Technical specification IT-3684
by Elena Perez Rodriguez
Thermosiphon project 2
• Introduction• Scope of the tender• General conditions for tendering and contracting• Technical requirements• Design • Assembly• Factory tests• Delivery and installation at CERN • Commissioning • Maintenance • Quality assurance• Safety• Annexes• Conclusion
CONTENTS
14/12/2010
Thermosiphon project 3
Introduction• This presentation will go through the technical
specifications for the chiller system.
• These documents have been sent to all the qualified bidders after the market survey 3684.
• Questions will be answered at the end of the presentation.
14/12/2010
CHILLER UNIT(S)
BRINE
Scope of the tender
4
Primary water
Chiller and brine : design, selection & purchase of components, refrigerants for chiller, construction, skids, installation, connection and commissioning
Thermosiphon condenser and piping
Spares(1 year & 10000 h)
Electrical design, functional analysis, electrical/control components, cabling and electrical/control cabinets
Documentation and labeling
Terminal blocks, PLC and software (UNICOS)
Fluid for the brine
Thermosiphon project 5
General conditions for tendering
Pre-tender discussions
• Bidders conference - Questions and answers sent to all bidders
14/12/2010
Technical and design
• P&ID, P-h diagram• Dimensions and weights, general assembly
drawings.• Electrical power, compress air and water supply
needed. • MSDS for refrigerants and TDS for compressors,
pumps and heat exchangers.• Technical questionnaire.• Reliability and risk analysis.
Organization
• Work site organisation, preliminary schedule, project team.
• Working methods, protection means and test methods for commissioning.
Purchase
• Price List.• Tender
form.
Documents to be sent with the tender
Refer to the purchase documents for more information
Thermosiphon project 6
Adjudication of the contract• Finance committee (16
march)
Detailed design• Functional analysis• Detailed design• Planning• CERN approval of design
Delivery• Delivery of the
skids at CERN.
InstallationCommissioning • Commissioning on the
by-pass.• Acceptance of the
equipment.
Delivery schedule
March 2011
April 2011
September 2011
October 2011
December 2011
Thermosiphon project 7
Technical requirements• Chiller units
– Two circuits in cascade (high and low temperature).
– Refrigerant to be chosen by contractor.
14/12/2010
Operation regimes Nominal operation
Warm operation
Cooling power in the Thermosiphon condenser 180 kW 50 kW
Temperature at the inlet of the Thermosiphon condenser -70°C -20°C
Temperature at the outlet of the Thermosiphon condenser -65°C -15°C
Maximum pressure drop 4 bar 4 bar
• Brine circuit– Mono-phase liquid
C6F14.
– Materials shall be compatible with fluorocarbons.
Thermosiphon project 8
Chiller configuration I
14/12/2010
C3F8 condenser 180 kW-70 °C
liquidtank
USA15cavern
Surface
C6F1
4 br
ine
circ
uit
Primary water 27°C
CHILLER 350% power for nominal operation
ATLAS IDDetector
UX15cavern
Back-up50 kW-20 °C Brine circuit
Redundant pumps
CHILLER 250% power for nominal operation
CHILLER 150% power for nominal operation
Thermosiphon project 9
Power supply : configuration I
14/12/2010
Standard power supply
Diesel power supply
30 kW
45 kW
45 kW
25 kW
45 + 45 kW
45 kW
45 kW
Thermosiphon project 10
P&I for the configuration I
14/12/2010
Thermosiphon project 1114/12/2010
Chiller configuration II
liquidtank
USA15cavern
Surface
C6F1
4 br
ine
circ
uit
Primary water 27°C
CHILLER 4100% power for nominal operationRedundant
CHILLER 5For emergency situation
ATLAS IDDetector
UX15cavern
C3F8 condenser 180 kW-70 °C
Back-up50 kW-20 °C Brine circuit
Redundant pumps
CHILLER 6For emergency situation
Thermosiphon project 12
Power supply : configuration II
14/12/2010
Standard power supply
Diesel power supply
25 kW
180 kW
20 kW
20 kW
30 kW
Thermosiphon project 13
P&I for the configuration II
14/12/2010
Thermosiphon project 14
DesignOperation and reliability
• Power regulation– 20 ÷ 100%
• Temperature regulation– 20°C ÷ -70°C– Precision ± 1 K
• Compressor– MTBF > 40,000 h– MTTR < 10 h
• Chiller system – MTBF > 20,000 h
Other
• Seismic requirements
• Sound level• Reliability and risk analysis
14/12/2010
Thermosiphon project 15
Integration
14/12/2010
Integration responsible:
Alexander Bitadze
To be approved by CERN’s safety team.Visit on site in the afternoon.
Thermosiphon project 16
Assembly
14/12/2010
• All the components shall be pre-assembled in metallic frames (skids)– Maximum dimensions : 14m x 2.5 m x 3 m– 15 tons
• Control and electrical cabinets will also be pre-assembled– Space will be leaved for the PLC and the terminal blocks provided by
CERN.
• The insulation shall be protected with an stainless steel cover.
Thermosiphon project 17
Factory tests
14/12/2010
In the contractor premises
Welding inspection
100% visual inspection
10% X-rays
Pressure and leak tests
Compliant with PED
Electrical mappingThe procedures and
reports of all the tests shall be supplied
Thermosiphon project 18
Delivery, installation and commissioning at CERN
Delivery and installation• Transport and handling of
the system to CERN Point 1 (Switzerland)
• The installation shall be performed by the contractor.
• The contractor staff shall have the adequate training. CERN will provide its domain-specific training.
Commissioning• Done in collaboration
between CERN and the supplier.
• CERN will provide the pre-tested program (according to the functional analysis).
• CERN will provide a dummy load for the tests phase.
14/12/2010
Thermosiphon project 19
Maintenance• Maintenance– Preventive maintenance plan and spare parts list
provided by the contractor.– The Preventive Maintenance Plan shall be done
during nominal operation at full power
The chiller units shall be electrically independent including instrumentation
14/12/2010
Thermosiphon project 20
Quality assurance• Documentation general
– Documentation in English or French.
– In a computer readable and editable form
• Labeling– The components shall be
identified with labels.• Technical documentation
– Templates for: Technical dossier (STA), Functional analysis, spare parts and installed parts list.
– Preventive Maintenance Plan shall also be provided
14/12/2010
Description Format
2D drawings AUTOCAD
3D drawings CATIA
Electrical drawings Ms Visio/ Tracelec /AUTOCAD
Other documents Ms Word / Ms Excel / Ms Project
Thermosiphon project 21
Safety
Rules and regulations
Can be consulted in the web
CERNInternational and national standards
Other documents
Host states
14/12/2010
Thermosiphon project 22
AnnexesHydraulic
• 1. Basic P&ID• 2. Technical
prescriptions for piping and accessories
• 3. C6F14 technical characteristics and properties.
• 4. Technical requirements for the brine circuit.
Electricity,
cont
rol an
d regula
tion
• 5. Control and Regulation
• 6. Instrumen tation
• 7. Electricity
Templates
• 8. Installed parts template
• 9. Spare parts list template
• 10. Purchase technical specification (STA) template.
• 11. Technical Dossier template.
Othe
r
• 12. Agenda for the bidders’ conference.
• 13. Price list
14/12/2010
Thermosiphon project 23
Conclusions• An overview of the specifications for the chiller
has been shown.
• More details can be found in the technical documents.
• The bidders are required to price the different options for the two configurations in the price list.
14/12/2010
Thermosiphon project 24
Thank you for
your attention
14/12/2010
Any questions ?