Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 1 of 51
Celcom 3G Project
NodeB Project File
Site Code: NW 40054
Site Name: IGEAST
Equipment Type: BTS3812A
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 2/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 2 of 51
© COPYRIGHT for Huawei
All rights reserved.
No part of this document may be copied, distributed, transmitted, transcribed, stored in a retrieval system or translated into any human or
computer language without the prior written permission of Huawei. The manufacturer will if necessary explain issue which may not be
covered by the documents. The manufacturer’s liability for any errors in the documents is limited to the correction of errors services.
The documents have been prepared to be used by professional and properly trained personnel and the customer assumes full responsibilitywhen using them. The manufacturer welcomes customer comments as part of the process of continual development and improvement of the
documentation in the best way possible from the user’s viewpoint.
Any trademarks mentioned in the documents are the property of their respective owners.
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 3/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 3 of 51
Table of Contents
Chapter 1 Map Reference ..........................................................................................01-01
Chapter 2 SDP ............................................................................................................02-01
Chapter 3 Project Description
Project Description .....................................................................................03-01
Node B cell parameter and data configuration............................................03-02
Chapter 4 Project Responsibility Interface .............................................................04-01
Chapter 5 Equipment Location
Node B Installed .........................................................................................05-01
AC/DC Power Tapping Point ......................................................................05-02
E1 Connection Point ...................................................................................05-03
Chapter 6 Antenna Location
Antenna Location........................................................................................06-01
Sector Beam width View.............................................................................06-02
Panoramic View..........................................................................................06-03
Chapter 7 Feeder Cable Routing
Feeder Cable Routing.................................................................................07-01
Earth Point..................................................................................................07-02
Chapter 8 Engineering Drawing................................................................................08-01
Chapter 9 Material Request & BOQ .........................................................................09-01
Chapter 10 Hardware Configuration
Cabinet Board Layout.................................................................................10-01
Board Information .......................................................................................10-02
Host Version Information List......................................................................10-03
Chapter 11 External Cable Connection ......................................................................11-01
Chapter 12 DTF & VSWR Plots....................................................................................12-01
Chapter 13 Commissioning & Integration Checklist.................................................13-01
Chapter 14 Equipment Installation Report.................................................................14-01
Chapter 15 Node B Hardware Installation Acceptance.............................................15-01Chapter 16 User Acceptance Report ..........................................................................16-01
Chapter 17 Single Site Verification Report ................................................................17-01
Chapter 18 Punch List ................................................................................................18-01
Chapter 19 Certification of Acceptance .....................................................................19-01
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 4/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 4 of 51
1
MAP REFERENCE
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 5/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 5 of 51
1 Map Reference
MAP AND SQUARE
MAP REFERENCE: IGEAST
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 6/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 6 of 51
2
SDP
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 7/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 8/141
SITE PICTURE
PEMBINAAN
SDN BHD
3G SITE DESIGN PACKAGE
IPOH
NORTHERN REGION
G 554
IG EAST
PERAK DARUL RIDZUAN
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 9/141
SITE ID : G 2554
SITE NAME :
SITE CONFIGURATION : 1 +1 +1
FREQ. BAND : 3G
PEMBINAAN
SDN BHD
CELCOM (M) BHD.
NORTHERN REGION
SITE DESIGN PACKAGE
Prepared by ;
IG EAST
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 10/141
CELCOM (M) BHD 1 Site Information
NORTHERN REGION
PERAK 2 RF Design
3 Existing 2G Information
4 New 3G Information
5 Site Picture
6 Mobile Checklist / BOQ
7 Transmission Check List
G 2554 8 CME BOQ
IG EAST 9 INSTALLATION PLAN
1 + 1 +1 10 SMU
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 11/141
SITE ID : G 2554
SITE NAME : IG EAST
SITE CONFIGURATION : 1 +1 +1
CELCOM (M) BHD.
NORTHERN REGION
Site Informations
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 12/141
Site Informations
Survey Date : 7 March 2006
Project: Celcom 3G, Northern Region, Malaysia
Celcom (M) Bhd.
Site: G 2554 IG EAST
1.0
1.1 Site Location and Access
GPS Positio n
Latitude: N 04° 37' 06"
Longitude : E 101° 7' 30"
Altitude : 18m
1.2 Address : Water Tank Tower
Jalan Perajurit 11,T.Ipoh Timur
31400 Ipoh Perak
SITE INFORMATIONS
Site Location
Legend
14(33)
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 13/141
Site Informations
Survey Date : 7 March 2006
Project: Celcom 3G, Northern Region, Malaysia
Celcom (M) Bhd.
Site: G 2554 IG EAST
1.3 Site Details (Existing )
Type of Site : Land Outdoor
Height of Building : N/A
Equipment Location : Plinth Outdoor
Plinth Dimension : 4000mm(L) x 900mm(w) x 400mm(H)
Air Conditioning : NA
Cable Ladder : 300mm cable Ladder
Lightning Protection : Good Condition
Type of Tower : 3m Tripod floor Mount
Type of terrain : Flat
Access road : Tar / Good / Car
Distance to main road : 1Km
Site Access Information : J.Tasek--> Jalan Perajurit 119(behind jusco) --> Menara Air
1.4 Contact Information
Celcom : Mizazuddin b Muhiyuddin
Telephone No. : 04-3973030
Fax No. : 04-3974040
Mobile No. :
019-5713060
Contractor Name : Mohd Yazid B md Yunus
Telephone No. : 03-4252 9589
Fax No. : 03-4252 5313
Mobile No. : 019-3555014
15(33)
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 14/141
SITE ID : G 2554
SITE NAME : IG EAST
SITE CONFIGURATION : 1 +1 +1
CELCOM (M) BHD.
NORTHERN REGION
RF DESIGN
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 15/141
Legend : Site Nodes :
10
RSCP Coverage Prediction Plots
RSCP Coverage w ith G2554
RSCP Coverage wit hout G2554
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 16/141
Legend : Site Nodes :
10
Single Site RSCP Coverage with G2554
RSCP Coverage Prediction Plots
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 17/141
Site Name:
Site ID :
Existing 2G Site Name:
Existing 2G Site ID:
Co-locate Operator: Cluster No:
Candidate:
Version:
Lat (N-WGS 84-Decimal): 4.61828 101º 7" 30'
Long (E-WGS 84-Decimal): 101.125 4º 37" 5'
Node B room Type: Node B Type:
Node B Configuration:
Transmission Type on site:
Cell Site RF Configu ration
Cell ID
Antenna Hei ght (mid . of ant )
Antenna Di rect ion (deg)
Electrical Tilt
Mech. Tilt
Cable Length (m)
Cable Type (inch)
MHA (Y/N)
Technical Site Surveyor : Company : Signature
Contact No:
RF Planner Company : Signature
Contact No:
TM/Celcom Reviewer :
Structure Height(m): 3
Proposed 3G antennae for all sectors. Using new 3m boom at height 20m.Azimuth for new sectors same as existing sectors.
15/8" 15/8" 7/8"
1
Type
IGEAST
G2554
0
2
20
Sector 1
No
Alcatel
20 20
6565
Sector 3Sector 2
62 57 25
65
80 200 320
2 2
0
Y
Mount
Pole Pole
3 3
1
Height (m)
No of Pole/ Tripod
Structure type
Manufacturer Kathrein
Beam width (deg) Antenna Type Singleband Singleband Singleband
3
Bipod
Area:
3G System
1
Ipoh
2
Outdoor
Ams l(m):
Reason for Node B type:
Technical Site Survey Report (Proposed Antenna Location)
Survey Date:
Building Height(m):
IGEAST
G2554
6-Mac-2006
18
Sector 1 cover housing, shoplot area, main road and commercial area.Proposed using new 3m boom at height 20m.
Comment/ Problem:
Sector 1 :
Sector 1 cover housing and shoplot area. Proposed using new 3m boom at height 20m.
Outdoor
Phase:
S1+1+1
Y N
1
PoleBipod Bipod
013-4566019
Sector 3 cover housing, shoplot, apartment and commercial area.Proposed using new 3m boom at height 20m.
Sector 2 :
Sector 3 :
0
Others:
Mohd Faizal Aziz
Ai rco m Internat ion al
Air com Conf iden tial 11/7/2007 Page 1
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 18/141
Site Name:
Site ID :
Existing 2G Site Name:
Existing 2G Site ID:
Co-locate Operator: Cluster No:
Version:
Lat (N-WGS 84- Decimal): 101.125 101º 7" 30'
Long (E-WGS 84-Decimal): 4.61828 4º 37" 5'
BTS room Type: BTS Type:
BTS Configuration:
Transmission Type on site:
Cell Site RF Configu ration
Cell ID
Antenna Hei ght (mid . of ant )
Antenna Di rect ion (deg)
Electrical Tilt
Mech. Tilt
Cable Length (m)
Cable Type (inch)
MHA (Y/N)
Technical Site Surveyor : Company : Signature
Contact No:
RF Planner Company : Signature
Contact No:
TM/Celcom Reviewer :
IGEAST Survey Date: 6-Mac-2006
Technical Site Survey Report (Existing Antenna System Locations
G2554 Building Height(m): 18
IGEAST Structure Height(m): 3
G2554 Area: Ipoh
No
Phase: 2
1
Ams l(m):
Outdoor GSM 1800
S2+2+2
Alcatel
Sector 1 Sector 2 Sector 3
Kathrein Antenna Type Model Number Kathrein Kathrein
Beam width (deg) 65
20 20 20
65 65
80 190 320
2 2 2
0 0 0
52 44 22
7/8" 7/8' 7/8"
Structure type Bipod Bipod Bipod
Mount
Type Pole Pole
No of Pole/ Tripod 1 1
Pole
Height (m) 3 3 3
1
Comment/ Problem:
Sector 1 :
Sector 1 cover housing and shoplot area.
Others:
Sector 2 :
Sector 1 cover housing, shoplot area, main road and commercial area.
Sector 3 :
Sector 3 cover housing, shoplot, apartment and commercial area.
013-4566019
Mohd Faizal Aziz
Ai rco m Internat ion al
Air com Conf iden tial 11/7/2007 Page 2
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 19/141
SIDE VIEW
Technical Site Surveyor : Company : Signature
Contact No:
RF Planner Company : Signature
Contact No:
TM/Celcom Reviewer :
Ai rco m Internat ion al
Technical Site Survey Drawing
Air com Conf iden tial 11/7/2007 Page 3
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 20/141
PLAN VIEW
Technical Site Surveyor : Company : Signature
Contact No:
RF Planner Company : Signature
Contact No:
TM/Celcom Reviewer :
Ai rco m Internat ion al
Technical Site Survey Drawing
Air com Conf iden tial 11/7/2007 Page 4
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 21/141
Please Do not "Zoom in" on the photo
Site View
Technical Site Survey Photograph
Site Photograph (Size 6" x 6")
Air com Conf iden tial 11/7/2007 Page 5
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 22/141
Sector 1 80 Degree Pl ease Do n ot " Zoom i n" on the pho to
Sector 2 200 Degree
Sector 3 320 Degree
Sectorial RF View (size 3.2" x 4.2")
Technical Site Survey Photograph
Housing Area
Shoplot
Shoplot
Main Road
Housing Area
Commercial Area
Apartment AreaHousing Area
Shoplot
Commercial Area
Air com Conf iden tial 11/7/2007 Page 6
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 23/141
0 degree Please Do not "Zoom in" on the photo
40 degree
80 degree
Technical Site Survey Photograph
Panoramic View (size 3.2" x 4.2")
Air com Conf iden tial 11/7/2007 Page 7
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 24/141
120 degree
160 degree
200 degree
Technical Site Survey Photograph
Air com Conf iden tial 11/7/2007 Page 8
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 25/141
240 degree
280 degree
320 degree
Technical Site Survey Photograph
Air com Conf iden tial 11/7/2007 Page 9
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 26/141
SITE ID : G 2554
SITE NAME : IG EAST
SITE CONFIGURATION : 2 + 2+ 2
CELCOM (M) BHD.
NORTHERN REGION
2G Info
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 27/141
Existing 2G
Survey Date : 7 March 2006
Project: Celcom 3G, Northern Region, Malaysia
Celcom (M) Bhd.
Site: G 2554 IG EAST
2.0
2.1 Ex it ing Equipment
Existing Equipment Type
No Of Cabinet
Configuration
Comments :
2.2 Existing Antenna Data 2G
Make
Height AGL (m)Gain (dBi)
Antenna Band
Polarization
Comments : Sect. 1: M-tilt=0° ; E-tilt= 0° ;Sect. 2: M-tilt=0° ; E-tilt= 0°
Sect. 3: M-tilt=0° ; E-tilt= 0°
Sect 1=80° ; Sect.2=190°; Sect.3=320°
2.3 Feeder Data 2G
Total no. of feeders (pcs)
Type of feeders
Feeder lengths (m) Tx
Rx
TOTAL
Comments :
2.4 Antenna Support Detai l
Type of antenna support :3.0 m Tripod Floor Mount
No. of H-Boom :NA
No. of G.I. Pipe :NA
Length of G.I. Pipes (m) : NA
Comments :
EXISTING 2G
GSM1800
Khaterine
Cell 3
20
Khaterine
Cell 1
Khaterine
Cell 2
20
236
118
1520
Cell 3 TOTAL
2 6
GSM1800
104 88 44
52 44 22
52 44
7/8"
22 118
7/8"7/8"
15
GSM1800
X-pol X-polX-pol
15
2
Cell 1 Cell 2
2
Alcatel Evolium MBO2
1
1800 (2 + 2 + 2)
16(33)
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 28/141
SITE ID : G 2554
SITE NAME : IG EAST
SITE CONFIGURATION : 1+1+1
CELCOM (M) BHD.
NORTHERN REGION
NEW 3G REQUIREMENT
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 29/141
Site Requirements
Survey Date : 7 March 2006
Project: Celcom 3G, Northern Region, Malaysia
Celcom (M) Bhd.
Site: G 2554 IG EAST
3.0
3.1 Feeder Data
Total no. of feeders (pcs)
Type of feeders
Feeder lengths (m)
Comments : 1. New 3 x 3m tripod floor mount
2.New 3 x MGB 10 holes c/w isolator
3. Azimuth : Sect 1=80° ; Sect.2=200°; Sect.3=320°
3.2 CABLING
Cable required
DDF free space (ports) : YES
Comments :
3.3 A ntenn a Su pp or t Det ai l
Type of antenna support : 3m Tripod Floor Mount
No. of H-Boom : NA
No. of G.I. Pipe : NA
Length of G.I. Pipes (m) : NA
Other Special Bracket : NA
Comments : 1. New 3m Tripod floor mount 3 pcs
62
62
50 288TOTAL 114124
1 5/8"
57
TOTAL
1 5/8" 1 5/8"
2
Cell 1
2
Cell 3Cell 2
144
Rx 57 144
25
25
Tx
NEW SITE REQUIREMENTS
15m
DDF to DF NA NA NA
2 6
Node B to MGB Grounding / 35mm Cable Lug / 35mm
Cable Cable type / size Connector type / size Length Needed
Node B E1 to DF Coax/3C2.5V Siemens (male) 3E1 x 15m
Node B to Breaker 10mm Cable Lug / 10mm 15m
17(33)
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 30/141
Site Requirements
Survey Date : 7 March 2006
Project: Celcom 3G, Northern Region, Malaysia
Celcom (M) Bhd.
Site: G 2554 IG EAST
3.4 OTHERS
Comments : 1. Re-construct and extend existing Fencing to cover new Node B(see CME picture)
2. Require Lorry Crane upon Delivery
3.5 POWER SUPPLY SYSTEM
Rectifier
Make Link Model Vout Iout
Capacity : NA
Banks : NA
Type / Model : NA
Comments :
Breaker
Used:
Required:
Used:
Free:
Required:
Free: -
4000mm(L) x 2000mm(w)
x 500mm(H)
NA NA
NA NA
NA
5Inlet,near bending and near
antenna
NA NA
NA See CME Photo
Capacity
1m x 1m reserved for node-B
Good condition
- -NA - -
Lightning Protection
CommentExisting Required
Good condition 300mm x 25m Refer to cme picture
BTS Location Outdoor NA
Cable Inlet
AC Ear thi ng B usb ar NA
DC Earthing Busbar NA
MGB 2
NA
Cable Gantry
Cabin Size NA
Plinth Size4000mm(L) x 900mm(w) x
400mm(H)NA
NA NA
18(33)
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 31/141
Site Requirements
Survey Date : 7 March 2006
Project: Celcom 3G, Northern Region, Malaysia
Celcom (M) Bhd.
Site: G 2554 IG EAST
3.6 SITE APPROVAL
Prepared by
3.6 ( Contractor )
MOHD YAZID B MD YUNUS
Site Approved
( Celcom )
Mobile Access - GN Date
Prepared by
( Contractor )
Site Approved
( Celcom )
TRANSMISSION - GN Date
AS Pembin aan Sdn . Bhd . Date
CME - GN Date
19(33)
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 32/141
SITE ID : G 2554
SITE NAME : IG EAST
SITE CONFIGURATION : 1 +1 +1
CELCOM (M) BHD.
NORTHERN REGION
Site Pictures
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 33/141
Existing Site Pictures
Survey Date : 7 March 2006
Site: G 2554 IG EAST
Photo 1. Site View
Photo 3. Existing BTS Location
Comment : MBO2
SITE PICTURES
Ant Hgt:
20 m agl
Ant Hgt:
18m agl
20(33)
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 34/141
Existing Site Pictures
Survey Date : 7 March 2006
Site: G 2554 IG EAST
SITE PICTURES
Photo 4. Existing Feeder Route
Comment:
Photo 6. Existing Feeder Route
Comment : Feeder Route sector to sector 1
21(33)
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 35/141
Existing Site Pictures
Survey Date : 7 March 2006
Site: G 2554 IG EAST
SITE PICTURES
Photo 7. Existing Feeder Route
Comment : Sector 1
Photo 8. Existing Antenna Location
Comment: 3m boom wall mount
Cell 1 = 80'
Cell 2 = 190'
Cell 3 = 320'
Ant.
Height:
20m AGL
22(33)
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 36/141
Existing Transmission
Survey Date : 7 March 2006
Site: G 2554 IG EAST
Photo 1. Microwave Locat ion
Comment : Shoot to Jusco Ipoh
Photo. 2 Re-Use existing Free E1
Comment
SITE PICTURES
Antenna Dish
Height: 34m
23(33)
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 37/141
Existing Transmission
Survey Date : 7 March 2006
Site: G 2554 IG EAST
SITE PICTURES
Photo 3. DDF Location
Comment: New DDF Location
Photo 4. Line Of sight(link to Taman perpaduan)
Comment:
24(33)
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 38/141
New Requrement
Survey Date : 7 March 2006
Site: G 2554 IG EAST
Photo 1 Propose Node B
Comment : Extend And Modified Fencing
Photo 2 Propose New Feeder Route
Comment : New feeder route
SITE PICTURES
New MGB
New MGB
25(33)
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 39/141
New Requrement
Survey Date : 7 March 2006
Site: G 2554 IG EAST
SITE PICTURES
Photo 3 Propose Antena Sector 1
Comment : New 3m Boom Tripod c/w air terminal and MGB
Photo 4. Antenne Location Sector 3
Comment : New 3m Boom Tripod c/w air terminal and MGB
NA
Cell 3 = 340'
20m agl
20m agl
26(33)
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 40/141
New Requrement
Survey Date : 7 March 2006
Site: G 2554 IG EAST
SITE PICTURES
Photo 5. Antenna Location Sector 2
Comment : New 3m Boom Tripod c/w air terminal and MGB
Photo 6. Lorry crane
Comment:
Cell 2 = 220'
20m agl
Need to closed drain
27(33)
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 41/141
Existing CME
Survey Date: 7 March 2006
Site: G 2554 IG EAST
Photo 1. Existing ACPDB
Comment : Exiting ACPDB- sufficient to supply the voltage for Node B
Photo 2. Exiting ACPDB / DCPDB
Comment : Remain Existing and re-use existing DB
SITE PICTURES
3 X 20A free Breaker
28(33)
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 42/141
Existing CME
Survey Date: 7 March 2006
Site: G 2554 IG EAST
SITE PICTURES
Photo 3. Existing Breaker AC or DC
Comment: Re-Use existing Breaker
Photo 5. Existing MGB
Comment : Existing MGB for BTS grounding(closed view)
Re-Use
existing
3 X 20A
Breaker
29(33)
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 43/141
Existing CME
Survey Date: 7 March 2006
Site: G 2554 IG EAST
SITE PICTURES
Photo 6. Existing MGB 2
Comment : Un sufficient For new 3G feeder cable
Existing Structure (Closed Up)
Comment: 3m Tripod Floor Mounted
Photo.8
3.0m
30(33)
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 44/141
SITE ID : G 2554
SITE NAME : IG EAST
SITE CONFIGURATION : 1 +1 +1
NORTHERN REGION
Mobile Checklist / BOQ
CELCOM (M) BHD.
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 45/141
BILL OF QUANTITY SITE G 2554
NO TYPE ITEMS ART NO. PACKING REQUEST SUPPLY IRON WORK Fill in your requested item(s)
1 SPECIAL BRACKET SET 3
2 6m Tripod NA SET
3 6m BOOM N/A PC
4 WALL BRACKET N/A SET
POWER / RF CABLES & ACCESSORIES
1 Power Cable METER
2 METER
3 AC ARMOURED CABLE, 4CORE, 16mm AC.ARM.4C.16mm METER
4 PVC/PVC AC CABLE 5 CORE, BLACK, 10mm 5C/10mm METER
5 CABLE TIE 4" (WHITE) CBL. TIE -W-IND-4" PC
6 CABLE TIE 8" (WHITE) CBL. TIE -W-IND-8" PC
7 CABLE TIE 14" (WHITE) CBL. TIE -W-IND-14" PC
8 CABLE TIE 14" (BLACK) CBL. TIE -W-OUD-14" PC
9 7/8" COAXIAL CABLE EC5-50 METER
10 1/2" COAXIAL CABLE LDF4-50A METER
11 TX JUMPER CABLE (716M - 716M), 2 MTR F4A-PDMDM-2M PC
12 RX JUMPER CABLE (716M - NM), 2 MTR F4A-PNMDM-2M PC
EARTHING SYSTEM
1 COPPER BARE WIRE, 35MM, MULTI STRAND N/A METER
2 ANDREW CONNECTOR EARTHING KIT (INDOOR) 244495 PC
3 ANDREW FEEDER EARTHING KIT (OUTDOOR) SGL5-06B1 PC
CONNECTORS
1 RFS ANGLE ADAPTER N-TYPE (MALE TO FEMALE) 15852401 PC
2 H+S BNC CONN. (JACK FULL), 75 OHM, FOR RG59 21BNC-75-4-4 PC
3 RFS 7/16 FEMALE CONNECTOR FOR 7/8" CABLE 15570560 PC
4 H+S N-MALE CONNECTOR FOR 7/8" CABLE 11N-50-23-10 PC
5 H+S N-MALE CONNECTOR FOR 1/2" CABLE 11N-50-12-10 PC
6 H+S TNC-MALE TO BNC FEMALE ADAPTOR 33-TNC-BNC50-1 PC
7 H+S N-MALE TO N-MALE ADAPTOR 32N-50-0-2 PC
8 RFS FEEDER COUPLING (SPLICER) 155 730 60 PC
MISCELLANEOUS ITEMS
1 AC TRUNKING, 2" X 2", ORANGE C/W ACCESS N/A PC
2 METAL CABLE TRAY, 4" X 1", H.D.G., C/W ACCESS N/A PC
3 CABLE LUG 35MM N/A PC
4 CABLE LUG 150MM N/A PC
5 C-CLAMP (C-TYPE) COMPRESSED FOR 35MM N/A PC
6 3M COOL SHRINK N/A PC
7 CABLE GLAND (FEEDER THROUGH) N/A PC
8 3M ELECTRICAL TAPE, SUPER 33+, 3/4 X 66' 6132 PC
9 3M ELECTRICAL PUTTY , SCOTCHFILL, 1 1/2" X 60" 15140 PC
10 FEEDER CLAMP (2 IN 1) N/A PC
11 FEEDER CLAMP (3 IN 1) N/A PC
12 PVC TRUNKING (GREY), 4" X 2" X 1.8M 7 LENGTH
13 SYW RAWL PLUG (M6X450MM) PC
14 SYW RAWL PLUG (M12) with rod PC
15 SYW RAWL PLUG (M12) w/o rod PC
TOTAL COST (FOR INSURANCE PURPOSES)
Requester: _________________________ Checked By: _________________________
(SIGNED & STAMPED) (SIGNED & STAMPED)
IG EAST
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 46/141
SITE ID : G 2554
SITE NAME : IG EAST
SITE CONFIGURATION : 1 +1 +1
NORTHERN REGION
Transmission Checklist
CELCOM (M) BHD.
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 47/141
A. SITE DETAILS
1 . X OWN TRANSMISSION SOLUTION
X MICROWAVE VSAT FIBER OPTIC
REMARKS
REMARKS :
2 . LEASED LINE
TM LEASED LINE POI/POP : . 2 E1
3 E1
REMARKS :
C . ADDITIONAL REQUIREMENT FOR TRANSMISSION SOLUTION.
1 . CME
TRM/TOC DC POWER SUPPLY ( Pls specify : )
TRIPOD SHELTER ( Pls specify : )
PLINTH DDF
REMARKS :
-
SITE A SITE B
Jusco Ipoh NA - -
INSTALLED FREEUSED RESERVED
IG East
IG East
G 2554
E1 SHARING ( MAXIS / DIGI) POI/POP : .
SITE NAME
SITE ID
RNC HOME
NODE B TYPE
AS Pembinaan
2-Mar-06
(Not Known)
Verify by, (Name, TX Region. HP num)
TSS TRANSMISSION CHECKLIST FOR 3G
Prepared by,(Mohd Yazid B Md Yunus;019-3555014)
B . TRANSMISSION MEDIA FOR NODE-B CONNECTION.
REGION
SURVEY BY
SURVEY DATE
NORTHERN
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 48/141
SITE ID : G 2554
SITE NAME : IG EAST
SITE CONFIGURATION : 1 +1 +1
CELCOM (M) BHD.
NORTHERN REGION
CME BOQ
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 49/141
SITE ID : G 2554
SITE NAME : IG EAST
SITE CONFIGURATION : 1 +1 +1
CELCOM (M) BHD.
NORTHERN REGION
Installation Plan
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 50/141
SITE ID : G 2554
SITE NAME : IG EAST
SITE CONFIGURATION : 1 +1 +1
SMU
CELCOM (M) BHD.
NORTHERN REGION
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 51/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 52/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 53/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 54/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 55/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 7 of 51
3
PROJECT DESCRIPTION
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 56/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 8 of 51
3.1 Project Description
General introduction:
NodeB name IGEAST Address Jalan Perajurit 11, T.Ipoh Timur, 31400 Ipoh
Project type 3G macro
NodeB type S1/1/1
Equipment type NodeB 3812A
Diversity mode 2×antenna diversity
Coordinate scale N 04º 37’ 5.8” E 101º 07’ 30”
Antenna system Sector 1 Sector 2 Sector 3 Sector 4 Sector 5 Sector 6
Antenna type AGINIT
RUST AGINIT
RUST AGINIT
RUST
Number of antennas 1 1 1
Antenna gain (dBi) 18.3 18.3 18.3
Antenna polarization modeDual
polarization
Dualpolarizat
ion
Dualpolarizat
ion
Antenna semi-wave angle 63 63 63
Azimuth 80˚ 200˚ 320˚
Antenna weight (kg) 5.3 5.3 5.3
Antenna Height 20 20 20
TTA presented or not N/A N/A N/A
Feeder type 1 5/8” 1 5/8” 7/8”
Length of a single feeder 63 52 26
E. Tilt 2 2 2
M. Tilt 0 0 0
Corollary equipment:Power supply(V) -48V DC
Battery capacity(Ah) 160
Transmission mode E1
No. of E1 2
Transmission Vendor Existing MW
No. of Battery Bank 1
DC power supply Existing ACPDB
User information
Person in charge
Celcom
Jason Stephen Nayagam Email [email protected]
Telephone Fax
Participants of the projectTelephone
Survey personnel CelcomEmail
TelephoneDesign personnel Celcom
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 57/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 9 of 51
3.2 NodeB Cell parameter and data configuration
Cell information Cell 1 Cell 2 Cell 3
Cell Name NW400541_1_1 NW400542_1_2 NW400543_1_3
Cell ID 11121 11122 11123
Max Transmit Power (dBm) 44 44 44
DL primary scrambling code 180 188 196
Time offset 256 512 768
UL Frequency 9812 9812 9812
DL Frequency 10762 10762 10762
LAC 3022 3022 3022
SAC 34054 34054 34054
RAC 1 1 1
URA 3022 3022 3022
CPICH (dBm) 33 33 33
Neighboring Cell
Neighboring Cell 1
Neighboring Cell 2
Neighboring Cell 3
NodeB Data Configuration Info
Version No. BTS3812E&3812A V100R006C01B080
Local IP Address 17.21.2.15
Local Cell ID 0, 1, 2
IMA Link No. 0, 1
UNI Link No. -
Note: Please input the cell parameter.
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 58/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 10 of 51
4
PROJECT RESPONSIBILITY INTERFACE
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 59/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 11 of 51
4. Project Responsibility Interface
R&A TELECOMMUNICATION
SDN BHD
PROJECT RESPONSIBILITY INTERFACE
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 60/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 12 of 51
5
EQUIPMENT LOCATION
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 61/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 13 of 51
5. Equipment Location
5.1 Node B Installed
5.2 AC/DC Power Tapping Point
AC PowerTaping Point
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 62/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 14 of 51
5.3 E1 Connection Point
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 63/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 15 of 51
6
ANTENNA LOCATION
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 64/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 16 of 51
6.1 Antenna Location
Sector 1
Sector 2
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 65/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 17 of 51
Sector 3
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 66/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 18 of 51
6.2 Sector Beam width View
a. Sector 1
b. Sector 2
c. Sector 3
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 67/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 19 of 51
6.3 Panoramic View
a. 0 degree
b. 40 degree
c. 80 degree
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 68/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 20 of 51
d. 120 degree
e. 160 degree
f. 200 degree
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 69/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 21 of 51
g. 240 degree
h. 280 degree
i. 320 degree
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 70/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 22 of 51
7
FEEDER CABLE ROUTING
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 71/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 23 of 51
7.1 Feeder Cable Routing
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 72/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 24 of 51
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 73/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 25 of 51
7.2 Earth Point
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 74/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 26 of 51
8
ENGINEERING DRAWING
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 75/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 76/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 77/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 27 of 51
9
MATERIAL REQUEST&
BOQ
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 78/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 79/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 80/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 81/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 82/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 83/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 84/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 85/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 86/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 87/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 88/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 89/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 90/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 91/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 92/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 93/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 94/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 28 of 51
9. BTS 3812A BOQ
BOM NO. DESCRIPTION QTY UOM
02130608 Power module,-33~65degC,90~290Vac,-53.5V/30A 3 PCS
02313069 Power System Monitor Module-EPMU01 1 PCS
31070026 Huawei License Certificate 1 PCS
02313078 Multicarrier Antenna Filter Unit 1 PCS
02313078 Multicarrier Antenna Filter Unit 1 PCS
02313078 Multicarrier Antenna Filter Unit 1 PCS
02312783NodeB band 1 Multi-Carrier Transceiver Unit
38W,Band1,RX1920-1980/TX2110-2170MHz)1 PCS
02312783NodeB band 1 Multi-Carrier Transceiver Unit
(38W,Band1,RX1920-1980/TX2110-2170MHz)1 PCS
02312783 NodeB band 1 Multi-Carrier Transceiver Unit(38W,Band1,RX1920-1980/TX2110-2170MHz)
1 PCS
03039105 HSDPA supported baseband processing and interface unit 1 PCS
03039105 HSDPA supported baseband processing and interface unit 1 PCS
03030ATX NodeB Digital Trunk Interface unit 1 PCS
03030CPM NodeB Main Processing & Timing unit without GPS 1 PCS
02111720 Battery Cabinet 1 PCS
02112092 3812A Outdoor 220V Hot-Exchange Assembly Cabinet 1 PCS
02234487 Filler Panels for WCDMA NodeB BTS3812A Power 4 PCS
21150495 BTS3812A Mount Base Kit 1 PCS
21150429 battery cabinet mount set component 1 PCS
27010236Directional antenna,1710~2170M,18dBi,65deg,dual
polarization,250W,2deg,,DIN/Female,With downtilts1 PCS
27010236Directional antenna,1710~2170M,18dBi,65deg,dual
polarization,250W,2deg,,DIN/Female,With downtilts1 PCS
27010236Directional antenna,1710~2170M,18dBi,65deg,dual
polarization,250W,2deg,,DIN/Female,With downtilts1 PCS
02210177 Conductive Material-ESD Glove, With Chinese/English Manual 1 PCS
04040653Trunk Cable,20m,75ohm,4E1,3.9mm,D25M,
SYVP75-2/0.34*8(S),BTS36121 PCS
04040795 Single Cable, Self-loop Cable,D25F,12*18UL1015BL,BTS3812 4 PCS
04044187Single Cable, Temperature Sensor External Cable,10m, H2(2.5),
16SJTW(4C)B, BTS3806A Auxiliary Storage Battery Cabinet1 PCS
14040137Coaxial Connector,7/16 DIN,50ohm,Plug/Straight,
Male, Matching Superflexible 1/2" Cable12 PCS
14040166Coaxial Connector, SMB Connector,
75ohm/Straight/Female,Matching SYV-75-2-2 Cable8 PCS
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 95/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 29 of 51
14180219Termi-Blok Stacking Connector,6PIN,Top Screw, Horizontal
Leading Wire, AWG13-2,Commissioning Before Choice1 PCS
21100015 Wire Clip,GT-150I,150*3.6mm,Strength 18.2kg 200 PCS
21100144Nonmetallic parts-GT-300I-cable fastener-
300*3.6mm-strength 18.2kg200 PCS
21101259 Cable Tie-GT-300IUV£¨3.6*300£© 100 PCS
21120291 Grounding Hardware Combination 2 SET
21200708 Label Type Harness 12 PCS
26010496Standard Parts-bolt with cross head, combination of spring
washer and plain washer-(GB9074.4-88)-M4*10-zinc plated4 PCS
28010212
GE TSE382C insulated fixing adhesives, translucence, manually
applying, single component room temperature vulcanization,
Silicone Sealant
5 PCS
28040013 Heat Shrink Tube/D18/Radial Shrink Rate>50%/Black 50 CM
28040015 Heat-Shrink Tube,D25,Radial Shrinkage Ratio>50%,Black 50 CM
28040017 Heat-Shrink Tube,D30,Radial Shrinkage Ratio>50%,Black 50 CM
28040023 Heat-Shrink Tube/D8.0/Radial Shrinkage Ratio %>50%/Black 50 CM
28050001 Wrist Strap 1 PCS
29040316
Blank Label,DB0699, Huawei D Blank Cable Label,40 Groups 40Pcs,
4 Columns*10 Rows, Height 17.8 Width 48.0,1Pcs Each Group,
White
1 PCS
29041038 Outdoor Label 4 PCS
29041060 Signal Cable label 2 PCS
29041061 Power Cable label 1 PCS
63120038 small metal parts 1 PCS
63200065DKBA0.480.0238,Cable Tie,GT-300HDUV,7.6X300,
Anti-Ultraviolet And Anti-Freeze, Black, For BTS3001C150 PCS
24020329Rechargeable Battery, VRLA Battery,48V,200Ah,
Battery Group, Single Cell 94*176*394mm1 SET
24020329Rechargeable Battery, VRLA Battery,48V,200Ah,
Battery Group, Single Cell 94*176*394mm1 SET
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 96/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 30 of 51
10
HARDWARE CONFIGURATION
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 97/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 31 of 51
10. Hardware Configuration
10.1 Cabinet Board Layout
Cabinet Board Layout
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 98/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 32 of 51
10.2 Board Information List ( BTS3812A)
Board name Boardcategory Board version Quantity Board serial NO.
QW-BNMAC
Outdoor3812ACabinetHeat-
exchanger-220V
N/A 1 210212316N064000093
KM-BAT-RACK
OutdoorStorageBatteryCabinet
N/A 1 210212315N0640001111
QW-FAN FAN Node B Fan Box 1 -
PMU PowerMonitorModule
V100R006 1 2958820
1 2957741
1 3014038PSU
PowerSupply
Module forMacro BTS
V100R006
1 3013738
NMPT SCC V100R006 1 030CPM106100028
V100R006 1 0391051067000093
HBBI
InterfaceProcessing
BoardHSDPA
SupportedV100R006 1 0391051067000072
NDTIDigital trunk
Interfaceboard
V100R006 1 030DEF1064000476
V100R006 1 21023130781061000655
V100R006 1 21023130781061000644MAFUMulticarrier AntennaFilter Unit
V100R006 1 21023130781061000508
V100R006 1 2199011478E063000029
V100R006 1 2199011478E063000005MTRUMulti-CarrierTransceiver
V100R006 1 2199011478E063000009
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 99/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 33 of 51
10.3 Host Version Information List
1. BTS3812 Version:
Host version Description
Version used by the local BS
(mark √ in the relevant column)
Remarks
BTS3812EID of the Node B
versionV100R006C02B080
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 100/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 34 of 51
11
EXTERNAL CABLE CONNECTION
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 101/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 35 of 51
11. External Cable Connection
Antenna Connection Table
Antenna connection table
NDDLNo.
N-ports on MAFUpanel
No. of the ports on the top of thecabinet
Corresponding sector Remarks
MAFU_TXM ANT_0A Sector 1MAFU
MAFU_TXD ANT_0B Sector 1
MAFU_TXM ANT_1AMAFU
MAFU_TXD ANT_1B
MAFU_TXM ANT_2A Sector 2
MAFU MAFU_TXD ANT_2B Sector 2
MAFU_TXM ANT_3AMAFU
MAFU_TXD ANT_3B
MAFU_TXM ANT_4A Sector 3MAFU
MAFU_TXD ANT_4B Sector 3
MAFU_TXM ANT_5AMAFU
MAFU_TXD ANT_5B
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 102/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 36 of 51
Trunk Cable Connection Table
E1 transmission mode E1 port No. Characteristic impedance
NDTINo.
No. of DB25 oncabinet top
E1port
Characteristicimpedance
Port No. ofDDF rack
Used orUnused
Peerequipment
Remarks
0 75 0 Used SYRN1
1 75 1 Used SYRN1
2 75E1_0
3 75
4
5
6
NDTI0
E1_1
7
89
10E1_2
11
12
13
14
NDTI1
E1_3
15
Optical transmission mode
NAOINo.
STM-1 portNo.
Optical typePort No. ofODF rack
Used orunused
Peerequipment
Remarks
0NAOI0
1
2NAOI1
3
NAOINo.
E1 port No. Characteristic impedancePort No. ofDDF rack
Used orunused
Peerequipment
Remarks
0
1
2NAOI1
3
4
5NAOI1
6
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 103/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 37 of 51
12
DTF & VSWR PLOTS
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 104/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 38 of 51
1. Sector 1 Tx/RxA – DTF
1.0
1.1
1.2
1.3
1.4
1.5
0 10 20 30 40 50 60 70 80
M1 M2 M3 M4 M5
Distance-to-faultIG EAST TX1/RX1A
Model: S251B Serial #: 00112098 Prop.Vel:0.890Date: 09/29/2006 Time: 15:35:02 Ins.Loss:0.043dB/mStd: Channel: 0BiasTee: OFF Output Power: 6.00 dBmResolution: 517 CAL:ON(COAX) CW: ON
V S W R
Distance (0.0 - 80.0 Meter)
M1: 1.004 @2.02 Meter M2: 1.043 @4.65 Meter M3: 1.039 @65.43 Meter
M4: 1.047 @67.75 Meter M5: 1.144 @69.61 Meter
2. Sector 1 Tx/RxA – VSWR
1.0
1.1
1.2
1.3
1.4
1.5
1.6
1750 1800 1850 1900 1950 2000 2050 2100 2150
Limit : 1.5
M1 M2
VSWR IG EAST TX1/RX1A
Model: S251B Serial #: 00112098Date: 09/29/2006 Time: 15:33:31Std: Channel: 0BiasTee: OFF Output Power: 6.00 dBmResolution: 517 CAL:ON(COAX) CW: ON
V S W R
Frequency (1710.0 - 2170.0 MHz)
M1: 1.25 @1816.98 MHz M2: 1.245 @2112.95 MHz
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 105/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 39 of 51
3. Sector 1 RxB – DTF
1.0
1.1
1.2
1.3
1.4
1.5
0 10 20 30 40 50 60 70 80
M1 M2 M3 M4M5
Distance-to-faultIG EAST RX1B
Model: S251B Serial #: 00112098 Prop.Vel:0.890Date: 09/29/2006 Time: 15:36:00 Ins.Loss:0.043dB/mStd: Channel: 0BiasTee: OFF Output Power: 6.00 dBmResolution: 517 CAL:ON(COAX) CW: ON
V S W R
Distance (0.0 - 80.0 Meter)
M1: 1.018 @2.33 Meter M2: 1.033 @4.50 Meter M3: 1.033 @64.96 Meter
M4: 1.022 @67.29 Meter M5: 1.047 @68.84 Meter
4. Sector 1 RxB – VSWR
1.0
1.1
1.2
1.3
1.4
1.5
1.6
1750 1800 1850 1900 1950 2000 2050 2100 2150
Limit : 1.5
M1 M2
VSWR IG EAST RX1B
Model: S251B Serial #: 00112098Date: 09/29/2006 Time: 15:36:21Std: Channel: 0BiasTee: OFF Output Power: 6.00 dBmResolution: 517 CAL:ON(COAX) CW: ON
V S W R
Frequency (1710.0 - 2170.0 MHz)
M1: 1.167 @1715.35 MHz M2: 1.2 @2094.22 MHz
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 106/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 40 of 51
5. Sector 2 Tx/RxA – DTF
1.0
1.1
1.2
1.3
1.4
1.5
0 10 20 30 40 50 60 70
M1 M2 M3 M4 M5
Distance-to-faultIG EAST TX2/RX2A
Model: S251B Serial #: 00112098 Prop.Vel:0.890Date: 09/29/2006 Time: 15:25:25 Ins.Loss:0.043dB/mStd: Channel: 0BiasTee: OFF Output Power: 6.00 dBmResolution: 517 CAL:ON(COAX) CW: ON
V S W R
Distance (0.0 - 70.0 Meter)
M1: 1.012 @2.31 Meter M2: 1.02 @4.61 Meter M3: 1.035 @54.40 Meter
M4: 1.035 @56.71 Meter M5: 1.128 @58.60 Meter
6. Sector 2 Tx/RxA – VSWR
1.0
1.1
1.2
1.3
1.4
1.5
1.6
1750 1800 1850 1900 1950 2000 2050 2100 2150
Limit : 1.5
M1 M2
VSWR IG EAST TX2/RX2A
Model: S251B Serial #: 00112098Date: 09/29/2006 Time: 15:26:58Std: Channel: 0BiasTee: OFF Output Power: 6.00 dBmResolution: 517 CAL:ON(COAX) CW: ON
V S W R
Frequency (1710.0 - 2170.0 MHz)
M1: 1.24 @1778.64 MHz M2: 1.22 @2038.95 MHz
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 107/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 41 of 51
7. Sector 2 RxB – DTF
1.0
1.1
1.2
1.3
1.4
1.5
0 10 20 30 40 50 60 70
M1 M2 M3 M4 M5
Distance-to-faultIG EAST RX2B
Model: S251B Serial #: 00112098 Prop.Vel:0.890Date: 09/29/2006 Time: 15:28:46 Ins.Loss:0.043dB/mStd: Channel: 0BiasTee: OFF Output Power: 6.00 dBmResolution: 517 CAL:ON(COAX) CW: ON
V S W R
Distance (0.0 - 70.0 Meter)
M1: 1.012 @2.17 Meter M2: 1.049 @4.61 Meter M3: 1.041 @55.76 Meter
M4: 1.045 @57.93 Meter M5: 1.06 @59.96 Meter
8. Sector 2 RxB – VSWR
1.0
1.1
1.2
1.3
1.4
1.5
1.6
1750 1800 1850 1900 1950 2000 2050 2100 2150
Limit : 1.5
M1 M2
VSWR IG EAST RX2B
Model: S251B Serial #: 00112098Date: 09/29/2006 Time: 15:29:08Std: Channel: 0BiasTee: OFF Output Power: 6.00 dBmResolution: 517 CAL:ON(COAX) CW: ON
V S W R
Frequency (1710.0 - 2170.0 MHz)
M1: 1.225 @1883.84 MHz M2: 1.273 @2001.51 MHz
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 108/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 42 of 51
9. Sector 3 Tx/RxA – DTF
1.0
1.1
1.2
1.3
1.4
1.5
0 5 10 15 20 25 30 35 40 45
M1 M2 M3 M4 M5
Distance-to-faultIG EAST TX3/RX3A
Model: S251B Serial #: 00112098 Prop.Vel:0.890Date: 09/29/2006 Time: 15:18:30 Ins.Loss:0.069dB/mStd: Channel: 0BiasTee: OFF Output Power: 6.00 dBmResolution: 517 CAL:ON(COAX) CW: ON
V S W R
Distance (0.0 - 45.0 Meter)
M1: 1.043 @2.35 Meter M2: 1.02 @5.23 Meter M3: 1.02 @28.08 Meter
M4: 1.024 @30.26 Meter M5: 1.141 @32.18 Meter
10. Sector 3 Tx/RxA – VSWR
1.0
1.1
1.2
1.3
1.4
1.5
1.6
1750 1800 1850 1900 1950 2000 2050 2100 2150
Limit : 1.5
M1 M2
VSWR IG EAST TX3/RX3A
Model: S251B Serial #: 00112098Date: 09/29/2006 Time: 15:18:51Std: Channel: 0BiasTee: OFF Output Power: 6.00 dBmResolution: 517 CAL:ON(COAX) CW: ON
V S W R
Frequency (1710.0 - 2170.0 MHz)
M1: 1.252 @1813.41 MHz M2: 1.24 @2104.92 MHz
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 109/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 43 of 51
11. Sector 3 RxB – DTF
1.0
1.1
1.2
1.3
1.4
1.5
0 5 10 15 20 25 30 35 40 45
M1 M2 M3 M4 M5
Distance-to-faultIG EAST RX3B
Model: S251B Serial #: 00112098 Prop.Vel:0.890Date: 09/29/2006 Time: 15:21:02 Ins.Loss:0.069dB/mStd: Channel: 0BiasTee: OFF Output Power: 6.00 dBmResolution: 517 CAL:ON(COAX) CW: ON
V S W R
Distance (0.0 - 45.0 Meter)
M1: 1.018 @2.53 Meter M2: 1.066 @5.06 Meter M3: 1.026 @27.99 Meter
M4: 1.033 @30.26 Meter M5: 1.058 @32.27 Meter
12. Sector 3 RxB – VSWR
1.0
1.1
1.2
1.3
1.4
1.5
1.6
1750 1800 1850 1900 1950 2000 2050 2100 2150
Limit : 1.5
M1 M2
VSWR IG EAST RX3B
Model: S251B Serial #: 00112098Date: 09/29/2006 Time: 15:20:31Std: Channel: 0BiasTee: OFF Output Power: 6.00 dBmResolution: 517 CAL:ON(COAX) CW: ON
V S W R
Frequency (1710.0 - 2170.0 MHz)
M1: 1.172 @1821.43 MHz M2: 1.227 @2085.31 MHz
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 110/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 44 of 51
13 Antenna System Test Result
Sector 1 Sector 2 Sector 3
Tx/RxA RxB Tx/RxA RxB Tx/RxA RxB
VSWR (Peak) 1.25 1.200 1.24 1.273 1.252 1.227
DTF (Peak) 1.144 1.047 1.128 1.06 1.141 1.058
DTF at End Jumper 1.047 1.022 1.035 1.045 1.024 1.033
DTF at Indoor
Jumper 1.043 1.033 1.02 1.049 1.043 1.066
Indoor jumper (m) 2.5 2.5 2.5 2.5 2.5 2.5
End jumper (m) 2.5 2.5 2.5 2.5 2.5 2.5
Feeder length (m) 62.93 62.46 51.90 52.76 25.26 2526
Total length (m) 32.13 32.10 31.55 31.55 31.94 31.94
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 111/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 45 of 51
13
COMMISSIONING & INTEGRATIONCHECKLIST
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 112/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 113/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 114/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 115/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 116/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 46 of 51
14
EQUIPMENT INSTALLATION REPORT
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 117/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 118/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 119/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 120/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 47 of 51
15
NODE B HARDWARE INSTALLATIONACCEPTANCE
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 121/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 122/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 123/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 124/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 125/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 126/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 127/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 128/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 129/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 48 of 51
16
NODE B USER ACCEPTANCE REPORT
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 130/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 131/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 132/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 133/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 134/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 135/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 136/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 49 of 51
17
SINGLE SITE VERIFICATION REPORT
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 137/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 138/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 50 of 51
18
PUNCH LIST
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 139/141
8/19/2019 Fr Igeast Nw40054 w Ed
http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 140/141
Celcom 3G ProjectNodeB Project File
Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc
Ver1.0 Confidential 06/11/2007 Page 51 of 51
19
CERTIFICATE OF ACCEPTANCE