-75 to 3 lanes in each direction; perform necessary related work. See PID
77801 for pavement wid Primary Work Category: Major Widening Termini:
WOO-75 2 twin bridges over Toussaint Creek and over CSX RR
DISTRICT 2 PRODUCTIONCO Air Quality
Exempt0 PE PE Engr 2012 4BD7 State 002 State Funds (S,O) $20,000 $0 $380,000 $0 $4,180,000 2012AM03ID0079FDPEEN
29 PE PE Engr 2012 4BD7 State 002 State Funds (S,O) $36,000
ODOT 2014-2017 STIP Page 88
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
29 PE PE Engr 2012 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $144,000
29 PE PE Engr 2012 4BK7 Federal L01E INTERSTATE MAINTENANCE $180,000
30 07/12/12 2013 FHWA 2 92465 TMACOG WOOWOO IR 75 9.92
Redeck/Widen
A major new funded project to redeck and widen 1 set of bridges over Portage
River Middle branch in Wood County, perform necessary related work. See PIDs
92077, 92079, 92464 for other bridge widening projects to accomodate the
addition of a third lane on Primary Work Category: Bridge Deck Replacement
Termini: I-75 bridge over Portage River Middle Branch
DISTRICT 2 PRODUCTIONCO Air Quality
Exempt0 PE Env PE 2013 4BK7 Federal L01E INTERSTATE MAINTENANCE $126,583 $259,002 $399,650 $259,352 $2,600,000 2012AM07ID0908FDPEEN
30 PE Env PE 2013 4BD7 State 002 State Funds (S,O) $14,065
31 04/12/12 2013 FHWA 2 92747 TMACOG WOOWOO US 20 7.59 Bridge
Repl
A district allocation funded project to replace the existing bridge over Henry
Creek; perform necessary related work. Primary Work Category: Bridge
Replacement Termini: Bridge over Henry Creek
DISTRICT 2 PRODUCTIONCO Air Quality
Exempt0 PE Dtl Dsgn 2013 4PF7 Federal L05E NATIONAL HIGHWAY SYSTEM $8,000 $0 $35,000 $0 $420,000 2012AM06ID0627FDPE
31 PE Dtl Dsgn 2013 4PF7 Federal L05E NATIONAL HIGHWAY SYSTEM $8,000
31 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $2,000
31 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $2,000
31 PE Env PE 2013 4PF7 Federal L05E NATIONAL HIGHWAY SYSTEM $12,000
31 PE Env PE 2013 4PS7 State 002 State Funds (S,O) $3,000
32 04/12/12 2013 FHWA 2 92748 TMACOG WOOWOO SR 579 1.91 Bridge
Repl
A district allocation funded project to replace the existing bridge over Cedar
Creek; perform necessary related work. Primary Work Category: Bridge
Replacement Termini: Bridge over Cedar Creek
DISTRICT 2 PRODUCTIONCO Air Quality
Exempt0 PE Dtl Dsgn 2013 4PF7 Federal L1CE BRIDGE 85% ON/OFF SYSTEM $16,000 $0 $75,000 $0 $900,000 2012AM06ID0628FDPE
32 PE Dtl Dsgn 2013 4PF7 Federal L1CE BRIDGE 85% ON/OFF SYSTEM $16,000
32 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $4,000
32 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $4,000
32 PE Env PE 2013 4PF7 Federal L1CE BRIDGE 85% ON/OFF SYSTEM $28,000
32 PE Env PE 2013 4PS7 State 002 State Funds (S,O) $7,000
33 04/12/12 2014 FHWA 2 92788 D02 D02 TSG FY2014
A district allocation funded project to maintain/upgrade existing traffic signals
district wide; perform necessary related work. Primary Work Category: Signals
Termini: Various locations in D-2
DISTRICT 2 PRODUCTIONCO Air Quality
Exempt0 CO CO Contr 2014 4PF7 Federal $200,000 $0 $275,000 $0 $275,000 2012AM06ID0629FDCO
33 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $50,000
33 CO CO Engr 2014 LABR Federal $20,000
33 CO CO Engr 2014 LABR State 002 State Funds (S,O) $5,000
34 04/12/12 2013 FHWA 2 92833 HENHEN SR 110 0.66
Relocate
A GSM funded project to address the landslide located on SR-110 adjacent to the
Maumee River, in the City of Napoleon, from about Maumee Lane to Campbell's
Soup factory entarnce; perform necessary related work. Primary Work
Category: Relocation Termini: From Maumee Lane in the City of Napoleon to
Campbell's Soup factory entrance
Napoleon, City ofCO Air Quality
Exempt0 PE Dtl Dsgn 2013 4SF7 Federal L20E STP RURAL <200K $120,000 $0 $350,000 $0 $2,000,000 2012AM06ID0630FDPE
34 PE Dtl Dsgn 2013 4SF7 Federal L20E STP RURAL <200K $80,000
34 PE Dtl Dsgn 2013 4SS7 State 002 State Funds (S,O) $30,000
34 PE Dtl Dsgn 2013 4SS7 State 002 State Funds (S,O) $20,000
34 PE Env PE 2013 4SF7 Federal L20E STP RURAL <200K $80,000
34 PE Env PE 2013 4SS7 State 002 State Funds (S,O) $20,000
35 07/12/12 2013 FHWA 2 93340 HENHEN US6 11.06
HarmonyAcre Noswl
A central office funded project to design-build a noise wall on US-6/US-24 in the
City of Napoleon between Woodlawn Ave and Glenwood Ave. This project will
benefit the Harmony Acres community; perform necessary related work.
Primary Work Category: Noise Wall Termini: Between Woodlawn Ave and
Glenwood Ave in the City of Napoleon
DISTRICT 2 PRODUCTIONCO Air Quality
Exempt1 CO CO Contr 2013 5BV7 Federal L05E NATIONAL HIGHWAY SYSTEM $221,200 $0 $385,000 $12,954 $432,954 2012AM07ID0911FDCO
35 CO CO Contr 2013 5BV7 Federal L25E STP RURAL <5K $56,000
35 CO CO Contr 2013 4BV7 State 002 State Funds (S,O) $55,300
35 CO CO Contr 2013 4BV7 State 002 State Funds (S,O) $14,000
35 CO CO Contr 2013 5BV7 Federal L20E STP RURAL <200K $2,800
35 CO CO Engr 2013 LABR Federal L05E NATIONAL HIGHWAY SYSTEM $22,120
35 CO CO Engr 2013 LABR Federal L25E STP RURAL <5K $5,600
35 CO CO Engr 2013 LABR State 002 State Funds (S,O) $5,530
35 CO CO Engr 2013 LABR State 002 State Funds (S,O) $1,400
36 10/15/12 2013 FHWA 2 93565 TMACOG LUCLUC US20A 5.56
Roundabt @ Eber
A safety funded project to construct a roundabout at the intersection of US-20A
and Eber Rd in Monclova Twp, Lucas County, perform necessary related work.
UPDATE (7/3/12): culvert @ 5.87, which was deleted from PID 85252, is added to
this PID. Primary Work Category: Intersection Improvement Termini:
Intersection of US-20A and Eber Rd
DISTRICT 2 PRODUCTIONCO Air Quality
Exempt0 PE Dtl Dsgn 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $15,350 $134,550 $151,606 $140,150 $1,697,206 2012AM08ID01179FDPE
36 PE Dtl Dsgn 2013 4BC7 State 002 State Funds (S,O) $1,706
37 10/15/12 2013 FHWA 2 93592 TMACOG WOOWOO/LUC IR75
30.70/0.00 Major
A Major Bridge and Multi Lane funded project (project # 1) to perform major
reconstruction and minor widening to existing pavement;
rehabilitate/widen/replace existing bridges; perform necessary related work.
See PID 93594 for project # 2 and PID 93604 fo Primary Work Category: Major
Reconstruction Termini: From Glenwood Rd to South Ave
DISTRICT 2 PRODUCTIONCO Air Quality
Exempt3 PE Dtl Dsgn 2014 4BU7 Federal L01E INTERSTATE MAINTENANCE $2,637,000 $0 $15,140,000 $0 $156,070,000 2012AM08ID01184FDPE
37 PE Dtl Dsgn 2014 4RC7 Federal L01E INTERSTATE MAINTENANCE $765,000
37 PE Dtl Dsgn 2014 4BT7 State 002 State Funds (S,O) $293,000
37 PE Dtl Dsgn 2014 4RA7 State 002 State Funds (S,O) $85,000
37 PE Env PE 2013 4BU7 Federal L01E INTERSTATE MAINTENANCE $7,920,000
37 PE Env PE 2013 4RC7 Federal L01E INTERSTATE MAINTENANCE $2,304,000
37 PE Env PE 2013 4BT7 State 002 State Funds (S,O) $880,000
37 PE Env PE 2013 4RA7 State 002 State Funds (S,O) $256,000
38 10/15/12 2013 FHWA 2 93594 TMACOG LUC LUC IR 75 1.10
A multi-Lane & Major Bridge funded project (project # 2) to reconstruct the
existing pavement and to rehabilitate/widen/replace existing bridges; perform
necessary related work. See PID 93592 for project # 1 and PID 93604 for project #
3. Primary Work Category: Major Rehabilitation Termini: Fron South Ave to
north of Dorr St
DISTRICT 2 PRODUCTIONCO Air Quality
Nonexempt2 PE Dtl Dsgn 2014 4BU7 Federal L01E INTERSTATE MAINTENANCE $2,502,000 $0 $12,510,000 $0 $129,010,000 2012AM08ID01180FDPE
38 PE Dtl Dsgn 2014 4RC7 Federal L01E INTERSTATE MAINTENANCE $315,000
38 PE Dtl Dsgn 2014 4BT7 State 002 State Funds (S,O) $278,000
ODOT 2014-2017 STIP Page 89
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
38 PE Dtl Dsgn 2014 4RA7 State 002 State Funds (S,O) $35,000
38 PE Env PE 2013 4BU7 Federal L01E INTERSTATE MAINTENANCE $7,542,000
38 PE Env PE 2013 4RC7 Federal L01E INTERSTATE MAINTENANCE $900,000
38 PE Env PE 2013 4BT7 State 002 State Funds (S,O) $838,000
38 PE Env PE 2013 4RA7 State 002 State Funds (S,O) $100,000
39 01/17/13 2013 FHWA 2 94724 TMACOG LUCLUC SR 2 10.67/11.71
Intersecton
A safety funded project to improve intersections of SR-2 (Airport Hwy) with US-
20 (Reynolds Rd) and SR-2 (Airport Hwy) with Holland-Sylvania Ave; perform
necessary related work. Primary Work Category: Intersection Improvement
Termini: SR-2/US-20 and SR-2/Holland-Sylvania intersections
DISTRICT 2 PRODUCTIONCO Air Quality
Exempt0.02 PE Dtl Dsgn 2013 4HJ7 Federal MS30 HSIP - HWY SAFETY IMPR $148,500 $0 $330,000 $0 $3,780,400 2012AM09ID1486FDPE
39 PE Dtl Dsgn 2013 4HJ7 Federal MS30 HSIP - HWY SAFETY IMPR $148,500
39 PE Dtl Dsgn 2013 4BC7 State 002 State Funds (S,O) $16,500
39 PE Dtl Dsgn 2013 4BC7 State 002 State Funds (S,O) $16,500
40 01/17/13 2013 FHWA 2 94732 TMACOG LUCLUC IR 475 9.05 Ramp
Reconfig
A safety funded project to reconfigure the ramps at I-475 and US-23 and US-20,
perform necessary related work. Primary Work Category: Realignment
Termini: I-475/US23/US20 split/Interchange in Sylvania
DISTRICT 2 PRODUCTIONCO Air Quality
Nonexempt0.05 PE Dtl Dsgn 2013 4BK7 Federal $1,350,000 $0 $1,000,000 $0 $12,000,000 2012AM09ID1487FDPE
40 PE Dtl Dsgn 2013 4BD7 State 002 State Funds (S,O) $150,000
41 03/21/13 2014 FHWA 2 95658 TMACOG LUCLUC McCord Rd/NSRR
Demolition
Demolish the structures/buildings on 7 parcels associated with the construction
of a new railroad grade separation on McCord Rd in Lucas County. Project split
out from PID 75107; perform necessary related work. Primary Work Category:
Building Demolition Termini: Near the intersection of McCord Rd and NS RR
Tracks
DISTRICT 2 PRODUCTIONCO Air Quality
Exempt0.04 CO CO Contr 2014 4F27 Federal M240 STP FLEXIBLE $135,000 $0 $165,000 $0 $165,000 2012MODID0198FDCO
41 CO CO Contr 2014 4BG7 Local Match 002 Local Match $7,500
41 CO CO Contr 2014 4BG7 Local Match 002 Local Match $7,500
41 CO CO Engr 2014 LABR Federal M240 STP FLEXIBLE $13,500
41 CO CO Engr 2014 LABR Local Match 002 Local Match $750
41 CO CO Engr 2014 LABR Local Match 002 Local Match $750
42 07/01/11 2013 FHWA 3 23104 NOACA LORLOR SR 0058 07.36
(Wellington)
REVIEW PRELIMINARY STUDY, DESIGN AND CONSTRUCT RAILROAD GRADE
SEPARATION Primary Work Category: Railroad Grade Separation Termini:
WELLINGTON. 0.13MI N OF SR18
ODOT SPONSORING
AGENCY
CO Air Quality
Exempt0 RW Acquis 2012 4BD7 State 002 State Funds (S,O) $406,400 $983,878 $3,856,520 $2,754,181 $22,846,823 2012stipID0661FDACUT
42 RW Acquis 2012 4BK7 Federal L25E STP RURAL <5K $1,625,600
42 RW Acquis 2012 4BG7 Local Match $159,000
42 RW Acquis 2012 4BG7 Local Match $159,000
42 RW Utl Remb 2012 4BD7 State 002 State Funds (S,O) $93,600
42 RW Utl Remb 2012 4BG7 Local Match $26,000
42 RW Utl Remb 2012 4BG7 Local Match $26,000
42 RW Utl Remb 2012 4BK7 Federal L25E STP RURAL <5K $374,400
43 07/01/11 2014 FHWA 3 77451 RCRPC RIC RIC IR 0071 13.45 PM
Preventive Maintenance - Surface Treatment Primary Work Category:
Preventive Maintenance Termini: 0.14 miles north of Mansfield-Lucas Road to
0.61 miles South of the Ashland County Line
ODOT SPONSORING
AGENCY7 CO CO Engr 2014 LABR Federal Q010 INTERSTATE MAINTENANCE $272,750 $0 $3,333,622 $0 $3,333,622 2012stipID0760FDCO
43 CO CO Engr 2014 LABR State 002 State Funds (S,O) $30,306
43 CO CO Contr 2014 4PF7 Federal Q010 INTERSTATE MAINTENANCE $2,727,509
43 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $303,057
44 02/26/13 2014 FHWA 3 79087 NOACA LORLOR CR0096 00.00
(Griswold)
widen to 3 lanes, concrete pavement, curb and gutter, storm sewer work
Primary Work Category: Major Rehabilitation Termini: Griswold Road, Lake
Ave. to Leona Street
LORAIN COUNTY
ENGINEER
CO Air Quality
Exempt0.61 CO CO Contr 2013 4TA7 Federal L23E STP URBANIZED AREAS $2,357,201 $0 $4,759,094 $75,000 $4,886,094 2012AM10ID1779FDCO
44 CO CO Contr 2013 LNTP Local Match LNTP Non Traditional Local Match $589,300
44 CO CO Engr 2013 4TA7 Federal L23E STP URBANIZED AREAS $95,095
44 CO CO Engr 2013 LNTP Local Match LNTP Non Traditional Local Match $23,774
44 CO CO Engr 2013 LNTP Local Match $359,009
44 CO CO Contr 2013 LNTP Local Match $1,334,715
45 07/01/11 2013 FHWA 3 79087 NOACA LORLOR CR0096 00.00
(Griswold)
widen to 3 lanes, concrete pavement, curb and gutter, storm sewer work
Primary Work Category: Major Rehabilitation Termini: Griswold Road, Lake
Ave. to Leona Street
LORAIN COUNTY
ENGINEER
CO Air Quality
Exempt1 RW Acquis 2013 4TA7 Federal L230 URBANIZED AREAS $75,000 $0 $201,000 $0 $3,267,370 2012stipID0635FDAC
45 RW Acquis 2013 LNTP Local Match LNTP Non Traditional Local Match $50,000
45 RW Acquis 2013 LNTP Local Match LNTP Non Traditional Local Match $75,000
46 07/01/11 2013 FHWA 3 79275 ERPC ERIERI Perkins Ave Signals
FY07
The project will replace the existing signals on Perkins Ave. between Camp
Street and US Route 250 that are now orer 30 yrs. old and degraded due to the
weather and ultra-violet light. The project scope of work will includ the
installation of mast arm po Primary Work Category: Signals Termini: Perkins
Avenue from Camp Street to USR 250
Sandusky, city of 0 PE Env PE 2012 LNTP Local Match LNTP Non Traditional Local Match $3,250 $0 $17,250 $0 $842,026 2012stipID0552FDEN
46 PE Env PE 2012 4TA7 Federal L20E STP RURAL <200K $13,000
47 07/01/11 2013 FHWA 3 79275 ERPC ERIERI Perkins Ave Signals
FY07
The project will replace the existing signals on Perkins Ave. between Camp
Street and US Route 250 that are now orer 30 yrs. old and degraded due to the
weather and ultra-violet light. The project scope of work will includ the
installation of mast arm po Primary Work Category: Signals Termini: Perkins
Avenue from Camp Street to USR 250
Sandusky, city of 0 RW RW Serv 2013 4TA7 Federal L200 STP RURAL AREAS<200,000 $57,000 $0 $71,250 $0 $842,026 2012stipID0553FDSV
47 RW RW Serv 2013 LNTP Local Match LNTP Non Traditional Local Match $14,250
48 07/01/11 2014 FHWA 3 79764 WAY WAY US 0250 12.30 PM
Preventive Maintenance - Surface Treatment Primary Work Category:
Preventive Maintenance Termini: US 250 - EB US 30 ramp to SR 83 & SR 83 - US
250 ramp to pvmt Jt N of US 30
ODOT SPONSORING
AGENCY2 CO CO Engr 2014 LABR Federal L20E STP RURAL <200K $6,683 $0 $656,409 $0 $656,409 2012stipID0843FDCO
48 CO CO Engr 2014 LABR State 002 State Funds (S,O) $1,671
48 CO CO Engr 2014 LABR Federal L05E NATIONAL HIGHWAY SYSTEM $41,055
48 CO CO Engr 2014 LABR State 002 State Funds (S,O) $10,264
48 CO CO Contr 2014 4PF7 Federal L20E STP RURAL <200K $66,834
48 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $16,709
48 CO CO Contr 2014 4PF7 Federal L05E NATIONAL HIGHWAY SYSTEM $410,554
48 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $102,639
ODOT 2014-2017 STIP Page 90
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
49 10/15/12 2013 FHWA 3 82427 NOACA MED MED SR 0003 21.19
Design and Construct the permanent slope correction and culvert
replacementlocation temporarily repaired by Soil Nailing with PID: 80255
summer 2005 Primary Work Category: Culvert Construction/Reconstr/Repair
Termini: 0.53 miles north of SR 606
ODOT SPONSORING
AGENCY0 RW Acquis 2013 4PF7 Federal L25E STP RURAL <5K $24,000 $0 $71,100 $0 $848,800 2012AM08ID01188FDRW
49 RW Acquis 2013 4PF7 Federal L25E STP RURAL <5K $20,000
49 RW Acquis 2013 4PS7 State 002 State Funds (S,O) $6,000
49 RW Acquis 2013 4PS7 State 002 State Funds (S,O) $5,000
49 RW RW Serv 2013 4PS7 State 002 State Funds (S,O) $10,000
49 RW RW Serv 2013 4PS7 State $3,100
49 RW RW Serv 2013 4PS7 State $3,000
50 04/12/12 2013 FHWA 3 82645 NOACA LOR LOR SR 0057 19.42
This project will modify the existing I-90/SR 57 Interchange to a Diamond
Interchange with traffic signals at the ramp intersections.Eastbound ramps will
move 620 feet north. Remove the 49th Street Bridge SR 57 Overpass, and the
ramps to Griswold Road and Primary Work Category: Major Rehabilitation
Termini: LOR-057-19.42 (IR 80 ramps) to 20.35 (IR 90 ramps)
ODOT SPONSORING
AGENCY0 RW Acquis 2013 4BK7 Federal $1,560,000 $0 $1,950,000 $1,695,886 $32,986,269 2012AM06ID0644FDRW
50 RW Acquis 2013 4BD7 State 002 State Funds (S,O) $390,000
51 11/08/11 2013 FHWA 3 83203 WAY WAY SR 0585 02.75Improve geometrics Primary Work Category: Section Improvement Termini:
WAY-585- 02.75 (Geyers Chapel Rd) and 03.31 (Thompson Rd)
ODOT SPONSORING
AGENCY0.55 PE Dtl Dsgn 2011 4HJ7 Federal LS30 HIGHWAY SAFETY IMP PROG $309,301 $433,975 $659,701 $433,975 $4,965,701 2012MODID00100FDPE
51 PE Dtl Dsgn 2011 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $220,699
52 07/01/11 2013 FHWA 3 83203 WAY WAY SR 0585 02.75Improve geometrics Primary Work Category: Section Improvement Termini:
WAY-585- 02.75 (Geyers Chapel Rd) and 03.31 (Thompson Rd)
ODOT SPONSORING
AGENCY1 RW Acquis 2012 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $500,000 $0 $500,000 $126,223 $4,965,701 2012stipID0831FDAC
53 07/01/11 2013 FHWA 3 83440 D03 D03 BH FY2014Bridge Maintenance Primary Work Category: Bridge Maintenance/Repair
(NEW) Termini: Various structures throughout District Three
ODOT SPONSORING
AGENCY0 RW Acquis 2013 4PS7 State $2,000 $0 $10,000 $0 $505,000 2012stipID0483FDAC
53 RW Acquis 2013 4PF7 Federal $8,000
54 02/26/13 2013 FHWA 3 83449 NOACA LOR LOR IR 0090 13.20
Bridge Replacements - 2 sets of I-90 structures Primary Work Category: Bridge
Replacement Termini: LOR-90-13.20 L&R over SR 57 / LOR-90-13.55 L&R over
West River Road
ODOT SPONSORING
AGENCY0.04 PE Dtl Dsgn 2014 4PF7 Federal L1CE BRIDGE 85% ON/OFF SYSTEM $180,000 $1,840 $1,301,840 $1,840 $15,651,840 2012AM10ID1781FDPE
54 PE Dtl Dsgn 2014 4PS7 State 002 State Funds (S,O) $20,000
54 PE Env PE 2014 4PF7 Federal $630,000
54 PE Env PE 2013 4PF7 Federal $360,000
54 PE Env PE 2014 4PS7 State $70,000
54 PE Env PE 2013 4PS7 State $40,000
55 07/01/11 2013 FHWA 3 83456 NOACA LORLOR SR 0301 21.50 (Abbe
Rd)
widening SR 301 (Abbe Rd) from 4 to 5 lanes, with 6 lanes at northbound
approach to SR 254, installing additional traffic control devices, sidewalks and
bikeway. Primary Work Category: Minor Widening Termini: Antioch Drive
within the City of Elyria (north entrance to LCCC) to SR 254
LORAIN COUNTY
ENGINEER1 RW Acquis 2012 LNTP Local Match LNTP Non Traditional Local Match $50,000 $0 $527,862 $0 $3,877,862 2012stipID0677FDAC
55 RW Acquis 2012 LNTP Local Match LNTP Non Traditional Local Match $175,000
55 RW Acquis 2012 4TA7 Federal L23E STP URBANIZED AREAS $175,000
55 RW Acquis 2012 LNTP Local Match LNTP Non Traditional Local Match $5,000
55 RW Labor 2012 LNTP Local Match LNTP Non Traditional Local Match $23,931
55 RW Labor 2012 LNTP Local Match LNTP Non Traditional Local Match $23,931
55 RW Labor 2012 LNTP Local Match LNTP Non Traditional Local Match $75,000
56 07/01/11 2013 FHWA 3 83548 ERPC ERI ERI US 0250 01.92
Reconstruct intersection of US 250 and Strub Road in accordance with PID:76235
Corridor Study. Primary Work Category: Intersection Improvement Termini:
ERI-250-01.92 (DeWitt Ave) to 02.36 (Sandusky Dr)
ODOT SPONSORING
AGENCY0 RW Acquis 2012 4BC7 State 002 State Funds (S,O) $40,000 $0 $1,000,000 $385,212 $4,364,535 2012stipID0576FDRW
56 RW Acquis 2012 4HJ7 Federal L050 NATIONAL HWY SYST $360,000
56 RW RW Serv 2012 4BC7 State 002 State Funds (S,O) $10,000
56 RW RW Serv 2012 4HJ7 Federal L050 NATIONAL HWY SYST $90,000
56 RW Utl Remb 2012 4HJ7 Federal L050 NATIONAL HWY SYST $450,000
56 RW Utl Remb 2012 4BC7 State 002 State Funds (S,O) $50,000
57 01/17/13 2013 FHWA 3 83793 NOACA LOR LOR SR 0254 00.01
LOR-254-00.01 - 00.43 Intersection SR 254 and West River RoadInstall an exclusive
right-turn lane for eastbound vehicles at West River Road intersection in
Elyria.Also install a two-way left turn on SR 254 between SR57 and West River
Road. Safety project: Primary Work Category: Minor Widening Termini: LOR-
254-00.01 - 00.43 Intersection SR 254 and West River Road
ODOT SPONSORING
AGENCY0.42 RW Acquis 2013 4HJ7 Federal LS30 HIGHWAY SAFETY IMP PROG $751,500 $165,000 $1,000,000 $609,378 $4,408,244 2012AM09ID1494FDRW
57 RW Acquis 2013 4BC7 State 002 State Funds (S,O) $83,500
58 07/01/11 2014 FHWA 3 84743 D03 D03 MICRO FY2014Preventive Maintenance - Microsurfacing Primary Work Category: Preventive
Maintenance Termini: Various routes and sections throughout District Three
ODOT SPONSORING
AGENCY0 CO CO Contr 2014 4PF7 Federal $1,078,774 $0 $1,483,314 $0 $1,483,314 2012stipID0521FDCO
58 CO CO Contr 2014 4PS7 State $269,694
58 CO CO Engr 2014 LABR Federal $107,877
58 CO CO Engr 2014 LABR State $26,969
59 07/01/11 2014 FHWA 3 84744 D03 D03 SMOOTH FY2014Preventive Maintenance - SmoothSeal Primary Work Category: Preventive
Maintenance Termini: Various routes and sections throughout District Three
ODOT SPONSORING
AGENCY0 CO CO Engr 2014 LABR Federal $123,288 $0 $1,695,216 $0 $1,695,216 2012stipID0538FDCO
59 CO CO Engr 2014 LABR State $30,822
59 CO CO Contr 2014 4PF7 Federal $1,232,885
59 CO CO Contr 2014 4PS7 State $308,221
60 07/01/11 2014 FHWA 3 85934 ERPC ERIERI First Street
(Sandusky)
milling and paving 2.5 inches of asphalt from Meigs Street to Cedar Point Drive
(6,751 feet), adjust manhole, monument and valve boxes. Pavement markings
will be replaced after the paving is completed. Curb ramps will be constructed
where necessary to me Primary Work Category: Mill and Fill Termini: First
Street - Meigs Street to Cedar Point Drive
Sandusky, city of 1 CO CO Contr 2013 LNTP Local Match LNTP Non Traditional Local Match $424,542 $0 $1,047,932 $0 $1,047,932 2012stipID0548FDCO
60 CO CO Contr 2013 4TA7 Federal L20E STP RURAL <200K $340,870
60 CO CO Contr 2013 LNTP Local Match LNTP Non Traditional Local Match $85,218
60 CO CO Engr 2013 LNTP Local Match LNTP Non Traditional Local Match $85,063
ODOT 2014-2017 STIP Page 91
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
61 04/12/12 2013 FHWA 3 86893 NOACA MED MED US 0042 19.33
Intersection Improvement - Add Lanes - Approach Lane extensions on US
42(200905D03-02)Related projects: PID:75995 MED US 0042 17.82 - Original PE PE
Study / PID:92954 MED US 0042 17.80 - New TRAC PID Primary Work Category:
Intersection Improvement Termini: MED-042-19.33 / Fenn Road
ODOT SPONSORING
AGENCY0 RW Acquis 2013 4HJ7 Federal LS30 HIGHWAY SAFETY IMP PROG $1,350,000 $0 $1,500,000 $199,190 $4,196,190 2012AM06ID0648FDRW
61 RW Acquis 2013 4BC7 State 002 State Funds (S,O) $150,000
62 02/26/13 2013 FHWA 3 88407 ERPC ERI ERI US 0250 00.00
Appraisal & Acquisition to be under separate Agreement from 9/10/12
Programmatic.Appraisal Review & Relocation Review to be separate Agreement
as part of ERI/LOR/MED-250/57/42-0.00/19.42/19.33 RW Services from 9/10/12
Programmatic. Also see PID 82645 & PI Primary Work Category: Section
Improvement Termini: US 6 to Bogart Road
ODOT SPONSORING
AGENCY4.31 PE Dtl Dsgn 2013 4BK7 Federal $416,000 $572,214 $2,917,214 $572,214 $8,447,214 2012AM10ID1777FDPE
62 PE Dtl Dsgn 2013 4BD7 State $104,000
62 PE Env PE 2013 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $676,000
62 PE Env PE 2013 4BD7 State 002 State Funds (S,O) $169,000
62 PE Env RW Serv 2013 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $416,000
62 PE Env RW Serv 2013 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $208,000
62 PE Env RW Serv 2013 4PF7 Federal L05E NATIONAL HIGHWAY SYSTEM $160,000
62 PE Env RW Serv 2013 4BD7 State 002 State Funds (S,O) $104,000
62 PE Env RW Serv 2013 4BD7 State 002 State Funds (S,O) $52,000
62 PE Env RW Serv 2013 4PS7 State 002 State Funds (S,O) $40,000
63 04/11/13 2013 FHWA 3 88407 ERPC ERI ERI US 0250 00.00
Appraisal & Acquisition to be under separate Agreement from 9/10/12
Programmatic.Appraisal Review & Relocation Review to be separate Agreement
as part of ERI/LOR/MED-250/57/42-0.00/19.42/19.33 RW Services from 9/10/12
Programmatic. Also see PID 82645 & PI Primary Work Category: Section
Improvement Termini: US 6 to Bogart Road
ODOT SPONSORING
AGENCY4.31 RW RW Serv 2013 4BD7 State 002 State Funds (S,O) $104,000 $0 $4,420,000 $1,377,678 $20,764,135 2012AM11ID1816FDRW
63 RW RW Serv 2013 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $416,000
63 RW Acquis 2014 4BD7 State 002 State Funds (S,O) $780,000
63 RW Acquis 2014 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $3,120,000
64 01/13/12 2013 FHWA 3 88739 ASD ASD US 0042 07.75Interchange Improvement / Bridge Replacement US42 over US250 Primary
Work Category: Bridge Replacement Termini: ASD-042-0792
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2013 4PF7 Federal L05E NATIONAL HIGHWAY SYSTEM $360,000 $291,467 $741,467 $291,467 $5,191,467 2012AM04ID0320FDPEDD
64 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $90,000
65 01/17/13 2013 FHWA 3 88739 ASD ASD US 0042 07.75Interchange Improvement / Bridge Replacement US42 over US250 Primary
Work Category: Bridge Replacement Termini: ASD-042-0792
ODOT SPONSORING
AGENCY0.02 RW Acquis 2015 4HJ7 Federal MS30 HSIP - HWY SAFETY IMPR $450,000 $0 $1,050,000 $293,782 $7,407,116 2012AM09ID1499FDRW
65 RW Acquis 2015 4BG7 Local Match 002 Local Match $50,000
65 RW Acquis 2013 4PF7 Federal L05E NATIONAL HIGHWAY SYSTEM $32,000
65 RW Acquis 2013 4PS7 State 002 State Funds (S,O) $8,000
65 RW RW Serv 2015 4HJ7 Federal MS30 HSIP - HWY SAFETY IMPR $450,000
65 RW RW Serv 2015 4BG7 Local Match 002 Local Match $50,000
65 RW RW Serv 2013 4PF7 Federal L05E NATIONAL HIGHWAY SYSTEM $8,000
65 RW RW Serv 2013 4PS7 State 002 State Funds (S,O) $2,000
66 07/01/11 2014 FHWA 3 88778 NOACA MED MED SR 0162 00.00
ResurfacingMED-SR-162-0.00-2.97Lorain Co. Line to Spencer E. Corp. Primary
Work Category: Minor Rehabilitation - Pavement Gnrl Sys Termini: MED-SR-162-
0.00-2.97
ODOT SPONSORING
AGENCY3 CO CO Engr 2015 LABR Federal L25E STP RURAL <5K $73,798 $0 $923,848 $0 $923,848 2012stipID0737FDCO
66 CO CO Engr 2015 LABR State $18,450
66 CO CO Contr 2015 4PF7 Federal L25E STP RURAL <5K $665,280
66 CO CO Contr 2015 4PS7 State 002 State Funds (S,O) $166,320
67 04/12/12 2013 FHWA 3 88816 RCRPC RIC RIC SR 0013 16.78Bridge Replacement RIC-013-1678 0.25 miles south of US 30 Primary Work
Category: Bridge Replacement Termini: RIC-013-1678 0.25 miles south of US 30
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2013 4PF7 Federal L05E NATIONAL HIGHWAY SYSTEM $72,000 $0 $150,000 $0 $957,000 2012AM06ID0652FDPE
67 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $18,000
67 PE PE Engr 2012 4PF7 Federal L05E NATIONAL HIGHWAY SYSTEM $48,000
67 PE PE Engr 2012 4PS7 State 002 State Funds (S,O) $12,000
68 01/13/12 2013 FHWA 3 88824 ASD ASD SR 0302 10.97ASD-302-10.97 - 11.22Bridge Replacement and Roadway Relocation Primary
Work Category: Bridge Replacement Termini: ASD-302-10.97 - 11.22
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2013 4PF7 Federal L25E STP RURAL <5K $176,000 $176,362 $396,362 $176,362 $1,631,362 2012AM04ID0321FDPEDD
68 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $44,000
69 07/01/11 2013 FHWA 3 88824 ASD ASD SR 0302 10.97ASD-302-10.97 - 11.22Bridge Replacement and Roadway Relocation Primary
Work Category: Bridge Replacement Termini: ASD-302-10.97 - 11.22
ODOT SPONSORING
AGENCY0 RW Acquis 2013 4PS7 State 002 State Funds (S,O) $5,000 $0 $25,000 $0 $1,460,000 2012stipID0443FDAC
69 RW Acquis 2013 4PF7 Federal L25E STP RURAL <5K $20,000
70 07/12/12 2013 FHWA 3 88827 RCRPC RIC RIC US 0042 12.34Replace box beams on a 33' structure over Painters CreekRIC-US-42-12.34
Primary Work Category: Bridge Repair Termini: RIC-US-42-12.34
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2013 4PF7 Federal L20E STP RURAL <200K $28,000 $1,208 $126,208 $1,208 $676,208 2012AM07ID0922FDPE
70 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $7,000
70 PE Env PE 2013 4PF7 Federal L20E STP RURAL <200K $72,000
70 PE Env PE 2013 4PS7 State 002 State Funds (S,O) $18,000
71 07/01/11 2014 FHWA 3 89427 D03 D03 PR FY2014Tree/Stump Removal and Prunning Primary Work Category: Pruning,
Tree/Bush Removal Termini: Various locations throughout District Three
ODOT SPONSORING
AGENCY0 CO CO Contr 2014 4CP7 State $125,000 $0 $137,500 $0 $137,500 2012stipID0528STCO
71 CO CO Engr 2014 LABR State $12,500
72 07/01/11 2013 FHWA 3 90360 HUR HUR SR 0547 06.91
Culvert Replacement Primary Work Category: Culvert
Construction/Reconstr/Repair Termini: HUR-547-06.91 - 0.11 miles east of Farr
Rd (TR 33)
ODOT SPONSORING
AGENCY0 RW Acquis 2012 4PS7 State 002 State Funds (S,O) $3,000 $0 $15,000 $0 $125,000 2012stipID0598FDAC
72 RW Acquis 2012 4PF7 Federal L25E STP RURAL <5K $12,000
73 07/01/11 2013 FHWA 3 90364 ERPC ERI ERI SR 0061 03.30Right of Way only for culvert replacement Primary Work Category: Acquire
Right of way Termini: ERI-061-03.30 - 0.39 miles north of SR 113
ODOT SPONSORING
AGENCY0 RW Acquis 2013 4PF7 Federal L25E STP RURAL <5K $12,000 $0 $15,000 $0 $15,000 2012stipID0561FDAC
73 RW Acquis 2013 4PS7 State 002 State Funds (S,O) $3,000
ODOT 2014-2017 STIP Page 92
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
74 04/11/13 2014 FHWA 3 90718 ERPC ERI ERI SR 0004 00.40
Various activities at slip locationGeoTech Funds approved March 2013 Primary
Work Category: General Engineering Services Termini: North east of Norfolk
Southern Railroad overpass
ODOT SPONSORING
AGENCY0.02 CO CO Contr 2014 4SF7 Federal M232 STP RURAL <5K $360,000 $0 $495,000 $16,970 $511,970 2012AM11ID1817FDCO
74 CO CO Contr 2014 4SS7 State 002 State Funds (S,O) $90,000
74 CO CO Engr 2014 LABR Federal M232 STP RURAL <5K $36,000
74 CO CO Engr 2014 LABR State 002 State Funds (S,O) $9,000
75 07/12/12 2013 FHWA 3 90905 ERPC ERI ERI US 0006 22.15Bridge Replacement ERI-006-22.15 (@ Cranberry Marina) Primary Work
Category: Bridge Replacement Termini: ERI-006-22.15 (@ Cranberry Marina)
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2014 4PF7 Federal L25E STP RURAL <5K $32,000 $0 $274,177 $0 $1,059,177 2012AM07ID0927FDPE
75 PE Dtl Dsgn 2014 4PS7 State 002 State Funds (S,O) $8,000
75 PE Env PE 2013 4PF7 Federal L25E STP RURAL <5K $100,000
75 PE Env PE 2013 4PF7 Federal L25E STP RURAL <5K $87,342
75 PE Env PE 2013 4PS7 State 002 State Funds (S,O) $25,000
75 PE Env PE 2013 4PS7 State 002 State Funds (S,O) $21,835
76 07/01/11 2013 FHWA 3 90933 NOACA LORD03 SRTS Elyria
Township
Project funded March 2011 with SRTS Program.Improved school zone signage and
speed feedback signs (school zone flashers, speed feedback signs) Primary
Work Category: Add Sidewalks Termini: 3 Schools in Elyria Township, Lake
Avenue and Adelbert Street Sidewalks
0 0 OTH Oth Remb 2012 4SC7 Federal $25,000 $0 $25,000 $0 $346,500 2012stipID0612FDOT
77 07/01/11 2013 FHWA 3 90933 NOACA LORD03 SRTS Elyria
Township
Project funded March 2011 with SRTS Program.Improved school zone signage and
speed feedback signs (school zone flashers, speed feedback signs) Primary
Work Category: Add Sidewalks Termini: 3 Schools in Elyria Township, Lake
Avenue and Adelbert Street Sidewalks
0 0 PE Dtl Dsgn 2012 4SC7 Federal $20,850 $0 $20,850 $0 $346,500 2012stipID0613FDDD
78 07/01/11 2013 FHWA 3 90994 WAYD03 SRTS Wooster Non
Inf
Non Infrastructure project funded March 2011, with the SRTS Program.This
funding is for the bicycle supplies and Bike Rodeo. Portions of this award may
have to be reassigned as an infrastructure project. Primary Work Category:
S.R.T.S Education & Encouragement Termini: City of Wooster
WOOSTER 0 OTH Oth Remb 2013 4SC7 Federal $29,700 $0 $29,700 $0 $29,700 2012stipID0801FDOT
79 07/01/11 2013 FHWA 3 90995 NOACA LORD03 SRTS Elyria Twp Non
Inf
Non Infrastructure project funded March 2011 with SRTS Program.Staff, Law
Enforcement, Programs, Walking Safety Primary Work Category: S.R.T.S
Education & Encouragement Termini: Elyria Township
0 0 OTH Oth Remb 2013 4SC7 Federal LU1E SAFE ROUTES TO SCHOOL PROGRAM $2,000 $0 $16,000 $0 $16,000 2012stipID0614FDOT
79 OTH Oth Remb 2013 4SC7 Federal LU1E SAFE ROUTES TO SCHOOL PROGRAM $10,000
79 OTH Oth Remb 2013 4SC7 Federal LU1E SAFE ROUTES TO SCHOOL PROGRAM $3,000
80 07/01/11 2013 FHWA 3 91014 NOACA LORD03 SRTS Oberlin Non
Inf
Non Infrastructure project funded March 2011 with SRTS Program.Bicycle Co-op
Training Program Primary Work Category: S.R.T.S Education & Encouragement
Termini: City of Oberlin
Oberlin, City of 0 OTH Oth Remb 2013 4SC7 Federal $5,270 $0 $5,270 $0 $5,270 2012stipID0618FDOT
81 10/15/12 2013 FHWA 3 91300 WAY WAY SR 0003 01.40
FY2015 Geologic Site Management Funds ApplicationSlide repairs / Both sides of
SR 3WAY-003-01.40 - 0.21 miles south of Newkirk Rd (CR 104)WAY-003-02.36 -
0.26 miles south of S Funk Rd (CR 16) Primary Work Category: Slide Repair
Termini: WAY-003-01.40 / WAY-003-02.36
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2013 4SF7 Federal L25E STP RURAL <5K $21,600 $0 $245,000 $0 $1,023,000 2012AM08ID01195FDPE
81 PE Dtl Dsgn 2013 4SS7 State 002 State Funds (S,O) $5,400
81 PE Env PE 2013 4SF7 Federal L25E STP RURAL <5K $174,400
81 PE Env PE 2013 4SS7 State 002 State Funds (S,O) $43,600
82 01/13/12 2014 FHWA 3 91301 CRA CRA US 0030 06.74
FY2015 Geologic Site Management Funds Application Slide Repair south side of
roadwayCRA-030-06.74 - 0.17 miles west of CSX RR underpassDesigner switched
to D03 Task Order consultant on 12/13/2011. Primary Work Category: Slide
Repair Termini: CRA-030-06.74 - 0.17 miles west of CSX RR underpass
ODOT SPONSORING
AGENCY0 CO CO Contr 2015 4SF7 Federal $468,000 $0 $585,000 $0 $685,000 2012AM04ID0326FDCO
82 CO CO Contr 2015 4SS7 State $117,000
83 04/11/13 2014 FHWA 3 92496 RCRPC RIC RIC CR PM FY2014Pavement Markings - Stripe various county roads in Richland County Primary
Work Category: Pavement Marking Termini: Various Richland County Roads
RICHLAND COUNTY
ENGINEER9.18 CO CO Contr 2014 4HB7 Federal LS3E HSIP - HWY SAFETY IMPR $136,500 $0 $150,000 $0 $150,000 2012AM11ID1820FDCO
83 CO CO Engr 2014 4HB7 Federal LS3E HSIP - HWY SAFETY IMPR $13,500
84 10/15/12 2013 FHWA 3 92691 NOACA MED MED SR 0057 17.67
Construct Round about at Intersection of MED SR 057/SR 252Safety project
(201110D03-05) Primary Work Category: Intersection Improvement Termini:
Intersection of MED SR 057/SR 252
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2014 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $144,986 $0 $608,747 $0 $3,228,857 2012AM08ID01189FDPE
84 PE Env PE 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $353,772
84 PE Env PE 2013 4HJ7 Federal $50,000
84 PE Env PE 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $44,989
84 PE Env PE 2014 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $15,000
85 02/26/13 2013 FHWA 3 92836 NOACA LORLOR SR 0082 09.05
(Boone Rd)
Re-Align North and South approaches of Boone Road to create 4-leg intersection
with SR 82Install positively offset left turn lanes on SR 82 / Install traffic signal at
the intersectionSafety Application # 201110D03-04 Primary Work Category:
Intersection Improvement Termini: LOR-082-09.05/09.07 and Boone Road (TR
130)
ODOT SPONSORING
AGENCY0.04 PE Dtl Dsgn 2014 4HJ7 Federal $72,000 $0 $700,000 $0 $2,225,000 2012AM10ID1782FDPE
85 PE Dtl Dsgn 2014 4BC7 State $18,000
85 PE Dtl Dsgn 2014 4BC7 State 002 State Funds (S,O) $10,000
85 PE Env PE 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $436,500
85 PE Env PE 2013 4BC7 State 002 State Funds (S,O) $48,500
85 PE Env PE 2014 4HJ7 Federal $48,000
85 PE Env PE 2014 4BC7 State $15,000
85 PE Env PE 2014 4BC7 State $12,000
86 02/26/13 2013 FHWA 3 92953 NOACA MED MED SR 0018 13.54
MED-018-13.54 (Foote Rd) to 15.15 (Nettleton Rd)Widen to 5 lanes from Foote Rd
to River Styx Rd and to7 lanes from River Styx Rd to Nettleton Rd.Access
management techniques / Aesthetic features will be part of this
project.PID:76946 MED SR 0018 13.00 - S Primary Work Category: Section
Improvement Termini: MED-018-13.54 (Foote Rd) to 15.15 (Nettleton Rd)
ODOT SPONSORING
AGENCY1.62 PE Env PE 2013 4PF7 Federal $440,000 $0 $2,074,900 $0 $3,353,450 2012AM10ID1783FDPE
86 PE Env PE 2013 4PS7 State $110,000
ODOT 2014-2017 STIP Page 93
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
86 PE Env PE 2013 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $413,377
86 PE Env PE 2013 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $386,543
86 PE Env PE 2013 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $320,000
86 PE Env PE 2013 4BD7 State 002 State Funds (S,O) $103,344
86 PE Env PE 2013 4BD7 State 002 State Funds (S,O) $96,636
86 PE Env PE 2013 4BD7 State 002 State Funds (S,O) $80,000
86 PE Env RW Serv 2014 4PS7 State $125,000
87 02/26/13 2013 FHWA 3 92954 NOACA MED MED US 0042 17.68
MED-042-17.68 (Harding St Area) to 19.40 (Fenn Rd)Widen to 5 Lanes
w/Intersections improvementsHarding St/Forest Meadows St/Northland
Dr/Reagan Pkwy/Hillsview Way/Ledgewood Dr/Grand Blvd/Stonegate Dr/Fenn
RdAccess management techniques / Multi use paths / Primary Work Category:
Section Improvement Termini: MED-042-17.68 (Harding St Area) to 19.40 (Fenn
Rd)
ODOT SPONSORING
AGENCY1.6 PE Env PE 2013 4BK7 Federal $1,320,000 $0 $2,950,000 $0 $4,050,000 2012AM10ID1784FDPE
87 PE Env PE 2013 4PF7 Federal $520,000
87 PE Env PE 2013 4PS7 State $130,000
87 PE Env PE 2013 4BK7 Federal $400,000
87 PE Env PE 2013 4BD7 State $330,000
87 PE Env PE 2013 4BD7 State $100,000
87 PE Env RW Serv 2014 4PS7 State $150,000
88 01/17/13 2013 FHWA 3 93551 ERPC ERID03 SRTS Perkins
Township
Construct pedestrian paths and improve crossings at Briar Middle School in
Perkins Township. Primary Work Category: Add Sidewalks Termini: Perkins
Township
Perkins, Township of 0 PE Dtl Dsgn 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $35,000 $0 $36,000 $0 $492,600 2012AM09ID1493FDPE
89 01/17/13 2013 FHWA 3 93551 ERPC ERID03 SRTS Perkins
Township
Construct pedestrian paths and improve crossings at Briar Middle School in
Perkins Township. Primary Work Category: Add Sidewalks Termini: Perkins
Township
Perkins, Township of 0 RW RW Serv 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $79,300 $0 $79,300 $0 $492,600 2012AM09ID1493FDRW
90 10/15/12 2013 FHWA 3 93552 WAY D03 SRTS Rittman
Project to construct Home Street sidewalks, add path lighting, improve
crosswalks and install speed feedback signs in the City of Rittman. Primary
Work Category: Add Sidewalks Termini: City of Rittman
Rittman, city of 0 PE Env PE 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $33,000 $0 $33,000 $0 $394,900 2012AM08ID01196FDPE
91 07/01/11 2013 FHWA 4 25062 EASTGATE MAH MAH SR 0289 03.71Resurfacing. Structure replacement. Primary Work Category: Mill and Fill
Termini: West Corp line to East Corp line.Campbell, City of
CO Air Quality
Exempt2 RW Acquis 2013 4TA7 Federal L23E STP URBANIZED AREAS $24,000 $4,900 $34,900 $362,605 $3,961,058 2012stipID0954FDAC
91 RW Acquis 2013 4PS7 State 002 State Funds (S,O) $6,000
92 07/01/11 2013 FHWA 4 76007 SCATS STASTA Navarre Road SW
Signals
Traffic signal system upgrade with a total of 14 intersections involved Primary
Work Category: Signals Termini: City of CantonCANTON
CO Air Quality
Exempt0 CO CO Contr 2013 4TB7 Federal Q400 Congestion Mitigation & Air Quality $1,411,000 $0 $1,760,000 $0 $2,159,100 2012stipID1038FDCO
92 CO CO Contr 2013 4BG7 Local Match 002 Local Match $181,000
92 CO CO Contr 2013 4BG7 Local Match 002 Local Match $352,750
92 CO CO Engr 2013 4BG7 Local Match 002 Local Match $39,250
92 CO CO Engr 2013 LABR Local Match 002 Local Match $18,100
92 CO CO Engr 2013 4TB7 Federal Q400 Congestion Mitigation & Air Quality $157,000
93 07/01/11 2014 FHWA 4 76413 EASTGATE TRU TRU SR 0082 14.08
Minor rehabilitation/resurfacing. Miscellaneous bridge work to six structures.
Primary Work Category: Minor Rehabilitation - Pavement Prmy Sys Termini:
From SR5 to SR46
ODOT SPONSORING
AGENCY3 CO CO Contr 2014 4PF7 Federal H050 NATIONAL HWY SYST $1,600,000 $0 $5,135,000 $0 $5,135,000 2012stipID1232FDCO
93 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $400,000
93 CO CO Engr 2014 LABR Federal H050 NATIONAL HWY SYST $108,000
93 CO CO Engr 2014 LABR State 002 State Funds (S,O) $27,000
93 CO CO Contr 2014 4PF7 Federal H050 NATIONAL HWY SYST $2,400,000
93 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $600,000
94 07/01/11 2013 FHWA 4 76849 AMATS SUM SUM SR 0059 00.00
Minor rehabilitation. Miscellaneous bridge work to eighteen structures.
Primary Work Category: Resurfacing, Divided System Termini: IR76 to East
Market Street.
ODOT SPONSORING
AGENCY3 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $1,330,000 $0 $11,782,000 $0 $11,782,000 2012stipID1135FDCO
94 CO CO Contr 2014 4PF7 Federal H240 STP FLEXIBLE $4,000,000
94 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $1,000,000
94 CO CO Contr 2014 4PF7 Federal H240 STP FLEXIBLE $5,320,000
94 CO CO Engr 2014 LABR State 002 State Funds (S,O) $26,400
94 CO CO Engr 2014 LABR Federal H240 STP FLEXIBLE $105,600
95 04/12/12 2013 FHWA 4 77269 AMATS SUMSUM IR 0076 10.00
(Main/Brdway)
Reconstruct IR-76/77, and change the access points and geometry of the
Main/Broadway and Wolf Ledges/Grant Interchanges.FY2010 Appropriations
Earmark IM1001 Primary Work Category: Major Reconstruction Termini: IR
76/77 West of the Main/Broadway and Wolf Ledges/Grant Interchanges.
AKRONCO Air Quality
Nonexempt2 PE Dtl Dsgn 2013 4BK7 Federal L01E INTERSTATE MAINTENANCE $3,510,000 $0 $6,455,556 $0 $127,865,556 2012AM06ID0665FDPE
95 PE Dtl Dsgn 2013 4BD7 State 002 State Funds (S,O) $390,000
95 PE PE Engr 2012 4BK7 Federal L01E INTERSTATE MAINTENANCE $900,000
95 PE PE Engr 2012 4BK7 Federal L01E INTERSTATE MAINTENANCE $900,000
95 PE PE Engr 2012 4D57 Federal L020 INTERSTATE MAINTENANCE DISCRETIONARY $500,000
95 PE PE Engr 2012 4BD7 State 002 State Funds (S,O) $100,000
95 PE PE Engr 2012 4BD7 State 002 State Funds (S,O) $100,000
95 PE PE Engr 2012 4BG7 Local Match 002 Local Match $55,556
96 04/12/12 2013 FHWA 4 77563 ATB ATB US 0020 13.78
Widen for TWLTL from Ridgewood to Cook Road. SLM 14.28 to 14.68Resurfacing /
Drainage / and Sidewalk improvements through section SLM 13.78 to
14.68QUANTITY SPLITS REQUIRED Primary Work Category: Widening Termini:
SR-11 to Cook Road.
ODOT SPONSORING
AGENCY
CO Air Quality
Exempt1 RW Acquis 2012 4HJ7 Federal LS30 HIGHWAY SAFETY IMP PROG $1,080,000 $1,000,000 $2,200,000 $2,047,994 $6,717,994 2012AM06ID0667FDRW
96 RW Acquis 2012 4BC7 State 002 State Funds (S,O) $120,000
97 01/13/12 2013 FHWA 4 78278 AMATS POR POR SR 0014 12.55
Terminate Newton Falls Road at Woodbine Avenue to eliminate 5th leg of
intersection, extend Peck Road to SR-59, and cul-de-sac Gladys Road at SR-14.
Primary Work Category: Intersection Improvement Termini: At intersection of
SR14/SR59/Newton Falls Road (CR-177) in Ravenna Township
ODOT SPONSORING
AGENCY
CO Air Quality
Exempt0 PE Dtl Dsgn 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $450,000 $1,504,387 $2,004,387 $1,504,387 $7,559,387 2012AM04ID0343FDPEDD
97 PE Dtl Dsgn 2013 4BC7 State 002 State Funds (S,O) $50,000
ODOT 2014-2017 STIP Page 94
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
98 01/13/12 2013 FHWA 4 78278 AMATS POR POR SR 0014 12.55
Terminate Newton Falls Road at Woodbine Avenue to eliminate 5th leg of
intersection, extend Peck Road to SR-59, and cul-de-sac Gladys Road at SR-14.
Primary Work Category: Intersection Improvement Termini: At intersection of
SR14/SR59/Newton Falls Road (CR-177) in Ravenna Township
ODOT SPONSORING
AGENCY
CO Air Quality
Exempt0 RW Acquis 2013 4R67 Federal HY20 Hi Priority Proj Sec 117 "Senate" $455,000 $0 $855,000 $1,504,387 $7,559,387 2012AM04ID0343FDRW
98 RW Acquis 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $360,000
98 RW Acquis 2013 4BC7 State 002 State Funds (S,O) $40,000
99 07/01/11 2014 FHWA 4 78883 ATBATB SR 0531 02.90
(Phase I & II)
PHASE I and II - Permanent treatment at SLM 2.90 erosion site.PE - Detailed
Design encumbered under PID#78882. Primary Work Category: Erosion
Protection Termini: ATB-SR531-2.90
ODOT SPONSORING
AGENCY1 CO CO Contr 2013 4SF7 Federal L240 STP FLEXIBLE $1,200,000 $0 $8,264,298 $637,014 $8,933,149 2012stipID0861FDCO
99 CO CO Contr 2013 4SS7 State 002 State Funds (S,O) $300,000
99 CO CO Engr 2013 LABR Federal L240 STP FLEXIBLE $240,000
99 CO CO Engr 2013 LABR State 002 State Funds (S,O) $60,000
99 CO CO Engr 2013 LABR Federal L240 STP FLEXIBLE $360,000
99 CO CO Engr 2013 LABR State 002 State Funds (S,O) $90,000
99 CO CO Contr 2013 4SF7 Federal L240 STP FLEXIBLE $800,000
99 CO CO Contr 2013 4SS7 State 002 State Funds (S,O) $200,000
99 CO CO Engr 2013 4PF7 Federal L24E STP FLEXIBLE $5,719
99 CO CO Engr 2013 4PS7 State 002 State Funds (S,O) $1,430
99 CO CO Contr 2013 4PF7 Federal L240 STP FLEXIBLE $80,000
99 CO CO Contr 2013 4PS7 State 002 State Funds (S,O) $20,000
99 CO CO Engr 2013 4PF7 Federal L24E STP FLEXIBLE $5,719
99 CO CO Engr 2013 4PS7 State 002 State Funds (S,O) $1,430
99 CO CO Contr 2013 4SF7 Federal L240 STP FLEXIBLE $1,200,000
99 CO CO Contr 2013 4SS7 State 002 State Funds (S,O) $300,000
99 CO CO Contr 2013 4PF7 Federal L240 STP FLEXIBLE $1,600,000
99 CO CO Contr 2013 4PS7 State 002 State Funds (S,O) $400,000
99 CO CO Contr 2013 4SF7 Federal L240 STP FLEXIBLE $400,000
99 CO CO Contr 2013 4SS7 State 002 State Funds (S,O) $100,000
99 CO CO Contr 2013 4SF7 Federal L240 STP FLEXIBLE $720,000
99 CO CO Contr 2013 4SS7 State 002 State Funds (S,O) $180,000
100 08/01/11 2014 FHWA 4 79516 ATB ATB Callender Road
Replacement of the existing structure with a three span structure with roadway
approach work and guardrail work.Credit Bridge Program MAX is $ 173,150.
Primary Work Category: Bridge Replacement Termini: West of Callender Road
(TR550C) & SR-45 Intersection - 1.35 miles and 9.2 miles north of the ATB County
line
ASHTABULA COUNTY
ENGINEER0.01 CO CO Contr 2011 4B87 Federal L110 BRIDGE 15% OFF SYSTEM $1,329,435 $0 $1,630,000 $63,755 $1,693,755 2012MODID0009FDCO
100 CO CO Contr 2011 LNTP Local Match LNTP Non Traditional Local Match $137,565
100 CO CO Engr 2011 4B87 Federal L110 BRIDGE 15% OFF SYSTEM $147,715
100 CO CO Engr 2011 LNTP Local Match LNTP Non Traditional Local Match $15,285
101 07/01/11 2013 FHWA 4 79846 EASTGATE TRUTRU Warren
Sharon/Howland Wilson
Install traffic signal at the intersection and construct left turn lanes on Warren
Sharon Rd & left turn on Howland Wilson Primary Work Category: Signals
Termini: Intersection of Warren Sharon Rd (CR329) & Howland Wilson Rd (CR155)
TRUMBULL COUNTY
ENGINEER
CO Air Quality
Exempt0 RW Acquis 2013 LNTP Local Match LNTP Non Traditional Local Match $14,500 $0 $72,500 $53,826 $1,235,746 2012stipID1265FDAC
101 RW Acquis 2013 4TA7 Federal L230 URBANIZED AREAS $58,000
102 07/01/11 2013 FHWA 4 80655 EASTGATE MAH MAH Mill Creek Bikeway
Development of 6.25 mile multi-use trail in Mahoning County.Construction
under PID# 85005, MAH-Metroparks Bikeway, Phase III. Primary Work
Category: Bikeways Termini: Columbiana County line to Pine Lake.
Mill Creek Park DistrictCO Air Quality
Exempt0 RW Acquis 2012 4R47 Federal HY10 Hi Priority Projects Sec 1702 "House" $225,783 $0 $225,783 $35,625 $399,985 2012stipID0940FDAC
103 04/12/12 2013 FHWA 4 80665 AMATS SUM SUM Lauby Road
Widen four lane facility to standard design width.Improve Lauby Road /
Greensburg Road intersection. Primary Work Category: Mill and Fill Termini:
Akron Canton Airport drive to Greensburg Road intersection.
Green, City ofCO Air Quality
Exempt1 RW Acquis 2012 4HJ7 Federal LS30 HIGHWAY SAFETY IMP PROG $54,000 $0 $60,000 $238,000 $1,630,000 2012AM06ID0669FDRW
103 RW Acquis 2012 LNTP Local Match LNTP Non Traditional Local Match $6,000
104 11/08/11 2013 FHWA 4 80666 EASTGATE TRU TRU Warren RiverwalkConstruction of riverwalk and adjacent facilities in Warren. Primary Work
Category: Bikeways Termini: Warren riverwalkWARREN
CO Air Quality
Exempt0 RW Acquis 2011 4R47 Federal HY10 Hi Priority Projects Sec 1702 "House" $25,000 $0 $25,000 $0 $342,000 2012AM04ID0345FDRW
105 08/29/11 2013 FHWA 4 80674 EASTGATE MAHMAH Western Reserve
Rd. (Phase1)
Major widening. Primary Work Category: Major Reconstruction Termini:
Hitchcock Road to SR-7
MAHONING COUNTY
ENGINEER
CO Air Quality
Nonexempt0.74 PE Env PE 2011 4R47 Federal HY10 Hi Priority Projects Sec 1702 "House" $500,000 $0 $500,000 $0 $1,820,000 2012MODID0018FDPE
106 08/30/11 2013 FHWA 4 80675 EASTGATE MAHMAH Y.S.U. Corridor
Safety Study
Studies to identify roadway and pedestrian safety improvements for Rayen
Avenue, Wick Avenue. 5th Avenue, and existing Hazel. Primary Work
Category: Section Improvement Termini: Youngstown State University
YOUNGSTOWNCO Air Quality
Exempt1.31 CO CO Contr 2011 4R47 Federal HY10 Hi Priority Projects Sec 1702 "House" $1,269,900 $0 $1,411,000 $329,728 $1,911,000 2012MODID0020FDCO
106 CO CO Engr 2011 4R47 Federal HY10 Hi Priority Projects Sec 1702 "House" $141,100
107 04/12/12 2013 FHWA 4 80680 SCATS STASTA CR-44-4.65 (Paris
Road)
Paris / Meese intersection improvement, consisting of profile corrections,
widening. Primary Work Category: Intersection Improvement Termini: Paris
Road at Meese Road.
STARK COUNTY ENGINEERCO Air Quality
Exempt0 PE Dtl Dsgn 2012 4R47 Federal HY10 Hi Priority Projects Sec 1702 "House" $80,000 $214,245 $314,245 $214,245 $3,896,439 2012AM06ID0671FDPE
107 PE Dtl Dsgn 2012 LNTP Local Match LNTP Non Traditional Local Match $20,000
108 10/13/11 2013 FHWA 4 80681 SCATS STA STA SR 0043 17.24Planning study of proposed widening area. Primary Work Category: Studies
Termini: 55th street to Mount PleasantDISTRICT 4 PRODUCTION
CO Air Quality
Nonexempt0 PE Dtl Dsgn 2013 4R47 Federal HY10 Hi Priority Projects Sec 1702 "House" $791,685 $1,848,315 $2,640,000 $1,000,000 $2,640,000 2012AM03ID0105FDPEDD
109 11/08/11 2013 FHWA 4 80684 AMATS SUM SUM Evans Avenue RGS
CSX rail grade seperation improvements.The DeWine Earmark ID OH359 (LY30
Federal Funds - 80% Federal, SAFETEA-LU Sect 1934, for "Evans Ave/CSX RR Grade
Separation improvements, Akron, Ohio") has an original Earmark award amount
of $1,600,000 for which $3, Primary Work Category: Railroad Grade Separation
Termini: Evans Avenue
AKRONCO Air Quality
Exempt0 RW Acquis 2011 4R47 Federal LY30 TRANSP IMPR EARMARK PROJECTS $456,000 $0 $456,000 $632,461 $8,000,000 2012AM04ID0346FDRW
110 08/30/11 2013 FHWA 4 81430 EASTGATE TRUTRU King Graves
Realignment
Study to determine realignment of King Graves Road Primary Work Category:
Studies Termini: Kings Graves Road
TRUMBULL COUNTY
ENGINEER0 PE Env PE 2011 4R47 Federal H660 SECTION 117 DEMO ID PROJECTS $983,928 $0 $983,928 $0 $983,928 2012MODID0021FDPE
ODOT 2014-2017 STIP Page 95
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
111 04/12/12 2013 FHWA 4 81656 AMATS SUM SUM SR 0082 04.65
Widening improvement that consists of widening existing 2 and 3 lane roadway
to 4 lanes with left turn lanes where warranted. Also, included are the
reconstruction of bike lanes. Primary Work Category: Major Widening
Termini: East of Crow Drive / Park Avenue intersection and end at Shepard Road.
MACEDONIACO Air Quality
Nonexempt1 PE Dtl Dsgn 2012 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $123,745 $461,255 $598,749 $461,255 $7,103,749 2012AM06ID0674FDPE
111 PE Dtl Dsgn 2012 4BG7 Local Match 002 Local Match $13,749
112 10/13/11 2013 FHWA 4 82086 EASTGATE MAH MAH Elm Street Bridge
Structure removal and replaced with a single span, steel girder. Primary Work
Category: Bridge Replacement Termini: Elm Street structure over Crandall Run
in Youngstown
YOUNGSTOWNCO Air Quality
Exempt0 PE Dtl Dsgn 2012 4TA7 Federal L230 URBANIZED AREAS $62,989 $149,170 $588,538 $149,170 $2,896,300 2012AM01ID0058FDPEDD
112 PE Dtl Dsgn 2012 LNTP Local Match 002 Local Match $15,747
112 PE Dtl Dsgn 2012 4TA7 Federal L230 URBANIZED AREAS $139,336
112 PE Dtl Dsgn 2012 LNTP Local 002 Local Match $34,834
112 PE Env PE 2010 LNTP Local LNTP Non Traditional Local Match $37,292
112 PE Env PE 2010 4TA7 Federal L230 URBANIZED AREAS $149,170
113 07/12/12 2013 FHWA 4 83407 EASTGATE TRU TRU WRG Phase III
Preparation of lease agreements and/or permanent easements, survey work,
environmental review documents, soils investigation, designing engineering
and drawing, construction and inspections in order to connect to Phase I
Primary Work Category: Bikeways Termini: Intersection of Champion Avenue
East in Champion Township
Trumball County
Metropark District0 PE Dtl Dsgn 2013 4TB7 Federal L400 CMAQ $110,632 $284,630 $395,262 $284,630 $1,615,262 2012AM07ID941FDPEDD
114 07/01/11 2013 FHWA 4 83407 EASTGATE TRU TRU WRG Phase III
Preparation of lease agreements and/or permanent easements, survey work,
environmental review documents, soils investigation, designing engineering
and drawing, construction and inspections in order to connect to Phase I
Primary Work Category: Bikeways Termini: Intersection of Champion Avenue
East in Champion Township
Trumball County
Metropark District0 RW Acquis 2012 4TB7 Federal L400 CMAQ $20,000 $0 $20,000 $220,573 $1,570,690 2012stipID1260FDAC
115 07/01/11 2013 FHWA 4 83600 EASTGATE TRU TRU CR 0142 04.68
Mill and fill of intersection with skid resistant material. Upgrade pavement
markings. Signal upgrade. Access management. Primary Work Category:
Resurfacing (safety related) Termini: North River Road at Elm Road.
TRUMBULL COUNTY
ENGINEER0 PE Dtl Dsgn 2012 4BG7 Local Match 002 Local Match $2,000 $0 $60,000 $0 $285,000 2012stipID1185FDENDD
115 PE Dtl Dsgn 2012 4HJ7 Federal LS30 HIGHWAY SAFETY IMP PROG $18,000
115 PE Env PE 2012 4BG7 Local Match 002 Local Match $4,000
115 PE Env PE 2012 4HJ7 Federal LS30 HIGHWAY SAFETY IMP PROG $36,000
116 10/13/11 2013 FHWA 4 83629 EASTGATE TRU TRU US 0422 09.34
Install left turn storage lanes at Coit Road intersection, intersection realigning
intersection, and bank driveway. Install TWLTL from Southern Boulevard to Coit
Road. Primary Work Category: Turn Lane Addition Termini: Southern
Boulevard to Coit Road.
WARREN 0 PE Dtl Dsgn 2012 4TB7 Federal L400 CMAQ $210,000 $308,835 $560,000 $308,835 $6,859,000 2012AM03ID0135FDPEED
116 PE Env PE 2012 4TB7 Federal L400 CMAQ $41,185
117 10/13/11 2013 FHWA 4 83629 EASTGATE TRU TRU US 0422 09.34
Install left turn storage lanes at Coit Road intersection, intersection realigning
intersection, and bank driveway. Install TWLTL from Southern Boulevard to Coit
Road. Primary Work Category: Turn Lane Addition Termini: Southern
Boulevard to Coit Road.
WARREN 0 RW Acquis 2013 4HJ7 Federal LS30 HIGHWAY SAFETY IMP PROG $122,400 $0 $505,000 $308,835 $6,859,000 2012AM03ID0135FDRW
117 RW Acquis 2013 LNTP Local Match LNTP Non Traditional Local Match $30,600
117 RW Acquis 2013 4TB7 Federal L400 CMAQ $352,000
118 07/12/12 2013 FHWA 4 84457 EASTGATE TRUTRU Parkman Meso. Rd
(CH313)
Replacing structure Primary Work Category: Bridge Replacement Termini:
Over Andrews Creek
TRUMBULL COUNTY
ENGINEER0 PE Dtl Dsgn 2013 4TA7 Federal L23E STP URBANIZED AREAS $78,611 $177,389 $275,653 $177,389 $957,053 2012AM07ID0942FDPEDD
118 PE Dtl Dsgn 2013 LNTP Local Match 002 Local Match $19,653
119 10/13/11 2013 FHWA 4 84458 EASTGATE TRUTRU Chestnut Ridge Rd
(CH12)
Replace structure Primary Work Category: Bridge Replacement Termini:
Over Little Yankee Creek
TRUMBULL COUNTY
ENGINEER0 PE Dtl Dsgn 2013 4BG7 Local Match 002 Local Match $30,000 $0 $300,000 $0 $1,415,100 2012AM03ID0126FDPEED
119 PE Dtl Dsgn 2013 4TA7 Federal L23E STP URBANIZED AREAS $120,000
119 PE Env PE 2012 4BG7 Local Match 002 Local Match $30,000
119 PE Env PE 2012 4TA7 Federal L23E STP URBANIZED AREAS $120,000
120 10/13/11 2013 FHWA 4 84459 EASTGATE TRUTRU Palmyra Road
(CH81)
Replace structure Primary Work Category: Bridge Replacement Termini:
Over Little Duck Creek
TRUMBULL COUNTY
ENGINEER0 PE Dtl Dsgn 2013 4TA7 Federal L23E STP URBANIZED AREAS $90,000 $0 $225,000 $0 $735,600 2012AM03ID0132FDPEED
120 PE Dtl Dsgn 2013 4BG7 Local Match 002 Local Match $22,500
120 PE Env PE 2012 4TA7 Federal L23E STP URBANIZED AREAS $90,000
120 PE Env PE 2012 4BG7 Local Match 002 Local Match $22,500
121 07/01/11 2013 FHWA 4 84460 EASTGATE TRUTRU Curtis Middlefield
(TH227)
Replace existing structure Primary Work Category: Bridge Replacement
Termini: Over Swine Creek
TRUMBULL COUNTY
ENGINEER0 PE Dtl Dsgn 2012 LNTP Local Match 002 Local Match $30,000 $0 $300,000 $0 $1,637,800 2012stipID1189FDENDD
121 PE Dtl Dsgn 2012 4TA7 Federal L23E STP URBANIZED AREAS $120,000
121 PE Env PE 2012 LNTP Local Match 002 Local Match $30,000
121 PE Env PE 2012 4TA7 Federal L23E STP URBANIZED AREAS $120,000
122 07/01/11 2013 FHWA 4 84460 EASTGATE TRUTRU Curtis Middlefield
(TH227)
Replace existing structure Primary Work Category: Bridge Replacement
Termini: Over Swine Creek
TRUMBULL COUNTY
ENGINEER0 RW Acquis 2012 LNTP Local Match 002 Local Match $15,000 $0 $75,000 $0 $1,637,800 2012stipID1190FDAC
122 RW Acquis 2012 4TA7 Federal L23E STP URBANIZED AREAS $60,000
123 10/13/11 2013 FHWA 4 84461 EASTGATE TRUTRU Newton Falls Bailey
(CH92)
Replace existing structure Primary Work Category: Bridge Replacement
Termini: Over Duck Creek
TRUMBULL COUNTY
ENGINEER0 PE Dtl Dsgn 2013 4TA7 Federal L23E STP URBANIZED AREAS $100,000 $0 $250,000 $0 $836,000 2012AM03ID0130FDPEED
123 PE Dtl Dsgn 2013 4BG7 Local Match 002 Local Match $25,000
123 PE Env PE 2012 4BG7 Local Match 002 Local Match $25,000
123 PE Env PE 2012 4TA7 Federal L23E STP URBANIZED AREAS $100,000
124 10/13/11 2013 FHWA 4 84463 EASTGATE TRUTRU Messick South Rd
(TH235)
Replace existing structure Primary Work Category: Bridge Replacement
Termini: Over Baughman Creek
TRUMBULL COUNTY
ENGINEER0 PE Dtl Dsgn 2013 4TA7 Federal L23E STP URBANIZED AREAS $100,000 $0 $250,000 $0 $906,400 2012AM03ID0128FDPEED
124 PE Dtl Dsgn 2013 4BG7 Local Match 002 Local Match $25,000
124 PE Env PE 2012 4BG7 Local Match 002 Local Match $25,000
124 PE Env PE 2012 4TA7 Federal L23E STP URBANIZED AREAS $100,000
ODOT 2014-2017 STIP Page 96
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
125 07/01/11 2013 FHWA 4 84476 EASTGATE TRUTRU Mayburn Corners
(CR279)
Replace existing structure Primary Work Category: Bridge Replacement
Termini: Over Sugar Creek
TRUMBULL COUNTY
ENGINEER0 RW Acquis 2012 LNTP Local Match 002 Local Match $10,000 $0 $50,000 $127,030 $980,900 2012stipID1207FDAC
125 RW Acquis 2012 4TA7 Federal L230 URBANIZED AREAS $40,000
126 04/12/12 2013 FHWA 4 84498 AMATS SUMSUM Cleve-Massillon
(CR17-7.44)
Safety Tier 2 PE - to determine selected alternative of appropriate measures to
improve congestion and saftey through corridor including signal improvements,
turn lane needs and access management.RW and CO phases under PID# 85076,
SUM-Cleveland Massillon Primary Work Category: Widening Termini:
Shannon Road to IR-76
Norton, City of 2 PE Dtl Dsgn 2012 4HJ7 Federal LS30 HIGHWAY SAFETY IMP PROG $562,807 $572,289 $1,247,630 $572,289 $1,247,630 2012AM06ID0677FDPE
126 PE Dtl Dsgn 2012 LNTP Local Match LNTP Non Traditional Local Match $62,534
126 PE Env PE 2012 4HJ7 Federal LS30 HIGHWAY SAFETY IMP PROG $45,000
126 PE Env PE 2012 LNTP Local Match LNTP Non Traditional Local Match $5,000
127 10/13/11 2013 FHWA 4 84546 AMATS POR POR East Summit Street
Install coordinated signal system, add center median to restrict turns and
discourage midblock pedestrian crossing, improve intersection at Lincoln Street,
extend Rhodes Road to Summit Street at East Campus Drive, and improve
profile/grade of Summit Stree Primary Work Category: Intersection
Improvement Termini: Between Lincoln Street and Loop Road
KENT 0 PE Dtl Dsgn 2012 LNTP Local Match LNTP Non Traditional Local Match $110,120 $272,800 $891,600 $272,800 $12,574,912 2012AM03ID009FD3PEDD
127 PE Dtl Dsgn 2012 4HJ7 Federal L240 STP FLEXIBLE $440,480
128 07/01/11 2014 FHWA 4 84586 SCATS STASTA US/SR 30/183
31.96/5.88
Resurfacing. US-30 from Minerva Western corp to Columbiana County line. SR-
183 from Market Street to Alliance Southern corp.Deck overlay and painting of
sfn# 7605625. Primary Work Category: Minor Rehabilitation - Pavement Gnrl
Sys Termini: US-30 and SR-183
DISTRICT 4-
MAINTENANCE12 CO CO Engr 2014 LABR Federal L20E STP RURAL <200K $6,400 $0 $3,108,000 $1,656 $3,110,787 2012stipID1075FDCO
128 CO CO Engr 2014 LABR State 002 State Funds (S,O) $1,600
128 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $1,896,000
128 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $474,000
128 CO CO Contr 2014 4PF7 Federal L20E STP RURAL <200K $64,000
128 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $16,000
128 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $320,000
128 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $80,000
128 CO CO Engr 2014 LABR Federal L25E STP RURAL <5K $200,000
128 CO CO Engr 2014 LABR State 002 State Funds (S,O) $50,000
129 07/01/11 2014 FHWA 4 84593 AMATS PORPOR SR 14/183
18.08/3.01
Resurfacing. Miscellaneous bridge work to four structures. Primary Work
Category: Minor Rehabilitation - Pavement Gnrl Sys Termini: SR-14 and SR-183
DISTRICT 4-
MAINTENANCE12 CO CO Engr 2014 LABR Federal L25E STP RURAL <5K $212,000 $0 $3,040,000 $0 $3,040,000 2012stipID1004FDCO
129 CO CO Engr 2014 LABR State 002 State Funds (S,O) $53,000
129 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $2,160,000
129 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $540,000
129 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $60,000
129 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $15,000
130 07/01/11 2014 FHWA 4 84601 EASTGATE MAHMAH/POR/TRU - 224/534
- Various
Resurfacing. To be sold with PID# 90225, MAH 224/534 ? Primary Work
Category: Minor Rehabilitation - Pavement Gnrl Sys Termini: MAH-224 and POR-
224, along with MAH-534 and TRU-534
DISTRICT 4-
MAINTENANCE14 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $2,560,000 $0 $3,520,000 $0 $3,520,000 2012stipID0979FDCO
130 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $640,000
130 CO CO Engr 2014 LABR Federal L25E STP RURAL <5K $256,000
130 CO CO Engr 2014 LABR State 002 State Funds (S,O) $64,000
131 07/01/11 2014 FHWA 4 84606 ATB ATB US 0322 8.11Resurfacing. Miscellaneous bridge work to four structures. Primary Work
Category: Minor Rehabilitation - Pavement Gnrl Sys Termini: SLM 8.11 to 17.49
DISTRICT 4-
MAINTENANCE9 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $1,720,000 $0 $2,410,000 $0 $2,410,000 2012stipID0868FDCO
131 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $430,000
131 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $40,000
131 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $10,000
131 CO CO Engr 2014 LABR Federal L25E STP RURAL <5K $168,000
131 CO CO Engr 2014 LABR State 002 State Funds (S,O) $42,000
132 07/01/11 2013 FHWA 4 84621 EASTGATE TRU TRU High / Main Street
Replacement of East Main Street bridge and addition of left turn lane East Main
and North High Streets Primary Work Category: Bridge Replacement
Termini: Intersection of High & Main Streets and intersection of Walnut St. &
East Main St.
TRUMBULL COUNTY
ENGINEER0 RW Acquis 2012 4TB7 Federal L400 CMAQ $150,000 $0 $150,000 $184,598 $2,425,000 2012stipID1194FDAC
133 01/13/12 2013 FHWA 4 85078 AMATS SUM SUM SR 0091 21.11
New capacity and safety improvement.Phase II to be constructed under
PID#92032, SUM-SR91-21.65 Primary Work Category: Widening Termini: Post
Road to Glenwood Drive.
TWINSBURG 1 PE Dtl Dsgn 2013 4HJ7 Federal LS30 HIGHWAY SAFETY IMP PROG $270,000 $290,538 $679,975 $290,538 $6,165,100 2012AM04ID0356FDPEDD
133 PE Dtl Dsgn 2012 4HJ7 Federal LS30 HIGHWAY SAFETY IMP PROG $80,493
133 PE Dtl Dsgn 2013 LNTP Local Match 002 Local Match $30,000
133 PE Dtl Dsgn 2012 LNTP Local Match 002 Local Match $8,944
134 10/13/11 2013 FHWA 4 85153 EASTGATE TRUTRU TR 17 1.08 Hubbard
Thomas
Bridge replacement. Primary Work Category: Bridge Replacement Termini:
Over Little Yankee Creek
TRUMBULL COUNTY
ENGINEER0 PE Dtl Dsgn 2014 4BG7 Local Match 002 Local Match $30,000 $0 $300,000 $0 $1,473,000 2012AM03ID0134FDPEED
134 PE Dtl Dsgn 2014 4TA7 Federal L23E STP URBANIZED AREAS $120,000
134 PE Env PE 2013 4BG7 Local Match 002 Local Match $30,000
134 PE Env PE 2013 4TA7 Federal L23E STP URBANIZED AREAS $120,000
135 11/08/11 2013 FHWA 4 85279 EASTGATE MAH MAH CR 0102 01.46Construction of roundabout. Primary Work Category: Intersection
Improvement Termini: Mathews / Sheridan Road Intersection
MAHONING COUNTY
ENGINEER0.01 RW Acquis 2011 4TB7 Federal L400 CMAQ $50,000 $0 $65,151 $144,606 $1,117,846 2012MODID00120FDRW
135 RW RW Serv 2011 4TB7 Federal L400 CMAQ $15,151
136 11/08/11 2013 FHWA 4 85296 AMATS POR POR SR 0005 03.22
Reconfigure SR-5 at New Milford Road intersection to restrict thru traffic and left
turn movements from New Milford Road. Design to be completed through
PID#78278, POR-SR14-12.55 Primary Work Category: Intersection Improvement
Termini: New Milford Road and Lake Road
ODOT SPONSORING
AGENCY0.08 RW Acquis 2011 4BC7 State 002 State Funds (S,O) $5,000 $0 $50,000 $0 $915,000 2012MODID00121FDRW
136 RW Acquis 2011 4HJ7 Federal LS30 HIGHWAY SAFETY IMP PROG $45,000
ODOT 2014-2017 STIP Page 97
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
137 10/13/11 2013 FHWA 4 85299 SCATS STA STA 12th Street HSP
Widening of 12th Street from Monument to Maple, including the widening of
Market Street (SR-43) approaches for addition of left turn storage lanes. Install
coordinated signal system through East/West corridor networked with existing
North/South systems. Primary Work Category: Turn Lane Addition Termini:
SR-43 at SR-153 intersection
CANTON 0 RW Acquis 2012 LNTP Local Match LNTP Non Traditional Local Match $71,638 $0 $1,004,978 $257,736 $12,088,782 2012AM03ID0097FDRW
137 RW Acquis 2012 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $241,200
137 RW Acquis 2012 4TB7 Federal L40E CMAQ $53,600
137 RW Acquis 2012 LNTP Local Match LNTP Non Traditional Local Match $13,400
137 RW Acquis 2012 4TA7 Federal L23E STP URBANIZED AREAS $286,550
137 RW Acquis 2012 LNTP Local Match LNTP Non Traditional Local Match $26,800
137 RW RW Serv 2012 LNTP Local Match LNTP Non Traditional Local Match $62,358
137 RW RW Serv 2012 4TA7 Federal L23E STP URBANIZED AREAS $249,432
138 01/17/13 2013 FHWA 4 86154 AMATS SUMSUM - Akron Cleveland
Road
Bridge replacement. SFN# 7768141. Primary Work Category: Bridge
Replacement Termini: Over Metroparks trail.BOSTON HEIGHTS 0 PE Dtl Dsgn 2013 4R47 Federal 56C0 DIV A 2010 STP APPROP EARMARK $328,340 $310,660 $650,000 $310,660 $4,713,000 2012AM09ID1506FDPE
138 PE Env PE 2013 4R47 Federal 56C0 DIV A 2010 STP APPROP EARMARK $11,000
139 01/17/13 2013 FHWA 4 86154 AMATS SUMSUM - Akron Cleveland
Road
Bridge replacement. SFN# 7768141. Primary Work Category: Bridge
Replacement Termini: Over Metroparks trail.BOSTON HEIGHTS 0 RW Acquis 2013 4R47 Federal 56C0 DIV A 2010 STP APPROP EARMARK $100,000 $0 $425,000 $310,660 $4,713,000 2012AM09ID1506FDRW
139 RW Utl Remb 2013 4BG7 Local Match 002 Local Match $325,000
140 04/12/12 2013 FHWA 4 86923 AMATS SUM SUM 31st Street (CR17)
Widening 31st street for the addition of a TWLTL including signal upgrade for the
Shannon Avenue intersection. Primary Work Category: Turn Lane Addition
Termini: Wooster Road to Shannon Avenue
Barberton, City of 1 RW Acquis 2013 4TA7 Federal $374,000 $0 $467,500 $308,720 $4,315,851 2012AM06ID0683FDRW
140 RW Acquis 2013 4BG7 Local Match 002 Local Match $93,500
141 07/12/12 2013 FHWA 4 86979 AMATS SUMSUM IR 76/77
11.27/12.22
Relocation of Johnston Street between Spicer Street and Brown Street two
facilitate the improvement of IR-76 by removing three structures over Johnston
Street. Primary Work Category: Bridge Deck Replacement Termini: Brown
Street to Central Interchange
DISTRICT 4-PLANNING 1 RW Acquis 2013 4PF7 Federal L01E INTERSTATE MAINTENANCE $1,575,000 $0 $2,000,000 $1,291,339 $20,391,339 2012AM07ID0944FDRW
141 RW Acquis 2013 4PS7 State 002 State Funds (S,O) $175,000
141 RW RW Serv 2013 4PF7 Federal L01E INTERSTATE MAINTENANCE $225,000
141 RW RW Serv 2013 4PS7 State 002 State Funds (S,O) $25,000
142 07/01/11 2013 FHWA 4 87545 EASTGATE MAHMAH Division Street (CH-
308)
Bridge replacement. Primary Work Category: Bridge Replacement Termini:
Division Street over Mahoning River
MAHONING COUNTY
ENGINEER0 RW Acquis 2012 LNTP Local Match 002 Local Match $20,000 $0 $100,000 $180,491 $3,978,000 2012stipID0912FDAC
142 RW Acquis 2012 4TA7 Federal L230 URBANIZED AREAS $80,000
143 07/01/11 2014 FHWA 4 88526 EASTGATE MAHMAH Porter Ave. SRTS,
Phase II
Replace and add sidwalks on Porter Avenue in the City of Campbell. Primary
Work Category: Add Sidewalks Termini: Porter AvenueCampbell, City of 0 CO CO Contr 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $263,700 $0 $293,000 $0 $318,000 2012stipID0942FDCO
143 CO CO Engr 2013 LABR Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $29,300
144 11/08/11 2013 FHWA 4 88533 AMATS SUMSUM IR-76 Martha
Corridor Study
Corridor Study per PDP process. To include an IMS. Primary Work Category:
Corridor Study Termini: Arlington Road to Market Street.AKRON 1.77 PE Pln Stdy 2011 4R47 Federal 56C0 DIV A 2010 STP APPROP EARMARK $750,000 $0 $750,000 $0 $750,000 2012AM04ID0362FDPE
145 07/01/11 2013 FHWA 4 89113 AMATS SUM SUM SR 0091 00.00 Study
Widen for NB dual LT lane, EB RT lane, proper EB LT & SB LT storage length.
Access management - restrict driveway LT's on Canton Road from Arcadia to Old
Home - provide alternate access. Improve profile and widen for TWLTL from Old
Home to Linwood. Primary Work Category: Widening Termini: SR91/CR66 at
US-224
DISTRICT 4-PLANNING 1 PE Env PE 2012 4BC7 State 002 State Funds (S,O) $35,000 $0 $350,000 $0 $350,000 2012stipID1139FDEN
145 PE Env PE 2012 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $315,000
146 07/01/11 2013 FHWA 4 89306 AMATS SUM SUM Canton Road SignalInstall a new traffic signal. Primary Work Category: Signals Termini:
Springfield Lake Drive at Canton Road
SUMMIT COUNTY
ENGINEER0 RW Acquis 2012 LNTP Local Match 002 Local Match $1,800 $0 $18,000 $26,402 $165,097 2012stipID1094FDAC
146 RW Acquis 2012 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $16,200
147 07/01/11 2013 FHWA 4 90213 EASTGATE TRUTRU High St. / West Main
Street
Resurfacing. Primary Work Category: Mill and Fill Termini: High Street and
West Main StreetCORTLAND 2 PE Dtl Dsgn 2013 LNTP Local Match 002 Local Match $9,000 $0 $45,000 $0 $670,000 2012stipID1196FDDD
147 PE Dtl Dsgn 2013 4TA7 Federal L23E STP URBANIZED AREAS $36,000
148 10/13/11 2013 FHWA 4 90268 SCATS STASTA Mahoning Rd.
Utilities-Ph. 1
Burying and relocating overhead utilities. Primary Work Category: Earthwork
Termini: Grace Avenue to Harmont AvenueCANTON 0 RW Acquis 2013 4BK7 Federal L20E STP RURAL <200K $800,000 $0 $1,000,000 $0 $2,250,000 2012AM03ID0102FDRW
148 RW Acquis 2013 4BD7 State 002 State Funds (S,O) $200,000
149 07/12/12 2013 FHWA 4 90361 SCATS STA STA SR 0153 01.70
Streetscape/economic development project to improve traffic flow and safety.
Address roadway pavement, curbs, sidewalks, ramps, crosswalks, lights, and
signals.To be sold with PID# 92235, STA-153-2.69. Urban Paving. Primary Work
Category: Mill and Fill Termini: Grace Avenue to Harmont Avenue
CANTON 1 RW Acquis 2013 4BK7 Federal L20E STP RURAL <200K $200,000 $0 $250,000 $0 $10,957,887 2012AM07ID0948FDRW
149 RW Acquis 2013 4BD7 State 002 State Funds (S,O) $50,000
150 07/12/12 2013 FHWA 4 90365 SCATS STA STA SR 0153 00.80
Streetscape/economic development project to improve traffic flow and safety.
Address roadway pavement, curbs, sidewalks, ramps, crosswalks, lights, and
signals. Primary Work Category: Mill and Fill Termini: Maple Avenue to
Grace Avenue.
CANTON 1 RW Acquis 2013 4BK7 Federal L20E STP RURAL <200K $400,000 $0 $500,000 $0 $8,350,000 2012AM07ID0949FDRW
150 RW Acquis 2013 4BD7 State 002 State Funds (S,O) $100,000
151 07/01/11 2013 FHWA 4 90465 SCATS STASTA 11th Street / Market
St.
Preliminary engineering.2009 TCSP Earmark TC0901 Primary Work Category: PE
Only Termini: 11th Street / Market AvenueCANTON 0 PE Dtl Dsgn 2012 4D57 Federal L680 TCSP $165,680 $0 $444,600 $0 $444,600 2012stipID1011FDENDD
151 PE Dtl Dsgn 2012 LNTP Local Match 002 Local Match $41,420
151 PE Env PE 2012 4D57 Federal L680 TCSP $190,000
151 PE Env PE 2012 LNTP Local Match 002 Local Match $47,500
152 07/01/11 2013 FHWA 4 90890 AMATS SUMSUM White Pond Drive -
Phase 3
Roadway improvements. Intersection.Three FED Earmarks: OH125, OH229, TC
0806 Primary Work Category: Mill and Fill Termini: Between IR-77 and
Copley Road
AKRON 1 PE Env PE 2012 LNTP Local Match 002 Local Match $151,511 $0 $757,553 $0 $3,157,553 2012stipID1177FDEN
152 PE Env PE 2012 4R47 Federal L680 TCSP $606,042
ODOT 2014-2017 STIP Page 98
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
153 07/01/11 2013 FHWA 4 90890 AMATS SUMSUM White Pond Drive -
Phase 3
Roadway improvements. Intersection.Three FED Earmarks: OH125, OH229, TC
0806 Primary Work Category: Mill and Fill Termini: Between IR-77 and
Copley Road
AKRON 1 RW Acquis 2013 4R47 Federal H170 SEC 115 STP EARMARK $750,000 $0 $750,000 $0 $3,157,553 2012stipID1178FDAC
154 01/13/12 2013 FHWA 4 91004 AMATS SUMSUM Call Road/Various
SRTS
Adding sidewalk connectivity at four locations. New speed monitors at crossings.
Primary Work Category: Add Sidewalks Termini: Various roads in the City of
Stow
Stow, City of 0 PE Dtl Dsgn 2012 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $2,200 $43,800 $46,000 $43,800 $376,270 2012AM04ID0364FDPEDD
155 10/15/12 2013 FHWA 4 91033 EASTGATE TRUTRU Ohio Avenue (CR-
351)
Resurfacing. Including curb ramps, pavement markings, signage, and storm
sewer repairs. Primary Work Category: Mill and Fill Termini: Marshall Road
to Olive Street
McDonald, Village of 1 PE Dtl Dsgn 2013 4TA7 Federal L23E STP URBANIZED AREAS $20,000 $0 $50,000 $0 $518,000 2012AM08ID01237FDPE
155 PE Dtl Dsgn 2013 LNTP Local Match 002 Local Match $5,000
155 PE Env PE 2013 4TA7 Federal L23E STP URBANIZED AREAS $20,000
155 PE Env PE 2013 LNTP Local Match 002 Local Match $5,000
156 10/13/11 2014 FHWA 4 91051 AMATS SUM SUM SR 0082 00.00Concrete overlay. Sealing of structure. Primary Work Category: Bridge Repair
Termini: Over Cuyahoga River, Railroad, Bike PathDISTRICT 4-PLANNING 0 CO CO Contr 2015 4BU7 Federal $2,000,000 $0 $2,750,000 $0 $2,750,000 2012AM03ID0122FDCO
156 CO CO Contr 2015 4BT7 State 002 State Funds (S,O) $500,000
156 CO CO Engr 2015 LABR Federal $200,000
156 CO CO Engr 2015 LABR State 002 State Funds (S,O) $50,000
157 01/13/12 2013 FHWA 4 92004 EASTGATE TRUTRU Warren Riverwalk-
Lovers Lane
This project will construct trails and facilities along the Mahoning River in the
City of Warren. Primary Work Category: Bikeways Termini: Lovers Lane Park
Trail
WARREN 0 PE Dtl Dsgn 2012 4R47 Federal LY10 HI PRI SEC 1702 $10,000 $0 $25,000 $0 $150,000 2012AM04ID0366FDPE
157 PE Env PE 2012 4R47 Federal LY10 HI PRI SEC 1702 $15,000
158 01/13/12 2013 FHWA 4 92022 EASTGATE TRUTRU Warren Riverwalk /
Burbank
Construction of trails and facilities along the Mahoning River in the City of
Warren. Primary Work Category: Add Sidewalks Termini: Warren RiverwalkWARREN 0 PE Dtl Dsgn 2012 4R47 Federal LY10 HI PRI SEC 1702 $10,000 $0 $25,000 $0 $150,000 2012AM04ID0367FDPE
158 PE Env PE 2012 4R47 Federal LY10 HI PRI SEC 1702 $15,000
159 01/13/12 2013 FHWA 4 92055 EASTGATE TRUTRU Warren
Mahoningside
Construct trail facilities along the Mahoning River in the City of Warren.
Primary Work Category: Parks Termini: MahoningsideWARREN 0 PE Dtl Dsgn 2012 4R47 Federal LY10 HI PRI SEC 1702 $10,000 $0 $25,000 $0 $200,000 2012AM04ID0368FDPE
159 PE Env PE 2012 4R47 Federal HY10 Hi Priority Projects Sec 1702 "House" $15,000
160 01/13/12 2013 FHWA 4 92068 EASTGATE TRUTRU Warren Riverwalk
Bullhead
Construct trails and facilities along the Mahoning River in the City of Warren.
Primary Work Category: Parks Termini: Bullhead ParkWARREN 0 PE Dtl Dsgn 2012 4R47 Federal HY10 Hi Priority Projects Sec 1702 "House" $10,000 $0 $25,000 $0 $250,000 2012AM04ID0369FDPE
160 PE Env PE 2012 4R47 Federal LY10 HI PRI SEC 1702 $15,000
161 01/13/12 2013 FHWA 4 92216 AMATS SUMSUM Ghent Historic
Wayside Acq
Purchase a 7.5 acre parcel along the Heritage Corridors of Bath Scenic Byway
which will be developed into a visitor information wayside. Primary Work
Category: Scenic Byway Termini: 1200' North of Granger Road in Bath Township
on West side of Roadway
BATH TOWNSHIP 0 RW Acquis 2013 4D57 Federal L970 Scenic Byway $247,116 $0 $340,931 $4,440 $345,371 2012AM04ID0371FDRW
161 RW Acquis 2013 LNTP Local Match 002 Local Match $61,779
161 RW Acquis 2013 LNTP Local Match 002 Local Match $32,036
162 01/13/12 2013 FHWA 4 92240 AMATS SUMSUM Ravenna Road (CR-
12)
Structure replacement. Primary Work Category: Bridge Replacement
Termini: Over Tinkers Creek
SUMMIT COUNTY
ENGINEER0 RW Utl Remb 2013 4B87 Federal L1CE BRIDGE 85% ON/OFF SYSTEM $80,000 $0 $100,000 $0 $1,775,000 2012AM04ID0372FDRW
162 RW Utl Remb 2013 LNTP Local Match 002 Local Match $20,000
163 01/13/12 2013 FHWA 4 92252 AMATS SUMSUM N HOWARD
Billboard Removal
Removal of three billboards Primary Work Category: Scenic Byway Termini:
Near interction of North Howard Street and West North StreetAKRON 0 RW Acquis 2013 4D57 Federal L970 Scenic Byway $240,000 $0 $300,000 $0 $300,000 2012AM04ID0373FDRW
163 RW Acquis 2013 LNTP Local Match 002 Local Match $60,000
164 01/17/13 2013 FHWA 4 92443 EASTGATE MAHMAH SR 0046 4.42 So.
Range
Construction of new turn lanes. Primary Work Category: Turn Lane Addition
Termini: SR-46 at new South Range school complexDISTRICT 4-PLANNING 0.38 RW Utl Remb 2013 4TB7 Federal $100,000 $0 $100,000 $182,394 $1,419,608 2012AM09ID1510FDRW
165 04/12/12 2013 FHWA 4 92562 SCATS STA STA SR 0172 11.91 Safety
Safety Tier II. Investigate upgrading signal system, improve signing, pavement
markings, improve sidewalks and crosswalks. Primary Work Category: Signals
Termini: Whipple Road to Smith Avenue
CANTON 1 PE Env PE 2012 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $250,000 $0 $277,778 $0 $277,778 2012AM06ID0696FDPE
165 PE Env PE 2012 LNTP Local Match 002 Local Match $27,778
166 02/26/13 2014 FHWA 4 92643 EASTGATE MAHMAH US 0224 12.69
(Main St.)
Resurfacing of various routes (US62, US62D, US224, SR46, SR46D), in the City of
Canfield, Mahoning County, Ohio. Primary Work Category: Mill and Fill
Termini: SR-46 to Talsman Road. Canfield Circle.
CANFIELD 1.66 CO CO Engr 2014 LABR Federal M240 STP FLEXIBLE $28,800 $0 $1,236,000 $0 $1,236,000 2012AM10ID1787FDCO
166 CO CO Engr 2014 LABR State 002 State Funds (S,O) $7,200
166 CO CO Contr 2014 4TA7 Federal L23E STP URBANIZED AREAS $586,000
166 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $146,500
166 CO CO Contr 2014 4PF7 Federal M240 STP FLEXIBLE $374,000
166 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $93,500
167 01/13/12 2014 FHWA 4 92719 AMATS SUMSUM State Street (CR-
162-2.44)
Resurfacing. Primary Work Category: Mill and Fill Termini: Robinson Avenue
to Highland AvenueBarberton, City of 1 CO CO Engr 2014 4TA7 Federal L23E STP URBANIZED AREAS $57,600 $0 $720,000 $0 $720,000 2012AM04ID0399FDCO
167 CO CO Engr 2014 LNTP Local Match 002 Local Match $14,400
167 CO CO Contr 2014 4TA7 Federal L23E STP URBANIZED AREAS $518,400
167 CO CO Contr 2014 LNTP Local Match 002 Local Match $129,600
168 07/12/12 2014 FHWA 4 93131 SCATS STA STA Alliance Sidewalks
Additional sidewalks. ADA ramps. Pavement markings. Signing for school
crosswalks. Primary Work Category: Add Sidewalks Termini: SR183, Rockhill
Avenue, 24th Street, Johnson Avenue, Vine Street, Harrison Street
ALLIANCE 0 CO CO Engr 2014 LNTP Local Match 002 Local Match $7,500 $0 $255,000 $0 $255,000 2012AM07ID0957FDCO
168 CO CO Engr 2014 4R47 Federal 56C0 DIV A 2010 STP APPROP EARMARK $18,000
168 CO CO Contr 2014 LNTP Local Match 002 Local Match $67,500
168 CO CO Contr 2014 4R47 Federal 56C0 DIV A 2010 STP APPROP EARMARK $162,000
169 07/12/12 2013 FHWA 4 93385 EASTGATE TRUTRU Greenway Trailhead
Project
The proposed project will consist of constructing a trailhead and amenities at
various locations along the Great Ohio Lake to River Greenway. Primary Work
Category: Bikeways Termini: Great Ohio Lake to River Greenway
WARREN 0 PE Dtl Dsgn 2013 LNTP Local Match 002 Local Match $50,000 $0 $210,000 $0 $760,000 2012AM07ID0962FDPE
ODOT 2014-2017 STIP Page 99
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
169 PE Env PE 2013 4D57 Federal L680 TCSP $128,000
169 PE Env PE 2013 LNTP Local Match 002 Local Match $32,000
170 10/15/12 2014 FHWA 4 93606 AMATS SUM SUM Hudson SRTS
Sidewalk installation. Flashing beacons. Crosswalk improvement. Bicycle racks.
Primary Work Category: Add Sidewalks Termini: Various streets in the City of
Hudson.
HUDSON 0 CO CO Contr 2014 4SC7 Federal LS2E HSIP - HI RISK RURAL $191,000 $0 $210,000 $0 $210,000 2012AM08ID01211FDCO
170 CO CO Engr 2014 4SC7 Federal LS2E HSIP - HI RISK RURAL $19,000
171 04/11/13 2014 FHWA 4 93608 AMATS SUMSUM Stow Munroe Falls
SRTS
Provide pedestrian facilities and upgraded crossings near schools in the Stow-
Munroe Falls school District. Primary Work Category: Add Sidewalks Termini:
Various schools in the Stow Munroe Falls school district.
Stow, City of 0 CO CO Engr 2014 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $39,166 $0 $391,655 $30,615 $446,655 2012AM11ID1834FDCO
171 CO CO Contr 2014 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $352,490
172 10/15/12 2013 FHWA 4 93608 AMATS SUMSUM Stow Munroe Falls
SRTS
Provide pedestrian facilities and upgraded crossings near schools in the Stow-
Munroe Falls school District. Primary Work Category: Add Sidewalks Termini:
Various schools in the Stow Munroe Falls school district.
Stow, City of 0 PE Dtl Dsgn 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $35,000 $0 $55,000 $0 $331,000 2012AM08ID01212FDPE
172 PE Env PE 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $20,000
173 01/17/13 2013 FHWA 4 93658 EASTGATE MAH MAH Lowellville SRTS
Improve bicycle and pedestrian safety at the SR-289 / Wood Street intersection
and the SR-289 / Walnut Street intersection. Primary Work Category:
Intersection Improvement Termini: Various streets in the Village of
Lowellville.
Lowellville, Village of 0.06 PE Dtl Dsgn 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $30,000 $0 $34,000 $0 $442,000 2012AM09ID1511FDPE
173 PE Env PE 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $4,000
174 01/17/13 2013 FHWA 4 93669 EASTGATE MAH MAH Poland Twp. SRTSConstruct sidewalks. Primary Work Category: Add Sidewalks Termini: SR-170
from Dobbins Road to Nesbit Drive.Poland, Township of 1.5 PE Dtl Dsgn 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $45,000 $0 $45,000 $0 $543,500 2012AM09ID1512FDPE
175 01/17/13 2013 FHWA 4 93669 EASTGATE MAH MAH Poland Twp. SRTSConstruct sidewalks. Primary Work Category: Add Sidewalks Termini: SR-170
from Dobbins Road to Nesbit Drive.Poland, Township of 1.5 RW Acquis 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $20,000 $0 $20,000 $0 $543,500 2012AM09ID1512FDRW
176 10/15/12 2013 FHWA 4 93672 EASTGATE TRU TRU Liberty Twp. SRTS
Provide pedestrian facilities and signals along SR-304 and various streets near
the Liberty School campus. Primary Work Category: Add Sidewalks Termini:
Various locations near the Liberty School campus
Liberty, Township of 2 PE Dtl Dsgn 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $32,000 $0 $37,000 $0 $490,000 2012AM08ID01238FDPE
176 PE Env PE 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $5,000
177 07/12/12 2013 FHWA 4 93729 EASTGATE TRUTRU Station Park
Trailhead
Construction of Station Park Trailhead and amenities along the TRU - Greenway
Trail. Primary Work Category: Bikeways Termini: Station Park TrailheadWARREN 0 PE Dtl Dsgn 2013 LNTP Local Match 002 Local Match $10,000 $0 $65,625 $0 $270,625 2012AM07ID0976FDPE
177 PE Env PE 2013 4D57 Federal L680 TCSP $44,500
177 PE Env PE 2013 LNTP Local Match 002 Local Match $11,125
178 01/17/13 2013 FHWA 4 93760 AMATS SUMSUM Liberty Road
Sidewalk
Construction of a sidewalk, including clearing, grading, pavement, and drainage
improvements. Primary Work Category: Bikeways Termini: Post to SolonTWINSBURG 0.68 PE Dtl Dsgn 2013 4TC7 Federal L22E STP ENHANCEMENT $18,100 $0 $77,625 $0 $477,625 2012AM09ID1507FDPE
178 PE Dtl Dsgn 2013 LNTP Local Match 002 Local Match $4,525
178 PE Env PE 2013 4TC7 Federal L22E STP ENHANCEMENT $44,000
178 PE Env PE 2013 LNTP Local Match 002 Local Match $11,000
179 10/15/12 2013 FHWA 4 94274 AMATS SUMSUM Everett Ranger
Parking Lot
Resurface the parking lot of the Everett Ranger Station located at 4683 Riverview
Road, Summit County, Ohio. Pave the existing gravel parking lot, with striping,
minor grading. Primary Work Category: Parking Lot Termini: Cuyahoga Valley
National Park
SUMMIT COUNTY
ENGINEER0 PE Dtl Dsgn 2013 4D57 Federal F130 Public Lands Highways Discretionary $10,000 $0 $10,000 $0 $94,240 2012AM08ID01224FDPE
180 01/17/13 2013 FHWA 4 94282 AMATS PORPOR Chestnut Street
Sidewalks
Construct sidewalk along County Route 163 (Chestnut Street) in the City of
Ravenna, Portage County, Ohio. Primary Work Category: Add Sidewalks
Termini: Ravenna High School to Robinson Memorial Hospital
RAVENNA 0.59 PE Dtl Dsgn 2013 4TC7 Federal M301 TAP URBANIZED AREAS $8,515 $0 $10,644 $0 $117,070 2012AM09ID1503FDPE
180 PE Dtl Dsgn 2013 LNTP Local Match 002 Local Match $2,129
181 07/01/11 2014 FHWA 5 25192 MORPC FAIFAI/PER SR 256
14.18/00.00
Resurfacing with chip seal Primary Work Category: Resurfacing, Undivided
System Termini: SR 256 from Baltimore E Corp Line to SR 13 in Per Co
ODOT SPONSORING
AGENCY15 CO CO Engr 2015 LABR State 002 State Funds (S,O) $114,770 $0 $6,009,971 $0 $6,010,971 2012stipID1354FDCO
181 CO CO Contr 2015 4PF7 Federal Q200 STP UA<200,000/RURAL $2,174,486
181 CO CO Contr 2015 4PS7 State 002 State Funds (S,O) $543,622
181 CO CO Contr 2015 4PS7 State 002 State Funds (S,O) $1,147,702
181 CO CO Engr 2015 LABR Federal Q200 STP UA<200,000/RURAL $217,449
181 CO CO Engr 2015 LABR State 002 State Funds (S,O) $54,362
182 07/12/12 2013 FHWA 5 81249 MUS MUS IR 70 11.43A/13.06
Rehab the backwalls on both bridges on IR 70 in Muskingum CountyRevised work
per scope: Mus-70-11.43A - New Overlay, new Approach Slabs, Replace
Breastwall and Modify to new abutment details. New parapets and guardrail.
Mus-70-13.06 – New Overlay, Pour Primary Work Category: Bridge Repair
Termini: Location 1) Ramp A over Ramp H; Location 2) IR 70 over an abandoned
Rail Road
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2013 4PF7 Federal $90,000 $0 $311,659 $0 $2,023,036 2012AM07ID0977FDPE
182 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $10,000
182 PE Env PE 2013 4PF7 Federal $190,043
182 PE Env PE 2013 4PS7 State 002 State Funds (S,O) $21,116
183 01/17/13 2013 FHWA 5 81871 FAI FAI US 22 22.92
Originally programmed as "D05 CUV FY2014" as a District wide culvert project -
Revised as Fai-US 22-22.92 after it was selected on 09/27/2011 as the only culvert
being addressed. Primary Work Category: Culvert
Construction/Reconstr/Repair Termini: District wide
ODOT SPONSORING
AGENCY0.02 RW Acquis 2013 4PF7 Federal L250 STP Rural <5,000 $12,000 $0 $35,000 $0 $441,069 2012AM09ID1534FDRW
183 RW Acquis 2013 4PS7 State 002 State Funds (S,O) $3,000
183 RW RW Serv 2013 4PF7 Federal L250 STP Rural <5,000 $16,000
183 RW RW Serv 2013 4PS7 State 002 State Funds (S,O) $4,000
ODOT 2014-2017 STIP Page 100
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
184 04/11/13 2014 FHWA 5 83024 MUS MUS SR 666 02.66/5.71
Revised work per scope: Mus-666-0266, SFN 6006450 is an existing single span
steel beam, to be replaced with a single span concrete slab with a new SFN of
6006469. Mus-666-0571, SFN 6006574 is an existing single span steel beam, to be
replaced with a thr Primary Work Category: Bridge Replacement Termini:
Location 1) 0.04 miles N of Riverview Bailey Drive on SR 666 Location 2) 0.03
miles south of TR 392
ODOT SPONSORING
AGENCY0.03 CO CO Engr 2014 LABR Federal L20E STP RURAL <200K $23,613 $0 $1,074,263 $20,000 $1,095,263 2012AM11ID1845FDCO
184 CO CO Engr 2014 LABR State 002 State Funds (S,O) $5,903
184 CO CO Engr 2014 LABR Federal L11E BRIDGE 15% OFF SYSTEM $32,610
184 CO CO Engr 2014 LABR State 002 State Funds (S,O) $8,153
184 CO CO Contr 2014 4PF7 Federal L11E BRIDGE 15% OFF SYSTEM $465,861
184 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $116,465
184 CO CO Contr 2014 4PF7 Federal L20E STP RURAL <200K $337,326
184 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $84,332
185 07/01/11 2014 FHWA 5 83108 Lancaster FAI FAI US 22 10.23
2" mill and fill on US 22 in Fairfield County Primary Work Category: Minor
Rehabilitation - Pavement Gnrl Sys Termini: From MR 335 (Zane Ave) in
Lancaster to 0.1 miles west of TR 389 (Snoke Hill Rd)
ODOT SPONSORING
AGENCY11 CO CO Engr 2014 LABR Federal L25E STP RURAL <5K $84,174 $0 $6,913,291 $0 $6,914,291 2012stipID1350FDCO
185 CO CO Engr 2014 LABR State 002 State Funds (S,O) $21,043
185 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $841,737
185 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $210,434
185 CO CO Contr 2014 4PF7 Federal L20E STP RURAL <200K $635,334
185 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $158,834
185 CO CO Engr 2014 LABR Federal L20E STP RURAL <200K $63,533
185 CO CO Engr 2014 LABR State 002 State Funds (S,O) $15,883
185 CO CO Engr 2014 LABR Federal L20E STP RURAL <200K $355,078
185 CO CO Engr 2014 LABR Local Match 002 Local Match $88,769
185 CO CO Contr 2014 4PF7 Federal L20E STP RURAL <200K $3,550,777
185 CO CO Contr 2014 4BG7 Local Match 002 Local Match $887,694
186 07/01/11 2013 FHWA 5 83863 D05D05 BK FY2013(C)-Real
Estate
Block Pid for Real Estate and Utility Expenses Primary Work Category: Blanket
Funding Estimates Termini: District Wide
ODOT SPONSORING
AGENCY0 RW Acquis 2013 4PS7 State 002 State Funds (S,O) $250,000 $0 $500,000 $0 $500,000 2012stipID1278FDAC
186 RW Acquis 2013 4PF7 Federal L240 STP FLEXIBLE $250,000
187 07/12/12 2013 FHWA 5 84292 MUS MUS SR 60 06.72
Realignment of approximately 1000' of SR 60 away from a rock cut slope
Placement of a drilled shaft wall with lagging panels. Selected as a FY 2012 GSM
project. Primary Work Category: Slide Repair Termini: SR 60 located 0.54
miles north of TR 612
ODOT SPONSORING
AGENCY0 RW Acquis 2013 4PF7 Federal $40,000 $0 $65,000 $51,815 $2,120,373 2012AM07ID0979FDRW
187 RW Acquis 2013 4PS7 State 002 State Funds (S,O) $10,000
187 RW RW Serv 2013 4PF7 Federal $12,000
187 RW RW Serv 2013 4PS7 State 002 State Funds (S,O) $3,000
188 01/17/13 2013 FHWA 5 84884 MORPC LICLIC CR 39 02.20 (York
Road)
Replace existing bridge, SFN 4535685 (Lic-CR 39-02.20) carrying York Rd (CR 39)
over the South Fork of Licking River. (CREDIT BRIDGE) Primary Work Category:
Bridge Replacement Termini: On York Road (CR 39) 0.20 miles south of TR 939
LICKING COUNTY
ENGINEER0.01 RW Acquis 2013 4B87 Federal L11E BRIDGE 15% OFF SYSTEM $60,000 $0 $140,000 $27,406 $2,446,584 2012AM09ID1529FDRW
188 RW RW Serv 2014 4B87 Federal L11E BRIDGE 15% OFF SYSTEM $80,000
189 03/01/12 2013 FHWA 5 86245 LCATS LIC LIC SR 13D 00.00
Conversion of 4t Street/Mount Vernon Road (SR13) to two way traffic from St
Clair to Locust. Make overpass two way with additional lanes. Radius
improvments through out. Primary Work Category: Bridge Replacement
Termini: State Route 13 south coversion to two way traffic St Clair to Locust
Newark, City of 1 PE Dtl Dsgn 2013 4BG7 Local Match 2 Local Match $48,460 $0 $807,680 $0 $6,782,680 2012AM05ID0586FDPE
189 PE Dtl Dsgn 2013 4TB7 Federal L40E CMAQ $193,840
189 PE Env PE 2012 4BG7 Local Match 2 Local Match $113,076
189 PE Env PE 2012 4TB7 Federal L400 CMAQ $452,304
190 11/08/11 2013 FHWA 5 86983 LCATS LICLIC CR 79 0.89 (High St
Enhance)
Addition of sidewalks and Bikepath Primary Work Category: Add Sidewalks
Termini: Enhancements to High Street (previous SR79A)Hebron, Village of 0.83 PE Dtl Dsgn 2012 4BG7 Local Match 002 Local Match $12,000 $0 $150,000 $0 $1,374,999 2012MODID00135FDPE
190 PE Dtl Dsgn 2012 4TA7 Federal L22E STP ENHANCEMENT $48,000
190 PE Env PE 2011 4TA7 Federal L22E STP ENHANCEMENT $72,000
190 PE Env PE 2011 4BG7 Local Match 002 Local Match $18,000
191 01/17/13 2013 FHWA 5 86983 LCATS LICLIC CR 79 0.89 (High St
Enhance)
Addition of sidewalks and Bikepath Primary Work Category: Add Sidewalks
Termini: Enhancements to High Street (previous SR79A)Hebron, Village of 0.83 RW Acquis 2013 4TA7 Federal L20E STP RURAL <200K $5,560 $0 $6,950 $95,765 $1,302,636 2012AM09ID1524FDRW
191 RW Acquis 2013 4BG7 Local Match 002 Local Match $1,390
192 03/01/12 2013 FHWA 5 87344 FAI FAI SR 158 03.75
Establish rock fall barriers on SR 158 starting just north of Valley View Drive
(03.75 to 03.86) Primary Work Category: Rock Barrier Termini: On SR 158
starting just north of Valley View Drive (03.75 to 03.86)
ODOT SPONSORING
AGENCY0 RW Acquis 2012 4SS7 State 2 State Funds (S,O) $6,800 $0 $34,000 $0 $1,462,666 2012AM05ID0587FDRW
192 RW Acquis 2012 4SF7 Federal L250 STP Rural <5,000 $27,200
193 07/12/12 2013 FHWA 5 87346 MUSMUS SR 146
30.95/31.51/31.58
Repair of landslides that are slipping out from under the roadway at three
locations on SR 146 in Muskingum County. Location 1 is 0.25 mi east of CR 61
(Zion Ridge Rd); Locations 2 & 3 are 0.14 & 0.21 mi east of Spratt. 01/11/2012 -
location has been re Primary Work Category: Slide Repair Termini: Location 1
is 0.25 mi east of CR 61 (Zion Ridge Rd); Locations 2 & 3 are 0.14 & 0.21 mi east of
Spratt
ODOT SPONSORING
AGENCY0 RW Acquis 2013 4PF7 Federal $4,800 $0 $6,000 $21,796 $83,296 2012AM07ID0980FDRW
193 RW Acquis 2013 4PS7 State 002 State Funds (S,O) $1,200
194 03/01/12 2013 FHWA 5 87577 KNO KNO US 62 18.82bridge replacement at Kno-62-18.82 Primary Work Category: Bridge
Replacement Termini: Kno-62-18.82
ODOT SPONSORING
AGENCY0 RW Acquis 2012 4PS7 State 2 State Funds (S,O) $4,000 $0 $20,000 $0 $794,684 2012AM05ID0588FDRW
194 RW Acquis 2012 4PF7 Federal $16,000
195 07/01/11 2014 FHWA 5 87588 D05 D05 GCS FY2014districtwide general crackseal Primary Work Category: Preventive
Maintenance Termini: districtwide
ODOT SPONSORING
AGENCY17 CO CO Engr 2014 LABR Federal $21,384 $0 $490,050 $0 $490,050 2012stipID1285FDCO
195 CO CO Engr 2014 LABR State 002 State Funds (S,O) $5,346
195 CO CO Engr 2014 LABR Federal $7,128
195 CO CO Engr 2014 LABR State 002 State Funds (S,O) $1,782
ODOT 2014-2017 STIP Page 101
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
195 CO CO Contr 2014 4PF7 Federal $71,280
195 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $17,820
195 CO CO Engr 2014 LABR Federal $7,128
195 CO CO Engr 2014 LABR State 002 State Funds (S,O) $1,782
195 CO CO Contr 2014 4PF7 Federal $71,280
195 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $17,820
195 CO CO Contr 2014 4PF7 Federal $213,840
195 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $53,460
196 07/01/11 2014 FHWA 5 87938 FAIFAI US 22 13.07/Per SR13
01.96
pile encasement Primary Work Category: Bridge Maintenance Termini: Fai-
22-13.07 bridge over Hunters Run, Per-13-1.96 bridge over Sunday Creek
ODOT SPONSORING
AGENCY0 CO CO Engr 2014 LABR Federal L1CE BRIDGE 85% ON/OFF SYSTEM $19,237 $0 $2,555,912 $0 $2,555,912 2012stipID1351FDCO
196 CO CO Engr 2014 LABR State 002 State Funds (S,O) $4,809
196 CO CO Engr 2014 LABR Federal L25E STP RURAL <5K $34,151
196 CO CO Engr 2014 LABR State 002 State Funds (S,O) $8,538
196 CO CO Contr 2014 4PF7 Federal L1CE BRIDGE 85% ON/OFF SYSTEM $192,368
196 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $48,092
196 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $341,511
196 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $85,378
197 01/17/13 2013 FHWA 5 88405 FAI FAI CR 71 00.93
Intersection improvement to County Road 71 and TR137 by re-alignment with
improvements to site distance. Primary Work Category: Intersection
Improvement Termini: Intersection of CR71 and TR 137
FAIRFIELD COUNTY
ENGINEER0.54 RW Acquis 2014 4RS7 Federal LS20 HSIP-HIGH RISK RURAL ROAD $18,000 $0 $60,000 $171,456 $586,028 2012AM09ID1535FDRW
197 RW Acquis 2014 LNTP Local Match 002 Local Match $2,000
197 RW RW Serv 2013 4RS7 Federal LS20 HSIP-HIGH RISK RURAL ROAD $36,000
197 RW RW Serv 2013 LNTP Local Match 002 Local Match $4,000
198 07/01/11 2013 FHWA 5 90867 MORPC FAI FAI TR 222 Long Rd SRTS
Construction of multi-use path from Long Rd to Janice Lane, the connection from
multi-use path to school, sidewalk from Diley Rod onto the Pickerington
Elementray School and School zone flashers. Primary Work Category: Add
Sidewalks Termini: Construction of multi-use path and sidewalks at various
location with the City of Pickerington
PICKERINGTON 0 PE Dtl Dsgn 2012 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $14,000 $0 $41,000 $0 $300,000 2012stipID1347FDENDD
198 PE Env PE 2012 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $27,000
199 07/01/11 2013 FHWA 5 90867 MORPC FAI FAI TR 222 Long Rd SRTS
Construction of multi-use path from Long Rd to Janice Lane, the connection from
multi-use path to school, sidewalk from Diley Rod onto the Pickerington
Elementray School and School zone flashers. Primary Work Category: Add
Sidewalks Termini: Construction of multi-use path and sidewalks at various
location with the City of Pickerington
PICKERINGTON 0 RW Acquis 2012 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $50,000 $0 $50,000 $0 $300,000 2012stipID1348FDAC
200 07/01/11 2014 FHWA 5 90868 MORPC LICLIC CR 26 00.20 (Summit
St SRTS)
Installation of flashing school speed signs, bike racks, sidewalks, crosswalks,
curb ramps and signage.Non Infrastructure approval for student incentives,
promotional materials, enforcement, education material and surveys. Primary
Work Category: Add Sidewalks Termini: Addition of sidewalks/flashing School
Speed signs along Sumit Street County Road 26
Pataskala, City of 0 CO CO Engr 2013 LABR Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $20,000 $0 $220,000 $0 $273,000 2012stipID1390FDCO
200 CO CO Contr 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $200,000
201 04/12/12 2013 FHWA 5 90885 FAIFAI CR 56 00.00 SRTS
Lancaster
Construction of sidewalks on various City streets within the City of LancasterNon
Infrastructure approval for enforcement Primary Work Category: Add
Sidewalks Termini: Various City streets within Lancaster
Lancaster, City of 1 PE Dtl Dsgn 2012 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $8,000 $21,840 $46,840 $21,840 $476,225 2012AM06ID0717FDPE
201 PE Env PE 2012 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $17,000
202 01/17/13 2013 FHWA 5 91813 GUEGUE SR 265
07.29/08.61/09.45
Revised work per scope: Gue-265-0729, Replace existing single span concrete
slab with a concrete box culvert. (Ex. Br. is Posted); Gue-265-0861, Replace
existing single span concrete slab with a concrete box culvert.Gue-265-0945,
Replace existing single s Primary Work Category: Bridge Replacement
Termini: Located on SR 265 at the 7.29, 8.61 & 9.45 mile markers over
Leatherwood Creek and a ditch
ODOT SPONSORING
AGENCY0.06 RW Acquis 2013 4PF7 Federal L1CE BRIDGE 85% ON/OFF SYSTEM $56,000 $0 $190,000 $0 $1,135,353 2012AM09ID1538FDRW
202 RW Acquis 2013 4PS7 State 002 State Funds (S,O) $14,000
202 RW RW Serv 2013 4PF7 Federal L1CE BRIDGE 85% ON/OFF SYSTEM $96,000
202 RW RW Serv 2013 4PS7 State 002 State Funds (S,O) $24,000
203 01/17/13 2013 FHWA 5 91851 PERPER SR 13 14.54/15.35 SR
37-18.0
Revised work per scope: Per-13-14.54 – Existing Slab Bridge with 10 foot span to
be replaced with 10 x 4 box culvert (Preliminary Size), The PH shall be taken later
to determine the PH for protection to be added.Per-13-15.35 – Existing Slab
Bridge with 14 Primary Work Category: Bridge Replacement Termini: On SR
13 0.33 miles west of TR 195; SR 13 0.35 miles west of TR 312; SR 37 0.05 miles
west of CR 22
ODOT SPONSORING
AGENCY0.06 RW Acquis 2013 4PF7 Federal L25E STP RURAL <5K $56,000 $0 $190,000 $0 $1,024,133 2012AM09ID1545FDRW
203 RW Acquis 2013 4PS7 State 002 State Funds (S,O) $14,000
203 RW RW Serv 2013 4PF7 Federal L25E STP RURAL <5K $96,000
203 RW RW Serv 2013 4PS7 State 002 State Funds (S,O) $24,000
204 04/11/13 2013 FHWA 5 91852 COSCOS SR 79
01.60/03.94/08.34/9.55
As scope or PIP: Cos-79-1.60 – Replace Bridge with a 3 span slab (estimated 32’-
40’-32’) including resurfacing approximately 200 feet each direction and related
work.Cos-79-3.94 – Replace Bridge with a 3 span slab (estimated 20’-25’-20’)
including resurfa Primary Work Category: Bridge Replacement Termini: Four
locations on SR 79 in Coshocton County
ODOT SPONSORING
AGENCY0.08 PE Dtl Dsgn 2014 4PF7 Federal L25E STP RURAL <5K $24,438 $515,133 $637,408 $515,133 $3,547,957 2012AM11ID1842FDPE
204 PE Dtl Dsgn 2014 4PF7 Federal L1CE BRIDGE 85% ON/OFF SYSTEM $16,982
204 PE Dtl Dsgn 2014 4PS7 State 002 State Funds (S,O) $6,109
204 PE Dtl Dsgn 2014 4PS7 State 002 State Funds (S,O) $4,246
204 PE Env RW Serv 2013 4PF7 Federal L25E STP RURAL <5K $28,000
204 PE Env RW Serv 2013 4PF7 Federal L1CE BRIDGE 85% ON/OFF SYSTEM $28,000
204 PE Env RW Serv 2013 4PS7 State 002 State Funds (S,O) $7,000
204 PE Env RW Serv 2013 4PS7 State 002 State Funds (S,O) $7,000
ODOT 2014-2017 STIP Page 102
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
205 10/13/11 2013 FHWA 5 92066 Lancaster FAIFAI CR 54 04.00 Pierce &
Fair
Mill and fill asphalt resurfacing, curb replacement/add within the project limits,
ADA ramps and upgrade of traffic signal equipment to current ADA standards for
the visually impaired. Primary Work Category: Intersection Improvement
Termini: West Fair Avenue & Pierce Avenue Intersection
Lancaster, City of 0 PE Dtl Dsgn 2013 4TA7 Federal L20E STP RURAL <200K $22,400 $0 $70,000 $0 $840,000 2012AM03ID0136FDPEED
205 PE Dtl Dsgn 2013 4BG7 Local Match 002 Local Match $5,600
205 PE Env PE 2012 4TA7 Federal L20E STP RURAL <200K $33,600
205 PE Env PE 2012 4BG7 Local Match 002 Local Match $8,400
206 01/13/12 2013 FHWA 5 92458 MORPC FAI FAI SR 256 00.50 Safety
Add through lanes, upgrade signal equipment and add medians and sidewalks
along SR256 within the City of Pickerington for I-70 to the Kroger/Giant Eagle
Signal. Primary Work Category: Widening Termini: SR256 from I-70 south to
Kroger/Giant Eagle Signal
PICKERINGTON 2 PE Dtl Dsgn 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $143,144 $0 $636,196 $0 $5,555,556 2012AM04ID0424FDPE
206 PE Dtl Dsgn 2013 4BG7 Local Match 002 Local Match $15,905
206 PE PE Engr 2012 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $429,432
206 PE PE Engr 2012 4BG7 Local Match 002 Local Match $47,715
207 04/12/12 2013 FHWA 5 93104 Zanesville MUS MUS CR 146 01.00
Replacement of deficient bridge on CR 146 over Joes Run Primary Work
Category: Bridge Replacement Termini: Replace bridge CR 146 at the 1.16 mile
marker
Zanesville, City of 1 PE Dtl Dsgn 2013 4TA7 Federal L20E STP RURAL <200K $9,600 $0 $50,000 $0 $352,500 2012AM06ID0732FDPE
207 PE Dtl Dsgn 2013 LNTP Local Match 002 Local Match $2,400
207 PE PE Engr 2012 4TA7 Federal $30,000
207 PE PE Engr 2012 LNTP Local Match 002 Local Match $7,500
208 01/17/13 2013 FHWA 5 93402 Zanesville MUS MUS Sign PurchasePurchase of Signs through State Contract Primary Work Category: Signs
Termini: Purchase of Signs through State ContractZanesville, City of 0 OTH Oth Remb 2013 4TA7 Federal L20E STP RURAL <200K $20,000 $0 $25,000 $0 $25,000 2012AM09ID1531FDOTH
208 OTH Oth Remb 2013 LNTP Local Match LNTP Non Traditional Local Match $5,000
209 02/26/13 2013 FHWA 5 93575 LCATS LIC LIC Newark SRTS
Construction of Pedestrian Bridge at Legend Elementary School over Log Pond
Run. Construction of sidewalks at various locations around Heritage and Wilson
Middle Schools.Non-Infrastructure funding for Education-Encouragement-
Enforcement-total $16,000 Primary Work Category: New Bridge Termini:
Construction of Pedestrian bridge over Log Pond Run and various sidewalk
improvement at various locations
Newark, City of 0 PE Dtl Dsgn 2014 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $9,500 $16,000 $121,549 $16,000 $529,648 2012AM10ID1790FDPE
209 PE Env PE 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $80,139
209 PE Env PE 2013 4BG7 Local Match 002 Local Match $15,910
210 07/01/11 2013 FHWA 6 17585 MORPC FRA FRA CR 61 01.100
DETAIL DESIGN, RIGHT OF WAY, AND CONSTRUCTION FOR THE WIDENING OF
HARD ROAD FROM SAWMILL ROAD TO SMOKY ROW ROAD. RW FED/LOCAL.
FORMERLY HARD ROAD A. ENVIRONMENTAL UNDER PID 11079. Primary Work
Category: Major Widening Termini: COLUMBUS. HARD ROAD FROM SAWMILL
ROAD TO SMOKY ROW ROAD.
COLUMBUS 1 RW Acquis 2012 4TA7 Federal Q230 STP UA>200,000 $1,600,000 $0 $2,126,000 $426,347 $14,834,162 2012stipID1566FDAC
210 RW Acquis 2012 LNTP Local Match LNTP Non Traditional Local Match $400,000
210 RW Labor 2012 LNTP Local Match LNTP Non Traditional Local Match $25,000
210 RW Labor 2012 4TA7 Federal Q230 STP UA>200,000 $100,000
211 07/01/11 2013 FHWA 6 23953 MORPC FRA FRA CR 122 4.14
RECONSTRUCT AND WIDEN ALUM CREEK DRIVE FROM 2 TO 5 LANES. Multi-use
path, curbs, drainage, lighting.2300' of widening & reconstruction on Williams
Rd, 700' on Watkins Rd.PD/ENVIRONMENTAL UNDER PID 16840 ALUM CREEK B -
COLUMBUS PORTION.Consultant Project Primary Work Category: Major
Widening Termini: COLUMBUS. Alum Creek Drive from Williams to Refugee.
COLUMBUSCO Air Quality
Nonexempt2 RW Utl Remb 2012 LNTP Local Match LNTP Non Traditional Local Match $1,111,198 $3,905,558 $6,482,948 $3,922,303 $34,252,698 2012stipID1554FDRWUT
211 RW Utl Remb 2012 4TA7 Federal L230 URBANIZED AREAS $391,042
211 RW Utl Remb 2012 LNTP Local Match LNTP Non Traditional Local Match $97,761
212 11/08/11 2013 FHWA 6 25733 MORPC FRA FRA IR 270 52.16
Preliminary Development, design, RW, and construction OF IR 270 BETWEEN US
23 AND IR 71 AND IR 71 BETWEEN IR 270 AND STRINGTOWN RD (INCLUDING
INTERCHANGES) TO ADDRESS SAFETY AND CONGESTION ISSUES.THIS PID ALSO
INCLUDES DETAIL DESIGN FOR PID 80707*** UNCOM Primary Work Category:
Major Reconstruction Termini: COLUMBUS. HAMILTON, JACKSON TWPS. IR 270
FROM WEST OF IR 71 TO EAST OF US 23; IR 71 FROM SOUTH OF STRINGTOWN TO
NORTH OF IR 270
DISTRICT 6-PLANNING 5.81 PE Env PE 2011 4PS7 State 002 State Funds (S,O) $40,000 $2,440,900 $4,959,866 $2,440,900 $289,359,866 2012MODID0042FDPE
212 PE Env PE 2011 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $2,000,000
212 PE Env PE 2011 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $408,000
212 PE Env PE 2011 4BD7 State 002 State Funds (S,O) $102,000
212 PE Env PE 2011 4BD7 State 002 State Funds (S,O) $500,000
212 PE Env PE 2011 4PF7 Federal L05E NATIONAL HIGHWAY SYSTEM $160,000
213 10/15/12 2013 FHWA 6 76282 MORPC FRA FRA US 40 4.71
MEDIAN CURB; SIGNAL RELOCATIONS; MODIFY DRIVEWAYS. PRELIMINARY
DEVELOPMENT UNDER PID 20878. HSP PROJECT. HSP FUNDS - MEDIAN, SIGNALS,
DRIVES; D6 FUNDS - RESURFACING and DRAINAGE.MORPC/Prairie Twp
streetscape enhancement items added to project per MORPC T- Primary Work
Category: Resurfacing (safety related) Termini: Columbus consent. Prairie Twp
& FRA County participation. SLM 4.71-6.31 (275' west of Hilliard-Rome Road to
just E of I-270)
DISTRICT 6-PLANNINGCO Air Quality
Exempt2 RW Acquis 2013 4HJ7 Federal L240 STP FLEXIBLE $1,773,000 $0 $4,742,000 $0 $14,132,965 2012AM08ID01256FDRW
213 RW Acquis 2013 4PF7 Federal L240 STP FLEXIBLE $1,657,600
213 RW Acquis 2013 4PS7 State 002 State Funds (S,O) $414,400
213 RW Acquis 2013 4BC7 State 002 State Funds (S,O) $197,000
213 RW RW Serv 2013 4PF7 Federal L24E STP FLEXIBLE $480,000
213 RW RW Serv 2013 4PS7 State 002 State Funds (S,O) $120,000
213 RW Utl Remb 2013 4PF7 Federal L24E STP FLEXIBLE $80,000
213 RW Utl Remb 2013 4PS7 State 002 State Funds (S,O) $20,000
214 11/08/11 2013 FHWA 6 76997 MORPC FRA FRA IR 70 16.170
Preliminary development to address congestion and safety. Looking at mainline
capacity and reconfiguring interchanges (at FRA-270, FAI-256, Brice Rd).
Primary Work Category: Major Reconstruction Termini: COLUMBUS,
REYNOLDSBURG, PICKERINGTON; IR 70 FROM APPROX. KELTON AVE. TO SR-310 in
Licking County. FRA-70, FAI-70, LIC-70.
DISTRICT 6-PLANNING 21.93 PE Env PE 2011 4BD7 State 002 State Funds (S,O) $34,511 $2,005,407 $33,587,597 $2,136,495 $319,587,597 2012MODID0050FDPE
ODOT 2014-2017 STIP Page 103
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
214 PE Env PE 2011 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $1,177,162
214 PE Env PE 2011 4BD7 State 002 State Funds (S,O) $294,291
214 PE Env PE 2011 4BK7 Federal L24E STP FLEXIBLE $61,956
214 PE Env PE 2011 4BK7 Federal L24E STP FLEXIBLE $138,044
214 PE Env PE 2011 4BD7 State 002 State Funds (S,O) $15,489
214 PE Env PE 2012 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $2,622,838
214 PE Env PE 2012 4BD7 State 002 State Funds (S,O) $655,709
215 07/01/11 2013 FHWA 6 77369 MORPC FRAFRA IR 71 17.760 (FIRST
PROJECT)
FIRST CONSTRUCTION PROJECT RESULTING FROM MAJOR
INVESTMENT/PRELIMINARY ENGINEERING STUDY (PID 23318).Reconstruction of
the 670/71 Interchange. Work involves realignment of I-670 EB so through traffic
stays to the left and traffic to I-71 exits to the righ Primary Work Category:
Major Reconstruction Termini: Columbus. I-670 from Cleveland to Leonard; I-
71 from Long to I-670; SR-3 from Spring to Jack Gibbs Blvd
DISTRICT 6-PLANNINGCO Air Quality
Nonexempt2 RW Acquis 2012 4BK7 Federal L010 INTERSTATE MAINTENANCE $900,000 $5,679,500 $7,687,500 $228,018,250 $278,382,371 2012stipID1621FDACUT
215 RW Acquis 2012 4BD7 State 002 State Funds (S,O) $100,000
215 RW Utl Remb 2012 4BK7 Federal L010 INTERSTATE MAINTENANCE $900,000
215 RW Utl Remb 2012 4BD7 State 002 State Funds (S,O) $100,000
216 07/01/11 2013 FHWA 6 77372 MORPC FRAFRA IR 70 13.54 (FOURTH
PROJECT)
FOURTH CONSTRUCTION PROJECT RESULTING FROM MAJOR
INVESTMENT/PRELIMINARY ENGINEERING STUDYSouth Trench - Downtown 70/71
overlapWork on Mound St from 2nd St to Fourth StWork on Fulton St from Front
St to Fourth St95% Interstate (80% Replacement & 20% capaci Primary Work
Category: Major Reconstruction Termini: Columbus. SLM 13.54/W of RR Bridge
(E of Scioto R) to SLM 14.47/W of Grant Ave
DISTRICT 6-PLANNINGCO Air Quality
Nonexempt1 PE Dtl Dsgn 2012 4BK7 Federal L24E STP FLEXIBLE $400,000 $0 $10,300,000 $0 $202,500,000 2012stipID1605FDDD
216 PE Dtl Dsgn 2012 4BD7 State 002 State Funds (S,O) $100,000
216 PE Dtl Dsgn 2012 4BK7 Federal L01E INTERSTATE MAINTENANCE $7,200,000
216 PE Dtl Dsgn 2012 4BD7 State 002 State Funds (S,O) $800,000
217 04/11/13 2014 FHWA 6 78041 MORPC DEL DEL SR 315 1.30
Provide east bound and west bound left turn lanes on SR 750 (at SR 315) by
widening the west leg and restriping the bridge over the Olentangy River.
Provide left turn lanes NB and SB on SR-315 with retaining walls. Replace 3
culverts under SR-315. Curb Primary Work Category: Turn Lane Addition
Termini: Liberty Township. SR 315 from 0.1 mi S of SR750 to 0.2 mi N of SR750. SR
750 from Valley Run Dr to SR 315
DISTRICT 6-PLANNINGCO Air Quality
Exempt0.49 CO CO Contr 2014 4PF7 Federal L240 STP FLEXIBLE $40,000 $0 $4,455,000 $2,285,992 $6,910,992 2012AM11ID1852FDCO
217 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $10,000
217 CO CO Engr 2014 LABR Federal MS30 HSIP - HWY SAFETY IMPR $270,000
217 CO CO Engr 2014 LABR State 002 State Funds (S,O) $30,000
217 CO CO Contr 2014 4HJ7 Federal MS30 HSIP - HWY SAFETY IMPR $2,700,000
217 CO CO Contr 2014 4BC7 State 002 State Funds (S,O) $300,000
217 CO CO Engr 2014 LABR Federal L24E STP FLEXIBLE $80,000
217 CO CO Engr 2014 LABR State 002 State Funds (S,O) $20,000
217 CO CO Engr 2014 LABR Federal L240 STP FLEXIBLE $4,000
217 CO CO Contr 2014 4PF7 Federal L240 STP FLEXIBLE $800,000
217 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $200,000
218 10/15/12 2014 FHWA 6 78152 MORPC FRA FRA IR 71 28.73
Pavement preservation project - pavement repair, 1.5" milling and 1.5"
resurfacingSigns and pavement markings at I-71 NB merge ramp from
GeminiReplace fence on Polaris bridge, Replace various damaged noise wall
panels, Seal median barrier with epoxy.D6 De Primary Work Category: Mill and
Fill Termini: Columbus. FRA IR 71 SLM 28.73 to 29.90; DEL IR 71 SLM 0.00 to 1.60
(270 to pavement break near Powell Rd)
DISTRICT 6-PLANNING 3 CO CO Engr 2014 LABR Federal L01E INTERSTATE MAINTENANCE $9,000 $0 $3,850,000 $0 $3,851,000 2012AM08ID01257FDCO
218 CO CO Engr 2014 LABR Federal L01E INTERSTATE MAINTENANCE $306,000
218 CO CO Engr 2014 LABR State 002 State Funds (S,O) $34,000
218 CO CO Contr 2014 4PF7 Federal L01E INTERSTATE MAINTENANCE $90,000
218 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $10,000
218 CO CO Contr 2014 4PF7 Federal H010 INTERSTATE MAINTENANCE $3,060,000
218 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $340,000
219 10/13/11 2013 FHWA 6 79366 MORPC DEL DEL US 23 8.770
Phase 1 – Update of previous safety study to include evaluation of alternative
solutions to reduce congestion and increase safety. Possible changes in the local
road network (additional river crossing) will be evaluated for their effect on the
traffic pa Primary Work Category: Intersection Improvement Termini: DEL-
US23-8.77-8.82; DEL-SR315-8.46-8.68; DEL-CR4-0.00-0.10 (STRATFORD ROAD).
DISTRICT 6-PLANNINGCO Air Quality
Exempt0 PE Dtl Dsgn 2012 4R67 Federal HY20 Hi Priority Proj Sec 117 "Senate" $100,000 $41,476 $751,850 $41,476 $2,037,298 2012AM03ID0140FDPEED
219 PE Env PE 2012 4R67 Federal LY20 HI PRI SEC 1702 $490,876
220 07/01/11 2014 FHWA 6 81081 MAD MAD SR142 11.21
FY14 GENERAL SYSTEM PROJECT.PORTION OF PROJECT CITY OF LONDON URBAN
PAVING PROJECT.MAD-SR142-11.21-13.58: US40 LEFT TO IR70.MAD-SR665-0.31-
11.11: LONDON. SR38 RIGHT TO FRA COUNTY. Primary Work Category:
Resurfacing, Undivided System Termini: MAD-SR142-11.21-13.58; MAD-SR665-
0.31-11.11
DISTRICT 6-PLANNING 13 CO CO Engr 2014 LABR Federal L240 STP FLEXIBLE $14,400 $0 $2,691,500 $0 $2,692,500 2012stipID1729FDCO
220 CO CO Engr 2014 LABR Local Match 002 Local Match $3,600
220 CO CO Contr 2014 4PF7 Federal L240 STP FLEXIBLE $150,800
220 CO CO Contr 2014 4BG7 Local Match 002 Local Match $37,700
220 CO CO Engr 2014 LABR Federal L200 STP RURAL AREAS<200,000 $176,000
220 CO CO Engr 2014 LABR State 002 State Funds (S,O) $44,000
220 CO CO Contr 2014 4PF7 Federal L200 STP RURAL AREAS<200,000 $1,812,000
220 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $453,000
221 10/13/11 2014 FHWA 6 81746 MORPC FRA FRA US 23 22.230
Part 1: North Central Outerbelt: Construction Project #4, B & B1.New const. of
two NB express lanes, replace/widen US-23 over I-270 bridge.Realign York
Temple Rd to tie into West Campus View Blvd. Environmental & PE under PID
77319.Two new structures Primary Work Category: Major Widening Termini:
FRA-23: SLM 22.23-24.65, 0.68 mi S of I-270 to Lazelle Rd. Worthington,
Columbus. (22.23-22.85 is STP, rest NH)
DISTRICT 6-PLANNINGCO Air Quality
Nonexempt0 CO CO Engr 2015 LABR Federal L05E NATIONAL HIGHWAY SYSTEM $144,000 $0 $84,028,829 $3,079,929 $133,953,000 2012AM03ID0148FDCO
221 CO CO Engr 2015 LABR State 002 State Funds (S,O) $16,000
221 CO CO Engr 2015 LABR Federal L05E NATIONAL HIGHWAY SYSTEM $6,720,000
ODOT 2014-2017 STIP Page 104
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
221 CO CO Engr 2015 LABR State 002 State Funds (S,O) $1,680,000
221 CO CO Engr 2015 LABR Local Match 002 Local Match $18,000
221 CO CO Contr 2015 4BG7 Local Match 002 Local Match $180,000
221 CO CO Engr 2015 LABR Federal $16,000
221 CO CO Engr 2015 LABR State 002 State Funds (S,O) $4,000
221 CO CO Engr 2015 LABR Federal L22E STP ENHANCEMENT $88,000
221 CO CO Engr 2015 LABR State 002 State Funds (S,O) $22,000
221 CO CO Contr 2015 4B37 Federal L220 ENHANCEMENT $880,000
221 CO CO Contr 2015 4PS7 State 002 State Funds (S,O) $220,000
221 CO CO Engr 2015 LABR Federal L24E STP FLEXIBLE $320,000
221 CO CO Engr 2015 LABR State 002 State Funds (S,O) $80,000
221 CO CO Engr 2015 LABR Federal L22E STP ENHANCEMENT $80,000
221 CO CO Engr 2015 LABR State 002 State Funds (S,O) $20,000
221 CO CO Contr 2015 4BK7 Federal $160,000
221 CO CO Contr 2015 4BD7 State 002 State Funds (S,O) $40,000
221 CO CO Contr 2015 4BK7 Federal L24E STP FLEXIBLE $3,200,000
221 CO CO Contr 2015 4BD7 State 002 State Funds (S,O) $800,000
221 CO CO Contr 2015 4BK7 Federal L050 NATIONAL HWY SYST $67,200,000
221 CO CO Contr 2015 4BD7 State 002 State Funds (S,O) $16,800,000
221 CO CO Engr 2015 LABR Federal L05E NATIONAL HIGHWAY SYSTEM $160,000
221 CO CO Engr 2015 LABR State 002 State Funds (S,O) $40,000
221 CO CO Contr 2015 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $1,440,000
221 CO CO Contr 2015 4BD7 State 002 State Funds (S,O) $160,000
221 CO CO Contr 2015 4BK7 Federal $4,720,000
221 CO CO Contr 2015 4BD7 State 002 State Funds (S,O) $1,180,000
221 CO CO Engr 2015 LABR Federal $472,000
221 CO CO Engr 2015 LABR State 002 State Funds (S,O) $118,000
221 CO CO Contr 2015 4BK7 Federal $800,000
221 CO CO Contr 2015 4BD7 State 002 State Funds (S,O) $200,000
221 CO CO Contr 2015 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $1,600,000
221 CO CO Contr 2015 4BD7 State 002 State Funds (S,O) $400,000
221 CO CO Engr 2015 4BK7 Federal L050 NATIONAL HWY SYST $20,000
221 CO CO Engr 2015 4BD7 State 002 State Funds (S,O) $5,000
222 10/13/11 2013 FHWA 6 81746 MORPC FRA FRA US 23 22.230
Part 1: North Central Outerbelt: Construction Project #4, B & B1.New const. of
two NB express lanes, replace/widen US-23 over I-270 bridge.Realign York
Temple Rd to tie into West Campus View Blvd. Environmental & PE under PID
77319.Two new structures Primary Work Category: Major Widening Termini:
FRA-23: SLM 22.23-24.65, 0.68 mi S of I-270 to Lazelle Rd. Worthington,
Columbus. (22.23-22.85 is STP, rest NH)
DISTRICT 6-PLANNINGCO Air Quality
Nonexempt0 RW Acquis 2012 4BK7 Federal L050 NATIONAL HWY SYST $15,200,000 $547,950 $24,497,950 $3,079,929 $133,953,000 2012AM03ID0148FDRW
222 RW Acquis 2012 4BD7 State 002 State Funds (S,O) $3,800,000
222 RW RW Serv 2012 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $320,000
222 RW RW Serv 2012 4BD7 State 002 State Funds (S,O) $80,000
222 RW Utl Remb 2012 4BK7 Federal L050 NATIONAL HWY SYST $3,640,000
222 RW Utl Remb 2012 4BD7 State 002 State Funds (S,O) $910,000
223 07/01/11 2013 FHWA 6 82426 MORPC FRAFRA Columbus PTW FY
12 - 15
Paving the Way Program Operated by Columbus and MORPC to Provide
Construction Project Information to the Public. Four Year Program FY 12 - FY15.
Primary Work Category: Congestion Mitigation Program Termini: Throughout
Franklin County. FY's 12, 13, 14, 15
COLUMBUS 0 PE Review 2012 LNTP Local Match 002 Local Match $39,000 $0 $795,000 $0 $795,000 2012stipID1571FDPERV
223 PE Review 2012 4TA7 Federal L230 URBANIZED AREAS $156,000
223 PE Review 2013 LNTP Local Match 002 Local Match $39,000
223 PE Review 2013 4TA7 Federal L230 URBANIZED AREAS $156,000
223 PE Review 2014 4TA7 Federal L230 URBANIZED AREAS $162,000
223 PE Review 2014 LNTP Local Match 002 Local Match $40,500
223 PE Review 2015 LNTP Local Match 002 Local Match $40,500
223 PE Review 2015 4TA7 Federal L230 URBANIZED AREAS $162,000
224 07/01/11 2013 FHWA 6 82514 MORPC FRA FRA CR 225 0.920
Rehabilitate superstructure to accommodate existing 2-lane roadway. Wider
shoulders will be provided to accommodate future bicycle/pedestrian
access.Lithopolis Winchester Road structure over Little Walnut Creek. Primary
Work Category: Bridge Deck Replacement Termini: Canal Winchester. Madison
Twp. On Franklin/Fairfiled County Line. Near intersection of Winchester Rd &
Lithopolis Winchester Rd
FRANKLIN COUNTY
ENGINEER
CO Air Quality
Exempt0 RW Acquis 2012 4TA7 Federal L230 URBANIZED AREAS $104,000 $0 $150,000 $0 $1,690,508 2012stipID1563FDACUT
224 RW Acquis 2012 LNTP Local Match LNTP Non Traditional Local Match $26,000
224 RW Utl Remb 2012 4TA7 Federal L230 URBANIZED AREAS $16,000
224 RW Utl Remb 2012 LNTP Local Match LNTP Non Traditional Local Match $4,000
225 07/01/11 2014 FHWA 6 83217 MORPC DEL DEL CR 124 1.880
Intersection improvement project, includes intersection of Home Road with SR-
257 and with South Section Line Road.Signalized intersection and roundabout
will be considered.Realignment of South Section Line Road will be
investigated.Project includes replac Primary Work Category: Intersection
Improvement Termini: DEL-CR 124, Home Road. 500' West of SR-257 to 500'
east of CR-5, South Section Line Road.
DELAWARE COUNTY
ENGINEER0 CO CO Engr 2014 4TB7 Federal L40E CMAQ $437,413 $0 $6,014,424 $0 $8,765,424 2012stipID1512FDCO
225 CO CO Engr 2014 LNTP Local Match LNTP Non Traditional Local Match $109,353
225 CO CO Contr 2014 4TB7 Federal L40E CMAQ $4,374,126
225 CO CO Contr 2014 LNTP Local Match LNTP Non Traditional Local Match $1,093,532
226 08/01/11 2013 FHWA 6 83217 MORPC DEL DEL CR 124 1.880
Intersection improvement project, includes intersection of Home Road with SR-
257 and with South Section Line Road.Signalized intersection and roundabout
will be considered.Realignment of South Section Line Road will be
investigated.Project includes replac Primary Work Category: Intersection
Improvement Termini: DEL-CR 124, Home Road. 500' West of SR-257 to 500'
east of CR-5, South Section Line Road.
DELAWARE COUNTY
ENGINEER0.34 RW Acquis 2011 LNTP Local Match LNTP Non Traditional Local Match $440,000 $0 $2,750,000 $0 $8,765,424 2012MODID0011FDRW
226 RW Acquis 2011 4TB7 Federal L400 CMAQ $1,760,000
226 RW Utl Remb 2011 LNTP Local Match LNTP Non Traditional Local Match $110,000
226 RW Utl Remb 2011 4TB7 Federal L400 CMAQ $440,000
ODOT 2014-2017 STIP Page 105
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
227 10/13/11 2013 FHWA 6 83666 PIC PIC East-West Connector
East - West connector study to evaluate the alternatives for a new or
reconstructed roadway between US-23 and Rickenbacker Port AuthorityOH 407
earmark Primary Work Category: New Construction Termini: From US-23 to
CR-7/Walnut Creek Pike.
PICKAWAY COUNTY
ENGINEER0 PE Dtl Dsgn 2012 4BD7 State 002 State Funds (S,O) $73,335 $1,822,669 $3,222,500 $616,537 $46,097,158 2012AM03ID0156FDPEDD
227 PE Dtl Dsgn 2012 4BK7 Federal L25E STP RURAL <5K $521,448
227 PE Dtl Dsgn 2012 4BD7 State 002 State Funds (S,O) $157,537
227 PE Dtl Dsgn 2012 4BD7 State 002 State Funds (S,O) $130,362
227 PE Dtl Dsgn 2012 4BK7 Federal L25E STP RURAL <5K $630,149
227 PE Review 2012 4BD7 State 002 State Funds (S,O) $15,000
228 01/13/12 2013 FHWA 6 83666 PIC PIC SR 762 11.180
East-West Connector study to evaluate the alternatives for a new or
reconstructed roadway between US-23 and Rickenbacker Port AuthorityEnv &
Detailed Design for Phase 1A and 1B (1B for Upgrading Ashville Pike and
roundabouts at intersections with 762 ext Primary Work Category: New
Construction Termini: Study from US-23 to CR-7/Walnut Creek Pike. Phase 1A
from US-23 to CR-28/Ashville Pike.
PICKAWAY COUNTY
ENGINEER2 RW Acquis 2012 4R47 Federal 56C0 DIV A 2010 STP APPROP EARMARK $999,658 $275,000 $3,050,000 $2,985,690 $18,421,564 2012AM04ID0432FDRW
228 RW Acquis 2012 4PF7 Federal L25E STP RURAL <5K $600,274
228 RW Acquis 2012 4R47 Federal 56C0 DIV A 2010 STP APPROP EARMARK $250,000
228 RW Acquis 2012 4PS7 State 002 State Funds (S,O) $150,068
228 RW RW Serv 2012 4R47 Federal 56C0 DIV A 2010 STP APPROP EARMARK $75,000
228 RW Utl Remb 2012 4R47 Federal 56A0 Section 125 2009 STP Approp Earmark $400,000
228 RW Utl Remb 2012 4PF7 Federal L25E STP RURAL <5K $240,000
228 RW Utl Remb 2012 4PS7 State 002 State Funds (S,O) $60,000
229 01/13/12 2013 FHWA 6 83695 Marion MAR MAR City Signal Phase 5
Phase 5 Traffic Signal Improvement Project for City of Marion.Work at 5
intersections.Post-construction traffic signal optimization. Consultant PM Doug
Iles. Primary Work Category: Signals Termini: Marion. Davids at Darius,
Center at Davids, Bark at Wellness, Hill at Main, Bellefontaine at Davids.
Marion, City of 0 RW Acquis 2012 4TA7 Federal L20E STP RURAL <200K $4,000 $0 $25,000 $353,517 $2,641,778 2012AM04ID0433FDRW
229 RW RW Serv 2012 4TA7 Federal L20E STP RURAL <200K $16,000
229 RW Utl Remb 2012 4TA7 Federal L20E STP RURAL <200K $5,000
230 01/17/13 2013 FHWA 6 83958 PIC PIC SR 674 4.210
Bridge Replacement and widening of structure over Turkey Run Primary Work
Category: Bridge Replacement Termini: PIC-674-4.21 thru 4.37 1.58 miles
North of SR-188. Walnut Township.
DISTRICT 6-PLANNING 0.16 PE Dtl Dsgn 2013 4PF7 Federal L1CE BRIDGE 85% ON/OFF SYSTEM $65,600 $106 $82,106 $4,186 $1,126,786 2012AM09ID1566FDPE
230 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $16,400
231 07/01/11 2014 FHWA 6 83975 MORPC FRA FRA SR 665 12.620FRA-665-12.62 - replace bridge over South Plum Run Primary Work Category:
Bridge Replacement Termini: FRA-665-12.62 - 0.42 mi E of SR-104. In Grove CityDISTRICT 6-PLANNING 0 CO CO Engr 2014 LABR Federal L250 STP Rural <5,000 $48,000 $0 $788,000 $0 $789,000 2012stipID1666FDCO
231 CO CO Engr 2014 LABR State 002 State Funds (S,O) $12,000
231 CO CO Contr 2014 4PF7 Federal L250 STP Rural <5,000 $582,400
231 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $145,600
232 04/11/13 2013 FHWA 6 85017 MORPC FRA FRA CR 122 6.220
Reconstruction and widening from 2 to 5 lanes of Alum Creek Drive. Multi-use
path, curbs, drainage, lighting, signal upgrades.Alum Creek Drive Phase C
Primary Work Category: Major Widening Termini: Columbus. From Refugee to
Frebis. 1.2 miles
COLUMBUS 1.6 PE Dtl Dsgn 2013 4TA7 Federal L23E STP URBANIZED AREAS $192,000 $0 $1,600,000 $0 $29,093,750 2012AM11ID1855FDPE
232 PE Dtl Dsgn 2013 LNTP Local Match LNTP Non Traditional Local Match $48,000
232 PE Env PE 2013 4TA7 Federal M230 STP URBANIZED AREAS $1,088,000
232 PE Env PE 2013 LNTP Local Match LNTP Non Traditional Local Match $272,000
233 07/01/11 2013 FHWA 6 86067 MORPC FRA FRA IR 270 36.94
Mulitlane funded major rehabilitation project.SLM 36.94-40.45Upgrade shoulder
widths. Upgrade interchange ramp geometrics. Provide vertical and horizontal
clearance on bridges.Upgrade guardrail, overhead signs, lighting, drainage.
Environmental Coordina Primary Work Category: Major Rehabilitation
Termini: Gahanna & Columbus. 0.36 mi W of Hamilton to 0.92 mi S of Broad (N.
of Main)
DISTRICT 6-PLANNING 4 PE Dtl Dsgn 2012 4RA7 State 002 State Funds (S,O) $401,878 $1,083,436 $5,121,417 $1,100,217 $65,621,417 2012stipID1596FDDD
233 PE Dtl Dsgn 2012 4RC7 Federal L010 INTERSTATE MAINTENANCE $3,616,902
234 10/13/11 2013 FHWA 6 87479 MORPC FRAFRA Rickenbacker Rail
Spur
Planning study and possible env work for proposed Rickenback Rail Spur from NS
line into proposed rail campus.$490,000 of 100% federal/4R47 earmark funding -
FY08 AA Primary Work Category: Studies Termini: Hamilton Twp. W of
Rickenbacker Airport and Rickenbacker Pkway. S of SR-317
Columbus Airport
Authority0 PE Env PE 2012 4R47 Federal LY90 Sction 129 STP $190,000 $0 $490,000 $0 $490,000 2012AM03ID0146FDPE
234 PE Pln Stdy 2012 4R47 Federal LY90 Sction 129 STP $300,000
235 04/11/13 2014 FHWA 6 87823 MORPC FRA FRA CR 14 5.41
ODOT FUNDED SAFETY PROJECT.INTERSECTION IMPROVEMENT BY ADDING TURN
LANES AT INTERSECTION OF REFUGEE/CHATTERTON ROAD AND NOE-BIXBY
ROAD.LOCAL-LET PROJECT ADMINISTERD BY FRANKLIN COUNTY ENGINEER.
Primary Work Category: Intersection Improvement Termini:
REFUGEE/CHATTERTON ROAD AT NOE-BIXBY ROAD.
FRANKLIN COUNTY
ENGINEER0.28 CO CO Contr 2014 LNTP Local Match 002 Local Match $2,529,183 $0 $6,935,101 $0 $8,436,101 2012AM11ID1856FDCO
235 CO CO Contr 2014 4DP7 Federal Pass-Th $3,750,000
235 CO CO Engr 2014 LNTP Local Match 002 Local Match $655,918
236 04/12/12 2013 FHWA 6 87823 MORPC FRA FRA CR 14 5.41
ODOT FUNDED SAFETY PROJECT.INTERSECTION IMPROVEMENT BY ADDING TURN
LANES AT INTERSECTION OF REFUGEE/CHATTERTON ROAD AND NOE-BIXBY
ROAD.LOCAL-LET PROJECT ADMINISTERD BY FRANKLIN COUNTY ENGINEER.
Primary Work Category: Intersection Improvement Termini:
REFUGEE/CHATTERTON ROAD AT NOE-BIXBY ROAD.
FRANKLIN COUNTY
ENGINEER0 RW Acquis 2012 4HJ7 Federal LS30 HIGHWAY SAFETY IMP PROG $1,250,000 $0 $1,500,000 $0 $7,441,000 2012AM06ID0741FDRW
236 RW Acquis 2012 LNTP Local Match 002 Local Match $250,000
237 07/01/11 2013 FHWA 6 89193 MAR MAR SR 423 4.210
Improve sight distance on the north leg of the intersection by lowering the road
profile.Replace culvert north of intersection (District funding)Design by M-E
Companies under Central Office Task Order Primary Work Category:
Intersection Improvement Termini: MAR SR 423 at CR 108(Owens Rd) to
approximately 600 feet north
DISTRICT 6-PLANNING 0 RW Acquis 2012 4BC7 State 002 State Funds (S,O) $11,000 $0 $110,000 $90,185 $627,070 2012stipID1748FDAC
237 RW Acquis 2012 4RS7 Federal LS2E HSIP - HI RISK RURAL $99,000
ODOT 2014-2017 STIP Page 106
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
238 07/01/11 2013 FHWA 6 90200 MORPC DEL DEL IR71 7.91
Preliminary studies in the area of the DEL IR71 at US36/SR37 interchange to
determine future interchange and road improvements to accommodate future
development. Primary Work Category: Interchange, New Termini: DEL IR 71
at US36/SR37 Interchange. IR 71 from Chesire Rd (SLM 7.91) to Berkshire Rd (SLM
10.93)
DISTRICT 6-PLANNING 3 PE Dtl Dsgn 2013 4BG7 Local Match 002 Local Match $4,200,000 $284,498 $9,265,133 $284,498 $52,920,133 2012stipID1516FDENDD
238 PE Env PE 2012 4BK7 Federal L01E INTERSTATE MAINTENANCE $4,500,000
238 PE Env PE 2012 4BD7 State 002 State Funds (S,O) $500,000
239 10/15/12 2013 FHWA 6 90241 MORPC FRAFRA CR222 (GENDER RD)
AT REFUGEE
ODOT FUNDED SAFETY PROJECT TO IMPROVE INTERSECTION OF CR222 (GENDER
ROAD) AND CR14 (REFUGEE ROAD). IMPROVEMENTS TO INCLUDE WIDENING
INTERSECTION TO PROVIDE TWO THROUGH LANES; EXCLUSIVE RIGHT AND LEFT
TURN LANES ON ALL APPROACHES; PROVIDE DOUBLE LEFT TURN Primary Work
Category: Intersection Improvement Termini: COLUMBUS. FRA-CR122 (GENDER
ROAD) AT FRA-CR14 (REFUGEE ROAD).
COLUMBUS 0 PE Env PE 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $409,500 $35,889 $565,889 $35,889 $5,135,889 2012AM08ID01266FDPE
239 PE Env PE 2013 LNTP Local Match 002 Local Match $45,500
240 10/15/12 2013 FHWA 6 90243 MORPC DEL DEL CR 10 0.90
PAVEMENT WIDENING WITH ADDITION OF PEDESTRIAN AND MULTI-USE
FACILITIES. Primary Work Category: Minor Widening Termini: DEL-CR10
(SOUTH OLD STATE ROAD) FROM WYNSTONE DRIVE (0.10 MILE S OF SR750) TO
ABBEY KNOLL DRIVE (0.10 MILE N OF ORANGE ROAD).
DELAWARE COUNTY
ENGINEER1 RW Acquis 2013 4TA7 Federal L23E STP URBANIZED AREAS $3,000,000 $0 $3,750,000 $0 $18,417,490 2012AM08ID01254FDRW
240 RW Acquis 2013 LNTP Local Match 002 Local Match $750,000
241 10/15/12 2013 FHWA 6 90383 MORPC FRA FRA Whitehall Signals
Whitehall signals, signalization, upgrade traffic control equipment and hardware
at various existing signalized intersections. Install bicycle detection equipment.
Upgrade pedestrian traffic control devices at each intersection. PM Joe
Ridgeway. Primary Work Category: Signals Termini: Whitehall. US40 (Main
Street) and SR16 (Broad Street), CR-102 (Yearling Road), Etna Road, Beechwood
Road.
WHITEHALL; CITY OF 5 RW Acquis 2013 4TB7 Federal $545,250 $0 $545,250 $0 $6,382,727 2012AM08ID01267FDRW
242 10/15/12 2013 FHWA 6 90388 MORPC FRA FRA HAMILTON ROAD
MAJOR WIDENING FROM TWO TO FIVE LANES WITH BIKEWAY AND MULTI-USE
PATH; AND MODERN ROUNDABOUTS AT THE INTERSECTION OF CLARK STATE
ROAD AND THE ENTRANCE TO THE COUNTY MRDD FACILITY.MULTI-USE PATH ON
WEST SIDE.SIDEWALK ON EAST SIDE. The Consultant PM is Jame Primary Work
Category: Major Widening Termini: GAHANNA. HAMILTON ROAD FROM
CARPENTER ROAD TO US62.
Gahanna, City of 1 RW Acquis 2013 4TA7 Federal L23E STP URBANIZED AREAS $1,840,000 $0 $2,300,000 $0 $18,061,008 2012AM08ID01268FDRW
242 RW Acquis 2013 4BG7 Local Match 002 Local Match $460,000
243 07/01/11 2013 FHWA 6 90649 MORPC FRAFRA WESTERVILLE RD
SIDEWALKS
ADDITION OF SIDEWALKS TO REDUCE PEDESTRIAN ACCIDENT RATE. Primary
Work Category: Add Sidewalks Termini: COLUMBUS, BLENDON TOWNSHIP. SR3
(WESTERVILLE ROAD) FROM SR161 TO IR270.
FRANKLIN COUNTY
ENGINEER2 PE Dtl Dsgn 2012 4BG7 Local Match 002 Local Match $22,000 $0 $220,000 $0 $3,213,500 2012stipID1702FDDD
243 PE Dtl Dsgn 2012 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $198,000
244 01/17/13 2013 FHWA 6 90653 MORPC FRA FRA US 62 10.67
Reconstruct the roadway to include curb and gutter, storm sewer, sidewalks,
bike lanes, and two-way, left turn lane.Safety funded project. Primary Work
Category: Section Improvement Termini: Franklin County Planning & Dev $, US
62/SR 3 (Harrisburg Pike) from Eakin/Hopkins to Brown Rd
DISTRICT 6-PLANNING 1.02 PE Dtl Dsgn 2014 4PF7 Federal M240 STP FLEXIBLE $120,000 $0 $950,000 $0 $6,576,100 2012AM09ID1557FDPE
244 PE Dtl Dsgn 2014 4PS7 State 002 State Funds (S,O) $30,000
244 PE Env PE 2013 4PF7 Federal L24E STP FLEXIBLE $520,000
244 PE Env PE 2013 4PS7 State 002 State Funds (S,O) $130,000
244 PE Env PE 2014 4PF7 Federal L24E STP FLEXIBLE $120,000
244 PE Env PE 2014 4PS7 State 002 State Funds (S,O) $30,000
245 01/17/13 2013 FHWA 6 90982 MAD MAD London SRTS Inf
SRTS Infrastructure funding of $272,000 for Env, DD, CO.Crosswalk upgrade at 9
locations - signage with LED flashers, pvmt markings, curb ramps, lighting10'
wide Bike path from Brooks Edge Subdivision/Thomas Lane to middle
schoolInstallation of 2 radar b Primary Work Category: Bikeways Termini:
London. Various locations
LONDON 0.1 PE Dtl Dsgn 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $5,000 $0 $49,000 $0 $292,000 2012AM09ID1564FDPE
245 PE Env PE 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $44,000
246 07/01/11 2013 FHWA 6 90984 MORPC FRAFRA New Albany SRTS
Inf
SRTS Infrastructure amount = $350,000 for DD, RW, COUpgrade Traffic control
devicesInstall 2 variable speed limit signs at 3 locationsShorten school zone
length at 3 locationsReplace existing ped signal indicator at 2
locationsSignage/marking/curb ramps a Primary Work Category: Signs
Termini: New Albany. Various locations
New Albany, Village of 0 RW Acquis 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $15,000 $0 $15,000 $0 $350,000 2012stipID1641FDAC
247 01/13/12 2013 FHWA 6 92230 MORPC DEL DEL IR 71 13.070
Rehab and raise six structures over I-71 in DEL and MRW counties to obtain a
minimum 16' 6" vertical clearance. Primary Work Category: Bridge Deck
Replacement Termini: DEL-71-13.07, DEL-521-9.93, DEL-71-15.63, MRW-71-0.40,
MRW-229-5.56, MRW-71-10.57
DISTRICT 6-PLANNING 1 PE Dtl Dsgn 2012 4RC7 Federal L01E INTERSTATE MAINTENANCE $720,000 $0 $800,000 $0 $9,700,000 2012AM04ID0440FDPEDD
247 PE Dtl Dsgn 2012 4RA7 State 002 State Funds (S,O) $80,000
248 10/15/12 2014 FHWA 6 92406 PIC PIC SR 316 0.000
Two lane resurfacing project from SR-56 to SR-104Safety edge along entire
project except curbed areasCurve warning signing at 6 locationsIn-House
Designer: Mark Katona Primary Work Category: Resurfacing, Undivided System
Termini: Darbyville. SLM 0.00-9.48
DISTRICT 6-PLANNING 9 CO CO Engr 2014 LABR Federal L25E STP RURAL <5K $165,120 $0 $2,502,500 $0 $2,503,500 2012AM08ID01287FDCO
248 CO CO Engr 2014 LABR State 002 State Funds (S,O) $41,280
248 CO CO Contr 2014 4PF7 Federal $168,800
248 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $42,200
248 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $1,651,200
248 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $412,800
248 CO CO Engr 2014 LABR Federal $16,880
248 CO CO Engr 2014 LABR State 002 State Funds (S,O) $4,220
ODOT 2014-2017 STIP Page 107
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
249 01/17/13 2013 FHWA 6 92438 FAY FAY SR 435 0.970
The scope of this project is pavement rehabilitation, intersection improvements,
erosion control improvements, bridge repair, and drainage improvements on
FAY-435 from 0.97 (0.5 miles west of IR71) to 2.37 (0.1 miles east of US35).
Erosion locations: FAY Primary Work Category: Minor Rehabilitation -
Pavement Gnrl Sys Termini: Octa, WCH. SLM 0.97-2.37 0.5 mile W of IR-71 to
0.1 mile E of US-35 for pvmt & drainage
DISTRICT 6-PLANNING 12.48 PE Dtl Dsgn 2014 4PF7 Federal $120,000 $0 $851,000 $0 $6,021,614 2012AM09ID1562FDPE
249 PE Dtl Dsgn 2014 4PS7 State 002 State Funds (S,O) $30,000
249 PE Env PE 2013 4PF7 Federal $280,000
249 PE Env PE 2014 4PF7 Federal $280,000
249 PE Env PE 2013 4PS7 State 002 State Funds (S,O) $70,000
249 PE Env PE 2014 4PS7 State 002 State Funds (S,O) $70,000
250 10/15/12 2013 FHWA 6 92478 MORPC FRAFRA IR 270 7.040 (Noise
Wall)
Design build contract to construct a Type II noise wall on west side of I-270 from
West Broad St north to RR tracks. Primary Work Category: Noise Wall
Termini: Prairie Twp. SLM 7.04-7.81 From West Broad to NS RR tracks
DISTRICT 6-PLANNING 1 PE Dtl Dsgn 2014 5BV7 Federal L01E INTERSTATE MAINTENANCE $144,000 $0 $160,000 $0 $1,920,000 2012AM08ID01269FDPE
250 PE Dtl Dsgn 2014 4BV7 State 002 State Funds (S,O) $16,000
251 01/17/13 2014 FHWA 6 92575 PIC PIC SR 762 13.370
Widen Ashville Pike to 3 lanes and construct roundabouts at intersection of new
SR 762 extension and at intersection with Rickenbacker PkwyRW & Construction
of Phase 1BEnv & DD under PID 83666 Primary Work Category: Major Widening
Termini: Ashville Pike/CR28 from Duvall Rd/T-20 to Rickenbacker Pkwy
DISTRICT 6-PRODUCTION 1.5 CO CO Contr 2014 4D47 Federal $3,058,431 $0 $6,479,000 $2,405,000 $9,992,500 2012AM09ID1567FDCO
251 CO CO Contr 2014 4D47 Federal $1,506,392
251 CO CO Contr 2014 4BG8 Local Match 002 Local Match $437,308
251 CO CO Contr 2014 4BG8 Local Match 002 Local Match $887,869
251 CO CO Engr 2014 LABR Local Match 002 Local Match $57,692
251 CO CO Engr 2014 LABR Local Match 002 Local Match $117,131
251 CO CO Engr 2014 LABR Federal $221,999
251 CO CO Engr 2014 LABR State 002 State Funds (S,O) $55,500
251 CO CO Engr 2014 LABR Federal $109,342
251 CO CO Engr 2014 LABR State 002 State Funds (S,O) $27,336
252 10/15/12 2013 FHWA 6 92575 PIC PIC SR 762 13.370
Widen Ashville Pike to 3 lanes and construct roundabouts at intersection of new
SR 762 extension and at intersection with Rickenbacker PkwyRW & Construction
of Phase 1BEnv & DD under PID 83666 Primary Work Category: Major Widening
Termini: Ashville Pike/CR28 from Duvall Rd/T-20 to Rickenbacker Pkwy
DISTRICT 6-PRODUCTION 2 RW Acquis 2013 4BK7 Federal L24E STP FLEXIBLE $348,400 $760,000 $4,362,500 $760,000 $11,101,500 2012AM08ID01288FDRW
252 RW Acquis 2013 4BK7 Federal L25E STP RURAL <5K $171,600
252 RW Acquis 2013 4BD7 State 002 State Funds (S,O) $87,100
252 RW Acquis 2013 4BD7 State 002 State Funds (S,O) $42,900
252 RW RW Serv 2013 4BK7 Federal $104,520
252 RW RW Serv 2013 4BK7 Federal $51,480
252 RW RW Serv 2013 4BD7 State 002 State Funds (S,O) $26,130
252 RW RW Serv 2013 4BD7 State 002 State Funds (S,O) $12,870
253 07/12/12 2014 FHWA 6 93030 MORPC FRAFRA IR 71 19.430
(Lighting)
Upgrade lighting at RR overpassSafety funded project Primary Work Category:
Lighting Termini: Columbus. I-71 at Norfolk Southern RR, just north of
Cleveland Ave
DISTRICT 6-PLANNING 0 CO CO Contr 2013 4DP7 Federal PassThr $700,000 $0 $770,000 $7,219 $778,219 2012AM07ID1008FDCO
253 CO CO Engr 2013 LABR Federal LS3E HSIP - HWY SAFETY IMPR $63,000
253 CO CO Engr 2013 LABR State 002 State Funds (S,O) $7,000
254 10/15/12 2013 FHWA 6 93842 MORPC FRAFRA Grandview Hts
Noninf 2012
City of Grandview Heights SRTS Noninfrastructure project awarded spring
2012Biking/walking to school events, enforcement in school zones,
encouragement incentives Primary Work Category: S.R.T.S Education &
Encouragement Termini: City of Grandview Heights, 117 Grandview Ave,
Grandview Heights, OH 43212
Grandview Heights, City
of0 OTH Oth Remb 2013 4SC7 Federal LU1E SAFE ROUTES TO SCHOOL PROGRAM $43,500 $0 $43,500 $0 $43,500 2012AM08ID01274FDOTH
255 10/15/12 2013 FHWA 6 93843 MORPC FRAFRA New Albany Noninf
2012
City of New Albany Noninfrastructure project funded spring 2012Parent &
student surveys for a five year period Primary Work Category: S.R.T.S
Education & Encouragement Termini: City of New Albany, 99 W Main St, PO
Box 188, New albany, OH 43054
New Albany, Village of 0 OTH Oth Remb 2013 4SC7 Federal LU1E SAFE ROUTES TO SCHOOL PROGRAM $7,500 $0 $7,500 $0 $7,500 2012AM08ID01275FDOTH
256 10/15/12 2013 FHWA 6 93845 MORPC FRAFRA Gahanna Noninf
2012
City fo Gahanna SRTS Noninfrastructure project funded spring 2012Biek Roadeo,
Walk/Bike to School Days, Encouragement Incentives Primary Work Category:
S.R.T.S Education & Encouragement Termini: City of Gahanna, 200 S Hamilton
Rd, Gahanna, OH 43230
Gahanna, City of 0 OTH Oth Remb 2013 4SC7 Federal LU1E SAFE ROUTES TO SCHOOL PROGRAM $29,000 $0 $29,000 $0 $29,000 2012AM08ID01276FDOTH
257 10/15/12 2013 FHWA 6 93913 MORPC FRAFRA Gahanna SRTS Inf
FY15
Gahanna SRTS Infrastructure ProjectMulti-use path on East Johnstown Rd from
Colony Pl to Cherry Bottom Rd. Upgrade signal at Johnstown/Cherry Bottom to
include ped crossing and ped signals. Sidewalk on Cherry Bottom Rd from
Johnstown Rd to Springbrook D Primary Work Category: Add Sidewalks
Termini: Gahanna. Various locations
Gahanna, City of 0 PE Dtl Dsgn 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $8,000 $0 $36,000 $0 $265,900 2012AM08ID01279FDPE
257 PE Env PE 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $28,000
258 04/11/13 2013 FHWA 6 93914 Marion MARMAR Marion City SRTS
Inf
City of Marion Safe Routes to School Infrastructure ProjectAdd missing sidewalk
on Richmond Ave with 8' wide pedestrian bridge over Blum RunAdd sidewalk on
Bermuda AveCurb ramp and crosswalk improvements at Bahama Dr/Richmond
Ave Primary Work Category: Add Sidewalks Termini: Marion. Richmond Ave,
Fairgrounds Ave, Bermuda Drive
Marion, City of 0.05 PE Dtl Dsgn 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $25,000 $0 $85,000 $0 $396,300 2012AM11ID1849FDPE
258 PE Env PE 2013 4SC7 Federal $60,000
259 10/15/12 2013 FHWA 6 94012 MORPC FRAFRA New Albany SRTS
Inf FY15
New Albany SRTS Infrastructure ProjectMullti-use path connectionsWest side of
New Albany Condit Rd from McElwee Dr to Kardules Field WaySouth side of
Dublin-Granville Rd from Market St to Ealy HouseMissing sections on north side
of Dublin-Granville Rd fro Primary Work Category: Bikeways Termini: New
Albany. Various locations
New Albany, Village of 0 PE Dtl Dsgn 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $25,000 $0 $25,000 $0 $237,000 2012AM08ID01280FDPE
ODOT 2014-2017 STIP Page 108
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
260 01/17/13 2013 FHWA 6 94155 MORPC D06 D06 Extrusign S
Systematic replacement of extrusheet signs on various routes in District Six.
Design for PID 94156 and 89303 also included in this PID Primary Work
Category: Signs Termini: Columbus. DEL-71, FRA-70, FRA-71, FRA-270, FRA-
670, MAD-70
DISTRICT 6-PLANNING 40.82 PE Dtl Dsgn 2013 4PF7 Federal M001 NATIONAL HIGHWAY PREFORMANCE PROGRAM $900,000 $0 $1,000,000 $0 $5,400,000 2012AM09ID1549FDPE
260 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $100,000
261 01/17/13 2013 FHWA 6 94460 MORPC FRAFRA IR 70/Hilliard Rome
Int
FRA-70/Hilliard Rome Rd interflush projectNew Signal at N side of interchang
with ramp realigments and wideningAdd lane both directions between I-70 &
Meijer DriveAdd NB dual left turn lanes on Hilliard Rome at Renner Rd Primary
Work Category: Section Improvement Termini: Columbus. CR-3/Hilliard Rome
Rd from I-70 to Meijer Store traffic signal
TRAFFIC 0.4 PE Dtl Dsgn 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $540,000 $409,222 $1,636,244 $409,222 $7,636,244 2012AM09ID1561FDPE
261 PE Dtl Dsgn 2013 4BC7 State 002 State Funds (S,O) $60,000
261 PE Dtl Dsgn 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $11,710
261 PE Dtl Dsgn 2013 4BC7 State 002 State Funds (S,O) $1,301
262 04/11/13 2014 FHWA 6 94893 MAR MAR SR 37 0.000
Two lane resurfacing of MAR-37 from Wyandot/Marion County line to SR-309
Primary Work Category: Resurfacing, Undivided System Termini: Rural. MAR-
309: SLM 0.00-3.31
DISTRICT 6-PLANNING 3.31 CO CO Engr 2014 LABR Federal M232 STP RURAL <5K $40,000 $0 $550,000 $0 $551,000 2012AM11ID1864FDCO
262 CO CO Engr 2014 LABR State 002 State Funds (S,O) $10,000
262 CO CO Contr 2014 4PF7 Federal M232 STP RURAL <5K $400,000
262 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $100,000
263 10/15/12 2013 FHWA 7 75863 MVRPC MOT MOT US 35 18.57
Preliminary engineering and detailed design for the add lane, pavement
reconstruction, noise wall, bridge replacement and interchange modification.PE
funding only for PID 85367, 80277, 89130, 90273, and 90285 on this PID. Primary
Work Category: PE Only Termini: MOT: FR SLM 18.57 TO THE MOT/GRE CL; GRE:
FR THE MOT/GRE CL TO THE JCT OF IR675.
ODOT SPONSORING
AGENCY
CO Air Quality
Nonexempt3 PE Dtl Dsgn 2013 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $745,321 $4,186,072 $6,073,607 $4,194,072 $6,081,607 2012AM08ID01304FDPE
263 PE Dtl Dsgn 2013 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $694,679
263 PE Dtl Dsgn 2013 4BD7 State 002 State Funds (S,O) $186,330
263 PE Dtl Dsgn 2013 4BD7 State 002 State Funds (S,O) $173,670
264 10/15/12 2013 FHWA 7 80450 CCSTS CLA CLA CR 333 0.00
PROVIDE CENTER LTL ALONG PROJECT AREA, AND DEDICATED TURN LANES AT
INTERSECTIONS. RESURFACING THE EXISTING ROADWAY, WITH JOINT REPAIRS
AND CULVERT REPAIRS, AS NEEDED. Primary Work Category: Resurfacing,
Undivided System Termini: FROM MILEPOST 0.527 TO THE ENON SCL LT.
DAYTON-SPRINGFIELD ROAD.
CLARK COUNTY ENGINEERCO Air Quality
Nonexempt3 PE Env PE 2013 4TB7 Federal L40E CMAQ $110,000 $553,480 $663,480 $553,480 $6,592,480 2012AM08ID01292FDPE
265 07/29/11 2013 FHWA 7 80450 CCSTS CLA CLA CR 333 0.00
PROVIDE CENTER LTL ALONG PROJECT AREA, AND DEDICATED TURN LANES AT
INTERSECTIONS. RESURFACING THE EXISTING ROADWAY, WITH JOINT REPAIRS
AND CULVERT REPAIRS, AS NEEDED. Primary Work Category: Resurfacing,
Undivided System Termini: FROM MILEPOST 0.527 TO THE ENON SCL LT.
DAYTON-SPRINGFIELD ROAD.
CLARK COUNTY ENGINEERCO Air Quality
Nonexempt0 RW Acquis 2013 4HB7 Federal LS30 HIGHWAY SAFETY IMP PROG $160,000 $0 $201,000 $315,022 $3,814,022 2012AM01ID0023FDRW
265 RW Acquis 2013 LNTP Local Match LNTP Non Traditional Local Match $40,000
266 01/17/13 2013 FHWA 7 82314 CCSTS CLACLA LITTLE MIAMI TRAIL
EXTENSION
CONSTRUCT A MULTI-USE TRAIL CONNECTING EXISTING MULTI-USE TRAIL
SEGMENTS IN SPRINGFIELD. Primary Work Category: Bikeways Termini: FR
FAIR ST TO JOHNNY LYTLE AVE AND FR JOHN STREET TO LEFFEL LANE IN
SPRINGFIELD
Springfield, City ofCO Air Quality
Nonexempt0 PE Env PE 2013 4TB7 Federal L400 CMAQ $50,000 $494,889 $544,889 $494,889 $2,412,554 2012AM09ID1568FDPE
267 10/15/12 2013 FHWA 7 83663 CCSTS CLACLA IR 70 10.55/13.98,
Ph. 2
Major rehabilitation of the existing lanes and the construction of an additional
lane in each direction on IR70 from US68 interchange to the SR72 interchange.
Other work will include installation of median cable barrier and all required
roadway, erosion Primary Work Category: Major Widening Termini: IR70
from the junction of US68 to the junction of SR72.
ODOT SPONSORING
AGENCY3 PE Dtl Dsgn 2013 4BK7 Federal L01E INTERSTATE MAINTENANCE $2,430,000 $464,887 $4,417,903 $464,887 $46,698,093 2012AM08ID01293FDPE
267 PE Dtl Dsgn 2013 4BD7 State 002 State Funds (S,O) $270,000
267 PE Env PE 2013 4BD7 State 002 State Funds (S,O) $1,135,113
268 04/11/13 2014 FHWA 7 84756 MVRPC MIAMIA GREAT MIAMI
BRIDGE CONN
CONSTRUCT A 14' WIDE BIKEWAY/PEDESTRIAN BRIDGE OVER THE GREAT MIAMI
RIVER TO CONNECT SECTIONS FIVE AND SIX IN MIAMI COUNTY'S TRAIL SYSTEM.
CONSTRUCT A SEGMENT OF BIKEWAY RUNNING NORTH ON THE EAST SIDE OF THE
RIVER TO CONNECT SECTIONS FIVE AND SIX IN MIAM Primary Work Category:
Bikeways Termini: MIAMI COUNTY, IN STAUNTON AND WASHINGTON
TOWNSHIPS, APPROX 1600' SOUTH OF PETERSON ROAD.
Miami County Park
District
CO Air Quality
Exempt0 CO CO Contr 2014 LNTP Local Match LNTP Non Traditional Local Match $500,000 $0 $2,101,867 $0 $2,106,322 2012AM11ID1867FDCO
268 CO CO Contr 2014 4TB7 Federal L400 CMAQ $579,000
268 CO CO Contr 2014 LNTP Local Match LNTP Non Traditional Local Match $144,750
268 CO CO Contr 2014 4R47 Federal LY10 HI PRI SEC 1702 $247,831
268 CO CO Contr 2014 LNTP Local Match LNTP Non Traditional Local Match $439,207
268 CO CO Engr 2014 LABR Federal L400 CMAQ $57,900
268 CO CO Engr 2014 LABR Local Match $14,475
268 CO CO Engr 2014 LNTP Local Match LNTP Non Traditional Local Match $118,704
269 07/01/11 2013 FHWA 7 85172 CCSTS CLA CLA BECHTLE BRIDGE
BRIDGE REPLACEMENT, PE AND RW PHASES FUNDED WHEN PROGRAMMED
11/03/08. CONSTRUCTION ADDED 01/05/09 - REPLACE EXISTING DECK, SIDEWALK,
AND RAILING, PAINT EXISTING STEEL BEAMS AND CONVERT ABUTMENTS TO SEMI
INTEGRAL ABUTMENTS. Primary Work Category: Bridge Deck Replacement
Termini: ON BECHTLE AVENUE OVER BUCK CREEK.
Springfield, City of 1 RW Acquis 2013 4TA7 Federal L240 STP FLEXIBLE $20,000 $0 $26,000 $62,775 $1,453,656 2012stipID1838FDAC
269 RW Acquis 2013 LNTP Local Match LNTP Non Traditional Local Match $5,000
270 04/11/13 2013 FHWA 7 86675 MVRPC MOT MOT IR 75 11.74
Replace deficient bridge decks with minimal approach transitions. All structures
part of I-75/US 35 interchange. Project to remove structural and functional
deficiencies. Structures 5707595, 5707501, and 5701627.Consultant will be
responsible for the d Primary Work Category: Bridge Deck Replacement
Termini: (Dayton) Various: Bridge limits, approach slabs and approach
transitions, only, at I-75/US 35 interchange
ODOT SPONSORING
AGENCY
CO Air Quality
Nonexempt0 PE PE Engr 2013 4PF7 Federal L1CE BRIDGE 85% ON/OFF SYSTEM $10,800 $1,934,395 $1,957,395 $1,934,395 $15,236,489 2012AM11ID1872FDPE
270 PE PE Engr 2013 4PF7 Federal L1CE BRIDGE 85% ON/OFF SYSTEM $9,000
270 PE PE Engr 2013 4PS7 State 002 State Funds (S,O) $1,200
ODOT 2014-2017 STIP Page 109
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
271 07/01/11 2014 FHWA 7 86684 CHP CHP CR 468 0.00
OVERLAY ASPHALTIC CONCRETE ON 17.55 MILES OF COUNTY ROADS. (ROADS ARE
RURAL MINOR COLLECTORS. FUNDING IS CONTINGENT ON INCLUDING RURAL
MINOR COLLECTORS FOR FEDERAL FUNDS IN THE NEXT TRANSPORTATION BILL).
Primary Work Category: Resurfacing, Undivided System Termini: VARIOUS
LOCATIONS IN CHP COUNTY.
Champaign County
Commissioners13 CO CO Engr 2014 LABR Federal L25E STP RURAL <5K $107,280 $0 $1,475,000 $0 $1,476,000 2012stipID1822FDCO
271 CO CO Engr 2014 LABR Local Match 002 Local Match $26,820
271 CO CO Contr 2014 4B77 Federal L25E STP RURAL <5K $1,072,720
271 CO CO Contr 2014 4BG7 Local Match 002 Local Match $268,180
272 01/17/13 2013 FHWA 7 87081 LOG LOG CR 21 1.00
DISASSEMBLE THE STRUCTURE AND REPAIR OR REPLACE EXISTING MEMBERS
PRIOR TO HOT DIP GALVANIZING OR METALIZING AND REASSEMBLE ON SITE.
REPAIR OF EXISTING STONE ABUTMENTS, REPLACE STEEL AND TIMBER DECKING
WITH A NEW FLOOR SYSTEM. UPGRADE RAILING SYSTEM. Primary Work
Category: Bridge Deck Replacement Termini: ON CR 21 IN LOGAN COUNTY
LOGAN COUNTY
ENGINEER0 PE Dtl Dsgn 2013 4B87 Federal L11E BRIDGE 15% OFF SYSTEM $50,000 $0 $251,000 $0 $2,576,752 2012AM09ID1594FDPE
272 PE Dtl Dsgn 2013 LNTP Local Match LNTP Non Traditional Local Match $12,500
272 PE Env PE 2013 4B87 Federal L11E BRIDGE 15% OFF SYSTEM $150,000
272 PE Env PE 2013 LNTP Local Match LNTP Non Traditional Local Match $37,500
273 07/29/11 2013 FHWA 7 87089 MVRPC MOT MOT CR 175 0.79
WIDEN YANKEE STREET FROM TWO TO FIVE LANES, BIKEPATH MAINTENANCE ON
YANKEE.PID 90856 CANCELLED AND ADDED TO THIS PID. Primary Work
Category: Minor Widening Termini: ON YANKEE STREET FROM AUSTIN
PIKE/SOCIAL ROW TO WINDING GREEN WAY.
MONTGOMERY COUNTY
ENGINEER0 PE PE Engr 2012 LNTP Local Match LNTP Non Traditional Local Match $168,000 $0 $841,000 $0 $6,068,548 2012AM01ID0030FDPE
273 PE PE Engr 2012 4TA7 Federal L23E STP URBANIZED AREAS $672,000
274 04/11/13 2013 FHWA 7 87534 MVRPC MIAMIA IR 75
12.90/13.15/13.28
Replace two (2) Mainline structures on MIA IR 75 (13.15LR) and rehabilitate four
(4) Mainline strucutures (12.90 LR, 13.28 LR).Co-ordinate with PID 24998
Primary Work Category: Bridge Replacement Termini: MIA 75 12.90 L-SFN
5502640 R-SFN 5502675, MIA 75 13.15 L-SFN 5502764,R-SFN 5502799, MIA 75 13.28
L-SFN 5502829,R-SFN 5502853
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2013 4PF7 Federal L010 INTERSTATE MAINTENANCE $89,371 $985,334 $1,096,632 $985,334 $16,054,964 2012AM11ID1868FDPE
274 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $9,930
275 07/12/12 2014 FHWA 7 87732 MVRPC MOT MOT SR 725 0.000
Resurface existing SR 725 with Asphalt concrete. Repair of precast box beam
bridge joints along with surface overlayCombining PID 81272 in with this PID
87732. Primary Work Category: Minor Rehabilitation - Pavement Gnrl Sys
Termini: Begin MOT/PRE County Line (SLM 0.00) to SR 4 (SLM 6.76). SFN 5710103
MOT 725 0579 Tributary over Twin Creek
ODOT SPONSORING
AGENCY
CO Air Quality
Exempt7 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $531,638 $0 $1,462,004 $0 $1,463,004 2012AM07ID1017FDCO
275 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $132,909
275 CO CO Contr 2014 4PF7 Federal L20E STP RURAL <200K $63,797
275 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $15,949
275 CO CO Engr 2014 LABR Federal L20E STP RURAL <200K $46,784
275 CO CO Engr 2014 LABR State 002 State Funds (S,O) $11,696
275 CO CO Engr 2014 LABR Federal L20E STP RURAL <200K $6,380
275 CO CO Engr 2014 LABR State 002 State Funds (S,O) $1,595
275 CO CO Contr 2014 4PF7 Federal L20E STP RURAL <200K $467,841
275 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $116,960
275 CO CO Engr 2014 LABR Federal L25E STP RURAL <5K $53,164
275 CO CO Engr 2014 LABR State 002 State Funds (S,O) $13,291
276 07/12/12 2013 FHWA 7 88008 CCSTS CLACLA CR 316 1.71 Lower
Valley Pk
INSTALL 2' PAVED SHOULDER LATERALLY ALONG THE ENTIRE CORRIDOR WHERE
SPEED LIMITS EXCEED 35 MPH (LOG POINT 1.71-2.82 AND LOG POINT 3.53-7.54).
INSTALL 4' STABILIZED/PAVED SHOULDER WITHIN 250' OF THE SEVEN
UNSIGNALIZED INTERSECTIONS WITHIN THE CORRIDOR. U Primary Work
Category: Widening Termini: ON LOWER VALLEY PIKE IN CLARK COUNTY
CLARK COUNTY ENGINEER 6 RW Acquis 2012 4RS7 Federal LS2E HSIP - HI RISK RURAL $297,000 $0 $900,000 $376,200 $7,577,200 2012AM07ID1018FDRW
276 RW Acquis 2012 LNTP Local Match LNTP Non Traditional Local Match $33,000
276 RW RW Serv 2012 4RS7 Federal LS2E HSIP - HI RISK RURAL $513,000
276 RW RW Serv 2012 LNTP Local Match LNTP Non Traditional Local Match $57,000
277 07/01/11 2013 FHWA 7 88222 MVRPC MIA MIA US 36 11.55
REPLACE RW FENCE WITH DECORATIVE FENCE, INSTALL CURBING AROUND
EXISTING GRASS MEDIAN AREA TO THE WEST OF IR75 BRIDGE; EXCAVATE THE
PAINTED MEDIAN EAST OF THE BRIDGE AND ADD CURBING AND TOPSOIL TO
CREATE A PLANTING AREA; INSTALL CURB AT THE PAVEMENT EDGE Primary
Work Category: Environmental/Scenic Termini: US 36 FROM SCOTT DRIVE TO
LOONEY ROAD
Piqua, City of 0 CO CO Contr 2014 4TC7 Federal L22E STP ENHANCEMENT $262,677 $0 $481,575 $0 $482,575 2012stipID2048FDCO
277 CO CO Contr 2014 4BG7 Local Match 002 Local Match $175,118
277 CO CO Engr 2014 LABR Local Match 002 Local Match $17,512
277 CO CO Engr 2014 LABR Federal L22E STP ENHANCEMENT $26,268
278 07/01/11 2014 FHWA 7 88229 MVRPC MIA MIA US 36 10.00
CONVERT OPERATION OF THE SIGNALS FROM PRETIMED TO ACTUATED,
COORDINATE SIGNAL OPERATIONS, AND INSTALL PREEMPTION SYSTEM.
Primary Work Category: Signals Termini: INTERSECTIONS OF
COLLEGE/COVINGTON, COLLEGE/WATER, AND COLLEGE/HIGH
Piqua, City of 0 CO CO Contr 2014 4TB7 Federal L40E CMAQ $426,710 $0 $586,726 $0 $587,726 2012stipID2045FDCO
278 CO CO Contr 2014 4BG7 Local Match 002 Local Match $106,677
278 CO CO Engr 2014 LABR Federal L40E CMAQ $42,671
278 CO CO Engr 2014 LABR Local Match 002 Local Match $10,668
279 07/01/11 2014 FHWA 7 88328 MVRPC MOT MOT IR 75 6.66
Interchange Gateway which will add city logos on an undulating concrete wall
that "wave" in both horizontal and vertical directions to represent the strong
influence of water on the community. Primary Work Category: Design
Aesthetics Termini: I-75 at Exit 47
DISTRICT 7 PRODUCTIONCO Air Quality
Nonexempt1 CO CO Contr 2014 4TC7 Federal L22E STP ENHANCEMENT $281,540 $0 $516,156 $0 $517,156 2012stipID2087FDCO
279 CO CO Contr 2014 4BG7 Local Match 002 Local Match $187,693
279 CO CO Engr 2014 LABR Federal L22E STP ENHANCEMENT $28,154
279 CO CO Engr 2014 LABR Local Match 002 Local Match $18,769
280 07/01/11 2013 FHWA 7 88371 MVRPC MIA MIA IR 75 15.69
Replace a deficient structure over IR 75 with Minimal Approach work. Statler
Road. Primary Work Category: Bridge Replacement Termini: SFN 5503094
MIA 75 15.69 (Statler Road)
ODOT SPONSORING
AGENCY0 RW RW Serv 2012 4PF7 Federal L01E INTERSTATE MAINTENANCE $9,000 $0 $10,000 $0 $2,761,000 2012stipID2030FDSV
ODOT 2014-2017 STIP Page 110
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
281 07/01/11 2014 FHWA 7 88746 D07 D07 LG FY 14/152014/2015 Highway lighting Maintenance Project Construction 09/01/13 to
08/31/15. Primary Work Category: Lighting Termini: DISTRICTWIDE
ODOT SPONSORING
AGENCY0 CO CO Engr 2014 LABR State 002 State Funds (S,O) $65,000 $0 $715,000 $0 $716,000 2012stipID1928STCO
281 CO CO Contr 2014 4CP7 State 002 State Funds (S,O) $650,000
282 04/11/13 2014 FHWA 7 88768 CHP CHP SR560 1.48/1.56
Replace deteriorating wearing surface (2 bridges) with no approach work except
approach slabs. Asphalt overlay precluded by legal load rating. Primary Work
Category: Bridge Repair Termini: CHP 560 0148 SFN 1103121 over Owens Creek
and CHP 560 0156 SFN 1103156 over Nettle Creek
ODOT SPONSORING
AGENCY0 CO CO Engr 2014 LABR Federal L1CE BRIDGE 85% ON/OFF SYSTEM $11,458 $0 $375,121 $0 $376,121 2012AM11ID1882FDCO
282 CO CO Engr 2014 LABR State 002 State Funds (S,O) $2,865
282 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $158,233
282 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $39,558
282 CO CO Engr 2014 LABR Federal L25E STP RURAL <5K $15,823
282 CO CO Engr 2014 LABR State 002 State Funds (S,O) $3,956
282 CO CO Contr 2014 4PF7 Federal L1CE BRIDGE 85% ON/OFF SYSTEM $114,582
282 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $28,646
283 07/01/11 2014 FHWA 7 88771 MVRPC MOT MOT SR 49 8.98 R
Replace deteriorated bridge deck with minimal approach work. Include repair of
pier columns and miscellaneous steel & concrete repair. Primary Work
Category: Bridge Deck Replacement Termini: MOT SR 49 8.98 R over IR 70 SFN
5704359
ODOT SPONSORING
AGENCY
CO Air Quality
Exempt0 CO CO Engr 2015 LABR Federal L1CE BRIDGE 85% ON/OFF SYSTEM $96,000 $0 $1,320,000 $0 $1,471,000 2012stipID2126FDCO
283 CO CO Engr 2015 LABR State 002 State Funds (S,O) $24,000
283 CO CO Contr 2015 4PF7 Federal L1CE BRIDGE 85% ON/OFF SYSTEM $960,000
283 CO CO Contr 2015 4PS7 State 002 State Funds (S,O) $240,000
284 07/01/11 2013 FHWA 7 88775 MVRPC MOT MOT SR 48 13.20
Replace deteriorated bridge superstructure with minimal approach work.
Primary Work Category: Bridge Repair Termini: MOT SR 48 13.20 SFN 5703697
over the Great Miami River
ODOT SPONSORING
AGENCY
CO Air Quality
Exempt0 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $85,000 $0 $851,000 $0 $10,091,000 2012stipID2120FDENDD
284 PE Dtl Dsgn 2013 4PF7 Federal L24E STP FLEXIBLE $340,000
284 PE Env PE 2012 4PF7 Federal L24E STP FLEXIBLE $340,000
284 PE Env PE 2012 4PS7 State 002 State Funds (S,O) $85,000
285 07/01/11 2014 FHWA 7 88779 MVRPC MIA MIA US 36 11.32
Replace or Rehab deteriorated backwalls/expansion joints/approach slabs
District Wide. Include necessary structural steel repairs and bearing rehab.
Primary Work Category: Bridge Repair Termini: MIA 36 11.32 SFN 5500095, MIA
55 11.83 SFN 5501504, CLA 334 00.86 SFN 1205641, CLA 334 00.62 SFN 1203150
ODOT SPONSORING
AGENCY0 CO CO Contr 2014 4PF7 Federal L20E STP RURAL <200K $108,800 $0 $440,000 $0 $441,000 2012stipID2047FDCO
285 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $27,200
285 CO CO Engr 2014 LABR Federal L05E NATIONAL HIGHWAY SYSTEM $5,440
285 CO CO Engr 2014 LABR State 002 State Funds (S,O) $1,360
285 CO CO Contr 2014 4PF7 Federal L05E NATIONAL HIGHWAY SYSTEM $54,400
285 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $13,600
285 CO CO Engr 2014 LABR Federal L25E STP RURAL <5K $6,080
285 CO CO Engr 2014 LABR State 002 State Funds (S,O) $1,520
285 CO CO Engr 2014 LABR Federal L24E STP FLEXIBLE $9,600
285 CO CO Engr 2014 LABR State 002 State Funds (S,O) $2,400
285 CO CO Contr 2014 4PF7 Federal L24E STP FLEXIBLE $96,000
285 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $24,000
285 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $60,800
285 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $15,200
285 CO CO Engr 2014 LABR Federal L20E STP RURAL <200K $10,880
285 CO CO Engr 2014 LABR State 002 State Funds (S,O) $2,720
286 07/12/12 2013 FHWA 7 88800 AUG AUG SR 219 07.21
Replace deteriorated bridge with minimal approach work. Primary Work
Category: Bridge Replacement Termini: AUG 219 0721 SFN 0603244 Bridge over
Schmier Ditch
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2013 4PF7 Federal L25E STP RURAL <5K $20,000 $0 $151,000 $0 $756,000 2012AM07ID1027FDPE
286 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $5,000
286 PE Env PE 2013 4PF7 Federal L25E STP RURAL <5K $100,000
286 PE Env PE 2013 4PS7 State 002 State Funds (S,O) $25,000
287 07/01/11 2013 FHWA 7 89421 CCSTS CLA CLA VILLA ROAD
WIDEN VILLA ROAD AND IMPROVE DRAINAGE . ADD A TRAFFIC SIGNAL.
Primary Work Category: Minor Widening Termini: ON VILLA ROAD FROM DERR
ROAD TO URBANA ROAD.
Springfield, City of 1 PE Dtl Dsgn 2014 LNTP Local Match $18,750 $0 $94,750 $0 $2,495,344 2012stipID1912FDDD
287 PE Dtl Dsgn 2014 4TB7 Federal L40E CMAQ $75,000
288 07/01/11 2013 FHWA 7 89421 CCSTS CLA CLA VILLA ROAD
WIDEN VILLA ROAD AND IMPROVE DRAINAGE . ADD A TRAFFIC SIGNAL.
Primary Work Category: Minor Widening Termini: ON VILLA ROAD FROM DERR
ROAD TO URBANA ROAD.
Springfield, City of 1 RW Acquis 2013 LNTP Local Match $45,000 $0 $225,000 $0 $2,495,344 2012stipID1913FDAC
288 RW Acquis 2013 4TB7 Federal L40E CMAQ $180,000
289 07/01/11 2013 FHWA 7 89434 CCSTS CLACLA UPPER VALLEY
BRIDGE
REPLACE BRIDGE AND UPGRADE INTERSECTIONS. Primary Work Category:
Bridge Replacement Termini: ON UPPER VALLEY PIKE SOUTH OF THE
INTERSECTION OF UVP, COUNTY LINE ROAD AND STORMS CREEK RD.
CLARK COUNTY ENGINEER 0 RW Acquis 2012 LNTP Local Match LNTP Non Traditional Local Match $5,000 $0 $25,000 $0 $1,210,000 2012stipID1901FDAC
289 RW Acquis 2012 4TA7 Federal L20E STP RURAL <200K $20,000
290 07/01/11 2013 FHWA 7 89441 CCSTS CLACLA NEW CARLISLE TRAIL
SIGNS
PLACEMENT OF TRAIL SIGNS CONSISTENT WITH THOSE USED BY SPRINGFIELD (UP
TO 6 SIGNS). Primary Work Category: Design Aesthetics Termini: ON WEST
LAKE AVE TO THE LOCATION OF THE OLD YMCA ON SR235
New Carlisle, City of 0 CO CO Mtrls 2013 4TC7 Federal L22E STP ENHANCEMENT $3,024 $0 $3,780 $0 $4,780 2012stipID1878FDCOMT
291 10/15/12 2013 FHWA 7 90260 MVRPC MOTMOT DAY REG Multi-
Modal Rail
This is a multi-phase project that supports the region's logistics and distribution
strategy for providing multi-modal options for regional companies with new full
freight rail service. Application is for project phases I and II. Includes DD
engineerin Primary Work Category: Railroad Improvements & Rehabilitation
Termini: From the CSXT mainline to E. property line of the Dayton International
Airport
Montgomery County
Transportation
Improvement District
0 PE Env PE 2013 4BK7 Federal L40E CMAQ $617,762 $227,797 $2,966,000 $227,797 $19,431,000 2012AM08ID01307FDPE
291 PE Env PE 2013 4BG7 Local Match 002 Local Match $450,000
291 PE Env PE 2013 4BD7 State 002 State Funds (S,O) $154,441
ODOT 2014-2017 STIP Page 111
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
292 04/11/13 2014 FHWA 7 90807 LOGLOG US 68/SR 235
8.10/8.68/8.18
Pavement planing and resurfacing with asphalt concrete.Urban Paving Program.
Primary Work Category: Minor Rehabilitation - Pavement Gnrl Sys Termini: US
68 from SLM 8.10 to SLM 8.49 and Brown St. US 68 from SLM 8.68 to SLM 10.09. SR
235 from SR 47 (SLM 8.18) to SR 720 (SLM 17.46)
ODOT SPONSORING
AGENCY11.08 CO CO Contr 2014 4PF7 Federal $73,472 $0 $2,435,752 $0 $2,436,752 2012AM11ID1885FDCO
292 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $18,368
292 CO CO Contr 2014 4PF7 Federal M231 STP RURAL <200K $88,228
292 CO CO Contr 2014 4BG7 Local Match 002 Local Match $22,057
292 CO CO Contr 2014 4PF7 Federal M232 STP RURAL <5K $1,388,827
292 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $347,207
292 CO CO Contr 2014 4PF7 Federal L05E NATIONAL HIGHWAY SYSTEM $324,522
292 CO CO Contr 2014 4BG7 Local Match 002 Local Match $81,131
292 CO CO Engr 2014 LABR Federal M232 STP RURAL <5K $41,665
292 CO CO Engr 2014 LABR State 002 State Funds (S,O) $10,416
292 CO CO Contr 2014 4PF7 Federal $1,228
292 CO CO Engr 2014 LABR Federal M231 STP RURAL <200K $2,647
292 CO CO Engr 2014 LABR Federal $2,204
292 CO CO Contr 2014 4PF7 Federal M231 STP RURAL <200K $15,570
292 CO CO Contr 2014 4BG7 Local Match 002 State Funds (S,O) $3,892
292 CO CO Engr 2014 LABR Federal L05E NATIONAL HIGHWAY SYSTEM $9,736
292 CO CO Engr 2014 LABR Local Match 002 Local Match $2,434
293 07/29/11 2013 FHWA 7 90822 MVRPC MOT MOT Iron Horse Bikeway
Construction of two types of path which include a 10' wide, concrete path
installed next to a street and a 10' wide asphalt path installed along a former
railroad route. Primary Work Category: Bikeways Termini: Northeast corner
of Stroop Road and Wilmington Pike to the Southwest corner of Woodman
Commerce Dr and Dorothy Ln (Delco Park)
Kettering, City of 0 RW Acquis 2013 LNTP Local Match LNTP Non Traditional Local Match $148,800 $0 $496,000 $0 $973,927 2012AM01ID0034FDRW
293 RW Acquis 2013 4TB7 Federal L40E CMAQ $347,200
294 07/01/11 2013 FHWA 7 90865 MVRPC MIAD07 SRTS MIA W Milton
Infrastruc
Installation of new sidewalks along Haskett and Hamilton Streets in West Milton.
Primary Work Category: Add Sidewalks Termini: Village of West Milton;
Haskett and Hamilton Streets
West Milton, Village of 0 RW Acquis 2012 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $5,000 $0 $5,000 $0 $190,300 2012stipID2012FDAC
295 10/13/11 2013 FHWA 7 91608 MVRPC MOT MOT US 35 15.76Replace deteriorating MSC wearing surface with new MSC overlay. Primary
Work Category: Bridge Deck Replacement Termini: SFN 5701929 MOT 35 15.76
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2014 4PF7 Federal L1CE BRIDGE 85% ON/OFF SYSTEM $290,000 $0 $726,000 $0 $8,774,000 2012AM03ID0186FDPEED
295 PE Dtl Dsgn 2014 4PS7 State 002 State Funds (S,O) $72,500
295 PE Env PE 2013 4PS7 State 002 State Funds (S,O) $72,500
295 PE Env PE 2013 4PF7 Federal L1CE BRIDGE 85% ON/OFF SYSTEM $290,000
296 10/13/11 2013 FHWA 7 91728 SHE SHE IR 75 1.02
Replace SHE 75 overpass with insufficient (non-Standard) vertical clearance in
advance of a mojor rehab of IR 75. Primary Work Category: Bridge
Replacement Termini: CR 132 East Lockington SFN 7501447 SHE 75 102
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $11,250 $0 $226,000 $0 $1,876,000 2012AM03ID0188FDPEED
296 PE Dtl Dsgn 2013 4PF7 Federal L01E INTERSTATE MAINTENANCE $101,250
296 PE Env PE 2013 4PF7 Federal L01E INTERSTATE MAINTENANCE $101,250
296 PE Env PE 2013 4PS7 State 002 State Funds (S,O) $11,250
297 01/17/13 2013 FHWA 7 91984 DARDAR SR 705
9.02/9.47/10.33
Three span concrete slab deck removal and replacement with minimal approach
work, possible guardrail end treatment upgrades.SFN 1903845 Darke 705 0947
over Holsapple DitchSFN 1903969 Darke 705 1033 over East Branch Baurers
DitchSFN 1903810 Darke 705 0902 Primary Work Category: Bridge Replacement
Termini: SFN 1903810 DAR 705 0905/ Mile Creek;(SFN 1903969 DAR 705 1033 / E Br
Baurer's Ditch);SFN 1903845 DAR 705 0947 / Hosapple Ditch
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2013 4PF7 Federal L25E STP RURAL <5K $134,000 $0 $270,801 $0 $2,048,078 2012AM09ID1592FDPE
297 PE Dtl Dsgn 2013 4PF7 Federal L25E STP RURAL <5K $66,000
297 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $33,500
297 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $16,500
298 01/17/13 2013 FHWA 7 92819 MVRPC MOT MOT SR 49 11.10 L/R
Removal and replacement of the existing bridges, approach slabs, and minimal
roadway work. Primary Work Category: Bridge Replacement Termini: SFN
5704561 (MOT 49 1110 L and 1110 R) and SFN 5704596 (over Razor Run)
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2014 4PF7 Federal L05E NATIONAL HIGHWAY SYSTEM $27,810 $59,036 $271,209 $59,036 $1,843,173 2012AM09ID1582FDPE
298 PE Dtl Dsgn 2014 4PS7 State 002 State Funds (S,O) $6,953
298 PE Env PE 2013 4PF7 Federal L05E NATIONAL HIGHWAY SYSTEM $139,366
298 PE Env PE 2013 4PS7 State 002 State Funds (S,O) $34,842
299 04/12/12 2013 FHWA 7 92820 MVRPC MOT MOT SR 202 7.00
Remove and replace 3 span continuous concrete slab deck bridge with minimal
approach work. NOTE: Sidewalks are box beams on outside of structure, not
attached except at abutment. Primary Work Category: Bridge Replacement
Termini: SFN 5709601 MOT 202 0700 over tributary of Great Miami River
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2013 4PF7 Federal L1CE BRIDGE 85% ON/OFF SYSTEM $84,000 $0 $176,000 $0 $1,537,791 2012AM06ID0790FDPE
299 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $21,000
299 PE Env PE 2013 4PF7 Federal L1CE BRIDGE 85% ON/OFF SYSTEM $56,000
299 PE Env PE 2013 4PS7 State 002 State Funds (S,O) $14,000
300 04/11/13 2013 FHWA 7 93176 MVRPC MOT MOT SR 741 5.52
Replace Deteriorated concrete slab bridge with new bridge deck and
substructure. Minimal approach work. Primary Work Category: Bridge
Replacement Termini: SFN 5710448 MOT 741 0552 Tributary over Great Miami
River
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2013 4PF7 Federal L24E STP FLEXIBLE $52,000 $0 $151,000 $0 $474,266 2012AM11ID1875FDPE
300 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $13,000
300 PE Env PE 2013 4PF7 Federal L24E STP FLEXIBLE $68,000
300 PE Env PE 2013 4PS7 State 002 State Funds (S,O) $17,000
301 10/15/12 2013 FHWA 7 93230 MVRPC MOTMOT I-675 Wilmington
Pike PH 1
To increase storage lane lengths to improve safety lane lengths to improve
safety and minimize the blocking of traffic in adjacent through lanes at
intersection. This short term improvement can be accomplished between the
existing bridge piers by reducing Primary Work Category: Intersection
Improvement Termini: I-675 and Wilmington Pike Interchange
CENTERVILLE 0 PE Env PE 2013 4TA7 Federal L23E STP URBANIZED AREAS $144,062 $0 $181,077 $0 $841,922 2012AM08ID01308FDPE
ODOT 2014-2017 STIP Page 112
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
301 PE Env PE 2013 LNTP Local Match LNTP Non Traditional Local Match $36,015
302 10/15/12 2013 FHWA 7 93245 MVRPC MIAMIA CR 25A
Reconstruction PH 2
Reconstruction and widening from 2-5 lanes. The project will also install new
curbs, ADA truncated dome handicapped access ramps, storm sewer system,
utility relocations, street light, restoration of traffic signage upgrades. Primary
Work Category: Major Reconstruction Termini: CR 25A from Michaels Road to
Evanston Road.
TIPP CITY 1 PE Env PE 2013 4TA7 Federal L23E STP URBANIZED AREAS $176,000 $0 $221,000 $0 $3,051,000 2012AM08ID01298FDPE
302 PE Env PE 2013 LNTP Local Match LNTP Non Traditional Local Match $44,000
303 07/12/12 2013 FHWA 7 93318 MVRPC MOT MOT IR 75 11.64 E
Replace deficient bridge deck with minimal approach transitions. Structure part
of I75/US35 interchange. Project to remove structural and functional
deficiencies. (Co-ordinate work with PID 86675 MOT 75 11.74) Primary Work
Category: Bridge Deck Replacement Termini: SFN 5707404 MOT 75 1164E on
Albany Street Ramp (IR 75 North - US 35 East)
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2013 4PF7 Federal L01E INTERSTATE MAINTENANCE $112,500 $0 $201,000 $0 $1,617,822 2012AM07ID1042FDPE
303 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $12,500
303 PE Env PE 2013 4PF7 Federal L01E INTERSTATE MAINTENANCE $67,500
303 PE Env PE 2013 4PS7 State 002 State Funds (S,O) $7,500
304 07/12/12 2014 FHWA 7 93471 LOG LOG VAR VAR
Rebuild deck edges, patch pier encasements, reface abutments, and seal deck
edges.SFN 4603125 LOG 292 0879 Tributary Mill CreekSFN 4603605 LOG 508 0196
Stoney CreekSFN 4603907 LOG 559 0170 Tributary Big Darby CreekSFN 4603966
LOG 559 0245 Tributary Big Da Primary Work Category: Bridge Repair Termini:
SFN 4603125 LOG 292 0879,4603605 LOG 508 0196, 4603907 LOG 559 0170; 4603966
LOG 559 0245; 4604121 LOG 708 0069
ODOT SPONSORING
AGENCY0 CO CO Engr 2014 LABR Federal L25E STP RURAL <5K $1,082 $0 $135,300 $0 $136,300 2012AM07ID1050FDCO
304 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $87,576
304 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $21,894
304 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $10,824
304 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $2,706
304 CO CO Engr 2014 LABR Federal L25E STP RURAL <5K $8,758
304 CO CO Engr 2014 LABR State 002 State Funds (S,O) $2,189
305 04/11/13 2013 FHWA 7 93561 MVRPC MIA MIA IR 75 19.95
Project shall consist of a bridge deck overlay, pier patching, and beam painting.
Primary Work Category: Bridge Repair Termini: SFN 5503450 MIA 75 1995 CR 6
Miami/Shelby Road
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2014 4PF7 Federal L01E INTERSTATE MAINTENANCE $36,000 $0 $126,000 $0 $1,051,569 2012AM11ID1870FDPE
305 PE Dtl Dsgn 2014 4PS7 State 002 State Funds (S,O) $4,000
305 PE Env PE 2013 4PF7 Federal L01E INTERSTATE MAINTENANCE $76,500
305 PE Env PE 2013 4PS7 State 002 State Funds (S,O) $8,500
306 10/15/12 2013 FHWA 7 93562 MVRPC MIA MIA IR 75 13.73Replace functionally obsolete bridge Primary Work Category: Bridge
Replacement Termini: SFN 5502888 MIA 75 1373 CR 15 Piqua-Troy
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2014 4PF7 Federal L01E INTERSTATE MAINTENANCE $135,000 $0 $501,000 $0 $4,952,946 2012AM08ID01300FDPE
306 PE Dtl Dsgn 2014 4PS7 State 002 State Funds (S,O) $15,000
306 PE Env PE 2013 4PF7 Federal L01E INTERSTATE MAINTENANCE $315,000
306 PE Env PE 2013 4PS7 State 002 State Funds (S,O) $35,000
307 04/11/13 2014 FHWA 7 93569 SHED7 HQ Radio
Demo/Garage New Cons
Demolish the back section of the Annex (Concrete block & steel portion attached
to the back of the Annex, Radio Room Area). Add new area onto the District
Garage to house the demolished Radio Room. Primary Work Category:
Building Demolition Termini: District Headquarter's at the Rear of Annex Bldg
at 1001 St. Marys Avenue.
ODOT SPONSORING
AGENCY0 CO CO Contr 2014 4MA7 State 002 State Funds (S,O) $570,000 $0 $627,000 $46,340 $675,460 2012AM11ID1887FDCO
307 CO CO Engr 2014 LABR State 002 State Funds (S,O) $57,000
308 10/15/12 2013 FHWA 7 93740 MVRPC MOTD07 SRTS MOT Riverside
Infra
Upgrade traffic signal at Valley & Harshman. Build campus pathway with lighting
from Rohrer Blvd to Mad River Middle School. Install sidewalk along Enright
Street. Build campus pathway for Beverly Gardens Elementary. Primary Work
Category: Signals Termini: Mad River Path: Rohrer Blvd to Middle School;
Enright: Spinning to Trunk; Bev Gardens: Elementary school to existing sidewalk
RIVERSIDE 0 PE Dtl Dsgn 2013 4SC7 Federal $14,000 $0 $36,000 $0 $293,000 2012AM08ID01318FDPE
308 PE Env PE 2013 4SC7 Federal $21,000
309 10/15/12 2013 FHWA 7 93852 DARDAR SR 185 4.97
Midmark
Relocation of State Route 185 from 0.04 mile East of Catalpa Drive (SLM 4.97)
South and East to the intersection with State Route 47 (SLM 5.45). A distance of
0.25 mile. The existing State Route 185 between SLM 4.97 and the overlap with
State Route 47 Primary Work Category: Relocation Termini: Between SLM
4.97 and the overlap with State Route 47 SLM 5.45.
Versailles, Village of 0 RW Acquis 2013 5DV7 Federal L25E STP RURAL <5K $16,000 $0 $20,000 $0 $1,789,108 2012AM08ID01339FDRW
309 RW Acquis 2013 4DV7 State 002 State Funds (S,O) $4,000
310 04/11/13 2013 FHWA 7 93953 MVRPC MOT MOT IR 75 21.96
Construct a new noise wall along the west side of Interstate 75 just south of the
U.S. 40 interchange. Primary Work Category: Noise Wall Termini: Construct a
new noisewall at MOT-75-21.96 to 22.10
ODOT SPONSORING
AGENCY0.14 PE Dtl Dsgn 2014 4PF7 Federal L01E INTERSTATE MAINTENANCE $31,500 $0 $117,410 $0 $537,410 2012AM11ID1878FDPE
310 PE Dtl Dsgn 2014 4PS7 State 002 State Funds (S,O) $3,500
310 PE Env PE 2013 4PF7 Federal L01E INTERSTATE MAINTENANCE $58,500
310 PE Env PE 2013 4PS7 State 002 State Funds (S,O) $6,500
311 01/17/13 2013 FHWA 7 94564 CHP CHP US 68 3.45
Project is to construct a left turn lane for south bound and northbound traffic on
U.S. 68 Primary Work Category: Intersection Improvement Termini:
Intersection of U.S. 68 and Hickory Grove
ODOT SPONSORING
AGENCY0.4 PE Dtl Dsgn 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $43,551 $0 $63,876 $0 $507,440 2012AM09ID1589FDPE
311 PE Dtl Dsgn 2013 4BC7 State 002 State Funds (S,O) $4,839
312 01/17/13 2013 FHWA 7 94632 CCSTS CLA CLA SR 235 0.23Access management, lighting and pedestrian improvements between Gerlaugh
and Dillie roads. Primary Work Category: Lighting Termini: CLA 235 0.23
ODOT SPONSORING
AGENCY1.28 PE Dtl Dsgn 2014 4HJ7 Federal MS30 HSIP - HWY SAFETY IMPR $94,500 $0 $301,000 $0 $2,789,500 2012AM09ID1570FDPE
312 PE Dtl Dsgn 2014 4BC7 State 002 State Funds (S,O) $10,500
312 PE Env PE 2013 4HJ7 Federal MS30 HSIP - HWY SAFETY IMPR $175,500
312 PE Env PE 2013 4BC7 State 002 State Funds (S,O) $19,500
ODOT 2014-2017 STIP Page 113
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
313 01/17/13 2013 FHWA 7 94639 CCSTS CLACLA SR 41/235
30.790/8.65
Project to construct a high speed roundabout at the intersection of S.R. 41 and
S.R. 235. Primary Work Category: Intersection Improvement Termini: S.R. 41
SLM 30.79 to SLM 31.17
ODOT SPONSORING
AGENCY0.76 PE Dtl Dsgn 2013 4HJ7 Federal MS30 HSIP - HWY SAFETY IMPR $121,500 $0 $136,000 $0 $1,521,100 2012AM09ID1571FDPE
313 PE Dtl Dsgn 2013 4BC7 State 002 State Funds (S,O) $13,500
314 01/17/13 2013 FHWA 7 95244 SHE SHE SR 47 13.74
Access management and intersection realignment along Michigan Street/West
Court Street corridor in Sidney. Primary Work Category: Section Improvement
Termini: From I75 West to Vandemark Road and improvements at Wilkinson
Avenue intersection
ODOT SPONSORING
AGENCY1.43 PE Dtl Dsgn 2013 4HJ7 Federal $90,729 $0 $101,810 $0 $1,599,460 2012AM09ID1605FDPE
314 PE Dtl Dsgn 2013 4BC7 State 002 State Funds (S,O) $10,081
315 07/01/11 2013 FHWA 8 20082 OKI HAM HAM US 50 18.79/19.03
Demolish Existing Waldvogel Viaduct, Widen US 50 And Construct Ramps To
Bridges To Elberon Avenue And Warsaw Avenue To Replace Functions Of
Viaduct. Railroad Relocation Programmed As PID 84126. All R/W Cost Including
Utility Cost Is Under PID 20082. ** HA Primary Work Category: Major Widening
Termini: .13 MI. WEST OF SR-264(STATE AVE.) TO THE OVERHEAD 5TH STREET
CONNECTOR ON-RAMP FROM WB US-50 TO WB IR-71.
CINCINNATICO Air Quality
Exempt1 RW Acquis 2012 4TA7 Federal L23E STP URBANIZED AREAS $400,000 $8,609,778 $11,003,992 $63,727,878 $71,690,726 2012stipID2474FDAC
315 RW Acquis 2012 LNTP Local Match LNTP Non Traditional Local Match $100,000
316 07/01/11 2013 FHWA 8 76256 OKI HAM HAM IR 75 10.10
Study the corridor for access improvements, study limits are from SLM 9.25 +/- to
15.50 +/-. Construction work limits are from 10.10 +/- to the 16.50 +/-. Work
includes major rehabilitation to the pavement, bridge work, and work
determined as a result o Primary Work Category: Major Widening Termini:
Glendale Milford Road to IR275 (phase 8)
ODOT SPONSORING
AGENCY
CO Air Quality
Nonexempt6 RW Acquis 2012 4BK7 Federal L050 NATIONAL HWY SYST $800,000 $0 $700,000 $7,060,892 $81,292,182 2012stipID2397FDRW
316 RW Acquis 2012 4BD7 State 002 State Funds (S,O) $200,000
316 RW RW Serv 2012 4BK7 Federal L050 NATIONAL HWY SYST $240,000
316 RW RW Serv 2012 4BD7 State 002 State Funds (S,O) $60,000
316 RW Utl Remb 2013 4BD7 State 002 State Funds (S,O) $500,000
316 RW Utl Remb 2013 4BK7 Federal L050 NATIONAL HWY SYST $2,000,000
317 04/11/13 2013 FHWA 8 77628 OKI HAM HAM IR 71 3.81
Provide a full movement interchange at IR-71 & MLK Drive while maintaining
existing connections to WHT and McMillan. Provide ramp metering on the
northbound entrance ramps from McMillan and MLK. Provide a northbound
auxiliary lane from the proposed NB ent Primary Work Category: Interchange,
Reconstruction Termini: Cincinnati - 9 Uptown communities.
CINCINNATI 2.07 PE Env PE 2013 4BK7 Federal L24E STP FLEXIBLE $2,185,015 $1,628,476 $7,359,745 $2,128,476 $83,415,745 2012AM11ID1888FDPE
317 PE Env PE 2013 4BD7 State 002 State Funds (S,O) $546,254
317 PE Dtl Dsgn 2014 4BG7 Local Match 002 Local Match $600,000
317 PE Env RW Serv 2013 4BD7 State 002 State Funds (S,O) $160,000
317 PE Env RW Serv 2013 4BK7 Federal L24E STP FLEXIBLE $640,000
317 PE Env RW Serv 2013 4BK7 Federal L24E STP FLEXIBLE $640,000
317 PE Env RW Serv 2013 4BK7 Federal L24E STP FLEXIBLE $640,000
317 PE Env RW Serv 2013 4BD7 State 002 State Funds (S,O) $160,000
317 PE Env RW Serv 2013 4BD7 State 002 State Funds (S,O) $160,000
318 11/08/11 2013 FHWA 8 81425 OKI CLE CLE SR 125 0.40
Widen SR-125 to add a right turn lane westbound at mt. carmel road and to
provide a third westbound through lane from just west of the IR275 southbound
exit ramp to Independence. Widen Mt. Carmel to provide southbound dual left
turn lanes. Widen SR-125 to Primary Work Category: Intersection
Improvement Termini: 0.40 miles east of the Hamilton county line to 1.15
miles east of the Hamilton county line
District 8 PlanningCO Air Quality
Exempt0.75 RW Acquis 2011 4HJ7 Federal LS30 HIGHWAY SAFETY IMP PROG $1,276,726 $0 $1,418,584 $762,509 $6,944,798 2012MODID0081FDRW
318 RW Acquis 2011 4BC7 State 002 State Funds (S,O) $141,858
319 11/08/11 2013 FHWA 8 81769 OKI BUT BUT US 27 10.92
Widen mainline US 27 to preferred design standards including increased
shoulder width, horizontal and vertical curvature considerations, lane width
deficiencies, and need for center turn lane provision at all major access points;
upgrade signalized inters Primary Work Category: Major Widening Termini:
Stillwell-Beckett Road to Chestnut Street
OXFORD; CITY OFCO Air Quality
Exempt4.35 RW Acquis 2011 4R47 Federal H640 NCPD $1,200,000 $0 $3,500,000 $1,271,016 $21,321,016 2012MODID0085FDRW
319 RW Acquis 2011 4BG7 Local Match 002 Local Match $300,000
319 RW Utl Remb 2014 4BG7 Local Match 002 Local Match $150,000
319 RW Utl Remb 2014 4R47 Federal LY20 HI PRI SEC 1702 $600,000
319 RW Utl Remb 2014 4TA7 Federal L230 URBANIZED AREAS $1,000,000
319 RW Utl Remb 2014 4BG7 Local Match 002 Local Match $250,000
320 07/01/11 2013 FHWA 8 82309 OKI CLE CLE IR 275 8.95
Complete construction of Phase 2. Primarily IR275 to eastbound SR32 and
southside of Eastgate Blvd interchange. Primary Work Category: Major
Reconstruction Termini: Approximately 1.5 miles north of SR32 to 1.0 miles
south of SR32 on IR275. From 0.15 miles west to 1.0 miles east of IR275 on SR32
ODOT SPONSORING
AGENCY4 PE Dtl Dsgn 2012 4BK7 Federal L24E STP FLEXIBLE $320,000 $0 $1,263,624 $0 $49,993,624 2012stipID2214FDDD
320 PE Dtl Dsgn 2012 4BD7 State 002 State Funds (S,O) $80,000
320 PE Dtl Dsgn 2012 4BK7 Federal L01E INTERSTATE MAINTENANCE $1,040,000
320 PE Dtl Dsgn 2012 4BD7 State 002 State Funds (S,O) $260,000
321 07/01/11 2013 FHWA 8 82553 OKI CLECLE CR3 Aicholtz Road
Connector
This project will provide a new network connection from Mt. Carmel-Tabasco
Road on Old State Route 74 approximately 7000 feet to Eastgate Boulevard.
Project right-of-way width will address highway, rail transit, and pedestrian
facilities consistent with Primary Work Category: Preliminary Development
Termini: Beginning 500 feet east of Mt. Carmel-Tobasco Road on Old SR 74
continuing east for approximaely 6500 feet to Eastgate Boulevard
Clermont County
Commissioners
CO Air Quality
Nonexempt0 RW Acquis 2012 4R47 Federal 56C0 DIV A 2010 STP APPROP EARMARK $899,846 $0 $899,846 $0 $899,846 2012stipID2210FDAC
322 07/01/11 2013 FHWA 8 83723 OKI HAM HAM IR 75 3.85
This is Phase 5 of the Hamilton 75 corridor projects. This phase was split off of
the work originally to be completed under PID 76257. Project adds a lane to I-75
and reconfigures the I-74/75 interchange. Primary Work Category: Major
Widening Termini: From the Monmouth overpass to just south of Clifton Rd.
ODOT SPONSORING
AGENCY3 RW Acquis 2012 4BK7 Federal L050 NATIONAL HWY SYST $712,000 $0 $1,400,000 $0 $177,432,817 2012stipID2407FDRW
322 RW Acquis 2012 4BD7 State 002 State Funds (S,O) $178,000
322 RW RW Serv 2012 4BK7 Federal L050 NATIONAL HWY SYST $88,000
322 RW RW Serv 2012 4BD7 State 002 State Funds (S,O) $22,000
322 RW Utl Remb 2013 4BD7 State 002 State Funds (S,O) $80,000
322 RW Utl Remb 2013 4BK7 Federal L050 NATIONAL HWY SYST $320,000
ODOT 2014-2017 STIP Page 114
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
323 07/01/11 2013 FHWA 8 84437 OKI HAM HAM US 27 14.15
Extend southbound right turn lane to westbound IR275 on ramp. Primary Work
Category: Intersection Improvement Termini: begin at westbound IR275 ramps
and end at Dry Ridge Connector, 0.24 miles.
ODOT SPONSORING
AGENCY0 RW Acquis 2012 4HJ7 Federal L240 STP FLEXIBLE $372,600 $0 $414,000 $194,450 $1,670,050 2012stipID2465FDAC
323 RW Acquis 2012 4BC7 State 002 State Funds (S,O) $41,400
324 07/01/11 2013 FHWA 8 85233 OKI CLE CLE SR 125 6.99
Constructing a left turn lane westbound from sr125 to sr132. Primary Work
Category: Intersection Improvement Termini: 0.1 miles east and west of SR132
south junction
ODOT SPONSORING
AGENCY0 RW Acquis 2012 4BC7 State 002 State Funds (S,O) $60,000 $0 $600,000 $105,744 $1,862,088 2012stipID2219FDAC
324 RW Acquis 2012 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $540,000
325 07/01/11 2013 FHWA 8 85874 OKI HAMHAM Clough Pike
Sidewalks
Add turn lanes at Royalgreen Drive and Berkshire Road/Goldengate Drive, access
management modifications, improve lighting, new sidewalk on northsideof
project, signalization improvements if warranted at Bartels, Royalgreene Hunley
Corbly and Berkshire/Go Primary Work Category: Turn Lane Addition
Termini: Newtown Road to .10 east of berkshire Road/Goldengate Drive
HAMILTON COUNTY
ENGINEER0 CO CO Contr 2013 4BG7 Local Match 002 Local Match $480,000 $0 $2,690,827 $0 $2,690,827 2012stipID2371FDCO
325 CO CO Contr 2013 4TB7 Federal L400 CMAQ $1,920,000
325 CO CO Engr 2013 LABR Federal L400 CMAQ $192,000
325 CO CO Engr 2013 LABR Local Match 002 Local Match $48,000
326 01/13/12 2013 FHWA 8 85874 OKI HAMHAM Clough Pike
Sidewalks
Add turn lanes at Royalgreen Drive and Berkshire Road/Goldengate Drive, access
management modifications, improve lighting, new sidewalk on northsideof
project, signalization improvements if warranted at Bartels, Royalgreene Hunley
Corbly and Berkshire/Go Primary Work Category: Turn Lane Addition
Termini: Newtown Road to .10 east of berkshire Road/Goldengate Drive
HAMILTON COUNTY
ENGINEER0 RW Acquis 2012 4TB7 Federal L40E CMAQ $100,000 $0 $125,000 $0 $2,829,999 2012AM04ID0477FDRW
326 RW Acquis 2012 LNTP Local Match LNTP Non Traditional Local Match $25,000
327 10/15/12 2013 FHWA 8 86457 OKI D08 D08 Culverts FY2015
Perform minor work to the following small culverts: Clean and ditch BUT-4-2461,
Pave invert BUT-4-2475, Pave invert BUT-4-2570. Replace CLI-380-0110 (96" CMP
arch), WAR-132-1056 (48" arch), WAR-123-2563 (60") & GRE-380-0149 (72"x44"
CMP arch). Line culve Primary Work Category: Culvert
Construction/Reconstr/Repair Termini: Varies
DISTRICT 8 PRODUCTION 0 RW Acquis 2013 4PF7 Federal L24E STP FLEXIBLE $64,000 $0 $80,000 $0 $1,379,000 2012AM08ID01362FDRW
327 RW Acquis 2013 4PS7 State 002 State Funds (S,O) $16,000
328 07/01/11 2013 FHWA 8 86633 OKI HAMHAM CR 273 3.20-
Plainfied Rd. BP
Add bicycle and pedestrian facility to east side of Plainfield Road including curb
and shoulder; extend existing culverts as needed;construct retaining wall where
required;adjust drainage catch basins and manholes as needed; utilitiey poles
will not be re Primary Work Category: Bikeways Termini: Cooper Road to
Glendale-Milford Road
BLUE ASH 1 CO CO Contr 2013 LNTP Local Match LNTP Non Traditional Local Match $380,172 $0 $950,172 $0 $950,172 2012stipID2362FDCO
328 CO CO Contr 2013 4TB7 Federal L400 CMAQ $525,000
328 CO CO Engr 2013 LNTP Local Match LNTP Non Traditional Local Match $45,000
329 07/01/11 2013 FHWA 8 86797 OKI HAM HAM US 127 15.16
Add two way left turn lane from end of left turn lane at Crest to Cranbrook, twltl
will become left turn lane at Cranbrook. Primary Work Category: Intersection
Improvement Termini: North of Crest to North of Cranbrook
ODOT SPONSORING
AGENCY0 RW Acquis 2013 4HJ7 Federal LS30 HIGHWAY SAFETY IMP PROG $135,000 $0 $150,000 $0 $737,500 2012stipID2452FDAC
329 RW Acquis 2013 4BC7 State 002 State Funds (S,O) $15,000
330 07/01/11 2013 FHWA 8 86895 OKI HAM HAM CR 456 0.56
Improvements to Reading Road consist of the addition of a two-way left turn
lane through the majority of the corridor; also left and right turn lane addition
and signal replacement to improve LOS at the intersection of Reading Road and
Hauck Road. In addi Primary Work Category: Turn Lane Addition Termini:
Reading Road: from Kemper Road to Crescentville Road; Hauck Road: from
Reading Road to 700 ft. east of Reading Road
SHARONVILLE 1 RW Acquis 2012 4TA7 Federal L230 URBANIZED AREAS $51,200 $0 $64,000 $0 $2,204,870 2012stipID2365FDAC
330 RW Acquis 2012 LNTP Local Match LNTP Non Traditional Local Match $12,800
331 07/01/11 2013 FHWA 8 87029 D08 D08 SIGNS FY2015Project for systematic sign upgrades in villages and other missed areas that need
upgrading. Primary Work Category: Signs Termini: Various Locations
ODOT SPONSORING
AGENCY
CO Air Quality
Exempt4 PE Dtl Dsgn 2012 4PF7 Federal L05E NATIONAL HIGHWAY SYSTEM $500,000 $0 $500,000 $0 $3,800,000 2012stipID2315FDDD
332 07/01/11 2013 FHWA 8 87036 OKI HAM HAM CR 612 0.20
The project will improve the S-curve from McMicken Ave. to Dixmyth Ave. by
improving the geometry, constructing the proper superelevation, and adding
left turn lanes where needed. The project will increase turning capability at
Dixmyth by making the exist Primary Work Category: Realignment Termini:
West MLK Jr. Dr. from 0.15mi east of US-127 & US-52 (Central Pkwy) to the
intersection of Clifton Ave.
CINCINNATI 1 RW Acquis 2012 4TA7 Federal L230 URBANIZED AREAS $400,000 $0 $5,300,000 $0 $11,332,405 2012stipID2366FDAC
332 RW Acquis 2012 LNTP Local Match LNTP Non Traditional Local Match $100,000
332 RW Acquis 2013 LNTP Local Match LNTP Non Traditional Local Match $960,000
332 RW Acquis 2013 4TA7 Federal L23E STP URBANIZED AREAS $3,840,000
333 10/15/12 2014 FHWA 8 87093 CLI CLI SR 28 0.00
Resurface and perform pavement repair to SR 28 in Clinton County Primary
Work Category: Minor Rehabilitation - Pavement Gnrl Sys Termini: CLI SR 28:
from SLM 0.00 to 18.16
ODOT SPONSORING
AGENCY
CO Air Quality
Exempt18 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $4,000,000 $0 $5,555,000 $0 $5,555,000 2012AM08ID01381FDCO
333 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $1,000,000
333 CO CO Engr 2014 LABR State L25E STP RURAL <5K $4,000
333 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $40,000
333 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $10,000
333 CO CO Engr 2014 LABR Federal L25E STP RURAL <5K $400,000
333 CO CO Engr 2014 LABR State 002 State Funds (S,O) $100,000
334 07/01/11 2013 FHWA 8 87172 CLI CLI US 68 14.41
Replace bridge CLI-68-1443 (SFN 1401173) over Lytle Creek in the City of
Wilmington. Primary Work Category: Bridge Replacement Termini: On US 68
from 0.28 mi. to 0.33 mi. north of the southern intersection with SR 134.
DISTRICT 8 PRODUCTION 0 RW Acquis 2014 4PS7 State $40,000 $0 $40,000 $16,286 $1,113,786 2012stipID2261STAC
ODOT 2014-2017 STIP Page 115
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
335 07/01/11 2013 FHWA 8 87375 OKI HAM HAM US 50 29.75
Project will include access management improvements along Wooster Pike (US-
50) including a new access road, closing several driveways, and cul-de-sac'ing of
intersecting streets. Improvements along Wooster Pike (US-50) will also include
sidewalks, curb an Primary Work Category: Section Improvement Termini:
From the intersection of Meadowlark Drive & Wooster Pike (US-50) to the
Mariemont corp. line on Wooster Pike (US-50).
Fairfax, Village of 0 RW Acquis 2012 4TB7 Federal L400 CMAQ $863,200 $0 $1,079,000 $0 $2,604,270 2012stipID2477FDAC
335 RW Acquis 2012 LNTP Local Match LNTP Non Traditional Local Match $215,800
336 07/01/11 2014 FHWA 8 87399 OKI WARHAM/WAR IR71
19.41/0.00 Gore Ext
Project will improve separation of mainline I-71 traffic from the NB/SB exit ramp
traffic by extending the ramp gores. Gores will be extended using a physical
barrier. Primary Work Category: Interchange, Reconstruction Termini: NB
exit ramp: 3000 LF west of the ramp diverge from I-71 to the diverge. SB exit
ramp: From Mason-Montg. Rd. to 3000 LF east.
WARREN COUNTY
ENGINEER1 CO CO Engr 2014 LABR Federal L23E STP URBANIZED AREAS $260,000 $0 $3,575,000 $0 $3,575,000 2012stipID2504FDCO
336 CO CO Engr 2014 LABR Local Match 002 Local Match $65,000
336 CO CO Contr 2014 4TA7 Federal L230 URBANIZED AREAS $2,600,000
336 CO CO Contr 2014 4BG7 Local Match 002 Local Match $650,000
337 07/01/11 2013 FHWA 8 87761 OKI CLE CLE SR 28 5.01
Widen for two way left turn lane, left turn lanes at intersections, from Branch
Hill Guinea Pike to Smith Road Primary Work Category: Turn Lane Addition
Termini: 0.05 miles east of Branch Hill Guinea Pike to 0.06 miles east of Smith
Road
ODOT SPONSORING
AGENCY1 RW Acquis 2012 4BC7 State 002 State Funds (S,O) $30,000 $0 $300,000 $28,957 $2,198,957 2012stipID2225FDAC
337 RW Acquis 2012 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $270,000
338 07/01/11 2013 FHWA 8 87763 OKI HAMHAM/CLE SR 125
5.41/0.00
Access management and minor traffic control improvements. Primary Work
Category: Section Improvement Termini: Five Mile Road to the County Line in
Hamilton County and county line to Independence/Hopper Hill in Clermont
County.
ODOT SPONSORING
AGENCY2 RW Acquis 2012 4HJ7 Federal LS30 HIGHWAY SAFETY IMP PROG $2,116,800 $0 $2,352,000 $234,492 $4,238,192 2012stipID2482FDAC
338 RW Acquis 2012 4BC7 State 002 State Funds (S,O) $235,200
339 07/01/11 2013 FHWA 8 88135 OKI HAM HAM GE Parkway
add local roadway connection on east side of IR75, aka GE parkway. Provide
southbound IR75 ramp to GE Parkway from Glendale Milford Road. (phase 2 TTV)
Primary Work Category: New Construction Termini: Shepherd Lane to Glendale
Milford Road (phase 2)
ODOT SPONSORING
AGENCY
CO Air Quality
Nonexempt0 PE Dtl Dsgn 2012 4BD7 State 002 State Funds (S,O) $100,000 $0 $500,000 $0 $24,210,000 2012stipID2375FDDD
339 PE Dtl Dsgn 2012 4BK7 Federal $400,000
340 07/01/11 2013 FHWA 8 88788 OKI HAMHAM CR 71/CR 73
1.28/1.44
Project includes the realignment of Blue Rock Rd. at the north intersection with
Cheviot Rd and addition of left-turn lanes on Cheviot Rd. at the intersection;
resurfacing of Cheviot Rd.; and reconfiguring the lanes on Cheviot at the south
intersection wi Primary Work Category: Intersection Improvement Termini:
Cheviot Road: from the south intersection with Blue Rock Rd. to Galbraith Rd.
HAMILTON COUNTY
ENGINEER1 RW Acquis 2012 4TA7 Federal L23E STP URBANIZED AREAS $800,000 $0 $1,000,000 $0 $5,126,500 2012stipID2368FDAC
340 RW Acquis 2012 LNTP Local Match LNTP Non Traditional Local Match $200,000
341 10/15/12 2013 FHWA 8 89068 OKI HAM HAM IR 75 0.22
Reconstruction of I-75 from Ohio River through the Western Hills Viaduct. Brent
Spence Bridge Detailed Design, RW, and Construction Phase Project (Ohio only).
September 2012 Programmatic Work is for R/W plan development and
Acquisition Services. Primary Work Category: Major Reconstruction Termini:
From the OH/KY State Line to the 3.00+/- Mile Marker
ODOT SPONSORING
AGENCY3 PE Dtl Dsgn 2013 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $3,200,000 $4,000,000 $58,243,000 $4,003,800 $1,108,000,650 2012AM08ID01366FDPE
341 PE Dtl Dsgn 2013 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $1,600,000
341 PE Dtl Dsgn 2013 4BD7 State 002 State Funds (S,O) $800,000
341 PE Dtl Dsgn 2013 4BD7 State 002 State Funds (S,O) $400,000
341 PE Dtl Dsgn 2013 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $4,800,000
341 PE Dtl Dsgn 2013 4BD7 State 002 State Funds (S,O) $1,200,000
342 10/15/12 2013 FHWA 8 89068 OKI HAM HAM IR 75 0.22
Reconstruction of I-75 from Ohio River through the Western Hills Viaduct. Brent
Spence Bridge Detailed Design, RW, and Construction Phase Project (Ohio only).
September 2012 Programmatic Work is for R/W plan development and
Acquisition Services. Primary Work Category: Major Reconstruction Termini:
From the OH/KY State Line to the 3.00+/- Mile Marker
ODOT SPONSORING
AGENCY3 RW Acquis 2013 4BD7 State $17,000,000 $3,800 $92,855,650 $4,003,800 $1,108,000,650 2012AM08ID01366FDRW
342 RW Acquis 2013 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $6,160,000
342 RW Acquis 2013 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $3,692,800
342 RW Acquis 2013 4BD7 State $3,000,000
342 RW Acquis 2013 4BD7 State 002 State Funds (S,O) $1,540,000
342 RW Acquis 2013 4BD7 State 002 State Funds (S,O) $923,200
342 RW Acquis 2013 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $198,050
342 RW Acquis 2013 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $2,000,000
342 RW Acquis 2013 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $1,853,000
342 RW Acquis 2013 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $1,294,000
342 RW RW Serv 2013 4BK7 Federal $131,200
342 RW RW Serv 2013 4BK7 Federal $96,000
342 RW RW Serv 2013 4BD7 State 002 State Funds (S,O) $32,800
342 RW RW Serv 2013 4BD7 State 002 State Funds (S,O) $24,000
342 RW Utl Remb 2014 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $10,280,000
342 RW Utl Remb 2014 4BD7 State 002 State Funds (S,O) $2,570,000
342 RW Utl Remb 2015 4BK7 Federal $1,128,000
342 RW Utl Remb 2013 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $400,000
342 RW Utl Remb 2015 4BD7 State 002 State Funds (S,O) $282,000
342 RW Utl Remb 2013 4BD7 State 002 State Funds (S,O) $100,000
343 07/01/11 2013 FHWA 8 89179 OKI WAR
WAR
MasonMont/Bethany
Roundabout
Project involves improving the intersection by constructing a two-lane
roundabout with two lane approaches and departures, curb and gutter, storm
sewers, bike path, sidewalk, a culvert replacement, and necessary utility
relocation. Primary Work Category: Intersection Improvement Termini:
Intersection of Bethany & Mason-Montgomery Roads: 750' on all four approaches
to the intersection.
MASON 1 RW Acquis 2012 4TB7 Federal L40E CMAQ $150,000 $0 $250,000 $0 $2,293,000 2012stipID2515FDAC
ODOT 2014-2017 STIP Page 116
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
343 RW Acquis 2012 LNTP Local Match LNTP Non Traditional Local Match $100,000
344 07/01/11 2013 FHWA 8 89182 OKI HAM HAM US 22/SR 3 15.20
Project includes the addition of auxiliary turn lanes, sidewalk along the east side
of Montgomery Road, and signing and traffic signal modifications. Primary
Work Category: Turn Lane Addition Termini: Montgomery Rd: Pfeiffer Rd to
Bethesda North Hospital main access; Pfeiffer Rd: approx. 1 mi W of
Montgomery Rd to Montgomery Rd
MONTGOMERY 0 RW Acquis 2013 4TB7 Federal L40E CMAQ $232,122 $0 $290,152 $0 $858,001 2012stipID2460FDAC
344 RW Acquis 2013 LNTP Local Match LNTP Non Traditional Local Match $58,030
345 07/01/11 2013 FHWA 8 89308 OKI BUTBUT CR 113 3.20 Lib-
Fairfield Rd
Project includes widening of Liberty Fairfield Road to connect two previously
federally funded projects that are complete at the north and south ends of the
proposed improvements. Improvements include replacement of a bridge size
CMP culvert with a concre Primary Work Category: Widening Termini:
Liberty-Fairfield Road: from 0.28 miles N of SR-4 to 0.17 miles S of the Great
Miami River.
BUTLER COUNTY
ENGINEER1 RW Acquis 2013 4TA7 Federal L23E STP URBANIZED AREAS $390,000 $0 $600,000 $0 $3,169,200 2012stipID2175FDAC
345 RW Acquis 2013 LNTP Local Match LNTP Non Traditional Local Match $210,000
346 01/17/13 2013 FHWA 8 89905 OKI HAM HAM SR 264 8.49
Widen Westbourne Drive to provide dual left turn lanes to go north on SR264
and widen southbound SR-264 to provide a right turn lane at Westbourne, which
will extend thru the intersection of Lawrence Road Primary Work Category:
Intersection Improvement Termini: 0.1 miles north of Lawerence Road (slm
8.59) continuing south to Westbourne Drive (slm 8.64)
ODOT SPONSORING
AGENCY0.16 PE Dtl Dsgn 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $29,819 $270,397 $304,529 $270,397 $2,186,529 2012AM09ID1614FDPE
346 PE Dtl Dsgn 2013 4BC7 State $3,313
347 07/01/11 2013 FHWA 8 89910 OKI CLE CLE SR 125 4.12
Widen westbound SR-125 to provide a right turn lane at Bach Buxton; upgrade
the traffic signal at SR-125 & Back Buxton, prepare capacity analysis to determine
if an EB PROT-ONLY left can be provided at Bach Buxton, and provide dilemma
zone detection at Ba Primary Work Category: Intersection Improvement
Termini: from the intersection of SR-125 & Bach Buxton to 600' east of Bach
Buxton
ODOT SPONSORING
AGENCY0 RW Acquis 2012 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $120,600 $0 $166,000 $0 $625,800 2012stipID2217FDAC
347 RW Acquis 2012 4BC7 State 002 State Funds (S,O) $13,400
347 RW Labor 2012 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $28,800
347 RW Labor 2012 4BC7 State 002 State Funds (S,O) $3,200
348 10/15/12 2013 FHWA 8 90412 PREPRE CR18/TR150
1.55/1.35 Des-Bld
Project involves the replacement of the structurally deficient Bridge No. PRE-
CR18-0155 (SFN: 6836267), which carries California School Road (CR-18) over Four
Mile Creek and the replacement of structurally deficient Bridge No. PRE-TR 15-
0135 (SFN: 6839401 Primary Work Category: Bridge Replacement Termini: CR-
18: from county log point 1.51 to county log point 1.59; TR-150: from county log
point 1.31 to county log point 1.39
PREBLE COUNTY
ENGINEER0 PE Dtl Dsgn 2013 LNTP Local Match LNTP Non Traditional Local Match $100,000 $13,538 $113,538 $13,538 $1,273,538 2012AM08ID01383FDPE
349 10/13/11 2013 FHWA 8 90896 CLI CLI Wilmington SRTS
Add sidewalks along Nelson and Truesdell (SR-730). Primary Work Category:
Add Sidewalks Termini: Nelson - from Truesdell to Moble Home Park.
Truesdell - from Nelson to Timber Glen.
Wilmington, City of 0 PE Dtl Dsgn 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $21,000 $0 $60,000 $0 $325,780 2012AM03ID0200FDPEED
349 PE Env PE 2012 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $39,000
350 07/12/12 2013 FHWA 8 91060 OKI HAM HAM CR 4 3.96
Widen Fields Ertel Road to provide a right turn lane to northbound I-71, restripe
Fields Ertel and Mason Montgomery intersection, widen Gregory for an
additional northbound lane and restripe the Gregory and Fields Ertel
intersection. Apply access managem Primary Work Category: Section
Improvement Termini: 0.26 miles south of the hamilton/warren county line to
0.28 miles north of the county line
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $286,160 $0 $963,500 $0 $5,932,900 2012AM07ID1072FDPE
350 PE Dtl Dsgn 2013 4BC7 State 002 State Funds (S,O) $31,796
350 PE Env PE 2012 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $580,991
350 PE Env PE 2012 4BC7 State 002 State Funds (S,O) $64,555
351 01/13/12 2013 FHWA 8 91066 OKI HAM HAM IR 71 12.44
NB IR-71 Ramps & US-22• Restripe and widen US-22 to provide a WB right turn
lane on US-22 at the NB IR-71 entrance ramp.• Restripe US-22 to provide two WB
through lanes through the IR-71 interchange. • Restripe US-22 to provide EB dual
left turn lanes at Primary Work Category: Intersection Improvement
Termini: IR-71: From 650' S of US-22 to 850' N of US-22; US-22: from 350' W of SB IR-
71 Ramps to 850' E of NB IR-71 Ramps
ODOT SPONSORING
AGENCY1 PE Dtl Dsgn 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $187,185 $0 $630,251 $0 $4,066,351 2012AM04ID0484FDPE
351 PE Dtl Dsgn 2013 4BC7 State 002 State Funds (S,O) $20,798
351 PE PE Engr 2012 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $380,041
351 PE PE Engr 2012 4BC7 State 002 State Funds (S,O) $42,227
352 01/13/12 2013 FHWA 8 91066 OKI HAM HAM IR 71 12.44
NB IR-71 Ramps & US-22• Restripe and widen US-22 to provide a WB right turn
lane on US-22 at the NB IR-71 entrance ramp.• Restripe US-22 to provide two WB
through lanes through the IR-71 interchange. • Restripe US-22 to provide EB dual
left turn lanes at Primary Work Category: Intersection Improvement
Termini: IR-71: From 650' S of US-22 to 850' N of US-22; US-22: from 350' W of SB IR-
71 Ramps to 850' E of NB IR-71 Ramps
ODOT SPONSORING
AGENCY1 RW Acquis 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $417,690 $0 $663,000 $0 $4,066,351 2012AM04ID0484FDRW
352 RW Acquis 2013 4BC7 State 002 State Funds (S,O) $46,410
352 RW Labor 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $179,010
352 RW Labor 2013 4BC7 State 002 State Funds (S,O) $19,890
353 10/13/11 2014 FHWA 8 91763 OKI CLE CLE SR 133 12.43Replace Bridge Size Culvert CLE-133-12.43. Primary Work Category: Culvert
Construction/Reconstr/Repair Termini: CLE 133: 0.97 miles south of SR 125.
ODOT SPONSORING
AGENCY0 CO CO Engr 2014 LABR Federal L25E STP RURAL <5K $53,360 $0 $733,700 $0 $733,700 2012AM03ID0198FDCO
353 CO CO Engr 2014 LABR State $13,340
353 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $533,600
353 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $133,400
354 10/15/12 2013 FHWA 8 91910 OKI HAM HAM IR 71 17.17
Rehabilitate Bridge HAM-71-1717 (COrnell Rd. Over I-71) by replacing the deck,
eliminating the hinge, and perfroming other related rehabilitation work.
Primary Work Category: Bridge Deck Replacement Termini: I-71: 0.35 mils
south of I-275.
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2013 4PF7 Federal $202,500 $0 $226,000 $0 $3,163,000 2012AM08ID01368FDPE
354 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $22,500
ODOT 2014-2017 STIP Page 117
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
355 01/13/12 2013 FHWA 8 92554 MVRPC GRE GRE CR 36 0.27
Reconfigure lanes on Inidan Ripple Road as they approach the ramps for IR675.
Improve signal timing and phasing at the ramps. Primary Work Category:
Intersection Improvement Termini: 0.27 miles west of IR675 to 0.1 miles east
of IR675
BEAVERCREEK 0 PE Env PE 2012 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $57,038 $0 $63,376 $0 $63,376 2012AM04ID0497FDPEEN
355 PE Env PE 2012 4BG7 Local Match 002 Local Match $6,338
356 07/12/12 2013 FHWA 8 92555 OKI HAM HAM US 27 14.15
Widen northbound US27 for a third lane ending as a right turn lane at Struble.
Part 1 PID 92555; Part 2 PID 84437, to be sold as one construction project.
Primary Work Category: Widening Termini: 0.07 miles north of IR275 to Struble
Road (0.61 miles north of IR275)
ODOT SPONSORING
AGENCY1 RW Acquis 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $630,000 $0 $752,450 $169,331 $2,581,736 2012AM07ID1080FDRW
356 RW Acquis 2013 4BC7 State 002 State Funds (S,O) $70,000
356 RW RW Serv 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $47,205
356 RW RW Serv 2013 4BC7 State 002 State Funds (S,O) $5,245
357 10/15/12 2013 FHWA 8 92556 OKI HAM HAM US 127 10.07
Provided median from 10.07-10.10 to eliminate lefts at Kroger drive and
construct a left turn lane for northbound US127 to Kemper Avenue Primary
Work Category: Intersection Improvement Termini: 0.15 miles south of SR126
to 0.21 miles north of SR126
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2013 4HJ7 Federal $22,063 $0 $74,285 $0 $519,085 2012AM08ID01370FDPE
357 PE Dtl Dsgn 2013 4BC7 State 002 State Funds (S,O) $2,451
357 PE Env PE 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $44,794
357 PE Env PE 2013 4BC7 State 002 State Funds (S,O) $4,977
358 10/15/12 2013 FHWA 8 93130 OKI BUTBUT TR 134 7.50 Yankee
Rd
Project involves total roadway reconstruction and widening from two to three
lanes, minor realignment of the roadway, addition of curb and gutter and storm
water system, signage, and pavement markings. Primary Work Category:
Major Rehabilitation Termini: Yankee Road (TR-134): from Todhunter Road to
MADE Industrial Drive
Middletown, City of 0 CO CO Contr 2013 5DV7 Federal L24E STP FLEXIBLE $675,120 $0 $1,290,740 $0 $1,290,740 2012AM08ID01357FDCO
358 CO CO Contr 2013 LNTP Local Match LNTP Non Traditional Local Match $329,500
358 CO CO Contr 2013 LNTP Local Match LNTP Non Traditional Local Match $168,780
358 CO CO Engr 2013 LNTP Local Match LNTP Non Traditional Local Match $117,340
359 10/15/12 2013 FHWA 8 93531 OKI HAMHAM Wyoming SRTS
2012 Compton Rd
Add sidewalk along Compton Road, improve intersection crosswalks with curb
ramps, signing, and pavement markings. Primary Work Category: Add
Sidewalks Termini: Compton Road: between Hilltop and Poage Farm Road
District 8 Planning 0 PE Dtl Dsgn 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $25,000 $0 $50,000 $0 $232,000 2012AM08ID01372FDPE
359 PE Env PE 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $25,000
360 10/15/12 2013 FHWA 8 93532 MVRPC GREGRE Sugarcreek SRTS 12
Feedwire
Extend existing path from Intermediate School south to existing path by water
tower on east side of Upper Bellbrook Road to connect to school sidewalk;
Extend path (current SRTS Infra. Proj.) from Middle School drive to Eden
Meadows Way on south side of F Primary Work Category: Add Sidewalks
Termini: Upper Bellbrook Rd. from existing path to School. Feedwire Rd. from
existing path to Eden Meadows Way
District 8 Planning 0 PE Dtl Dsgn 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $10,000 $0 $49,000 $0 $460,000 2012AM08ID01350FDPE
360 PE Env PE 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $39,000
361 10/15/12 2013 FHWA 8 93533 OKI HAMHAM Mariemont SRTS
HAWK Signal
HAWK Signal on Plainville Road at mid-block crossing in front of school entrance;
New School signing on streets surrounding school; and bike racks at the school.
Install missing sidewalk connection on Wooster Pike near Park Ave. Upgrade
existing asphalt s Primary Work Category: Signals Termini: Plainville Road
north of US-50; Wooster Pike from west to east corp limit; Murray Ave. from
Beech St. to Oak St.
District 8 Planning 0 PE Dtl Dsgn 2014 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $12,500 $0 $58,940 $0 $392,345 2012AM08ID01373FDPE
361 PE Env PE 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $45,440
362 10/15/12 2013 FHWA 8 93536 MVRPC GREGRE Yellow Spr. SRTS
Sidewalks
Sidewalks, pavement markings and signing at various locations near the schools
inside Yellow Springs. Primary Work Category: Add Sidewalks Termini:
Sidewalks at various locations on local streets within Yellow Springs, and
upgrade of signing.
0 0 PE Dtl Dsgn 2014 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $8,000 $0 $33,000 $0 $308,000 2012AM08ID01351FDPE
362 PE PE Engr 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $25,000
363 10/15/12 2013 FHWA 8 93593 OKI BUT BUT SR 129 13.65
Realign offset intersection of SR129/SR177/Eaton Avenue. Construct new signal.
Primary Work Category: Intersection Improvement Termini: 300' south of
SR177 to 500' west of SR177
Hamilton, City of 0 PE Dtl Dsgn 2014 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $147,980 $0 $498,250 $0 $3,850,910 2012AM08ID01358FDPE
363 PE Dtl Dsgn 2014 4BG7 Local Match 002 Local Match $16,442
363 PE Env PE 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $300,445
363 PE Env PE 2013 4BG7 Local Match 002 Local Match $33,383
364 10/15/12 2013 FHWA 8 93595 OKI BUT BUT SR 128 9.65
Improve intersection by adding southbound dual lefts and northbound right turn
lane. Intersection local street names are MLK and High St. Primary Work
Category: Intersection Improvement Termini: US127 to 500' east of US127.
Hamilton, City of 0 PE Dtl Dsgn 2014 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $158,226 $0 $532,750 $0 $2,933,131 2012AM08ID01359FDPE
364 PE Dtl Dsgn 2014 4BG7 Local Match 002 Local Match $17,581
364 PE Env PE 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $321,249
364 PE Env PE 2013 4BG7 Local Match 002 Local Match $35,694
365 10/15/12 2014 FHWA 8 93938 OKI WAR WAR IR 71 0.07
Widen exit ramp to provide for dual right turn lanes, improve cross slope from
Ramp E onto Mason Montgomery Road, may require reconstruction of portion of
the ramp. Primary Work Category: Intersection Improvement Termini:
Mason Montgomery Road to beginning of Exit Ramp E
WARREN COUNTY
ENGINEER0 CO CO Contr 2014 4TA7 Federal L23E STP URBANIZED AREAS $1,000,000 $0 $1,375,000 $106,820 $1,481,820 2012AM08ID01380FDCO
365 CO CO Contr 2014 4BC7 State 002 State Funds (S,O) $250,000
365 CO CO Engr 2014 LABR Federal L23E STP URBANIZED AREAS $100,000
365 CO CO Engr 2014 4BC7 State 002 State Funds (S,O) $25,000
366 01/17/13 2013 FHWA 8 94494 OKI WARWAR SR 48 8.80 Mason
Morrow Mill
Project will add exclusive left turn lanes on both approaches of Mason Morrow
Millgrove Road, add an additional eastbound thru/right lane to the west
approach of Mason Morrow Millgrove Road, add an additional left turn lane on
the north approach of State Primary Work Category: Intersection
Improvement Termini: Intersection of SR-48 and Mason Morrow Millgrove
Road
WARREN COUNTY
ENGINEER0.7 PE Dtl Dsgn 2014 4HJ7 Federal MS30 HSIP - HWY SAFETY IMPR $126,000 $0 $220,000 $0 $3,390,000 2012AM09ID1623FDPE
ODOT 2014-2017 STIP Page 118
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
366 PE Dtl Dsgn 2014 4BC7 State 002 State Funds (S,O) $14,000
366 PE PE Engr 2013 4HJ7 Federal MS30 HSIP - HWY SAFETY IMPR $72,000
366 PE PE Engr 2013 4BC7 State 002 State Funds (S,O) $8,000
367 01/17/13 2013 FHWA 8 94520 OKI WARWAR HRRR CR 23/7
0.43/3.74
Pave with skid treatment on Foster Maineville on curves between Butterworth
and Southern Pines, provide lighting at Foster Maineville and Butterworth and
provided optical speed bar markings on Wilmington Road east of Nixon Camp
Road prior to curves. Primary Work Category: Resurfacing (safety related)
Termini: Foster Maineville Road from Butterworth to Soutern Pines (0.43 to 0.58)
and Wlimington Road from Nixon Camp to curves (3.74-3.81)
WARREN COUNTY
ENGINEER0.15 CO CO Contr 2013 4RS7 Federal LS2E HSIP - HI RISK RURAL $315,000 $0 $385,000 $16,207 $408,690 2012AM09ID1624FDCO
367 CO CO Contr 2013 LNTP Local Match 002 Local Match $35,000
367 CO CO Engr 2013 4RS7 Federal LS2E HSIP - HI RISK RURAL $31,500
367 CO CO Engr 2013 LNTP Local Match LNTP Non Traditional Local Match $3,500
368 01/17/13 2014 FHWA 8 94628 OKI HAM HAM IR 71 14.33
Provide an auxiliary lane for southbound IR71 from the Pfeiffer on ramp to the
SR126 off ramp. Requires extension of a culvert and moving of a short section of
noise wall. Primary Work Category: Spot Safety Termini: 14.33 to 15.63;
beginning of exit ramp for SR126 to end of exit ramp at Pfeiffer Road
southbound
ODOT SPONSORING
AGENCY1.3 CO CO Engr 2014 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $180,000 $0 $2,700,000 $109,561 $3,174,561 2012AM09ID1619FDCO
368 CO CO Engr 2014 4BC7 State 002 State Funds (S,O) $20,000
368 CO CO Contr 2014 4DP7 Federal Pass-Th $2,500,000
369 01/17/13 2014 FHWA 8 94628 OKI HAM HAM IR 71 14.33
Provide an auxiliary lane for southbound IR71 from the Pfeiffer on ramp to the
SR126 off ramp. Requires extension of a culvert and moving of a short section of
noise wall. Primary Work Category: Spot Safety Termini: 14.33 to 15.63;
beginning of exit ramp for SR126 to end of exit ramp at Pfeiffer Road
southbound
ODOT SPONSORING
AGENCY1.3 PE Dtl Dsgn 2014 4DP7 Federal Pass-Th $365,000 $109,561 $474,561 $109,561 $3,174,561 2012AM09ID1619FDPE
370 01/17/13 2013 FHWA 8 94741 OKI HAM HAM IR 71 6.86
Widen northbound IR-71 to provide three continuous through lanes through the
SR-562 interchange. This widening will result in one additional lane from SR-562
to Red Bank Expressway. Actual pavement widening will occur from
approximately SLM 8.54-9.60 +/-. Primary Work Category: Widening Termini:
0.1 mi south of Williams Avenue Overpass to 0.04 mi north of Red Bank (SLM 6.86-
9.74)
ODOT SPONSORING
AGENCY2.88 PE Env PE 2013 4HJ7 Federal MS30 HSIP - HWY SAFETY IMPR $225,000 $0 $500,000 $0 $12,270,000 2012AM09ID1620FDPE
370 PE Env PE 2013 4BC7 State 002 State Funds (S,O) $25,000
370 PE PE Engr 2013 4HJ7 Federal MS30 HSIP - HWY SAFETY IMPR $225,000
370 PE PE Engr 2013 4BC7 State 002 State Funds (S,O) $25,000
371 01/17/13 2013 FHWA 8 94754 OKI HAM HAM SR 126 19.40
Signalize the intersection of SR-126 and the southbound exit ramp from I-71
while maintaining freeflow connections from eastbound SR-126 to I-71.
Primary Work Category: Intersection Improvement Termini: 0.1 mi west of
Pedestrian bridge overpass to the exit ramp to northbound I-71 (SLM 19.40-
19.76)
ODOT SPONSORING
AGENCY0.36 PE Dtl Dsgn 2014 UNFU Not Determined 002 State Funds (S,O) $185,000 $0 $485,000 $0 $5,835,000 2012AM09ID1621FDPE
371 PE Env PE 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $270,000
371 PE Env PE 2013 4BC7 State 002 State Funds (S,O) $30,000
372 04/12/12 2013 FHWA 9 13234 SCI SCI SR 73 1.10
REPLACE THE EXISTING DEFICIENT STRUCTURE NO 7302193 WITH A NEW
STRUCTURE AND ANY NECESSARY APPROACH WORK. BRIDGE SPANS RARDEN
CREEK. Primary Work Category: Bridge Replacement Termini: .01 MI. W OF
RARDEN WCL PT. 1
DISTRICT 9 PRODUCTION 0 RW Acquis 2012 4PF7 Federal L25E STP RURAL <5K $4,000 $0 $5,000 $154,039 $1,250,039 2012AM06ID0811FDRW
373 01/17/13 2013 FHWA 9 19415 SCISCI SR 823 6.67
PortsByPass Ph 1
Project Termini: Intersection of Lucasville-Minford Rd & Flowers-Ison east to
SR335 & terminating in the vicinity of the Scioto County Airport. It is proposed to
construct a new 4-lane limited access highway/bypass of Portsmouth, Ohio.
Phase 1 shall be co Primary Work Category: Bypass Termini: Intersection of
Lucasville-Minford Rd & Flowers-Ison east to SR335 & terminating in the vicinity
of the Scioto County Airport.
DISTRICT 9 PRODUCTION 3.55 OTH Oth Remb 2013 4D27 Federal L980 APPALACHIAN HWYS DEV $2,100,000 $0 $3,300,000 $49,797,567 $152,426,976 2012AM09ID1659FDOTH
373 OTH Oth Remb 2013 4BD7 State $1,200,000
374 01/17/13 2013 FHWA 9 19415 SCISCI SR 823 6.67
PortsByPass Ph 1
Project Termini: Intersection of Lucasville-Minford Rd & Flowers-Ison east to
SR335 & terminating in the vicinity of the Scioto County Airport. It is proposed to
construct a new 4-lane limited access highway/bypass of Portsmouth, Ohio.
Phase 1 shall be co Primary Work Category: Bypass Termini: Intersection of
Lucasville-Minford Rd & Flowers-Ison east to SR335 & terminating in the vicinity
of the Scioto County Airport.
DISTRICT 9 PRODUCTION 3.55 PE Dtl Dsgn 2013 4D27 Federal H980 APPALACHIAN HWYS DEV $2,448,000 $39,514,249 $55,652,399 $49,797,567 $152,426,976 2012AM09ID1659FDPE
374 PE Dtl Dsgn 2013 4D27 Federal H980 APPALACHIAN HWYS DEV $1,150,494
374 PE Dtl Dsgn 2013 4BD7 State 002 State Funds (S,O) $612,000
374 PE Dtl Dsgn 2014 TRAC Not Determined $578,239
374 PE Dtl Dsgn 2013 4D27 Federal H980 APPALACHIAN HWYS DEV $320,000
374 PE Dtl Dsgn 2013 4BD7 State 002 State Funds (S,O) $287,623
374 PE Dtl Dsgn 2013 4D27 Federal L980 APPALACHIAN HWYS DEV $160,000
374 PE Dtl Dsgn 2014 TRAC Not Determined 002 State Funds (S,O) $144,560
374 PE Dtl Dsgn 2013 4BD7 State 002 State Funds (S,O) $80,000
374 PE Dtl Dsgn 2013 4BD7 State 002 State Funds (S,O) $40,000
374 PE Dtl Dsgn 2013 4D27 Federal H980 APPALACHIAN HWYS DEV $32,000
374 PE Dtl Dsgn 2013 4BD7 State 002 State Funds (S,O) $8,000
375 04/11/13 2013 FHWA 9 19415 SCISCI SR 823 6.67
PortsByPass Ph 1
Project Termini: Intersection of Lucasville-Minford Rd & Flowers-Ison east to
SR335 & terminating in the vicinity of the Scioto County Airport. It is proposed to
construct a new 4-lane limited access highway/bypass of Portsmouth, Ohio.
Phase 1 shall be co Primary Work Category: Bypass Termini: Intersection of
Lucasville-Minford Rd & Flowers-Ison east to SR335 & terminating in the vicinity
of the Scioto County Airport.
DISTRICT 9 PRODUCTION 3.55 RW Acquis 2014 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $2,400,000 $14,503,668 $37,597,530 $54,029,917 $167,840,596 2012AM11ID1910FDRW
375 RW Acquis 2013 4D27 Federal L980 APPALACHIAN HWYS DEV $2,160,000
375 RW Acquis 2013 4BK7 Federal L05E NATIONAL HIGHWAY SYSTEM $997,324
375 RW Acquis 2014 4BD7 State 002 State Funds (S,O) $600,000
ODOT 2014-2017 STIP Page 119
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
375 RW Acquis 2013 4D27 Federal L980 APPALACHIAN HWYS DEV $560,000
375 RW Acquis 2013 4BD7 State 002 State Funds (S,O) $540,000
375 RW Acquis 2013 4BD7 State 002 State Funds (S,O) $500,000
375 RW Acquis 2013 4BD7 State 002 State Funds (S,O) $249,331
375 RW Acquis 2013 4BD7 State 002 State Funds (S,O) $140,000
375 RW RW Serv 2013 4D27 Federal H980 APPALACHIAN HWYS DEV $575,840
375 RW RW Serv 2013 4D27 Federal L980 APPALACHIAN HWYS DEV $320,000
375 RW RW Serv 2013 4BD7 State 002 State Funds (S,O) $143,960
375 RW RW Serv 2013 4D27 Federal H980 APPALACHIAN HWYS DEV $116,800
375 RW RW Serv 2013 4D27 Federal L980 APPALACHIAN HWYS DEV $104,960
375 RW RW Serv 2013 4D27 Federal L980 APPALACHIAN HWYS DEV $82,704
375 RW RW Serv 2013 4BD7 State 002 State Funds (S,O) $80,000
375 RW RW Serv 2013 4BD7 State 002 State Funds (S,O) $29,200
375 RW RW Serv 2013 4BD7 State 002 State Funds (S,O) $26,240
375 RW RW Serv 2013 4BD7 State 002 State Funds (S,O) $20,676
375 RW Utl Remb 2013 4D27 Federal L980 APPALACHIAN HWYS DEV $680,000
375 RW Utl Remb 2013 4D27 Federal L980 APPALACHIAN HWYS DEV $320,000
375 RW Utl Remb 2013 4BD7 State 002 State Funds (S,O) $170,000
375 RW Utl Remb 2013 4D27 Federal L980 APPALACHIAN HWYS DEV $155,030
375 RW Utl Remb 2013 4BD7 State 002 State Funds (S,O) $80,000
375 RW Utl Remb 2013 4BD7 State 002 State Funds (S,O) $38,757
376 01/17/13 2013 FHWA 9 79221 PIKPIK SR 220 6.98
WaverlyConnector
Beginning at the intersection of US23 and current east-west road between US23
& Second St, proceed NW intersecting w/SR104 & terminate @ SR220. And being
more fully described as follows: Construct a new segment of SR 220 roadway
along the south west side Primary Work Category: New Construction
Termini: Begin @ intersection US23 and current east-west road between US23 &
Second St, proceed NW intersecting w/SR104 & terminate @ SR220
WAVERLY 0 PE Dtl Dsgn 2013 4R47 Federal H660 SECTION 117 DEMO ID PROJECTS $169,771 $1,051,916 $1,222,988 $1,051,916 $15,313,233 2012AM09ID1645FDPE
377 01/17/13 2013 FHWA 9 79221 PIKPIK SR 220 6.98
WaverlyConnector
Beginning at the intersection of US23 and current east-west road between US23
& Second St, proceed NW intersecting w/SR104 & terminate @ SR220. And being
more fully described as follows: Construct a new segment of SR 220 roadway
along the south west side Primary Work Category: New Construction
Termini: Begin @ intersection US23 and current east-west road between US23 &
Second St, proceed NW intersecting w/SR104 & terminate @ SR220
WAVERLY 0 RW Acquis 2013 4R47 Federal HY10 Hi Priority Projects Sec 1702 "House" $295,000 $0 $926,569 $1,051,916 $15,313,233 2012AM09ID1645FDRW
377 RW Acquis 2013 4R47 Federal H660 SECTION 117 DEMO ID PROJECTS $230,155
377 RW Acquis 2013 4R47 Federal HY10 Hi Priority Projects Sec 1702 "House" $28,414
377 RW RW Serv 2013 4R47 Federal HY10 Hi Priority Projects Sec 1702 "House" $81,000
377 RW Utl Remb 2013 4R47 Federal HY10 Hi Priority Projects Sec 1702 "House" $292,000
378 04/12/12 2013 FHWA 9 81541 SCI SCI SR 140 4.94 Safety
It is proposed to correct the horizontal and vertical alignnment of the curve on
this section of highway. Primary Work Category: Realignment Termini: 4.94
miles NE from US52
ODOT SPONSORING
AGENCY0 RW Acquis 2012 4HJ7 Federal LS30 HIGHWAY SAFETY IMP PROG $22,500 $0 $110,000 $36,945 $1,377,877 2012AM06ID0815FDRW
378 RW Acquis 2012 4BC7 State 002 State Funds (S,O) $2,500
378 RW Utl Remb 2012 4HJ7 Federal LS30 HIGHWAY SAFETY IMP PROG $76,500
378 RW Utl Remb 2012 4BC7 State 002 State Funds (S,O) $8,500
379 04/12/12 2013 FHWA 9 83987 HIGHIG Hobart/Carl Smith
Drive 1
The services include preparation of construction contract plans, right of way
plans, right of way acquisition, and the construciton of Hobart/Smith Drive in
Highland County with a project length of approximately 7,100 feet. The design
will involve improv Primary Work Category: New Construction Termini:
Project begins at intersection of Hobart Dr. & US 62 and extends to the 7.30 mm
of SR 73.
HIGHLAND COUNTY
ENGINEER1 RW Acquis 2012 4D37 Federal L980 APPALACHIAN HWYS DEV $300,000 $0 $375,000 $380,738 $7,333,174 2012AM06ID0819FDRW
379 RW Acquis 2012 4BG7 Local Match 002 Local Match $75,000
380 01/17/13 2013 FHWA 9 84630 PIK PIK SR 220 7.05
It is proposed to resurface the existing SR220 highway with asphalt
concrete.Begin project @ Waverly west corp, head east and terminate at Shuster
Road (Zahan's Corner). CO CC PV Urban - plan splits Urban portion SLM 7.05 to
9.55, Waverly area. CO CC PV R Primary Work Category: Resurfacing, Undivided
System Termini: Begin project @ Waverly west corp, head east and terminate
at Shuster Road (Zahan's Corner).
ODOT SPONSORING
AGENCY6.46 PE PE Engr 2013 4PF7 Federal L25E STP RURAL <5K $5,200 $0 $9,500 $0 $1,116,256 2012AM09ID1646FDPE
380 PE PE Engr 2013 4PF7 Federal L25E STP RURAL <5K $1,600
380 PE PE Engr 2013 4PS7 State 002 State Funds (S,O) $1,300
381 01/17/13 2014 FHWA 9 84703 LAW LAW SR 141 8.43
Resurfacing of 2-Lane Highways. LAW-141-(8.43-16.47) Pave Thru Bridgs.4402308
LAW SR141 8.83 Intersect: Trib Of Dog Fork4402332 LAW SR141 9.21 Intersect: Trib
Of Dog Fork4402367 LAW SR141 11.57 Intersect: Trib Of Deloss Creek4402545 LAW
SR141 15.3 Interse Primary Work Category: Resurfacing, Undivided System
Termini: LAW-140-(0.00-1.68) & LAW-141-(8.43-16.47)
ODOT SPONSORING
AGENCY7.94 CO CO Engr 2014 LABR Federal L250 STP Rural <5,000 $1,038 $0 $1,132,383 $0 $1,133,383 2012AM09ID1642FDCO
381 CO CO Contr 2014 4PF7 Federal L250 STP Rural <5,000 $34,593
381 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $8,648
381 CO CO Contr 2014 4PF7 Federal L250 STP Rural <5,000 $844,928
381 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $211,232
381 CO CO Engr 2014 LABR Federal L250 STP Rural <5,000 $25,348
381 CO CO Engr 2014 LABR State 002 State Funds (S,O) $6,337
382 07/12/12 2014 FHWA 9 85678 HIGHIG CR 5/ CR 74 / T192
Intersect
It is proposed to improve the intersection of CR5 (Prospect Rd), CR74B (Pleasant
Rd), & TR192A (Main Rd) by vertical profile adjustments at the intersection to
meet 55 mph design standards and intersection and vertical sight distance
standards. Primary Work Category: Intersection Improvement Termini:
Marshal Twp, 1.23 mile east of SR125, intersections of CR5, CR74B, & T192A.
HIGHLAND COUNTY
ENGINEER1 CO CO Contr 2014 4HB7 Federal LS30 HIGHWAY SAFETY IMP PROG $539,786 $0 $742,206 $45,983 $789,189 2012AM07ID1101FDCO
382 CO CO Contr 2014 4BG7 Local Match 002 Local Match $134,947
382 CO CO Engr 2014 LABR Federal LS30 HIGHWAY SAFETY IMP PROG $53,979
ODOT 2014-2017 STIP Page 120
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
382 CO CO Engr 2014 LABR Local Match 002 Local Match $13,495
383 04/12/12 2013 FHWA 9 86867 ROSROS US 50 23.37
Safety/Paving
It is proposed to perform intersections improvment, safety corridor
improvement, and turn lane addition on US50 within the City of Chillicothe from
Elm Street to Bridge Street. Primary Work Category: Intersection Improvement
Termini: Elm Street to Bridge Street
Chillicothe, City of 1 RW Utl Remb 2012 4HJ7 Federal LS30 HIGHWAY SAFETY IMP PROG $18,000 $0 $20,000 $0 $1,980,762 2012AM06ID0825FDRW
383 RW Utl Remb 2012 4BG7 Local Match 002 Local Match $2,000
384 04/12/12 2013 FHWA 9 87181 PIKPIK SR 124 7.47 Brdg
Replacement
It is proposed to replace the deficient structure (SFN 6601200). Primary Work
Category: Bridge Replacement Termini: Located 1.03 mile east of Dry Bone
Road (CR8).
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2013 4PF7 Federal L25E STP RURAL <5K $64,000 $0 $166,000 $0 $738,000 2012AM06ID0826FDPE
384 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $16,000
384 PE Env PE 2012 4PF7 Federal L25E STP RURAL <5K $68,000
384 PE Env PE 2012 4PS7 State 002 State Funds (S,O) $17,000
385 07/01/11 2013 FHWA 9 87182 SCISCI SR 776 0.19 Brdg
Replacement
It is proposed to replace the deficient structure (SFN 7306210). Primary Work
Category: Bridge Replacement Termini: Project is 0.19 east of SR335.
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2013 4PF7 Federal L25E STP RURAL <5K $36,800 $0 $47,000 $0 $470,500 2012stipID2759FDDD
385 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $9,200
386 07/12/12 2013 FHWA 9 87206 ADAADA SR 41 0.96 Brdg
Replacement
It is proposed to replace the deficient structure SFN 0100633. Primary Work
Category: Bridge Replacement Termini: Project is 0.96 mile north of the Brown
County Line.
ODOT SPONSORING
AGENCY0 RW Acquis 2013 4PF7 Federal L25E STP RURAL <5K $4,000 $0 $5,000 $0 $276,600 2012AM07ID1109FDRW
387 04/12/12 2013 FHWA 9 87214 HIGHIG SR 753 16.75 Brdg
Replacemen
It is proposed to replace the defieicent structure, SFN 6304322. Primary Work
Category: Bridge Replacement Termini: 8.71 miles north of US50
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2013 4PF7 Federal L25E STP RURAL <5K $48,000 $0 $121,000 $0 $484,000 2012AM06ID0827FDPE
387 PE Dtl Dsgn 2013 4PS7 State $12,000
387 PE Env PE 2012 4PF7 Federal L25E STP RURAL <5K $48,000
387 PE Env PE 2012 4PS7 State 002 State Funds (S,O) $12,000
388 07/01/11 2013 FHWA 9 87217 LAWLAW SR 217 5.85 Brdg
Replacement
It is proposed to replace the deficient structure (SFN 4402979). Primary Work
Category: Bridge Replacement Termini: 8.85 miles east of SR141
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $20,400 $0 $102,000 $0 $1,435,300 2012stipID2683FDDD
388 PE Dtl Dsgn 2013 4PF7 Federal L25E STP RURAL <5K $81,600
389 07/01/11 2014 FHWA 9 87251 ADA ADA SR 41 0.00It is proposed to resurface the highway with asphalt concrete. Primary Work
Category: Resurfacing, Undivided System Termini: Brown County line to SR136.
ODOT SPONSORING
AGENCY7 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $946,540 $0 $1,301,492 $0 $1,302,492 2012stipID2558FDCO
389 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $236,635
389 CO CO Engr 2014 LABR Federal L25E STP RURAL <5K $94,654
389 CO CO Engr 2014 LABR State 002 State Funds (S,O) $23,663
390 07/01/11 2014 FHWA 9 87253 BROBRO US 52/US 68
4.31/41.01
It is proposed to resurface the highway with asphalt concrete. On US52, begin at
the west corp limit east thru Higginsport and terminate 0.85 mile east of TR255.
On US68, begin at the south corp limit of Fayetteville north thru the village and
terminate a Primary Work Category: Resurfacing, Undivided System Termini:
On US 52, begin at the west corp limit of Higginsport and terminate 0.85 mile
east of TR255 (Pisgah Hill Road).
ODOT SPONSORING
AGENCY11 CO CO Engr 2014 LABR Federal L25E STP RURAL <5K $87,450 $0 $2,202,433 $0 $2,203,433 2012stipID2607FDCO
390 CO CO Engr 2014 LABR State 002 State Funds (S,O) $21,862
390 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $1,674,497
390 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $418,624
391 07/01/11 2014 FHWA 9 88277 BROBRO US 52 19.44
Aberdeen SRTS
It is proposed to construct Phase 2 of the Aberdeen SRTS Shared Use Path
begining at Huntington Parkway, east to Elm Street. Primary Work Category:
Bikeways Termini: Along US52, begin @ Huntington Ave east and terminate at
Elm Street.
Aberdeen, Village of 1 CO CO Contr 2012 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $206,856 $0 $227,500 $18,624 $253,000 2012stipID2606FDCO
391 CO CO Engr 2012 LABR Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $20,644
392 07/01/11 2014 FHWA 9 88281 LAWLAW South Point SRTS
Project
It is proposed to construct sidewalks, curb ramps, school zone signage, and
pavement markings along the perimeter of the new elementary school along
Park, High, Seventh, and Washington. Primary Work Category: Add Sidewalks
Termini: Village of South Point
South Point, Village of 0 CO CO Engr 2012 LABR Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $15,300 $0 $168,300 $9,210 $184,600 2012stipID2696FDCO
392 CO CO Contr 2012 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $153,000
393 04/12/12 2013 FHWA 9 88720 HIG HIG SR 247 11.07It is proposed to replace the bridge deck on SFN 3603660 Primary Work
Category: Bridge Deck Replacement Termini: HIG SR247
ODOT SPONSORING
AGENCY0 PE Dtl Dsgn 2013 4PF7 Federal L1CE BRIDGE 85% ON/OFF SYSTEM $72,000 $0 $180,000 $0 $1,092,000 2012AM06ID0828FDPE
393 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $18,000
393 PE Env PE 2012 4PF7 Federal L25E STP RURAL <5K $72,000
393 PE Env PE 2012 4PS7 State 002 State Funds (S,O) $18,000
394 07/01/11 2014 FHWA 9 90837 BROBRO Mt. Orab SRTS
Sidewalk
It is proposed to construct sidewalks along Boyd road, Tri-County Road, Campus
Drive, Western Ave., and between Campus Drive and Western Ave. so that
children can safely walk and bike to and from school. Primary Work Category:
Add Sidewalks Termini: Mt. Orab, Western Brown Local School District
0 0 CO CO Contr 2012 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $158,054 $0 $173,854 $0 $199,354 2012stipID2586FDCO
394 CO CO Engr 2012 LABR Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $15,800
395 04/12/12 2013 FHWA 9 92900 BRO BRO SR 41 1.93 Safety
It is proposed to improve the alignment of SR41 with a spiral curve, realign the
SR763 intersection to improve its width, and remove the intersection of
Slickaway Road. Primary Work Category: Section Improvement Termini: On
SR41, begin just S of the intersection of SR41/763, head north and terminate at
Slickaway Road.
ODOT SPONSORING
AGENCY1 RW RW Serv 2013 4HJ7 Federal $18,000 $0 $45,000 $0 $2,314,257 2012AM06ID0834FDRW
395 RW RW Serv 2013 4BC7 State 002 State Funds (S,O) $2,000
395 RW Utl Remb 2013 4HJ7 Federal $22,500
395 RW Utl Remb 2013 4BC7 State 002 State Funds (S,O) $2,500
ODOT 2014-2017 STIP Page 121
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
396 04/11/13 2014 FHWA 9 93325 ROSROS SR 159 4.33
Kenworth Inter
It is proposed to add a north bound lane on SR159, add a west bound thru-right
turn lane on Kenworth Drive, add east bound lane on Adena Drive, and add a
right turn lane into the right in right out diveway to Kenworth that is located
across from Claybourn Primary Work Category: Intersection Improvement
Termini: Intersections of SR159 & Kenworth Drive, and SR159, Claybourne
Heights & Kenworth.
ODOT SPONSORING
AGENCY0.5 CO CO Contr 2014 4PF7 Federal M231 STP RURAL <200K $416,000 $0 $686,400 $0 $1,861,400 2012AM11ID1907FDCO
396 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $104,000
396 CO CO Engr 2014 LABR Federal M231 STP RURAL <200K $85,120
396 CO CO Engr 2014 LABR State 002 State Funds (S,O) $21,280
396 CO CO Contr 2014 4DV7 State 002 State Funds (S,O) $500,000
396 CO CO Contr 2014 5DV7 Federal $500,000
396 CO CO Mtrls 2013 4PF7 Federal M231 STP RURAL <200K $48,000
396 CO CO Mtrls 2013 4PS7 State 002 State Funds (S,O) $12,000
397 01/17/13 2013 FHWA 9 93794 SCI SCI SR 140 7.28 Safety
On SR140, 0.65 mile north of Staten Road to 0.37 mile south of Gephart Road
(7.28 to 7.80), it is proposed to perform a safety project by widening the
shoulder through two curves. Primary Work Category: Widening Termini:
0.65 mile north of Staten Road to 0.37 mile south of Gephart Road
ODOT SPONSORING
AGENCY0.52 PE Dtl Dsgn 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $16,565 $157,237 $175,643 $157,237 $673,643 2012AM09ID1663FDPE
397 PE Dtl Dsgn 2013 4BC7 State 002 State Funds (S,O) $1,841
398 07/12/12 2013 FHWA 9 93794 SCI SCI SR 140 7.28 Safety
It is proposed to perform a safety project by widening the shoulder through two
curves. Primary Work Category: Widening Termini: 0.65 mile north of Staten
Road to 0.37 mile south of Gephart Road
ODOT SPONSORING
AGENCY1 RW Acquis 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $18,000 $0 $25,000 $0 $578,000 2012AM07ID1170FDRW
398 RW Acquis 2013 4BC7 State 002 State Funds (S,O) $2,000
398 RW RW Serv 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $4,500
399 07/12/12 2013 FHWA 9 93797 SCI SCI SR 335 1.80 Safety
It is proposed on SR335 to upgrade and relocate guradrail on the east side of
SR335 and at the intersection of Swauger Valley Road and install paved gutter on
the west side of SR335. Primary Work Category: Section Improvement
Termini: On SR335, 0.05 mile south of Swauger Valley Road to RR overpass.
ODOT SPONSORING
AGENCY1 RW Utl Remb 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $9,000 $0 $10,000 $0 $1,438,669 2012AM07ID1171FDRW
400 01/17/13 2014 FHWA 9 94075 PIK PIK SR 32 20.24 OH11-02
On SR32, 0.10 mile east of the railroad underpass, it is proposed to repair the
slip. DSR PIK-009 Disaster #OH11-02 Primary Work Category: Slide Repair
Termini: On SR32, 0.10 mile east of the railroad underpass.
ODOT SPONSORING
AGENCY0.15 CO CO Engr 2013 4BY7 Federal 09VE FY11 ER Funding $72,000 $0 $990,000 $0 $1,125,000 2012AM09ID1651FDCO
400 CO CO Engr 2013 4BE7 State 002 State Funds (S,O) $18,000
400 CO CO Contr 2013 4BY7 Federal 09VE FY11 ER Funding $720,000
400 CO CO Contr 2013 4BE7 State 002 State Funds (S,O) $180,000
401 01/17/13 2013 FHWA 9 94188 D09D09 KY 12th St Ashalnd
Brdg UW13
To reimburse Kentucky for the underwater brdg inspection performed on the
12th St. Ashland Bridge in Lawrence County in FY13. Primary Work Category:
Bridge Inspection Termini: Underwater inspection of the 12th St Ashland Brdg
0 0 PE Brg Insp 2013 4PF7 Federal M001 NATIONAL HIGHWAY PREFORMANCE PROGRAM $10,000 $0 $12,500 $0 $12,500 2012AM09ID1635FDPE
401 PE Brg Insp 2013 4PS7 State 002 State Funds (S,O) $2,500
402 01/17/13 2013 FHWA 9 95270 SCISCI CEAO PM Various
FY2013
It is proposed to replace pavement markings on various county routes in Scioto
County. Primary Work Category: Pavement Marking Termini: Scioto County
Pavement Marking Project
SCIOTO COUNTY
ENGINEER0 CO CO Contr 2013 4HB7 Federal $96,200 $0 $100,000 $0 $101,000 2012AM09ID1666FDCO
402 CO CO Engr 2013 LNTP Local Match 2 Local Match $3,800
403 04/11/13 2014 FHWA 9 95371 LAWLAW PIK ROS Brdg
Debris Removal
It is proposed to removed debris from the piers and abutments of the following
structures.4402014 District 9 SLAWSR00093**C : 26.370 6600573 District 9
SPIKUS00023**C : 11.560 6601669 District 9 SPIKSR00032**C : 13.740
6601146 Primary Work Category: Debris Removal Termini: Law 93, Pike 23,
32, &124, Ros 50, 159, & 772
ODOT SPONSORING
AGENCY0 CO CO Contr 2014 4CP7 State 002 State Funds (S,O) $237,900 $0 $261,690 $0 $262,690 2012AM11ID1903FDCO
403 CO CO Engr 2014 LABR State 002 State Funds (S,O) $23,790
404 11/08/11 2013 FHWA 10 77158 GAL GAL Farm Road - Phase II
Complete Phase 2 of Farm rd. connector by extending farm Rd. from GKN, Sinter
Drive and ending at SR 7, via parts of Second St. Includes construction of bike
path. Primary Work Category: New Construction Termini: Begin at GKN
Sinter Drive and end at SR 7
GALLIPOLIS 0 RW Acquis 2011 TOLL Local Match 002 Local Match $182,000 $0 $910,000 $454,875 $8,575,868 2012MODID0051FDRW
404 RW Acquis 2011 4R47 Federal HY10 Hi Priority Projects Sec 1702 "House" $728,000
405 01/17/13 2014 FHWA 10 82826 MOE MOE SR 26 0.000
Two-Lane resurfacing project using a 2" asphalt overlay treatment. MOE 26 0.00-
5.56 and MOE 565 0.00-4.10. Primary Work Category: Resurfacing, Undivided
System Termini: Begin at the Washington County line.
ODOT SPONSORING
AGENCY9.66 CO CO Engr 2014 LABR Federal L200 STP RURAL AREAS<200,000 $43,200 $0 $1,399,000 $0 $1,399,000 2012AM09ID1710FDCO
405 CO CO Engr 2014 LABR State 002 State Funds (S,O) $10,800
405 CO CO Contr 2014 4PF7 Federal L200 STP RURAL AREAS<200,000 $1,076,000
405 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $269,000
406 01/13/12 2014 FHWA 10 82838 MEG MEG SR 689 0.000
Two-Lane resurfacing project using an asphalt overlay. MEG 689 0.00-4.16 and
VIN 689 0.00-3.36. Primary Work Category: Resurfacing, Undivided System
Termini: Begin at Vinton County Line.
ODOT SPONSORING
AGENCY8 CO CO Engr 2014 LABR Federal L25E STP RURAL <5K $40,800 $0 $1,320,000 $0 $1,320,000 2012AM04ID0516FDCO
406 CO CO Engr 2014 LABR State 002 State Funds (S,O) $10,200
406 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $1,015,200
406 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $253,800
407 07/12/12 2014 FHWA 10 82840 MOE MOE SR 7 12.300
Two-Lane resurfacing project using a mill and fill treatment. MOE 7 12.3-21.13
and MOE 536 0.00-0.24. Includes bridge ramps. Primary Work Category:
Resurfacing, Undivided System Termini: Begin 0.51 mi. N of Township Road 427
(Frye Hill).
ODOT SPONSORING
AGENCY9 CO CO Engr 2014 LABR Federal L20E STP RURAL <200K $15,200 $0 $3,094,000 $0 $3,094,000 2012AM07ID1129FDCO
407 CO CO Engr 2014 LABR State 002 State Funds (S,O) $3,800
407 CO CO Contr 2014 4PF7 Federal L20E STP RURAL <200K $380,800
407 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $95,200
407 CO CO Engr 2014 LABR Federal L25E STP RURAL <5K $80,000
407 CO CO Engr 2014 LABR State 002 State Funds (S,O) $20,000
407 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $1,999,200
407 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $499,800
ODOT 2014-2017 STIP Page 122
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
408 01/17/13 2014 FHWA 10 82844 WWW WAS WAS SR 555 0.000
Two-Lane resurfacing project using and asphalt overlay treatment. WAS 555 0.00-
7.49. Primary Work Category: Resurfacing, Undivided System Termini: Begin
at US 50.
ODOT SPONSORING
AGENCY7.49 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $868,000 $0 $1,128,400 $0 $1,128,400 2012AM09ID1670FDCO
408 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $217,000
408 CO CO Engr 2014 LABR Federal L25E STP RURAL <5K $34,720
408 CO CO Engr 2014 LABR State 002 State Funds (S,O) $8,680
409 10/15/12 2014 FHWA 10 83389 WWW WASWAS SR 7 23.740
Pike/Acme
Intersection improvement at Pike (SR 7) and Acme Street in City of Marietta.
Primary Work Category: Intersection Improvement Termini: Begin at Pike (SR
7) and Acme Street Intersection in City of Marietta.
Marietta, City of 0 CO CO Engr 2014 LABR Federal L240 STP FLEXIBLE $34,400 $0 $1,769,575 $176,173 $2,126,198 2012AM08ID01408FDCO
409 CO CO Engr 2014 LABR Local Match 002 Local Match $8,600
409 CO CO Contr 2014 4HJ7 Federal L050 NATIONAL HWY SYST $1,057,500
409 CO CO Contr 2014 4BC7 State 002 State Funds (S,O) $117,500
409 CO CO Engr 2014 LABR Federal L050 NATIONAL HWY SYST $106,965
409 CO CO Engr 2014 LABR State 002 State Funds (S,O) $11,885
409 CO CO Contr 2014 4TB7 Federal L240 STP FLEXIBLE $346,180
409 CO CO Contr 2014 4BG7 Local Match 002 Local Match $86,545
410 01/13/12 2013 FHWA 10 83389 WWW WASWAS SR 7 23.740
Pike/Acme
Intersection improvement at Pike (SR 7) and Acme Street in City of Marietta.
Primary Work Category: Intersection Improvement Termini: Begin at Pike (SR
7) and Acme Street Intersection in City of Marietta.
Marietta, City of 0 RW Acquis 2012 4HJ7 Federal LS30 HIGHWAY SAFETY IMP PROG $180,000 $0 $200,000 $156,623 $2,106,723 2012AM04ID0518FDRW
410 RW Acquis 2012 4BC7 State 002 State Funds (S,O) $20,000
411 04/12/12 2014 FHWA 10 83709 HOC HOC SR 93 12.620
Two-Lane resurfacing project using an asphalt overlay treatment. HOC 93 12.62-
13.68, HOC 180 0.39-7.35, and HOC 664 15.94-24.50. Primary Work Category:
Resurfacing, Undivided System Termini: Begin at E Front Street, City of Logan.
ODOT SPONSORING
AGENCY17 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $2,488,000 $0 $3,554,300 $0 $3,554,300 2012AM06ID0841FDCO
411 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $622,000
411 CO CO Engr 2014 LABR Federal L20E STP RURAL <200K $4,400
411 CO CO Engr 2014 LABR Local Match 002 Local Match $1,100
411 CO CO Engr 2014 LABR Federal L20E STP RURAL <200K $5,440
411 CO CO Engr 2014 LABR Local Match 002 Local Match $1,360
411 CO CO Contr 2014 4PF7 Federal L20E STP RURAL <200K $109,600
411 CO CO Contr 2014 4BG7 Local Match 002 Local Match $27,400
411 CO CO Engr 2014 LABR Federal L25E STP RURAL <5K $99,200
411 CO CO Engr 2014 LABR State 002 State Funds (S,O) $24,800
411 CO CO Contr 2014 4PF7 Federal L20E STP RURAL <200K $136,800
411 CO CO Contr 2014 4BG7 Local Match 002 Local Match $34,200
412 04/11/13 2014 FHWA 10 84201 WWW D10D10 General System GR
FY2014
Guardrail upgrade/replacement contract for FY 2014. Various routes and sections
in D-10. Routes include: ATH 78, ATH 550, MRG 78, NOB 78 and WAS 550.
Primary Work Category: Guardrail upgrade/replace Termini: Various routes and
sections in D-10.
ODOT SPONSORING
AGENCY92.74 CO CO Contr 2014 4PF7 Federal L25E STP RURAL <5K $375,966 $0 $515,957 $0 $515,957 2012AM11ID1913FDCO
412 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $93,991
412 CO CO Engr 2014 LABR Federal L25E STP RURAL <5K $36,800
412 CO CO Engr 2014 LABR State 002 State Funds (S,O) $9,200
413 01/13/12 2013 FHWA 10 86863 WWW WASWAS SR 7 22.950
Green/7th ST
Intersection improvement project at Pike/Green/7th Street. Includes Safety,
MPO and Local funding. Primary Work Category: Intersection Improvement
Termini: Begin at the Pike/Green/7th Street intersection in Marietta.
Marietta, City of 0 RW Acquis 2012 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $204,930 $0 $289,049 $304,642 $3,428,848 2012AM04ID0524FDRW
413 RW Acquis 2012 4BC7 State 002 State Funds (S,O) $22,770
413 RW RW Serv 2012 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $55,214
413 RW RW Serv 2012 4BC7 State 002 State Funds (S,O) $6,135
414 04/12/12 2014 FHWA 10 87240 ATH ATH US 33 5.980
Four-Lane resurfacing project using an asphalt overlay. ATH US 33 5.98-10.40 and
ATH 50 9.18-11.56. Primary Work Category: Resurfacing, Divided System
Termini: Begin 0.025 mi. S of the S Corp. Limit Nelsonville.
ODOT SPONSORING
AGENCY7 CO CO Contr 2014 4PF7 Federal L05E NATIONAL HIGHWAY SYSTEM $2,690,400 $0 $3,497,000 $0 $3,497,000 2012AM06ID0846FDCO
414 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $672,600
414 CO CO Engr 2014 LABR Federal L05E NATIONAL HIGHWAY SYSTEM $107,200
414 CO CO Engr 2014 LABR State 002 State Funds (S,O) $26,800
415 07/01/11 2014 FHWA 10 89009 WWW WASWAS SR 7 23.020 Pike St
Resurf
Resurfacing project using and asphalt overlay and milling. Work includes curb
ramps, pavement marking and inclusion of some minor counter measures from
past traffic safety study. WAS 7 23.02-23.71. Primary Work Category:
Resurfacing, Undivided System Termini: Begin at S 7th Street in City of
Marietta.
Marietta, City of 1 CO CO Engr 2014 LABR Federal L05E NATIONAL HIGHWAY SYSTEM $41,564 $0 $571,503 $0 $571,503 2012stipID2975FDCO
415 CO CO Engr 2014 LABR Local Match 002 Local Match $10,391
415 CO CO Contr 2014 4TA7 Federal L05E NATIONAL HIGHWAY SYSTEM $415,639
415 CO CO Contr 2014 4BG7 Local Match 002 Local Match $103,910
416 07/01/11 2013 FHWA 10 89167 HOCHOC Logan SRTS Non-
Infra 2010
Safe Routes to School non-infrastructure project. Includes education,
encouragement and enforcement activities for Central Elementary. Primary
Work Category: S.R.T.S Education & Encouragement Termini: City of Logan.
Logan, City of 0 OTH Oth Remb 2012 4SC7 Federal LU1E SAFE ROUTES TO SCHOOL PROGRAM $36,000 $0 $36,000 $0 $36,000 2012stipID2848FDOT
417 04/11/13 2014 FHWA 10 90595 GAL GAL CR 2 Var PM FY2014
Pavement Marking project using CEAO funds. Various routes and sections in
Gallia County. Primary Work Category: Pavement Marking Termini: Various
routes and sections in Gallia County.
GALLIA COUNTY
ENGINEER3.68 CO CO Contr 2014 4HB7 Federal MS30 HSIP - HWY SAFETY IMPR $144,500 $0 $150,000 $0 $150,000 2012AM11ID1916FDCO
417 CO CO Engr 2014 LABR Federal MS30 HSIP - HWY SAFETY IMPR $5,500
418 10/15/12 2014 FHWA 10 91451 GAL GAL SR 7 5.710
Pavement project using concrete pavement repair (CPR) treatment. GAL 7 5.71-
10.21. Primary Work Category: Resurfacing, Undivided System Termini:
Begin 0.43 mi N of County Road 50 intersection (Hannan Trace Rd).
ODOT SPONSORING
AGENCY5 CO CO Engr 2014 LABR Federal L05E NATIONAL HIGHWAY SYSTEM $6,400 $0 $208,000 $0 $208,000 2012AM08ID01421FDCO
418 CO CO Engr 2014 LABR State 002 State Funds (S,O) $1,600
418 CO CO Contr 2014 4PF7 Federal L05E NATIONAL HIGHWAY SYSTEM $160,000
418 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $40,000
ODOT 2014-2017 STIP Page 123
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
419 04/11/13 2014 FHWA 10 92321 ATH ATH SR 682 2.14
Bridge rehabilitation on ATH-682-2.14, SFN 0504742. Work includes backwall
repair, approach slab, and expansion joint replacement. Primary Work
Category: Major Rehabilitation Termini: Begin 0.07 mi N of SR 56.
ODOT SPONSORING
AGENCY0 CO CO Engr 2014 LABR Federal L20E STP RURAL <200K $8,000 $0 $233,402 $0 $234,402 2012AM11ID1915FDCO
419 CO CO Engr 2014 LABR State 002 State Funds (S,O) $2,000
419 CO CO Contr 2014 4PF7 Federal L20E STP RURAL <200K $178,722
419 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $44,680
420 01/17/13 2014 FHWA 10 93087 WWW D10D10 Signal Maint. FY
2014
Signal maintenance/upgrade project. Replacement of poles, signal heads, pull
boxes, detectors, etc. Installation of battery boxes at all signals. Primary Work
Category: Signal Maintenance/Repair (NEW) Termini: Various Routes and
Sections (locations) in D10.
ODOT SPONSORING
AGENCY0.09 CO CO Engr 2014 LABR Federal MS30 HSIP - HWY SAFETY IMPR $8,000 $0 $385,000 $0 $385,000 2012AM09ID1669FDCO
420 CO CO Engr 2014 LABR State 002 State Funds (S,O) $2,000
420 CO CO Contr 2014 4HJ7 Federal MS30 HSIP - HWY SAFETY IMPR $163,000
420 CO CO Engr 2014 LABR Federal M232 STP RURAL <5K $9,600
420 CO CO Engr 2014 LABR State 002 State Funds (S,O) $2,400
420 CO CO Contr 2014 4PF7 Federal M232 STP RURAL <5K $160,000
420 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $40,000
421 10/15/12 2013 FHWA 10 93584 WASWAS Beverly Sidewalk
FY2014 SRTS
Construct side walk under Safe Routes to School Program. Begin at 5th Street
between McIntosh and Park Streets(180 ft); Park Street between 5th and
Mitchell Street (540 ft) and Cemetary Street between Mitchell St. and Pinecrest
Drive (500 ft). Primary Work Category: Add Sidewalks Termini: Begin at 5th
Street between McIntosh and Park Streets.
Beverly, Village of 0 PE Dtl Dsgn 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $30,000 $0 $39,000 $0 $185,000 2012AM08ID01436FDPE
421 PE Env PE 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $9,000
422 10/15/12 2013 FHWA 10 93586 WWW WAS WAS Marietta SRTS Infra
Add pedestrain connections in City of Marietta for the City School District.
Various sections on local streets. Primary Work Category: Add Sidewalks
Termini: Begin at
Marietta, City of 0 PE Dtl Dsgn 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $30,000 $0 $32,700 $0 $170,000 2012AM08ID01412FDPE
422 PE Env PE 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $2,700
423 07/12/12 2014 FHWA 10 93588 ATH ATH SRTS Infra 2014
Construct pedestrian connections using Safe Routes to School funds. Begin
Athens Middle School and Watt and 2nd Streets. Primary Work Category: Add
Sidewalks Termini: Begin Athens Middle School and Watt and 2nd Streets.
Athens, City of 0 CO CO Contr 2014 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $94,600 $0 $95,600 $0 $111,000 2012AM07ID1137FDCO
424 10/15/12 2013 FHWA 10 93588 ATH ATH SRTS Infra 2014
Construct pedestrian connections using Safe Routes to School funds. Begin
Athens Middle School and Watt and 2nd Streets. Primary Work Category: Add
Sidewalks Termini: Begin Athens Middle School and Watt and 2nd Streets.
Athens, City of 0 PE Dtl Dsgn 2013 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $15,400 $0 $15,400 $0 $111,000 2012AM08ID01416FDPE
425 04/11/13 2014 FHWA 10 93623 MEG MEG US 33 3.090
Improve 2 to 4 lane transition area(s). MEG US 33 3.09-3.23 and 14.15-14.27.
Primary Work Category: Section Improvement Termini: Begin 0.12 mi. W of
intersection (ramp) to SR 681.
ODOT SPONSORING
AGENCY0.26 CO CO Engr 2014 LABR Federal LS3E HSIP - HWY SAFETY IMPR $18,900 $0 $539,000 $0 $539,000 2012AM11ID1919FDCO
425 CO CO Engr 2014 LABR State 002 State Funds (S,O) $2,100
425 CO CO Contr 2014 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $466,200
425 CO CO Contr 2014 4BC7 State 002 State Funds (S,O) $51,800
426 01/17/13 2014 FHWA 10 94353 VINVIN Lake Hope State
Park FY2014
ODNR funded project. Lake Hope State Park - Asphalt repairs/resurfacing; Zaleski
State Forest - Culvert replacements and asphalt resurfacing; Waterloo Wildlife
Area - Asphalt/aggregate resurfacing and guardrail. Primary Work Category:
Parks Termini: Lake Hope State Park.
ODNR 0 CO CO Contr 2014 4BF7 State 002 State Funds (S,O) $2,530,000 $0 $2,606,000 $0 $2,606,000 2012AM09ID1732FDCO
426 CO CO Engr 2014 LABR State 002 State Funds (S,O) $76,000
427 02/26/13 2013 FHWA 10 95320 WWW WASWAS Marietta River Trail
Ph.5
Extension of Marietta River Trail Bike/Ped path, approximately 0.83 miles
beginning at Jefferson Street and ending at Cogswell Lane. A new bridge
crossing will be provided over Duck Creek downstream of the existing Pike
Street bridge. Primary Work Category: Bikeways Termini: Begin at Jefferson
Street and 8th Street and end at Cogswell Lane.
Marietta, City of 0.68 PE Dtl Dsgn 2013 4TB7 Federal M400 CMAQ $48,000 $0 $60,000 $0 $1,402,323 2012AM10ID1799FDPE
427 PE Dtl Dsgn 2013 4BG7 Local Match 002 Local Match $12,000
428 07/01/11 2013 FHWA 11 79463 BOM BEL BEL CR 10 20.200Replace bridge over Wheeling Creek(?) Primary Work Category: Bridge
Replacement Termini: 1.71 miles West of TR 438 on Blaine Barton Road
BELMONT COUNTY
ENGINEER
CO Air Quality
Exempt0 PE Dtl Dsgn 2012 4B87 Federal H100 BRIDGE 65% ON $54,800 $0 $119,500 $0 $1,185,623 2012stipID2989FDENDD
428 PE Dtl Dsgn 2012 4BG7 Local Match 002 Local Match $13,700
428 PE Env PE 2012 4B87 Federal H100 BRIDGE 65% ON $40,000
428 PE Env PE 2012 4BG7 Local Match 002 Local Match $10,000
429 07/01/11 2013 FHWA 11 80914 HOL HOL Berlin Parking
Provide off-street parking in preparation for an ODOT widening project, (PID
76266). If no location found, funds MAY be used in PID 76266. 1/18/11 Funding
to be used for RW purchase Primary Work Category: Other Modes Related
Termini: Community of Berlin
HOLMES COUNTY
ENGINEER0 RW Acquis 2012 4R67 Federal HY10 Hi Priority Projects Sec 1702 "House" $91,135 $0 $91,135 $0 $92,135 2012stipID3179FDAC
430 01/17/13 2013 FHWA 11 83378 TUS TUS SR 39 24.22landslide repair FY 2014 GSMP Primary Work Category: Slide Repair Termini:
0.21 miles East of CR92DISTRICT 11-Planning 0.2 RW Utl Remb 2013 4SF7 Federal $8,000 $33,700 $43,700 $48,954 $1,096,154 2012AM09ID1755FDRW
430 RW Utl Remb 2013 4SS7 State $2,000
431 01/17/13 2013 FHWA 11 83382 HAS HAS US 250 23.23GSMP landslide repair, realign roadway Primary Work Category: Slide Repair
Termini: 0.18 miles East of CR15DISTRICT 11-Planning 0.23 RW Acquis 2013 4SF7 Federal L250 STP Rural <5,000 $32,000 $0 $40,000 $25,401 $1,936,105 2012AM09ID1750FDRW
431 RW Acquis 2013 4SS7 State 002 State Funds (S,O) $8,000
432 07/01/11 2013 FHWA 11 83555 TUS TUS SR 39 13.550
Widening SR 39 from the RJ Corman railroad tracks to 7th Street to provide a two
way left turn lane. Widening the roadway will provide left turning vehicles a
safe refuge while turning from SR 39 into drives and side streets, thus reducing
opportunities Primary Work Category: Section Improvement Termini: On SR
39 (aka West High Avenue) from the RJ Corman railroad to 7th Street in the City
of New Philadelphia
New Philadelphia, City of 0 RW Acquis 2013 4BG7 Local Match 002 Local Match $130,000 $0 $650,000 $0 $2,321,900 2012stipID3255FDAC
432 RW Acquis 2013 4HJ7 Federal LS3E HSIP - HWY SAFETY IMPR $520,000
ODOT 2014-2017 STIP Page 124
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
433 07/12/12 2013 FHWA 11 85112 BOM BEL BEL US 40 23.380Mill and fill with new curb, gutter, sidewalk, etc., where necessary Primary
Work Category: Mill and Fill Termini: CR 10 to West Corp line of BridgeportDISTRICT 11-Planning
CO Air Quality
Exempt4 PE Dtl Dsgn 2013 4PF7 Federal L20E STP RURAL <200K $165,420 $93,225 $300,000 $93,225 $2,740,657 2012AM07ID1154FDPEDD
433 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $41,355
434 11/08/11 2013 FHWA 11 86047 BHJ JEFJEF TITANIUM WAY
BRIDGE
The project's purpose is to remove and replace the existing bridge on existing
alignment , carrying Titanium Way over Jeddo Run and Jeddo Run Road, (Lynn
Drive.) Work will also include the construction of approximately 400’ of sidewalk
adjacent to curb a Primary Work Category: Bridge Replacement Termini:
Toronto. 0.1 Mile South of Intersection Franklin Ave.
Toronto, City of 0.03 PE Dtl Dsgn 2012 4BG7 Local Match 002 Local Match $20,000 $104,286 $231,358 $104,286 $1,249,692 2012MODID00126FDPE
434 PE Dtl Dsgn 2012 4TA7 Federal L20E STP RURAL <200K $80,000
434 PE Env PE 2011 4TA7 Federal L20E STP RURAL <200K $80,000
434 PE Env PE 2011 4BG7 Local Match 002 Local Match $20,000
434 PE Review 2011 LABR State 002 State Funds (S,O) $1,000
435 01/17/13 2013 FHWA 11 86205 BOM BELBEL CR 7 0.80 (Central
Ave.)
Perform a streetscape enhancement project on Central Avenue to include new
sidewalks, integral curbs/curb inlets/catch basins, brick paved crosswalks,
ornamental lighting, landscaping, furnishings and signing. The conflicting
utilities will be relocated b Primary Work Category: Environmental/Scenic
Termini: Shadyside. Central Avenue from 37th to 40th Street
0 0.41 RW Utl Remb 2013 4B37 Federal M302 TAP RURAL <200K $520,000 $0 $650,000 $0 $1,311,000 2012AM09ID1740FDRW
435 RW Utl Remb 2013 LNTP Local Match LNTP Non Traditional Local Match $130,000
436 07/01/11 2013 FHWA 11 86994 COL COL SR 154 14.040
Remove existing box beam bridge and replace with new multi-span structure.
The new structure type will be identified through the structure type study
performed during Preliminary Engineering. Primary Work Category: Bridge
Replacement Termini: 0.4 Miles West of SR 170
DISTRICT 11-Planning 0 PE Dtl Dsgn 2012 4PF7 Federal L25E STP RURAL <5K $140,000 $0 $276,000 $0 $1,861,205 2012stipID3075FDDDEG
436 PE Dtl Dsgn 2012 4PS7 State 002 State Funds (S,O) $35,000
436 PE PE Engr 2012 4PS7 State 002 State Funds (S,O) $20,000
436 PE PE Engr 2012 4PF7 Federal L25E STP RURAL <5K $80,000
437 07/01/11 2013 FHWA 11 87890 TUS TUS IR 77 25.950
Remove existing NB and SB bridges over abandoned RR on I 77 and replace with
a conspan structure. Primary Work Category: Bridge Replacement Termini:
1.77 mile South of junction US 250
DISTRICT 11-Planning 0 RW Acquis 2013 4PS7 State 002 State Funds (S,O) $5,000 $0 $5,000 $298,324 $3,481,632 2012stipID3246STAC
438 07/01/11 2013 FHWA 11 88459 COL COL-West Street
Sidewalk replacement or installation along the east and west sides of West
Street, from West North Avenue to West Main Street (SR 46) and then along one
side of Park Drive through City Park. Primary Work Category: Add Sidewalks
Termini: Along West Street from West North Avenue to West Main then south of
West Main along Park Dr.
East Palestine, City of 0 PE Dtl Dsgn 2012 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $34,000 $0 $39,000 $0 $300,000 2012stipID3109FDENDD
438 PE Env PE 2012 4SC7 Federal LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE $5,000
439 01/17/13 2013 FHWA 11 88923 HAS HAS US 22 17.240
Remove existing structure and realign existing township road to eliminate need
of replacement structure. Primary Work Category: Bridge Demolition Only
Termini: 0.35 M W of Jct US 250 and SR 9
DISTRICT 11-Planning 0.04 RW Acquis 2014 4PF7 Federal L05E NATIONAL HIGHWAY SYSTEM $18,800 $0 $48,500 $245,503 $1,677,174 2012AM09ID1753FDRW
439 RW Acquis 2014 4PS7 State 002 State Funds (S,O) $4,700
439 RW RW Serv 2013 4PF7 Federal L050 NATIONAL HWY SYST $20,000
439 RW RW Serv 2013 4PS7 State 002 State Funds (S,O) $5,000
440 07/12/12 2013 FHWA 11 89314 BOM BELBEL Mall Rd/Connector
Rd
Improve Mall Rd including widening, signals, turn lanes, etc., from Banfield Rd to
US 40. Project to include widening on US 40 from Mall Rd to Eric Dr. Also
construction of new connector roadway from US 40 south to intersection of Mall
Rd/Banfield Rd. Primary Work Category: New Construction Termini: St.
Clairsville. Mall Rd south of I-70 to US 40.
DISTRICT 11-Planning 1 PE Dtl Dsgn 2012 4R47 Federal LY10 HI PRI SEC 1702 $750,000 $1,389,304 $2,139,304 $1,389,304 $13,261,850 2012AM07ID1157FDPEDD
441 07/12/12 2013 FHWA 11 89314 BOM BELBEL Mall Rd/Connector
Rd
Improve Mall Rd including widening, signals, turn lanes, etc., from Banfield Rd to
US 40. Project to include widening on US 40 from Mall Rd to Eric Dr. Also
construction of new connector roadway from US 40 south to intersection of Mall
Rd/Banfield Rd. Primary Work Category: New Construction Termini: St.
Clairsville. Mall Rd south of I-70 to US 40.
DISTRICT 11-Planning 1 RW Acquis 2013 4R47 Federal LY10 HI PRI SEC 1702 $250,000 $0 $251,000 $1,389,304 $13,261,850 2012AM07ID1157FDRW
442 07/01/11 2013 FHWA 11 89450 BHJ JEF JEF CR 74 1.360Bridge replacement over Cross Creek. Primary Work Category: Bridge
Replacement Termini: 0.70 mile south of CR 28.
JEFFERSON COUNTY
ENGINEER0 RW RW Serv 2013 4BG7 Local Match 002 Local Match $5,000 $0 $30,000 $0 $1,200,000 2012stipID3208FDSV
442 RW RW Serv 2013 4B87 Federal L11E BRIDGE 15% OFF SYSTEM $20,000
442 RW RW Serv 2013 4B87 Federal L11E BRIDGE 15% OFF SYSTEM $4,000
443 07/01/11 2013 FHWA 11 89541 CAR CAR 542 13.35
This is a High Risk Rural Road funded project that proposes to eliminate a
horizontal curve (approx. SLM 13.35) that is experiencing a high number of run
off the road crashes that seem to be related to the deficient horizontal and
vertical alignment of SR Primary Work Category: Realignment Termini: CAR-
542-(13.00-13.50)
DISTRICT 11-Planning 1 RW Acquis 2013 4BC7 State 002 State Funds (S,O) $9,000 $0 $92,700 $157,483 $1,406,983 2012stipID3048FDAC
443 RW Acquis 2013 4RS7 Federal LS2E HSIP - HI RISK RURAL $81,000
444 01/17/13 2014 FHWA 11 91836 BOM BEL BEL SR 26 0.000
General System Minor Rehab.; includes asphalt overlay, pavement repairs,
pavement marking Primary Work Category: Minor Rehabilitation - Pavement
Gnrl Sys Termini: SR 800 to 0.17 mi. E. of SR 145
DISTRICT 11-Planning 19.21 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $739,452 $0 $2,090,770 $0 $2,091,770 2012AM09ID1743FDCO
444 CO CO Engr 2014 LABR State 002 State Funds (S,O) $22,184
444 CO CO Engr 2014 LABR Federal M232 STP RURAL <5K $30,970
444 CO CO Engr 2014 LABR State 002 State Funds (S,O) $7,743
444 CO CO Contr 2014 4PF7 Federal M232 STP RURAL <5K $1,032,337
444 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $258,084
445 01/17/13 2013 FHWA 11 91866 BOM BEL BEL IR 70 5.920
Replace existing superstructure on two bridges (L & R) at SLM 5.92 and widen
bridges for MOT needs. Minor repairs to substructure units Primary Work
Category: Bridge Repair Termini: 2.01 miles East of SR 800
DISTRICT 11-Planning 0.08 PE Dtl Dsgn 2014 4PF7 Federal M001 NATIONAL HIGHWAY PREFORMANCE PROGRAM $225,000 $0 $426,000 $0 $11,420,250 2012AM09ID1744FDPE
445 PE Dtl Dsgn 2014 4PS7 State 002 State Funds (S,O) $25,000
445 PE Env PE 2013 4PF7 Federal M001 NATIONAL HIGHWAY PREFORMANCE PROGRAM $140,000
445 PE Env PE 2013 4PS7 State 002 State Funds (S,O) $35,000
ODOT 2014-2017 STIP Page 125
2014 to 2017 STIP Carry Forward Listing - Updated 4/29/13 By Phase By Project
Carry
ID #
Stip/
Amend
Date
Carry
SFYAgency Dist PID MPO Cnty Project Name (ie CRS) Project Description / Primary Work Type Category / Termini Sponsoring Agency Air Quality Status
Total
SLM
Miles
Ph SubphaseEnc Req
SFYSAC
Fund Type
(F, S, B, O)
Obl
CodeObligation Description
Estimate
RevisedEncumbered
Enc'd/
Estimate
Total
Encumbered
Enc'd/
Estimate
Total
Carry STIP Reference
446 07/12/12 2013 FHWA 11 92353 BOM BEL BEL SR 149 8.28
FY2015 GSMP project. Tier 4 rockfall site. Lay slope back and install D50 wall.
NOTE: This project will include PID 92354 under a single design contract, but will
be sold separately. Primary Work Category: Slide Repair Termini: 0.03 miles
North of TR 656
DISTRICT 11-Planning 0 RW Acquis 2013 4SF7 Federal L25E STP RURAL <5K $40,000 $0 $51,000 $315,481 $2,066,481 2012AM07ID1161FDRW
446 RW Acquis 2013 4SS7 State 002 Local Match $10,000
447 07/12/12 2013 FHWA 11 92354 COL COL SR 39 0.930
FY2015 GSMP project. Tier 4 rockfall site. Lay slope back and install D50 wall. In
the village of Salineville. NOTE: This project will be combined with PID 92353
under a single design contract, but sold separately. Primary Work Category:
Slide Repair Termini: 0.07 miles West of State St.
DISTRICT 11-Planning 0 RW Acquis 2013 4SF7 Federal L25E STP RURAL <5K $24,000 $0 $31,000 $0 $982,000 2012AM07ID1162FDRW
447 RW Acquis 2013 4SS7 State 002 State Funds (S,O) $6,000
448 01/17/13 2013 FHWA 11 94453 COL COL SR 11 19.950
Replace the superstructure (slab) on two bridges at SLM 19.95 (L/R) & provide
new overlay on two bridges at SLM 23.35 (L/R) on SR 11. Primary Work
Category: Bridge Deck Replacement Termini: 2.185 miles North of SR 517
DISTRICT 11-Planning 0.1 PE Dtl Dsgn 2013 4PF7 Federal M001 NATIONAL HIGHWAY PREFORMANCE PROGRAM $280,000 $0 $351,000 $0 $4,156,362 2012AM09ID1749FDPE
448 PE Dtl Dsgn 2013 4PS7 State 002 State Funds (S,O) $70,000
449 07/01/11 2013 FHWA 12 5669 NOACA LAK LAK VROOMAN ROAD
Upgrade and relocate Vrooman Rd from IR-90 to SR-84 in LeRoy and Perry
Townships. MPO-STP. $150,000 for Arch Study set up in 1997 as federal. Plans by
Lake County Primary Work Category: Relocation Termini: LeRoy, Perry Twps;
IR-90 to SR-84
LAKE COUNTY ENGINEERCO Air Quality
Exempt2 PE Dtl Dsgn 2012 4B87 Federal L240 STP FLEXIBLE $1,779,200 $949,654 $3,575,324 $949,654 $28,271,062 2012stipID3549FDDD
449 PE Dtl Dsgn 2012 LNTP Local Match LNTP Non Traditional Local Match $444,800
450 01/17/13 2013 FHWA 12 80418 NOACA CUYCUY IR 271 00.00
Addlane
Add one (1) lane in each direction along I-271 from IR-480 at the Summit County
Line to IR-480 at Columbus Rd. Work will include replacing the existing
pavement from the Summit County Line to approx. Miles Rd. - TRAC candidate
project for 2016 Primary Work Category: Major Rehabilitation Termini:
Oakwood, Bedford; County Line to Miles Road
ODOT SPONSORING
AGENCY6.36 PE Dtl Dsgn 2013 4RC7 Federal L01E INTERSTATE MAINTENANCE $4,320,000 $951,330 $6,535,682 $951,330 $136,006,682 2012AM09ID1758FDPE
450 PE Dtl Dsgn 2013 4BK7 Federal L01E INTERSTATE MAINTENANCE $560,000
450 PE Dtl Dsgn 2013 4RA7 State 002 State Funds (S,O) $480,000
450 PE Dtl Dsgn 2013 4BD7 State 002 State Funds (S,O) $140,000
450 PE Env PE 2013 4BD7 State $84,352
451 07/01/11 2013 FHWA 12 87075 NOACA CUYCUY CLEVELAND
TOWPATH TRAIL Ph 4
o Construct Stage 4 of the Cleveland Towpath Trail from Tremont/Literary
Trailhead to Canal Basin Park.o SAFETEA-LU Earmarks: OH-214 and OH-322
Primary Work Category: Bikeways Termini: N/A
CUYAHOGA COUNTY
ENGINEER
CO Air Quality
Exempt0 PE Dtl Dsgn 2012 4R47 Federal LY10 HI PRI SEC 1702 $1,301,720 $0 $2,292,136 $0 $14,692,136 2012stipID3285FDENDD
451 PE Env PE 2012 4R47 Federal LY20 HI PRI SEC 1702 $990,416
452 07/29/11 2013 FHWA 12 88443 NOACA CUYCUY CLEVELAND
RIVERWALK
Construct a riverwalk connecting Front Street and Maine Avenue in the Flats
Eastbank.This project is part of a bigger project called the Flats Eastbank
Project.SAFETEA-LU Earmark OH317See also PID 80969; CUY CLEVELAND
BULKHEAD Primary Work Category: Add Sidewalks Termini: N/A
CLEVELANDCO Air Quality
Exempt0 PE Dtl Dsgn 2012 4D57 Federal L680 TCSP $254,596 $0 $318,246 $0 $1,776,394 2012AM01ID0054FDPE
452 PE Dtl Dsgn 2012 LNTP Local Match 002 Local Match $63,649
453 07/01/11 2013 FHWA 12 89032 NOACA CUY CUY WATERLOO ROAD
2013 NOACA STP Project: Waterloo Road reconstruction2013 NOACA
Enhancement Project: Waterloo Road streetscape Primary Work Category:
Major Rehabilitation Termini: Cleveland: East 152nd Street to East 162nd Street
CLEVELAND 1 RW Acquis 2014 LNTP Local Match 002 Local Match $50,000 $0 $50,000 $0 $5,046,580 2012stipID3454STAC
454 07/12/12 2013 FHWA 12 92223 NOACA GEA GEA SR 087 00.92
FY 2013 Maintenance Project: Slope repair along westbound SR-87 (Kinsman Rd)
approximately at mile marker 0.92 in Russell Township. Primary Work
Category: Slide Repair Termini: Russell Twp: approximately along mile marker
00.92
ODOT SPONSORING
AGENCY0 CO CO Contr 2013 4SF7 Federal L24E STP FLEXIBLE $280,000 $0 $385,000 $10,054 $395,054 2012AM07ID1168FDCO
454 CO CO Contr 2013 4SS7 State 002 State Funds (S,O) $70,000
454 CO CO Engr 2013 LABR Federal L24E STP FLEXIBLE $28,000
454 CO CO Engr 2013 LABR State 002 State Funds (S,O) $7,000
455 04/11/13 2014 FHWA 12 94046 NOACA D12 D12 GR FY2014
Annual districtwide guardrail job order contract for SFY 2014 guardrail repairs.
Includes replacement of guardrail along the I-71 corridor from approximately I-
480 to Denison Avenue. Primary Work Category: Guardrail upgrade/replace
Termini: N/A
ODOT SPONSORING
AGENCY4.48 CO CO Engr 2014 LABR State 002 State Funds (S,O) $15,000 $0 $935,000 $0 $935,000 2012AM11ID1937FDCO
455 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $150,000
455 CO CO Contr 2014 4PF7 Federal L01E INTERSTATE MAINTENANCE $630,000
455 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $70,000
455 CO CO Engr 2014 LABR Federal L01E INTERSTATE MAINTENANCE $63,000
455 CO CO Engr 2014 LABR State 002 State Funds (S,O) $7,000
456 04/11/13 2014 FHWA 12 94723 NOACA CUYCUY IR 480 11.60
Interchange
Upgrade the IR-480 and Tiedeman Interchange in the City of Brooklyn to improve
traffic flow. SFY2013 pilot Quick Clear project. Primary Work Category:
Intersection Improvement Termini: City of Brooklyn; 480/Tiedeman
Interchange
ODOT SPONSORING
AGENCY0.08 CO CO Contr 2014 4PF7 Federal L01E INTERSTATE MAINTENANCE $306,000 $0 $2,482,300 $20,930 $2,683,230 2012AM11ID1932FDCO
456 CO CO Contr 2014 4PS7 State 002 State Funds (S,O) $34,000
456 CO CO Engr 2014 LABR Federal L01E INTERSTATE MAINTENANCE $9,180
456 CO CO Engr 2014 LABR State 002 State Funds (S,O) $1,020
456 CO CO Contr 2014 4DP7 Federal Pass-Th $2,070,000
456 CO CO Engr 2014 LABR Federal Pass-Th $62,100
457 04/11/13 2014 FHWA 12 94723 NOACA CUYCUY IR 480 11.60
Interchange
Upgrade the IR-480 and Tiedeman Interchange in the City of Brooklyn to improve
traffic flow. SFY2013 pilot Quick Clear project. Primary Work Category:
Intersection Improvement Termini: City of Brooklyn; 480/Tiedeman
Interchange
ODOT SPONSORING
AGENCY0.08 PE Dtl Dsgn 2014 4DP7 Federal Pass-Th $180,000 $20,930 $200,930 $20,930 $2,683,230 2012AM11ID1932FDPE
ODOT 2014-2017 STIP Page 126
APPENDIX 5
2014-2017 STIP PROJECT LIST AND GUIDE
ODOT 2014-2017 STIP Page 127
APPENDIX 5
COLUMN NAME COLUMN DESCRIPTION
Agency FHWA - Federal Highway Administration
FTA - Federal Transit Administration
Dist District - ODOT District Number
PID ODOT's Project Identification Number
MPO The Metropolitan Planning Organization
Cnty County of the project
Project Name Official Title assigned by ODOT - by County, Route, Section (three letter county
code, route, number or street name, and for state routes the straight line mileage
from the county line to the project beginning point
Project Description/Primary
Work Category/Termini
Description of Project and the work being preformed. Termini is described in the
terms of prominent intersecting street or county lines.
Sponsoring Agency The unit of government or agency that initiated the project, implementation
responsibility and assigned local share
Air Quality Status Exempt: the project does not meet the requirements to dictate an air quality
conformity analysis
Non-exempt: the project requires an assessment to determine conformity
Length (SLM) Total length of a project in miles
Phase Phase: CO - Construction, PE - Preliminary Engineering, R/W - Right of Way
Sub Phase CO Contr - Construction Contract, CO Engr - Construction Engineering,
PE Env - Preliminary Environmental, PE DD Preliminary Detail Design,
R/W Acq - Right of Way Acquisition, R/W Rem - Right of Way Reimbursement,
R/W RE Ser - Right of Way Real Estate Services
SFY State Fiscal Year
SAC ODOT's Funding Code
Fund Type Type of Funds: Federal, State, or Local
Billing Code Federal Billing Code
Fiscal Analysis Group State fiscal year fiscal analysis group associated to the line item cost. The cost
associated would be summarized in the statewide and MPO fiscal analysis under
this group in the relative state fiscal year.
ALI - Qty XXX (FTA Projects) Federal Transit Administration -ALI Codes
STIP Phase Estimate Estimated cost of project by phase in the current STIP
Total Phase Encumbered Total encumbered amount by phase all years (including prior years to the STIP)
STIP Phase Total Total phase encumbered plus total STIP phase estimate
Project Total Project total encumbered/estimate for all state fiscal years of the project including
anticipated costs beyond the STIP state fiscal years. This includes committed and
STIP Ref ID STIP ID Reference Number
GUIDE TO STIP PROJECT LIST
Top Related