Federal Railroad Administration
Fiscal Year 2018 Enforcement Report
i
Table of Contents
I. Introduction
II. Summary of Inspections and Audits Performed, and of Enforcement Actions Recommended in FY 2018 A. Railroad Safety and Hazmat Compliance Inspections and Audits
1. All Railroads and Other Entities (e.g., Hazmat Shippers) Except Individuals 2. Railroads Only
B. Summary of Railroad Safety Violations Cited by Inspectors, by Regulatory Oversight Discipline or Subdiscipline 1. Accident/Incident Reporting 2. Grade Crossing Signal System Safety 3. Hazardous Materials 4. Industrial Hygiene 5. Motive Power and Equipment 6. Railroad Operating Practices 7. Signal and train Control 8. Track
C. FRA and State Inspections of Railroads, Sorted by Railroad Type 1. Class I Railroads 2. Probable Class II Railroads 3. Probable Class III Railroads
D. Inspections and Recommended Enforcement Actions, Sorted by Class I Railroad 1. BNSF Railway Company 2. Canadian National Railway/Grand Trunk Corporation 3. Canadian Pacific Railway/Soo Line Railroad Company 4. CSX Transportation, Inc. 5. The Kansas City Southern Railway Company 6. National Railroad Passenger Corporation 7. Norfolk Southern Railway Company 8. Union Pacific Railroad Company
III. Summaries of Civil Penalty Initial Assessments, Settlements, and Final Assessments
in FY 2018 A. In General B. Summary 1—Brief Summary, with Focus on Initial Assessments Transmitted C. Breakdown of Initial Assessments in Summary 1
1. For Each Class I Railroad Individually in FY 2018 2. For Probable Class II Railroads in the Aggregate in FY 2018 3. For Probable Class III Railroads in the Aggregate in FY 2018 4. For Hazmat Shippers in the Aggregate in FY 2018 5. For Contractors in the Aggregate in FY 2018 6. For Other Cases in the Aggregate in FY 2018
D. Summary 2—More Detailed Summary of Settlements and Final Assessments of Civil Penalties in FY 2018
ii
E. Breakdown of Settlements and Final Assessments in Summary 2 1. For Each Class I Railroad Individually in FY 2018 2. For Probable Class II Railroads in the Aggregate in FY 2018 3. For Probable Class III Railroads in the Aggregate in FY 2018 4. For Hazmat Shippers in the Aggregate in FY 2018 5. For Contractors in the Aggregate in FY 2018 6. For Other Cases in the Aggregate in FY 2018
IV. Enforcement Actions against Individuals in FY 2018
A. Civil Penalty Cases against Individuals in the Aggregate B. Other Enforcement Actions against Individuals in the Aggregate
V. Discussion of Railroad Safety—The Relationship of Inspections, Enforcement, and
Accidents or Incidents
VI. Summary and Analysis of Operating Crew Certification Cases A. Locomotive Engineer and Operating Crew Review Board (LERB/OCRB) B. Administrative Hearings C. Appeals to the Administrator
VII. Summary and Analysis of Administrative Hearing Cases Related to Hazmat
Violations or Enforcement Actions against Individuals
VIII. Number of Cases Referred to the Attorney General for Civil or Criminal Enforcement
IX. Number and Subject Matter of Compliance Orders, Emergency Orders, or Precursor Agreements
Appendix A—“Railroad Safety Civil Penalty Cases Closed during Fiscal Year 2018”
1
Federal Railroad Administration Fiscal Year 2018 Enforcement Report
I. INTRODUCTION
For several decades, the Federal Railroad Administration (FRA) has compiled an annual civil penalty report summarizing the civil penalty claims for violations of Federal railroad safety and hazardous materials (hazmat) statutes, regulations, and orders FRA has closed.1 As authorized by law, FRA negotiates settlements with railroads and other entities subject to its safety jurisdiction to resolve claims for civil penalties imposed for failures to comply with specific requirements that promote and ensure the safety of the Nation’s freight and passenger railroad operations.2 Also, as authorized by law, FRA issues orders assessing civil penalties for violations of the hazardous materials statutes, regulations, and orders.3 In April 2010, FRA posted an expanded enforcement report pursuant to 49 U.S.C. § 20120 on FRA’s Web site (http://www.fra.dot.gov) to include more information.4 FRA intends to make this additional safety enforcement information available each year by December 31 for the preceding fiscal year (FY), October 1 through September 30. This FY 2018 report includes the following:
• A summary of rail safety and hazmat compliance inspections and audits FRA or State inspectors conducted and enforcement actions FRA recommended;
• A summary of FRA civil penalty enforcement actions sorted by type of alleged violation and type of respondent, including railroads, hazmat shippers, contractors, and individuals;
• A discussion of the relationship between inspections and enforcement actions, the number and rate of reportable accidents and incidents and railroad safety;
• An analysis of locomotive engineer certification cases brought before FRA; and • A list of civil penalty cases FRA closed (at Appendix A to this report).
1 See primarily title 49 of the United States Code, chapters 201-213 and 51, respectively (49 U.S.C. ch. 201-213 and 51, respectively); title 49 of the Code of Federal Regulations (C.F.R.), subtitle B, chapter II (parts 209-244, 272) and chapter I, subchapter A, Hazardous Materials and Oil Transportation, and subchapter C, Hazardous Materials Regulations; 49 U.S.C. § 103; and 49 C.F.R. § 1.89. 2 49 U.S.C. ch. 213, and 31 U.S.C. § 3711. 3 49 U.S.C. ch. 51; 49 C.F.R. § 1.89; 49 C.F.R. part 209. 4 This is consistent with Sections 303 and 307 of the Rail Safety Improvement Act of 2008 (RSIA), Public Law No. 110-432, Division A (122 Stat. 4848), enacted October 16, 2008 (codified at 49 U.S.C. §§ 20120 and 103, note, respectively).
2
II. SUMMARY OF INSPECTIONS AND AUDITS PERFORMED, AND ENFORCEMENT ACTIONS RECOMMENDED
IN FY 2018
A. RAILROAD SAFETY AND HAZMAT COMPLIANCE INSPECTIONS AND AUDITS
1. All Railroads and Other Entities (e.g., Hazmat Shippers) Except Individuals
Number of Inspection Reports: 71,569 Defects: 280,607 Units: 3,288,361 Number of Observations: 315,660 Number of Reports with a Recommended Violation: 3,968 Number of Recommended Violation Defects: 9,940 Number of Inspection Days: 56,057
2. Railroads Only
Number of Inspection Reports: 65,417 Defects: 270,717 Units: 3,230,794 Number of Observations: 297,224 Number of Reports with a Recommended Violation: 3,137 Number of Recommended Violation Defects: 7,294 Number of Inspection Days: 53,253
B. SUMMARY OF RAILROAD SAFETY VIOLATIONS CITED BY INSPECTORS,
BY REGULATORY OVERSIGHT DISCIPLINE OR SUBDISCIPLINE
1. Accident/Incident Reporting Violation Type Number of Recommended Violations
Accident Reporting 322
2. Grade Crossing Signal System Safety Violation Type Number of Recommended Violations
Grade Crossing Signal Safety 308
3. Hazardous Materials Violation Type Number of Recommended Violations
Hazardous Materials 3,026
3
4. Industrial Hygiene Violation Type Number of Recommended Violations
Occupational Noise Exposure 0
5. Motive Power and Equipment Violation Type Number of Recommended Violations
Freight Car Safety Standards 629
Locomotive Safety Standards 457
Passenger Equipment Safety Standards 29
Passenger Train Emergency Preparedness 5
Rear End Marking Devices 1
Safety Appliance Statutes and Regulations 1,539
Safety Glazing Standards 0
Steam Locomotive Inspection and Maintenance 0
All 2,660
6. Railroad Operating Practices Violation Type Number of Recommended Violations
Alcohol and Drug Use 316
Conductor Qualifications 83
Critical Incident Stress Plans 1
Engineer Qualifications 99
FRA Emergency Order(s) 0
Hours of Service Laws and Regulations 192
Hours of Service Record Keeping 210
Railroad Communications 9
Railroad Operating Practices 404
Railroad Operating Rules 514
Railroad Safety Enforcement Procedures 9
Train Horn/Quiet Zone 4
All 1,841
4
7. Signal and Train Control Violation Type Number of Recommended Violations
Signal Inspection Regulations 118
PTC System Implementation 13
All 131
8. Track Violation Type Number of Recommended Violations
Bridge Safety Standards 7
Bridge Worker Safety Standards 19
Roadway Worker Protection 74
Track Safety Standards 1,552
All 1,652
C. FRA AND STATE INSPECTIONS OF RAILROADS, SORTED BY RAILROAD TYPE
1. Class I Railroads
Number of Inspection Reports: 47,659 Defects: 202,100 Units: 2,576,138 Number of Observations: 222,502 Number of Reports with a Recommended Violation: 2,490 Number of Recommended Violation Defects: 5,669 Number of Inspection Days: 5 39,859
5 The total number of inspection days for Class I Railroads in II.C.1 of this report is less than the sum of all the individual Class I railroads’ inspection days cited in II.D.1-8 of this report because FRA inspectors may visit more than one Class I railroad in a day. The same is true for the total number of inspection days for railroads FRA believes are Class II and Class III railroads. See note six for an explanation regarding FRA’s determination of Class I, Class II and Class III railroads.
5
2. Probable Class II Railroads6
Number of Inspection Reports: 1,957 Defects: 7,489 Units: 155,949 Number of Observations: 9,280 Number of Reports with a Recommended Violation: 48 Number of Recommended Violation Defects: 71 Number of Inspection Days: 1,784
3. Probable Class III Railroads
Number of Inspection Reports: 15,801 Defects: 61,128 Units: 498,707 Number of Observations: 65,442 Number of Reports with a Recommended Violation: 599 Number of Recommended Violation Defects: 1,554 Number of Inspection Days: 13,679
6 FRA has identified seven of the eight Class I railroads based on information they filed with the Surface Transportation Board (STB) for calendar year 2017—the latest year available—regarding their annual operating revenues. See STB Web site (http://www.stb.dot.gov) under “All Economic Data” and then “Annual Report Financial Data.” STB requires such filings only from Class I railroads. See 49 C.F.R. § 1241.11 and Ex Parte No. 393 (Sub-No. 2), decided Oct. 28, 1988, 1988 WL 224990 (I.C.C.). Therefore, FRA identified the eighth Class I railroad, Amtrak based on FRA research of other data. Generally, Class II and III railroads are not required to report their annual operating revenues to STB. As a result, FRA identified railroads that are probably Class II and Class III railroads based on its research of railroad revenues, which does not cover commuter railroads. FRA concludes that the following railroads are probably Class II railroads: Alaska Railroad Corp.; Buffalo & Pittsburgh Railroad, Inc.; Florida East Coast Railway Co.; Indiana Rail Road Co.; Iowa Interstate Railroad, Ltd.; Montana Rail Link; Paducah & Louisville Railway Co.; Springfield Terminal Railway Co. and other regional railroads (including Boston & Maine Corp., Maine Central Railroad Co., Pan Am Southern LLC, and Portland Terminal Co.) (all held by Pan Am Railways, Inc.); Rapid City, Pierre & Eastern Railroad, Inc.; Wheeling & Lake Erie Railway Co.; and Wisconsin & Southern Railroad Co. Note that switching and terminal railroads are, by definition, Class III railroads, without regard to their annual operating revenues. 49 C.F.R. § 1201.1-1(d).
6
D. INSPECTIONS AND RECOMMENDED ENFORCEMENT ACTIONS, SORTED BY CLASS I RAILROAD
1. BNSF Railway Company
Number of Inspection Reports: 10,131 Defects: 43,279 Units: 578,516 Number of Observations: 47,889 Number of Reports with a Recommended Violation: 512 Number of Recommended Violation Defects: 1,328 Number of Inspection Days: 8,752
2. Canadian National Railway/Grand Trunk Corporation
Number of Inspection Reports: 2,440 Defects: 9,396 Units: 132,835 Number of Observations: 11,263 Number of Reports with a Recommended Violation: 152 Number of Recommended Violation Defects: 304 Number of Inspection Days: 2,153
3. Canadian Pacific Railway/Soo Line Railroad Company
Number of Inspection Reports: 1,696 Defects: 9,612 Units: 130,086 Number of Observations: 8,450 Number of Reports with a Recommended Violation: 88 Number of Recommended Violation Defects: 119 Number of Inspection Days: 1,508
7
4. CSX Transportation, Inc.
Number of Inspection Reports: 9,495 Defects: 42,618 Units: 529,377 Number of Observations: 44,642 Number of Reports with a Recommended Violation: 419 Number of Recommended Violation Defects: 916 Number of Inspection Days: 8,321
5. The Kansas City Southern Railway Company
Number of Inspection Reports: 1,347 Defects: 5,756 Units: 77,916 Number of Observations: 6,435 Number of Reports with a Recommended Violation: 36 Number of Recommended Violation Defects: 62 Number of Inspection Days: 1,173
6. National Railroad Passenger Corporation (Amtrak)
Number of Inspection Reports: 1,873 Defects: 2,613 Units: 21,416 Number of Observations: 7,569 Number of Reports with a Recommended Violation: 60 Number of Recommended Violation Defects: 181 Number of Inspection Days: 1,564
7. Norfolk Southern Railway Company
Number of Inspection Reports: 7,539 Defects: 38,776 Units: 474,715 Number of Observations: 36,314 Number of Reports with a Recommended Violation: 412 Number of Recommended Violation Defects: 877 Number of Inspection Days: 6,601
8
8. Union Pacific Railroad Company
Number of Inspection Reports: 13,138 Defects: 50,050 Units: 631,277 Number of Observations: 59,940 Number of Reports with a Recommended Violation: 811 Number of Recommended Violation Defects: 1,882 Number of Inspection Days: 11,429
III. SUMMARIES OF CIVIL PENALTY INITIAL ASSESSMENTS, SETTLEMENTS, AND FINAL ASSESSMENTS IN FY 2018
A. IN GENERAL7
Summary 1 Summary 1 provides a broad overview of penalties FRA initially assessed during FY 2018, the initial penalty assessment for cases closed during FY 2018, and the amount of the settlement or the final assessment of civil penalty. FRA has transitioned to a paperless enforcement system for most of the major railroads and under that system, to enhance the readability of the cases on the computer screen, a case includes only one violation report, and not multiple reports, as in the past. Summary 1, below, provides the following:
• The number of violations for which FRA assessed a civil penalty in FY 2018 (through demand letters or, in hazmat cases, notices of probable violation);
• The number of violation reports that FRA declined to enforce in FY 2018 after legal review;
• The initial amount of civil penalties assessed in FY 2018 (the amount of the civil penalty specified in FRA’s demand letter or, for hazmat cases, a notice of probable violation that was transmitted to a respondent (railroad, hazmat shipper, or individual that received the penalty assessment)) regardless of whether FRA closed the cases during FY 2018;
• The civil penalties FRA initially assessed (the “potential collectible amount” or “POCA” listed in in Appendix A) in all cases FRA settled or otherwise closed during FY 2018 (because FRA issued an order assessing a civil penalty in a hazmat case or the respondent paid the civil penalty in full without settling with FRA); and
• The total amount of civil penalties assessed or settled during FY 2018.8
7 The totals in this section exclude civil penalties against individuals. Those are addressed in section IV.A. of this report. 8 In this report, FRA rounded settlement amounts to the nearest whole dollar.
9
Summary 2
To provide more transparency, Summary 2, below, shows initial assessment information only for those cases closed during FY 2018. All numbers in Summary 2 reflect the initial assessments that resulted in FY 2018 settlements or final assessments even though the initial assessments may have occurred in a prior fiscal year. This summary shows (1) the difference between the initial amount of civil penalties assessed and the settlement or final assessment amount, and (2) the difference between the revised assessment amount (or what Attachment A describes as the “provable collectible amount” or “PRCA”) and the final assessment or settlement amount. The revised assessment amount is the amount FRA calculated it could legally collect after evaluating the facts of the violation. Caveat: The number of violation reports in a single case ranges from one to five or more, depending on a number of factors, and a single violation report may allege one or more violations. Therefore, the number of cases with civil penalties initially assessed or settled or finally assessed during a specific period cannot be used for a realistic comparison. This report provides the information, as required by the statute, in Assessment and Summary 2. However, the number of violations provides a better opportunity for standardized review and comparison than does the number of cases.
B. SUMMARY 1—BRIEF SUMMARY, WITH FOCUS ON INITIAL
ASSESSMENTS TRANSMITTED Total number of cases with civil penalties initially assessed in FY 2018:
4,567
Total number of violations with civil penalties initially assessed in FY 2018:
6,225
Total number of violation reports declined during legal review in FY 2018:
325
Total amount of civil penalties initially assessed (POCA) for violations in cases transmitted in FY 2018:
$22,474,257
Total amount of civil penalties initially assessed (POCA) for violations in cases finally assessed or settled in FY 2018:
$25,270,025
Total final civil penalty assessment or settlement in FY 2018:
$17,686,116
10
C. BREAKDOWN OF INITIAL ASSESSMENTS IN SUMMARY 1 1. For Each Class I Railroad Individually in FY 2018
AMTRAK
Number of cases with civil penalties initially assessed:
65
Number of violations with civil penalties initially assessed:
90
Number of violation reports declined during legal review:
12
Initial amount of civil penalty assessed: $334,403 BNSF RAILWAY COMPANY
Number of cases with civil penalties initially assessed:
702
Number of violations with civil penalties initially assessed:
971
Number of violation reports declined during legal review:
51
Initial amount of civil penalty assessed: $3,170,904
CANADIAN NATIONAL RAILWAY/GRAND TRUNK CORPORATION
Number of cases with civil penalties initially assessed:
193
Number of violations with civil penalties initially assessed:
234
Number of violation reports declined during legal review:
27
Initial amount of civil penalty assessed: $766,904
CANADIAN PACIFIC RAILWAY/SOO LINE RAILROAD COMPANY
Number of cases with civil penalties initially assessed:
96
Number of violations with civil penalties initially assessed:
113
Number of violation reports declined during legal review:
25
Initial amount of civil penalty assessed: $396,404
11
CSX TRANSPORTATION, INC.
Number of cases with civil penalties initially assessed:
491
Number of violations with civil penalties initially assessed:
654
Number of violation reports declined during legal review:
39
Initial amount of civil penalty assessed: $2,155,000 THE KANSAS CITY SOUTHERN RAILWAY COMPANY
Number of cases with civil penalties initially assessed:
48
Number of violations with civil penalties initially assessed:
54
Number of violation reports declined during legal review:
7
Initial amount of civil penalty assessed: $210,904 NORFOLK SOUTHERN RAILWAY COMPANY
Number of cases with civil penalties initially assessed:
504
Number of violations with civil penalties initially assessed:
595
Number of violation reports declined during legal review:
35
Initial amount of civil penalty assessed: $2,164,000 UNION PACIFIC RAILROAD COMPANY
Number of cases with civil penalties initially assessed:
1,022
Number of violations with civil penalties initially assessed:
1,383
Number of violation reports declined during legal review:
81
Initial amount of civil penalty assessed: $4,474,007
12
2. For Probable Class II Railroads in the Aggregate in FY 2018
Number of cases with civil penalties initially assessed:
109
Number of violations with civil penalties initially assessed:
143
Number of violation reports declined during legal review:
6
Initial amount of civil penalty assessed: $553,500 3. For Probable Class III Railroads in the Aggregate in FY 20189
Number of cases with civil penalties initially assessed:
585
Number of violations with civil penalties initially assessed:
870
Number of violation reports declined during legal review:
31
Initial amount of civil penalty assessed: $3,487,732 4. For Hazmat Shippers in the Aggregate in FY 2018
Number of cases with civil penalties initially assessed:
688
Number of violations with civil penalties initially assessed:
1,034
Number of violation reports declined during legal review:
7
Initial amount of civil penalty assessed: $4,430,499 5. For Contractors in the Aggregate in FY 2018
Number of cases with civil penalties initially assessed:
14
Number of violations with civil penalties initially assessed:
17
Number of violation reports declined during legal review:
4
Initial amount of civil penalty assessed: $50,000
9 This category may be over-inclusive as STB jurisdiction may not extend to some of the commuter railroads that FRA has listed as Class III railroads. Regardless, the “Total final civil penalty assessment or settlement in FY 2018” amount remains correct as FRA includes data from enforcement actions against regulated entities that are otherwise not subject to STB jurisdiction.
13
6. For other cases in the Aggregate in FY 201810
Number of cases with civil penalties initially assessed:
50
Number of violations with civil penalties initially assessed:
67
Number of violation reports declined during legal review:
0
Initial amount of civil penalty assessed: $280,000
10 The category of “other cases” includes all hazardous materials civil penalty cases against respondents that are coded in FRA’s Railroad Enforcement System as contractors rather than shippers. Some entities have been classified as contractors based on criteria unrelated to the shipment of hazardous materials but perform functions under hazardous materials regulations that are associated with shippers.
14
D. SUMMARY 2—MORE DETAILED SUMMARY OF SETTLEMENTS AND FINAL ASSESSMENTS OF CIVIL PENALTIES IN FY 2018
Total number of cases closed in FY 2017:
5,027
Total number of violations in cases closed in FY 2017:
7,157
Total initial amount of civil penalty assessed for cases closed (POCA):
$25,270,025
Total final amount of civil penalty assessed or settlement for cases closed:
$17,686,116
Amount terminated (generally due to legal defenses presented during settlement negotiations):
$1,840,500
Amount of revised assessment after terminations (PRCA):
$23,429,525
Difference between initial civil penalty assessment (POCA) and final assessment or settlement amount for cases closed:
$7,583,909
Difference between revised assessment (PRCA) and final assessment or settlement amount for cases closed:
$5,743,409
15
E. BREAKDOWN OF SETTLEMENTS AND FINAL ASSESSMENTS IN SUMMARY 2
1. For Each Class I Railroad Individually in FY 2018
AMTRAK
Number of cases closed:
42
Number of violations in cases closed:
43
Initial amount of civil penalty assessed for cases closed (POCA):
$129,500
Final amount of civil penalty assessed or settlement for cases closed:
$90,645
Amount terminated (generally due to legal defenses presented during settlement negotiations):
$9,500
Amount of revised assessment after terminations (PRCA):
$120,000
Difference between initial civil penalty assessment (POCA) and final assessment or settlement amount for cases closed:
$38,855
Difference between revised assessment (PRCA) and final assessment or settlement amount for cases closed:
$29,355
16
BNSF RAILWAY COMPANY
Number of cases closed:
840
Number of violations in cases closed:
1,200
Initial amount of civil penalty assessed for cases closed (POCA):
$4,000,500
Final amount of civil penalty assessed or settlement for cases closed:
$2,748,053
Amount terminated (generally due to legal defenses presented during settlement negotiations):
$245,500
Amount of revised assessment after terminations (PRCA):
$3,746,000
Difference between initial civil penalty assessment (POCA) and final assessment or settlement amount for cases closed:
$1,252,447
Difference between revised assessment (PRCA) and final assessment or settlement amount for cases closed:
$997,947
CANADIAN NATIONAL RAILWAY/GRAND TRUNK CORPORATION
Number of cases closed:
143
Number of violations in cases closed:
226
Initial amount of civil penalty assessed for cases closed (POCA):
$667,500
Final amount of civil penalty assessed or settlement for cases closed:
$470,585
Amount terminated (generally due to legal defenses presented during settlement negotiations):
$20,000
Amount of revised assessment after terminations (PRCA):
$647,500
Difference between initial civil penalty assessment (POCA) and final assessment or settlement amount for cases closed:
$196,915
Difference between revised assessment (PRCA) and final assessment or settlement amount for cases closed:
$176,915
17
CANADIAN PACIFIC RAILWAY/SOO LINE RAILROAD COMPANY
Number of cases closed:
125
Number of violations in cases closed:
200
Initial amount of civil penalty assessed for cases closed (POCA):
$630,500
Final amount of civil penalty assessed or settlement for cases closed:
$421,000
Amount terminated (generally due to legal defenses presented during settlement negotiations):
$20,000
Amount of revised assessment after terminations (PRCA):
$610,500
Difference between initial civil penalty assessment (POCA) and final assessment or settlement amount for cases closed:
$209,500
Difference between revised assessment (PRCA) and final assessment or settlement amount for cases closed:
$189,500
CSX TRANSPORTATION, INC.
Number of cases closed:
679
Number of violations in cases closed:
927
Initial amount of civil penalty assessed for cases closed (POCA):
$3,134,455
Final amount of civil penalty assessed or settlement for cases closed:
$2,290,466
Amount terminated (generally due to legal defenses presented during settlement negotiations):
$114,500
Amount of revised assessment after terminations (PRCA):
$3,019,955
Difference between initial civil penalty assessment (POCA) and final assessment or settlement amount for cases closed:
$843,989
Difference between revised assessment (PRCA) and final assessment or settlement amount for cases closed:
$729,489
18
THE KANSAS CITY SOUTHERN RAILWAY COMPANY
Number of cases closed:
55
Number of violations in cases closed:
58
Initial amount of civil penalty assessed for cases closed (POCA):
$231,000
Final amount of civil penalty assessed or settlement for cases closed:
$165,830
Amount terminated (generally due to legal defenses presented during settlement negotiations):
$0
Amount of revised assessment after terminations (PRCA):
$231,000
Difference between initial civil penalty assessment (POCA) and final assessment or settlement amount for cases closed:
$65,170
Difference between revised assessment (PRCA) and final assessment or settlement amount for cases closed:
$65,170
NORFOLK SOUTHERN RAILWAY COMPANY
Number of cases closed:
468
Number of violations in cases closed:
557
Initial amount of civil penalty assessed for cases closed (POCA):
$1,854,500
Final amount of civil penalty assessed or settlement for cases closed:
$1,336,278
Amount terminated (generally due to legal defenses presented during settlement negotiations):
$68,500
Amount of revised assessment after terminations (PRCA):
$1,786,000
Difference between initial civil penalty assessment (POCA) and final assessment or settlement amount for cases closed:
$518,222
Difference between revised assessment (PRCA) and final assessment or settlement amount for cases closed:
$449,722
19
UNION PACIFIC RAILROAD COMPANY
Number of cases closed:
1,057
Number of violations in cases closed:
1,300
Initial amount of civil penalty assessed for cases closed (POCA):
$4,303,404
Final amount of civil penalty assessed or settlement for cases closed:
$3,175,113
Amount terminated (generally due to legal defenses presented during settlement negotiations):
$59,000
Amount of revised assessment after terminations (PRCA):
$4,244,404
Difference between initial civil penalty assessment (POCA) and final assessment or settlement amount for cases closed:
$1,128,291
Difference between revised assessment (PRCA) and final assessment or settlement amount for cases closed:
$1,069,291
2. For Probable Class II Railroads in the Aggregate in FY 2018
Number of cases closed:
90
Number of violations in cases closed:
122
Initial amount of civil penalty assessed for cases closed (POCA):
$466,500
Final amount of civil penalty assessed or settlement for cases closed:
$376,651
Amount terminated (generally due to legal defenses presented during settlement negotiations):
$1,000
Amount of revised assessment after terminations (PRCA):
$465,500
Difference between initial civil penalty assessment (POCA) and final assessment or settlement amount for cases closed:
$89,849
Difference between revised assessment (PRCA) and final assessment or settlement amount for cases closed:
$88,849
20
3. For Probable Class III Railroads in the Aggregate in FY 2018
Number of cases closed:
789
Number of violations in cases closed:
1,358
Initial amount of civil penalty assessed for cases closed (POCA):
$4,977,167
Final amount of civil penalty assessed or settlement for cases closed:
$3,240,461
Amount terminated (generally due to legal defenses presented during settlement negotiations):
$538,500
Amount of revised assessment after terminations (PRCA):
$4,438,667
Difference between initial civil penalty assessment (POCA) and final assessment or settlement amount for cases closed:
$1,736,706
Difference between revised assessment (PRCA) and final assessment or settlement amount for cases closed:
$1,198,206
4. For Hazmat Shippers in the Aggregate in FY 2018
Number of cases closed:
647
Number of violations in cases closed:
948
Initial amount of civil penalty assessed for cases closed (POCA):
$4,248,999
Final amount of civil penalty assessed or settlement for cases closed:
$3,090,734
Amount terminated (generally due to legal defenses presented during settlement negotiations):
$465,000
Amount of revised assessment after terminations (PRCA):
$3,783,999
Difference between initial civil penalty assessment (POCA) and final assessment or settlement amount for cases closed:
$1,158,265
Difference between revised assessment (PRCA) and final assessment or settlement amount for cases closed:
$693,265
21
5. For Contractors in the Aggregate in FY 2018
Number of cases closed:
44
Number of violations in cases closed:
142
Initial amount of civil penalty assessed for cases closed (POCA):
$336,500
Final amount of civil penalty assessed or settlement for cases closed:
$68,050
Amount terminated (generally due to legal defenses presented during settlement negotiations):
$251,500
Amount of revised assessment after terminations (PRCA):
$85,000
Difference between initial civil penalty assessment (POCA) and final assessment or settlement amount for cases closed:
$268,450
Difference between revised assessment (PRCA) and final assessment or settlement amount for cases closed:
$16,950
6. For other cases in the Aggregate in FY 201811
Number of cases closed:
48
Number of violations in cases closed:
76
Initial amount of civil penalty assessed for cases closed (POCA):
$289,500
Final amount of civil penalty assessed or settlement for cases closed:
$212,250
Amount terminated (generally due to legal defenses presented during settlement negotiations):
$38,500
Amount of revised assessment after terminations (PRCA):
$251,000
Difference between initial civil penalty assessment (POCA) and final assessment or settlement amount for cases closed:
$77,250
Difference between revised assessment (PRCA) and final assessment or settlement amount for cases closed:
$38,750
IV. ENFORCEMENT ACTIONS AGAINST INDIVIDUALS IN FY 2018 11 The category of “other cases” includes all hazardous materials civil penalty cases against respondents that are coded in FRA’s Railroad Enforcement System as contractors rather than shippers. Some entities have been classified as contractors based on criteria unrelated to the shipment of hazardous materials but perform functions under hazardous materials regulations that are associated with shippers.
22
A. CIVIL PENALTY CASES AGAINST INDIVIDUALS IN THE AGGREGATE
Total number of civil penalty cases initially assessed in FY 2018:
1
Total number of violations with civil penalties initially assessed in FY 2018:
1
Total initial amount of civil penalty assessed in FY 2018:
$2,500
Number of civil penalty cases closed in FY 2018:
2
Total number of violations in cases closed in FY 2018:
2
Total initial amount of civil penalty assessed for cases closed in FY 2018:
$5,000
Total final amount of civil penalty assessed (or settlement) for cases closed in FY 2018:
$2,500
Amount terminated (generally due to legal defenses presented during settlement negotiations) for cases closed in FY 2018:
$0
Amount of revised assessment (PRCA) after terminations:
$5,000
Difference between revised civil penalty assessment (PRCA) and final civil penalty assessment for cases closed in FY 2018:
$2,500
Difference between initial amount of civil penalty assessed (POCA) and final settlement amount for a violation in a case closed in FY 2018:
$2,500
23
B. OTHER ENFORCEMENT ACTIONS AGAINST INDIVIDUALS IN THE AGGREGATE
Number of notices of proposed disqualification issued and served in FY 2018:
1
Number of proposed disqualification cases closed in FY 2018:
6
Number of warning letters issued by Office of Chief Counsel in FY 2018:
0
Number of warning letters issued by regional offices of FRA Office of Railroad Safety (regional warning letters) in FY 2018:
23
24
V. DISCUSSION OF RAILROAD SAFETY—THE RELATIONSHIP OF INSPECTIONS, ENFORCEMENT, AND ACCIDENTS OR
INCIDENTS FRA was statutorily mandated12 to commission a report by an independent consultant examining FRA’s approach to achieving industry compliance with the Federal railroad safety laws and the hazmat safety laws and their implementing regulations, and the role of civil penalties in that process. The final report, dated July 15, 2009, was entitled, “The Federal Railroad Administration’s Use of Civil Penalties in the Federal Railroad Safety Program.” This report concludes on page 13 that—
[t]he fair and professional conduct of an agency’s regulatory function requires the informed exercise of discretion beginning with the FRA inspector on the ground and continuing with FRA’s regional discipline specialist, the regional administrator, and headquarters officials in FRA’s Office of Railroad Safety and Office of Chief Counsel. This use of discretion helps ensure that the agency’s exercise of enforcement power is calibrated to achieve an effect that is proportional to the specific circumstances of a given violation. The final element of the agency’s discretion in the civil penalty context is the exercise of the power to compromise authorized and guided by law, directed by the Executive, and strongly encouraged the Judiciary. FRA’s exercise of the statutory authority to compromise civil penalty assessments serves the purpose of encouraging compliance by ensuring that the enforcement process is proportional in those cases [in which FRA assesses penalties]. [Using] the enforcement hand, seen (as in the case of civil penalty assessments) or unseen (as during FRA inspectors’ daily interactions with railroad personnel regarding safety issues), as consistently as possible across the railroad industry . . . results in a rational, effective safety program.
As the independent consultant noted, FRA has long sought to determine whether enforcement actions measurably correlate with the imposition of civil penalties and with specific safety performance improvements. Previously, FRA found that the available data permits some measurement of safety improvements in a functional area covered by an entire rule or an entire safety program. However, FRA cannot determine from the data whether detectable safety improvements are directly attributable to discrete civil penalties. Accordingly, FRA relies heavily upon the knowledge and expertise of its field inspectors who are most familiar with the unique attributes of specific railroad operations, geographic territories, facilities, and safety practices. Subjectively, their nuanced perceptions and judgments indicate that issuing civil penalties yields observable improvements in safety practices and compliance with the law. However, it is important to note that civil penalties are by no means FRA’s only enforcement tool.
12 Consolidated Appropriations Act, 2008 (H.R. 2764; Public Law 110-161), House Appropriations Committee Print, Division K—Transportation, Housing and Urban Development, and Related Agencies Appropriations Act, 2008, Explanatory Statement, at 2367.
25
Thus, while FRA cannot precisely quantify the impact of civil penalties, it carefully monitors railroad reactions and responses to enforcement activity, and adjusts the intensity and duration of focused oversight as necessary. FRA compiles and analyzes a vast amount of data derived from reports the regulated railroads prepare and file with FRA. However, the report to Congress found that the data FRA uses to identify and track safety trends is typically developed separately from regulatory provisions that ameliorate the conditions leading to particular accident causes that have civil penalties associated with them. Results of this research found no meaningful correlation between specific accident cause codes and use of a civil penalty to enforce a specific regulatory provision, making statistically valid and reliable comparisons exceedingly difficult and statistically suspect or grossly inaccurate. In addition, examining FRA’s civil penalty enforcement in a vacuum, without considering the numerous other factors influencing positive safety outcomes, such as railroad management and individual rail worker behavior and activity, is not possible. One must consider FRA’s regulatory regime as a whole instead of as its component parts. Specific regulatory provisions can complement one another to minimize or prevent conditions that contribute to an accident. However, the complexity of the regulatory scheme may conceal the magnitude of any one regulatory provision’s contribution to the positive safety outcome.
As stated in the independent consultant’s report on page 41—
[o]ne fruitful way to take a holistic view of the effects of the safety program is to look at accident rates over the long term. Rates, which are normalized by million train miles traveled, more reliably indicate the true state of railroad safety than do raw accident numbers. As FRA began to promulgate the first versions of major rules such as track safety standards and power brakes in the 1970’s, the adverse trend in railroad safety was slowed and then sharply reversed. There are few sharp lines of demarcation because railroads and shippers often began to modify their behavior during the rulemaking process; a new safety rule typically takes effect a considerable time after it is issued; and enforcement can occur only after the effective date of the rule. Nevertheless, each subject FRA regulates shows a response pattern generally similar to the graph shown below for train accident rates, which reflects the strongly positive effects of FRA’s railroad safety program, including civil penalty enforcement, even though the data shown do not permit one to draw statistically valid conclusions about the precise effects of civil penalties, or other measures, in isolation. This dramatic improvement in railroad safety over the past 30 years suggests that FRA would be well advised to continue in the future to pursue the various measures and strategies that have guided its safety program in the past. As the results of this study suggest, it is the cumulative impact of these measures, one supporting and amplifying the other, that makes the difference.
26
Train Accident Rate
0 2 4 6 8
10 12 14 16
Trai
n A
ccid
ents
per
Mill
ion
Trai
n
Mile
s
27
VI. SUMMARY AND ANALYSIS OF OPERATING CREW CERTIFICATION CASES13
A. LOCOMOTIVE ENGINEER AND OPERATING CREW REVIEW BOARD (LERB/OCRB) Petitions for relief filed with the LERB/OCRB in FY 2018: 66 [27 Conductor + 39 Locomotive Engineer] Decisions issued by the LERB/OCRB in FY 2018: 89 [37 Conductor + 52 Locomotive Engineer] Average length of time for decision in FY 2018: 283 days from the date petition filed14
(179 days from the date of the railroad’s response to the appeal to the date that a decision was issued15)
B. ADMINISTRATIVE HEARINGS Number of pending cases before the Administrative Hearing Officer (AHO) as of October 1, 2017: 6 Number of requests for review by the AHO received during FY 2018: 11 Number of cases closed by the AHO during FY 2018: 16 2
Number of pending AHO cases as of October 1, 2018: 15 Average length of time for decision or other disposition: 12 months
13 FRA’s Locomotive Engineer Review Board (LERB) reviews petitions for initial review of railroad decisions denying or revoking locomotive engineer certifications (49 C.F.R. part 240), while the Operating Crew Review Board (OCRB) reviews petitions for initial review of railroad decisions denying or revoking conductor certifications (49 C.F.R. part 242). Since both Boards share the same board members, FRA intends to merge the two review boards so that both crew members will have their petitions reviewed solely by the OCRB. 14 This excludes any delay issuing an interim order caused, where one or more of the parties initially provided incomplete information. 15 See preceding footnote. 16 This number of cases the AHO closed includes cases closed by decision, stipulation, or dismissal.
28
C. APPEALS TO THE ADMINISTRATOR Appeals to the Administrator from the AHO decisions filed in FY 2018: 2 Number of Appeals Pending during FY 2018: 4 (as of October 1, 2017, there were 2 cases pending) Decisions issued by the Administrator during FY 2018: 0 Average length of time for decision issued in FY 2018: N/A (calendar days) (from close of record to decision)
VII. SUMMARY AND ANALYSIS OF ADMINISTRATIVE HEARING CASES RELATED TO HAZMAT VIOLATIONS OR
ENFORCEMENT ACTIONS AGAINST INDIVIDUALS Number of hearings requested in FY 2018: 4 Number of hearing-request cases completed in FY 2018: 1
VIII. NUMBER OF CASES REFERRED TO THE ATTORNEY GENERAL FOR CIVIL OR CRIMINAL ENFORCEMENT
Number of cases referred to the Attorney General for civil enforcement in FY 2018: 0 Number of cases referred to the Attorney General for criminal enforcement in FY 2018: 0
IX. NUMBER AND SUBJECT MATTER OF COMPLIANCE ORDERS, EMERGENCY ORDERS, OR PRECURSOR AGREEMENTS
During FY 2018, FRA did not issue any compliance or emergency orders, or enter into any precursor agreements.
APPENDIX A “Railroad Safety Civil Penalty Cases Closed during Fiscal Year 2018”
0 Federal Railroad Administration
OFFICE OF CHIEF COUNSEL Safety Law Division
RAILROAD SAFETY CIVIL PENAL TY CASES CLOSED DURING FISCAL YEAR 2018
This report summarizes the disposition of all civil penalty cases for which the Federal Railroad Administration (FRA) reached an agreement to collect a civil penalty, issued an order requiring the payment of a civil penalty, or otherwise closed under the Federal railroad safety statutes and regulations, and the hazardous materials transportation laws (HMT) during fiscal year 2018. FRA closed cases under most of these statutes by settlement, and under the HMT generally by final orders of assessment. An overview of FRA's Railroad Safety Enforcement procedures is provided in 49 C.F.R. Part 209, Appendix A.
Total penalty settlements and final assessments against companies, summarized in this report, were as follows:
Railroad safety statutes (except HMT)
HMT
Total Civil Penalties
$12,970,356
$4,715,760
$17,686,116
FRA collected $2,500 in civil penalty settlements or final assessments from individuals for alleged violations of the railroad safety laws in fiscal year 2018.
3
Abbreviations and Explanations of Terms Used in this Report
The type of violation alleged in each civil penalty case can be identified using the following codes, one of which appears as a suffix to each case number:
AD
AR
BSS
BW
CC
EO
EP
EQ
FCS
GC
GS
HMT
HS
HSR
LI
PEQ
REF
REM
RMM
ROP
ROR
RSP
RW
SA
SI
SI
TH
TS
Alcohol and Drug Use
Accident Reports Regulations
Bridge Safety Standards
Bridge Worker Safety Standards
Conductor Certification Regulations
FRA Emergency Order
Railroad Safety Enforcement
Engineer Qualifications
Freight Car Safety Standards
Grade Crossing Signal Safety
Safety Glazing Standards
Hazardous Materials Regulations
Hours of Service Laws
Hours of Service Record Keeping
Locomotive Safety Standards
Passenger Equipment Safety Standards
Reflectorization of Railroad Rolling Stock
Rear End Marking Devices
Roadway Maintenance Machines
Railroad Operating Practices
Railroad Operating Rules
Railroad Standards and Procedures
Roadway Worker Protection
Safety Appliance Statutes
Positive Train Control
Signal Inspection Regulations
TRAIN HORN/QUIET ZONE
Track Safety Standards
4
FRA identifies railroads and other respondents are by a respondent code (see the legend provided at the end of this report), which appears as the letters in the case number after "FRA No. ". FRA identifies hazardous materials and emergency order cases involving shippers by a respondent code beginning with the letter "Z". FRA identifies cases involving contractors by a respondent code beginning with the letter "X". The column labeled "POCA" shows the initial penalty assessed in the case. The column labeled "PRCA" shows the total amount of the initial assessment for alleged violations that FRA concluded it would be able to sustain if the case were litigated. There are two situations when PRCA does not equal to POCA. First, would be if FRA concluded one or more of the violations initially alleged could likely not be sustained. FRA considers such violations terminated. Second, would be if FRA decided the violation could be sustained but the initial penalty assessment for the violation was incorrect. For such cases, FRA corrects the penalty amount and the violation is considered "partially terminated." Cases against individuals (who are liable for civil penalties for willful violations) are identified by the prefix "Indpen" and are listed separately. The "Comments" column shows the violation number of terminated or partially terminated violations.
5
INDPEN 2016-1
INDPEN 2017-2
FRA No.
$2,500
$2,500
Initial Penalty Demanded
$1,250
$1,250
Settlement Amount
11/21/2017
04/12/2018
Settlement Date
FRA Civil Penalty Cases against IndividualsClosed in Fiscal Year 2018
Total $5,000 $2,500
6
ABS 2017-1(ROP)
ABS 2017-2(AR)ACWR 2017-2(GC)ADCX 2017-1(CC)ADCX 2017-2(EQ)AERC 2018-1(HS)AGR 2017-3(AD)AGR 2017-4(SA)AGR 2017-5(FCS)AGR 2017-6(GC)AGR 2017-7(AD)AIKR 2017-2(TS)AIKR 2017-3(TS)ALAB 2017-1(GC)AM 2018-1(GC)AM 2018-2(TS)APRR 2018-1(ROP)ARR 2017-3(ROP)ARR 2018-1(HMT)ASRY 2017-1(HMT)ATAX 2017-1(TS)ATK 2017-30(PEQ)ATK 2017-31(LI)ATK 2017-32(ROP)ATK 2017-33(CC)ATK 2017-34(ROR)ATK 2017-35(AR)ATK 2017-36(ROP)ATK 2017-37(TS)ATK 2017-39(GC)ATK 2017-40(TS)ATK 2017-41(RW)ATK 2017-42(AD)ATK 2017-43(TH)ATK 2017-44(RW)ATK 2017-45(SI)ATK 2017-46(TS)ATK 2017-47(TS)ATK 2017-48(PEQ)ATK 2017-49(AR)ATK 2017-50(PEQ)ATK 2017-51(SI)ATK 2017-52(HSR)ATK 2017-53(CC)ATK 2017-54(LI)ATK 2017-55(AR)ATK 2017-56(AR)ATK 2017-57(AR)ATK 2017-58(AR)
FRA No.
09/24/2018
09/24/201811/14/201710/17/201710/17/201704/24/201809/27/201809/27/201809/27/201809/27/201809/27/201801/04/201801/04/201808/01/201803/01/201803/01/201808/16/201801/09/201806/21/201810/29/201712/05/201709/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/2018
SettlementDate Comments
1
111121111111511111211111111111111112111111111111
No. ofViolations
$7,500
$2,500 $2,500 $2,500 $1,000 $2,000 $2,500 $2,500 $2,500 $1,000 $5,000 $2,500 $1,000 $6,500 $5,000 $5,000 $7,500 $7,500 $7,500 $5,000 $1,000 $5,000 $2,500 $9,500 $2,500 $9,500 $2,500 $9,500 $2,500 $5,000 $5,000 $1,500 $2,500 $5,000 $3,000 $2,500 $7,500 $2,500 $2,500 $2,500 $2,500 $2,500 $1,000 $1,000 $2,500 $2,500 $2,500 $2,500 $2,500
PRCA
$2,000
$1,750 $2,500 $2,500 $1,000 $2,000 $1,950 $1,950 $1,950 $900 $3,950 $853 $853 $4,059 $3,350 $3,250 $4,500 $5,700 $5,900 $3,500 $1,000 $3,900 $1,950 $6,800 $1,900 $5,700 $1,900 $0 $1,950 $4,000 $3,900 $1,200 $1,900 $3,600 $2,100 $2,000 $5,850 $1,950 $1,950 $1,900 $1,950 $1,625 $900 $860 $1,950 $1,900 $1,900 $1,900 $1,900
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,000
$2,500 $2,500 $2,500 $1,000 $2,000 $2,500 $2,500 $2,500 $1,000 $5,000 $2,500 $1,000 $5,500 $5,000 $5,000 $7,500 $7,500 $7,500 $5,000 $1,000 $5,000 $2,500 $9,500 $2,500 $9,500 $2,500 $0 $2,500 $5,000 $5,000 $1,500 $2,500 $5,000 $3,000 $2,500 $7,500 $2,500 $2,500 $2,500 $2,500 $2,500 $1,000 $1,000 $2,500 $2,500 $2,500 $2,500 $2,500
Partially Terminated Violation(s): 1.
Terminated violation(s): 2.
Case Terminated.
7
ATK 2017-59(AR)ATK 2017-60(AR)ATK 2017-61(AR)ATK 2017-62(AR)ATK 2017-63(AR)ATK 2017-64(AR)ATK 2017-65(AR)ATK 2017-66(AR)ATK 2017-67(HSR)ATK 2017-68(LI)ATK 2018-1(HSR)ATK 2018-2(HSR)ATK 2018-3(HSR)ATK 2018-4(RW)ATN 2017-4(AD)ATN 2017-5(GC)ATN 2018-1(TS)AVR 2017-1(ROP)AWRR 2017-2(SA)BAP 2017-3(SA)BAP 2017-4(SA)BB 2017-1(AR)BB 2018-1(TS)BBAY 2016-1(AD)BJRY 2017-1(AD)BJRY 2017-2(AD)BJRY 2017-3(AD)BML 2017-1(TS)BNSF 2012-159(SA)BNSF 2012-376(RSP)BNSF 2012-377(RSP)BNSF 2013-505(LI)BNSF 2014-39(TS)BNSF 2014-87(LI)BNSF 2014-102(TS)BNSF 2014-183(LI)BNSF 2014-258(TS)BNSF 2014-282(EO)
BNSF 2014-377(TS)BNSF 2014-501(HMT)BNSF 2014-579(SA)BNSF 2014-607(LI)BNSF 2014-747(SA)BNSF 2015-88(HMT)BNSF 2015-173(HS)BNSF 2015-328(ROP)BNSF 2015-372(HSR)BNSF 2015-395(AD)BNSF 2015-404(TS)
FRA No.
09/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201803/29/201803/29/201803/29/201810/17/201709/24/201811/14/201711/14/201710/20/201704/05/201809/24/201812/08/201712/08/201712/08/201712/21/201709/28/201809/28/201811/16/201709/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
11111111111111112111111111111111111111
31111111916
No. ofViolations
$2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $1,000 $1,000 $2,500 $1,000 $1,000 $1,000 $2,000 $2,500 $5,000 $5,000 $2,000 $2,500 $5,000 $5,000 $1,000 $2,500 $5,000 $5,000 $2,500 $2,500 $2,500 $10,000 $5,500 $9,500 $2,500 $1,000 $2,500 $5,000 $1,000 $2,500 $22,000
$7,500 $2,500 $1,000 $1,000 $5,000 $2,000 $1,000 $2,000 $9,000 $2,500 $17,000
PRCA
$1,900 $1,900 $1,900 $1,900 $1,900 $1,900 $1,900 $860 $900 $1,950 $900 $900 $900 $1,600 $1,700 $3,700 $3,500 $1,100 $1,750 $2,500 $2,500 $853 $1,625 $3,200 $3,750 $1,875 $1,875 $1,500 $0 $0 $0 $0 $785 $1,900 $3,600 $750 $1,800 $2,500
$5,400 $1,825 $785 $750 $3,650 $1,475 $853 $1,450 $0 $2,000 $12,240
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $1,000 $1,000 $2,500 $1,000 $1,000 $1,000 $2,000 $2,500 $5,000 $5,000 $2,000 $2,500 $5,000 $5,000 $1,000 $2,500 $5,000 $5,000 $2,500 $2,500 $2,500 $0 $0 $0 $0 $1,000 $2,500 $5,000 $1,000 $2,500 $2,500
$7,500 $2,500 $1,000 $1,000 $5,000 $2,000 $1,000 $2,000 $0 $2,500 $17,000
Case Terminated.Case Terminated.Case Terminated.Case Terminated.
Partially Terminated Violation(s): 1.
Case Terminated.
8
BNSF 2015-414(RW)BNSF 2015-515(LI)BNSF 2015-552(FCS)BNSF 2015-571(HMT)BNSF 2015-574(HMT)BNSF 2015-608(TS)BNSF 2015-637(LI)BNSF 2015-650(TS)BNSF 2015-652(TS)BNSF 2015-703(TS)BNSF 2016-48(TS)BNSF 2016-56(TS)BNSF 2016-68(AR)BNSF 2016-70(AR)BNSF 2016-71(AR)BNSF 2016-73(AR)BNSF 2016-107(ROP)BNSF 2016-131(AR)BNSF 2016-167(FCS)BNSF 2016-172(RW)BNSF 2016-221(RMM)BNSF 2016-338(TS)BNSF 2016-499(TS)BNSF 2016-564(HMT)BNSF 2016-576(HSR)BNSF 2016-589(HMT)BNSF 2016-606(EQ)BNSF 2016-612(TS)BNSF 2016-617(TS)BNSF 2016-654(HMT)BNSF 2016-674(HMT)BNSF 2016-677(EP)BNSF 2016-680(EP)BNSF 2016-706(REM)BNSF 2016-724(HMT)BNSF 2016-739(HMT)BNSF 2016-826(TS)BNSF 2016-863(TS)BNSF 2017-14(HMT)BNSF 2017-33(HMT)BNSF 2017-133(TS)BNSF 2017-179(HS)BNSF 2017-183(SA)BNSF 2017-185(SI)BNSF 2017-186(SI)BNSF 2017-187(HMT)BNSF 2017-188(HMT)BNSF 2017-191(TS)BNSF 2017-192(TS)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1311110182182111111112
3424218116511111117131221111111
No. ofViolations
$25,000 $12,000 $2,500 $1,500 $2,000 $25,000 $2,500 $20,000 $2,000 $5,000 $22,500 $5,000 $2,500 $2,500 $2,500 $2,500 $7,500 $2,500 $2,000 $15,000 $10,000
$34,000 $60,000 $7,000 $18,000 $2,000 $1,000 $22,500 $6,500 $2,000 $3,000 $1,000 $1,000 $2,500 $2,000 $20,000 $17,500 $2,500 $18,500 $5,000 $7,500 $2,000 $5,000 $1,000 $1,000 $2,000 $2,000 $2,500 $5,000
PRCA
$20,500 $9,300 $1,850 $1,100 $1,450 $18,000 $1,900 $14,400 $1,740 $3,600 $16,200 $3,600 $1,875 $1,875 $1,875 $1,875 $5,400 $1,875 $1,500 $12,200 $7,000
$0 $43,000 $5,200 $0 $1,475 $853 $16,200 $4,700 $1,475 $2,200 $853 $853 $1,850 $1,475 $14,500 $12,600 $1,800 $13,500 $3,700 $5,400 $1,678 $3,650 $853 $853 $1,450 $1,450 $1,800 $3,600
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$25,000 $12,000 $2,500 $1,500 $2,000 $25,000 $2,500 $20,000 $2,000 $5,000 $22,500 $5,000 $2,500 $2,500 $2,500 $2,500 $7,500 $2,500 $2,000 $15,000 $10,000
$0 $60,000 $7,000 $0 $2,000 $1,000 $22,500 $6,500 $2,000 $3,000 $1,000 $1,000 $2,500 $2,000 $20,000 $17,500 $2,500 $18,500 $5,000 $7,500 $2,000 $5,000 $1,000 $1,000 $2,000 $2,000 $2,500 $5,000
Case Terminated.
Case Terminated.
9
BNSF 2017-193(FCS)BNSF 2017-194(SA)BNSF 2017-195(SA)BNSF 2017-196(SA)BNSF 2017-198(TS)BNSF 2017-199(TS)BNSF 2017-200(ROP)BNSF 2017-201(ROP)BNSF 2017-202(ROP)BNSF 2017-203(ROP)BNSF 2017-204(FCS)BNSF 2017-205(ROP)BNSF 2017-206(ROP)BNSF 2017-207(SA)BNSF 2017-208(SA)BNSF 2017-209(SA)BNSF 2017-210(SA)BNSF 2017-211(SA)BNSF 2017-212(SA)BNSF 2017-213(SA)BNSF 2017-214(SI)BNSF 2017-215(SA)BNSF 2017-216(ROP)BNSF 2017-217(SA)BNSF 2017-218(SA)BNSF 2017-219(SA)BNSF 2017-220(SA)BNSF 2017-221(SA)BNSF 2017-222(SA)BNSF 2017-223(SA)BNSF 2017-224(SA)BNSF 2017-225(SA)BNSF 2017-226(SA)BNSF 2017-227(LI)BNSF 2017-228(LI)BNSF 2017-229(LI)BNSF 2017-230(LI)BNSF 2017-231(LI)BNSF 2017-232(LI)BNSF 2017-233(LI)BNSF 2017-234(RW)BNSF 2017-235(GC)BNSF 2017-236(LI)BNSF 2017-237(HS)BNSF 2017-238(SA)BNSF 2017-239(SA)BNSF 2017-240(ROP)BNSF 2017-241(ROP)BNSF 2017-242(ROP)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1111231111111111111111211111111112111111111211111
No. ofViolations
$2,500 $2,500 $2,500 $5,000 $7,500 $12,500 $7,500 $7,500 $7,500 $7,500 $2,500 $7,500 $2,000 $2,500 $5,000 $5,000 $5,000 $2,500 $5,000 $2,500 $5,000 $5,000 $4,000 $5,000 $5,000 $5,000 $2,500 $5,000 $5,000 $5,000 $5,000 $2,500 $5,000 $3,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,000 $5,000 $2,500 $2,000 $5,000 $5,000 $7,500 $7,500 $7,500
PRCA
$1,850 $1,825 $1,825 $3,650 $5,400 $9,075 $5,400 $5,450 $5,450 $5,450 $1,850 $5,450 $1,440 $1,825 $3,650 $3,650 $3,600 $1,825 $3,650 $1,825 $3,675 $3,660 $2,900 $3,660 $3,350 $3,660 $1,825 $3,660 $3,660 $3,660 $3,660 $1,825 $3,660 $2,725 $1,825 $1,825 $1,900 $853 $853 $1,900 $1,450 $3,700 $1,900 $1,706 $3,660 $3,660 $5,450 $5,450 $5,450
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $2,500 $2,500 $5,000 $7,500 $12,500 $7,500 $7,500 $7,500 $7,500 $2,500 $7,500 $2,000 $2,500 $5,000 $5,000 $5,000 $2,500 $5,000 $2,500 $5,000 $5,000 $4,000 $5,000 $5,000 $5,000 $2,500 $5,000 $5,000 $5,000 $5,000 $2,500 $5,000 $3,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,000 $5,000 $2,500 $2,000 $5,000 $5,000 $7,500 $7,500 $7,500
10
BNSF 2017-243(ROP)
BNSF 2017-244(TS)BNSF 2017-245(TS)BNSF 2017-246(ROP)BNSF 2017-247(ROP)BNSF 2017-248(SA)BNSF 2017-249(SA)BNSF 2017-250(SA)BNSF 2017-251(SA)BNSF 2017-252(SA)BNSF 2017-253(ROP)BNSF 2017-254(ROP)
BNSF 2017-255(ROP)
BNSF 2017-256(SA)BNSF 2017-257(TS)BNSF 2017-258(TS)BNSF 2017-259(LI)BNSF 2017-260(LI)BNSF 2017-261(SA)BNSF 2017-262(SA)BNSF 2017-263(HS)BNSF 2017-264(TS)BNSF 2017-265(TS)BNSF 2017-266(ROP)BNSF 2017-267(ROP)BNSF 2017-268(SA)BNSF 2017-269(FCS)BNSF 2017-270(FCS)BNSF 2017-271(FCS)BNSF 2017-272(SA)BNSF 2017-273(SA)BNSF 2017-274(FCS)BNSF 2017-275(SA)BNSF 2017-276(SA)BNSF 2017-277(SA)BNSF 2017-278(GC)BNSF 2017-279(SA)BNSF 2017-280(SA)BNSF 2017-281(SA)BNSF 2017-282(SA)BNSF 2017-283(SA)BNSF 2017-284(TS)BNSF 2017-285(ROP)BNSF 2017-286(ROP)BNSF 2017-287(ROP)BNSF 2017-288(SI)BNSF 2017-289(SA)
FRA No.
09/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
09/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1
11111111111
1
1131111111111111111111111111411111
No. ofViolations
$7,500
$2,500 $2,500 $9,500 $7,500 $2,500 $5,000 $2,500 $5,000 $5,000 $9,500 $9,500
$9,500
$5,000 $5,000 $7,500 $2,500 $2,500 $5,000 $5,000 $1,000 $2,500 $5,000 $9,500 $7,500 $5,000 $2,500 $2,500 $5,000 $2,500 $5,000 $2,500 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $4,000 $7,500 $7,500 $7,500 $1,000 $5,000
PRCA
$2,000
$1,800 $1,800 $0 $5,450 $1,825 $3,660 $1,825 $3,660 $3,660 $6,900 $4,100
$5,000
$3,660 $3,600 $5,400 $1,900 $853 $3,660 $3,660 $853 $1,975 $3,600 $6,900 $5,500 $3,660 $1,850 $1,850 $3,650 $1,825 $3,660 $1,850 $3,660 $3,600 $3,600 $3,700 $3,600 $3,600 $3,600 $3,600 $3,660 $3,412 $5,500 $5,500 $5,475 $853 $3,660
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,000
$2,500 $2,500 $0 $7,500 $2,500 $5,000 $2,500 $5,000 $5,000 $9,500 $5,000
$5,000
$5,000 $5,000 $7,500 $2,500 $2,500 $5,000 $5,000 $1,000 $2,500 $5,000 $9,500 $7,500 $5,000 $2,500 $2,500 $5,000 $2,500 $5,000 $2,500 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $4,000 $7,500 $7,500 $7,500 $1,000 $5,000
Partially Terminated Violation(s): 1.
Case Terminated.
Partially Terminated Violation(s): 1.Partially Terminated Violation(s): 1.
11
BNSF 2017-290(SA)BNSF 2017-291(SA)BNSF 2017-292(SA)BNSF 2017-293(SA)BNSF 2017-294(ROR)BNSF 2017-295(SA)BNSF 2017-296(SA)BNSF 2017-297(ROP)
BNSF 2017-298(TS)BNSF 2017-299(TS)BNSF 2017-300(RW)BNSF 2017-301(RW)BNSF 2017-302(TS)BNSF 2017-303(TS)BNSF 2017-304(TS)BNSF 2017-305(TS)BNSF 2017-306(HMT)BNSF 2017-307(SA)BNSF 2017-308(SA)BNSF 2017-309(SA)BNSF 2017-310(FCS)BNSF 2017-311(FCS)BNSF 2017-312(ROP)BNSF 2017-313(FCS)BNSF 2017-314(TS)BNSF 2017-315(TS)BNSF 2017-316(SA)BNSF 2017-317(SA)BNSF 2017-318(FCS)BNSF 2017-319(SA)BNSF 2017-320(SA)BNSF 2017-321(SA)BNSF 2017-322(SA)BNSF 2017-323(SA)BNSF 2017-324(SA)BNSF 2017-325(TS)BNSF 2017-326(TS)BNSF 2017-327(TS)BNSF 2017-328(TS)BNSF 2017-329(TS)BNSF 2017-330(TS)BNSF 2017-331(TS)BNSF 2017-332(TS)BNSF 2017-333(TS)BNSF 2017-334(TS)BNSF 2017-335(ROP)BNSF 2017-336(ROP)BNSF 2017-337(TS)BNSF 2017-338(TS)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
11111111
11111212111111114211111121121121111121112
No. ofViolations
$5,000 $5,000 $5,000 $5,000 $7,500 $5,000 $5,000 $9,500
$2,500 $2,500 $1,000 $2,000 $2,500 $10,000 $1,000 $7,500 $2,000 $5,000 $2,500 $2,500 $5,000 $2,500 $7,500 $2,500 $4,000 $7,500 $2,500 $2,500 $5,000 $5,000 $2,500 $2,500 $4,000 $5,000 $5,000 $7,500 $2,500 $1,000 $2,000 $1,000 $5,000 $5,000 $1,000 $5,000 $7,500 $2,000 $2,000 $2,500 $7,500
PRCA
$3,660 $3,660 $3,660 $3,660 $5,500 $3,660 $3,660 $5,000
$1,800 $1,800 $853 $1,450 $1,800 $7,200 $853 $5,400 $1,450 $3,660 $1,825 $1,825 $3,650 $1,800 $5,850 $1,800 $3,412 $5,400 $1,825 $1,825 $3,650 $0 $1,800 $1,825 $2,920 $3,660 $3,660 $5,400 $1,800 $853 $1,706 $853 $3,600 $3,650 $853 $3,600 $5,400 $1,450 $1,450 $1,800 $5,400
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $5,000 $5,000 $5,000 $7,500 $5,000 $5,000 $5,000
$2,500 $2,500 $1,000 $2,000 $2,500 $10,000 $1,000 $7,500 $2,000 $5,000 $2,500 $2,500 $5,000 $2,500 $7,500 $2,500 $4,000 $7,500 $2,500 $2,500 $5,000 $0 $2,500 $2,500 $4,000 $5,000 $5,000 $7,500 $2,500 $1,000 $2,000 $1,000 $5,000 $5,000 $1,000 $5,000 $7,500 $2,000 $2,000 $2,500 $7,500
Partially Terminated Violation(s): 1.
Case Terminated.
12
BNSF 2017-339(TS)BNSF 2017-340(TS)BNSF 2017-341(FCS)BNSF 2017-342(SA)BNSF 2017-343(SA)BNSF 2017-344(SA)BNSF 2017-345(SA)BNSF 2017-346(SA)BNSF 2017-347(SA)BNSF 2017-348(SA)BNSF 2017-349(SA)BNSF 2017-350(SA)BNSF 2017-351(SA)BNSF 2017-352(SA)BNSF 2017-353(SA)BNSF 2017-354(SA)BNSF 2017-355(SA)BNSF 2017-356(SA)BNSF 2017-357(ROP)
BNSF 2017-358(ROP)BNSF 2017-359(RW)BNSF 2017-360(RW)BNSF 2017-361(LI)BNSF 2017-362(RMM)BNSF 2017-363(LI)BNSF 2017-364(GC)BNSF 2017-365(LI)BNSF 2017-366(GC)BNSF 2017-367(SA)BNSF 2017-368(SA)BNSF 2017-369(SI)BNSF 2017-370(ROP)BNSF 2017-371(ROP)BNSF 2017-372(ROP)BNSF 2017-373(FCS)BNSF 2017-374(SA)BNSF 2017-375(AD)BNSF 2017-376(AD)BNSF 2017-377(SI)BNSF 2017-378(SA)BNSF 2017-379(HMT)BNSF 2017-380(SA)BNSF 2017-381(SA)BNSF 2017-382(SA)BNSF 2017-383(SA)BNSF 2017-384(SA)BNSF 2017-385(TS)BNSF 2017-386(FCS)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
64111111111111111111
11112
111111111111221111111111
No. ofViolations
$64,000 $2,500 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $5,000 $2,500 $7,500
$2,000 $1,000 $2,000 $2,500 $5,000
$1,500 $5,000 $2,500 $1,000 $5,000 $2,500 $5,000 $2,000 $7,500 $9,500 $2,500 $2,500 $10,000 $10,000 $7,500 $5,000 $2,000 $5,000 $5,000 $2,500 $5,000 $5,000 $1,000 $2,500
PRCA
$0 $2,125 $3,650 $3,660 $3,660 $1,825 $1,825 $1,825 $3,660 $3,660 $3,660 $3,660 $3,660 $1,825 $1,825 $1,825 $3,660 $1,825 $3,840
$1,450 $853 $1,450 $1,900 $3,500
$1,140 $3,700 $1,900 $853 $3,660 $1,825 $3,675 $1,450 $5,500 $6,900 $1,850 $1,825 $7,500 $8,000 $5,550 $3,660 $0 $3,660 $3,660 $1,825 $3,660 $3,660 $853 $1,850
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$0 $2,500 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $5,000 $2,500 $4,000
$2,000 $1,000 $2,000 $2,500 $5,000
$1,500 $5,000 $2,500 $1,000 $5,000 $2,500 $5,000 $2,000 $7,500 $9,500 $2,500 $2,500 $10,000 $10,000 $7,500 $5,000 $0 $5,000 $5,000 $2,500 $5,000 $5,000 $1,000 $2,500
Case Terminated.
Partially Terminated Violation(s): 1.
Case Terminated.
13
BNSF 2017-387(SA)BNSF 2017-388(SA)BNSF 2017-389(SA)BNSF 2017-390(SA)BNSF 2017-391(HS)BNSF 2017-392(SA)BNSF 2017-393(ROP)BNSF 2017-394(ROP)BNSF 2017-395(ROP)BNSF 2017-396(ROP)BNSF 2017-397(ROP)BNSF 2017-398(ROP)BNSF 2017-399(ROP)BNSF 2017-400(ROP)BNSF 2017-401(TS)BNSF 2017-402(TS)BNSF 2017-403(TS)BNSF 2017-404(TS)BNSF 2017-405(TS)BNSF 2017-406(GC)BNSF 2017-407(GC)BNSF 2017-408(RW)BNSF 2017-409(RW)BNSF 2017-410(ROP)BNSF 2017-411(HMT)BNSF 2017-412(SA)BNSF 2017-413(FCS)BNSF 2017-414(LI)
BNSF 2017-415(FCS)BNSF 2017-416(ROP)BNSF 2017-417(ROP)BNSF 2017-418(TS)BNSF 2017-419(ROP)BNSF 2017-421(SA)BNSF 2017-422(HSR)BNSF 2017-423(ROP)BNSF 2017-424(ROP)BNSF 2017-425(SA)BNSF 2017-426(SA)BNSF 2017-427(FCS)BNSF 2017-428(FCS)BNSF 2017-429(FCS)BNSF 2017-430(FCS)BNSF 2017-431(FCS)BNSF 2017-432(ROP)BNSF 2017-433(ROP)BNSF 2017-434(FCS)BNSF 2017-435(ROP)BNSF 2017-436(SA)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
11111111111111411212111113111
211111111111111121311
No. ofViolations
$2,500 $2,500 $2,500 $2,500 $1,000 $5,000 $7,500 $7,500 $2,000 $2,000 $2,000 $2,000 $2,000 $7,500 $15,000 $42,500 $7,500 $2,500 $2,000 $5,000 $5,000 $3,000 $3,000 $7,500 $15,000 $5,000 $2,500 $2,500
$10,000 $7,500 $2,000 $5,000 $7,500 $5,000 $2,500 $7,500 $9,500 $5,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $4,000 $9,500 $7,500 $5,000 $2,500
PRCA
$1,825 $1,800 $1,800 $1,800 $853 $3,660 $5,500 $5,475 $1,460 $1,460 $1,460 $1,460 $1,460 $5,500 $10,800 $30,600 $5,400 $1,800 $1,706 $3,700 $3,700 $2,175 $2,175 $5,500 $10,800 $3,660 $1,825 $853
$7,450 $5,500 $1,460 $3,600 $5,500 $3,660 $1,800 $5,500 $6,900 $3,660 $3,660 $1,850 $1,825 $1,825 $1,825 $1,825 $2,900 $6,900 $5,000 $3,650 $1,825
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $2,500 $2,500 $2,500 $1,000 $5,000 $7,500 $7,500 $2,000 $2,000 $2,000 $2,000 $2,000 $7,500 $15,000 $42,500 $7,500 $2,500 $2,000 $5,000 $5,000 $3,000 $3,000 $7,500 $15,000 $5,000 $2,500 $1,000
$10,000 $7,500 $2,000 $5,000 $7,500 $5,000 $2,500 $7,500 $9,500 $5,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $4,000 $9,500 $7,500 $5,000 $2,500
Partially Terminated Violation(s): 1.
14
BNSF 2017-437(SA)BNSF 2017-438(SA)BNSF 2017-439(SA)BNSF 2017-440(TS)BNSF 2017-441(TS)BNSF 2017-442(ROP)BNSF 2017-443(LI)BNSF 2017-444(SA)BNSF 2017-445(SA)BNSF 2017-446(FCS)BNSF 2017-447(FCS)BNSF 2017-448(FCS)BNSF 2017-449(ROP)BNSF 2017-450(ROP)BNSF 2017-451(SA)BNSF 2017-452(ROP)BNSF 2017-453(SA)BNSF 2017-454(SA)BNSF 2017-455(RW)BNSF 2017-456(SA)BNSF 2017-457(TS)BNSF 2017-458(GC)BNSF 2017-459(ROP)BNSF 2017-460(TS)BNSF 2017-461(TS)BNSF 2017-462(TS)BNSF 2017-463(TS)BNSF 2017-464(TS)BNSF 2017-465(TS)BNSF 2017-466(TS)BNSF 2017-467(TS)BNSF 2017-468(TS)BNSF 2017-469(TS)BNSF 2017-470(ROP)BNSF 2017-471(ROP)BNSF 2017-472(ROP)BNSF 2017-474(SA)BNSF 2017-475(SA)BNSF 2017-476(SA)BNSF 2017-477(SA)BNSF 2017-478(FCS)BNSF 2017-479(TS)BNSF 2017-480(ROP)BNSF 2017-481(SA)BNSF 2017-482(FCS)BNSF 2017-483(LI)BNSF 2017-484(HS)BNSF 2017-486(SA)BNSF 2017-487(SA)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1113111111111111111111112222211111111111111111211
No. ofViolations
$5,000 $5,000 $5,000 $4,500 $2,500 $9,500 $1,500 $5,000 $2,500 $2,500 $5,000 $2,500 $2,000 $2,000 $2,500 $7,500 $2,500 $5,000 $2,000 $5,000 $5,000 $2,500 $1,000 $2,500 $10,000 $5,000 $5,000 $7,500 $5,000 $5,000 $2,500 $5,000 $5,000 $9,500 $7,500 $2,000 $5,000 $2,500 $5,000 $5,000 $2,500 $5,000 $7,500 $5,000 $2,500 $2,500 $2,000 $5,000 $2,500
PRCA
$3,660 $3,660 $3,660 $3,250 $1,800 $6,900 $1,140 $3,660 $1,825 $1,825 $3,700 $1,825 $1,460 $1,460 $1,825 $5,500 $1,825 $3,660 $1,450 $3,660 $3,600 $1,900 $853 $1,800 $7,200 $3,600 $3,600 $5,400 $3,600 $3,600 $1,800 $3,600 $3,600 $6,900 $5,500 $1,450 $3,700 $1,825 $3,660 $3,660 $1,825 $3,600 $5,500 $3,660 $1,825 $1,900 $1,706 $3,660 $1,825
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $5,000 $5,000 $4,500 $2,500 $9,500 $1,500 $5,000 $2,500 $2,500 $5,000 $2,500 $2,000 $2,000 $2,500 $7,500 $2,500 $5,000 $2,000 $5,000 $5,000 $2,500 $1,000 $2,500 $10,000 $5,000 $5,000 $7,500 $5,000 $5,000 $2,500 $5,000 $5,000 $9,500 $7,500 $2,000 $5,000 $2,500 $5,000 $5,000 $2,500 $5,000 $7,500 $5,000 $2,500 $2,500 $2,000 $5,000 $2,500
15
BNSF 2017-488(SA)BNSF 2017-489(FCS)BNSF 2017-490(FCS)BNSF 2017-491(FCS)BNSF 2017-492(TS)BNSF 2017-493(FCS)BNSF 2017-494(ROP)BNSF 2017-495(SA)BNSF 2017-496(SA)BNSF 2017-497(SA)BNSF 2017-498(SA)BNSF 2017-499(SA)BNSF 2017-500(SA)BNSF 2017-501(SA)BNSF 2017-502(SA)BNSF 2017-503(FCS)BNSF 2017-504(FCS)BNSF 2017-505(HMT)BNSF 2017-506(TS)BNSF 2017-507(TS)BNSF 2017-508(LI)BNSF 2017-509(TS)BNSF 2017-510(FCS)BNSF 2017-511(EP)BNSF 2017-512(SA)BNSF 2017-513(SA)BNSF 2017-514(ROP)BNSF 2017-515(SA)BNSF 2017-516(SA)BNSF 2017-517(SA)BNSF 2017-518(FCS)BNSF 2017-519(SA)BNSF 2017-520(FCS)BNSF 2017-521(SA)BNSF 2017-522(SA)BNSF 2017-523(SA)BNSF 2017-524(ROP)BNSF 2017-525(ROP)BNSF 2017-526(SA)BNSF 2017-527(LI)BNSF 2017-528(LI)BNSF 2017-529(SA)BNSF 2017-530(ROP)BNSF 2017-531(EQ)BNSF 2017-532(EP)BNSF 2017-533(EP)BNSF 2017-534(CC)BNSF 2017-535(FCS)BNSF 2017-536(TS)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1111111111111111131111111111111111131111111311212
No. ofViolations
$2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $7,500 $2,500 $2,500 $5,000 $5,000 $5,000 $2,500 $5,000 $5,000 $2,500 $2,500 $14,000 $5,000 $2,500 $5,000 $2,500 $2,500 $1,000 $5,000 $5,000 $7,500 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $5,000 $5,000 $12,500 $7,500 $7,500 $5,000 $2,500 $2,500 $2,500 $7,500 $7,500 $1,000 $1,000 $2,000 $2,500 $5,000
PRCA
$1,825 $1,825 $1,825 $1,850 $3,600 $3,700 $5,500 $1,800 $1,800 $3,660 $3,660 $3,660 $1,825 $3,660 $3,660 $1,850 $1,850 $10,250 $3,600 $1,800 $3,700 $1,800 $1,850 $853 $3,660 $3,660 $5,500 $3,660 $3,660 $3,660 $3,700 $3,660 $1,850 $3,660 $3,660 $9,250 $5,500 $5,800 $3,660 $1,900 $1,900 $1,825 $5,500 $5,400 $853 $853 $1,750 $1,850 $3,600
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $7,500 $2,500 $2,500 $5,000 $5,000 $5,000 $2,500 $5,000 $5,000 $2,500 $2,500 $14,000 $5,000 $2,500 $5,000 $2,500 $2,500 $1,000 $5,000 $5,000 $7,500 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $5,000 $5,000 $12,500 $7,500 $7,500 $5,000 $2,500 $2,500 $2,500 $7,500 $7,500 $1,000 $1,000 $2,000 $2,500 $5,000
16
BNSF 2017-537(TS)BNSF 2017-538(TS)BNSF 2017-539(TS)BNSF 2017-540(TS)BNSF 2017-541(SA)BNSF 2017-542(EP)BNSF 2017-543(FCS)BNSF 2017-544(HMT)BNSF 2017-545(SA)BNSF 2017-546(SA)BNSF 2017-547(SA)BNSF 2017-548(SA)BNSF 2017-549(SA)BNSF 2017-550(SA)BNSF 2017-551(ROP)BNSF 2017-552(ROP)BNSF 2017-553(ROP)BNSF 2017-554(ROP)BNSF 2017-555(ROP)BNSF 2017-556(SA)BNSF 2017-557(SA)BNSF 2017-558(SA)BNSF 2017-559(SA)BNSF 2017-560(SA)BNSF 2017-561(SA)BNSF 2017-562(TS)BNSF 2017-563(SA)BNSF 2017-564(SA)BNSF 2017-565(GC)BNSF 2017-566(GC)BNSF 2017-567(TS)BNSF 2017-568(GC)BNSF 2017-569(ROP)BNSF 2017-570(SA)BNSF 2017-571(SA)BNSF 2017-572(LI)BNSF 2017-573(LI)BNSF 2017-574(LI)BNSF 2017-575(SA)BNSF 2017-576(SA)BNSF 2017-577(SA)BNSF 2017-578(SA)BNSF 2017-579(SA)BNSF 2017-580(FCS)BNSF 2017-581(FCS)BNSF 2017-582(ROP)BNSF 2017-583(GC)BNSF 2017-584(EQ)BNSF 2017-585(SA)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
3111111411111111111111111311111111111111111111111
No. ofViolations
$7,500 $5,000 $1,000 $2,500 $5,000 $1,000 $5,000 $20,000 $5,000 $2,500 $5,000 $2,500 $5,000 $5,000 $2,000 $2,000 $7,500 $2,000 $7,500 $5,000 $5,000 $2,500 $5,000 $5,000 $2,500 $12,500 $5,000 $5,000 $2,500 $1,000 $2,500 $1,000 $2,000 $5,000 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $5,000 $2,500 $5,000 $2,500 $2,000 $1,000 $1,000 $5,000
PRCA
$5,400 $3,600 $853 $1,800 $3,660 $853 $3,700 $14,500 $3,660 $1,800 $3,600 $2,000 $2,500 $3,700 $1,450 $1,450 $5,450 $1,450 $5,400 $3,700 $3,700 $1,850 $3,700 $3,700 $1,850 $9,000 $3,700 $3,700 $1,900 $853 $1,800 $853 $1,450 $3,700 $1,850 $853 $1,900 $1,900 $3,700 $3,700 $3,700 $3,700 $1,850 $3,700 $1,500 $1,450 $853 $853 $3,700
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$7,500 $5,000 $1,000 $2,500 $5,000 $1,000 $5,000 $20,000 $5,000 $2,500 $5,000 $2,500 $5,000 $5,000 $2,000 $2,000 $7,500 $2,000 $7,500 $5,000 $5,000 $2,500 $5,000 $5,000 $2,500 $12,500 $5,000 $5,000 $2,500 $1,000 $2,500 $1,000 $2,000 $5,000 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $5,000 $2,500 $5,000 $2,500 $2,000 $1,000 $1,000 $5,000
17
BNSF 2017-586(ROP)BNSF 2017-587(SA)BNSF 2017-588(SA)BNSF 2017-589(SA)BNSF 2017-590(SA)BNSF 2017-591(TS)BNSF 2017-592(TS)BNSF 2017-593(FCS)BNSF 2017-594(FCS)BNSF 2017-595(FCS)BNSF 2017-596(FCS)BNSF 2017-597(FCS)BNSF 2017-598(FCS)BNSF 2017-599(ROP)BNSF 2017-600(TS)BNSF 2017-601(TS)BNSF 2017-602(HMT)BNSF 2017-603(HMT)BNSF 2017-604(SA)BNSF 2017-605(SA)BNSF 2017-606(HMT)BNSF 2017-607(SA)BNSF 2017-608(RW)BNSF 2017-609(HMT)BNSF 2017-610(LI)BNSF 2017-611(TS)BNSF 2017-612(TS)BNSF 2017-613(TS)BNSF 2017-614(ROP)BNSF 2017-615(TS)BNSF 2017-616(TS)BNSF 2017-617(TS)BNSF 2017-618(TS)BNSF 2017-619(ROP)BNSF 2017-620(ROP)BNSF 2017-621(ROP)BNSF 2017-622(SA)BNSF 2017-623(GC)BNSF 2017-624(HMT)BNSF 2017-625(ROP)BNSF 2017-626(TS)BNSF 2017-627(TS)BNSF 2017-628(ROP)BNSF 2017-629(SA)BNSF 2017-630(TS)BNSF 2017-631(TS)BNSF 2017-632(TS)BNSF 2017-633(SA)BNSF 2017-634(SA)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1111131111111111111121121231121211111111131111111
No. ofViolations
$2,000 $2,500 $2,500 $2,500 $5,000 $15,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,000 $5,000 $2,500 $7,500 $2,000 $5,000 $2,500 $7,000 $2,500 $3,000 $11,500 $2,500 $7,500 $8,500 $1,000 $7,500 $5,000 $2,500 $7,000 $1,000 $2,000 $7,500 $9,500 $5,000 $2,500 $7,500 $7,500 $2,500 $7,500 $7,500 $5,000 $2,500 $2,500 $2,500 $5,000 $5,000
PRCA
$1,430 $1,825 $1,825 $1,825 $3,700 $10,800 $3,600 $1,850 $1,850 $1,850 $1,850 $1,850 $1,850 $1,450 $3,600 $1,800 $5,400 $1,450 $3,700 $1,850 $5,100 $1,850 $2,175 $8,400 $1,900 $5,400 $6,125 $853 $5,400 $3,600 $1,800 $5,050 $853 $1,450 $5,400 $6,800 $3,700 $1,900 $5,400 $5,400 $1,800 $5,400 $5,400 $3,700 $1,800 $1,800 $1,800 $3,700 $3,700
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,000 $2,500 $2,500 $2,500 $5,000 $15,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,000 $5,000 $2,500 $7,500 $2,000 $5,000 $2,500 $7,000 $2,500 $3,000 $11,500 $2,500 $7,500 $8,500 $1,000 $7,500 $5,000 $2,500 $7,000 $1,000 $2,000 $7,500 $9,500 $5,000 $2,500 $7,500 $7,500 $2,500 $7,500 $7,500 $5,000 $2,500 $2,500 $2,500 $5,000 $5,000
18
BNSF 2017-635(RW)BNSF 2017-636(HSR)BNSF 2017-637(HSR)BNSF 2017-638(HSR)BNSF 2017-641(HSR)BNSF 2017-642(TS)BNSF 2017-643(TS)BNSF 2017-644(TS)
BNSF 2017-645(TS)BNSF 2017-646(TS)BNSF 2017-647(TS)BNSF 2017-648(TS)BNSF 2017-649(TS)BNSF 2017-650(TS)BNSF 2017-651(TS)BNSF 2017-652(TS)BNSF 2017-653(ROP)BNSF 2017-654(ROP)BNSF 2017-655(ROP)BNSF 2017-656(FCS)BNSF 2017-657(ROP)BNSF 2017-658(ROP)BNSF 2017-659(SA)BNSF 2017-660(FCS)BNSF 2017-661(FCS)BNSF 2017-662(FCS)BNSF 2017-663(FCS)BNSF 2017-664(FCS)BNSF 2017-665(FCS)BNSF 2017-666(SA)BNSF 2017-667(SA)BNSF 2017-668(SA)BNSF 2017-669(SA)BNSF 2017-670(SA)BNSF 2017-671(SA)BNSF 2017-672(FCS)BNSF 2017-673(FCS)BNSF 2017-674(ROP)BNSF 2017-675(ROP)BNSF 2017-676(AR)BNSF 2017-677(SA)BNSF 2017-678(SA)BNSF 2017-679(FCS)BNSF 2017-680(SA)BNSF 2017-681(SA)BNSF 2017-682(SA)BNSF 2017-683(SA)BNSF 2017-684(HS)BNSF 2017-685(ROP)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
111113120
13131122111111111111111111111111111111121
No. ofViolations
$2,000 $1,000 $1,000 $1,000 $1,000 $6,000 $1,000 $20,000
$1,000 $3,000 $2,500 $10,000 $2,500 $2,500 $7,500 $6,000 $7,500 $7,500 $7,500 $5,000 $7,500 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $7,500 $7,500 $2,500 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $2,000 $9,500
PRCA
$1,450 $853 $853 $853 $853 $4,325 $853 $11,000
$853 $2,559 $1,800 $7,200 $1,850 $1,850 $5,500 $4,400 $3,750 $3,750 $3,750 $3,700 $5,500 $3,500 $1,850 $1,850 $1,850 $1,850 $1,850 $3,700 $1,850 $1,850 $1,850 $1,850 $1,850 $1,850 $1,850 $1,850 $1,850 $5,500 $5,500 $1,250 $3,700 $3,700 $3,700 $3,700 $3,700 $3,700 $3,700 $1,706 $7,000
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,000 $1,000 $1,000 $1,000 $1,000 $6,000 $1,000 $11,000
$1,000 $3,000 $2,500 $10,000 $2,500 $2,500 $7,500 $6,000 $7,500 $7,500 $7,500 $5,000 $7,500 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $7,500 $7,500 $2,500 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $2,000 $9,500
Partially Terminated Violation(s): 1.
19
BNSF 2017-686(SA)BNSF 2017-687(SA)BNSF 2017-688(ROP)BNSF 2017-689(SA)BNSF 2017-690(SA)BNSF 2017-691(SA)BNSF 2017-692(SA)BNSF 2017-693(SA)BNSF 2017-694(FCS)BNSF 2017-695(SA)BNSF 2017-696(SA)BNSF 2017-697(ROP)BNSF 2017-698(GC)BNSF 2017-699(FCS)BNSF 2017-700(TS)BNSF 2017-701(SA)BNSF 2017-702(SA)BNSF 2017-703(SA)BNSF 2017-704(FCS)BNSF 2017-705(SA)BNSF 2017-706(HS)BNSF 2017-707(HS)BNSF 2017-708(HS)BNSF 2017-711(HSR)BNSF 2017-712(LI)BNSF 2017-713(ROP)BNSF 2017-714(FCS)BNSF 2017-715(SA)BNSF 2017-716(SA)BNSF 2017-717(ROP)BNSF 2017-718(ROP)BNSF 2017-719(ROP)BNSF 2017-720(ROP)BNSF 2017-721(ROP)BNSF 2017-722(ROP)BNSF 2017-723(LI)BNSF 2017-724(ROP)BNSF 2017-725(SA)BNSF 2017-726(SA)BNSF 2017-727(TS)BNSF 2017-728(TS)BNSF 2017-729(TS)BNSF 2017-730(ROP)
BNSF 2017-731(SA)BNSF 2017-732(RW)BNSF 2017-733(TS)BNSF 2017-734(TS)BNSF 2017-735(TS)BNSF 2017-736(TS)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1121111111112111111111111111111113111111111
111111
No. ofViolations
$2,500 $2,500 $4,000 $5,000 $2,500 $2,500 $2,500 $5,000 $2,500 $2,500 $5,000 $2,000 $10,000 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $5,000 $1,000 $1,000 $1,000 $2,500 $2,500 $7,500 $5,000 $5,000 $5,000 $2,000 $7,500 $4,000 $7,500 $6,000 $9,500 $2,500 $7,500 $5,000 $5,000 $2,500 $5,000 $5,000 $7,500
$5,000 $1,000 $2,500 $2,500 $5,000 $1,000
PRCA
$1,850 $1,850 $2,950 $3,700 $1,850 $1,850 $1,850 $2,900 $1,850 $1,850 $3,700 $1,450 $7,400 $1,850 $1,750 $1,850 $1,850 $3,700 $1,850 $3,700 $853 $853 $853 $1,800 $1,900 $5,850 $3,700 $3,700 $3,700 $1,450 $5,400 $2,900 $5,500 $4,400 $6,800 $1,900 $5,400 $3,700 $3,700 $1,750 $4,000 $3,700 $2,000
$3,700 $853 $1,800 $1,850 $3,700 $853
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $2,500 $4,000 $5,000 $2,500 $2,500 $2,500 $5,000 $2,500 $2,500 $5,000 $2,000 $10,000 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $5,000 $1,000 $1,000 $1,000 $2,500 $2,500 $7,500 $5,000 $5,000 $5,000 $2,000 $7,500 $4,000 $7,500 $6,000 $9,500 $2,500 $7,500 $5,000 $5,000 $2,500 $5,000 $5,000 $2,000
$5,000 $1,000 $2,500 $2,500 $5,000 $1,000
Partially Terminated Violation(s): 1.
20
BNSF 2017-737(HMT)BNSF 2017-738(SA)BNSF 2017-739(ROP)BNSF 2017-740(GC)BNSF 2017-741(GC)BNSF 2017-742(TS)BNSF 2017-743(ROP)BNSF 2017-744(ROP)BNSF 2017-745(ROP)BNSF 2017-750(HMT)BNSF 2017-754(LI)BNSF 2017-755(LI)BNSF 2017-756(SA)BNSF 2017-757(SA)BNSF 2017-758(SA)BNSF 2017-759(SA)BNSF 2017-760(SA)BNSF 2017-761(SA)BNSF 2017-762(HMT)BNSF 2017-764(SA)BNSF 2017-765(SA)BNSF 2017-766(SA)BNSF 2017-767(TS)BNSF 2017-768(TS)BNSF 2017-769(TS)BNSF 2017-770(TS)BNSF 2017-771(TS)BNSF 2017-772(TS)BNSF 2017-773(TS)BNSF 2017-774(TS)BNSF 2017-775(TS)BNSF 2017-776(SA)BNSF 2017-777(SA)BNSF 2017-778(GC)BNSF 2017-779(GC)BNSF 2017-780(TS)BNSF 2017-781(TS)
BNSF 2017-782(TS)BNSF 2017-783(TS)BNSF 2017-784(TS)BNSF 2017-785(FCS)BNSF 2017-786(AR)BNSF 2017-787(AR)BNSF 2017-788(AR)BNSF 2017-789(SI)BNSF 2017-790(SI)BNSF 2017-791(FCS)BNSF 2017-792(FCS)BNSF 2017-793(SA)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
11111111111111111121111114111111111211
222114411111
No. ofViolations
$7,500 $5,000 $7,500 $5,000 $5,000 $5,000 $9,500 $7,500 $7,500 $2,000 $2,000 $2,500 $2,500 $5,000 $5,000 $2,500 $5,000 $2,500 $13,500 $5,000 $5,000 $5,000 $2,500 $5,000 $5,000 $10,000 $5,000 $1,000 $5,000 $5,000 $1,000 $5,000 $2,500 $5,000 $5,000 $5,000 $11,000
$7,500 $3,500 $7,500 $5,000 $1,000 $10,000 $10,000 $1,000 $5,000 $2,500 $2,500 $2,500
PRCA
$5,250 $3,700 $5,400 $3,700 $3,700 $3,700 $6,800 $5,400 $5,400 $1,475 $1,545 $1,900 $1,850 $3,700 $3,700 $1,825 $3,660 $1,825 $9,800 $3,660 $3,660 $3,660 $1,850 $3,700 $3,700 $7,200 $3,900 $853 $3,700 $3,700 $853 $3,660 $1,825 $3,700 $3,000 $3,700 $5,000
$5,500 $2,700 $5,500 $3,700 $853 $7,500 $7,500 $853 $3,675 $1,850 $1,850 $1,825
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$7,500 $5,000 $7,500 $5,000 $5,000 $5,000 $9,500 $7,500 $7,500 $2,000 $2,000 $2,500 $2,500 $5,000 $5,000 $2,500 $5,000 $2,500 $13,500 $5,000 $5,000 $5,000 $2,500 $5,000 $5,000 $10,000 $5,000 $1,000 $5,000 $5,000 $1,000 $5,000 $2,500 $5,000 $5,000 $5,000 $5,000
$7,500 $3,500 $7,500 $5,000 $1,000 $10,000 $10,000 $1,000 $5,000 $2,500 $2,500 $2,500
Partially Terminated Violation(s): 1.
21
BNSF 2017-794(SA)BNSF 2017-795(SA)BNSF 2017-796(SA)BNSF 2017-797(ROP)BNSF 2017-798(RW)BNSF 2017-799(SA)BNSF 2017-800(SA)BNSF 2017-801(SA)BNSF 2017-802(SA)BNSF 2017-803(SA)BNSF 2017-804(GC)BNSF 2017-805(GC)BNSF 2017-806(ROP)BNSF 2017-807(ROP)BNSF 2017-808(TS)BNSF 2017-809(SA)BNSF 2017-810(FCS)BNSF 2017-811(TS)BNSF 2017-812(HS)BNSF 2017-813(HS)BNSF 2017-814(HMT)BNSF 2017-815(HMT)BNSF 2017-816(LI)BNSF 2017-817(LI)BNSF 2017-818(RW)BNSF 2017-819(ROP)BNSF 2017-820(ROP)BNSF 2017-821(HMT)BNSF 2017-822(HMT)BNSF 2017-823(SA)BNSF 2017-824(SA)BNSF 2017-825(LI)BNSF 2018-1(SA)BNSF 2018-2(SA)BNSF 2018-3(SA)BNSF 2018-4(SA)BNSF 2018-5(SA)BNSF 2018-6(FCS)BNSF 2018-7(FCS)BNSF 2018-8(FCS)BNSF 2018-9(FCS)BNSF 2018-10(FCS)BNSF 2018-11(FCS)BNSF 2018-12(FCS)BNSF 2018-13(FCS)BNSF 2018-14(SA)BNSF 2018-15(FCS)BNSF 2018-16(FCS)BNSF 2018-17(SA)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1113111111111121112121111115111111111111111111111
No. ofViolations
$5,000 $2,500 $5,000 $22,500 $3,000 $2,500 $5,000 $2,500 $2,500 $2,500 $5,000 $2,500 $7,500 $7,500 $7,500 $5,000 $2,500 $2,500 $2,000 $1,000 $4,000 $7,500 $5,000 $2,500 $1,500 $2,000 $2,000 $11,000 $3,000 $5,000 $5,000 $2,500 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000
PRCA
$3,660 $1,825 $3,660 $15,000 $2,175 $1,825 $3,660 $1,825 $1,825 $1,825 $3,700 $1,850 $5,000 $5,400 $5,500 $3,660 $1,850 $1,850 $1,706 $853 $0 $5,450 $3,800 $1,775 $1,100 $1,430 $1,430 $7,920 $2,200 $3,660 $3,660 $1,900 $3,660 $0 $3,660 $3,660 $3,660 $1,850 $1,850 $1,850 $1,850 $1,850 $1,850 $1,850 $1,850 $1,800 $1,850 $1,850 $3,600
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $2,500 $5,000 $22,500 $3,000 $2,500 $5,000 $2,500 $2,500 $2,500 $5,000 $2,500 $7,500 $7,500 $7,500 $5,000 $2,500 $2,500 $2,000 $1,000 $0 $7,500 $5,000 $2,500 $1,500 $2,000 $2,000 $11,000 $3,000 $5,000 $5,000 $2,500 $5,000 $0 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000
Case Terminated.
Case Terminated.
22
BNSF 2018-18(SA)BNSF 2018-19(SA)BNSF 2018-20(SA)BNSF 2018-21(SA)BNSF 2018-22(SA)BNSF 2018-23(SA)BNSF 2018-24(ROP)BNSF 2018-25(TS)BNSF 2018-26(TS)BNSF 2018-27(TS)BNSF 2018-28(TS)BNSF 2018-29(TS)BNSF 2018-30(TS)BNSF 2018-31(SA)BNSF 2018-32(HMT)BNSF 2018-33(ROP)BNSF 2018-34(SA)BNSF 2018-35(SA)BNSF 2018-36(SA)BNSF 2018-37(SA)BNSF 2018-38(SA)BNSF 2018-39(SA)BNSF 2018-40(LI)BNSF 2018-41(HS)BNSF 2018-42(TS)BNSF 2018-43(TS)BNSF 2018-44(FCS)BNSF 2018-45(ROP)BNSF 2018-46(AR)BNSF 2018-47(GC)BNSF 2018-48(LI)BNSF 2018-49(GC)BNSF 2018-50(LI)BNSF 2018-51(ROP)BNSF 2018-52(SA)BNSF 2018-53(HMT)BNSF 2018-54(HMT)BNSF 2018-55(HMT)BNSF 2018-56(HS)BNSF 2018-57(SA)BNSF 2018-58(SA)BNSF 2018-59(SA)BNSF 2018-60(SA)BNSF 2018-61(LI)BNSF 2018-62(SA)BNSF 2018-63(SA)BNSF 2018-64(SA)BNSF 2018-65(SA)BNSF 2018-66(SA)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1111113111211111111111121111111111111121111111111
No. ofViolations
$2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $6,000 $2,500 $5,000 $2,500 $10,000 $1,000 $1,000 $5,000 $5,000 $7,500 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $2,000 $5,000 $2,500 $2,500 $2,000 $2,500 $5,000 $2,500 $5,000 $2,500 $7,500 $5,000 $6,000 $5,000 $2,000 $2,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500
PRCA
$1,800 $1,800 $1,800 $3,660 $3,660 $3,660 $4,300 $1,850 $3,700 $1,850 $7,200 $853 $853 $3,660 $3,600 $5,400 $3,660 $3,660 $3,660 $3,660 $1,825 $1,825 $1,900 $1,706 $3,700 $1,850 $1,850 $1,430 $1,875 $3,700 $1,900 $3,700 $1,775 $5,400 $3,660 $4,320 $3,600 $1,450 $1,706 $3,660 $1,825 $1,825 $1,825 $1,900 $1,825 $1,825 $1,825 $1,825 $1,825
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $6,000 $2,500 $5,000 $2,500 $10,000 $1,000 $1,000 $5,000 $5,000 $7,500 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $2,000 $5,000 $2,500 $2,500 $2,000 $2,500 $5,000 $2,500 $5,000 $2,500 $7,500 $5,000 $6,000 $5,000 $2,000 $2,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500
23
BNSF 2018-67(FCS)BNSF 2018-68(FCS)BNSF 2018-69(FCS)BNSF 2018-70(FCS)BNSF 2018-71(FCS)BNSF 2018-72(FCS)BNSF 2018-73(FCS)BNSF 2018-74(FCS)BNSF 2018-75(HMT)BNSF 2018-76(LI)BNSF 2018-77(SA)BNSF 2018-78(FCS)BNSF 2018-79(FCS)BNSF 2018-80(FCS)BNSF 2018-81(ROP)BNSF 2018-82(TS)BNSF 2018-83(LI)BNSF 2018-84(SA)BNSF 2018-85(TS)BNSF 2018-86(EP)BNSF 2018-87(EP)BNSF 2018-88(TS)BNSF 2018-89(TS)BNSF 2018-90(TS)BNSF 2018-91(TS)BNSF 2018-92(FCS)BNSF 2018-93(TS)BNSF 2018-94(SA)BNSF 2018-95(SA)BNSF 2018-96(FCS)BNSF 2018-97(ROP)BNSF 2018-98(AR)BNSF 2018-99(AR)BNSF 2018-100(AR)BNSF 2018-101(AR)BNSF 2018-102(AR)BNSF 2018-103(AR)BNSF 2018-104(HMT)BNSF 2018-105(SA)BNSF 2018-106(HMT)BNSF 2018-108(SA)BNSF 2018-109(LI)BNSF 2018-110(GC)BNSF 2018-111(HSR)BNSF 2018-112(HMT)BNSF 2018-113(SI)BNSF 2018-114(ROP)BNSF 2018-115(FCS)BNSF 2018-116(FCS)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1111111111111112112111311171111111111111111111111
No. ofViolations
$2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $7,500 $5,000 $2,500 $2,500 $5,000 $1,000 $1,000 $1,000 $12,500 $2,500 $5,000 $5,000 $20,000 $5,000 $5,000 $5,000 $2,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $7,500 $5,000 $1,500 $5,000 $1,000 $2,000 $5,000 $2,000 $2,500 $2,500
PRCA
$1,850 $3,700 $1,850 $1,850 $1,850 $1,850 $1,850 $1,850 $0 $1,900 $1,825 $1,850 $1,850 $1,850 $5,400 $3,700 $1,900 $1,825 $3,700 $853 $853 $853 $9,000 $1,650 $3,600 $3,700 $14,600 $3,660 $3,660 $3,700 $1,430 $1,875 $1,875 $1,875 $1,875 $1,875 $1,875 $3,600 $3,660 $5,400 $3,660 $1,140 $3,700 $853 $1,170 $3,675 $1,430 $1,850 $1,850
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $0 $2,500 $2,500 $2,500 $2,500 $2,500 $7,500 $5,000 $2,500 $2,500 $5,000 $1,000 $1,000 $1,000 $12,500 $2,500 $5,000 $5,000 $20,000 $5,000 $5,000 $5,000 $2,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $7,500 $5,000 $1,500 $5,000 $1,000 $2,000 $5,000 $2,000 $2,500 $2,500
Case Terminated.
24
BNSF 2018-117(FCS)BNSF 2018-118(FCS)BNSF 2018-119(HMT)BNSF 2018-120(SA)BNSF 2018-121(SA)BNSF 2018-122(HSR)BNSF 2018-123(TS)BNSF 2018-124(SA)BNSF 2018-125(ROP)BNSF 2018-126(SA)BNSF 2018-128(HMT)BNSF 2018-129(SA)BNSF 2018-130(SA)BNSF 2018-131(ROP)BNSF 2018-132(SA)BNSF 2018-133(SA)BNSF 2018-134(FCS)BNSF 2018-135(SA)BNSF 2018-136(SA)BNSF 2018-137(SA)BNSF 2018-138(SA)BNSF 2018-139(SA)BNSF 2018-140(TS)BNSF 2018-141(TS)BNSF 2018-142(ROP)BNSF 2018-143(ROP)BNSF 2018-145(FCS)BNSF 2018-146(TS)BNSF 2018-147(ROP)BNSF 2018-150(SA)BNSF 2018-151(SA)BNSF 2018-154(SI)BNSF 2018-155(GC)BNSO 2015-3(ROP)BNSO 2017-1(PEQ)BNSO 2017-2(ROP)BPRR 2017-2(SI)BPRR 2017-3(SI)BPRR 2017-4(SI)BPRR 2017-5(SI)BPRR 2017-6(SI)BPRR 2017-7(SA)BRC 2017-1(SA)BRC 2017-2(SA)BRC 2017-3(SA)BRC 2017-4(HMT)
BRC 2017-6(ROP)BRC 2017-7(HS)BRC 2017-8(HMT)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201801/11/201801/11/201801/11/201805/23/2018
01/11/201801/11/201805/23/2018
SettlementDate Comments
11111111111111111111111112111111111111111121345
111
No. ofViolations
$5,000 $2,500 $5,000 $5,000 $5,000 $1,000 $5,000 $2,500 $2,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $5,000 $5,000 $2,500 $5,000 $5,000 $1,000 $9,500 $4,000 $5,000 $5,000 $7,500 $5,000 $5,000 $2,500 $5,000 $25,000 $5,000 $5,000 $1,000 $1,000 $1,000 $1,000 $1,000 $2,500 $10,000 $5,000 $12,500 $182,000
$7,500 $1,000 $1,000
PRCA
$3,700 $1,850 $3,600 $3,660 $3,660 $853 $3,700 $1,825 $1,430 $3,660 $0 $3,660 $3,660 $3,600 $3,660 $1,825 $1,850 $0 $3,660 $3,660 $1,825 $3,660 $3,700 $853 $6,800 $2,875 $3,700 $3,700 $5,400 $3,600 $3,600 $1,850 $3,700 $18,750 $3,900 $3,600 $900 $900 $900 $900 $900 $1,950 $7,400 $2,500 $9,250 $94,750
$4,875 $853 $700
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $2,500 $5,000 $5,000 $5,000 $1,000 $5,000 $2,500 $2,000 $5,000 $0 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $0 $5,000 $5,000 $2,500 $5,000 $5,000 $1,000 $9,500 $4,000 $5,000 $5,000 $7,500 $5,000 $5,000 $2,500 $5,000 $25,000 $5,000 $5,000 $1,000 $1,000 $1,000 $1,000 $1,000 $2,500 $10,000 $5,000 $12,500 $152,000
$7,500 $1,000 $1,000
Case Terminated.
Case Terminated.
Partially Terminated Violation(s): 2.
25
BRC 2017-9(HMT)BRC 2017-10(ROP)BRSR 2017-1(ROP)
BRSR 2017-2(RW)BVRR 2018-1(SA)CAGY 2017-1(AD)CAGY 2017-2(AD)CBCX 2016-1(TS)CBR 2016-2(TS)CBR 2016-3(RW)CBR 2017-1(REF)CBR 2017-2(LI)CBR 2017-3(AR)CBR 2017-4(ROP)CBR 2017-5(ROP)CC 2017-1(ROP)CC 2017-2(TS)CC 2017-3(TS)CC 2017-4(TS)CC 2017-5(TS)CC 2017-6(TS)CCHA 2017-1(AD)CERA 2017-1(SA)CFNR 2017-1(LI)CFRC 2016-8(GC)CFRC 2016-10(GC)CFRC 2016-11(GC)CFRC 2016-12(ROR)CFRC 2017-5(TS)CFRC 2017-6(GC)CFRC 2017-7(EP)CFRC 2017-8(GC)CFRC 2017-9(ROR)CFRC 2017-10(ROR)CFRC 2018-1(SI)CFRC 2018-2(GC)CFRC 2018-3(SI)CFRC 2018-4(SI)CIC 2017-1(SA)CKIN 2014-2(SA)CLC 2017-1(SA)CMEM 2017-1(SA)CMQX 2017-1(TS)CMR 2017-1(TS)CMR 2017-2(TS)CMR 2017-3(TS)CMR 2017-4(TS)CMR 2017-5(TS)CMR 2017-6(TS)
FRA No.
05/23/201805/23/201809/24/2018
09/24/201809/24/201809/27/201809/27/201801/12/201810/30/201710/30/201710/30/201710/30/201710/30/201710/30/201710/30/201708/17/201808/17/201808/17/201808/17/201808/17/201808/17/201809/27/201809/27/201809/27/201811/08/201711/08/201711/08/201711/08/201711/08/201711/08/201711/08/201711/08/201711/08/201711/08/201703/15/201803/15/201805/30/201808/17/201804/20/201802/07/201811/14/201704/12/201802/26/201802/05/201802/05/201802/05/201802/05/201802/05/201804/26/2018
SettlementDate Comments
111
1141122131111112111119111241431111111212212524
No. ofViolations
$1,000 $9,500 $7,500
$2,000 $2,500 $10,000 $5,000 $1,000 $10,000 $7,000 $5,000 $7,500 $2,500 $7,500 $9,500 $5,000 $5,000 $2,500 $7,500 $2,500 $2,000 $5,000 $5,000 $2,500 $22,500 $2,500 $1,000 $2,500 $10,000 $15,000 $1,000 $5,500 $28,500 $9,500 $2,500 $1,000 $5,000 $27,904 $5,000 $5,000 $10,000 $5,000 $10,000 $5,000 $2,500 $7,500 $18,500 $7,500 $12,500
PRCA
$700 $6,650 $2,000
$1,400 $1,750 $7,600 $3,950 $1,000 $8,500 $5,500 $4,000 $7,500 $2,500 $5,750 $6,000 $3,750 $3,600 $1,800 $5,600 $1,800 $1,400 $3,950 $3,600 $1,950 $19,987 $2,000 $800 $2,000 $9,000 $12,000 $853 $4,400 $15,200 $7,500 $2,000 $853 $4,125 $26,250 $4,000 $3,000 $5,000 $5,000 $10,000 $3,750 $1,750 $5,250 $15,000 $4,250 $10,000
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$1,000 $9,500 $2,000
$2,000 $2,500 $10,000 $5,000 $1,000 $10,000 $7,000 $5,000 $7,500 $2,500 $7,500 $9,500 $5,000 $5,000 $2,500 $7,500 $2,500 $2,000 $5,000 $5,000 $2,500 $22,500 $2,500 $1,000 $2,500 $10,000 $15,000 $1,000 $5,500 $19,000 $9,500 $2,500 $1,000 $5,000 $27,904 $5,000 $5,000 $10,000 $5,000 $10,000 $5,000 $2,500 $7,500 $18,500 $7,500 $12,500
Partially Terminated Violation(s): 1.
Terminated Violation(s): 2.
26
CMR 2018-1(TS)CMR 2018-2(TS)CMTY 2018-1(SI)CN 2015-224(HSR)CN 2017-2(SA)CN 2017-3(SA)CN 2017-4(SA)CN 2017-5(SA)CN 2017-6(SA)CN 2017-7(TS)CN 2017-8(FCS)CN 2017-9(LI)CN 2017-10(LI)CN 2017-11(SA)CN 2017-12(SA)CN 2017-13(FCS)CN 2017-14(SI)CN 2017-15(GC)CN 2017-16(GC)CN 2017-17(GC)CN 2017-18(HSR)CN 2017-19(GC)CN 2017-20(LI)CN 2017-21(LI)CN 2017-22(HMT)CN 2017-23(ROP)CN 2017-24(GC)CN 2017-25(HS)CN 2017-26(HS)CN 2017-27(LI)CN 2017-28(TS)CN 2017-29(SI)CN 2017-30(LI)CN 2017-31(GC)CN 2017-32(GC)CN 2017-33(TS)CN 2017-34(TS)CN 2017-35(TS)CN 2017-36(SI)CN 2017-37(HMT)CN 2017-38(HMT)CN 2017-39(SA)CN 2017-40(SA)CN 2017-41(GC)CN 2017-42(TS)CN 2017-43(HMT)CN 2017-44(SA)CN 2017-45(LI)CN 2017-46(SA)
FRA No.
05/07/201805/07/201808/01/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/2018
SettlementDate Comments
13115121114111111311111176111111111111111211151111
No. ofViolations
$5,000 $10,000 $27,904 $15,000 $2,500 $5,000 $2,500 $5,000 $2,500 $20,000 $2,500 $1,500 $2,500 $2,500 $2,500 $5,000 $3,000 $2,500 $2,500 $2,500 $1,000 $5,000 $2,500 $8,500 $12,000 $9,500 $2,500 $1,000 $1,000 $2,500 $1,000 $1,000 $1,500 $5,000 $1,000 $5,000 $1,000 $5,000 $1,000 $1,000 $10,500 $5,000 $5,000 $2,500 $20,000 $7,500 $5,000 $1,500 $2,500
PRCA
$4,000 $8,000 $25,113 $12,900 $1,650 $3,350 $1,650 $3,250 $1,650 $14,500 $1,700 $990 $1,650 $1,650 $1,825 $3,500 $2,010 $1,850 $1,850 $1,850 $670 $3,700 $1,700 $6,970 $8,500 $7,000 $1,850 $850 $850 $1,650 $850 $850 $990 $3,700 $730 $3,600 $850 $3,650 $850 $680 $7,950 $3,250 $3,700 $1,850 $14,100 $5,690 $3,250 $1,010 $1,650
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $10,000 $27,904 $15,000 $2,500 $5,000 $2,500 $5,000 $2,500 $20,000 $2,500 $1,500 $2,500 $2,500 $2,500 $5,000 $3,000 $2,500 $2,500 $2,500 $1,000 $5,000 $2,500 $8,500 $12,000 $9,500 $2,500 $1,000 $1,000 $2,500 $1,000 $1,000 $1,500 $5,000 $1,000 $5,000 $1,000 $5,000 $1,000 $1,000 $10,500 $5,000 $5,000 $2,500 $20,000 $7,500 $5,000 $1,500 $2,500
27
CN 2017-47(HS)CN 2017-48(HS)CN 2017-49(HMT)CN 2017-50(SA)CN 2017-51(AD)CN 2017-52(AD)CN 2017-53(FCS)CN 2017-54(SA)CN 2017-55(HMT)CN 2017-56(ROP)CN 2017-57(SA)CN 2017-58(TS)CN 2017-59(SA)CN 2017-60(LI)CN 2017-61(HS)CN 2017-62(HS)CN 2017-63(HS)CN 2017-64(LI)CN 2017-65(LI)CN 2017-66(SA)CN 2017-67(SA)CN 2017-68(HS)CN 2017-69(HS)CN 2017-70(HS)CN 2017-71(SA)CN 2017-72(SA)CN 2017-73(AR)CN 2017-74(FCS)CN 2017-75(FCS)CN 2017-76(ROP)CN 2017-77(SA)CN 2017-78(HMT)CN 2017-79(HMT)CN 2017-80(HMT)CN 2017-81(HMT)CN 2017-82(HMT)CN 2017-83(HMT)CN 2017-84(SA)CN 2017-85(TS)CN 2017-86(HMT)CN 2017-87(SA)CN 2017-88(SA)CN 2017-89(SA)CN 2017-90(SA)CN 2017-91(SA)CN 2017-92(AD)CN 2017-93(SA)CN 2017-94(SA)CN 2017-95(ROP)
FRA No.
08/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/2018
SettlementDate Comments
11121111111151111111111111111111111129111111111111
No. ofViolations
$1,000 $1,000 $4,000 $10,000 $2,500 $5,000 $2,500 $2,500 $4,000 $2,000 $2,500 $15,000 $5,000 $2,500 $1,000 $1,000 $1,000 $2,500 $5,000 $5,000 $5,000 $1,000 $1,000 $1,000 $2,500 $5,000 $2,500 $2,500 $2,500 $2,000 $5,000 $4,000 $4,000 $4,000 $4,000 $11,500 $45,000 $5,000 $2,500 $5,000 $5,000 $2,500 $5,000 $2,500 $5,000 $5,000 $2,500 $5,000 $9,500
PRCA
$850 $850 $2,970 $7,100 $1,675 $3,550 $1,750 $1,625 $2,840 $1,500 $1,825 $12,900 $3,250 $1,650 $870 $870 $870 $1,650 $3,450 $3,250 $3,200 $870 $870 $870 $1,575 $3,325 $1,700 $1,700 $1,750 $1,560 $3,250 $2,970 $2,900 $2,900 $2,970 $8,500 $34,000 $3,700 $1,775 $3,750 $3,700 $1,625 $3,325 $1,650 $3,325 $0 $1,550 $3,700 $7,000
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$1,000 $1,000 $4,000 $10,000 $2,500 $5,000 $2,500 $2,500 $4,000 $2,000 $2,500 $15,000 $5,000 $2,500 $1,000 $1,000 $1,000 $2,500 $5,000 $5,000 $5,000 $1,000 $1,000 $1,000 $2,500 $5,000 $2,500 $2,500 $2,500 $2,000 $5,000 $4,000 $4,000 $4,000 $4,000 $11,500 $45,000 $5,000 $2,500 $5,000 $5,000 $2,500 $5,000 $2,500 $5,000 $0 $2,500 $5,000 $9,500
Case Terminated.
28
CN 2017-96(SA)CN 2017-97(FCS)CN 2017-98(SA)CN 2017-99(LI)CN 2017-100(AD)CN 2017-101(SA)CN 2017-102(SA)CN 2017-103(HMT)CN 2017-104(TS)CN 2017-105(TS)CN 2017-106(SA)CN 2017-107(TS)CN 2017-108(TS)CN 2017-109(TS)CN 2017-110(HMT)CN 2017-111(HMT)CN 2017-112(SA)CN 2017-113(SA)CN 2017-114(EQ)CN 2017-115(FCS)CN 2017-116(TS)CN 2017-117(SA)CN 2017-118(SA)CN 2017-119(SA)CN 2017-120(SA)CN 2017-121(SA)CN 2017-122(TS)CN 2017-123(SA)CN 2017-124(SA)CN 2017-125(SA)CN 2017-126(SA)CN 2017-127(SA)CN 2017-128(SA)CN 2017-129(SA)CN 2017-130(SA)CN 2017-131(SA)CN 2017-132(SA)CN 2017-133(TS)CN 2017-134(TS)CN 2017-135(SA)CN 2017-136(SA)CN 2018-116(SA)COP 2017-1(RW)CORP 2017-1(TS)CORP 2017-2(TS)CORP 2017-3(SA)CORP 2017-4(LI)CORP 2017-5(SA)CORP 2017-6(TS)
FRA No.
08/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/17/201808/27/201801/12/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/2018
SettlementDate Comments
11111421111111151111112111121111111111221111221111
No. ofViolations
$2,500 $2,500 $5,000 $1,500 $1,000 $20,000 $7,500 $5,000 $2,500 $2,500 $5,000 $2,500 $1,000 $2,500 $1,000 $25,000 $5,000 $5,000 $2,500 $2,500 $2,500 $5,000 $10,000 $10,000 $5,000 $2,500 $12,000 $5,000 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $5,000 $2,500 $10,000 $2,000 $5,000 $2,500 $5,000 $5,000
PRCA
$1,650 $1,650 $3,250 $1,010 $870 $14,100 $5,350 $3,750 $1,750 $1,750 $3,325 $1,750 $860 $1,800 $680 $18,950 $3,700 $3,700 $1,825 $1,700 $1,750 $3,700 $7,400 $0 $3,700 $1,750 $10,320 $3,250 $1,625 $3,700 $1,650 $1,625 $1,625 $1,625 $1,625 $3,700 $3,700 $3,550 $3,550 $1,650 $1,650 $0 $2,000 $7,000 $1,800 $3,950 $1,950 $3,950 $3,950
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $2,500 $5,000 $1,500 $1,000 $20,000 $7,500 $5,000 $2,500 $2,500 $5,000 $2,500 $1,000 $2,500 $1,000 $25,000 $5,000 $5,000 $2,500 $2,500 $2,500 $5,000 $10,000 $0 $5,000 $2,500 $12,000 $5,000 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $0 $2,500 $10,000 $2,000 $5,000 $2,500 $5,000 $5,000
Case Terminated.
Case Terminated.
29
CORP 2017-7(SA)CORP 2017-8(SA)CORP 2017-9(SA)CORP 2017-10(FCS)CORP 2018-2(SA)CORP 2018-3(FCS)CORP 2018-4(TS)CP 2016-216(SA)CP 2016-217(SA)CP 2016-241(SA)CP 2017-61(SA)CP 2017-62(SA)CP 2017-63(SA)CP 2017-64(SA)CP 2017-65(SA)CP 2017-68(SA)CP 2017-69(SA)CP 2017-71(HMT)CP 2017-72(TS)CP 2017-73(SA)CP 2017-74(ROP)CP 2017-75(ROP)CP 2017-76(SA)CP 2017-77(SA)CP 2017-78(SA)CP 2017-79(TS)CP 2017-80(SA)CP 2017-81(SA)CP 2017-82(ROP)CP 2017-84(HMT)CP 2017-85(HMT)CP 2017-86(EP)CP 2017-87(SA)CP 2017-88(SA)CP 2017-89(ROP)CP 2017-90(SA)CP 2017-91(FCS)CP 2017-92(FCS)CP 2017-93(FCS)CP 2017-94(SA)CP 2017-95(SA)CP 2017-96(SA)CP 2017-97(SA)CP 2017-98(FCS)CP 2017-99(FCS)CP 2017-100(SA)CP 2017-101(SA)CP 2017-102(TS)CP 2017-103(LI)
FRA No.
09/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
111111110101111111111111111111157111611111111111111
No. ofViolations
$2,500 $5,000 $2,500 $5,000 $5,000 $2,500 $5,000 $25,000 $25,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $3,000 $5,000 $2,500 $7,500 $9,500 $2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $2,000 $12,500 $17,500 $1,000 $2,500 $5,000 $12,000 $5,000 $2,500 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $5,000 $5,000 $5,000 $1,000
PRCA
$1,950 $3,950 $1,950 $3,950 $3,600 $1,950 $3,950 $17,500 $17,500 $0 $1,625 $1,625 $1,625 $1,625 $1,625 $1,625 $3,250 $2,100 $3,250 $1,750 $5,000 $6,650 $1,750 $1,750 $1,625 $3,600 $0 $3,500 $1,225 $8,500 $11,850 $853 $1,750 $3,325 $8,500 $3,150 $0 $3,400 $3,150 $3,750 $3,850 $3,500 $3,500 $0 $1,650 $3,600 $3,600 $3,250 $853
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $5,000 $2,500 $5,000 $5,000 $2,500 $5,000 $25,000 $25,000 $0 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $3,000 $5,000 $2,500 $7,500 $9,500 $2,500 $2,500 $2,500 $5,000 $0 $5,000 $2,000 $12,500 $17,500 $1,000 $2,500 $5,000 $12,000 $5,000 $0 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $0 $2,500 $5,000 $5,000 $5,000 $1,000
Case Terminated.
Case Terminated.
Case Terminated.
Case Terminated.
30
CP 2017-104(FCS)CP 2017-105(FCS)CP 2017-107(HSR)CP 2017-108(SA)CP 2017-109(SI)CP 2017-110(FCS)CP 2017-112(HMT)CP 2017-113(SA)CP 2017-114(SA)CP 2017-115(SA)CP 2017-117(HS)CP 2017-118(FCS)CP 2017-119(HMT)CP 2017-120(HMT)CP 2017-121(HS)CP 2017-122(SA)CP 2017-123(SA)CP 2017-124(HMT)CP 2017-125(TS)CP 2017-126(HMT)CP 2017-128(TS)CP 2017-129(AR)CP 2017-130(TS)CP 2017-131(AR)CP 2017-132(ROP)CP 2017-133(TS)CP 2017-134(TS)CP 2017-135(SA)CP 2017-136(SA)CP 2017-137(SA)CP 2017-138(SA)CP 2017-148(FCS)CP 2017-149(ROP)CP 2017-150(GC)CP 2017-151(TS)CP 2017-152(EP)CP 2017-153(SA)CP 2017-154(FCS)CP 2017-155(AD)CP 2017-156(AD)CP 2017-157(HMT)CP 2017-158(HMT)CP 2017-159(AD)CP 2017-160(SA)CP 2017-161(SA)CP 2017-162(HMT)CP 2017-163(TS)CP 2017-164(AD)CP 2017-165(AD)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
11111171111112111211611111111111111711111112111122
No. ofViolations
$2,500 $5,000 $1,000 $5,000 $5,000 $2,000 $31,000 $2,500 $2,500 $2,500 $1,000 $2,500 $1,000 $7,000 $1,000 $2,500 $5,000 $10,000 $5,000 $40,000 $2,500 $2,500 $5,000 $2,500 $7,500 $2,500 $2,000 $5,000 $5,000 $2,500 $2,500 $5,000 $2,000 $1,000 $7,000 $1,000 $5,000 $2,500 $5,000 $2,500 $8,000 $2,000 $10,000 $5,000 $2,500 $7,500 $2,500 $5,000 $5,000
PRCA
$1,700 $0 $853 $3,350 $3,500 $1,400 $19,000 $1,650 $1,875 $1,750 $853 $1,750 $853 $5,000 $853 $1,800 $2,750 $7,000 $3,250 $26,500 $1,625 $1,700 $3,400 $1,700 $5,700 $1,800 $1,400 $3,200 $3,175 $1,750 $1,700 $3,500 $1,400 $853 $5,100 $853 $3,700 $1,700 $3,300 $1,650 $5,900 $1,440 $7,000 $3,500 $1,775 $5,500 $1,700 $3,650 $3,400
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $0 $1,000 $5,000 $5,000 $2,000 $31,000 $2,500 $2,500 $2,500 $1,000 $2,500 $1,000 $7,000 $1,000 $2,500 $5,000 $10,000 $5,000 $40,000 $2,500 $2,500 $5,000 $2,500 $7,500 $2,500 $2,000 $5,000 $5,000 $2,500 $2,500 $5,000 $2,000 $1,000 $7,000 $1,000 $5,000 $2,500 $5,000 $2,500 $8,000 $2,000 $10,000 $5,000 $2,500 $7,500 $2,500 $5,000 $5,000
Case Terminated.
31
CP 2017-166(AD)CP 2017-167(AD)CP 2017-168(AD)CP 2017-169(AD)CP 2017-170(SA)CP 2017-171(SA)CP 2017-172(SA)CP 2017-173(AD)CP 2017-174(AD)CP 2017-175(AD)CP 2017-176(AD)CP 2017-177(TS)CP 2017-178(SA)CP 2017-179(SA)CP 2017-180(SA)CP 2017-181(SA)CP 2018-1(LI)CP 2018-2(SA)CP 2018-3(SA)CP 2018-4(HMT)CP 2018-5(FCS)CP 2018-6(HMT)CP 2018-7(FCS)CP 2018-8(SA)CP 2018-9(SA)CP 2018-10(GC)CP 2018-11(GC)CP 2018-12(HMT)CP 2018-13(SA)CP 2018-15(TS)CP 2018-16(SA)CP 2018-17(SA)CRL 2014-1(HMT)CRL 2017-2(ROP)CRL 2017-3(ROP)CRSH 2016-6(ROP)
CRSH 2017-5(AR)CRSH 2017-6(RW)CRSH 2017-7(SA)CRSH 2017-8(ROP)CRSH 2017-9(ROP)
CRSH 2017-10(ROP)CRSH 2017-11(TS)CRSH 2018-1(SA)CRSH 2018-2(ROP)CRSH 2018-3(SA)CSCD 2017-1(GC)CSX 2014-85(HMT)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201812/20/201703/01/201803/01/201808/03/2018
08/03/201808/03/201808/03/201808/03/201808/03/2018
08/03/201808/03/201808/03/201808/03/201808/03/201809/27/201809/26/2018
SettlementDate Comments
212111122211111111121111111412115111
11114
1111111
No. ofViolations
$5,000 $5,000 $5,000 $2,500 $5,000 $2,500 $5,000 $5,000 $5,000 $5,000 $5,000 $1,000 $5,000 $2,500 $5,000 $5,000 $1,000 $2,500 $5,000 $10,000 $2,500 $2,000 $2,500 $5,000 $5,000 $5,000 $1,000 $10,000 $5,000 $5,000 $2,500 $5,000 $12,500 $9,500 $9,500 $7,500
$2,500 $3,000 $2,500 $7,500 $8,000
$7,500 $2,500 $5,000 $7,500 $5,000 $5,000 $6,000
PRCA
$3,375 $3,450 $3,450 $1,675 $3,350 $1,675 $3,500 $3,400 $3,427 $3,250 $3,750 $853 $3,700 $1,500 $3,750 $3,500 $853 $2,000 $3,750 $7,250 $1,525 $1,400 $1,625 $3,500 $3,500 $3,250 $853 $7,250 $3,300 $3,600 $1,800 $3,500 $8,500 $7,600 $7,600 $1,750
$1,900 $2,400 $2,150 $6,000 $5,025
$6,450 $2,050 $4,250 $6,350 $4,250 $3,950 $4,500
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $5,000 $5,000 $2,500 $5,000 $2,500 $5,000 $5,000 $5,000 $5,000 $5,000 $1,000 $5,000 $2,500 $5,000 $5,000 $1,000 $2,500 $5,000 $10,000 $2,500 $2,000 $2,500 $5,000 $5,000 $5,000 $1,000 $10,000 $5,000 $5,000 $2,500 $5,000 $12,500 $9,500 $9,500 $2,000
$2,500 $3,000 $2,500 $7,500 $6,000
$7,500 $2,500 $5,000 $7,500 $5,000 $5,000 $6,000
Partially Terminated Violation(s): 1.
Partially Terminated Violation(s): 1.
32
CSX 2014-121(SA)CSX 2015-3(AR)CSX 2015-420(HMT)CSX 2016-57(ROP)CSX 2016-61(GC)
CSX 2016-84(LI)CSX 2016-96(SI)CSX 2016-102(HSR)CSX 2016-110(FCS)CSX 2016-114(GC)CSX 2016-121(SI)CSX 2016-174(ROP)CSX 2016-197(LI)CSX 2016-202(GC)CSX 2016-271(AR)CSX 2016-273(AR)CSX 2016-279(HMT)CSX 2016-282(ROP)CSX 2016-307(SA)CSX 2016-323(FCS)CSX 2016-330(AD)CSX 2016-331(AD)CSX 2016-338(AR)CSX 2016-339(AR)CSX 2016-342(AR)CSX 2016-346(SA)CSX 2016-347(SA)CSX 2016-350(SA)CSX 2016-362(SA)CSX 2016-363(RSP)CSX 2016-367(SA)CSX 2016-374(HMT)CSX 2016-375(HS)CSX 2016-381(GC)CSX 2016-384(HSR)CSX 2016-386(HSR)CSX 2016-387(EQ)CSX 2016-393(GC)CSX 2016-395(GC)CSX 2016-396(LI)CSX 2016-399(GC)CSX 2016-404(AR)CSX 2016-405(AR)CSX 2016-407(AR)CSX 2016-408(AR)CSX 2016-411(HMT)CSX 2016-412(HMT)CSX 2016-417(HSR)CSX 2016-423(RW)
FRA No.
09/26/201809/26/201809/26/201809/26/201809/26/2018
09/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/2018
SettlementDate Comments
11112
112111111116111141111111111111111112111111812
No. ofViolations
$5,000 $2,500 $5,000 $7,500 $10,000
$1,000 $1,000 $2,000 $2,500 $1,000 $2,500 $2,000 $1,500 $5,000 $1,000 $1,000 $36,500 $7,500 $2,500 $2,500 $2,500 $10,000 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $9,500 $5,000 $11,000 $1,000 $5,000 $1,000 $1,000 $2,500 $1,000 $2,500 $2,000 $2,500 $2,500 $2,500 $2,500 $2,500 $15,000 $54,000 $1,000 $5,000
PRCA
$3,500 $1,908 $3,750 $5,722 $4,000
$839 $839 $1,678 $1,750 $853 $1,875 $1,300 $1,150 $3,800 $920 $853 $27,300 $5,572 $1,875 $1,875 $1,875 $7,500 $1,750 $1,750 $1,908 $1,875 $1,875 $3,750 $3,750 $6,400 $3,250 $8,250 $839 $3,800 $839 $839 $1,875 $853 $1,925 $1,400 $1,850 $1,908 $1,908 $1,908 $1,908 $11,250 $40,400 $839 $3,750
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $2,500 $5,000 $7,500 $5,000
$1,000 $1,000 $2,000 $2,500 $1,000 $2,500 $2,000 $1,500 $5,000 $1,000 $1,000 $36,500 $7,500 $2,500 $2,500 $2,500 $10,000 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $9,500 $5,000 $11,000 $1,000 $5,000 $1,000 $1,000 $2,500 $1,000 $2,500 $2,000 $2,500 $2,500 $2,500 $2,500 $2,500 $15,000 $54,000 $1,000 $5,000
Partially Terminated Violation(s): 1, 2.
33
CSX 2016-428(TS)CSX 2016-431(SI)CSX 2016-439(HMT)CSX 2016-447(HMT)CSX 2016-451(HS)CSX 2016-455(LI)CSX 2016-457(RW)CSX 2016-467(ROP)CSX 2016-473(AR)CSX 2016-475(AR)CSX 2016-477(AR)CSX 2016-479(AR)CSX 2016-480(AR)CSX 2016-481(AR)CSX 2016-483(AR)CSX 2016-485(GC)CSX 2016-487(GC)CSX 2016-489(TS)CSX 2016-502(HMT)CSX 2016-508(HS)CSX 2016-509(HMT)CSX 2017-20(EP)CSX 2017-24(TS)CSX 2017-32(GC)CSX 2017-38(GC)CSX 2017-50(LI)CSX 2017-54(SA)CSX 2017-56(LI)CSX 2017-60(SA)CSX 2017-62(SA)CSX 2017-66(SA)CSX 2017-68(LI)CSX 2017-72(SA)CSX 2017-73(ROP)CSX 2017-74(SA)CSX 2017-75(SA)CSX 2017-76(SA)CSX 2017-77(SA)CSX 2017-78(SA)CSX 2017-79(SA)CSX 2017-80(SA)CSX 2017-81(SA)CSX 2017-82(LI)CSX 2017-83(FCS)CSX 2017-84(FCS)CSX 2017-85(HSR)CSX 2017-86(TS)CSX 2017-87(TS)CSX 2017-88(TS)
FRA No.
09/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/2018
SettlementDate Comments
11112111111111111112101711111111111111111111112113
No. ofViolations
$2,500 $1,000 $7,500 $3,000 $2,000 $2,000 $1,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $27,455 $2,000 $2,000 $75,000 $1,000 $35,000 $2,500 $2,500 $2,500 $5,000 $2,000 $5,000 $5,000 $5,000 $2,500 $5,000 $7,500 $5,000 $5,000 $2,500 $5,000 $2,500 $5,000 $2,500 $5,000 $2,500 $2,500 $2,500 $2,000 $5,000 $1,000 $7,500
PRCA
$1,875 $853 $5,625 $2,370 $1,678 $1,450 $853 $3,715 $1,908 $1,900 $1,900 $1,900 $1,825 $1,900 $1,900 $3,900 $1,825 $19,750 $1,580 $1,678 $56,098 $853 $25,500 $1,825 $1,850 $1,800 $3,750 $1,200 $3,750 $3,750 $3,750 $1,775 $3,650 $5,572 $3,750 $3,750 $1,850 $3,750 $1,875 $3,750 $1,850 $3,750 $1,600 $1,875 $1,875 $1,678 $3,750 $839 $5,600
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $1,000 $7,500 $3,000 $2,000 $2,000 $1,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $27,455 $2,000 $2,000 $75,000 $1,000 $35,000 $2,500 $2,500 $2,500 $5,000 $2,000 $5,000 $5,000 $5,000 $2,500 $5,000 $7,500 $5,000 $5,000 $2,500 $5,000 $2,500 $5,000 $2,500 $5,000 $2,500 $2,500 $2,500 $2,000 $5,000 $1,000 $7,500
34
CSX 2017-89(HMT)CSX 2017-90(FCS)CSX 2017-91(ROP)
CSX 2017-92(SI)CSX 2017-93(SA)CSX 2017-94(SA)CSX 2017-95(SA)CSX 2017-96(TS)CSX 2017-97(TS)CSX 2017-98(EP)CSX 2017-99(TS)CSX 2017-100(TS)CSX 2017-101(SA)CSX 2017-102(SA)CSX 2017-103(ROP)CSX 2017-104(SA)CSX 2017-105(HMT)CSX 2017-106(HMT)CSX 2017-107(GC)CSX 2017-108(RW)CSX 2017-109(TS)CSX 2017-110(TS)CSX 2017-112(GC)CSX 2017-113(GC)CSX 2017-114(LI)CSX 2017-115(LI)CSX 2017-116(GC)CSX 2017-117(TS)CSX 2017-118(SI)CSX 2017-119(SI)CSX 2017-120(SI)CSX 2017-121(SI)CSX 2017-122(SI)CSX 2017-123(SI)CSX 2017-124(SA)CSX 2017-125(SA)CSX 2017-127(SA)CSX 2017-128(HS)CSX 2017-129(SA)CSX 2017-130(SA)
CSX 2017-131(SA)CSX 2017-132(SA)CSX 2017-133(SA)CSX 2017-134(FCS)CSX 2017-135(FCS)
CSX 2017-136(SA)CSX 2017-137(SA)
FRA No.
09/26/201809/26/201809/26/2018
09/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/2018
09/26/201809/26/201809/26/201809/26/201809/26/2018
09/26/201809/26/2018
SettlementDate Comments
111
1111331611111225111111111111111111211
11112
11
No. ofViolations
$2,000 $5,000 $7,500
$2,500 $5,000 $2,500 $2,500 $3,000 $10,000 $1,000 $15,000 $5,000 $2,500 $2,500 $9,500 $2,500 $10,000 $15,000 $25,000 $3,000 $2,500 $1,000 $1,000 $2,500 $1,500 $1,000 $5,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $5,000 $2,500 $2,500 $2,000 $5,000 $2,500
$5,000 $2,500 $5,000 $5,000 $5,000
$5,000 $2,500
PRCA
$1,450 $3,650 $839
$1,875 $3,750 $1,875 $1,800 $2,225 $7,500 $853 $10,684 $3,750 $1,875 $1,775 $7,125 $1,875 $7,200 $11,000 $19,000 $2,275 $1,875 $853 $839 $1,900 $1,150 $839 $3,800 $839 $853 $853 $839 $839 $853 $853 $3,750 $1,875 $1,875 $1,678 $3,550 $1,550
$3,650 $1,875 $3,750 $3,650 $2,500
$3,750 $1,875
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,000 $5,000 $1,000
$2,500 $5,000 $2,500 $2,500 $3,000 $10,000 $1,000 $15,000 $5,000 $2,500 $2,500 $9,500 $2,500 $10,000 $15,000 $25,000 $3,000 $2,500 $1,000 $1,000 $2,500 $1,500 $1,000 $5,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $5,000 $2,500 $2,500 $2,000 $5,000 $2,000
$5,000 $2,500 $5,000 $5,000 $2,500
$5,000 $2,500
Partially Terminated Violation(s): 1.
Partially Terminated Violation(s): 1.
Partially Terminated Violation(s): 1.
35
CSX 2017-138(SA)
CSX 2017-139(SA)CSX 2017-140(SA)CSX 2017-141(SA)CSX 2017-142(SA)CSX 2017-143(SA)CSX 2017-144(SA)CSX 2017-145(FCS)CSX 2017-146(FCS)CSX 2017-147(FCS)CSX 2017-148(SA)CSX 2017-149(SA)CSX 2017-150(SA)CSX 2017-151(HS)CSX 2017-153(SA)CSX 2017-154(GC)CSX 2017-155(GC)CSX 2017-156(LI)CSX 2017-157(LI)CSX 2017-158(LI)CSX 2017-159(LI)CSX 2017-160(LI)CSX 2017-161(LI)CSX 2017-162(LI)CSX 2017-163(LI)CSX 2017-164(HMT)CSX 2017-165(SA)CSX 2017-166(SA)CSX 2017-167(TS)CSX 2017-168(SA)CSX 2017-169(SA)CSX 2017-170(RW)CSX 2017-171(ROP)CSX 2017-172(FCS)CSX 2017-173(SA)CSX 2017-174(SA)CSX 2017-175(SA)CSX 2017-176(SA)CSX 2017-177(SA)CSX 2017-178(SA)CSX 2017-179(SA)CSX 2017-180(SA)CSX 2017-181(SA)CSX 2017-182(SA)CSX 2017-183(FCS)CSX 2017-184(SA)CSX 2017-185(GC)CSX 2017-186(HSR)CSX 2017-187(GC)
FRA No.
09/26/2018
09/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/2018
SettlementDate Comments
1
111111111111111113131112111111111111111111111121
No. ofViolations
$5,000
$2,500 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $1,000 $2,500 $5,000 $5,000 $2,500 $7,500 $2,500 $7,500 $2,500 $2,500 $2,500 $4,000 $4,000 $5,000 $5,000 $2,500 $5,000 $5,000 $1,000 $7,500 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $2,500 $2,000 $5,000
PRCA
$2,000
$1,875 $3,750 $3,750 $3,750 $3,750 $1,875 $1,800 $1,800 $1,900 $3,550 $3,500 $3,550 $853 $1,875 $3,800 $3,850 $1,850 $4,000 $1,875 $5,650 $1,775 $1,775 $1,850 $2,975 $3,075 $3,750 $3,750 $1,875 $3,750 $3,750 $853 $5,722 $1,900 $3,750 $1,775 $1,775 $1,875 $1,875 $1,875 $1,775 $1,875 $1,875 $1,875 $3,650 $3,550 $1,850 $1,706 $3,850
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500
$2,500 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $1,000 $2,500 $5,000 $5,000 $2,500 $5,000 $2,500 $7,500 $2,500 $2,500 $2,500 $4,000 $4,000 $5,000 $5,000 $2,500 $5,000 $5,000 $1,000 $7,500 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $2,500 $2,000 $5,000
Partially Terminated Violation(s): 1.
Terminated Violation(s): 1.
36
CSX 2017-188(ROP)CSX 2017-189(TS)CSX 2017-190(ROP)CSX 2017-191(HMT)CSX 2017-192(SA)CSX 2017-193(HMT)CSX 2017-194(SA)CSX 2017-195(SA)CSX 2017-196(SA)CSX 2017-197(GC)CSX 2017-198(GC)CSX 2017-199(GC)CSX 2017-200(GC)CSX 2017-201(GC)CSX 2017-202(SA)CSX 2017-203(HMT)CSX 2017-204(FCS)CSX 2017-205(SA)CSX 2017-207(SA)CSX 2017-208(SA)CSX 2017-209(FCS)CSX 2017-210(FCS)CSX 2017-211(FCS)CSX 2017-212(SA)CSX 2017-213(SA)CSX 2017-214(SA)CSX 2017-215(SA)CSX 2017-216(SA)CSX 2017-217(SA)CSX 2017-218(SA)CSX 2017-219(TS)CSX 2017-220(TS)CSX 2017-221(TS)CSX 2017-222(TS)CSX 2017-223(TS)CSX 2017-224(TS)CSX 2017-225(RMM)CSX 2017-226(RW)CSX 2017-227(GC)CSX 2017-228(TS)CSX 2017-229(LI)CSX 2017-230(TS)CSX 2017-231(LI)CSX 2017-232(TS)CSX 2017-233(TS)CSX 2017-234(TS)CSX 2017-235(TS)CSX 2017-236(HS)
CSX 2017-237(HS)
FRA No.
09/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/2018
09/26/2018
SettlementDate Comments
111111111111111111111111111111121121111111123224
2
No. ofViolations
$9,500 $2,500 $9,500 $7,500 $5,000 $4,000 $2,500 $2,500 $5,000 $5,000 $5,000 $5,000 $1,000 $5,000 $2,500 $5,000 $2,500 $2,500 $5,000 $5,000 $2,500 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $5,000 $5,000 $2,500 $2,500 $7,500 $2,500 $2,500 $5,000 $2,500 $5,000 $2,000 $5,000 $2,500 $2,500 $1,000 $2,500 $7,500 $7,500 $7,500 $5,000 $4,000
$2,000
PRCA
$7,239 $1,900 $7,239 $5,600 $3,750 $3,075 $1,875 $1,875 $3,750 $3,900 $3,900 $3,800 $0 $3,800 $0 $3,850 $1,900 $1,875 $3,750 $3,750 $1,900 $3,700 $0 $3,750 $3,750 $1,775 $1,775 $3,750 $3,550 $1,875 $1,825 $5,300 $1,800 $1,750 $3,550 $1,775 $3,800 $1,450 $3,800 $1,775 $1,875 $853 $1,875 $5,750 $5,600 $5,300 $3,500 $1,706
$1,706
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$9,500 $2,500 $9,500 $7,500 $5,000 $4,000 $2,500 $2,500 $5,000 $5,000 $5,000 $5,000 $0 $5,000 $0 $5,000 $2,500 $2,500 $5,000 $5,000 $2,500 $5,000 $0 $5,000 $5,000 $2,500 $2,500 $5,000 $5,000 $2,500 $2,500 $7,500 $2,500 $2,500 $5,000 $2,500 $5,000 $2,000 $5,000 $2,500 $2,500 $1,000 $2,500 $7,500 $7,500 $7,500 $5,000 $2,000
$2,000
Case Terminated.
Case Terminated.
Case Terminated.
Partially Terminated Violation(s): 1.
37
CSX 2017-238(SA)CSX 2017-239(SA)CSX 2017-240(SA)CSX 2017-241(SA)CSX 2017-242(SA)CSX 2017-243(SA)CSX 2017-244(FCS)CSX 2017-245(ROP)CSX 2017-246(SA)CSX 2017-247(SA)CSX 2017-248(FCS)CSX 2017-249(SA)CSX 2017-250(SA)CSX 2017-251(SA)CSX 2017-252(SA)CSX 2017-253(ROP)CSX 2017-254(SA)CSX 2017-256(TS)CSX 2017-257(ROP)CSX 2017-258(TS)CSX 2017-259(SA)CSX 2017-260(SA)CSX 2017-261(SA)CSX 2017-262(SA)CSX 2017-263(ROP)CSX 2017-264(ROP)CSX 2017-265(TS)CSX 2017-266(TS)CSX 2017-267(SA)CSX 2017-268(LI)CSX 2017-269(SA)CSX 2017-270(SA)CSX 2017-271(SA)CSX 2017-272(SA)CSX 2017-273(SA)CSX 2017-274(SA)CSX 2017-275(SA)CSX 2017-276(LI)CSX 2017-277(TS)CSX 2017-278(SA)CSX 2017-279(SA)CSX 2017-280(SA)CSX 2017-281(SA)CSX 2017-282(SI)CSX 2017-283(GC)
CSX 2017-284(GC)
CSX 2017-285(GC)CSX 2017-286(ROP)
FRA No.
09/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/2018
09/26/2018
09/26/201809/26/2018
SettlementDate Comments
111111111111111111111111115511111111121111111
1
11
No. ofViolations
$2,500 $5,000 $5,000 $2,500 $5,000 $5,000 $5,000 $7,500 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $2,500 $7,500 $2,500 $5,000 $2,000 $5,000 $5,000 $2,500 $2,500 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $5,000 $5,000 $7,500 $2,500 $5,000 $2,500 $2,500 $5,000 $2,500 $5,000 $2,500 $5,000 $2,500 $1,000 $5,000
$5,000
$5,000 $9,500
PRCA
$1,875 $3,750 $3,750 $1,850 $3,750 $3,700 $3,700 $5,723 $1,900 $1,900 $1,850 $1,900 $3,700 $3,700 $1,900 $5,800 $1,900 $3,750 $1,550 $3,600 $3,800 $1,900 $1,900 $3,800 $3,900 $3,900 $3,750 $3,750 $3,800 $1,875 $3,800 $3,800 $7,200 $1,850 $4,800 $1,900 $1,900 $3,765 $1,875 $3,800 $1,900 $3,700 $1,900 $853 $2,300
$2,100
$3,750 $6,850
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $5,000 $5,000 $2,500 $5,000 $5,000 $5,000 $7,500 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $2,500 $7,500 $2,500 $5,000 $2,000 $5,000 $5,000 $2,500 $2,500 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $5,000 $5,000 $7,500 $2,500 $5,000 $2,500 $2,500 $5,000 $2,500 $5,000 $2,500 $5,000 $2,500 $1,000 $2,500
$2,500
$5,000 $9,500
Partially Terminated Violation(s): 1.Partially Terminated Violation(s): 1.
38
CSX 2017-287(ROP)CSX 2017-288(HMT)CSX 2017-289(TS)CSX 2017-290(TS)CSX 2017-291(SA)CSX 2017-292(SA)CSX 2017-293(SA)CSX 2017-294(FCS)CSX 2017-295(FCS)CSX 2017-296(SA)CSX 2017-297(AR)CSX 2017-298(AR)CSX 2017-299(TS)CSX 2017-300(GC)CSX 2017-301(GC)CSX 2017-302(GC)CSX 2017-303(GC)CSX 2017-304(GC)CSX 2017-305(GC)CSX 2017-306(GC)CSX 2017-307(TS)CSX 2017-310(TS)CSX 2017-311(TS)CSX 2017-312(LI)CSX 2017-313(TS)CSX 2017-314(TS)CSX 2017-315(TS)CSX 2017-316(LI)CSX 2017-317(SA)CSX 2017-318(SA)CSX 2017-319(SA)CSX 2017-320(SA)CSX 2017-321(ROP)CSX 2017-322(SA)CSX 2017-324(SA)CSX 2017-325(SA)CSX 2017-326(TS)CSX 2017-327(SA)CSX 2017-328(FCS)
CSX 2017-329(SA)CSX 2017-330(SA)CSX 2017-331(SA)CSX 2017-333(SA)CSX 2017-334(FCS)
CSX 2017-335(FCS)CSX 2017-336(SA)CSX 2017-337(LI)CSX 2017-338(HMT)
FRA No.
09/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/2018
09/26/201809/26/201809/26/201809/26/201809/26/2018
09/26/201809/26/201809/26/201809/26/2018
SettlementDate Comments
131111111111311111111121111111111111212
11112
1111
No. ofViolations
$9,500 $22,500 $1,000 $5,000 $5,000 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $10,000 $2,500 $5,000 $2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $2,500 $5,000 $2,500 $5,000 $1,000 $1,000 $5,000 $2,500 $2,500 $5,000 $2,500 $7,500 $5,000 $2,500 $2,500 $5,000 $5,000 $10,000
$5,000 $5,000 $5,000 $5,000 $10,000
$2,500 $5,000 $2,500 $6,000
PRCA
$6,850 $16,500 $853 $3,750 $3,800 $1,900 $3,800 $1,875 $1,875 $1,900 $1,900 $1,900 $7,500 $1,875 $3,750 $1,875 $1,875 $1,875 $3,915 $3,750 $3,750 $1,902 $3,815 $1,875 $3,750 $853 $853 $3,815 $1,900 $1,900 $3,800 $1,900 $5,675 $3,800 $1,900 $1,900 $3,765 $3,800 $4,100
$3,800 $3,800 $3,800 $3,800 $4,100
$1,800 $3,600 $1,882 $4,500
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$9,500 $22,500 $1,000 $5,000 $5,000 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $10,000 $2,500 $5,000 $2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $2,500 $5,000 $2,500 $5,000 $1,000 $1,000 $5,000 $2,500 $2,500 $5,000 $2,500 $7,500 $5,000 $2,500 $2,500 $5,000 $5,000 $5,000
$5,000 $5,000 $5,000 $5,000 $5,000
$2,500 $5,000 $2,500 $6,000
Partially Terminated Violation(s): 1.
Partially Terminated Violation(s): 1.
39
CSX 2017-339(HMT)CSX 2017-340(LI)CSX 2017-341(HMT)CSX 2017-342(ROP)CSX 2017-343(TS)CSX 2017-344(TH)CSX 2017-345(HMT)CSX 2017-346(HMT)CSX 2017-347(HMT)CSX 2017-348(HMT)CSX 2017-349(HMT)CSX 2017-350(HMT)CSX 2017-351(LI)CSX 2017-352(LI)CSX 2017-353(SA)CSX 2017-354(SA)CSX 2017-355(SA)CSX 2017-356(SA)CSX 2017-357(SA)CSX 2017-358(LI)CSX 2017-359(LI)CSX 2017-360(SA)CSX 2017-361(AR)CSX 2017-362(ROP)CSX 2017-363(ROP)CSX 2017-364(SA)CSX 2017-365(SA)CSX 2017-366(HS)CSX 2017-367(FCS)CSX 2017-368(HMT)CSX 2017-369(HMT)CSX 2017-370(HMT)CSX 2017-371(SA)CSX 2017-372(FCS)CSX 2017-373(LI)CSX 2017-374(HSR)CSX 2017-375(HS)CSX 2017-376(SA)CSX 2017-377(HS)CSX 2017-378(HS)CSX 2017-379(HS)CSX 2017-380(HS)CSX 2017-381(HS)CSX 2017-382(HS)CSX 2017-383(HS)CSX 2017-384(SI)CSX 2017-385(TS)CSX 2017-386(HSR)CSX 2017-387(HS)
FRA No.
09/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/2018
SettlementDate Comments
1111113153111111111112111111161811312111111111141
No. ofViolations
$4,000 $5,000 $6,000 $7,500 $2,500 $5,000 $13,000 $2,500 $12,500 $7,500 $7,500 $6,000 $2,500 $5,000 $5,000 $5,000 $2,500 $2,500 $5,000 $2,500 $2,500 $5,000 $1,000 $2,000 $7,500 $5,000 $2,500 $1,000 $6,000 $15,000 $2,500 $20,000 $5,000 $2,500 $7,500 $1,000 $2,000 $10,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $2,500 $5,000 $4,000 $1,000
PRCA
$3,075 $3,915 $4,500 $0 $1,875 $3,750 $9,500 $1,850 $9,250 $5,000 $5,500 $4,625 $1,883 $3,765 $4,900 $3,750 $1,900 $1,900 $3,800 $1,882 $1,883 $3,800 $853 $1,500 $5,700 $3,800 $1,900 $853 $4,500 $11,600 $1,850 $14,650 $3,800 $1,875 $5,670 $853 $0 $9,600 $853 $853 $853 $853 $853 $0 $853 $1,900 $3,750 $3,412 $853
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$4,000 $5,000 $6,000 $0 $2,500 $5,000 $13,000 $2,500 $12,500 $7,500 $7,500 $6,000 $2,500 $5,000 $5,000 $5,000 $2,500 $2,500 $5,000 $2,500 $2,500 $5,000 $1,000 $2,000 $7,500 $5,000 $2,500 $1,000 $6,000 $15,000 $2,500 $20,000 $5,000 $2,500 $7,500 $1,000 $0 $10,000 $1,000 $1,000 $1,000 $1,000 $1,000 $0 $1,000 $2,500 $5,000 $4,000 $1,000
Case Terminated.
Case Terminated.
Case Terminated.
40
CSX 2017-388(HS)CSX 2017-389(SA)CSX 2017-390(HS)CSX 2017-391(HS)CSX 2017-392(HS)CSX 2017-393(HS)CSX 2017-394(HS)CSX 2017-395(HS)CSX 2017-396(GC)CSX 2017-397(SA)CSX 2017-398(AR)CSX 2017-399(TS)CSX 2017-400(GC)CSX 2017-401(FCS)CSX 2017-402(SI)CSX 2017-403(SA)CSX 2017-404(SA)CSX 2017-405(LI)CSX 2017-406(HMT)CSX 2017-407(LI)CSX 2017-408(EQ)CSX 2017-410(ROP)CSX 2017-411(FCS)CSX 2017-412(RSP)CSX 2017-413(RSP)CSX 2017-414(ROP)CSX 2017-415(HSR)CSX 2017-416(HMT)CSX 2017-417(SA)CSX 2017-418(SA)CSX 2017-419(SA)CSX 2017-420(HMT)CSX 2017-421(SA)CSX 2017-422(SA)CSX 2017-423(SA)CSX 2017-424(SI)CSX 2017-425(SA)CSX 2017-426(HMT)CSX 2017-427(HMT)CSX 2017-428(HMT)CSX 2017-429(HMT)CSX 2017-430(GC)CSX 2017-431(GC)CSX 2017-432(GC)CSX 2017-433(SA)CSX 2017-434(SA)CSX 2017-435(SI)CSX 2017-436(SI)CSX 2017-437(SA)
FRA No.
09/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/2018
SettlementDate Comments
1111111111111111111111111132111111111541411121111
No. ofViolations
$1,000 $5,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $2,500 $5,000 $1,000 $5,000 $5,000 $2,500 $1,000 $5,000 $2,500 $2,500 $2,500 $2,500 $1,000 $7,500 $2,000 $9,500 $9,500 $7,500 $3,000 $8,500 $5,000 $5,000 $5,000 $8,000 $5,000 $2,500 $2,500 $2,500 $5,000 $15,000 $21,500 $2,000 $8,000 $1,000 $1,000 $1,000 $10,000 $5,000 $2,500 $2,500 $5,000
PRCA
$853 $3,700 $853 $853 $853 $853 $853 $853 $1,875 $3,700 $853 $3,915 $3,869 $1,900 $853 $3,700 $1,900 $1,882 $1,850 $1,883 $853 $5,700 $1,450 $5,500 $7,100 $5,700 $2,559 $6,300 $3,700 $3,700 $3,700 $5,950 $3,700 $1,900 $1,900 $1,900 $3,700 $11,200 $16,100 $1,550 $6,000 $853 $853 $853 $7,600 $3,700 $1,900 $1,800 $3,700
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$1,000 $5,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $2,500 $5,000 $1,000 $5,000 $5,000 $2,500 $1,000 $5,000 $2,500 $2,500 $2,500 $2,500 $1,000 $7,500 $2,000 $9,500 $9,500 $7,500 $3,000 $8,500 $5,000 $5,000 $5,000 $8,000 $5,000 $2,500 $2,500 $2,500 $5,000 $15,000 $21,500 $2,000 $8,000 $1,000 $1,000 $1,000 $10,000 $5,000 $2,500 $2,500 $5,000
41
CSX 2017-438(ROP)CSX 2017-439(SA)CSX 2017-440(HS)CSX 2017-441(SA)CSX 2017-442(SA)CSX 2017-443(SA)CSX 2017-444(SA)CSX 2017-445(SA)CSX 2017-446(ROP)CSX 2017-447(FCS)CSX 2017-449(FCS)CSX 2017-450(FCS)CSX 2017-451(FCS)CSX 2017-452(FCS)CSX 2017-453(ROP)CSX 2017-454(GC)CSX 2017-455(GC)CSX 2017-456(GC)CSX 2017-457(GC)CSX 2017-458(GC)CSX 2017-459(GC)CSX 2017-460(GC)CSX 2017-461(AD)CSX 2017-462(LI)CSX 2017-463(LI)CSX 2017-464(GC)CSX 2017-465(GC)CSX 2017-466(GC)CSX 2017-467(LI)CSX 2017-468(LI)CSX 2017-469(SA)CSX 2017-470(SI)CSX 2017-471(SA)CSX 2017-472(SA)CSX 2017-473(FCS)CSX 2017-474(SA)CSX 2017-475(GC)CSX 2017-476(SA)CSX 2017-477(SA)CSX 2017-478(SA)CSX 2017-480(SA)CSX 2017-481(SA)CSX 2017-483(SA)CSX 2017-484(SA)CSX 2017-485(SA)CSX 2017-486(SA)CSX 2017-487(LI)CSX 2017-488(FCS)CSX 2017-489(FCS)
FRA No.
09/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/2018
SettlementDate Comments
1231111111111111111111221111611111121111112111111
No. ofViolations
$9,500 $5,000 $3,000 $5,000 $2,500 $5,000 $5,000 $2,500 $9,500 $2,500 $1,000 $2,500 $2,500 $2,500 $7,500 $2,500 $1,000 $1,000 $1,000 $5,000 $2,500 $1,000 $10,000 $5,000 $2,500 $2,500 $1,000 $2,500 $13,500 $2,500 $2,500 $1,000 $5,000 $5,000 $2,500 $5,000 $5,000 $12,500 $25,000 $5,000 $2,500 $2,500 $5,000 $2,500 $2,500 $5,000 $2,500 $2,500 $2,500
PRCA
$6,850 $3,700 $2,559 $3,700 $0 $3,750 $3,700 $1,900 $6,900 $1,900 $853 $1,900 $1,900 $1,925 $5,800 $1,880 $853 $853 $853 $3,750 $1,880 $853 $7,500 $3,765 $1,875 $1,880 $853 $1,875 $10,300 $1,940 $1,900 $853 $3,700 $3,700 $1,925 $3,700 $3,869 $9,400 $18,500 $3,700 $1,900 $1,900 $3,750 $1,900 $1,907 $3,815 $1,940 $1,925 $1,925
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$9,500 $5,000 $3,000 $5,000 $0 $5,000 $5,000 $2,500 $9,500 $2,500 $1,000 $2,500 $2,500 $2,500 $7,500 $2,500 $1,000 $1,000 $1,000 $5,000 $2,500 $1,000 $10,000 $5,000 $2,500 $2,500 $1,000 $2,500 $13,500 $2,500 $2,500 $1,000 $5,000 $5,000 $2,500 $5,000 $5,000 $12,500 $25,000 $5,000 $2,500 $2,500 $5,000 $2,500 $2,500 $5,000 $2,500 $2,500 $2,500
Case Terminated.
42
CSX 2017-490(FCS)CSX 2017-491(FCS)CSX 2017-493(FCS)CSX 2017-494(FCS)CSX 2017-495(FCS)CSX 2017-496(FCS)CSX 2017-497(FCS)CSX 2017-498(FCS)CSX 2017-499(SA)CSX 2017-500(SA)CSX 2017-501(FCS)CSX 2017-502(FCS)CSX 2017-503(FCS)CSX 2017-504(FCS)CSX 2017-505(SA)CSX 2017-506(HMT)CSX 2017-507(FCS)
CSX 2017-508(FCS)CSX 2017-509(FCS)CSX 2017-510(FCS)CSX 2017-511(ROP)CSX 2017-512(SA)CSX 2017-513(LI)CSX 2017-514(FCS)
CSX 2017-515(FCS)CSX 2017-516(FCS)CSX 2017-517(SA)CSX 2017-518(SA)CSX 2017-519(SA)CSX 2017-520(SA)CSX 2017-521(SA)CSX 2017-522(SA)CSX 2017-523(FCS)CSX 2017-524(FCS)CSX 2017-525(FCS)CSX 2017-526(FCS)CSX 2017-527(SA)CSX 2017-528(SA)CSX 2017-529(SA)CSX 2017-530(HMT)CSX 2017-531(HS)CSX 2017-532(SA)CSX 2017-533(SA)CSX 2017-534(FCS)CSX 2017-535(FCS)CSX 2017-536(FCS)CSX 2017-537(SA)CSX 2017-538(SA)
FRA No.
09/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/2018
09/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/2018
09/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/2018
SettlementDate Comments
11111111111111118
1111152
111111111111111111112111
No. ofViolations
$5,000 $2,000 $5,000 $2,500 $5,000 $5,000 $5,000 $2,000 $2,500 $2,000 $2,000 $2,500 $2,500 $2,500 $2,500 $2,500 $16,000
$2,500 $2,500 $2,500 $7,500 $5,000 $11,500 $4,000
$2,500 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $5,000 $2,000 $2,500 $2,500 $5,000 $2,500 $5,000 $1,000 $5,000 $2,500 $2,500 $10,000 $2,500 $5,000 $2,500
PRCA
$3,900 $1,575 $3,800 $1,900 $3,858 $3,900 $3,900 $1,575 $1,908 $1,400 $1,575 $1,900 $1,900 $1,900 $1,907 $1,950 $1,600
$1,900 $1,900 $1,883 $5,600 $3,815 $9,000 $1,800
$0 $0 $3,815 $3,815 $3,815 $3,815 $1,908 $1,907 $1,883 $3,765 $1,560 $1,883 $1,908 $3,815 $1,907 $3,800 $853 $3,815 $1,908 $1,882 $7,530 $1,883 $3,815 $1,908
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $2,000 $5,000 $2,500 $5,000 $5,000 $5,000 $2,000 $2,500 $2,000 $2,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,000
$2,500 $2,500 $2,500 $7,500 $5,000 $11,500 $2,000
$0 $0 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $5,000 $2,000 $2,500 $2,500 $5,000 $2,500 $5,000 $1,000 $5,000 $2,500 $2,500 $10,000 $2,500 $5,000 $2,500
Partially Terminated Violation(s): 1.
Partially Terminated Violation(s): 1.Case Terminated.Case Terminated.
43
CSX 2017-539(FCS)CSX 2017-540(FCS)CSX 2017-541(FCS)CSX 2017-542(FCS)CSX 2017-543(SA)CSX 2017-544(SA)CSX 2017-545(SA)CSX 2017-546(SA)CSX 2017-547(FCS)CSX 2017-548(FCS)CSX 2017-549(SA)CSX 2017-550(ROP)CSX 2017-551(SA)CSX 2017-552(GC)CSX 2017-553(LI)CSX 2017-554(LI)CSX 2017-555(RW)CSX 2017-556(SA)CSX 2017-557(FCS)CSX 2017-558(SA)CSX 2017-559(ROP)CSX 2017-560(SA)CSX 2017-561(HSR)CSX 2017-562(ROP)CSX 2017-563(SA)CSX 2017-564(SA)CSX 2017-565(SA)CSX 2017-566(EP)CSX 2017-567(SA)CSX 2017-568(SA)CSX 2017-569(SA)CSX 2017-570(FCS)CSX 2017-571(FCS)CSX 2017-572(FCS)CSX 2017-585(HMT)CSX 2017-586(HMT)CSX 2017-587(HS)CSX 2017-588(HS)CSX 2017-589(HS)CSX 2017-590(HMT)CSX 2017-591(SA)CSX 2017-592(LI)CSX 2017-593(EQ)
CSX 2017-594(EQ)CSX 2017-595(SA)CSX 2017-596(SA)CSX 2017-597(SA)CSX 2017-598(SA)CSX 2017-599(SA)
FRA No.
09/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/2018
09/26/201809/26/201809/26/201809/26/201809/26/201809/26/2018
SettlementDate Comments
1111111121111111111111111111111111112223111
111111
No. ofViolations
$2,500 $2,000 $2,500 $2,500 $5,000 $2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $9,500 $2,500 $5,000 $2,500 $2,500 $2,000 $5,000 $2,500 $5,000 $7,500 $5,000 $1,000 $7,500 $5,000 $5,000 $5,000 $1,000 $2,500 $5,000 $5,000 $2,500 $2,500 $2,500 $7,500 $5,000 $2,000 $2,000 $2,000 $14,500 $5,000 $2,500 $5,000
$4,000 $2,500 $2,500 $2,500 $5,000 $5,000
PRCA
$1,882 $0 $1,883 $0 $3,815 $1,907 $0 $0 $3,765 $3,765 $3,915 $7,100 $1,908 $3,750 $1,940 $1,940 $1,450 $3,915 $1,883 $3,815 $5,600 $3,915 $853 $5,700 $3,815 $3,815 $3,815 $853 $1,907 $3,815 $3,815 $1,883 $1,883 $1,882 $5,600 $3,950 $1,706 $1,706 $1,706 $11,000 $0 $1,940 $3,300
$3,100 $1,908 $1,907 $1,908 $3,815 $3,915
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $0 $2,500 $0 $5,000 $2,500 $0 $0 $5,000 $5,000 $5,000 $9,500 $2,500 $5,000 $2,500 $2,500 $2,000 $5,000 $2,500 $5,000 $7,500 $5,000 $1,000 $7,500 $5,000 $5,000 $5,000 $1,000 $2,500 $5,000 $5,000 $2,500 $2,500 $2,500 $7,500 $5,000 $2,000 $2,000 $2,000 $14,500 $0 $2,500 $4,000
$4,000 $2,500 $2,500 $2,500 $5,000 $5,000
Case Terminated.
Case Terminated.
Case Terminated.Case Terminated.
Case Terminated.
Partially Terminated Violation(s): 1.
44
CSX 2017-600(SA)CSX 2017-601(SA)CSX 2017-602(SA)CSX 2017-603(EQ)CSX 2017-604(HS)CSX 2017-605(SA)CSX 2017-606(ROP)CSX 2017-607(SA)CSX 2017-608(SA)CSX 2017-609(TS)CSX 2017-610(HMT)CSX 2017-611(HMT)CSX 2018-1(FCS)CSX 2018-2(ROP)CSX 2018-3(ROP)CSX 2018-4(SA)CSX 2018-5(SA)CSX 2018-6(SA)CSX 2018-7(LI)CSX 2018-8(LI)CSX 2018-9(LI)CSX 2018-10(LI)CSX 2018-11(LI)CSX 2018-12(LI)CSX 2018-13(SA)CSX 2018-14(SA)CSX 2018-15(HMT)CSX 2018-16(SA)CSX 2018-17(TS)CSX 2018-18(SA)CSX 2018-19(SA)CSX 2018-34(SA)CSX 2018-35(SA)CSX 2018-54(SI)CSX 2018-58(LI)CSX 2018-59(TS)CSX 2018-60(HS)CSX 2018-61(SA)CSX 2018-62(HS)CSX 2018-63(RW)CSX 2018-64(TS)CSX 2018-65(TS)CSX 2018-66(TS)CSX 2018-68(TS)CSX 2018-69(ROP)CSX 2018-71(TS)CSX 2018-72(ROP)CSX 2018-73(ROP)
CSX 2018-74(SI)
FRA No.
09/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/2018
09/26/2018
SettlementDate Comments
1111111111811111413131111111111111111126113111111
1
No. ofViolations
$5,000 $5,000 $5,000 $2,500 $1,000 $2,500 $7,500 $2,500 $2,500 $2,500 $56,500 $3,000 $5,000 $7,500 $7,500 $5,000 $10,000 $2,500 $7,500 $2,500 $7,500 $1,000 $2,500 $1,000 $5,000 $2,500 $6,000 $5,000 $25,000 $2,500 $2,500 $5,000 $2,500 $1,000 $2,500 $1,000 $1,000 $5,000 $26,000 $2,000 $2,500 $7,500 $1,000 $2,500 $7,500 $2,500 $7,500 $7,500
$2,500
PRCA
$3,915 $3,915 $3,915 $1,875 $853 $1,908 $5,700 $1,907 $1,908 $1,875 $42,400 $2,375 $3,765 $5,300 $5,300 $3,815 $7,630 $1,907 $5,710 $1,925 $5,800 $853 $1,925 $853 $3,915 $1,908 $4,500 $3,815 $18,750 $1,908 $1,907 $3,815 $1,908 $853 $1,925 $853 $853 $3,915 $22,178 $1,525 $1,875 $5,600 $853 $1,875 $5,700 $1,907 $5,300 $2,000
$1,900
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $5,000 $5,000 $2,500 $1,000 $2,500 $7,500 $2,500 $2,500 $2,500 $56,500 $3,000 $5,000 $7,500 $7,500 $5,000 $10,000 $2,500 $7,500 $2,500 $7,500 $1,000 $2,500 $1,000 $5,000 $2,500 $6,000 $5,000 $25,000 $2,500 $2,500 $5,000 $2,500 $1,000 $2,500 $1,000 $1,000 $5,000 $26,000 $2,000 $2,500 $7,500 $1,000 $2,500 $7,500 $2,500 $7,500 $2,000
$2,500
Partially Terminated Violation(s): 1.
45
CSX 2018-76(TS)CSX 2018-77(ROP)CSX 2018-78(TS)CSX 2018-80(HSR)CSX 2018-82(TS)CSX 2018-83(SA)CSX 2018-84(SA)CSX 2018-85(SA)CSX 2018-86(SA)CSX 2018-87(SA)CSX 2018-88(SA)CSX 2018-89(SA)CSX 2018-90(SA)CSX 2018-91(EQ)CSX 2018-93(FCS)CSX 2018-94(SA)CSX 2018-95(SA)CSX 2018-97(HMT)CSX 2018-98(ROP)
CSX 2018-99(LI)CSX 2018-101(SA)CSX 2018-102(SA)CSX 2018-103(TS)CSX 2018-105(RW)CSX 2018-106(LI)CSX 2018-107(SA)CSX 2018-109(SA)CSX 2018-110(SA)CSX 2018-111(SA)CSX 2018-114(SA)CSX 2018-115(SA)CSX 2018-117(SA)CSX 2018-118(SA)CSX 2018-119(SA)CSX 2018-121(FCS)CSX 2018-122(LI)CSX 2018-123(LI)CSX 2018-125(ROP)CSX 2018-126(HSR)CSX 2018-127(TS)CSX 2018-129(ROP)CSX 2018-130(SI)CSX 2018-131(ROP)CSX 2018-134(AR)CTM 2016-11(AR)CTM 2016-12(AR)CTN 2016-1(AR)CTN 2017-1(ROP)CTRR 2017-1(SA)
FRA No.
09/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/2018
09/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201809/26/201804/25/201804/25/201812/20/201712/20/201710/25/2017
SettlementDate Comments
23146111111111111111
111111112111111113111111111111
No. ofViolations
$23,000 $9,500 $4,000 $6,000 $5,000 $2,500 $2,500 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $1,000 $5,000 $2,500 $2,500 $7,500 $9,500
$2,500 $5,000 $5,000 $2,500 $5,000 $1,500 $5,000 $2,500 $5,000 $2,500 $5,000 $2,500 $2,500 $2,500 $5,000 $2,500 $1,000 $7,500 $7,500 $1,000 $5,000 $7,500 $2,500 $7,500 $2,500 $2,500 $2,500 $2,500 $9,500 $5,000
PRCA
$19,619 $7,100 $3,412 $5,118 $3,750 $1,908 $1,907 $3,915 $3,815 $3,915 $3,915 $3,915 $1,907 $853 $3,765 $1,908 $1,907 $5,600 $4,600
$1,940 $3,915 $3,815 $1,875 $3,900 $1,150 $3,815 $1,907 $3,815 $1,907 $3,815 $1,908 $1,907 $1,908 $3,815 $1,883 $875 $5,600 $5,750 $853 $3,750 $0 $1,900 $5,600 $1,900 $1,500 $1,500 $1,700 $8,000 $5,000
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$23,000 $9,500 $4,000 $6,000 $5,000 $2,500 $2,500 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $1,000 $5,000 $2,500 $2,500 $7,500 $5,000
$2,500 $5,000 $5,000 $2,500 $5,000 $1,500 $5,000 $2,500 $5,000 $2,500 $5,000 $2,500 $2,500 $2,500 $5,000 $2,500 $1,000 $7,500 $7,500 $1,000 $5,000 $0 $2,500 $7,500 $2,500 $2,500 $2,500 $2,500 $9,500 $5,000
Partially Terminated Violation(s): 1.
Case Terminated.
46
CVR 2017-2(SA)CVR 2017-3(TS)CVR 2017-4(TS)CVR 2017-5(TS)CVR 2017-6(TS)CVR 2017-7(TS)CWRO 2017-1(AR)CWRO 2018-1(AD)DCR 2017-1(GC)DEAD 2017-1(HMT)DGNO 2017-1(TS)DGNO 2017-2(TS)DME 2017-3(SA)DME 2017-4(TS)DMVW 2018-1(TS)DMVW 2018-2(ROP)DQE 2016-1(GC)DR 2016-1(TS)DR 2016-3(GC)DR 2016-4(RMM)DR 2018-1(RW)DR 2018-2(TS)DSC 2018-1(SA)DSRC 2017-1(HMT)DSRC 2017-2(AR)DSRC 2017-4(EQ)EDW 2018-1(HMT)EEC 2017-1(AR)EIRR 2018-1(REM)EIRR 2018-2(TS)ELS 2017-1(HS)ELS 2018-1(ROP)EMRY 2017-2(EQ)EMRY 2017-3(TS)ESPN 2017-1(TS)EWG 2017-1(GC)EWG 2017-2(GC)EWG 2018-1(SA)EWG 2018-2(SA)FCEN 2013-2(LI)FCEN 2017-1(ROP)FCEN 2017-2(AD)FCEN 2017-3(SA)FCR 2013-1(LI)FCR 2017-1(ROP)FCR 2017-2(ROP)FCR 2017-3(AD)FCTY 2008-1(AD)FMWX 2011-1(GC)
FRA No.
01/31/201801/31/201801/31/201801/31/201801/31/201801/31/201807/09/201807/09/201810/13/201707/09/201809/27/201809/27/201809/28/201809/28/201802/14/201804/26/201811/14/201706/18/201806/18/201806/18/201806/18/201805/15/201805/10/201805/30/201805/30/201805/30/201805/16/201811/14/201709/24/201809/24/201805/30/201807/11/201810/17/201704/17/201810/19/201704/17/201804/17/201804/17/201804/17/201802/28/201802/28/201802/28/201802/28/201801/10/201801/10/201801/10/201801/10/201805/08/201803/28/2018
SettlementDate Comments
1111131111111111121112111111122111121112121111711
No. ofViolations
$5,000 $2,500 $5,000 $5,000 $2,500 $12,500 $2,500 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $5,000 $7,500 $2,500 $5,000 $5,000 $2,500 $2,000 $2,000 $2,500 $2,500 $1,000 $1,000 $7,500 $2,500 $5,000 $5,000 $2,000 $9,500 $2,500 $5,000 $5,000 $3,500 $2,500 $5,000 $5,000 $3,000 $2,000 $5,000 $2,500 $1,500 $7,500 $7,500 $35,000 $5,000 $2,500
PRCA
$4,000 $1,500 $4,000 $4,000 $1,500 $10,000 $2,500 $5,000 $2,500 $5,000 $3,950 $1,950 $1,700 $1,750 $5,000 $0 $1,750 $5,000 $5,000 $2,500 $2,000 $2,000 $2,500 $2,500 $1,000 $1,000 $2,000 $650 $3,250 $3,250 $0 $0 $1,500 $3,050 $5,000 $2,103 $1,250 $2,500 $2,500 $1,300 $1,400 $3,500 $1,800 $750 $6,000 $6,000 $28,000 $0 $0
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $2,500 $5,000 $5,000 $2,500 $12,500 $2,500 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $5,000 $0 $2,500 $5,000 $5,000 $2,500 $2,000 $2,000 $2,500 $2,500 $1,000 $1,000 $7,500 $2,500 $5,000 $5,000 $0 $0 $2,500 $5,000 $5,000 $3,500 $2,500 $5,000 $5,000 $3,000 $2,000 $5,000 $2,500 $1,500 $7,500 $7,500 $35,000 $0 $0
Case Terminated.
Case Terminated.Case Terminated.
Case Terminated.Case Terminated.
47
FNOR 2007-1(GC)FWWR 2004-1(TS)FWWR 2004-2(TS)FWWR 2009-1(GC)FWWR 2009-2(TS)FWWR 2010-1(TS)FWWR 2010-2(TS)FWWR 2011-1(TS)FWWR 2011-2(SA)FWWR 2012-1(SA)FWWR 2012-2(SA)FWWR 2012-3(SA)FWWR 2012-4(SA)FWWR 2012-5(SA)FWWR 2013-1(AD)FWWR 2014-1(AR)FWWR 2014-2(TS)FWWR 2014-3(SA)FWWR 2014-4(TS)FWWR 2014-5(GC)FWWR 2014-6(TS)FWWR 2014-7(TS)FWWR 2014-8(EP)FWWR 2015-1(TS)FWWR 2015-2(LI)FWWR 2015-3(TS)FWWR 2015-4(TS)FWWR 2015-6(TS)FWWR 2016-2(TS)FWWR 2016-3(ROP)FWWR 2016-4(TS)FWWR 2017-1(GC)FWWR 2017-2(GC)FWWR 2017-3(GC)FWWR 2017-4(GC)FWWR 2017-6(ROP)GCSR 2010-1(RW)GCSR 2011-1(ROR)GCSR 2011-2(ROP)GCSR 2011-3(AR)GCSR 2011-4(HSR)GCSR 2011-5(RSP)GCSR 2011-6(RSP)GCSR 2012-1(LI)GCSR 2012-2(GC)GCSR 2012-3(SA)GCSR 2012-4(ROR)GCSR 2012-5(EQ)GCSR 2012-6(GC)
FRA No.
03/27/201801/04/201801/04/201801/04/201801/04/201801/04/201801/04/201801/04/201801/04/201801/04/201801/04/201801/04/201801/04/201801/04/201801/04/201803/15/201803/15/201803/15/201803/15/201803/15/201803/15/201803/15/201803/15/201803/15/201803/15/201803/15/201803/15/201803/15/201803/15/201803/15/201803/15/201803/15/201803/15/201803/15/201803/15/201803/15/201805/21/201805/21/201805/21/201805/21/201805/21/201805/21/201805/21/201805/21/201805/21/201805/21/201805/21/201805/21/201805/21/2018
SettlementDate Comments
12111111121232111111321111112123555111431111211131
No. ofViolations
$5,000 $5,000 $2,500 $2,500 $5,000 $5,000 $5,000 $5,000 $2,500 $5,000 $2,500 $10,000 $12,500 $5,000 $5,000 $2,500 $1,000 $5,000 $5,000 $2,500 $3,000 $10,000 $1,000 $27,500 $2,500 $2,500 $5,000 $10,000 $5,000 $15,000 $15,000 $25,000 $25,000 $25,000 $5,000 $7,500 $3,000 $15,000 $24,500 $2,500 $1,000 $9,500 $9,500 $5,000 $1,000 $5,000 $5,000 $4,500 $2,500
PRCA
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,750 $700 $3,500 $3,500 $1,750 $2,100 $7,000 $700 $19,250 $1,750 $1,750 $3,500 $7,000 $3,500 $10,500 $10,500 $10,000 $10,000 $10,000 $2,000 $5,250 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,500 $1,000 $5,000 $5,000 $2,500 $3,000 $10,000 $1,000 $27,500 $2,500 $2,500 $5,000 $10,000 $5,000 $15,000 $15,000 $25,000 $25,000 $25,000 $5,000 $7,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.
Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.
48
GCSR 2012-8(TS)GCSR 2012-9(LI)GCSR 2012-10(EQ)GCSR 2012-11(ROR)GCSR 2012-12(HSR)GCSR 2012-13(HSR)GCSR 2013-1(LI)GDLK 2017-1(SA)GFRR 2015-1(HMT)GFRR 2015-5(TS)GFRR 2015-6(TS)GFRR 2015-7(TS)GFRR 2015-8(TS)GFRR 2017-1(SI)GFRR 2017-2(SI)GFRR 2017-3(AD)GFRR 2017-4(AD)GFRR 2017-5(AD)GFRR 2017-6(GC)GFRR 2017-7(TS)GLC 2016-1(ROP)GLC 2016-2(ROP)GLC 2016-3(SA)GLC 2017-1(SA)GMRC 2016-1(AR)GNBC 2016-1(SA)GNRL 2010-1(TS)GNRR 2017-1(BW)GNRR 2017-2(AD)
GNWR 2017-5(AD)GRNW 2017-1(EQ)GRNW 2017-2(SI)GRYR 2015-2(HMT)GRYR 2016-1(GC)GRYR 2016-2(GC)GRYR 2017-1(HS)GRYR 2017-2(GC)GRYR 2017-3(GC)GRYR 2017-4(GC)GRYR 2017-5(GC)GRYR 2017-6(GC)GRYR 2017-7(GC)GRYR 2017-8(GC)GS 2017-1(GC)GS 2017-2(GC)GS 2017-3(HSR)GS 2017-4(TS)GS 2017-5(TS)GSM 2015-1(GC)
FRA No.
05/21/201805/21/201805/21/201805/21/201805/21/201805/21/201805/21/201809/24/201803/13/201803/28/201803/28/201803/28/201803/28/201803/13/201803/13/201803/13/201803/13/201803/13/201803/28/201803/28/201804/11/201804/11/201804/11/201804/11/201804/03/201804/05/201805/21/201811/14/201711/14/2017
09/27/201809/24/201809/24/201803/26/201804/25/201804/25/201804/25/201804/25/201804/25/201804/25/201804/25/201804/25/201804/25/201804/25/201804/18/201804/18/201804/18/201804/18/201804/18/201804/10/2018
SettlementDate Comments
41112121411113322211111111326
111111155411411542111
No. ofViolations
$4,000 $5,000 $1,000 $7,500 $2,000 $1,000 $10,000 $5,000 $13,000 $1,000 $1,000 $2,500 $1,000 $3,000 $3,000 $10,000 $5,000 $5,000 $5,000 $5,000 $7,500 $7,500 $5,000 $5,000 $2,500 $5,000 $6,000 $10,000 $15,000
$2,500 $2,000 $2,500 $6,000 $1,000 $5,000 $1,000 $12,500 $12,500 $10,000 $27,500 $10,000 $2,500 $5,000 $16,000 $5,500 $2,000 $5,000 $5,000 $2,500
PRCA
$0 $0 $0 $0 $0 $0 $0 $3,900 $10,400 $853 $853 $1,625 $853 $1,950 $1,950 $8,000 $0 $4,000 $4,000 $3,500 $5,250 $5,250 $3,500 $3,000 $1,650 $3,500 $0 $5,000 $2,500
$1,950 $1,250 $2,000 $0 $750 $3,600 $750 $9,000 $9,000 $7,200 $19,800 $7,200 $1,800 $3,600 $9,600 $3,575 $1,500 $3,500 $3,500 $1,500
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$0 $0 $0 $0 $0 $0 $0 $5,000 $13,000 $1,000 $1,000 $2,500 $1,000 $3,000 $3,000 $10,000 $0 $5,000 $5,000 $5,000 $7,500 $7,500 $5,000 $5,000 $2,500 $5,000 $0 $10,000 $2,500
$2,500 $2,000 $2,500 $0 $1,000 $5,000 $1,000 $12,500 $12,500 $10,000 $27,500 $10,000 $2,500 $5,000 $16,000 $5,500 $2,000 $5,000 $5,000 $2,500
Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.
Case Terminated.
Caes Terminated.
Partially Terminated Violation(s): 2-5.
Case Terminated.
49
GTRA 2017-1(AD)GWR 2018-1(TS)GWWL 2014-1(SA)GWWL 2014-2(ROP)HERQ 2017-2(RW)HRRC 2018-1(TS)IAIS 2018-1(ROP)IAIS 2018-2(HMT)IHB 2017-4(HMT)IHB 2017-5(SA)INRD 2017-1(HMT)INRD 2018-1(GC)IORY 2017-1(ROP)IORY 2017-2(GC)IORY 2018-1(ROP)JCIV 2018-1(TS)KCS 2017-17(ROP)KCS 2017-18(AR)KCS 2017-19(GC)KCS 2017-20(SA)KCS 2017-21(FCS)KCS 2017-22(TS)KCS 2017-23(LI)KCS 2017-24(EQ)KCS 2017-25(SA)KCS 2017-26(SA)KCS 2017-27(ROP)KCS 2017-28(SA)KCS 2017-29(SA)KCS 2017-30(ROP)KCS 2017-31(SA)KCS 2017-32(TS)KCS 2017-33(GC)KCS 2017-34(SA)KCS 2017-35(FCS)KCS 2017-36(SA)KCS 2017-37(TS)KCS 2017-38(SA)KCS 2017-39(ROP)KCS 2017-40(FCS)KCS 2017-41(SA)KCS 2017-42(TS)KCS 2017-43(HS)KCS 2017-44(FCS)KCS 2017-45(SA)KCS 2017-46(HMT)KCS 2017-47(FCS)KCS 2017-48(FCS)KCS 2017-49(ROP)
FRA No.
11/14/201703/29/201803/01/201803/01/201803/15/201805/10/201807/20/201808/18/201811/06/201711/06/201706/04/201807/03/201809/27/201809/27/201809/27/201809/14/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/2018
SettlementDate Comments
1112311211111111111111111111111111111112211111121
No. ofViolations
$2,500 $5,000 $5,000 $11,500 $9,000 $5,000 $5,000 $5,000 $2,000 $2,500 $2,500 $5,000 $7,500 $2,500 $7,500 $1,000 $7,500 $1,000 $5,000 $5,000 $2,500 $5,000 $2,500 $2,500 $5,000 $5,000 $7,500 $5,000 $5,000 $7,500 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $5,000 $7,500 $5,000 $7,500 $5,000 $1,000 $2,500 $2,500 $3,000 $2,500 $10,000 $7,500
PRCA
$1,750 $3,750 $0 $0 $6,750 $3,500 $5,000 $5,000 $2,000 $1,750 $2,000 $5,000 $5,700 $1,450 $5,700 $1,000 $5,000 $850 $3,500 $4,000 $2,000 $3,750 $2,500 $1,950 $3,500 $3,500 $5,000 $3,500 $3,500 $5,000 $3,300 $3,500 $3,750 $1,000 $3,250 $1,750 $1,750 $5,000 $5,000 $3,000 $5,000 $3,000 $875 $2,500 $2,500 $2,500 $2,000 $6,500 $4,800
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $5,000 $0 $0 $9,000 $5,000 $5,000 $5,000 $2,000 $2,500 $2,500 $5,000 $7,500 $2,500 $7,500 $1,000 $7,500 $1,000 $5,000 $5,000 $2,500 $5,000 $2,500 $2,500 $5,000 $5,000 $7,500 $5,000 $5,000 $7,500 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $5,000 $7,500 $5,000 $7,500 $5,000 $1,000 $2,500 $2,500 $3,000 $2,500 $10,000 $7,500
Case Terminated.Case Terminated.
50
KCS 2017-50(FCS)KCS 2017-51(GC)KCS 2017-52(GC)KCS 2017-53(LI)KCS 2017-54(SA)KCS 2017-55(SA)KCS 2017-56(SA)KCS 2017-57(AD)KCS 2017-58(AD)KCS 2018-1(ROP)KCS 2018-2(SA)KCS 2018-3(FCS)KCS 2018-4(FCS)KCS 2018-5(FCS)KCS 2018-6(SA)KCS 2018-7(SA)KCS 2018-8(SA)KCS 2018-9(SA)KCS 2018-10(FCS)KCS 2018-11(FCS)KCS 2018-12(SA)KCS 2018-13(SA)KCT 2017-1(AD)KCT 2018-1(SI)KFR 2017-1(EQ)KFR 2017-2(AR)KFR 2017-3(ROP)KFR 2017-4(AR)KJRY 2017-1(BSS)KNOR 2017-1(TS)KNWA 2017-2(HMT)KRR 2017-1(TS)KRR 2017-2(RW)KYLE 2017-1(TS)KYLE 2017-2(TS)KYLE 2017-3(TS)LAJ 2017-1(LI)LAJ 2018-1(AR)LBWR 2017-1(RW)LBWR 2017-2(TS)LBWR 2017-3(FCS)LBWR 2017-4(TS)LI 2017-1(ROR)LI 2017-2(ROR)LI 2017-3(ROR)LI 2017-4(SI)LI 2017-5(RW)LSRC 2017-1(ROP)LSRC 2018-1(GC)
FRA No.
08/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201808/01/201802/23/201808/22/201812/01/201701/31/201812/01/201712/01/201705/18/201805/04/201809/24/201809/27/201809/27/201809/27/201809/27/201809/27/201809/28/201809/28/201809/24/201809/24/201809/24/201809/24/201806/08/201806/08/201806/08/201806/08/201806/08/201811/13/201706/08/2018
SettlementDate Comments
1111111111111111111111111111211121111113111111111
No. ofViolations
$2,500 $2,500 $5,000 $2,500 $5,000 $2,500 $2,500 $2,500 $1,000 $7,500 $5,000 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $2,500 $5,000 $2,500 $5,000 $2,500 $2,500 $27,904 $2,000 $2,500 $7,500 $1,000 $8,000 $5,000 $1,000 $1,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $2,000 $12,500 $2,500 $2,500 $9,500 $9,500 $9,500 $2,500 $2,000 $9,500 $5,000
PRCA
$2,000 $2,500 $3,750 $2,500 $3,500 $2,000 $2,000 $2,500 $850 $5,000 $3,500 $1,800 $1,800 $1,800 $1,750 $3,350 $3,000 $1,750 $3,555 $1,800 $4,100 $2,500 $2,500 $23,718 $0 $2,000 $6,000 $853 $6,000 $5,000 $900 $900 $3,950 $3,950 $3,950 $1,900 $1,900 $1,875 $1,400 $9,000 $1,750 $1,750 $5,500 $5,500 $5,500 $1,500 $1,250 $6,000 $3,000
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $2,500 $5,000 $2,500 $5,000 $2,500 $2,500 $2,500 $1,000 $7,500 $5,000 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $2,500 $5,000 $2,500 $5,000 $2,500 $2,500 $27,904 $0 $2,500 $7,500 $1,000 $8,000 $5,000 $1,000 $1,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $2,000 $12,500 $2,500 $2,500 $9,500 $9,500 $9,500 $2,500 $2,000 $9,500 $5,000
Case Terminated.
51
LVRR 2017-1(SA)MACZ 2013-1(SI)MACZ 2013-3(LI)MACZ 2013-4(LI)MACZ 2013-5(LI)MACZ 2013-6(PEQ)MACZ 2014-1(PEQ)MACZ 2014-2(LI)MACZ 2014-3(SI)MACZ 2014-4(PEQ)MACZ 2015-1(SI)MACZ 2015-2(PEQ)MACZ 2015-3(AR)MACZ 2015-4(AR)MACZ 2015-5(PEQ)MACZ 2015-6(PEQ)MACZ 2015-7(PEQ)
MACZ 2015-8(ROP)MACZ 2015-9(SI)MACZ 2015-10(LI)MACZ 2015-11(EP)MACZ 2016-1(EP)MACZ 2016-2(PEQ)MACZ 2016-3(EQ)
MACZ 2016-4(AD)MACZ 2016-5(AD)MACZ 2016-6(AD)MACZ 2017-1(PEQ)MACZ 2017-2(SI)MACZ 2017-3(ROP)MACZ 2017-4(SI)MBRR 2017-1(TS)MBTA 2015-1(AR)MBTA 2015-2(ROP)MBTA 2015-3(PEQ)MBTA 2015-4(LI)MBTA 2015-5(TS)MBTA 2016-1(PEQ)MBTA 2016-2(AD)MBTA 2016-3(AD)MBTA 2016-4(AD)MBTA 2016-5(PEQ)MBTA 2016-6(AR)MBTA 2016-7(PEQ)MBTA 2016-8(ROP)MBTA 2016-9(PEQ)MBTA 2016-10(PEQ)MBTA 2017-1(TS)
FRA No.
11/30/201710/24/201710/24/201710/24/201710/24/201710/24/201710/24/201710/24/201710/24/201710/24/201710/24/201710/24/201710/24/201710/24/201710/24/201710/24/201710/24/2017
10/24/201710/24/201710/24/201710/24/201710/24/201710/24/201710/24/2017
10/24/201710/24/201710/24/201710/24/201710/24/201710/24/201702/20/201809/27/201811/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/2017
SettlementDate Comments
11121211141111112
1111111
2122111111214111231212112
No. ofViolations
$5,000 $5,000 $1,500 $5,000 $2,500 $7,500 $5,000 $2,500 $5,000 $10,000 $5,000 $5,000 $2,500 $2,500 $5,000 $5,000 $10,000
$9,500 $2,500 $2,500 $1,000 $1,000 $2,500 $2,500
$10,000 $2,500 $5,000 $5,000 $1,000 $9,500 $4,000 $5,000 $1,000 $5,000 $5,000 $2,500 $10,000 $2,500 $5,000 $5,000 $10,000 $17,500 $2,500 $10,000 $7,500 $7,500 $2,500 $12,000
PRCA
$2,750 $4,250 $1,275 $4,000 $2,000 $6,375 $4,250 $2,125 $4,250 $6,375 $4,150 $4,000 $1,875 $1,875 $4,000 $4,150 $5,000
$8,550 $2,247 $2,125 $850 $950 $2,125 $1,000
$8,500 $2,250 $4,250 $4,250 $853 $7,125 $2,800 $3,950 $750 $3,750 $3,750 $1,875 $7,500 $1,875 $3,750 $3,750 $7,500 $13,125 $1,875 $7,500 $5,625 $5,625 $1,875 $10,068
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $5,000 $1,500 $5,000 $2,500 $7,500 $5,000 $2,500 $5,000 $7,500 $5,000 $5,000 $2,500 $2,500 $5,000 $5,000 $5,000
$9,500 $2,500 $2,500 $1,000 $1,000 $2,500 $1,000
$10,000 $2,500 $5,000 $5,000 $1,000 $9,500 $4,000 $5,000 $1,000 $5,000 $5,000 $2,500 $10,000 $2,500 $5,000 $5,000 $10,000 $17,500 $2,500 $10,000 $7,500 $7,500 $2,500 $12,000
Terminated Violation(s): 3.
Partially Terminated Violation(s): 1, 2.
Partially Terminated Violation(s): 1.
52
MBTA 2017-2(RW)MBTA 2017-3(PEQ)MBTA 2017-4(SI)MBTA 2017-5(GC)MBTA 2017-6(LI)MBTA 2017-7(PEQ)MBTA 2017-8(PEQ)MBTA 2017-9(PEQ)MBTA 2017-10(PEQ)MBTA 2017-11(ROR)MBTA 2017-12(ROR)MBTA 2017-13(ROR)MBTA 2017-14(ROR)MBTA 2017-15(ROR)MBTA 2017-16(ROR)MBTA 2017-17(ROR)MBTA 2017-18(ROR)MBTA 2017-19(ROR)MBTA 2017-20(ROR)MBTA 2017-21(ROR)MBTA 2017-22(PEQ)MBTA 2017-23(PEQ)MBTA 2017-24(ROR)MBTA 2017-25(ROR)MBTA 2017-26(ROR)MCRL 2015-4(GC)MCRL 2016-3(AR)MCRL 2016-4(AR)MCRL 2017-1(GC)MDDE 2018-1(GC)MDS 2017-1(CC)MEC 2017-6(TS)MEC 2017-7(TS)MEC 2017-8(TS)MEC 2017-9(TS)MEC 2017-10(TS)MEC 2017-11(TS)MEC 2017-12(TS)MEC 2017-13(TS)MEC 2017-14(TS)MEC 2017-15(TS)MEC 2017-16(TS)MH 2016-9(AR)MH 2016-10(TS)MH 2017-1(SA)MH 2018-1(TS)MH 2018-2(TS)MH 2018-3(TS)MH 2018-4(TS)
FRA No.
11/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201711/30/201704/25/201804/25/201804/25/201804/25/201802/26/201801/02/201809/11/201809/11/201809/11/201809/11/201809/11/201809/11/201809/11/201809/11/201809/11/201809/11/201809/11/201804/25/201804/25/201804/25/201804/25/201804/25/201804/25/201804/25/2018
SettlementDate Comments
1311141121111111111111111111111111111111111111121
No. ofViolations
$3,000 $20,000 $5,000 $5,000 $27,455 $32,500 $15,000 $2,500 $10,000 $7,500 $7,500 $9,500 $9,500 $9,500 $12,000 $9,500 $12,000 $9,500 $7,500 $9,500 $2,500 $15,000 $9,500 $9,500 $9,500 $2,500 $2,500 $2,500 $5,000 $5,000 $2,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $4,000 $5,000 $5,000 $10,000 $5,000
PRCA
$2,250 $13,932 $3,750 $3,750 $20,591 $24,375 $11,250 $1,875 $7,500 $7,125 $5,625 $7,125 $7,125 $7,125 $9,000 $7,125 $9,000 $7,125 $5,625 $7,125 $1,875 $11,250 $7,125 $7,125 $7,125 $1,800 $1,500 $1,500 $3,600 $3,000 $2,000 $4,250 $3,800 $3,800 $4,250 $5,000 $5,000 $5,000 $5,000 $3,250 $3,250 $3,800 $1,500 $1,800 $2,900 $3,800 $3,800 $7,600 $3,800
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$3,000 $20,000 $5,000 $5,000 $27,455 $32,500 $15,000 $2,500 $10,000 $7,500 $7,500 $9,500 $9,500 $9,500 $12,000 $9,500 $12,000 $9,500 $7,500 $9,500 $2,500 $15,000 $9,500 $9,500 $9,500 $2,500 $2,500 $2,500 $5,000 $5,000 $2,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $4,000 $5,000 $5,000 $10,000 $5,000
53
MNA 2017-1(GC)MNBR 2017-1(TS)MNBR 2018-1(TS)MNBR 2018-2(TS)MNBR 2018-3(TS)MNBR 2018-4(TS)MNBR 2018-5(TS)MNCW 2014-27(PEQ)MNCW 2014-28(AR)MNCW 2015-26(RW)MNCW 2015-27(RW)MNCW 2015-28(GC)MNCW 2015-29(SA)MNCW 2015-30(RW)MNCW 2015-31(GC)MNCW 2015-32(GC)MNCW 2015-33(GC)MNCW 2015-35(BW)MNCW 2015-36(AR)MNCW 2015-37(AR)MNCW 2015-38(TS)MNCW 2015-39(TS)MNCW 2015-40(TS)MNCW 2015-41(TS)MNCW 2015-42(TS)MNCW 2015-43(TS)MNCW 2015-44(ROR)MNCW 2015-45(ROR)MNCW 2015-46(ROR)MNCW 2015-47(ROR)MNCW 2015-48(ROP)MNCW 2015-49(ROP)MNCW 2015-50(ROP)MNCW 2015-51(PEQ)MNCW 2015-52(RW)MNCW 2016-2(ROP)MNCW 2016-3(AD)MNCW 2016-4(AD)MNCW 2016-5(AD)
MNCW 2016-6(AD)
MNCW 2016-7(AD)
MNCW 2016-8(AD)
MNCW 2016-9(AD)
MNCW 2016-10(AD)
MNCW 2016-12(HSR)
FRA No.
09/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201810/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/2017
10/23/2017
10/23/2017
10/23/2017
10/23/2017
10/23/2017
10/23/2017
SettlementDate Comments
112141111111111111112111111111111111612
2
2
2
2
2
1
No. ofViolations
$2,500 $5,000 $10,000 $5,000 $16,000 $1,000 $1,000 $5,000 $2,500 $2,000 $2,000 $5,000 $5,000 $3,000 $1,000 $1,000 $1,000 $5,000 $2,500 $2,500 $5,000 $5,000 $5,000 $5,000 $2,000 $5,000 $9,500 $9,500 $7,500 $7,500 $7,500 $5,000 $9,500 $2,500 $3,000 $7,500 $30,000 $2,500 $5,000
$5,000
$5,000
$5,000
$5,000
$5,000
$1,000
PRCA
$1,950 $3,950 $7,600 $3,950 $12,300 $900 $900 $4,250 $2,125 $1,700 $1,700 $4,250 $4,250 $2,550 $900 $900 $900 $4,500 $2,125 $2,125 $4,500 $4,250 $4,250 $4,250 $1,700 $4,250 $8,075 $8,075 $0 $6,375 $6,375 $4,500 $8,075 $2,125 $2,550 $6,375 $23,100 $2,125 $2,500
$2,500
$2,500
$2,500
$2,500
$2,500
$900
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $5,000 $10,000 $5,000 $16,000 $1,000 $1,000 $5,000 $2,500 $2,000 $2,000 $5,000 $5,000 $3,000 $1,000 $1,000 $1,000 $5,000 $2,500 $2,500 $5,000 $5,000 $5,000 $5,000 $2,000 $5,000 $9,500 $9,500 $0 $7,500 $7,500 $5,000 $9,500 $2,500 $3,000 $7,500 $30,000 $2,500 $2,500
$2,500
$2,500
$2,500
$2,500
$2,500
$1,000
Case Terminated.
Partially Terminated Violation(s): 1.Partially Terminated Violation(s): 1.Partially Terminated Violation(s): 1.Partially Terminated Violation(s): 1.Partially Terminated Violation(s): 1.Partially Terminated Violation(s): 1.
54
MNCW 2016-13(ROP)MNCW 2016-14(ROP)MNCW 2016-15(SA)MNCW 2016-16(AD)MNCW 2016-17(AD)MNCW 2016-18(AD)MNCW 2016-19(AD)MNCW 2016-20(AD)MNCW 2016-21(AD)MNCW 2016-22(AD)MNCW 2016-23(AD)MNCW 2016-24(AD)MNCW 2016-25(AD)MNCW 2016-26(AD)MNCW 2016-27(AD)MNCW 2016-28(AD)MNCW 2016-29(AD)MNCW 2016-30(AD)MNCW 2016-31(AD)MNCW 2016-32(AD)MNCW 2016-33(AD)MNCW 2016-34(AD)MNCW 2016-35(AD)MNCW 2016-36(AD)MNCW 2016-37(AD)MNCW 2016-38(AD)MNCW 2016-39(AD)MNCW 2016-40(AD)MNCW 2016-41(AD)MNCW 2016-42(AD)MNCW 2016-43(AD)MNCW 2016-44(AD)MNCW 2016-45(AD)MNCW 2016-46(AD)MNCW 2016-47(AD)MNCW 2016-48(AD)MNCW 2016-49(AD)MNCW 2016-50(AD)MNCW 2016-51(AD)MNCW 2016-52(AD)MNCW 2016-53(AD)MNCW 2016-54(AD)MNCW 2016-55(AD)MNCW 2016-56(AD)MNCW 2016-57(AD)MNCW 2016-58(ROP)MNCW 2016-59(GS)
MNCW 2016-60(GS)MNNR 2017-3(HMT)
FRA No.
10/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/201710/23/2017
10/23/201712/13/2017
SettlementDate Comments
11111111111111111111121111211211111111111111113
18
No. ofViolations
$7,500 $7,500 $2,500 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $7,500 $7,500
$2,500 $35,000
PRCA
$6,375 $6,375 $2,125 $5,000 $4,250 $4,250 $4,250 $4,250 $4,250 $2,125 $2,125 $2,125 $2,125 $2,125 $2,125 $2,125 $2,125 $2,125 $2,125 $2,125 $2,125 $4,250 $2,125 $2,125 $2,125 $2,125 $4,250 $2,125 $2,125 $4,250 $2,125 $2,125 $2,125 $2,125 $2,125 $2,125 $2,125 $2,250 $2,125 $4,500 $4,500 $4,500 $4,500 $4,500 $4,500 $6,375 $2,500
$2,500 $26,250
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$7,500 $7,500 $2,500 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $7,500 $2,500
$2,500 $35,000
Partially Terminated Violation(s): 1.
55
MNR 2017-1(ROP)MOR 2018-1(LI)MRA 2016-6(AR)MRL 2017-2(SA)MRL 2017-3(SA)MRL 2017-4(FCS)MRL 2017-5(FCS)MRL 2017-6(AR)MRL 2017-7(SA)MRL 2017-8(HS)MRL 2017-9(FCS)MRL 2017-10(TS)MRL 2017-11(GC)MRL 2017-12(GC)MRL 2017-13(LI)MRL 2017-14(SA)MRL 2017-15(SA)MRL 2017-16(RSP)MRL 2017-18(SA)MRL 2017-19(AR)MRL 2017-20(EP)MRL 2017-21(TS)MRL 2017-22(SA)MRL 2018-1(TS)MRL 2018-2(LI)MRL 2018-3(SA)MRL 2018-4(FCS)MSDR 2016-1(CC)MSDR 2016-2(ROR)MSDR 2016-3(EQ)NCTC 2018-1(PEQ)NCVA 2017-1(HMT)NCVA 2017-2(GC)NCVA 2017-3(GC)NECR 2017-1(SA)NERR 2017-1(SI)NHN 2018-1(TS)NHRR 2017-2(AD)NJTR 2015-3(TS)NJTR 2015-7(EQ)NJTR 2015-8(GC)NJTR 2015-9(ROP)NJTR 2015-10(CC)NJTR 2015-11(PEQ)NJTR 2015-12(ROP)NJTR 2015-13(ROP)NJTR 2015-14(AR)NJTR 2016-1(PEQ)NJTR 2016-2(PEQ)
FRA No.
10/02/201704/16/201804/25/201805/31/201805/31/201805/31/201805/31/201805/31/201805/31/201805/31/201805/31/201805/31/201805/31/201805/31/201805/31/201805/31/201805/31/201805/31/201805/31/201805/31/201805/31/201805/31/201805/31/201805/31/201805/31/201805/31/201805/31/201805/22/201805/22/201805/22/201805/15/201809/27/201809/27/201809/27/201809/27/201812/01/201702/07/201807/06/201812/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/2017
SettlementDate Comments
11112531211211111111111103441111111151121111111151
No. ofViolations
$9,500 $1,000 $2,500 $5,000 $10,000 $20,000 $12,500 $1,000 $10,000 $1,000 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $5,000 $5,000 $5,000 $2,500 $1,000 $2,500 $2,500 $22,500 $7,500 $17,500 $10,000 $10,000 $7,500 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $20,000 $5,000 $2,500 $7,000 $1,000 $5,000 $7,500 $2,000 $2,500 $7,500 $7,500 $2,500 $25,000 $5,000
PRCA
$7,600 $853 $1,500 $4,000 $8,500 $16,250 $10,125 $853 $8,500 $853 $4,000 $4,250 $4,250 $4,250 $2,125 $2,125 $4,250 $4,250 $4,250 $2,125 $0 $2,125 $2,125 $19,125 $5,625 $14,875 $7,500 $8,000 $6,000 $5,000 $5,000 $3,950 $3,950 $3,950 $1,950 $10,500 $2,500 $1,250 $5,000 $700 $3,650 $5,250 $1,400 $1,250 $5,250 $5,250 $1,900 $17,800 $3,550
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$9,500 $1,000 $2,500 $5,000 $10,000 $20,000 $12,500 $1,000 $10,000 $1,000 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $5,000 $5,000 $5,000 $2,500 $0 $2,500 $2,500 $22,500 $7,500 $17,500 $10,000 $10,000 $7,500 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $20,000 $5,000 $2,500 $7,000 $1,000 $5,000 $7,500 $2,000 $2,500 $7,500 $7,500 $2,500 $25,000 $5,000
Case Terminated.
56
NJTR 2016-3(ROP)
NJTR 2016-5(SA)NJTR 2016-6(HSR)NJTR 2016-7(PEQ)NJTR 2016-8(ROP)
NJTR 2016-9(CC)NJTR 2016-10(CC)NJTR 2016-11(PEQ)NJTR 2016-12(ROP)NJTR 2016-13(ROP)NJTR 2016-14(PEQ)NJTR 2016-15(RSP)NJTR 2016-16(PEQ)NJTR 2016-17(ROP)NJTR 2016-18(SA)NJTR 2016-21(PEQ)NJTR 2016-22(ROP)NJTR 2016-23(TH)NJTR 2017-18(RW)NJTR 2017-20(PEQ)NJTR 2017-21(PEQ)NJTR 2017-22(PEQ)NJTR 2017-23(RSP)NJTR 2017-25(RW)NJTR 2017-26(TH)NJTR 2017-27(LI)NJTR 2017-28(SI)NJTR 2017-33(PEQ)NJTR 2017-34(TH)NJTR 2017-35(PEQ)NJTR 2017-37(PEQ)NJTR 2017-38(SA)NJTR 2017-39(ROP)NJTR 2017-41(TH)NKCR 2017-1(GC)NMRX 2018-1(AD)NOGC 2018-1(ROP)NOPB 2018-1(SA)NOPB 2018-2(SA)NOPB 2018-3(HMT)NOPB 2018-4(ROP)NOPB 2018-5(ROR)NOPB 2018-6(SA)NOPB 2018-7(HMT)NPB 2017-1(HMT)NPB 2017-2(ROP)NPB 2017-3(SA)NSCR 2017-1(SI)
FRA No.
12/08/2017
12/08/201712/08/201712/08/201712/08/2017
12/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201712/08/201702/02/201802/27/201807/23/201804/30/201804/30/201804/30/201804/30/201804/30/201804/30/201808/16/201810/04/201710/04/201710/04/201702/21/2018
SettlementDate Comments
2
22022
1211611141211311111111111111111112253116111
No. ofViolations
$17,000
$7,500 $20,000 $10,000 $17,000
$1,000 $2,000 $5,000 $9,500 $33,500 $2,500 $9,500 $5,000 $32,000 $5,000 $10,000 $2,000 $1,000 $12,000 $5,000 $5,000 $5,000 $9,500 $3,000 $1,000 $1,000 $16,000 $5,000 $1,000 $2,500 $2,500 $5,000 $7,500 $1,000 $2,500 $2,500 $5,000 $5,000 $10,000 $4,000 $17,500 $28,500 $2,500 $2,000 $32,500 $7,500 $5,000 $1,000
PRCA
$11,500
$5,400 $14,600 $7,100 $7,000
$700 $1,400 $3,600 $6,650 $23,450 $1,800 $7,000 $3,600 $22,400 $3,600 $7,100 $1,400 $839 $10,000 $3,550 $3,550 $3,550 $7,000 $2,300 $853 $853 $12,000 $3,549 $853 $1,850 $1,850 $3,600 $5,250 $853 $2,000 $1,750 $2,500 $2,500 $5,000 $2,400 $8,750 $14,250 $1,500 $1,000 $12,000 $3,750 $2,500 $853
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$11,500
$7,500 $20,000 $10,000 $7,000
$1,000 $2,000 $5,000 $9,500 $33,500 $2,500 $9,500 $5,000 $32,000 $5,000 $10,000 $2,000 $1,000 $12,000 $5,000 $5,000 $5,000 $9,500 $3,000 $1,000 $1,000 $16,000 $5,000 $1,000 $2,500 $2,500 $5,000 $7,500 $1,000 $2,500 $2,500 $5,000 $5,000 $10,000 $4,000 $17,500 $28,500 $2,500 $2,000 $32,500 $7,500 $5,000 $1,000
Partially Terminated Violation(s): 1.
Partially Terminated Violation(s): 1, 2.
57
NYA 2017-2(FCS)NYA 2017-3(FCS)NYSW 2017-3(SA)NYSW 2017-4(SA)NYSW 2017-5(SA)NYSW 2018-1(SA)NYSW 2018-2(LI)OCTL 2016-1(GC)OCTL 2017-1(GC)OCTL 2017-2(GC)OCTL 2017-3(GC)OERR 2017-1(SA)OHCR 2017-1(SA)OHCR 2017-2(SA)OHIO 2018-1(HMT)OMTX 2017-1(AD)OMTX 2017-2(AD)PAL 2018-1(ROR)PAS 2017-7(TS)PAS 2017-8(TS)PAS 2017-9(TS)PAS 2017-10(SA)PAS 2017-11(TS)PAS 2018-1(SA)PAS 2018-2(TS)PAS 2018-3(TS)PAS 2018-4(TS)PAS 2018-5(TS)PAS 2018-6(TS)PAS 2018-7(LI)PCC 2017-1(SA)PCJX 2012-1(SI)PCJX 2015-1(GC)PCJX 2016-1(SI)PCJX 2018-1(ROP)PNWR 2017-4(SA)PNWR 2017-5(ROP)PNWR 2017-6(ROP)PNWR 2017-7(TS)PNWR 2017-8(LI)PNWR 2017-9(SA)PNWR 2017-10(SA)PNWR 2017-11(SA)PNWR 2017-12(SA)PNWR 2017-13(FCS)PNWR 2017-14(FCS)PNWR 2017-15(FCS)PNWR 2017-16(SA)PNWR 2017-17(SA)
FRA No.
07/12/201807/10/201807/02/201807/02/201807/02/201807/02/201807/02/201805/14/201805/14/201805/14/201805/14/201802/15/201809/27/201809/27/201807/26/201802/20/201802/20/201805/11/201809/11/201809/11/201809/11/201809/11/201809/11/201809/11/201809/11/201809/11/201809/11/201809/11/201809/11/201809/11/201809/24/201805/31/201805/31/201805/31/201805/31/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/201809/27/2018
SettlementDate Comments
1111111423111113331211111111111112111121111111111
No. ofViolations
$5,000 $5,000 $5,000 $2,500 $5,000 $2,500 $2,500 $10,000 $5,000 $6,000 $2,500 $5,000 $2,500 $2,500 $2,000 $10,000 $7,500 $26,500 $5,000 $2,000 $1,000 $5,000 $5,000 $5,000 $1,000 $1,000 $5,000 $1,000 $5,000 $2,500 $5,000 $1,000 $5,000 $6,000 $7,500 $5,000 $9,500 $7,500 $3,500 $2,500 $2,500 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000
PRCA
$5,000 $5,000 $3,000 $2,000 $3,000 $1,750 $1,750 $0 $2,500 $3,375 $1,500 $3,250 $1,950 $1,950 $1,275 $8,000 $6,000 $15,900 $3,800 $1,850 $1,000 $3,750 $4,500 $4,500 $1,000 $1,000 $3,800 $1,000 $3,800 $1,850 $3,900 $0 $3,750 $4,750 $5,250 $4,000 $7,410 $5,700 $2,660 $1,975 $1,975 $4,000 $4,000 $4,000 $4,000 $4,000 $4,000 $4,000 $4,000
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $5,000 $5,000 $2,500 $5,000 $2,500 $2,500 $0 $5,000 $6,000 $2,500 $5,000 $2,500 $2,500 $2,000 $10,000 $7,500 $26,500 $5,000 $2,000 $1,000 $5,000 $5,000 $5,000 $1,000 $1,000 $5,000 $1,000 $5,000 $2,500 $5,000 $0 $5,000 $6,000 $7,500 $5,000 $9,500 $7,500 $3,500 $2,500 $2,500 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000
Case Terminated.
Case Terminated.
58
PNWR 2017-18(ROP)PNWR 2017-19(SA)PNWR 2018-1(ROP)PNWR 2018-2(SA)PNWR 2018-3(SA)PR 2015-1(AD)PR 2016-1(SA)PR 2016-2(AD)PR 2018-1(ROP)PSRM 2016-1(AD)PW 2017-3(TS)PW 2017-5(LI)PW 2017-6(TH)PW 2017-7(ROP)PW 2018-1(LI)PW 2018-2(LI)RJCP 2017-1(AR)RJCP 2017-2(AR)RJCP 2017-3(AR)RJCP 2017-4(RW)SAPT 2017-2(AD)SAPT 2017-3(AD)SBG 2016-1(HMT)SBG 2016-2(HMT)SCAX 2017-3(AR)SCAX 2017-4(AR)SCAX 2017-5(ROP)SCAX 2017-6(HS)SCAX 2017-7(ROR)SCAX 2017-8(ROR)SCAX 2017-9(ROR)SCAX 2017-10(RSP)SCAX 2018-1(PEQ)SCAX 2018-2(TS)SCAX 2018-3(LI)SCAX 2018-4(PEQ)SCCT 2017-1(GC)SCIH 2017-1(AD)SCX 2016-3(AR)SCX 2017-1(TS)SCX 2017-2(TS)SCX 2017-3(RMM)SDTI 2017-1(GC)SEPA 2017-2(SI)SEPA 2017-3(RW)SEPA 2018-1(ROP)SEPA 2018-3(GC)SFRV 2015-4(GC)SFRV 2016-1(TS)
FRA No.
09/27/201809/27/201809/27/201809/27/201809/27/201808/20/201808/20/201808/20/201808/20/201811/02/201709/27/201809/27/201809/27/201809/27/201809/27/201809/27/201804/17/201804/17/201804/17/201804/17/201809/27/201809/27/201804/02/201804/02/201811/16/201712/08/201712/08/201712/08/201712/08/201701/29/201801/29/201801/29/201804/18/201805/02/201805/24/201809/18/201805/23/201804/20/201804/25/201804/25/201804/25/201804/25/201805/23/201811/13/201712/21/201704/20/201808/01/201805/18/201805/18/2018
SettlementDate Comments
11111141126391111111111112111111111111111111211111111
No. ofViolations
$2,000 $5,000 $7,500 $2,500 $2,500 $2,500 $20,000 $2,500 $2,000 $65,000 $87,000 $2,500 $5,000 $7,500 $2,500 $2,500 $2,500 $2,500 $2,500 $3,000 $2,500 $2,500 $2,500 $5,000 $2,500 $1,000 $7,500 $1,000 $7,500 $7,500 $9,500 $9,500 $1,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $11,000 $84,000 $2,000 $2,500 $1,000 $5,000 $2,000 $5,000 $5,000 $2,500
PRCA
$1,600 $4,000 $5,700 $1,975 $1,975 $1,000 $4,000 $1,000 $0 $0 $55,310 $1,900 $3,950 $5,700 $1,950 $1,950 $2,125 $2,125 $2,125 $2,550 $1,950 $1,950 $1,800 $3,500 $1,500 $853 $5,100 $853 $5,400 $5,625 $7,125 $6,175 $853 $1,750 $1,750 $1,875 $2,500 $1,625 $1,500 $9,900 $55,200 $1,300 $2,500 $853 $4,250 $1,500 $3,750 $5,000 $1,700
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,000 $5,000 $7,500 $2,500 $2,500 $2,500 $20,000 $2,500 $0 $0 $87,000 $2,500 $5,000 $7,500 $2,500 $2,500 $2,500 $2,500 $2,500 $3,000 $2,500 $2,500 $2,500 $5,000 $2,500 $1,000 $7,500 $1,000 $7,500 $7,500 $9,500 $9,500 $1,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $11,000 $84,000 $2,000 $2,500 $1,000 $5,000 $2,000 $5,000 $5,000 $2,500
Case Terminated.Case Terminated.
59
SFRV 2017-2(GC)SFRV 2017-3(TS)SFRV 2017-4(GC)SFRV 2018-1(TS)SGSC 2017-1(AD)SIRS 2016-1(SA)SIRS 2016-2(SA)SIRS 2016-3(LI)SIRS 2016-4(LI)SIRS 2016-5(ROP)SJVR 2017-3(SA)SJVR 2018-1(SA)SKOL 2017-9(RW)SKOL 2017-10(TS)SKOL 2017-11(TS)SKOL 2017-12(TS)SKOL 2017-13(TS)SKOL 2017-14(TS)SKOL 2017-15(TS)SKOL 2017-16(SA)SKOL 2017-17(FCS)SKOL 2017-18(TS)SKOL 2017-19(TS)SKOL 2017-20(TS)SKOL 2017-21(TS)SKOL 2017-22(TS)SKOL 2018-1(GC)SKOL 2018-2(TS)SLC 2017-1(TS)SLC 2017-2(TS)SLC 2017-3(TS)SLGW 2017-1(SA)SLGW 2017-2(ROP)SLGW 2017-3(SA)SLGW 2017-4(ROP)SLR 2017-1(AR)SLRG 2016-16(GC)SLRG 2016-17(GC)SLRG 2017-1(GC)SLRG 2017-2(GC)SLRG 2017-3(TS)SLRG 2017-4(GC)SLRG 2017-5(GC)SLRG 2017-6(GC)SLRG 2017-7(GC)
SLRG 2017-8(GC)SLRG 2017-9(GC)SLRG 2017-10(GC)SLRG 2017-11(GC)
FRA No.
05/18/201805/18/201805/18/201805/18/201801/22/201805/24/201805/24/201805/24/201805/24/201805/24/201809/27/201809/27/201809/24/201809/24/201809/24/201809/24/201809/24/201809/24/201809/24/201809/24/201809/24/201809/24/201809/24/201809/24/201809/24/201809/24/201809/24/201809/24/201805/03/201805/03/201805/03/201809/12/201809/12/201809/12/201809/12/201809/27/201804/25/201804/25/201804/25/201804/25/201804/25/201804/25/201804/25/201804/25/201804/25/2018
04/25/201804/25/201804/25/201804/25/2018
SettlementDate Comments
1111111111111831212111111211111111131111211215
10101010
No. ofViolations
$5,000 $5,000 $5,000 $2,500 $2,500 $5,000 $5,000 $2,500 $2,500 $7,500 $5,000 $5,000 $2,000 $8,000 $3,000 $1,000 $5,000 $5,000 $10,000 $5,000 $5,000 $5,000 $5,000 $1,000 $2,500 $7,500 $5,000 $5,000 $5,000 $2,500 $5,000 $5,000 $9,500 $5,000 $9,500 $7,500 $5,000 $5,000 $2,500 $2,500 $7,500 $5,000 $12,000 $1,000 $25,000
$25,000 $25,000 $25,000 $25,000
PRCA
$5,000 $3,500 $5,000 $1,750 $2,500 $3,500 $3,400 $1,675 $1,675 $4,500 $3,950 $3,950 $1,400 $6,880 $2,850 $950 $3,250 $3,250 $7,000 $3,750 $3,200 $3,250 $3,500 $950 $1,750 $5,500 $3,500 $3,500 $3,250 $1,625 $3,400 $5,000 $5,000 $5,000 $9,500 $5,400 $3,500 $3,500 $1,800 $1,800 $5,600 $3,500 $10,800 $900 $2,500
$18,000 $18,000 $18,000 $18,000
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $5,000 $5,000 $2,500 $2,500 $5,000 $5,000 $2,500 $2,500 $7,500 $5,000 $5,000 $2,000 $8,000 $3,000 $1,000 $5,000 $5,000 $10,000 $5,000 $5,000 $5,000 $5,000 $1,000 $2,500 $7,500 $5,000 $5,000 $5,000 $2,500 $5,000 $5,000 $9,500 $5,000 $9,500 $7,500 $5,000 $5,000 $2,500 $2,500 $7,500 $5,000 $12,000 $1,000 $2,500
$25,000 $25,000 $25,000 $25,000
Partially Terminated Violation(s): 1.
60
SLRG 2017-12(TS)SLRG 2017-13(HSR)SLRG 2017-14(TS)SLRG 2017-15(TS)SLRG 2017-16(TS)SLRG 2017-17(TS)SLRG 2018-1(GC)SLRG 2018-2(GC)SLRG 2018-3(GC)SLRG 2018-4(TS)SLRG 2018-5(TS)SLRG 2018-6(TS)SLWC 2017-1(SA)SLWC 2017-2(LI)SLWC 2017-3(LI)SLWC 2017-4(LI)SLWC 2017-5(TS)SLWC 2017-6(TS)SLWC 2017-7(TS)SLWC 2017-8(TS)SLWC 2017-9(TS)SM 2017-1(GC)SMRT 2017-1(GC)SMRT 2017-3(GC)SMRT 2018-2(GC)SNC 2016-5(SA)SOU 2014-181(FCS)SOU 2014-238(FCS)SOU 2017-34(GC)SOU 2017-35(GC)SOU 2017-36(GC)SOU 2017-37(GC)SOU 2017-38(GC)SOU 2017-39(GC)SOU 2017-40(GC)SOU 2017-41(GC)SOU 2017-42(GC)SOU 2017-43(GC)SOU 2017-44(GC)SOU 2017-56(LI)SOU 2017-58(TS)SOU 2017-60(TS)SOU 2017-62(RW)SOU 2017-63(SA)SOU 2017-64(AR)SOU 2017-65(EP)SOU 2017-66(HMT)SOU 2017-67(SI)SOU 2017-68(SA)
FRA No.
04/25/201804/25/201804/25/201804/25/201804/25/201804/25/201804/25/201804/25/201804/25/201804/25/201804/25/201804/25/201809/24/201809/24/201809/24/201809/24/201809/24/201809/24/201809/24/201809/24/201809/24/201805/21/201805/23/201805/23/201802/08/201804/25/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
611111111213101111113121121112111111111114211111311
No. ofViolations
$9,000 $1,000 $5,000 $2,500 $5,000 $2,500 $1,000 $1,000 $12,000 $5,000 $15,000 $25,000 $10,000 $2,500 $2,500 $2,500 $5,000 $1,000 $6,000 $2,500 $5,000 $1,000 $2,500 $3,500 $2,500 $5,000 $2,500 $4,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $4,000 $5,000 $2,500 $5,000 $5,000 $1,000 $1,000 $15,000 $2,500 $5,000
PRCA
$6,800 $920 $3,800 $1,800 $3,950 $1,800 $920 $900 $10,800 $3,750 $11,400 $18,000 $8,000 $1,800 $2,000 $2,000 $3,500 $950 $4,275 $1,750 $3,250 $1,000 $2,500 $3,500 $2,500 $3,650 $1,325 $2,700 $839 $839 $839 $839 $839 $839 $839 $839 $839 $839 $839 $3,356 $3,900 $1,950 $5,000 $3,500 $875 $875 $11,250 $1,800 $3,500
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$9,000 $1,000 $5,000 $2,500 $5,000 $2,500 $1,000 $1,000 $12,000 $5,000 $15,000 $25,000 $10,000 $2,500 $2,500 $2,500 $5,000 $1,000 $6,000 $2,500 $5,000 $1,000 $2,500 $3,500 $2,500 $5,000 $2,500 $4,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $4,000 $5,000 $2,500 $5,000 $5,000 $1,000 $1,000 $15,000 $2,500 $5,000
61
SOU 2017-69(SA)SOU 2017-70(FCS)SOU 2017-71(FCS)SOU 2017-72(FCS)SOU 2017-73(FCS)SOU 2017-74(TS)SOU 2017-75(TS)SOU 2017-76(TS)SOU 2017-77(LI)SOU 2017-78(LI)SOU 2017-79(TS)SOU 2017-80(FCS)SOU 2017-81(FCS)SOU 2017-82(SA)SOU 2017-83(SA)SOU 2017-84(SA)SOU 2017-85(SA)SOU 2017-86(SA)SOU 2017-87(ROP)SOU 2017-88(SA)SOU 2017-89(SA)SOU 2017-90(AR)SOU 2017-91(AR)
SOU 2017-92(ROP)SOU 2017-93(FCS)SOU 2017-94(SA)SOU 2017-95(ROP)SOU 2017-96(SA)SOU 2017-97(SA)SOU 2017-98(AR)SOU 2017-99(AR)
SOU 2017-100(AR)SOU 2017-102(AR)SOU 2017-103(ROP)SOU 2017-104(HS)SOU 2017-105(HS)SOU 2017-106(HS)SOU 2017-107(HS)SOU 2017-108(AR)SOU 2017-109(ROP)SOU 2017-110(RW)SOU 2017-111(TS)SOU 2017-113(LI)SOU 2017-114(LI)SOU 2017-115(HMT)SOU 2017-116(HMT)SOU 2017-117(TS)SOU 2017-118(HS)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
11211133111111111111111
11112111
11111111112111111
No. ofViolations
$2,500 $2,500 $5,000 $2,500 $2,500 $5,000 $6,000 $10,000 $2,500 $2,500 $1,000 $2,500 $2,500 $5,000 $5,000 $5,000 $5,000 $5,000 $7,500 $5,000 $5,000 $1,000 $2,500
$7,500 $2,500 $2,500 $5,000 $7,500 $5,000 $1,000 $2,500
$1,000 $1,000 $2,000 $1,000 $1,000 $1,000 $1,000 $1,000 $5,000 $5,000 $6,000 $2,500 $2,500 $1,000 $4,000 $5,000 $1,000
PRCA
$1,825 $1,800 $3,500 $1,825 $1,825 $3,750 $4,650 $7,500 $1,700 $1,825 $839 $1,825 $1,825 $3,650 $3,550 $3,500 $3,500 $3,500 $5,700 $3,750 $3,550 $875 $853
$6,225 $1,825 $1,825 $4,250 $5,175 $3,500 $875 $875
$875 $875 $1,650 $853 $853 $853 $853 $875 $4,150 $4,500 $4,650 $1,375 $1,700 $750 $2,550 $4,000 $853
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $2,500 $5,000 $2,500 $2,500 $5,000 $6,000 $10,000 $2,500 $2,500 $1,000 $2,500 $2,500 $5,000 $5,000 $5,000 $5,000 $5,000 $7,500 $5,000 $5,000 $1,000 $1,000
$7,500 $2,500 $2,500 $5,000 $7,500 $5,000 $1,000 $1,000
$1,000 $1,000 $2,000 $1,000 $1,000 $1,000 $1,000 $1,000 $5,000 $5,000 $6,000 $2,500 $2,500 $1,000 $4,000 $5,000 $1,000
Partially Terminated Violation(s): 1.
Partially Terminated Violation(s): 1.
62
SOU 2017-119(AR)
SOU 2017-120(AR)SOU 2017-121(ROP)SOU 2017-122(AR)SOU 2017-123(SA)SOU 2017-124(SA)SOU 2017-125(SA)SOU 2017-126(SA)SOU 2017-127(ROP)SOU 2017-128(LI)SOU 2017-129(ROP)SOU 2017-130(SA)SOU 2017-131(SA)SOU 2017-132(AR)SOU 2017-133(SA)SOU 2017-134(SA)SOU 2017-135(AR)
SOU 2017-136(SA)SOU 2017-137(AR)SOU 2017-138(SA)SOU 2017-139(SA)SOU 2017-140(SA)SOU 2017-141(SA)SOU 2017-142(FCS)SOU 2017-143(SA)SOU 2017-144(SA)SOU 2017-145(SA)SOU 2017-146(AR)SOU 2017-147(AR)SOU 2017-148(AR)SOU 2017-149(ROP)SOU 2017-150(FCS)SOU 2017-151(SA)SOU 2017-152(SA)SOU 2017-153(SA)SOU 2017-154(ROP)SOU 2017-155(ROP)SOU 2017-157(TS)SOU 2017-158(GC)SOU 2017-159(GC)SOU 2017-160(RW)SOU 2017-161(HMT)SOU 2017-162(LI)SOU 2017-163(TS)SOU 2017-164(GC)SOU 2017-165(GC)SOU 2017-166(RW)SOU 2017-167(GC)
FRA No.
09/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1
1111111111121111
1111111111111111111111111311111
No. ofViolations
$2,500
$1,000 $5,000 $1,000 $5,000 $2,500 $2,500 $2,500 $7,500 $2,500 $5,000 $2,500 $5,000 $1,000 $5,000 $2,500 $2,500
$5,000 $1,000 $5,000 $2,500 $2,500 $2,500 $2,500 $10,000 $2,500 $5,000 $1,000 $1,000 $1,000 $5,000 $2,500 $5,000 $5,000 $5,000 $7,500 $7,500 $2,500 $5,000 $5,000 $3,000 $5,000 $10,000 $2,500 $1,000 $2,500 $1,000 $5,000
PRCA
$875
$875 $4,050 $853 $3,500 $1,825 $1,825 $1,825 $5,850 $1,700 $4,050 $1,825 $3,400 $875 $3,500 $1,775 $875
$3,600 $853 $3,650 $1,875 $1,875 $1,875 $1,825 $7,250 $1,800 $3,650 $853 $853 $853 $4,050 $1,825 $3,500 $3,500 $3,500 $6,000 $6,225 $1,825 $4,100 $4,100 $2,725 $4,000 $6,900 $1,825 $853 $2,175 $853 $4,250
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$1,000
$1,000 $5,000 $1,000 $5,000 $2,500 $2,500 $2,500 $7,500 $2,500 $5,000 $2,500 $5,000 $1,000 $5,000 $2,500 $1,000
$5,000 $1,000 $5,000 $2,500 $2,500 $2,500 $2,500 $10,000 $2,500 $5,000 $1,000 $1,000 $1,000 $5,000 $2,500 $5,000 $5,000 $5,000 $7,500 $7,500 $2,500 $5,000 $5,000 $3,000 $5,000 $10,000 $2,500 $1,000 $2,500 $1,000 $5,000
Partially Terminated Violation(s): 1.
Partially Terminated Violation(s): 1.
63
SOU 2017-168(TS)SOU 2017-169(LI)SOU 2017-170(LI)SOU 2017-171(TS)SOU 2017-172(TS)SOU 2017-173(TS)SOU 2017-174(TS)SOU 2017-175(HS)SOU 2017-176(HS)SOU 2017-177(HS)SOU 2017-178(HS)SOU 2017-179(HS)SOU 2017-180(HS)SOU 2017-181(HMT)SOU 2017-182(SA)SOU 2017-184(SA)SOU 2017-185(SA)SOU 2017-186(SA)SOU 2017-187(SA)SOU 2017-188(FCS)SOU 2017-189(FCS)SOU 2017-190(FCS)SOU 2017-191(SA)SOU 2017-192(SA)SOU 2017-193(SA)SOU 2017-194(SA)SOU 2017-195(FCS)SOU 2017-196(SA)SOU 2017-197(SA)SOU 2017-198(SA)SOU 2017-199(SA)SOU 2017-200(GC)SOU 2017-201(ROP)SOU 2017-202(TS)SOU 2017-203(TS)SOU 2017-204(FCS)SOU 2017-205(TS)SOU 2017-206(TS)SOU 2017-207(SA)SOU 2017-208(SA)SOU 2017-209(FCS)SOU 2017-210(FCS)SOU 2017-211(LI)SOU 2017-212(LI)SOU 2017-213(LI)SOU 2017-214(SA)SOU 2017-215(SI)SOU 2017-216(ROP)SOU 2017-217(SA)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
11112121111111111111111111111111111120211112111111
No. ofViolations
$2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $6,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $2,500 $2,000 $2,500 $5,000 $5,000 $37,000 $2,000 $2,500 $2,500 $5,000 $5,000 $4,000 $2,500 $2,500 $5,000 $1,000 $7,500 $2,500
PRCA
$1,875 $1,800 $1,800 $1,875 $3,750 $3,650 $4,550 $853 $853 $853 $853 $853 $853 $500 $3,750 $3,500 $3,500 $1,825 $1,825 $1,875 $1,850 $1,825 $3,500 $3,500 $3,500 $1,825 $1,825 $1,825 $3,750 $3,650 $3,650 $2,175 $1,700 $2,000 $3,650 $3,450 $27,000 $1,550 $1,875 $1,825 $3,400 $0 $2,625 $1,950 $1,800 $3,500 $950 $6,375 $1,825
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $6,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $2,500 $2,000 $2,500 $5,000 $5,000 $37,000 $2,000 $2,500 $2,500 $5,000 $0 $4,000 $2,500 $2,500 $5,000 $1,000 $7,500 $2,500
Case Terminated.
64
SOU 2017-218(SA)SOU 2017-219(FCS)SOU 2017-220(LI)SOU 2017-221(LI)SOU 2017-222(LI)SOU 2017-223(LI)SOU 2017-224(HMT)SOU 2017-225(HMT)SOU 2017-226(LI)SOU 2017-227(TS)SOU 2017-228(TS)SOU 2017-229(LI)SOU 2017-230(SA)SOU 2017-231(SI)SOU 2017-232(FCS)SOU 2017-233(FCS)SOU 2017-234(ROP)SOU 2017-235(SA)SOU 2017-236(SA)SOU 2017-237(ROP)SOU 2017-238(ROP)SOU 2017-239(AR)SOU 2017-240(ROP)SOU 2017-241(ROP)SOU 2017-242(AR)SOU 2017-243(CC)SOU 2017-244(TS)SOU 2017-245(TS)SOU 2017-246(TS)SOU 2017-247(SA)SOU 2017-248(SA)SOU 2017-249(SA)SOU 2017-250(FCS)SOU 2017-251(FCS)SOU 2017-252(HMT)SOU 2017-253(LI)SOU 2017-254(GC)
SOU 2017-255(LI)SOU 2017-256(TS)SOU 2017-257(SA)SOU 2017-258(SA)SOU 2017-259(SA)SOU 2017-260(HMT)SOU 2017-261(LI)SOU 2017-262(SA)SOU 2017-263(LI)SOU 2017-264(LI)SOU 2017-265(SA)SOU 2017-266(RW)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1111111111131111111111111111151111216
111114111111
No. ofViolations
$2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $6,000 $2,000 $2,500 $5,000 $2,500 $4,500 $2,500 $1,000 $5,000 $2,500 $2,000 $5,000 $5,000 $5,000 $5,000 $1,000 $9,500 $9,500 $1,000 $1,000 $5,000 $2,500 $5,000 $20,000 $5,000 $5,000 $2,500 $2,500 $7,000 $2,500 $30,000
$2,500 $2,500 $2,500 $2,500 $5,000 $26,500 $2,500 $5,000 $1,500 $2,500 $2,500 $2,000
PRCA
$1,700 $1,850 $1,800 $1,950 $1,800 $1,800 $4,600 $1,625 $1,800 $3,900 $1,925 $3,456 $1,875 $950 $3,425 $1,900 $0 $5,000 $3,650 $4,250 $4,250 $853 $7,950 $7,950 $0 $875 $3,800 $1,925 $3,900 $13,800 $3,650 $3,550 $1,825 $1,825 $5,275 $1,825 $10,000
$2,050 $2,000 $1,825 $1,825 $3,650 $19,700 $1,700 $3,500 $1,200 $1,825 $1,775 $853
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $6,000 $2,000 $2,500 $5,000 $2,500 $4,500 $2,500 $1,000 $5,000 $2,500 $0 $5,000 $5,000 $5,000 $5,000 $1,000 $9,500 $9,500 $0 $1,000 $5,000 $2,500 $5,000 $20,000 $5,000 $5,000 $2,500 $2,500 $7,000 $2,500 $10,000
$2,500 $2,500 $2,500 $2,500 $5,000 $26,500 $2,500 $5,000 $1,500 $2,500 $2,500 $2,000
Case Terminated.
Case Terminated.
Partially Terminated Violation(s): 1.
65
SOU 2017-267(TS)SOU 2017-268(TS)SOU 2017-269(LI)SOU 2017-270(SA)SOU 2017-271(SA)SOU 2017-272(SA)SOU 2017-273(HMT)SOU 2017-274(TS)SOU 2017-275(HMT)SOU 2017-276(SI)SOU 2017-277(SA)SOU 2017-278(TS)SOU 2017-279(TS)SOU 2017-280(TS)SOU 2017-281(HMT)SOU 2017-282(GC)SOU 2017-283(SA)SOU 2017-284(SA)
SOU 2017-285(SA)SOU 2017-286(SA)SOU 2017-287(SA)SOU 2017-288(LI)SOU 2017-289(AR)SOU 2017-290(AR)SOU 2017-291(AR)SOU 2017-292(AR)SOU 2017-293(AR)SOU 2017-294(ROP)SOU 2017-295(SA)
SOU 2017-296(SA)SOU 2017-297(SI)SOU 2017-298(SA)SOU 2017-299(TS)SOU 2017-300(SA)SOU 2017-301(FCS)SOU 2017-302(RW)SOU 2017-303(SA)SOU 2017-304(TS)SOU 2017-305(SA)SOU 2017-306(SA)SOU 2017-307(SA)SOU 2017-308(SA)SOU 2017-309(SA)SOU 2017-310(TS)SOU 2017-311(SI)SOU 2017-312(FCS)SOU 2017-313(HMT)SOU 2017-314(SA)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
111131121111111111
11111111111
1111111111111111111
No. ofViolations
$2,500 $5,000 $2,500 $2,500 $12,500 $2,500 $3,000 $5,000 $3,000 $2,500 $5,000 $2,500 $2,500 $2,500 $5,000 $1,000 $2,500 $5,000
$5,000 $2,500 $5,000 $2,500 $1,000 $2,000 $1,000 $2,000 $1,000 $9,500 $5,000
$5,000 $2,500 $5,000 $2,500 $5,000 $2,500 $2,000 $2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $2,500 $5,000 $1,000 $2,500 $4,000 $5,000
PRCA
$2,000 $3,900 $1,825 $1,825 $9,375 $2,050 $1,725 $3,900 $1,725 $1,950 $3,700 $2,000 $2,000 $2,000 $4,000 $853 $1,825 $2,000
$3,700 $1,825 $3,900 $1,700 $853 $853 $853 $853 $853 $0 $1,900
$3,650 $1,950 $3,650 $2,050 $3,650 $1,825 $1,600 $1,825 $2,050 $1,825 $3,650 $3,650 $3,650 $1,825 $3,800 $900 $1,850 $2,900 $3,650
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $5,000 $2,500 $2,500 $12,500 $2,500 $3,000 $5,000 $3,000 $2,500 $5,000 $2,500 $2,500 $2,500 $5,000 $1,000 $2,500 $2,500
$5,000 $2,500 $5,000 $2,500 $1,000 $2,000 $1,000 $2,000 $1,000 $0 $2,500
$5,000 $2,500 $5,000 $2,500 $5,000 $2,500 $2,000 $2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $2,500 $5,000 $1,000 $2,500 $4,000 $5,000
Partially Terminated Violation(s): 1.
Case Terminated.Partially Terminated Violation(s): 1.
66
SOU 2017-315(LI)SOU 2017-316(SA)SOU 2017-317(SA)SOU 2017-318(SI)SOU 2017-319(SA)SOU 2017-320(EQ)SOU 2017-321(SA)SOU 2017-322(ROP)SOU 2017-323(AD)SOU 2017-324(AD)SOU 2017-325(SI)SOU 2017-326(SA)SOU 2017-327(FCS)SOU 2017-328(ROP)SOU 2017-329(SA)SOU 2017-330(GC)SOU 2017-331(GC)SOU 2017-332(SI)SOU 2017-333(SA)SOU 2017-334(SA)SOU 2017-335(SA)SOU 2017-336(FCS)SOU 2017-337(FCS)SOU 2017-338(LI)SOU 2017-339(LI)SOU 2017-340(LI)
SOU 2017-341(LI)SOU 2017-342(GC)SOU 2017-343(SA)SOU 2017-344(FCS)SOU 2017-345(FCS)SOU 2017-346(SA)SOU 2017-347(SA)SOU 2017-348(LI)SOU 2017-349(LI)SOU 2017-350(GC)SOU 2017-351(GC)SOU 2017-352(SA)SOU 2017-353(ROP)SOU 2017-354(SA)SOU 2017-355(SA)SOU 2017-356(FCS)SOU 2017-357(FCS)SOU 2017-358(LI)SOU 2017-359(LI)SOU 2017-360(SA)SOU 2017-361(FCS)SOU 2017-362(LI)SOU 2017-363(LI)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
11111111111111111121111124
11111111111121411111111
No. ofViolations
$2,500 $5,000 $5,000 $2,500 $5,000 $4,000 $5,000 $5,000 $2,500 $1,000 $2,500 $2,500 $5,000 $7,500 $5,000 $5,000 $5,000 $2,500 $10,000 $5,000 $5,000 $2,500 $2,500 $2,500 $5,000 $10,000
$2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $2,500 $10,000 $2,500 $20,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500
PRCA
$1,950 $3,650 $3,700 $1,950 $3,650 $3,100 $3,700 $4,150 $1,475 $875 $1,800 $1,825 $3,425 $6,375 $3,650 $4,000 $4,350 $1,800 $7,000 $3,650 $3,200 $1,825 $1,825 $1,825 $3,550 $4,850
$2,050 $4,100 $1,825 $1,825 $1,825 $1,800 $1,825 $2,050 $1,900 $4,250 $4,250 $1,825 $7,800 $1,800 $14,200 $1,825 $1,825 $1,800 $1,800 $1,825 $1,825 $1,850 $1,800
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $5,000 $5,000 $2,500 $5,000 $4,000 $5,000 $5,000 $2,500 $1,000 $2,500 $2,500 $5,000 $7,500 $5,000 $5,000 $5,000 $2,500 $10,000 $5,000 $5,000 $2,500 $2,500 $2,500 $5,000 $7,500
$2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $2,500 $10,000 $2,500 $20,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500
Partially Terminated Violation(s): 3.
67
SOU 2017-364(ROP)SOU 2017-365(LI)SOU 2017-366(FCS)SOU 2017-367(FCS)SOU 2017-368(SA)SOU 2017-369(SA)SOU 2017-370(SA)SOU 2017-371(SA)SOU 2017-372(SA)SOU 2017-373(HMT)SOU 2017-374(HMT)SOU 2017-375(GC)SOU 2017-376(GC)SOU 2017-377(TS)SOU 2017-378(TS)SOU 2017-379(TS)SOU 2017-380(LI)SOU 2017-381(SA)SOU 2017-382(ROP)SOU 2017-383(ROP)SOU 2017-384(ROP)SOU 2017-385(SA)SOU 2017-386(HMT)SOU 2017-387(SA)SOU 2017-388(AD)SOU 2017-389(LI)SOU 2017-390(GC)SOU 2017-391(ROP)SOU 2017-392(SA)SOU 2017-393(ROP)SOU 2017-394(HSR)SOU 2017-395(AR)SOU 2017-396(HS)SOU 2017-397(SA)SOU 2017-398(LI)SOU 2017-399(SA)SOU 2017-400(HMT)SOU 2017-401(ROP)SOU 2017-402(FCS)SOU 2017-403(SA)SOU 2017-404(SA)SOU 2017-405(SA)SOU 2017-406(FCS)SOU 2017-407(SA)SOU 2018-1(FCS)SOU 2018-2(AR)SOU 2018-3(AR)SOU 2018-4(ROP)SOU 2018-5(ROP)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1111111114111123111121111111111111112111111111111
No. ofViolations
$9,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $26,500 $4,000 $5,000 $5,000 $2,500 $5,000 $7,500 $2,500 $2,500 $2,000 $2,000 $4,000 $5,000 $2,000 $5,000 $2,500 $2,500 $1,000 $7,500 $5,000 $7,500 $1,000 $1,000 $1,000 $5,000 $2,500 $2,500 $12,500 $7,500 $2,500 $5,000 $2,500 $5,000 $2,500 $2,500 $2,500 $1,000 $1,000 $7,500 $5,000
PRCA
$8,075 $2,050 $1,825 $1,825 $1,825 $1,825 $1,825 $0 $1,700 $19,650 $4,000 $4,750 $0 $1,825 $3,900 $5,625 $1,575 $1,825 $1,650 $1,650 $3,200 $3,650 $1,650 $3,550 $1,750 $1,825 $853 $5,850 $3,650 $5,850 $853 $875 $853 $3,550 $1,650 $1,825 $7,450 $6,375 $1,825 $3,650 $1,825 $3,650 $1,825 $1,825 $1,825 $875 $875 $6,225 $4,150
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$9,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $0 $2,500 $26,500 $4,000 $5,000 $0 $2,500 $5,000 $7,500 $2,500 $2,500 $2,000 $2,000 $4,000 $5,000 $2,000 $5,000 $2,500 $2,500 $1,000 $7,500 $5,000 $7,500 $1,000 $1,000 $1,000 $5,000 $2,500 $2,500 $12,500 $7,500 $2,500 $5,000 $2,500 $5,000 $2,500 $2,500 $2,500 $1,000 $1,000 $7,500 $5,000
Case Terminated.
Case Terminated.
68
SOU 2018-6(FCS)SOU 2018-7(SA)SOU 2018-8(SA)SOU 2018-9(SA)SOU 2018-10(SA)SOU 2018-11(SA)SOU 2018-12(SA)SOU 2018-13(LI)SOU 2018-14(LI)SOU 2018-15(SA)SOU 2018-16(SA)SOU 2018-17(SA)SOU 2018-18(LI)SOU 2018-19(SA)SOU 2018-20(SA)SOU 2018-21(AR)SOU 2018-22(FCS)SOU 2018-23(LI)SOU 2018-24(LI)SOU 2018-25(SA)SOU 2018-26(SA)SOU 2018-27(TS)SOU 2018-28(GC)SOU 2018-29(ROP)SOU 2018-30(HMT)SOU 2018-31(HMT)SOU 2018-32(SA)SOU 2018-33(SA)SOU 2018-34(LI)SOU 2018-35(LI)SOU 2018-36(LI)SOU 2018-37(SA)SOU 2018-38(FCS)SOU 2018-39(HS)SOU 2018-40(HS)SOU 2018-41(HS)SOU 2018-42(HS)SOU 2018-43(HS)SOU 2018-44(ROP)SOU 2018-45(AR)SOU 2018-46(HS)SOU 2018-47(HS)SOU 2018-48(ROP)SOU 2018-49(FCS)SOU 2018-50(FCS)SOU 2018-51(FCS)SOU 2018-52(FCS)SOU 2018-53(SA)SOU 2018-54(SA)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1111111111111111111211112111222111111111111111111
No. ofViolations
$5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $5,000 $2,500 $5,000 $1,500 $2,500 $5,000 $1,000 $2,500 $1,000 $2,500 $5,000 $5,000 $2,500 $5,000 $7,500 $15,000 $2,000 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $1,000 $1,000 $1,000 $1,000 $1,000 $2,000 $1,000 $1,000 $1,000 $3,000 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500
PRCA
$3,425 $3,550 $3,550 $3,650 $3,650 $3,650 $3,650 $2,050 $1,850 $3,650 $1,900 $3,400 $900 $1,825 $3,650 $853 $1,825 $853 $1,900 $0 $3,700 $2,050 $4,150 $6,375 $11,700 $1,550 $3,650 $3,450 $3,550 $3,900 $3,550 $1,800 $1,850 $853 $853 $853 $853 $853 $1,650 $875 $853 $853 $2,700 $1,825 $1,825 $1,825 $1,825 $3,650 $1,825
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $5,000 $2,500 $5,000 $1,500 $2,500 $5,000 $1,000 $2,500 $1,000 $2,500 $0 $5,000 $2,500 $5,000 $7,500 $15,000 $2,000 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $1,000 $1,000 $1,000 $1,000 $1,000 $2,000 $1,000 $1,000 $1,000 $3,000 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500
Case Terminated.
69
SOU 2018-55(SA)SOU 2018-56(SA)SOU 2018-57(SA)SOU 2018-58(HSR)SOU 2018-59(LI)SOU 2018-60(SI)SOU 2018-61(ROP)SOU 2018-62(SA)SOU 2018-63(SA)SOU 2018-64(SA)SOU 2018-65(SA)SOU 2018-66(SA)SOU 2018-67(SA)SOU 2018-68(SA)SOU 2018-69(SA)SOU 2018-70(SA)SOU 2018-71(FCS)SOU 2018-72(SA)SOU 2018-73(SA)SOU 2018-74(SA)SOU 2018-75(SI)SOU 2018-76(ROP)SOU 2018-77(ROR)SOU 2018-78(LI)SOU 2018-79(HMT)SOU 2018-80(LI)SOU 2018-81(EP)SOU 2018-82(LI)SOU 2018-83(ROP)SOU 2018-84(FCS)SOU 2018-85(SA)SOU 2018-86(SA)SOU 2018-88(TS)SOU 2018-89(TS)SOU 2018-90(SA)SOU 2018-91(FCS)SOU 2018-92(LI)SOU 2018-93(SI)SOU 2018-94(LI)SOU 2018-95(TS)SOU 2018-96(TS)SOU 2018-97(FCS)SOU 2018-98(ROP)SOU 2018-99(HMT)SOU 2018-100(SA)SOU 2018-101(SA)SOU 2018-103(SA)SOU 2018-104(SA)SOU 2018-105(SA)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1111111111112111111113212111411112111111111111111
No. ofViolations
$5,000 $5,000 $5,000 $1,000 $2,500 $5,000 $7,500 $5,000 $2,500 $2,500 $2,500 $2,500 $7,500 $2,500 $5,000 $5,000 $5,000 $5,000 $2,500 $5,000 $2,500 $15,000 $19,000 $2,500 $4,000 $2,500 $1,000 $2,500 $8,000 $2,500 $2,500 $2,500 $2,500 $10,000 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $2,500 $2,000 $5,000 $2,500 $2,500 $5,000 $5,000 $5,000
PRCA
$3,450 $3,450 $3,450 $853 $1,950 $3,600 $6,375 $3,550 $1,800 $1,825 $1,825 $1,825 $5,275 $1,825 $3,650 $3,525 $3,425 $3,550 $1,825 $3,550 $1,950 $12,450 $15,200 $1,950 $2,750 $1,825 $853 $1,825 $6,225 $1,825 $1,900 $1,800 $0 $7,500 $1,800 $1,825 $1,950 $1,950 $1,950 $3,900 $4,150 $1,900 $1,650 $3,650 $2,050 $1,800 $3,650 $3,650 $3,650
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $5,000 $5,000 $1,000 $2,500 $5,000 $7,500 $5,000 $2,500 $2,500 $2,500 $2,500 $7,500 $2,500 $5,000 $5,000 $5,000 $5,000 $2,500 $5,000 $2,500 $15,000 $19,000 $2,500 $4,000 $2,500 $1,000 $2,500 $8,000 $2,500 $2,500 $2,500 $0 $10,000 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $2,500 $2,000 $5,000 $2,500 $2,500 $5,000 $5,000 $5,000
Case Terminated.
70
SOU 2018-106(GC)SOU 2018-107(LI)SOU 2018-108(LI)SOU 2018-109(HMT)SOU 2018-110(RSP)SOU 2018-111(GC)SOU 2018-112(GC)SRN 2017-1(SA)SS 2016-1(TS)SS 2016-2(RW)SS 2016-3(TS)ST 2017-4(SA)ST 2017-5(ROP)ST 2017-6(LI)ST 2017-7(SA)ST 2017-8(AD)ST 2017-9(AD)ST 2017-10(SA)ST 2018-1(RSP)ST 2018-2(SA)ST 2018-3(SA)STE 2018-1(HSR)SW 2016-18(HSR)SW 2016-20(HS)SW 2016-21(HS)SW 2016-23(ROP)SW 2016-24(ROP)SW 2016-25(ROP)SW 2016-26(ROR)SW 2016-27(ROP)SW 2016-28(SA)SW 2016-29(HMT)SW 2016-30(AR)SW 2016-31(AR)SW 2016-32(HMT)SW 2016-33(TS)SW 2016-34(TS)SYSI 2017-1(LI)TASD 2011-6(RW)TASD 2012-1(SA)TASD 2012-2(SA)TASD 2012-3(SA)TASD 2012-4(AD)TASD 2015-2(SA)TASD 2017-1(TS)TASD 2017-2(SA)
TASD 2017-3(SA)
TASD 2017-4(ROP)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201805/23/201802/08/201802/08/201802/08/201809/11/201809/11/201809/11/201809/11/201809/11/201809/11/201809/11/201809/11/201809/11/201809/11/201809/18/201804/23/201804/23/201804/23/201804/23/201804/23/201804/23/201804/23/201804/23/201804/23/201804/23/201804/23/201804/23/201804/23/201804/23/201804/23/201805/24/201801/25/201801/25/201801/25/201801/25/201801/25/201801/24/201801/24/201801/24/2018
01/24/2018
01/24/2018
SettlementDate Comments
1111111131211111111111131111511111142111342211
1
1
No. ofViolations
$5,000 $2,500 $2,000 $5,000 $9,500 $5,000 $2,500 $5,000 $3,000 $3,000 $2,000 $5,000 $7,500 $2,500 $5,000 $5,000 $2,500 $5,000 $5,000 $5,000 $2,500 $1,000 $1,000 $3,000 $1,000 $2,000 $2,000 $7,500 $47,500 $7,500 $5,000 $5,000 $1,000 $1,000 $7,500 $4,000 $5,000 $2,500 $3,000 $5,000 $15,000 $10,000 $7,500 $10,000 $2,500 $5,000
$7,500
$7,500
PRCA
$4,150 $1,800 $1,650 $2,650 $8,550 $4,350 $2,225 $5,000 $1,950 $2,400 $1,300 $4,500 $6,500 $1,850 $3,850 $4,000 $2,000 $3,850 $3,750 $3,850 $1,925 $853 $650 $1,950 $650 $1,400 $1,400 $5,250 $30,875 $4,875 $3,500 $3,500 $839 $839 $5,250 $3,356 $3,000 $1,625 $0 $0 $0 $0 $0 $7,000 $2,200 $2,500
$5,000
$4,500
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $2,500 $2,000 $5,000 $9,500 $5,000 $2,500 $5,000 $3,000 $3,000 $2,000 $5,000 $7,500 $2,500 $5,000 $5,000 $2,500 $5,000 $5,000 $5,000 $2,500 $1,000 $1,000 $3,000 $1,000 $2,000 $2,000 $7,500 $47,500 $7,500 $5,000 $5,000 $1,000 $1,000 $7,500 $4,000 $5,000 $2,500 $0 $0 $0 $0 $0 $10,000 $2,500 $2,500
$5,000
$7,500
Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.
Partially Terminated Violation(s): 1.Partially Terminated Violation(s): 1.
71
TIBR 2017-2(TS)TMBL 2017-1(SA)TMBL 2017-2(FCS)TMBL 2017-3(SA)TMBL 2017-4(SA)TMBL 2017-5(SA)TMBL 2017-6(SA)TMBL 2017-7(FCS)TMBL 2017-8(FCS)TMBL 2017-9(FCS)TMBL 2017-10(FCS)TNMR 2015-13(AR)TNMR 2015-14(TS)TNMR 2015-15(TS)TNMR 2016-17(AR)TPW 2018-1(LI)TPW 2018-2(LI)TRC 2016-1(GC)TRMW 2018-1(ROP)TRRA 2013-1(SA)TRRA 2014-4(GC)TRRA 2014-5(GC)TRRA 2015-2(AD)TRRA 2017-3(ROP)TRRA 2018-1(FCS)TRRA 2018-2(FCS)TRRA 2018-3(EQ)TRRA 2018-4(FCS)TRRA 2018-5(AD)TSR 2016-1(AR)TSRR 2011-1(TS)TSRR 2012-1(TS)TSWS 2017-1(SA)TXN 2015-2(AR)TXN 2015-3(TS)TXN 2015-4(TS)TXN 2018-1(ROP)TXN 2018-2(GC)TXNW 2018-1(HMT)UFRC 2017-5(SI)UFRC 2017-6(AD)UFRC 2017-7(GC)UP 2015-266(TS)UP 2015-350(EP)UP 2015-386(ROP)UP 2016-63(TS)UP 2016-305(GC)UP 2016-426(TS)UP 2016-719(SA)
FRA No.
09/24/201810/03/201710/03/201710/03/201710/03/201705/01/201805/01/201805/01/201805/01/201805/01/201805/01/201803/26/201803/26/201803/26/201804/25/201809/27/201809/27/201803/29/201805/01/201811/17/201711/17/201711/17/201701/31/201811/17/201705/03/201805/03/201805/14/201808/24/201808/16/201804/25/201811/14/201711/14/201701/12/201809/24/201809/24/201809/24/201809/24/201809/24/201808/24/201812/12/201701/11/201803/20/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
23121211111111111113111111111121111111122111110151
No. ofViolations
$7,500 $12,500 $2,500 $10,000 $2,500 $7,500 $2,500 $2,500 $5,000 $5,000 $5,000 $1,000 $5,000 $2,500 $2,500 $2,500 $2,500 $1,000 $7,500 $10,000 $5,000 $2,500 $5,000 $7,500 $5,000 $5,000 $2,500 $2,500 $2,500 $2,500 $10,000 $5,000 $5,000 $1,000 $5,000 $2,500 $7,500 $2,500 $5,000 $2,000 $5,000 $2,500 $7,000 $1,000 $7,500 $10,000 $5,000 $12,500 $5,000
PRCA
$5,000 $7,400 $1,400 $6,850 $1,350 $2,500 $1,250 $1,250 $2,500 $2,500 $2,500 $0 $0 $0 $1,500 $1,950 $1,950 $1,000 $3,750 $7,000 $4,000 $2,000 $3,000 $5,500 $3,000 $3,000 $2,500 $2,500 $2,500 $1,500 $1,300 $650 $5,000 $900 $3,000 $1,900 $4,750 $2,000 $3,250 $2,000 $3,500 $2,500 $5,110 $650 $0 $7,500 $3,750 $9,375 $0
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$7,500 $12,500 $2,500 $10,000 $2,500 $5,000 $2,500 $2,500 $5,000 $5,000 $5,000 $0 $0 $0 $2,500 $2,500 $2,500 $1,000 $7,500 $10,000 $5,000 $2,500 $5,000 $7,500 $5,000 $5,000 $2,500 $2,500 $2,500 $2,500 $10,000 $5,000 $5,000 $1,000 $5,000 $2,500 $7,500 $2,500 $5,000 $2,000 $5,000 $2,500 $7,000 $1,000 $0 $10,000 $5,000 $12,500 $0
Terminated Violation(s): 1.
Case Terminated.Case Terminated.Case Terminated.
Case Terminated.
Case Terminated.
72
UP 2016-757(SA)UP 2016-817(EQ)UP 2016-823(SI)UP 2016-984(SA)UP 2016-1080(GC)UP 2016-1110(HMT)UP 2017-15(TS)UP 2017-44(HMT)UP 2017-54(LI)UP 2017-59(TS)UP 2017-64(FCS)UP 2017-69(SA)UP 2017-74(SA)UP 2017-79(FCS)UP 2017-84(FCS)UP 2017-89(SA)UP 2017-94(SA)UP 2017-99(SA)UP 2017-104(SA)UP 2017-109(SA)UP 2017-110(SA)UP 2017-114(HS)UP 2017-115(HS)UP 2017-119(SA)UP 2017-120(EP)UP 2017-124(SA)UP 2017-125(SA)UP 2017-129(SA)UP 2017-130(SA)UP 2017-134(TS)UP 2017-139(TS)UP 2017-140(TS)UP 2017-144(RW)UP 2017-149(SA)UP 2017-150(SA)UP 2017-154(TS)UP 2017-155(TS)UP 2017-159(TS)UP 2017-160(ROP)UP 2017-164(GC)UP 2017-165(HS)UP 2017-169(SI)UP 2017-170(SI)UP 2017-174(SA)UP 2017-175(SA)UP 2017-179(SA)UP 2017-184(LI)UP 2017-185(LI)UP 2017-189(SA)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
10181110311111111111111121111111610321111111211111111
No. ofViolations
$25,000 $5,000 $20,000 $2,500 $5,000 $75,000 $15,000 $7,500 $2,500 $2,500 $5,000 $2,500 $5,000 $2,500 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $5,000 $1,000 $2,000 $5,000 $1,000 $5,000 $5,000 $2,500 $5,000 $40,000 $10,000 $7,500 $4,000 $5,000 $5,000 $5,000 $5,000 $2,500 $9,500 $2,500 $2,000 $1,000 $2,500 $5,000 $2,500 $5,000 $2,500 $2,500 $5,000
PRCA
$18,750 $3,750 $15,400 $1,875 $3,750 $56,250 $10,950 $6,000 $1,875 $1,875 $3,750 $1,875 $3,750 $1,875 $1,875 $3,750 $1,875 $1,875 $1,875 $1,875 $3,750 $853 $1,706 $3,750 $853 $3,750 $3,750 $1,875 $3,750 $32,000 $8,000 $5,625 $3,000 $3,750 $3,750 $3,750 $3,750 $1,875 $7,005 $1,875 $1,706 $853 $1,825 $3,750 $1,875 $3,750 $1,875 $1,875 $3,750
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$25,000 $5,000 $20,000 $2,500 $5,000 $75,000 $15,000 $7,500 $2,500 $2,500 $5,000 $2,500 $5,000 $2,500 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $5,000 $1,000 $2,000 $5,000 $1,000 $5,000 $5,000 $2,500 $5,000 $40,000 $10,000 $7,500 $4,000 $5,000 $5,000 $5,000 $5,000 $2,500 $9,500 $2,500 $2,000 $1,000 $2,500 $5,000 $2,500 $5,000 $2,500 $2,500 $5,000
73
UP 2017-190(FCS)UP 2017-194(FCS)UP 2017-195(FCS)UP 2017-199(ROP)UP 2017-200(SA)UP 2017-204(SI)UP 2017-205(SI)UP 2017-209(SI)UP 2017-214(TS)UP 2017-215(TS)UP 2017-219(GC)UP 2017-220(HMT)UP 2017-224(HMT)UP 2017-225(HS)UP 2017-229(SA)UP 2017-230(SA)UP 2017-234(HS)UP 2017-235(SA)UP 2017-239(HMT)UP 2017-240(HMT)UP 2017-244(SA)UP 2017-245(SA)UP 2017-249(LI)UP 2017-250(HMT)UP 2017-254(TS)UP 2017-255(SA)UP 2017-259(AR)UP 2017-260(ROP)UP 2017-264(ROP)UP 2017-265(SA)UP 2017-270(SA)UP 2017-275(SA)UP 2017-279(FCS)UP 2017-280(FCS)UP 2017-284(HS)UP 2017-285(ROR)UP 2017-289(TS)UP 2017-290(GC)UP 2017-295(TS)UP 2017-299(ROP)UP 2017-300(ROP)UP 2017-304(SA)UP 2017-305(HMT)UP 2017-309(FCS)UP 2017-310(ROP)UP 2017-314(SA)UP 2017-315(SA)UP 2017-319(SA)UP 2017-320(SA)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1111111131111211211111111111111111112181111121111
No. ofViolations
$2,500 $5,000 $2,500 $2,000 $5,000 $1,000 $2,500 $1,000 $7,500 $5,000 $5,000 $2,000 $2,000 $2,000 $5,000 $5,000 $5,000 $1,000 $2,000 $2,000 $2,500 $5,000 $2,500 $5,000 $2,500 $2,500 $1,000 $7,500 $2,000 $2,500 $2,500 $5,000 $2,500 $2,500 $1,000 $9,500 $7,500 $5,000 $16,000 $7,500 $9,500 $2,500 $4,000 $5,000 $4,000 $2,500 $2,500 $5,000 $2,500
PRCA
$1,875 $3,750 $1,875 $1,455 $3,750 $853 $1,825 $853 $5,625 $3,750 $3,750 $1,500 $1,500 $1,706 $3,750 $3,750 $0 $853 $1,500 $1,500 $1,875 $3,750 $1,875 $3,750 $1,875 $1,875 $853 $5,525 $1,250 $1,875 $1,875 $3,750 $1,875 $1,875 $0 $6,650 $5,625 $3,750 $12,000 $5,525 $7,005 $1,875 $3,000 $3,750 $2,500 $1,875 $1,875 $3,750 $1,875
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $5,000 $2,500 $2,000 $5,000 $1,000 $2,500 $1,000 $7,500 $5,000 $5,000 $2,000 $2,000 $2,000 $5,000 $5,000 $0 $1,000 $2,000 $2,000 $2,500 $5,000 $2,500 $5,000 $2,500 $2,500 $1,000 $7,500 $2,000 $2,500 $2,500 $5,000 $2,500 $2,500 $0 $9,500 $7,500 $5,000 $16,000 $7,500 $9,500 $2,500 $4,000 $5,000 $4,000 $2,500 $2,500 $5,000 $2,500
Case Terminated.
Case Terminated.
74
UP 2017-324(SA)UP 2017-325(SA)UP 2017-329(SA)UP 2017-330(SA)UP 2017-333(GC)UP 2017-334(HSR)UP 2017-335(GC)UP 2017-338(HSR)UP 2017-339(HSR)UP 2017-344(LI)UP 2017-348(TS)UP 2017-349(TS)UP 2017-352(TS)UP 2017-353(TS)UP 2017-354(RW)UP 2017-358(TS)UP 2017-360(AR)UP 2017-361(AR)UP 2017-365(FCS)UP 2017-366(SA)UP 2017-367(SA)UP 2017-370(SA)UP 2017-371(SA)UP 2017-372(SA)UP 2017-375(HS)UP 2017-376(FCS)UP 2017-377(ROR)UP 2017-380(SA)UP 2017-381(EP)UP 2017-382(TS)UP 2017-383(ROP)UP 2017-384(SA)UP 2017-385(ROP)UP 2017-386(HMT)UP 2017-387(SA)UP 2017-388(SA)UP 2017-389(SA)UP 2017-390(CC)UP 2017-391(CC)UP 2017-392(CC)UP 2017-393(CC)UP 2017-394(CC)UP 2017-395(SA)UP 2017-396(SA)UP 2017-397(SI)UP 2017-398(SI)UP 2017-399(SA)UP 2017-400(TS)UP 2017-401(TS)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1111111111112211311111111111111111111111111111121
No. ofViolations
$5,000 $5,000 $2,500 $2,500 $5,000 $1,000 $5,000 $1,000 $1,000 $2,500 $5,000 $2,500 $5,000 $7,500 $2,000 $2,500 $7,500 $2,500 $2,500 $5,000 $2,500 $2,500 $5,000 $2,500 $1,000 $2,500 $9,500 $2,500 $1,000 $5,000 $7,500 $5,000 $2,000 $7,500 $5,000 $5,000 $5,000 $4,000 $4,000 $4,000 $4,000 $4,000 $2,500 $5,000 $1,000 $1,000 $5,000 $10,000 $5,000
PRCA
$3,750 $3,750 $1,875 $1,875 $3,750 $853 $3,750 $853 $853 $1,875 $3,750 $1,875 $3,750 $5,625 $1,500 $1,875 $5,325 $1,875 $1,875 $3,750 $1,875 $1,875 $3,750 $1,875 $0 $1,875 $6,650 $1,875 $853 $3,750 $5,525 $3,750 $1,455 $5,625 $3,750 $3,750 $3,750 $3,000 $3,000 $3,000 $3,000 $3,000 $1,875 $3,750 $853 $853 $3,750 $7,500 $3,750
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $5,000 $2,500 $2,500 $5,000 $1,000 $5,000 $1,000 $1,000 $2,500 $5,000 $2,500 $5,000 $7,500 $2,000 $2,500 $7,500 $2,500 $2,500 $5,000 $2,500 $2,500 $5,000 $2,500 $0 $2,500 $9,500 $2,500 $1,000 $5,000 $7,500 $5,000 $2,000 $7,500 $5,000 $5,000 $5,000 $4,000 $4,000 $4,000 $4,000 $4,000 $2,500 $5,000 $1,000 $1,000 $5,000 $10,000 $5,000
Case Terminated.
75
UP 2017-402(TS)UP 2017-403(TS)UP 2017-405(ROP)UP 2017-406(FCS)UP 2017-408(FCS)UP 2017-409(SA)UP 2017-411(SA)UP 2017-412(SA)UP 2017-413(SA)UP 2017-414(SA)UP 2017-415(SA)UP 2017-416(SA)UP 2017-417(SA)UP 2017-418(SA)UP 2017-419(SA)UP 2017-420(SA)UP 2017-421(SA)UP 2017-422(SA)UP 2017-423(HS)UP 2017-424(SA)UP 2017-425(SA)UP 2017-426(SA)UP 2017-427(ROP)UP 2017-428(ROP)UP 2017-429(ROP)UP 2017-430(ROP)UP 2017-431(SA)UP 2017-432(SA)UP 2017-433(SA)UP 2017-435(FCS)UP 2017-436(ROP)UP 2017-437(ROP)UP 2017-438(SA)UP 2017-439(SA)UP 2017-440(HSR)UP 2017-441(TS)UP 2017-442(LI)UP 2017-443(LI)UP 2017-444(LI)UP 2017-445(TS)UP 2017-446(LI)UP 2017-447(LI)UP 2017-448(RW)UP 2017-449(TS)UP 2017-450(TS)UP 2017-451(LI)UP 2017-452(LI)UP 2017-454(GC)UP 2017-455(GC)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1111111111111111112111111111111111111111111121111
No. ofViolations
$2,500 $2,500 $9,500 $2,500 $2,500 $2,500 $10,000 $5,000 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $2,500 $5,000 $5,000 $5,000 $2,000 $2,500 $5,000 $5,000 $7,500 $2,000 $7,500 $2,000 $5,000 $2,500 $2,500 $2,500 $7,500 $9,500 $2,500 $5,000 $1,000 $5,000 $2,000 $1,000 $2,500 $2,500 $1,000 $2,500 $2,000 $5,000 $10,000 $2,500 $2,500 $5,000 $5,000
PRCA
$1,875 $1,875 $7,125 $1,875 $1,875 $1,875 $7,500 $3,750 $1,875 $1,875 $1,875 $1,875 $3,750 $1,875 $1,875 $3,750 $3,750 $3,750 $1,706 $1,875 $3,750 $3,750 $5,525 $1,455 $5,525 $1,455 $3,750 $1,875 $1,875 $1,875 $5,525 $7,005 $1,875 $3,750 $853 $3,750 $1,500 $853 $1,875 $1,825 $853 $1,875 $1,500 $3,500 $7,300 $1,875 $1,875 $3,750 $3,750
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $2,500 $9,500 $2,500 $2,500 $2,500 $10,000 $5,000 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $2,500 $5,000 $5,000 $5,000 $2,000 $2,500 $5,000 $5,000 $7,500 $2,000 $7,500 $2,000 $5,000 $2,500 $2,500 $2,500 $7,500 $9,500 $2,500 $5,000 $1,000 $5,000 $2,000 $1,000 $2,500 $2,500 $1,000 $2,500 $2,000 $5,000 $10,000 $2,500 $2,500 $5,000 $5,000
76
UP 2017-456(GC)UP 2017-457(GC)UP 2017-458(TS)UP 2017-459(GC)UP 2017-460(SA)UP 2017-461(FCS)UP 2017-462(ROP)UP 2017-463(HMT)UP 2017-464(SA)UP 2017-465(FCS)UP 2017-466(ROP)UP 2017-467(SA)UP 2017-468(ROP)UP 2017-469(LI)UP 2017-470(LI)UP 2017-471(LI)UP 2017-472(RW)UP 2017-473(TS)UP 2017-474(TS)UP 2017-475(RW)UP 2017-476(TS)UP 2017-477(LI)UP 2017-478(GC)UP 2017-479(GC)UP 2017-480(TS)UP 2017-481(TS)UP 2017-482(HMT)UP 2017-483(GC)UP 2017-484(SA)UP 2017-485(SA)UP 2017-486(SA)UP 2017-487(SA)UP 2017-488(FCS)UP 2017-489(SA)UP 2017-490(SA)UP 2017-491(SA)UP 2017-492(SA)UP 2017-493(SA)UP 2017-494(ROP)UP 2017-495(ROP)UP 2017-496(SA)UP 2017-497(LI)UP 2017-498(LI)UP 2017-499(SA)UP 2017-500(SA)UP 2017-501(ROP)UP 2017-502(ROP)UP 2017-503(FCS)UP 2017-504(FCS)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
11111111111111111212111111121111111111111111111111
No. ofViolations
$5,000 $5,000 $35,000 $1,000 $2,500 $2,500 $9,500 $2,000 $5,000 $2,500 $2,000 $5,000 $7,500 $2,500 $1,000 $1,000 $4,500 $5,000 $5,000 $3,000 $5,000 $2,500 $5,000 $5,000 $2,500 $1,000 $6,000 $2,500 $2,500 $2,500 $5,000 $2,500 $5,000 $5,000 $5,000 $2,500 $5,000 $2,500 $9,500 $9,500 $5,000 $2,500 $2,500 $5,000 $5,000 $2,000 $2,000 $2,500 $2,500
PRCA
$3,750 $3,750 $28,000 $853 $1,875 $1,875 $7,125 $1,500 $3,750 $1,875 $1,455 $3,750 $5,525 $1,875 $853 $853 $3,375 $3,650 $3,650 $2,195 $3,650 $1,875 $3,750 $3,750 $1,825 $853 $4,500 $1,875 $1,875 $1,875 $3,750 $1,875 $3,750 $3,750 $3,750 $1,875 $3,750 $1,875 $7,005 $7,125 $3,750 $1,875 $1,772 $3,750 $3,750 $1,455 $1,455 $1,875 $1,875
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $5,000 $35,000 $1,000 $2,500 $2,500 $9,500 $2,000 $5,000 $2,500 $2,000 $5,000 $7,500 $2,500 $1,000 $1,000 $4,500 $5,000 $5,000 $3,000 $5,000 $2,500 $5,000 $5,000 $2,500 $1,000 $6,000 $2,500 $2,500 $2,500 $5,000 $2,500 $5,000 $5,000 $5,000 $2,500 $5,000 $2,500 $9,500 $9,500 $5,000 $2,500 $2,500 $5,000 $5,000 $2,000 $2,000 $2,500 $2,500
77
UP 2017-505(FCS)UP 2017-506(SA)UP 2017-507(SA)UP 2017-508(SA)UP 2017-509(SA)UP 2017-510(SA)UP 2017-511(SA)UP 2017-512(SA)UP 2017-513(SA)UP 2017-514(SA)UP 2017-515(SA)UP 2017-516(HMT)UP 2017-517(HMT)UP 2017-518(ROP)UP 2017-519(FCS)UP 2017-520(LI)UP 2017-521(LI)UP 2017-522(LI)UP 2017-523(LI)UP 2017-524(AD)UP 2017-525(TS)UP 2017-526(EP)UP 2017-527(EP)UP 2017-528(EP)UP 2017-529(EP)UP 2017-530(EP)UP 2017-531(EP)UP 2017-533(SA)UP 2017-534(SA)UP 2017-535(SA)UP 2017-536(FCS)UP 2017-537(FCS)UP 2017-538(FCS)UP 2017-539(FCS)UP 2017-540(FCS)UP 2017-541(FCS)UP 2017-542(FCS)UP 2017-543(FCS)UP 2017-544(FCS)UP 2017-545(FCS)UP 2017-546(FCS)UP 2017-547(FCS)UP 2017-548(FCS)UP 2017-549(FCS)UP 2017-550(FCS)UP 2017-551(ROP)UP 2017-552(SA)UP 2017-554(LI)UP 2017-555(SA)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1111111111111111111111111111111111111111111111111
No. ofViolations
$2,500 $5,000 $2,500 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $4,000 $2,500 $7,500 $2,500 $1,000 $2,500 $2,500 $1,000 $2,500 $5,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $2,500 $5,000
PRCA
$1,875 $3,750 $1,875 $1,875 $3,750 $1,875 $1,875 $1,875 $1,875 $1,875 $3,750 $3,000 $1,875 $5,525 $1,875 $853 $1,875 $1,875 $853 $1,875 $3,650 $853 $853 $853 $853 $853 $853 $3,750 $3,750 $3,750 $1,875 $1,875 $1,875 $1,600 $1,600 $1,875 $1,875 $3,750 $3,750 $1,875 $1,875 $1,875 $1,875 $1,875 $1,875 $3,675 $3,750 $1,875 $3,750
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $5,000 $2,500 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $4,000 $2,500 $7,500 $2,500 $1,000 $2,500 $2,500 $1,000 $2,500 $5,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $2,500 $5,000
78
UP 2017-556(SA)UP 2017-557(SA)UP 2017-558(HMT)UP 2017-559(LI)UP 2017-560(LI)UP 2017-561(TS)UP 2017-562(TS)UP 2017-563(SA)UP 2017-564(FCS)UP 2017-565(FCS)UP 2017-566(FCS)UP 2017-567(LI)UP 2017-568(TS)UP 2017-569(TS)UP 2017-570(ROP)UP 2017-571(ROP)UP 2017-572(ROP)UP 2017-573(TS)UP 2017-574(LI)UP 2017-575(TH)UP 2017-576(TS)UP 2017-577(AR)UP 2017-578(ROP)UP 2017-579(ROP)UP 2017-580(ROP)
UP 2017-581(SA)UP 2017-582(SA)UP 2017-583(SA)UP 2017-584(SA)UP 2017-585(SA)UP 2017-586(SA)UP 2017-587(HMT)UP 2017-588(SA)UP 2017-589(TS)UP 2017-590(TS)UP 2017-591(TS)UP 2017-592(RW)UP 2017-594(SA)UP 2017-595(HMT)UP 2017-596(SA)UP 2017-597(SA)UP 2017-598(HMT)UP 2017-599(FCS)UP 2017-600(LI)UP 2017-601(TS)UP 2017-602(TS)UP 2017-603(AR)UP 2017-604(FCS)UP 2017-605(FCS)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1111112111111111111111111
111111111121111121111111
No. ofViolations
$2,500 $2,500 $5,000 $2,500 $2,500 $2,500 $10,000 $2,500 $2,500 $5,000 $5,000 $1,500 $5,000 $2,500 $2,000 $2,000 $7,500 $2,500 $2,500 $5,000 $2,500 $1,000 $2,000 $2,000 $9,500
$5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $15,000 $5,000 $2,500 $2,500 $5,000 $1,000 $2,500 $7,500 $2,500 $5,000 $5,000 $2,500 $1,000 $2,500 $2,500 $2,500 $2,500 $2,500
PRCA
$2,500 $1,875 $3,750 $1,875 $1,250 $1,825 $7,300 $1,875 $1,875 $3,750 $3,750 $1,125 $3,650 $1,825 $1,455 $1,500 $5,625 $1,825 $1,875 $3,594 $1,825 $853 $1,500 $1,500 $5,000
$3,750 $3,750 $3,750 $3,750 $3,200 $3,750 $11,250 $3,750 $1,825 $1,725 $3,500 $853 $1,875 $5,625 $1,875 $3,750 $3,750 $1,875 $853 $2,250 $1,500 $1,875 $1,875 $1,875
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $2,500 $5,000 $2,500 $2,500 $2,500 $10,000 $2,500 $2,500 $5,000 $5,000 $1,500 $5,000 $2,500 $2,000 $2,000 $7,500 $2,500 $2,500 $5,000 $2,500 $1,000 $2,000 $2,000 $5,000
$5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $15,000 $5,000 $2,500 $2,500 $5,000 $1,000 $2,500 $7,500 $2,500 $5,000 $5,000 $2,500 $1,000 $2,500 $2,500 $2,500 $2,500 $2,500
Partially Terminated Violation(s): 1.
79
UP 2017-606(FCS)UP 2017-607(FCS)UP 2017-608(FCS)UP 2017-609(FCS)UP 2017-610(FCS)UP 2017-611(FCS)UP 2017-612(FCS)UP 2017-613(ROP)UP 2017-614(HSR)UP 2017-615(HSR)UP 2017-616(LI)UP 2017-617(HSR)UP 2017-618(HS)UP 2017-619(HS)UP 2017-620(HS)UP 2017-622(HS)UP 2017-623(SA)UP 2017-624(SA)UP 2017-625(SA)UP 2017-626(SA)UP 2017-627(SA)UP 2017-628(SA)UP 2017-629(SA)UP 2017-630(SA)UP 2017-631(HMT)UP 2017-632(SA)UP 2017-633(SA)UP 2017-634(FCS)UP 2017-635(FCS)UP 2017-636(SA)UP 2017-637(ROP)
UP 2017-638(ROP)UP 2017-639(SA)UP 2017-640(SA)UP 2017-641(SA)UP 2017-642(SA)UP 2017-643(SA)UP 2017-644(SA)UP 2017-645(SA)UP 2017-646(SA)UP 2017-647(SA)UP 2017-648(SA)UP 2017-649(SA)UP 2017-650(SA)UP 2017-651(SA)UP 2017-652(SA)UP 2017-653(SA)UP 2017-654(FCS)UP 2017-655(FCS)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1111111111112222111111111111111
111111111111111111
No. ofViolations
$2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $2,000 $1,000 $1,000 $2,500 $1,000 $2,000 $2,000 $2,000 $2,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $9,500
$2,000 $2,500 $2,500 $5,000 $2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $2,500 $2,500 $5,000 $2,500 $5,000 $5,000 $2,500 $2,500
PRCA
$1,875 $1,875 $1,875 $1,875 $1,875 $3,750 $1,875 $1,500 $853 $853 $1,875 $853 $1,706 $1,706 $1,706 $0 $3,750 $1,875 $1,875 $1,875 $1,875 $1,875 $3,750 $1,875 $3,750 $2,000 $2,000 $1,875 $1,875 $1,875 $4,500
$1,500 $1,875 $1,875 $3,750 $1,875 $1,875 $1,875 $4,000 $3,750 $3,750 $1,875 $1,875 $3,200 $1,600 $3,200 $3,750 $1,725 $1,875
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $2,000 $1,000 $1,000 $2,500 $1,000 $2,000 $2,000 $2,000 $0 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000
$2,000 $2,500 $2,500 $5,000 $2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $2,500 $2,500 $5,000 $2,500 $5,000 $5,000 $2,500 $2,500
Case Terminated.
Partially Terminated Violation(s): 1.
80
UP 2017-656(FCS)UP 2017-657(SA)UP 2017-658(SA)UP 2017-659(SA)UP 2017-660(FCS)UP 2017-661(FCS)UP 2017-662(FCS)UP 2017-663(FCS)UP 2017-664(FCS)UP 2017-665(FCS)UP 2017-666(FCS)UP 2017-667(FCS)UP 2017-668(FCS)UP 2017-669(FCS)UP 2017-670(FCS)UP 2017-671(FCS)UP 2017-672(FCS)UP 2017-673(FCS)UP 2017-674(FCS)UP 2017-675(FCS)UP 2017-677(SI)UP 2017-678(SI)UP 2017-679(LI)UP 2017-681(SI)UP 2017-682(SI)UP 2017-683(TS)UP 2017-684(TS)UP 2017-685(TS)UP 2017-686(SI)UP 2017-687(ROP)UP 2017-688(AR)UP 2017-689(ROP)UP 2017-690(LI)UP 2017-692(SA)UP 2017-693(SA)UP 2017-694(SA)UP 2017-695(SA)UP 2017-696(SA)UP 2017-697(SA)UP 2017-698(SA)UP 2017-699(LI)UP 2017-700(LI)UP 2017-701(TS)UP 2017-702(FCS)UP 2017-703(HMT)UP 2017-704(RW)UP 2017-705(HMT)UP 2017-706(FCS)UP 2017-707(FCS)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1111111111111111111111111111111111121111112121311
No. ofViolations
$5,000 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $2,500 $2,500 $5,000 $2,500 $2,500 $1,000 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $1,000 $2,500 $7,500 $1,000 $5,000 $1,500 $2,500 $2,500 $5,000 $5,000 $2,500 $5,000 $5,000 $2,000 $2,000 $10,000 $5,000 $11,500 $3,000 $14,500 $2,500 $2,500
PRCA
$3,750 $1,875 $3,750 $1,875 $1,875 $1,875 $1,875 $1,875 $1,875 $1,875 $1,875 $1,875 $1,875 $3,750 $1,875 $1,875 $1,875 $3,750 $1,725 $1,875 $853 $1,825 $1,875 $1,825 $1,825 $3,650 $3,650 $853 $1,875 $5,625 $853 $3,750 $1,125 $1,875 $0 $3,250 $3,750 $2,000 $3,750 $3,750 $1,500 $1,500 $8,000 $3,750 $8,625 $2,195 $10,500 $1,875 $1,875
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $2,500 $2,500 $5,000 $2,500 $2,500 $1,000 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $1,000 $2,500 $7,500 $1,000 $5,000 $1,500 $2,500 $0 $5,000 $5,000 $2,500 $5,000 $5,000 $2,000 $2,000 $10,000 $5,000 $11,500 $3,000 $14,500 $2,500 $2,500
Case Terminated.
81
UP 2017-708(FCS)UP 2017-709(FCS)UP 2017-710(FCS)UP 2017-711(SA)UP 2017-712(SI)UP 2017-713(SI)UP 2017-714(SI)UP 2017-715(SI)UP 2017-716(SA)UP 2017-717(SA)UP 2017-718(ROP)UP 2017-719(TS)UP 2017-720(LI)UP 2017-721(TS)UP 2017-722(LI)UP 2017-723(TS)UP 2017-724(TS)UP 2017-725(LI)UP 2017-726(LI)UP 2017-727(LI)UP 2017-728(LI)UP 2017-729(FCS)UP 2017-730(ROP)UP 2017-731(SA)UP 2017-732(SA)UP 2017-734(RMM)UP 2017-735(SA)UP 2017-736(ROP)UP 2017-737(ROP)UP 2017-738(ROP)UP 2017-739(ROP)UP 2017-740(LI)UP 2017-741(SA)UP 2017-742(SA)UP 2017-743(SA)
UP 2017-744(FCS)UP 2017-745(FCS)UP 2017-746(FCS)UP 2017-748(SI)UP 2017-749(SA)UP 2017-750(ROP)UP 2017-751(ROP)
UP 2017-752(HSR)UP 2017-753(TS)UP 2017-754(LI)UP 2017-755(TS)UP 2017-756(HS)UP 2017-758(LI)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
11111111111111111111111111111111111
1111111
121121
No. ofViolations
$2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $7,500 $2,500 $1,500 $5,000 $2,500 $1,000 $5,000 $2,000 $2,000 $2,000 $2,500 $5,000 $2,000 $5,000 $2,500 $2,500 $2,500 $2,000 $2,000 $2,000 $9,500 $2,500 $5,000 $5,000 $5,000
$5,000 $2,500 $2,500 $1,000 $2,500 $7,500 $9,500
$1,000 $7,500 $2,500 $1,000 $2,000 $2,500
PRCA
$1,875 $1,875 $1,875 $1,725 $1,875 $1,825 $1,875 $1,875 $3,750 $1,875 $5,625 $1,825 $1,125 $3,650 $1,875 $853 $3,750 $1,500 $1,500 $1,500 $1,875 $3,750 $1,500 $3,750 $1,875 $1,875 $1,875 $1,500 $1,500 $1,500 $7,125 $1,875 $3,750 $3,750 $2,500
$3,750 $1,875 $1,875 $853 $1,875 $4,500 $4,500
$853 $5,625 $1,875 $853 $1,706 $1,875
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $7,500 $2,500 $1,500 $5,000 $2,500 $1,000 $5,000 $2,000 $2,000 $2,000 $2,500 $5,000 $2,000 $5,000 $2,500 $2,500 $2,500 $2,000 $2,000 $2,000 $9,500 $2,500 $5,000 $5,000 $2,500
$5,000 $2,500 $2,500 $1,000 $2,500 $7,500 $5,000
$1,000 $7,500 $2,500 $1,000 $2,000 $2,500
Partially Terminated Violation(s): 1.
Partially Terminated Violation(s): 1.
82
UP 2017-759(LI)UP 2017-760(FCS)UP 2017-761(TS)UP 2017-762(HS)UP 2017-763(EQ)UP 2017-764(LI)UP 2017-765(LI)UP 2017-766(SA)UP 2017-767(SA)UP 2017-768(SA)UP 2017-769(SA)UP 2017-770(HS)UP 2017-771(SI)UP 2017-773(LI)UP 2017-774(TH)UP 2017-775(SA)UP 2017-776(ROP)UP 2017-777(TS)UP 2017-778(LI)UP 2017-779(SA)UP 2017-780(ROP)
UP 2017-781(ROP)UP 2017-782(ROP)UP 2017-783(SA)UP 2017-784(SA)UP 2017-785(SA)UP 2017-786(FCS)UP 2017-787(SA)UP 2017-788(SA)UP 2017-789(SA)UP 2017-790(SA)UP 2017-791(SA)UP 2017-792(SA)UP 2017-793(SA)UP 2017-794(LI)UP 2017-795(LI)UP 2017-796(LI)UP 2017-797(LI)UP 2017-798(LI)UP 2017-799(ROP)UP 2017-800(SA)UP 2017-801(HMT)UP 2017-802(SA)UP 2017-803(SA)UP 2017-804(SA)UP 2017-805(LI)UP 2017-806(HMT)UP 2017-807(HMT)UP 2017-808(GC)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1112111111111211111111
1112111111112221111111111111
No. ofViolations
$5,000 $5,000 $5,000 $2,000 $1,000 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $1,000 $12,000 $2,500 $5,000 $2,500 $7,500 $2,500 $2,500 $5,000 $7,500
$2,000 $2,000 $5,000 $5,000 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $3,500 $2,500 $2,500 $2,500 $7,500 $5,000 $2,000 $5,000 $2,500 $2,500 $1,000 $2,000 $4,000 $5,000
PRCA
$3,750 $3,750 $3,750 $1,706 $853 $1,875 $1,875 $1,875 $1,875 $4,000 $3,750 $853 $8,400 $1,875 $3,595 $1,875 $5,625 $1,875 $1,875 $3,750 $1,400
$1,500 $1,400 $3,750 $4,500 $1,875 $3,750 $1,875 $1,875 $1,875 $1,875 $1,875 $1,875 $3,750 $3,750 $2,625 $1,875 $1,875 $1,875 $4,500 $3,750 $1,500 $3,750 $1,875 $1,875 $853 $1,500 $3,000 $3,750
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $5,000 $5,000 $2,000 $1,000 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $1,000 $12,000 $2,500 $5,000 $2,500 $7,500 $2,500 $2,500 $5,000 $2,000
$2,000 $2,000 $5,000 $5,000 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $3,500 $2,500 $2,500 $2,500 $7,500 $5,000 $2,000 $5,000 $2,500 $2,500 $1,000 $2,000 $4,000 $5,000
Partially Terminated Violation(s): 1.
83
UP 2017-809(GC)UP 2017-810(SA)UP 2017-811(ROP)UP 2017-813(ROP)UP 2017-814(ROP)UP 2017-815(AR)UP 2017-816(TS)UP 2017-818(TS)UP 2017-819(TS)UP 2017-820(HSR)UP 2017-821(HSR)UP 2017-823(HSR)UP 2017-824(HSR)UP 2017-825(SI)UP 2017-826(SI)UP 2017-829(HMT)UP 2017-830(SI)UP 2017-831(TS)UP 2017-832(ROP)UP 2017-833(HMT)UP 2017-834(HMT)UP 2017-835(TS)UP 2017-836(HMT)UP 2017-837(SA)
UP 2017-838(SA)UP 2017-839(SA)
UP 2017-840(FCS)UP 2017-841(SA)UP 2017-842(SA)UP 2017-843(SA)UP 2017-844(SA)UP 2017-845(LI)UP 2017-846(TS)UP 2017-847(TS)UP 2017-848(TS)UP 2017-849(GC)UP 2017-850(SA)UP 2017-851(LI)UP 2017-852(SA)UP 2017-853(SA)UP 2017-854(SA)UP 2017-855(TS)UP 2017-856(TS)UP 2017-857(TS)UP 2017-859(SA)UP 2017-860(SA)UP 2017-861(ROP)UP 2017-862(ROP)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
09/28/201809/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
111111111121111111112111
11
1111111121111112111111
No. ofViolations
$5,000 $5,000 $7,500 $2,000 $2,000 $2,500 $5,000 $2,500 $5,000 $1,000 $2,000 $1,000 $1,000 $2,500 $2,500 $5,000 $1,000 $5,000 $7,500 $2,500 $5,000 $2,500 $5,000 $5,000
$2,500 $5,000
$5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $2,500 $2,500 $5,000 $5,000 $7,500 $2,500 $2,500 $5,000 $2,500 $7,500 $2,000
PRCA
$3,750 $2,700 $5,625 $1,500 $1,500 $1,875 $3,750 $1,875 $3,750 $853 $1,706 $853 $853 $1,250 $1,250 $3,800 $853 $3,750 $5,625 $1,875 $3,750 $1,875 $3,750 $2,500
$1,875 $2,500
$3,750 $3,750 $3,750 $3,750 $3,750 $1,825 $1,875 $1,875 $3,750 $853 $4,500 $1,825 $1,875 $3,750 $3,750 $5,625 $1,875 $1,875 $3,750 $1,875 $5,625 $1,500
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $5,000 $7,500 $2,000 $2,000 $2,500 $5,000 $2,500 $5,000 $1,000 $2,000 $1,000 $1,000 $2,500 $2,500 $5,000 $1,000 $5,000 $7,500 $2,500 $5,000 $2,500 $5,000 $2,500
$2,500 $2,500
$5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $5,000 $5,000 $5,000 $2,500 $2,500 $5,000 $5,000 $7,500 $2,500 $2,500 $5,000 $2,500 $7,500 $2,000
Partially Terminated Violation(s): 1.
Partially Terminated Violation(s): 1.
84
UP 2017-863(FCS)UP 2017-864(FCS)UP 2017-865(SA)UP 2017-866(SA)UP 2017-867(FCS)UP 2017-868(FCS)UP 2017-869(FCS)UP 2017-870(FCS)UP 2017-871(FCS)UP 2017-872(SA)UP 2017-873(SA)UP 2017-874(TS)UP 2017-875(HMT)UP 2017-876(HMT)UP 2017-878(TS)UP 2017-879(ROP)UP 2017-881(SA)UP 2017-882(SA)UP 2017-883(SA)UP 2017-884(SA)UP 2017-885(HS)UP 2017-886(HS)UP 2017-887(HS)UP 2017-888(HS)UP 2017-890(HS)UP 2017-891(ROP)UP 2017-892(FCS)UP 2017-893(ROP)UP 2017-895(SA)UP 2017-896(SA)UP 2017-897(SA)UP 2017-898(SA)UP 2017-899(SA)UP 2017-900(FCS)UP 2017-901(FCS)UP 2017-902(LI)UP 2017-903(SI)UP 2017-904(RSP)UP 2017-905(LI)UP 2017-906(FCS)UP 2017-907(ROP)UP 2017-908(SA)UP 2017-909(LI)UP 2017-911(SA)UP 2017-912(SI)UP 2017-913(SI)UP 2017-914(ROP)UP 2017-915(ROP)UP 2017-916(ROP)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1111111111116391111122232111111111111111111111111
No. ofViolations
$2,500 $2,500 $2,500 $5,000 $5,000 $2,500 $2,500 $2,500 $5,000 $5,000 $2,500 $2,500 $26,000 $6,000 $9,000 $7,500 $5,000 $5,000 $5,000 $5,000 $2,000 $2,000 $2,000 $3,000 $2,000 $7,500 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $1,000 $5,000 $9,500 $2,500 $2,500 $7,500 $5,000 $2,500 $5,000 $2,500 $2,500 $7,500 $2,000 $2,000
PRCA
$1,875 $1,875 $1,875 $3,750 $3,750 $1,875 $1,875 $1,875 $3,750 $3,750 $1,875 $1,875 $20,000 $4,800 $7,680 $5,625 $3,750 $3,750 $3,750 $3,750 $0 $1,706 $1,706 $2,559 $1,706 $5,625 $3,750 $3,750 $3,750 $1,875 $1,875 $1,875 $1,875 $1,875 $1,875 $853 $3,750 $7,125 $1,825 $1,875 $5,625 $2,125 $1,450 $3,750 $1,750 $1,750 $5,625 $1,500 $1,500
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $2,500 $2,500 $5,000 $5,000 $2,500 $2,500 $2,500 $5,000 $5,000 $2,500 $2,500 $26,000 $6,000 $9,000 $7,500 $5,000 $5,000 $5,000 $5,000 $0 $2,000 $2,000 $3,000 $2,000 $7,500 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $1,000 $5,000 $9,500 $2,500 $2,500 $7,500 $5,000 $2,500 $5,000 $2,500 $2,500 $7,500 $2,000 $2,000
Case Terminated.
85
UP 2017-917(SI)UP 2017-918(SA)UP 2017-919(LI)UP 2017-920(SA)UP 2017-921(ROP)UP 2017-922(ROP)UP 2017-923(ROP)UP 2017-924(ROP)
UP 2017-925(TS)UP 2017-926(TS)UP 2017-927(SA)UP 2017-928(SA)UP 2017-929(SI)UP 2017-930(SI)UP 2017-931(ROP)UP 2017-932(ROP)UP 2017-933(SA)UP 2017-934(SA)UP 2017-935(SA)UP 2017-936(SA)UP 2017-937(SA)UP 2017-938(HSR)UP 2017-939(LI)UP 2017-940(HSR)UP 2017-941(HSR)UP 2017-942(HSR)UP 2017-943(HSR)UP 2017-944(HSR)UP 2017-945(HSR)UP 2017-946(HSR)UP 2017-947(HSR)UP 2017-948(HSR)UP 2017-949(LI)UP 2017-950(EP)UP 2017-951(SA)UP 2017-952(SA)UP 2017-953(SI)UP 2017-954(SA)UP 2017-955(ROP)UP 2017-956(SA)UP 2017-957(TS)UP 2017-958(SA)UP 2017-959(HMT)UP 2017-960(SA)UP 2017-961(SA)UP 2017-962(SA)UP 2017-963(SA)UP 2017-964(CC)UP 2017-965(SA)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
11111111
61111111111111111111111111111111111111111
No. ofViolations
$2,500 $5,000 $2,500 $2,500 $5,000 $2,000 $7,500 $9,500
$30,000 $1,000 $2,500 $2,500 $1,000 $1,000 $2,000 $2,000 $5,000 $5,000 $5,000 $5,000 $5,000 $1,000 $2,500 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $2,500 $1,000 $5,000 $5,000 $2,500 $2,500 $9,500 $2,500 $2,500 $5,000 $4,000 $5,000 $5,000 $5,000 $5,000 $4,000 $5,000
PRCA
$1,875 $3,750 $1,825 $1,875 $3,750 $1,500 $5,625 $5,000
$22,500 $853 $1,875 $1,875 $853 $853 $1,500 $1,500 $3,750 $3,750 $3,750 $3,750 $3,750 $853 $1,825 $853 $853 $853 $853 $853 $853 $853 $853 $853 $1,825 $853 $3,750 $3,750 $1,875 $1,875 $7,125 $1,875 $1,875 $3,750 $3,000 $3,750 $3,750 $3,750 $3,750 $3,000 $3,750
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $5,000 $2,500 $2,500 $5,000 $2,000 $7,500 $5,000
$30,000 $1,000 $2,500 $2,500 $1,000 $1,000 $2,000 $2,000 $5,000 $5,000 $5,000 $5,000 $5,000 $1,000 $2,500 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $2,500 $1,000 $5,000 $5,000 $2,500 $2,500 $9,500 $2,500 $2,500 $5,000 $4,000 $5,000 $5,000 $5,000 $5,000 $4,000 $5,000
Partially Terminated Violation(s): 1.
86
UP 2017-966(SA)UP 2017-967(SA)UP 2017-968(SA)UP 2017-969(SA)UP 2017-970(SA)UP 2017-971(SA)UP 2017-972(SA)UP 2017-973(SA)UP 2017-974(SA)UP 2017-975(EP)UP 2017-976(EP)UP 2017-977(SA)UP 2017-978(SA)UP 2017-979(SA)UP 2017-980(LI)UP 2017-981(LI)UP 2017-982(GC)UP 2017-983(TS)UP 2017-984(FCS)UP 2017-985(FCS)UP 2017-986(FCS)UP 2017-987(FCS)UP 2017-988(FCS)UP 2017-989(FCS)UP 2017-990(EQ)UP 2017-991(LI)UP 2017-992(LI)UP 2017-993(SA)UP 2017-994(SA)UP 2017-995(SA)UP 2017-997(FCS)UP 2017-998(FCS)UP 2017-999(SA)UP 2017-1000(GC)UP 2017-1001(ROP)UP 2017-1002(CC)UP 2017-1003(ROP)UP 2017-1004(SA)UP 2017-1005(SA)UP 2017-1006(SA)UP 2017-1007(SA)UP 2017-1008(SA)UP 2017-1009(SA)UP 2017-1010(SA)UP 2017-1011(SA)UP 2017-1012(SA)UP 2017-1013(FCS)UP 2017-1014(LI)UP 2017-1015(LI)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1111111111111111111111111111111111111111111111111
No. ofViolations
$5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $5,000 $2,500 $2,500 $1,000 $1,000 $2,500 $2,500 $5,000 $2,500 $2,500 $5,000 $5,000 $2,500 $2,500 $2,500 $5,000 $2,500 $5,000 $5,000 $2,500 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $2,000 $4,000 $5,000 $2,500 $10,000 $10,000 $2,500 $2,500 $5,000 $5,000 $2,500 $2,500 $2,500 $1,500 $1,500
PRCA
$3,750 $3,750 $3,750 $3,750 $1,875 $1,875 $3,750 $1,875 $1,875 $853 $853 $1,875 $1,875 $3,750 $1,825 $1,825 $3,750 $3,750 $1,775 $1,875 $1,875 $3,750 $1,875 $3,750 $3,750 $1,825 $1,450 $3,750 $1,875 $1,875 $1,875 $1,875 $3,750 $1,875 $1,500 $3,000 $3,750 $1,875 $7,000 $7,000 $1,875 $1,875 $3,750 $3,750 $1,875 $1,875 $1,875 $1,085 $1,085
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $5,000 $2,500 $2,500 $1,000 $1,000 $2,500 $2,500 $5,000 $2,500 $2,500 $5,000 $5,000 $2,500 $2,500 $2,500 $5,000 $2,500 $5,000 $5,000 $2,500 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $2,000 $4,000 $5,000 $2,500 $10,000 $10,000 $2,500 $2,500 $5,000 $5,000 $2,500 $2,500 $2,500 $1,500 $1,500
87
UP 2017-1016(LI)UP 2017-1017(SA)UP 2017-1018(SA)UP 2017-1019(SA)UP 2017-1020(SA)UP 2017-1022(SA)UP 2017-1023(SA)UP 2017-1024(SA)UP 2017-1025(SA)UP 2017-1026(SA)UP 2017-1027(FCS)UP 2017-1028(LI)UP 2017-1029(LI)UP 2017-1030(LI)UP 2017-1031(SA)UP 2017-1032(SA)UP 2017-1033(SA)UP 2017-1034(FCS)UP 2017-1035(ROP)UP 2017-1036(ROP)UP 2017-1037(FCS)UP 2017-1038(SA)UP 2017-1039(SA)UP 2017-1040(SA)UP 2017-1042(FCS)UP 2017-1043(SA)UP 2017-1044(SA)UP 2017-1045(GC)UP 2017-1047(TS)UP 2017-1048(TS)UP 2017-1049(TS)UP 2017-1050(TS)UP 2017-1051(SA)UP 2017-1052(SA)UP 2017-1053(FCS)UP 2017-1054(SA)UP 2017-1055(SA)UP 2017-1056(FCS)UP 2017-1057(FCS)UP 2017-1058(SA)UP 2017-1059(SA)UP 2017-1060(TS)UP 2017-1061(LI)UP 2017-1062(LI)UP 2017-1063(LI)UP 2017-1064(LI)UP 2017-1065(LI)UP 2017-1066(LI)UP 2017-1067(TS)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
11111111111111111111111111111111211111111111211111
No. ofViolations
$2,500 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $1,000 $2,500 $5,000 $2,500 $2,500 $2,500 $5,000 $5,000 $2,500 $5,000 $2,000 $7,500 $2,500 $2,500 $2,500 $5,000 $2,500 $5,000 $5,000 $5,000 $2,500 $5,000 $5,000 $16,500 $5,000 $2,500 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $5,000 $1,000 $2,500 $5,000 $2,500 $2,500 $2,500 $1,000 $5,000
PRCA
$1,825 $3,750 $3,750 $3,750 $3,750 $1,875 $1,875 $1,875 $853 $1,875 $3,750 $1,450 $1,825 $1,825 $3,750 $3,750 $1,875 $3,750 $1,500 $5,625 $1,875 $1,875 $1,875 $3,750 $1,875 $3,750 $3,750 $3,750 $1,875 $3,750 $3,750 $12,375 $3,750 $1,875 $1,875 $3,750 $1,875 $1,875 $1,875 $1,875 $3,750 $853 $1,825 $3,675 $1,825 $1,825 $1,825 $853 $3,650
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $1,000 $2,500 $5,000 $2,500 $2,500 $2,500 $5,000 $5,000 $2,500 $5,000 $2,000 $7,500 $2,500 $2,500 $2,500 $5,000 $2,500 $5,000 $5,000 $5,000 $2,500 $5,000 $5,000 $16,500 $5,000 $2,500 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $5,000 $1,000 $2,500 $5,000 $2,500 $2,500 $2,500 $1,000 $5,000
88
UP 2017-1068(ROP)UP 2017-1069(ROP)UP 2017-1070(ROP)UP 2017-1071(ROP)UP 2017-1072(SA)UP 2017-1073(SA)UP 2017-1074(SA)UP 2017-1076(SA)UP 2017-1077(SA)UP 2017-1078(SA)UP 2017-1079(SA)UP 2017-1080(HMT)UP 2018-1(HMT)UP 2018-2(SA)UP 2018-3(LI)UP 2018-4(LI)UP 2018-5(LI)UP 2018-6(SA)UP 2018-7(SA)UP 2018-8(FCS)UP 2018-9(SI)UP 2018-10(SA)UP 2018-11(SA)UP 2018-12(LI)UP 2018-13(TS)UP 2018-14(ROP)UP 2018-15(ROP)UP 2018-17(SA)UP 2018-18(SA)UP 2018-19(SA)UP 2018-21(TS)UP 2018-22(RW)UP 2018-23(TS)UP 2018-24(ROP)UP 2018-25(ROP)UP 2018-26(ROP)UP 2018-27(SA)UP 2018-28(ROP)UP 2018-29(TS)UP 2018-31(LI)UP 2018-32(LI)UP 2018-33(LI)UP 2018-34(ROP)UP 2018-35(ROP)UP 2018-37(SA)UP 2018-38(SA)UP 2018-39(SA)UP 2018-40(SA)UP 2018-41(SA)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1111111111111111111111112111111151111111111111411
No. ofViolations
$7,500 $2,000 $2,000 $2,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $7,000 $2,000 $2,500 $1,500 $1,000 $2,500 $2,500 $5,000 $2,500 $2,500 $5,000 $5,000 $2,500 $7,500 $2,000 $2,000 $2,500 $5,000 $5,000 $5,000 $3,000 $5,000 $2,000 $7,500 $2,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $2,000 $2,000 $2,500 $5,000 $17,500 $5,000 $2,500
PRCA
$5,625 $1,500 $1,500 $1,500 $3,750 $3,750 $3,750 $3,750 $3,750 $3,750 $3,750 $5,250 $1,500 $1,875 $1,085 $853 $1,825 $1,875 $3,750 $1,875 $1,750 $3,750 $3,750 $1,825 $5,500 $1,500 $1,500 $1,875 $3,750 $3,650 $3,650 $2,250 $4,265 $1,500 $5,625 $1,500 $3,650 $3,750 $3,650 $1,825 $1,825 $1,825 $1,500 $1,500 $1,800 $3,650 $12,900 $3,650 $1,800
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$7,500 $2,000 $2,000 $2,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $7,000 $2,000 $2,500 $1,500 $1,000 $2,500 $2,500 $5,000 $2,500 $2,500 $5,000 $5,000 $2,500 $7,500 $2,000 $2,000 $2,500 $5,000 $5,000 $5,000 $3,000 $5,000 $2,000 $7,500 $2,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $2,000 $2,000 $2,500 $5,000 $17,500 $5,000 $2,500
89
UP 2018-42(FCS)UP 2018-43(HMT)UP 2018-44(ROP)UP 2018-45(ROP)UP 2018-47(ROP)UP 2018-48(HS)UP 2018-49(HS)
UP 2018-50(SA)UP 2018-52(SA)UP 2018-53(SA)UP 2018-54(ROP)UP 2018-55(LI)UP 2018-57(SA)UP 2018-58(HS)UP 2018-59(AR)UP 2018-60(LI)UP 2018-62(SA)UP 2018-63(SA)UP 2018-64(FCS)UP 2018-65(FCS)UP 2018-67(EQ)UP 2018-68(TS)UP 2018-69(LI)UP 2018-70(FCS)UP 2018-72(SA)UP 2018-73(SA)UP 2018-74(SA)UP 2018-75(SA)UP 2018-77(HMT)UP 2018-78(SA)UP 2018-79(SA)UP 2018-80(SA)UP 2018-82(SA)UP 2018-83(SA)UP 2018-84(SA)UP 2018-85(SA)UP 2018-87(SA)UP 2018-88(LI)UP 2018-89(LI)UP 2018-90(LI)UP 2018-92(LI)UP 2018-93(SA)UP 2018-94(FCS)UP 2018-95(SA)UP 2018-97(FCS)UP 2018-98(LI)UP 2018-99(LI)UP 2018-102(SA)UP 2018-103(SA)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1111124
111111211111111111111311111111111111131111
No. ofViolations
$2,500 $2,500 $5,000 $7,500 $2,000 $2,000 $4,000
$5,000 $2,500 $5,000 $7,500 $2,500 $5,000 $2,000 $1,000 $2,500 $2,500 $5,000 $2,500 $2,500 $5,000 $1,000 $1,000 $2,500 $5,000 $5,000 $2,500 $2,500 $14,000 $2,500 $5,000 $5,000 $2,500 $2,500 $5,000 $5,000 $5,000 $2,500 $1,500 $2,500 $2,500 $2,500 $5,000 $5,000 $6,000 $2,500 $2,500 $2,500 $2,500
PRCA
$1,875 $1,875 $3,750 $5,625 $1,500 $1,706 $1,706
$3,650 $1,800 $3,650 $5,625 $1,825 $3,650 $1,706 $853 $1,825 $1,800 $3,650 $1,875 $1,875 $3,750 $853 $853 $1,875 $3,650 $3,650 $1,800 $1,800 $10,500 $1,800 $3,650 $3,650 $1,800 $1,800 $3,650 $3,650 $3,650 $1,825 $1,085 $1,825 $1,825 $1,800 $3,750 $3,650 $4,500 $1,825 $1,825 $1,800 $1,800
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $2,500 $5,000 $7,500 $2,000 $2,000 $2,000
$5,000 $2,500 $5,000 $7,500 $2,500 $5,000 $2,000 $1,000 $2,500 $2,500 $5,000 $2,500 $2,500 $5,000 $1,000 $1,000 $2,500 $5,000 $5,000 $2,500 $2,500 $14,000 $2,500 $5,000 $5,000 $2,500 $2,500 $5,000 $5,000 $5,000 $2,500 $1,500 $2,500 $2,500 $2,500 $5,000 $5,000 $6,000 $2,500 $2,500 $2,500 $2,500
Partially Terminated Violation(s): 1.
90
UP 2018-104(SA)UP 2018-105(SA)UP 2018-107(HMT)UP 2018-108(HMT)UP 2018-109(HMT)UP 2018-112(SI)UP 2018-113(FCS)UP 2018-114(HMT)UP 2018-117(CC)UP 2018-118(TS)UP 2018-119(TS)UP 2018-120(TS)UP 2018-122(TS)UP 2018-124(FCS)UP 2018-127(FCS)UP 2018-128(TS)UP 2018-129(SA)UP 2018-130(TS)UP 2018-132(AR)UP 2018-134(FCS)UP 2018-135(ROP)UP 2018-137(SA)UP 2018-138(SA)UP 2018-139(SA)UP 2018-140(SA)UP 2018-142(SA)UP 2018-144(SA)UP 2018-145(SA)UP 2018-147(FCS)UP 2018-149(FCS)UP 2018-150(LI)UP 2018-152(SI)UP 2018-153(SI)UP 2018-154(ROP)UP 2018-155(HMT)UP 2018-157(TS)UP 2018-159(LI)UP 2018-160(LI)UP 2018-162(ROP)UP 2018-164(SA)UP 2018-165(SA)UP 2018-167(SA)UP 2018-168(ROP)UP 2018-169(ROP)UP 2018-170(ROP)UP 2018-172(FCS)UP 2018-173(SA)UP 2018-174(ROP)UP 2018-176(SA)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
11111111111111111111111111111111111101111111111111
No. ofViolations
$2,500 $2,500 $4,000 $7,500 $7,500 $2,500 $2,500 $4,000 $4,000 $2,500 $1,000 $2,500 $2,500 $5,000 $5,000 $2,500 $2,500 $5,000 $1,000 $5,000 $2,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $1,000 $2,500 $2,000 $4,000 $14,500 $2,500 $2,500 $7,500 $2,500 $5,000 $2,500 $9,500 $5,000 $2,000 $2,500 $2,500 $7,500 $2,500
PRCA
$1,800 $1,800 $3,000 $5,650 $5,650 $1,875 $1,875 $3,000 $3,000 $1,800 $853 $1,800 $1,800 $3,750 $3,750 $1,800 $1,800 $3,650 $853 $3,750 $1,400 $3,650 $3,650 $3,650 $1,800 $1,800 $1,800 $1,800 $1,875 $3,750 $1,825 $853 $1,875 $1,500 $3,000 $10,680 $1,825 $1,825 $5,625 $1,800 $3,650 $1,800 $6,655 $3,000 $1,500 $1,875 $1,800 $5,250 $1,800
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $2,500 $4,000 $7,500 $7,500 $2,500 $2,500 $4,000 $4,000 $2,500 $1,000 $2,500 $2,500 $5,000 $5,000 $2,500 $2,500 $5,000 $1,000 $5,000 $2,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $1,000 $2,500 $2,000 $4,000 $14,500 $2,500 $2,500 $7,500 $2,500 $5,000 $2,500 $9,500 $5,000 $2,000 $2,500 $2,500 $7,500 $2,500
91
UP 2018-177(SA)UP 2018-178(SA)UP 2018-179(SA)UP 2018-181(LI)UP 2018-182(TS)UP 2018-183(SA)UP 2018-184(SA)UP 2018-186(ROP)UP 2018-187(SA)UP 2018-188(LI)UP 2018-189(SA)UP 2018-191(HS)UP 2018-192(HS)UP 2018-193(HMT)UP 2018-196(SA)UP 2018-197(SA)UP 2018-198(SA)UP 2018-199(SA)UP 2018-201(SA)UP 2018-202(SA)UP 2018-203(SA)UP 2018-206(ROP)UP 2018-207(ROP)UP 2018-208(FCS)UP 2018-209(ROP)UP 2018-211(CC)UP 2018-212(ROP)UP 2018-213(ROP)UP 2018-214(ROP)UP 2018-216(HMT)UP 2018-217(SA)UP 2018-218(SA)UP 2018-219(SA)UP 2018-221(TS)UP 2018-222(LI)UP 2018-224(LI)UP 2018-225(TS)UP 2018-226(SI)UP 2018-227(SI)UP 2018-229(GC)UP 2018-230(LI)UP 2018-231(LI)UP 2018-232(LI)UP 2018-234(TS)UP 2018-235(TS)UP 2018-236(SA)UP 2018-237(HMT)UP 2018-239(ROP)UP 2018-240(ROP)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1211111111121211111111111111111114111111111211111
No. ofViolations
$2,500 $5,000 $2,500 $2,500 $5,000 $5,000 $5,000 $2,000 $5,000 $2,500 $5,000 $2,000 $1,000 $10,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $2,000 $2,000 $5,000 $7,500 $4,000 $7,500 $7,500 $7,500 $7,500 $2,500 $10,000 $5,000 $15,000 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $2,500 $2,500 $2,500 $5,000 $2,500 $2,500 $2,000 $9,500 $7,500
PRCA
$1,800 $3,650 $1,800 $1,825 $3,650 $3,650 $3,650 $1,500 $3,650 $1,825 $3,650 $1,706 $853 $7,500 $3,650 $3,650 $3,650 $3,650 $3,650 $3,650 $3,650 $853 $1,400 $3,750 $5,625 $3,000 $5,625 $5,625 $5,625 $5,650 $1,800 $7,350 $3,650 $11,050 $1,825 $1,825 $1,800 $1,500 $3,750 $4,000 $1,825 $1,825 $1,825 $3,650 $1,800 $1,800 $1,500 $6,650 $5,625
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $5,000 $2,500 $2,500 $5,000 $5,000 $5,000 $2,000 $5,000 $2,500 $5,000 $2,000 $1,000 $10,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $2,000 $2,000 $5,000 $7,500 $4,000 $7,500 $7,500 $7,500 $7,500 $2,500 $10,000 $5,000 $15,000 $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 $2,500 $2,500 $2,500 $5,000 $2,500 $2,500 $2,000 $9,500 $7,500
92
UP 2018-241(SA)UP 2018-242(SA)UP 2018-244(CC)UP 2018-245(CC)UP 2018-246(FCS)UP 2018-247(CC)UP 2018-249(CC)UP 2018-250(ROP)UP 2018-251(FCS)UP 2018-252(FCS)UP 2018-254(FCS)UP 2018-255(FCS)UP 2018-256(FCS)UP 2018-257(SI)UP 2018-258(TS)UP 2018-259(TS)UP 2018-260(SA)UP 2018-262(SA)UP 2018-263(SA)UP 2018-264(SA)UP 2018-265(SA)UP 2018-267(SA)UP 2018-268(SA)UP 2018-269(SA)UP 2018-270(SA)UP 2018-272(SA)UP 2018-273(SA)UP 2018-274(SA)UP 2018-275(SA)UP 2018-277(SA)UP 2018-278(SA)UP 2018-279(SA)UP 2018-280(SA)UP 2018-282(ROP)UP 2018-283(SA)UP 2018-284(SA)UP 2018-285(HMT)UP 2018-287(SA)UP 2018-290(SA)UP 2018-291(SA)UP 2018-292(FCS)UP 2018-295(HMT)UP 2018-296(SI)UP 2018-297(SA)UP 2018-300(TS)UP 2018-301(HSR)UP 2018-302(HSR)UP 2018-305(SA)UP 2018-306(SA)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/2018
SettlementDate Comments
1111111111111111111111111111111111111111111111111
No. ofViolations
$5,000 $10,000 $4,000 $4,000 $2,500 $4,000 $4,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $2,500 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $5,000 $2,500 $5,000 $5,000 $2,500 $2,500 $2,500 $2,500 $9,500 $5,000 $5,000 $7,500 $2,500 $2,500 $2,500 $2,500 $7,000 $2,500 $5,000 $2,500 $1,000 $1,000 $2,500 $5,000
PRCA
$3,650 $7,350 $3,000 $3,000 $1,875 $3,000 $3,000 $3,750 $1,875 $1,875 $1,875 $1,875 $1,875 $3,750 $1,800 $1,800 $3,650 $3,650 $3,650 $3,650 $3,650 $3,650 $1,800 $1,800 $1,800 $3,650 $1,800 $3,650 $4,000 $1,800 $1,800 $1,800 $1,800 $6,655 $3,650 $3,650 $5,650 $1,800 $1,800 $1,800 $1,875 $5,250 $1,750 $3,650 $1,800 $853 $853 $1,800 $3,650
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $10,000 $4,000 $4,000 $2,500 $4,000 $4,000 $5,000 $2,500 $2,500 $2,500 $2,500 $2,500 $5,000 $2,500 $2,500 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $2,500 $2,500 $2,500 $5,000 $2,500 $5,000 $5,000 $2,500 $2,500 $2,500 $2,500 $9,500 $5,000 $5,000 $7,500 $2,500 $2,500 $2,500 $2,500 $7,000 $2,500 $5,000 $2,500 $1,000 $1,000 $2,500 $5,000
93
UP 2018-307(SA)UP 2018-310(SA)UP 2018-311(SA)UP 2018-312(SA)UP 2018-315(FCS)UP 2018-316(ROP)UP 2018-317(ROP)UP 2018-320(ROP)UP 2018-321(TS)UP 2018-322(TS)UP 2018-327(TS)UP 2018-330(TS)UP 2018-331(LI)UP 2018-334(LI)UP 2018-336(TS)UP 2018-339(SA)UP 2018-340(SA)UP 2018-344(HS)UP 2018-346(HS)UP 2018-349(HS)UP 2018-351(HS)UP 2018-354(HS)UP 2018-474(SI)VR 2018-1(ROP)VSOR 2017-1(AR)WATX 2017-3(SA)WATX 2017-4(GC)WATX 2017-5(SA)WATX 2017-6(SA)WE 2017-2(RW)WE 2017-3(AD)WE 2017-4(ROR)WHIR 2018-1(HMT)WNYP 2018-1(HMT)WPRR 2017-1(SA)WPRR 2017-2(SA)WSS 2017-1(AD)WTJR 2018-1(SA)WTLC 2015-19(AD)WTLC 2016-7(AR)WTLC 2016-8(AR)WTLC 2016-9(AR)WVC 2017-1(ROR)WW 2018-1(FCS)XAHM 2018-1(HMT)XAIR 2018-1(HMT)XAMA 2017-1(SA)XAMA 2017-2(SA)XAWS 2017-2(BW)
FRA No.
09/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201809/28/201808/24/201809/27/201809/24/201809/24/201809/24/201809/24/201809/24/201802/27/201802/27/201802/27/201809/07/201808/28/201809/27/201809/27/201805/29/201803/05/201804/25/201804/25/201804/25/201804/25/201810/31/201705/23/201805/03/201804/17/201802/13/201802/13/201805/01/2018
SettlementDate Comments
11111111217311221113322111111112111111111111111111
No. ofViolations
$2,500 $2,500 $5,000 $5,000 $5,000 $2,000 $2,000 $7,500 $7,500 $5,000 $17,500 $15,000 $2,500 $2,500 $44,000 $5,000 $5,000 $1,000 $3,000 $3,000 $2,000 $2,000 $27,904 $2,000 $2,500 $2,500 $5,000 $2,500 $2,500 $1,000 $5,000 $7,500 $2,000 $2,000 $5,000 $5,000 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $7,500 $2,500 $2,000 $2,000 $5,000 $5,000 $2,500
PRCA
$1,800 $1,800 $3,650 $3,650 $3,750 $1,500 $1,500 $5,625 $5,500 $3,650 $12,900 $11,050 $1,825 $1,825 $31,895 $3,650 $3,650 $853 $2,559 $2,559 $1,706 $1,706 $25,113 $1,600 $1,750 $1,750 $3,250 $1,500 $1,500 $925 $4,000 $6,150 $2,000 $1,200 $3,950 $3,950 $1,900 $4,000 $1,800 $1,500 $1,500 $1,500 $5,000 $1,300 $1,300 $2,000 $3,500 $3,000 $2,500
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $2,500 $5,000 $5,000 $5,000 $2,000 $2,000 $7,500 $7,500 $5,000 $17,500 $15,000 $2,500 $2,500 $44,000 $5,000 $5,000 $1,000 $3,000 $3,000 $2,000 $2,000 $27,904 $2,000 $2,500 $2,500 $5,000 $2,500 $2,500 $1,000 $5,000 $7,500 $2,000 $2,000 $5,000 $5,000 $2,500 $5,000 $2,500 $2,500 $2,500 $2,500 $7,500 $2,500 $2,000 $2,000 $5,000 $5,000 $2,500
94
XAWS 2018-1(BW)XBBR 2018-1(HSR)XBBR 2018-2(HS)XBCP 2017-1(SA)XBRI 2018-1(GC)XCAI 2018-1(HMT)XCAI 2018-2(HMT)XCHS 2017-3(HMT)XCHS 2017-4(HMT)XCIH 2017-1(HMT)XCIH 2018-1(HMT)XCPT 2015-1(HMT)XCPT 2016-1(HMT)XCPT 2016-2(HMT)XCPT 2017-1(HMT)XCPT 2018-1(HMT)XCRB 2016-1(RW)XCSG 2017-2(HMT)XCSK 2016-1(HMT)XCSK 2017-1(HMT)XCVA 2017-1(HMT)XCWW 2017-1(RMM)XDOO 2016-1(HMT)
XDOO 2016-2(HMT)XFBR 2016-2(HMT)XFLD 2010-1(HMT)XFLD 2017-1(HMT)XFMC 2016-4(HMT)XFMC 2017-1(HMT)XFUJ 2018-1(HMT)XGEI 2017-1(HMT)XGEO 2017-1(HMT)XGEO 2018-1(HMT)XGEO 2018-2(HMT)XGLK 2017-1(HMT)XHLL 2017-1(RW)XICB 2018-1(HMT)XLCS 2016-1(RW)XLOV 2018-1(HMT)XLTC 2017-1(HMT)XMAG 2017-1(HMT)XMAG 2017-2(HMT)XMDA 2017-1(HMT)XMKW 2017-5(HMT)XMKW 2017-6(HMT)XMKW 2018-1(HMT)XMKW 2018-2(HMT)XMPM 2018-1(HMT)XMSW 2017-1(HMT)
FRA No.
09/27/201803/27/201803/27/201812/08/201703/28/201806/04/201805/16/201805/07/201805/07/201804/18/201804/18/201805/04/201805/14/201805/14/201805/14/201808/16/201801/12/201810/11/201709/26/201809/26/201801/12/201801/12/201806/18/2018
06/18/201808/18/201805/08/201812/04/201712/15/201712/04/201707/26/201805/10/201804/03/201804/03/201804/03/201805/30/201801/22/201807/19/201810/23/201702/28/201802/08/201809/27/201809/27/201810/31/201710/12/201701/15/201806/14/201808/17/201804/09/201810/10/2017
SettlementDate Comments
11111521121111222131113
44112141211131211125111111
No. ofViolations
$2,500 $1,000 $1,000 $2,500 $2,500 $25,000 $10,000 $2,000 $2,000 $5,000 $2,000 $2,000 $2,000 $2,000 $10,000 $4,000 $6,000 $2,000 $12,000 $5,000 $5,000 $5,000 $22,500
$15,000 $8,000 $7,500 $7,500 $4,000 $5,000 $4,000 $5,000 $15,000 $5,000 $5,000 $7,500 $7,000 $2,000 $5,000 $2,000 $2,500 $5,000 $3,500 $10,000 $5,000 $10,000 $5,000 $10,000 $2,000 $5,000
PRCA
$2,500 $1,000 $1,000 $1,250 $0 $25,000 $10,000 $1,650 $1,650 $3,700 $1,800 $1,500 $1,500 $1,500 $8,000 $3,000 $0 $2,000 $9,000 $3,800 $5,000 $3,500 $5,875
$7,125 $8,000 $0 $7,500 $4,000 $5,000 $4,000 $4,000 $12,000 $3,250 $3,250 $4,600 $5,700 $2,000 $3,000 $2,000 $2,500 $0 $0 $10,000 $4,000 $8,000 $3,850 $8,000 $2,000 $5,000
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $1,000 $1,000 $2,500 $0 $25,000 $10,000 $2,000 $2,000 $5,000 $2,000 $2,000 $2,000 $2,000 $10,000 $4,000 $0 $2,000 $12,000 $5,000 $5,000 $5,000 $9,500
$15,000 $8,000 $0 $7,500 $4,000 $5,000 $4,000 $5,000 $15,000 $5,000 $5,000 $7,500 $7,000 $2,000 $5,000 $2,000 $2,500 $0 $0 $10,000 $5,000 $10,000 $5,000 $10,000 $2,000 $5,000
Case Terminated.
Case Terminated.
Partially Terminated Violation(s): 1, 2.
Case Terminated.
Case Terminated.Case Terminated.
95
XMVM 2018-1(HMT)XNSD 2017-1(HMT)XQDI 2018-1(HMT)XRJC 2016-2(RW)XRMA 2016-1(HMT)XRNN 2018-1(HMT)XRPI 2018-1(RW)XRRP 2017-1(RW)XSBK 2017-1(HMT)XSER 2017-1(HMT)XSNJ 2017-1(AR)XSRS 2015-1(TS)XSSP 2018-1(HMT)XSTH 2017-1(HMT)XTEC 2013-1(HMT)XTGS 2011-1(AD)XTGS 2011-2(TS)XTGS 2011-3(TS)XTGS 2011-4(RW)XTGS 2011-5(AD)XTGS 2011-6(EO)XTGS 2011-7(HMT)XTGS 2011-8(TS)XTGS 2011-9(RW)XTGS 2011-10(TS)XTGS 2011-11(HS)XTGS 2011-12(ROP)XTGS 2011-13(SA)XTGS 2011-15(TS)XTGS 2011-16(RSP)XTGS 2011-17(EQ)XTGS 2012-1(ROP)XTGS 2012-2(HMT)XTGS 2012-3(HMT)XTGS 2012-4(RW)XTGS 2012-5(TS)XTGS 2012-6(SA)XTGS 2012-7(ROP)XTGS 2012-8(SA)XTGS 2012-9(SA)YVRR 2015-2(LI)ZAAO 2017-2(HMT)ZAAO 2017-3(HMT)ZABC 2018-1(HMT)ZABS 2018-1(HMT)ZACR 2017-2(HMT)ZACR 2018-1(HMT)ZACR 2018-2(HMT)ZACR 2018-3(HMT)
FRA No.
02/22/201801/03/201801/25/201812/18/201712/15/201708/29/201806/11/201805/31/201805/23/201805/29/201805/23/201805/14/201803/16/201805/29/201812/06/201711/01/201711/01/201711/01/201711/01/201711/01/201711/01/201711/01/201711/01/201711/01/201711/01/201711/01/201711/01/201711/01/201711/01/201711/01/201711/01/201711/01/201711/01/201711/01/201711/01/201711/01/201711/01/201711/01/201712/22/201711/01/201710/18/201703/01/201803/01/201804/24/201806/14/201811/30/201703/22/201803/28/201806/19/2018
SettlementDate Comments
211421111121111210313211464331110121112111121211211112
No. ofViolations
$20,000 $2,000 $2,000 $21,000 $4,000 $2,000 $5,000 $5,000 $5,000 $5,000 $5,000 $25,000 $2,000 $2,500 $7,500 $5,000 $10,000 $3,000 $38,500 $5,000 $2,500 $2,500 $4,000 $16,500 $4,000 $33,000 $9,500 $5,000 $10,000 $1,000 $6,000 $7,500 $7,500 $2,500 $6,000 $19,500 $5,000 $2,000 $10,000 $2,500 $5,000 $2,000 $2,000 $7,500 $4,000 $5,000 $5,000 $5,000 $10,000
PRCA
$15,000 $2,000 $0 $16,500 $3,000 $1,800 $5,000 $5,000 $5,000 $5,000 $5,000 $0 $2,000 $2,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,500 $1,460 $1,460 $7,500 $2,800 $3,600 $3,000 $3,000 $6,500
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$20,000 $2,000 $0 $21,000 $4,000 $2,000 $5,000 $5,000 $5,000 $5,000 $5,000 $0 $2,000 $2,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000 $2,000 $2,000 $7,500 $4,000 $5,000 $5,000 $5,000 $10,000
Case Terminated.
Case Terminated.
Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.
96
ZACR 2018-5(HMT)ZADN 2017-2(HMT)ZADN 2018-1(HMT)ZAEM 2018-1(HMT)ZAEN 2018-1(HMT)ZAEO 2018-1(HMT)ZAEX 2017-1(HMT)ZAFQ 2017-1(HMT)ZAFQ 2017-2(HMT)ZAFQ 2017-3(HMT)ZAG 2017-1(HMT)ZAG 2017-2(HMT)ZAGA 2018-1(HMT)ZAGP 2018-1(HMT)ZAGT 2018-1(HMT)ZAHL 2017-1(HMT)ZAHL 2018-1(HMT)ZAID 2016-1(HMT)ZAIV 2018-1(HMT)ZAKN 2017-2(HMT)ZAKN 2017-3(HMT)ZAKN 2018-1(HMT)ZALA 2017-1(HMT)ZALG 2018-1(HMT)ZALQ 2018-1(HMT)ZALTI 2017-1(HMT)ZALTI 2017-2(HMT)
ZAMC 2017-4(HMT)ZAMC 2018-1(HMT)ZAMC 2018-2(HMT)ZAMC 2018-3(HMT)ZAMC 2018-4(HMT)ZAMRI 2018-1(HMT)ZAMV 2017-1(HMT)ZAND 2017-1(HMT)ZAND 2017-2(HMT)ZAND 2017-3(HMT)ZAND 2017-4(HMT)ZAND 2017-5(HMT)ZAND 2018-1(HMT)ZAPM 2017-2(HMT)ZAPM 2018-1(HMT)ZAPM 2018-2(HMT)ZARGR 2017-2(HMT)ZARJ 2017-2(HMT)ZARJ 2017-3(HMT)ZARK 2017-1(HMT)ZASR 2017-3(HMT)ZASR 2018-1(HMT)
FRA No.
09/28/201811/21/201702/12/201804/05/201803/29/201804/19/201804/24/201803/27/201803/27/201803/27/201803/14/201803/13/201806/27/201804/30/201806/14/201801/04/201802/15/201805/29/201805/01/201801/04/201804/30/201809/11/201810/10/201705/23/201806/05/201805/31/201805/31/2018
01/16/201802/01/201805/22/201807/05/201809/04/201809/28/201811/09/201702/12/201810/05/201711/21/201711/21/201711/21/201707/12/201801/23/201801/23/201808/18/201811/09/201702/01/201802/01/201810/29/201711/30/201704/03/2018
SettlementDate Comments
111311111111411151121111111
1211111132212233111111
No. ofViolations
$5,000 $10,000 $5,000 $6,000 $5,000 $10,000 $5,000 $10,000 $10,000 $5,000 $5,000 $5,000 $20,000 $2,000 $2,500 $5,000 $12,000 $10,000 $5,000 $10,000 $10,000 $2,000 $2,000 $2,000 $10,000 $5,000 $10,000
$5,000 $10,000 $2,000 $2,000 $5,000 $10,000 $5,000 $5,000 $6,000 $10,000 $7,000 $10,000 $15,000 $4,500 $6,000 $15,000 $5,000 $2,000 $2,000 $10,000 $2,000 $2,000
PRCA
$3,500 $8,000 $3,400 $4,200 $5,000 $10,000 $2,050 $8,000 $4,000 $2,000 $0 $4,150 $20,000 $2,000 $2,500 $5,000 $12,000 $6,200 $3,900 $7,100 $8,000 $2,000 $1,300 $0 $10,000 $900 $900
$0 $7,000 $1,300 $1,300 $3,350 $10,000 $5,000 $2,800 $6,000 $7,000 $3,500 $7,800 $11,250 $5,000 $6,000 $15,000 $3,650 $1,400 $1,300 $10,000 $2,000 $2,000
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $10,000 $5,000 $6,000 $5,000 $10,000 $5,000 $10,000 $10,000 $5,000 $0 $5,000 $20,000 $2,000 $2,500 $5,000 $12,000 $10,000 $5,000 $10,000 $10,000 $2,000 $2,000 $0 $10,000 $5,000 $5,000
$0 $10,000 $2,000 $2,000 $5,000 $10,000 $5,000 $5,000 $6,000 $10,000 $7,000 $10,000 $15,000 $4,500 $6,000 $15,000 $5,000 $2,000 $2,000 $10,000 $2,000 $2,000
Case Terminated.
Case Terminated.
Partially Terminated Violation(s): 1.Case Terminated.
97
ZASY 2017-1(HMT)ZAUL 2018-1(HMT)ZAVX 2018-1(HMT)ZAXI 2017-1(HMT)ZAXI 2018-1(HMT)ZAXI 2018-2(HMT)ZAXI 2018-3(HMT)ZBAC 2018-1(HMT)ZBADG 2017-2(HMT)ZBAK 2017-1(HMT)ZBAN 2015-1(HMT)ZBAN 2016-1(HMT)ZBAN 2016-2(HMT)ZBAS 2017-3(HMT)ZBAS 2017-4(HMT)ZBAS 2017-5(HMT)ZBAS 2018-1(HMT)ZBAS 2018-2(HMT)ZBAS 2018-3(HMT)ZBCU 2017-2(HMT)ZBEP 2017-1(HMT)ZBEP 2017-2(HMT)ZBEP 2018-1(HMT)ZBEP 2018-2(HMT)ZBEP 2018-3(HMT)ZBGL 2018-1(HMT)ZBHM 2018-1(HMT)ZBMR 2018-1(HMT)ZBMS 2017-1(HMT)ZBMS 2017-2(HMT)ZBMS 2017-3(HMT)ZBMS 2018-1(HMT)ZBRM 2017-1(HMT)ZBRM 2018-1(HMT)ZBRP 2018-1(HMT)ZBRY 2018-1(HMT)ZBSN 2017-1(HMT)ZBTA 2017-1(HMT)ZBTC 2017-1(HMT)ZBTM 2018-1(HMT)ZBUT 2018-1(HMT)ZBWW 2018-1(HMT)ZBYS 2018-1(HMT)ZCAB 2017-1(HMT)ZCAM 2016-1(HMT)ZCAU 2017-1(HMT)ZCBK 2016-1(HMT)ZCCF 2017-1(HMT)ZCCM 2017-2(HMT)
FRA No.
10/26/201706/28/201806/05/201811/28/201704/10/201805/22/201805/22/201803/28/201801/08/201803/05/201810/18/201710/18/201710/18/201710/12/201711/29/201701/10/201804/14/201805/02/201808/16/201811/20/201701/18/201801/18/201802/06/201805/22/201806/12/201803/09/201804/09/201809/24/201810/30/201712/29/201712/29/201701/19/201811/30/201709/17/201808/21/201804/03/201811/02/201703/06/201811/17/201704/23/201809/25/201809/18/201806/19/201810/25/201705/09/201805/09/201805/09/201801/03/201801/03/2018
SettlementDate Comments
1111211211214131111112111111111211111132112111121
No. ofViolations
$2,000 $2,000 $5,000 $2,000 $7,500 $5,000 $5,000 $15,000 $5,000 $2,500 $10,000 $10,000 $20,000 $5,000 $9,000 $2,000 $2,000 $5,000 $5,000 $10,000 $7,500 $7,000 $10,000 $5,000 $2,500 $5,000 $7,500 $2,000 $2,000 $2,000 $2,000 $4,000 $10,000 $5,000 $2,000 $5,000 $10,000 $2,000 $14,500 $4,000 $1,000 $2,000 $6,000 $5,000 $7,500 $2,000 $5,000 $9,000 $5,000
PRCA
$1,400 $1,300 $3,600 $1,360 $5,250 $3,500 $3,100 $7,500 $5,000 $2,500 $5,000 $8,750 $14,000 $5,000 $9,000 $2,000 $2,000 $5,000 $5,000 $8,500 $7,000 $6,250 $10,000 $5,000 $2,500 $2,500 $6,000 $2,000 $2,000 $2,000 $2,000 $4,000 $10,000 $5,000 $1,600 $2,800 $8,500 $1,500 $8,000 $4,000 $1,000 $1,300 $4,000 $5,000 $5,250 $1,500 $3,250 $9,000 $5,000
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,000 $2,000 $5,000 $2,000 $7,500 $5,000 $5,000 $15,000 $5,000 $2,500 $10,000 $10,000 $20,000 $5,000 $9,000 $2,000 $2,000 $5,000 $5,000 $10,000 $7,500 $7,000 $10,000 $5,000 $2,500 $5,000 $7,500 $2,000 $2,000 $2,000 $2,000 $4,000 $10,000 $5,000 $2,000 $5,000 $10,000 $2,000 $14,500 $4,000 $1,000 $2,000 $6,000 $5,000 $7,500 $2,000 $5,000 $9,000 $5,000
98
ZCCN 2018-2(HMT)ZCDA 2016-1(HMT)ZCDY 2017-1(HMT)ZCEE 2017-2(HMT)ZCEF 2018-2(HMT)ZCELA 2017-3(HMT)ZCFC 2017-4(HMT)ZCHX 2018-1(HMT)ZCHY 2017-1(HMT)ZCIE 2017-1(HMT)ZCJZ 2017-1(HMT)ZCLQ 2016-1(HMT)ZCLX 2017-1(HMT)ZCLX 2017-2(HMT)ZCMA 2015-1(HMT)ZCMA 2017-1(HMT)ZCME 2016-1(HMT)ZCME 2017-1(HMT)ZCMP 2017-1(HMT)ZCNC 2017-2(HMT)ZCNL 2017-1(HMT)ZCNL 2017-2(HMT)ZCORN 2016-1(HMT)ZCOV 2017-1(HMT)ZCOY 2017-1(HMT)ZCPSI 2018-1(HMT)ZCRY 2017-1(HMT)ZCRY 2018-2(HMT)ZCRZ 2017-1(HMT)ZCSF 2018-1(HMT)ZCSPI 2017-1(HMT)ZCT 2018-2(HMT)ZCUI 2016-2(HMT)ZCUI 2018-1(HMT)ZCYS 2018-1(HMT)ZDAK 2018-1(HMT)ZDCM 2017-1(HMT)ZDCU 2017-5(HMT)ZDCU 2018-1(HMT)ZDCU 2018-2(HMT)ZDET 2017-1(HMT)ZDKR 2018-1(HMT)ZDMX 2014-1(HMT)ZDNA 2016-1(HMT)ZDNA 2016-2(HMT)ZDNA 2016-3(HMT)ZDNA 2017-1(HMT)
ZDPM 2017-1(HMT)ZDSP 2018-1(HMT)
FRA No.
05/09/201801/10/201812/21/201710/25/201705/07/201812/04/201705/07/201802/07/201803/09/201803/14/201801/12/201805/31/201801/17/201805/04/201810/17/201701/12/201805/07/201805/07/201801/12/201812/28/201702/05/201802/05/201812/28/201705/16/201812/04/201705/02/201801/10/201805/02/201801/12/201807/09/201801/10/201807/09/201803/14/201805/04/201802/28/201806/12/201803/20/201801/23/201807/03/201807/12/201801/19/201804/25/201811/17/201709/12/201809/12/201809/12/201809/12/2018
01/25/201805/21/2018
SettlementDate Comments
21211111114231111111111111121121211111111121323
21
No. ofViolations
$4,000 $2,000 $4,000 $5,000 $999 $5,000 $2,000 $10,000 $2,500 $5,000 $8,000 $10,000 $22,500 $2,000 $4,000 $4,000 $5,000 $5,000 $5,000 $5,000 $2,000 $10,000 $2,000 $5,000 $2,000 $2,000 $10,000 $15,000 $10,000 $2,000 $20,000 $2,000 $6,500 $5,000 $2,000 $2,000 $5,000 $5,000 $2,000 $5,000 $5,000 $15,000 $4,000 $5,000 $15,000 $10,000 $15,000
$12,500 $10,000
PRCA
$4,000 $2,000 $3,000 $5,000 $999 $5,000 $1,600 $10,000 $2,500 $5,000 $6,400 $7,500 $17,500 $1,500 $3,000 $0 $4,000 $4,000 $4,000 $4,000 $1,600 $7,500 $1,500 $3,500 $2,000 $2,000 $8,000 $12,500 $8,000 $2,000 $16,000 $2,000 $5,200 $5,000 $2,000 $2,000 $3,500 $4,000 $1,600 $4,000 $4,000 $0 $3,000 $3,250 $9,750 $6,500 $4,500
$4,500 $4,000
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$4,000 $2,000 $4,000 $5,000 $999 $5,000 $2,000 $10,000 $2,500 $5,000 $8,000 $10,000 $22,500 $2,000 $4,000 $0 $5,000 $5,000 $5,000 $5,000 $2,000 $10,000 $2,000 $5,000 $2,000 $2,000 $10,000 $15,000 $10,000 $2,000 $20,000 $2,000 $6,500 $5,000 $2,000 $2,000 $5,000 $5,000 $2,000 $5,000 $5,000 $0 $4,000 $5,000 $15,000 $10,000 $6,000
$5,000 $10,000
Case Terminated.
Case Terminated.
Partially Terminated Violation(s): 1.Terminated Violation(s): 2.
99
ZDUB 2017-2(HMT)ZDUK 2018-1(HMT)ZDUP 2017-3(HMT)ZDUP 2018-1(HMT)ZDUP 2018-2(HMT)ZDYI 2017-3(HMT)ZDYI 2017-4(HMT)ZDYI 2018-1(HMT)ZDYI 2018-2(HMT)ZEACH 2018-1(HMT)ZEACH 2018-2(HMT)ZECD 2018-1(HMT)ZECD 2018-2(HMT)ZECDP 2017-1(HMT)ZECQ 2017-1(HMT)ZEJO 2018-1(HMT)ZEME 2018-1(HMT)ZEMER 2018-1(HMT)ZEMT 2018-1(HMT)ZENK 2017-1(HMT)ZEPC 2017-1(HMT)ZEPG 2017-1(HMT)ZEPZ 2017-1(HMT)ZEQU 2017-1(HMT)ZESG 2018-1(HMT)ZESG 2018-2(HMT)ZESR 2017-2(HMT)ZETT 2018-1(HMT)ZEVC 2018-1(HMT)ZEVD 2017-1(HMT)ZFAL 2011-1(HMT)ZFAS 2017-1(HMT)ZFBB 2009-1(HMT)ZFBI 2006-2(HMT)ZFCQ 2009-1(HMT)ZFEQ 2010-1(HMT)ZFFP 2010-1(HMT)ZFGC 2014-1(HMT)ZFGC 2017-2(HMT)ZFGC 2018-1(HMT)ZFHR 2014-1(HMT)ZFHR 2016-3(HMT)ZFHR 2018-1(HMT)ZFIC 2010-1(HMT)ZFIC 2010-2(HMT)ZFIT 2018-1(HMT)ZFIT 2018-2(HMT)ZFKP 2018-1(HMT)ZFLS 2017-1(HMT)
FRA No.
10/11/201708/01/201812/05/201706/14/201806/01/201803/29/201812/29/201703/26/201804/10/201804/17/201807/10/201803/20/201806/26/201810/12/201701/04/201808/09/201807/03/201806/28/201809/25/201810/12/201710/02/201711/02/201710/24/201710/31/201703/05/201803/20/201801/04/201802/27/201808/16/201811/30/201703/27/201802/13/201803/27/201803/27/201803/27/201803/27/201803/27/201808/21/201808/21/201804/19/201808/22/201812/05/201708/21/201803/27/201803/27/201809/04/201805/05/201804/25/201811/06/2017
SettlementDate Comments
1212221211311611111311111111112132131111112111111
No. ofViolations
$2,000 $3,000 $5,000 $7,000 $8,000 $4,000 $2,000 $10,000 $5,000 $2,000 $6,000 $2,000 $5,000 $30,000 $7,500 $10,000 $5,000 $5,000 $5,000 $7,500 $5,000 $2,000 $5,000 $10,000 $5,000 $5,000 $10,000 $5,000 $5,000 $2,000 $10,000 $5,000 $14,500 $10,000 $2,000 $15,000 $7,500 $4,000 $5,000 $5,000 $5,000 $5,000 $10,000 $5,000 $7,500 $2,000 $2,000 $5,000 $2,000
PRCA
$2,000 $3,000 $3,750 $7,000 $5,000 $4,000 $2,000 $10,000 $5,000 $1,360 $4,200 $1,400 $3,950 $30,000 $5,475 $8,100 $5,000 $5,000 $5,000 $7,500 $5,000 $2,000 $5,000 $7,700 $4,000 $4,000 $8,200 $3,500 $5,000 $1,360 $0 $4,000 $0 $0 $0 $0 $0 $3,500 $4,000 $4,000 $3,500 $5,000 $8,500 $0 $0 $2,000 $2,000 $4,000 $1,500
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,000 $3,000 $5,000 $7,000 $8,000 $4,000 $2,000 $10,000 $5,000 $2,000 $6,000 $2,000 $5,000 $30,000 $7,500 $10,000 $5,000 $5,000 $5,000 $7,500 $5,000 $2,000 $5,000 $10,000 $5,000 $5,000 $10,000 $5,000 $5,000 $2,000 $0 $5,000 $0 $0 $0 $0 $0 $4,000 $5,000 $5,000 $5,000 $5,000 $10,000 $0 $0 $2,000 $2,000 $5,000 $2,000
Case Terminated.
Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.
Case Terminated.Case Terminated.
100
ZFLS 2017-2(HMT)ZFMB 2017-1(HMT)ZFMJ 2008-1(HMT)ZFNS 2011-1(HMT)ZFON 2013-1(HMT)ZFOR 2017-1(HMT)ZFOR 2018-1(HMT)ZFOT 2010-1(HMT)ZFPC 2018-1(HMT)ZFPI 2007-1(HMT)ZFRR 2007-1(HMT)ZFSQ 2007-1(HMT)ZFTP 2006-1(HMT)ZFUR 2010-1(HMT)ZFVP 2017-1(HMT)ZFXI 2016-2(HMT)ZGDB 2016-1(HMT)ZGDE 2015-1(HMT)ZGEO 2016-1(HMT)ZGEPA 2016-3(HMT)ZGEPA 2016-4(HMT)ZGEPA 2017-1(HMT)ZGEPA 2018-1(HMT)ZGEPA 2018-2(HMT)ZGEU 2016-3(HMT)ZGEU 2017-1(HMT)ZGEU 2018-1(HMT)ZGFE 2017-2(HMT)ZGFE 2017-3(HMT)ZGPE 2016-1(HMT)ZGPE 2017-1(HMT)ZGPF 2017-1(HMT)ZGPF 2017-2(HMT)ZGSR 2017-1(HMT)ZGSZ 2016-2(HMT)ZGSZ 2017-1(HMT)ZGSZ 2017-2(HMT)ZGSZ 2017-4(HMT)ZGSZ 2017-5(HMT)ZGUS 2016-1(HMT)ZHAR 2018-1(HMT)ZHAR 2018-2(HMT)ZHCG 2017-4(HMT)ZHCG 2018-1(HMT)ZHCG 2018-2(HMT)ZHCG 2018-3(HMT)ZHCH 2018-1(HMT)ZHCM 2018-1(HMT)ZHEI 2017-1(HMT)
FRA No.
02/08/201812/12/201703/28/201803/28/201803/28/201811/29/201709/18/201803/27/201804/09/201805/08/201803/28/201805/08/201803/27/201803/27/201809/27/201801/22/201805/24/201803/23/201805/30/201804/03/201804/03/201804/03/201804/03/201805/21/201805/16/201805/16/201805/16/201804/11/201804/11/201805/09/201805/09/201804/03/201812/07/201707/02/201804/04/201804/04/201803/22/201803/28/201804/04/201805/16/201803/26/201806/01/201801/31/201806/05/201805/14/201806/14/201808/22/201805/31/201802/01/2018
SettlementDate Comments
2114141311211111111121311112111111121111121111111
No. ofViolations
$4,000 $4,000 $10,000 $8,000 $5,000 $20,000 $7,500 $8,000 $5,000 $5,000 $15,000 $5,000 $5,000 $5,000 $5,000 $2,000 $10,000 $5,000 $5,000 $10,000 $10,000 $5,000 $20,000 $5,000 $5,000 $10,000 $10,000 $10,000 $5,000 $10,000 $10,000 $5,000 $2,000 $10,000 $5,000 $10,000 $5,000 $10,000 $7,500 $10,000 $2,000 $4,000 $5,000 $5,000 $5,000 $5,000 $2,000 $5,000 $10,000
PRCA
$4,000 $4,000 $0 $0 $0 $20,000 $5,000 $0 $3,250 $0 $0 $0 $0 $0 $4,000 $1,600 $5,000 $3,250 $3,500 $8,000 $6,000 $3,000 $15,500 $3,250 $2,900 $7,500 $7,500 $6,900 $3,500 $7,000 $7,000 $3,000 $2,000 $6,000 $4,000 $10,000 $5,000 $10,000 $7,500 $7,500 $2,000 $4,000 $5,000 $5,000 $5,000 $5,000 $2,000 $3,250 $4,500
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$4,000 $4,000 $0 $0 $0 $20,000 $7,500 $0 $5,000 $0 $0 $0 $0 $0 $5,000 $2,000 $10,000 $5,000 $5,000 $10,000 $10,000 $5,000 $20,000 $5,000 $5,000 $10,000 $10,000 $10,000 $5,000 $10,000 $10,000 $5,000 $2,000 $10,000 $5,000 $10,000 $5,000 $10,000 $7,500 $10,000 $2,000 $4,000 $5,000 $5,000 $5,000 $5,000 $2,000 $5,000 $5,000
Case Terminated.Case Terminated.Case Terminated.
Case Terminated.
Case Terminated.Case Terminated.Case Terminated.Case Terminated.Case Terminated.
Partially Terminated Violation(s): 1.
101
ZHEI 2018-1(HMT)ZHEI 2018-2(HMT)ZHEI 2018-3(HMT)ZHFA 2017-1(HMT)ZHFR 2018-1(HMT)ZHFR 2018-2(HMT)ZHLA 2017-1(HMT)ZHLR 2018-1(HMT)ZHMS 2017-1(HMT)ZHNI 2017-4(HMT)ZHNI 2018-1(HMT)ZHNI 2018-2(HMT)ZHRM 2018-1(HMT)ZHUN 2018-1(HMT)ZHWS 2017-1(HMT)ZHYC 2018-1(HMT)
ZIEL 2018-1(HMT)ZIML 2017-1(HMT)ZIP 2017-4(HMT)ZIP 2017-5(HMT)ZIRO 2017-1(HMT)ZIRO 2017-2(HMT)ZIRR 2013-1(HMT)ZIRR 2013-2(HMT)ZITH 2018-1(HMT)ZIVE 2017-1(HMT)ZIWI 2018-1(HMT)ZIWT 2017-1(HMT)ZJCC 2016-1(HMT)ZJCC 2016-2(HMT)ZJCC 2017-1(HMT)ZJMA 2017-1(HMT)ZJRS 2017-2(HMT)ZJRS 2017-3(HMT)ZJRS 2018-1(HMT)ZJRS 2018-2(HMT)ZJRS 2018-3(HMT)ZJRS 2018-4(HMT)ZJRS 2018-5(HMT)ZJRS 2018-6(HMT)ZKAE 2018-1(HMT)ZKAT 2016-1(HMT)ZKDM 2017-2(HMT)ZKDM 2017-3(HMT)ZKEL 2017-1(HMT)ZKEM 2017-1(HMT)ZKEN 2017-1(HMT)
ZKKC 2016-1(HMT)
FRA No.
03/28/201806/05/201807/02/201810/25/201706/06/201806/05/201801/29/201805/21/201812/07/201701/02/201807/03/201807/18/201807/18/201805/25/201801/18/201807/10/2018
09/24/201810/27/201710/27/201710/06/201711/28/201711/28/201705/30/201805/30/201809/10/201806/04/201807/26/201808/28/201810/04/201710/04/201710/04/201711/09/201710/10/201701/16/201802/21/201803/20/201804/11/201804/11/201805/09/201808/16/201802/15/201805/10/201803/05/201803/05/201805/04/201804/18/201805/07/2018
05/16/2018
SettlementDate Comments
2211161821111116
1141111511111111211111112111121
1
No. ofViolations
$4,000 $4,000 $2,000 $5,000 $2,000 $30,000 $2,500 $34,000 $10,000 $2,000 $2,000 $4,500 $2,000 $5,000 $2,000 $45,000
$2,500 $5,000 $8,000 $2,000 $5,000 $2,000 $5,000 $25,000 $4,000 $5,000 $2,000 $2,500 $2,000 $5,000 $15,000 $1,000 $20,000 $5,000 $5,000 $10,000 $5,000 $5,000 $2,000 $2,000 $10,000 $4,000 $5,000 $10,000 $5,000 $10,000 $10,000
$10,000
PRCA
$3,200 $3,000 $1,700 $5,000 $2,000 $30,000 $0 $34,000 $10,000 $1,500 $2,000 $3,750 $1,250 $5,000 $1,250 $6,000
$2,500 $3,475 $6,000 $2,000 $5,000 $2,000 $0 $0 $4,000 $5,000 $2,000 $2,500 $1,000 $4,000 $12,000 $650 $14,000 $3,000 $2,500 $8,000 $3,000 $3,000 $1,500 $1,300 $10,000 $4,000 $2,500 $6,500 $3,500 $10,000 $7,500
$8,000
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$4,000 $4,000 $2,000 $5,000 $2,000 $30,000 $0 $34,000 $10,000 $2,000 $2,000 $4,500 $2,000 $5,000 $2,000 $7,500
$2,500 $5,000 $8,000 $2,000 $5,000 $2,000 $0 $0 $4,000 $5,000 $2,000 $2,500 $2,000 $5,000 $15,000 $1,000 $20,000 $5,000 $5,000 $10,000 $5,000 $5,000 $2,000 $2,000 $10,000 $4,000 $5,000 $10,000 $5,000 $10,000 $7,500
$10,000
Case Terminated.
Partially Terminated Violation(s): 1.
Case Terminated.Case Terminated.
Partially Terminated Violation(s): 1.
102
ZKML 2017-3(HMT)ZKML 2017-4(HMT)ZKML 2018-1(HMT)ZKML 2018-2(HMT)ZKML 2018-3(HMT)ZKML 2018-4(HMT)ZKML 2018-5(HMT)ZKMQ 2017-1(HMT)ZKMQ 2018-1(HMT)ZKOR 2015-1(HMT)ZKOR 2016-1(HMT)ZKOR 2016-2(HMT)ZKPI 2017-3(HMT)ZKRA 2018-1(HMT)ZKTS 2017-1(HMT)ZKWS 2017-1(HMT)ZKWS 2017-2(HMT)ZKWS 2017-3(HMT)ZKYE 2015-1(HMT)ZLAS 2018-1(HMT)ZLDE 2017-3(HMT)ZLDE 2018-1(HMT)ZLDE 2018-2(HMT)ZLDI 2017-1(HMT)ZLDI 2017-2(HMT)ZLDI 2018-1(HMT)ZLDI 2018-2(HMT)ZLDR 2017-1(HMT)ZLEA 2017-1(HMT)ZLGD 2018-1(HMT)ZLHP 2018-1(HMT)ZLSH 2017-1(HMT)ZLUB 2017-4(HMT)ZLUB 2018-1(HMT)ZLUIN 2018-1(HMT)ZLUIN 2018-2(HMT)ZLWD 2003-1(HMT)ZMAF 2017-2(HMT)ZMAF 2017-3(HMT)ZMAX 2017-2(HMT)ZMAX 2018-1(HMT)ZMFQ 2017-2(HMT)ZMFQ 2017-3(HMT)ZMFQ 2017-4(HMT)ZMFQ 2018-1(HMT)ZMFQ 2018-2(HMT)ZMGP 2017-1(HMT)ZMGP 2017-2(HMT)ZMGP 2018-1(HMT)
FRA No.
01/08/201801/08/201806/06/201807/09/201805/02/201807/09/201807/09/201803/06/201803/06/201805/04/201805/04/201805/04/201812/18/201705/22/201804/20/201804/18/201812/05/201712/05/201706/06/201802/22/201805/14/201803/08/201803/08/201810/23/201712/18/201702/12/201803/05/201802/09/201801/08/201807/31/201806/05/201812/18/201712/21/201705/08/201807/17/201809/14/201812/04/201710/03/201711/28/201711/29/201704/11/201811/14/201702/02/201802/02/201806/21/201805/18/201810/17/201712/19/201703/26/2018
SettlementDate Comments
1111111111112211113111211121711111111471121412121
No. ofViolations
$2,000 $2,000 $2,000 $2,000 $2,000 $5,000 $2,000 $5,000 $5,000 $2,000 $10,000 $2,000 $10,000 $7,000 $2,000 $1,000 $5,000 $5,000 $6,000 $2,000 $10,000 $2,000 $4,500 $5,000 $2,000 $2,000 $10,000 $10,000 $23,000 $5,000 $5,000 $5,000 $5,000 $10,000 $2,000 $5,000 $2,000 $8,000 $14,000 $5,000 $5,000 $3,000 $2,000 $8,000 $10,000 $4,000 $5,000 $8,000 $5,000
PRCA
$1,500 $1,300 $1,750 $1,400 $2,000 $4,500 $1,400 $2,750 $2,750 $1,200 $8,000 $1,500 $6,000 $5,600 $1,500 $1,000 $3,000 $3,000 $6,000 $1,000 $7,500 $1,300 $3,300 $3,500 $1,400 $1,400 $7,000 $6,000 $23,000 $5,000 $5,000 $3,250 $5,000 $10,000 $2,000 $3,000 $0 $6,400 $11,200 $5,000 $5,000 $3,000 $1,500 $6,400 $0 $4,000 $3,900 $6,240 $3,900
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,000 $2,000 $2,000 $2,000 $2,000 $5,000 $2,000 $5,000 $5,000 $2,000 $10,000 $2,000 $10,000 $7,000 $2,000 $1,000 $5,000 $5,000 $6,000 $2,000 $10,000 $2,000 $4,500 $5,000 $2,000 $2,000 $10,000 $10,000 $23,000 $5,000 $5,000 $5,000 $5,000 $10,000 $2,000 $5,000 $0 $8,000 $14,000 $5,000 $5,000 $3,000 $2,000 $8,000 $0 $4,000 $5,000 $8,000 $5,000
Case Terminated.
Case Terminated.
103
ZMHO 2017-2(HMT)ZMIP 2017-2(HMT)ZMIP 2018-1(HMT)ZMIP 2018-2(HMT)ZMKJ 2018-1(HMT)ZMNE 2017-1(HMT)ZMNP 2017-3(HMT)ZMNP 2017-4(HMT)ZMNP 2017-5(HMT)
ZMNP 2018-1(HMT)ZMNT 2018-1(HMT)ZMNX 2018-1(HMT)ZMQE 2017-1(HMT)ZMQE 2018-1(HMT)ZMRK 2018-1(HMT)ZMSL 2018-1(HMT)ZMTE 2017-3(HMT)ZMTE 2018-1(HMT)ZMTE 2018-2(HMT)ZMTE 2018-3(HMT)ZMTE 2018-4(HMT)ZMTE 2018-5(HMT)ZMTE 2018-6(HMT)ZMTE 2018-7(HMT)
ZMTR 2018-1(HMT)ZMUN 2017-1(HMT)ZMUN 2018-1(HMT)ZMUSK 2017-2(HMT)ZMWE 2017-1(HMT)ZNAL 2017-1(HMT)ZNAL 2017-2(HMT)ZNBA 2017-1(HMT)ZNBA 2017-2(HMT)ZNBA 2017-3(HMT)ZNBX 2018-1(HMT)ZNCS 2017-1(HMT)ZNDM 2017-1(HMT)ZNDM 2018-1(HMT)ZNDM 2018-2(HMT)ZNGE 2017-1(HMT)ZNGE 2018-1(HMT)ZNGL 2017-1(HMT)ZNPT 2018-1(HMT)
ZNSL 2017-2(HMT)ZNSL 2017-3(HMT)ZNSS 2016-1(HMT)ZNXE 2017-2(HMT)
FRA No.
02/26/201802/22/201802/22/201809/06/201805/03/201801/04/201812/05/201712/05/201704/23/2018
03/07/201802/20/201802/27/201810/03/201703/20/201809/06/201804/05/201801/10/201803/28/201805/29/201805/09/201805/09/201805/30/201808/10/201808/15/2018
04/17/201812/12/201704/25/201812/20/201702/26/201801/25/201801/25/201810/12/201711/21/201711/06/201705/16/201806/18/201811/28/201703/01/201809/12/201812/27/201702/08/201810/03/201706/07/2018
01/30/201801/11/201806/06/201804/05/2018
SettlementDate Comments
114411112
111131112524212
1211112211212111415
1111
No. ofViolations
$5,000 $2,500 $10,000 $10,000 $2,000 $2,000 $2,000 $5,000 $20,000
$2,500 $5,000 $7,500 $5,000 $15,000 $4,000 $4,000 $2,000 $4,000 $10,000 $4,000 $8,000 $4,000 $2,000 $10,000
$5,000 $6,000 $10,000 $2,000 $10,000 $2,000 $10,000 $10,000 $5,000 $1,000 $4,000 $2,000 $12,000 $10,000 $2,000 $500 $20,000 $2,000 $20,000
$4,000 $2,000 $2,000 $5,000
PRCA
$5,000 $2,500 $10,000 $10,000 $1,250 $1,600 $2,000 $4,000 $10,000
$2,500 $5,000 $0 $4,000 $15,000 $4,000 $3,200 $2,000 $4,000 $0 $4,000 $8,000 $4,000 $2,000 $4,000
$5,000 $6,000 $8,000 $2,000 $10,000 $1,400 $7,000 $6,500 $3,500 $700 $2,800 $2,000 $12,000 $10,000 $2,000 $500 $12,000 $2,000 $2,500
$0 $2,000 $1,000 $5,000
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $2,500 $10,000 $10,000 $2,000 $2,000 $2,000 $5,000 $10,000
$2,500 $5,000 $0 $5,000 $15,000 $4,000 $4,000 $2,000 $4,000 $0 $4,000 $8,000 $4,000 $2,000 $4,000
$5,000 $6,000 $10,000 $2,000 $10,000 $2,000 $10,000 $10,000 $5,000 $1,000 $4,000 $2,000 $12,000 $10,000 $2,000 $500 $20,000 $2,000 $2,500
$0 $2,000 $2,000 $5,000
Partially Terminated Violation(s): 1.
Case Terminated.
Case Terminated.
Partially Terminated Violation(s): 1.
Terminated Violation(s): 1, 2, 4.Case Terminated.
104
ZNXE 2017-3(HMT)ZNXE 2018-1(HMT)ZOBC 2017-1(HMT)ZOCC 2016-4(HMT)ZOCC 2016-5(HMT)ZOCC 2016-6(HMT)ZOCC 2017-1(HMT)ZOCC 2017-2(HMT)ZOCC 2017-3(HMT)ZOCC 2017-4(HMT)ZOCC 2018-1(HMT)ZOCC 2018-2(HMT)ZOEE 2018-1(HMT)ZOKH 2018-1(HMT)ZOLI 2017-4(HMT)ZOLI 2017-5(HMT)ZOLI 2018-1(HMT)ZOLI 2018-2(HMT)ZOLI 2018-3(HMT)ZOLI 2018-4(HMT)ZOLI 2018-5(HMT)ZOLI 2018-6(HMT)ZOLI 2018-7(HMT)ZOLI 2018-8(HMT)ZOLI 2018-9(HMT)ZOLI 2018-10(HMT)ZOMP 2017-1(HMT)ZONB 2017-1(HMT)ZONG 2018-1(HMT)ZOTER 2017-2(HMT)ZOTER 2018-1(HMT)ZOTER 2018-2(HMT)ZOTER 2018-3(HMT)ZOTT 2017-1(HMT)ZOTT 2018-1(HMT)ZPAE 2016-2(HMT)ZPAE 2017-1(HMT)
ZPAE 2017-2(HMT)ZPCSI 2018-1(HMT)ZPCSS 2017-1(HMT)ZPCSS 2018-1(HMT)ZPCSS 2018-2(HMT)ZPCU 2018-1(HMT)ZPGW 2015-1(HMT)ZPHO 2016-1(HMT)ZPLA 2018-1(HMT)ZPLA 2018-2(HMT)ZPLS 2017-2(HMT)ZPME 2017-1(HMT)
FRA No.
12/18/201704/05/201812/27/201702/14/201802/14/201802/14/201805/08/201805/08/201805/08/201805/08/201809/18/201809/18/201806/04/201806/08/201812/12/201701/22/201804/26/201805/24/201805/24/201805/24/201805/24/201805/24/201806/28/201808/10/201809/10/201809/18/201801/05/201811/22/201705/31/201802/14/201806/05/201806/05/201807/11/201810/16/201709/05/201810/09/201710/09/2017
10/09/201704/18/201805/21/201805/21/201805/21/201809/11/201804/10/201805/21/201803/14/201804/18/201811/17/201711/13/2017
SettlementDate Comments
1111111122111111212141111211311112111
111211121111
No. ofViolations
$2,500 $2,000 $5,000 $6,000 $5,000 $5,000 $10,000 $5,000 $10,000 $10,000 $5,000 $5,000 $10,000 $5,000 $7,500 $5,000 $10,000 $10,000 $7,000 $10,000 $18,000 $5,000 $5,000 $6,000 $5,000 $10,000 $5,000 $8,000 $4,500 $11,000 $10,000 $2,000 $10,000 $7,000 $5,000 $5,000 $5,000
$5,000 $2,000 $5,000 $10,000 $5,000 $5,000 $6,000 $10,000 $10,000 $2,000 $5,000 $5,000
PRCA
$2,500 $2,000 $5,000 $4,920 $3,850 $3,850 $8,000 $3,500 $7,000 $7,000 $4,000 $3,500 $8,500 $5,000 $6,375 $3,250 $7,000 $8,500 $5,600 $8,500 $13,500 $3,750 $4,000 $4,500 $3,750 $8,000 $3,750 $4,000 $4,500 $7,000 $8,000 $1,000 $7,000 $5,850 $4,000 $4,000 $2,000
$5,000 $2,000 $3,750 $7,000 $3,750 $5,000 $6,000 $7,500 $10,000 $2,000 $4,000 $5,000
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,500 $2,000 $5,000 $6,000 $5,000 $5,000 $10,000 $5,000 $10,000 $10,000 $5,000 $5,000 $10,000 $5,000 $7,500 $5,000 $10,000 $10,000 $7,000 $10,000 $18,000 $5,000 $5,000 $6,000 $5,000 $10,000 $5,000 $8,000 $4,500 $11,000 $10,000 $2,000 $10,000 $7,000 $5,000 $5,000 $2,000
$5,000 $2,000 $5,000 $10,000 $5,000 $5,000 $6,000 $10,000 $10,000 $2,000 $5,000 $5,000
Partially Terminated Violation(s): 1.
105
ZPME 2017-2(HMT)ZPMS 2016-5(HMT)ZPNF 2017-1(HMT)ZPNF 2017-2(HMT)ZPNQ 2017-1(HMT)ZPOL 2017-1(HMT)ZPOTS 2017-1(HMT)ZPOTS 2018-1(HMT)ZPPJ 2018-1(HMT)ZPRG 2009-1(HMT)ZPRX 2018-1(HMT)ZPRX 2018-2(HMT)ZPVS 2018-1(HMT)ZPVS 2018-2(HMT)ZQTL 2018-1(HMT)ZRAI 2017-1(HMT)ZRAS 2018-1(HMT)ZRBA 2018-1(HMT)ZRCA 2017-1(HMT)ZRCA 2017-2(HMT)ZRCA 2017-3(HMT)ZRFC 2018-1(HMT)ZRFC 2018-2(HMT)ZRKM 2017-1(HMT)ZRKP 2018-1(HMT)ZRLG 2018-1(HMT)ZRPM 2017-2(HMT)ZRSH 2017-1(HMT)ZRSO 2018-1(HMT)ZRTLS 2017-1(HMT)ZRTLS 2018-1(HMT)ZRVI 2016-1(HMT)ZRVI 2017-1(HMT)ZSAB 2018-1(HMT)ZSAM 2017-1(HMT)ZSAM 2018-1(HMT)ZSASN 2017-1(HMT)ZSASN 2017-2(HMT)ZSASN 2018-1(HMT)ZSCC 2015-1(HMT)ZSCC 2016-1(HMT)ZSCC 2016-2(HMT)ZSCC 2017-2(HMT)ZSCC 2017-3(HMT)ZSCC 2018-1(HMT)ZSCC 2018-2(HMT)ZSCC 2018-3(HMT)ZSCC 2018-4(HMT)ZSHEL 2017-1(HMT)
FRA No.
10/20/201711/17/201705/21/201805/21/201801/03/201810/12/201705/21/201805/21/201801/23/201805/31/201806/07/201806/07/201809/12/201809/12/201804/30/201811/30/201707/26/201805/15/201812/20/201702/21/201802/21/201806/15/201808/24/201805/04/201806/25/201808/30/201812/15/201705/14/201803/28/201803/12/201803/12/201811/28/201711/28/201704/24/201801/03/201803/13/201805/21/201801/17/201802/28/201803/16/201803/16/201803/16/201803/16/201803/16/201805/29/201805/29/201805/29/201805/29/201803/16/2018
SettlementDate Comments
1111111111111111111131211241211111111111111111111
No. ofViolations
$5,000 $10,000 $10,000 $7,500 $2,000 $2,000 $5,000 $5,000 $2,000 $2,500 $5,000 $10,000 $2,000 $5,000 $2,000 $2,000 $2,000 $2,000 $2,000 $7,500 $15,000 $2,500 $10,000 $10,000 $2,000 $5,000 $30,000 $7,500 $4,000 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $5,000 $5,000 $5,000 $5,000 $5,000 $10,000 $10,000 $10,000 $5,000 $5,000 $10,000 $15,000 $12,500
PRCA
$5,000 $8,500 $8,500 $6,000 $2,000 $1,000 $3,750 $3,750 $2,000 $1,000 $4,250 $8,500 $1,500 $4,250 $2,000 $2,000 $2,000 $2,000 $2,000 $7,500 $15,000 $2,500 $10,000 $7,000 $2,000 $4,500 $30,000 $5,500 $4,000 $2,000 $2,000 $1,000 $1,000 $1,400 $2,000 $2,000 $5,000 $5,000 $5,000 $5,000 $5,000 $10,000 $10,000 $10,000 $5,000 $5,000 $10,000 $15,000 $12,500
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $10,000 $10,000 $7,500 $2,000 $2,000 $5,000 $5,000 $2,000 $2,500 $5,000 $10,000 $2,000 $5,000 $2,000 $2,000 $2,000 $2,000 $2,000 $7,500 $15,000 $2,500 $10,000 $10,000 $2,000 $5,000 $30,000 $7,500 $4,000 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $5,000 $5,000 $5,000 $5,000 $5,000 $10,000 $10,000 $10,000 $5,000 $5,000 $10,000 $15,000 $12,500
106
ZSHEL 2017-2(HMT)ZSHEL 2017-3(HMT)
ZSHIN 2018-1(HMT)ZSHL 2015-2(HMT)ZSI 2018-1(HMT)ZSIND 2017-1(HMT)
ZSIQ 2016-1(HMT)ZSIQ 2017-1(HMT)ZSIQ 2018-1(HMT)ZSKE 2018-1(HMT)ZSKE 2018-2(HMT)ZSKI 2017-1(HMT)ZSKS 2017-1(HMT)ZSLH 2017-1(HMT)ZSLH 2018-2(HMT)ZSMC 2017-1(HMT)ZSMZ 2018-1(HMT)
ZSNA 2018-1(HMT)ZSNG 2018-1(HMT)ZSOC 2016-1(HMT)ZSOC 2017-1(HMT)ZSOC 2018-1(HMT)ZSOLI 2018-1(HMT)ZSRE 2014-1(HMT)ZSRE 2014-2(HMT)ZSRE 2014-3(HMT)ZSRE 2017-1(HMT)ZSRE 2017-2(HMT)ZSRE 2017-3(HMT)ZSRE 2018-1(HMT)ZSRZ 2017-1(HMT)ZSRZ 2018-1(HMT)ZSSCO 2015-14(HMT)ZSSCO 2016-1(HMT)ZSSCO 2016-2(HMT)ZSSCO 2016-3(HMT)ZSSCO 2016-4(HMT)ZSSCO 2016-5(HMT)ZSSCO 2016-7(HMT)ZSSCO 2016-8(HMT)ZSSCO 2017-1(HMT)ZSSCO 2017-2(HMT)ZSSCO 2017-3(HMT)ZSSCO 2018-1(HMT)ZSSQ 2018-1(HMT)ZSUF 2017-1(HMT)ZSVC 2017-1(HMT)
FRA No.
03/16/201803/16/2018
04/09/201803/16/201802/26/201801/24/2018
05/21/201805/22/201804/25/201805/21/201805/21/201805/21/201805/23/201804/06/201805/18/201805/21/201805/25/2018
05/21/201802/27/201803/16/201803/16/201803/16/201806/21/201805/03/201805/29/201805/30/201805/14/201805/14/201805/14/201805/24/201804/11/201804/11/201804/02/2018
04/02/201804/02/201804/02/201804/02/201804/02/201804/02/201804/02/201804/02/201804/02/201804/02/201804/02/201809/28/201805/21/201805/21/2018
SettlementDate Comments
11
1111
11211111225
1111514231121332
12111221111231
No. ofViolations
$2,000 $5,000
$5,000 $3,500 $2,000 $10,000
$2,000 $5,000 $6,000 $5,000 $2,000 $5,000 $2,000 $2,000 $4,000 $6,000 $32,500
$5,000 $4,000 $5,000 $5,000 $10,000 $2,000 $8,000 $4,000 $15,000 $2,000 $10,000 $15,000 $5,000 $6,000 $20,000 $10,000
$2,000 $10,000 $5,000 $5,000 $5,000 $15,000 $10,000 $5,000 $5,000 $2,000 $2,000 $4,000 $9,000 $5,000
PRCA
$2,000 $1,000
$5,000 $3,500 $2,000 $1,600
$2,000 $5,000 $6,000 $2,500 $1,000 $5,000 $2,000 $2,000 $4,000 $6,000 $17,500
$5,000 $4,000 $5,000 $5,000 $10,000 $1,400 $6,400 $3,200 $12,000 $2,000 $10,000 $15,000 $3,000 $6,000 $20,000 $6,800
$1,300 $7,000 $3,500 $3,500 $3,500 $10,700 $7,000 $3,500 $3,500 $1,300 $1,300 $2,800 $5,850 $3,500
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$2,000 $1,000
$5,000 $3,500 $2,000 $2,000
$2,000 $5,000 $6,000 $5,000 $2,000 $5,000 $2,000 $2,000 $4,000 $6,000 $25,000
$5,000 $4,000 $5,000 $5,000 $10,000 $2,000 $8,000 $4,000 $15,000 $2,000 $10,000 $15,000 $5,000 $6,000 $20,000 $10,000
$2,000 $10,000 $5,000 $5,000 $5,000 $15,000 $10,000 $5,000 $5,000 $2,000 $2,000 $4,000 $9,000 $5,000
Partially Terminated Violation(s): 1.
Partially Terminated Violation(s): 1.
Partially Terminated Violation(s): 2.
107
ZSXL 2017-1(HMT)ZSYM 2017-1(HMT)ZSYM 2017-2(HMT)ZSYM 2018-1(HMT)ZTCML 2017-1(HMT)ZTCZ 2017-1(HMT)ZTCZ 2017-2(HMT)ZTDL 2013-2(HMT)ZTDL 2018-1(HMT)ZTERM 2018-1(HMT)ZTIL 2016-1(HMT)ZTIM 2017-1(HMT)ZTLY 2017-1(HMT)ZTLY 2017-2(HMT)ZTLY 2017-3(HMT)ZTMT 2015-1(HMT)ZTMT 2016-1(HMT)ZTMT 2017-1(HMT)ZTPE 2018-1(HMT)ZTRG 2013-1(HMT)ZTRG 2014-1(HMT)ZTRG 2015-1(HMT)ZTRG 2015-2(HMT)ZTRG 2016-1(HMT)ZTRG 2016-2(HMT)ZTRG 2016-3(HMT)ZTRG 2016-4(HMT)ZTRG 2017-1(HMT)ZTRG 2017-2(HMT)ZTRSP 2005-1(HMT)ZTRSP 2012-1(HMT)ZTRSP 2014-1(HMT)ZTRSP 2017-1(HMT)ZTRSP 2018-1(HMT)ZTSS 2017-1(HMT)ZTTM 2017-1(HMT)ZTTM 2017-2(HMT)ZTTP 2017-1(HMT)ZTUI 2012-1(HMT)ZTUI 2014-1(HMT)ZTYR 2017-1(HMT)ZUCL 2017-1(HMT)ZUNC 2018-1(HMT)ZUPZ 2018-1(HMT)ZURC 2018-1(HMT)ZURC 2018-2(HMT)ZURC 2018-3(HMT)ZUSEP 2018-1(HMT)ZUTC 2013-1(HMT)
FRA No.
05/21/201805/22/201801/10/201805/07/201804/09/201811/06/201711/06/201709/26/201809/25/201804/19/201803/20/201804/09/201810/06/201701/12/201801/12/201801/09/201801/09/201801/09/201804/04/201812/27/201712/27/201712/27/201712/27/201712/27/201712/27/201712/27/201712/27/201712/27/201712/27/201701/03/201801/03/201812/29/201712/29/201708/21/201812/06/201709/04/201809/04/201812/07/201712/13/201712/13/201704/09/201811/28/201702/08/201802/07/201802/01/201805/10/201808/01/201803/14/201812/12/2017
SettlementDate Comments
11311112111111111121111115111111112211121111111122
No. ofViolations
$10,000 $5,000 $6,000 $2,000 $7,500 $10,000 $5,000 $4,000 $5,000 $5,000 $1,000 $4,000 $2,000 $27,000 $2,000 $10,000 $2,000 $17,500 $2,000 $4,000 $10,000 $10,000 $5,000 $5,000 $25,000 $10,000 $5,000 $10,000 $10,000 $2,500 $5,000 $10,000 $5,000 $4,000 $4,000 $5,000 $5,000 $7,500 $15,000 $10,000 $2,500 $2,000 $1,000 $1,000 $4,000 $5,000 $5,000 $15,000 $15,000
PRCA
$7,000 $5,000 $6,000 $2,000 $7,500 $8,000 $3,000 $0 $5,000 $5,000 $1,000 $4,000 $1,600 $18,000 $1,500 $7,000 $1,600 $11,000 $2,000 $2,000 $8,000 $7,500 $3,250 $3,000 $15,000 $8,000 $3,000 $7,750 $7,500 $0 $0 $7,500 $3,750 $4,000 $4,000 $3,250 $3,000 $7,500 $0 $8,000 $2,500 $1,200 $650 $1,000 $4,000 $5,000 $5,000 $15,000 $0
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$10,000 $5,000 $6,000 $2,000 $7,500 $10,000 $5,000 $0 $5,000 $5,000 $1,000 $4,000 $2,000 $27,000 $2,000 $10,000 $2,000 $17,500 $2,000 $4,000 $10,000 $10,000 $5,000 $5,000 $25,000 $10,000 $5,000 $10,000 $10,000 $0 $0 $10,000 $5,000 $4,000 $4,000 $5,000 $5,000 $7,500 $0 $10,000 $2,500 $2,000 $1,000 $1,000 $4,000 $5,000 $5,000 $15,000 $0
Case Terminated.
Case Terminated.Case Terminated.
Case Terminated.
Case Terminated.
108
ZUTC 2017-2(HMT)ZUTC 2017-4(HMT)ZUTC 2017-5(HMT)ZUTC 2017-6(HMT)ZUTC 2018-1(HMT)ZVALM 2010-1(HMT)ZVALM 2010-2(HMT)ZVALM 2011-1(HMT)ZVALM 2012-1(HMT)ZVALM 2012-3(HMT)ZVCL 2014-1(HMT)ZVCL 2017-1(HMT)ZVES 2016-1(HMT)ZVES 2017-1(HMT)ZVES 2017-2(HMT)ZVGT 2010-1(HMT)ZVGT 2010-2(HMT)ZVGT 2017-1(HMT)ZVLQ 2010-2(HMT)ZVLQ 2010-3(HMT)ZVPK 2010-2(HMT)ZVRI 2016-1(HMT)ZVSA 2017-1(HMT)ZVSC 2017-1(HMT)ZVSE 2008-2(HMT)ZVSI 2015-1(HMT)ZVSW 2017-1(HMT)ZVTM 2017-1(HMT)ZVTM 2017-2(HMT)ZVTZ 2013-2(HMT)ZVTZ 2014-1(HMT)ZVTZ 2015-1(HMT)ZVTZ 2017-1(HMT)ZVUS 2012-1(HMT)ZVUS 2016-1(HMT)ZWDB 2018-1(HMT)ZWEB 2018-1(HMT)ZWEN 2014-1(HMT)ZWHS 2018-1(HMT)ZWLL 2018-1(HMT)ZWLL 2018-2(HMT)ZWLT 2017-1(HMT)ZWMS 2017-1(HMT)ZWPCO 2017-1(HMT)ZWRB 2017-1(HMT)ZWRC 2017-2(HMT)ZWRE 2018-1(HMT)ZWSA 2018-1(HMT)ZZAR 2018-1(HMT)
FRA No.
10/23/201705/09/201812/27/201712/15/201705/29/201805/31/201805/31/201805/31/201805/31/201805/31/201811/17/201711/17/201711/13/201711/13/201711/13/201710/06/201710/06/201710/06/201705/31/201805/31/201801/27/201811/16/201702/20/201805/31/201810/13/201710/27/201710/11/201710/11/201702/28/201801/27/201801/11/201801/11/201810/11/201710/26/201710/26/201707/17/201808/30/201812/28/201704/03/201805/01/201805/18/201801/18/201802/06/201802/13/201804/06/201812/08/201705/07/201806/05/201807/03/2018
SettlementDate Comments
5111113712111111163116111122111132111111111111121
No. ofViolations
$5,000 $5,000 $10,000 $10,000 $10,000 $2,000 $12,500 $35,000 $2,500 $15,000 $10,000 $5,000 $5,000 $5,000 $5,000 $4,000 $5,000 $18,500 $6,000 $5,000 $5,000 $24,000 $3,000 $2,000 $7,500 $5,000 $20,000 $4,000 $2,000 $10,000 $5,000 $5,000 $6,000 $4,000 $3,000 $2,000 $2,000 $15,000 $5,000 $5,000 $10,000 $2,000 $5,000 $2,000 $10,000 $10,000 $10,000 $8,000 $2,000
PRCA
$5,000 $5,000 $10,000 $10,000 $10,000 $1,000 $6,000 $17,000 $1,200 $7,000 $8,000 $3,000 $3,250 $3,500 $4,750 $0 $0 $12,500 $3,000 $2,000 $0 $12,500 $3,000 $1,200 $0 $0 $20,000 $4,000 $2,000 $0 $3,000 $4,000 $6,000 $4,000 $3,000 $2,000 $1,650 $0 $4,250 $0 $7,000 $1,500 $3,500 $1,650 $9,000 $10,000 $7,500 $4,900 $2,000
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$5,000 $5,000 $10,000 $10,000 $10,000 $2,000 $12,500 $35,000 $2,500 $15,000 $10,000 $5,000 $5,000 $5,000 $5,000 $0 $0 $18,500 $6,000 $5,000 $0 $24,000 $3,000 $2,000 $0 $0 $20,000 $4,000 $2,000 $0 $5,000 $5,000 $6,000 $4,000 $3,000 $2,000 $2,000 $0 $5,000 $0 $10,000 $2,000 $5,000 $2,000 $10,000 $10,000 $10,000 $8,000 $2,000
Case Terminated.Case Terminated.
Case Terminated.
Case Terminated.Case Terminated.
Case Terminated.
Case Terminated.
Case Terminated.
109
ZZBT 2018-1(HMT)ZZBT 2018-2(HMT)ZZCT 2018-1(HMT)ZZIE 2018-1(HMT)ZZPR 2018-1(HMT)ZZSG 2018-1(HMT)
FRA No.
05/14/201805/14/201805/15/201805/30/201805/29/201809/19/2018
SettlementDate Comments
751422
No. ofViolations
$14,000 $10,000 $2,000 $14,000 $5,000 $15,000
PRCA
$7,000 $5,000 $2,000 $2,400 $5,000 $9,000
SettlementAmount
Federal Railroad Administration Safety Cases Closed in FY 2018
POCA
$14,000 $10,000 $2,000 $4,000 $5,000 $15,000
Terminated Violation(s): 1.
7,157 $25,270,025 $23,429,525 $17,686,116Total
110
ABS
ACWR
ADCX
AERC
AGR
AIKR
ALAB
AM
APRR
ARR
ASRY
ATAX
ATK
ATN
AVR
AWRR
BAP
BB
BBAY
BJRY
BML
BNSF
BNSO
BPRR
BRC
BRSR
BVRR
CAGY
CBCX
CBR
CC
CCHA
CERA
CFNR
CFRC
CIC
CKIN
CLC
CMEM
Codes
Alabama Southern Railroad
ABERDEEN, CAROLINA AND WESTERN RAILROAD
Adirondack Scenic Railroad
ALBANY AND EASTERN RAILROAD COMPANY
Alabama & Gulf Coast Railway LLC.
Aiken Railway Company, LLC
ALABAMA RAILROAD CO.
Arkansas and Missouri Railroad Company
ALBANY PORT RAILROAD CORPORATION
Alaska Railroad Corporation
ASHLAND RAILWAY INC.
Balfour Beatty Rail
National Railroad Passenger Corporation
Alabama & Tennessee River Railway LLC
ALLEGHENY VALLEY RAILROAD CO.
AUSTIN WESTERN RAILROAD
Rarus Railway, LLC d/b/a Butte, Anaconda & Pacific
Buckingham Branch Railroad Company
Bogalusa Bayou Railroad LLC
BURLINGTON JUNCTION RAILWAY
BELFAST & MOOSEHEAD LAKE PRESERVATION SOCIETY
BNSF RAILWAY COMPANY
BNSF SUBURBAN OPERATIONS
BUFFALO & PITTSBURGH RAILROAD, INC.
The Belt Railway Company of Chicago
BATON ROUGE SOUTHERN RAILROAD
Boise Valley Railroad, LLC
Columbus & Greenville Railway
Columbia Business Center
Coos Bay Rail Line
CHICAGO, CENTRAL & PACIFIC RAILROAD COMPANY
Columbus & Chattahoochee Railroad, Inc.
CENTRAL RAILROAD COMPANY OF INDIANAPOLIS
CALIFORNIA NORTHERN RAILROAD CO.
CENTRAL FLORIDA RAIL CORRIDOR
Cedar Rapids and Iowa City Railway Company
CHESAPEAKE AND INDIANA RAILROAD CO. INC.
COLUMBIA & COWLITZ RAILWAY, LLC
Cargill Memphis
Respondent Names
Respondent
111
CMQX
CMR
CMTY
CN
COP
CORP
CP
CRL
CRSH
CSCD
CSX
CTM
CTN
CTRR
CVR
CWRO
DCR
DEAD
DGNO
DME
DMVW
DQE
DR
DSC
DSRC
EDW
EEC
EIRR
ELS
EMRY
ESPN
EWG
FCEN
FCR
FCTY
FMWX
FNOR
FWWR
GCSR
Codes
Central Maine & Quebec Railway
CENTRAL MIDLAND RAILWAY
Capital Metropolitan Transportation Authority
Canadian National Railway Company
City of Prineville Railway
CENTRAL OREGON & PACIFIC RAILROAD, INC.
CANADIAN PACIFIC RAILWAY
CHICAGO RAIL LINK
Consolidated Rail Corporation
CASCADE AND COLUMBIA RIVER RAILROAD CO.
CSX TRANSPORTATION, INC.
Chicago Terminal Railroad
CANTON RAILROAD COMPANY
CLOQUET TERMINAL RR CO INC
Cimarron Valley Railroad
Cleveland Works Railway Co.
Delmarva Central Railroad
DEAD RIVER COMPANY
Dallas, Garland and Northeastern Railroad, Inc.
Dakota, Minnesota & Eastern Railroad Co.
DAKOTA MISSOURI VALLEY AND WESTERN
DEQUEEN AND EASTERN RAILROAD, LLC
DARDANELLE & RUSSELLVILLE RAILROAD
Drake Switching Company, LLC.
DAKOTA SOUTHERN RAILWAY COMPANY
EL DORADO & WESSON RAILWAY CO.
EAST ERIE COMMERCIAL RAILROAD
Eastern Idaho Railroad, LLC
ESCANABA AND LAKE SUPERIOR RAILROAD CO.
Eastern Maine Railway
East Penn Railroad LLC
EASTERN WASHINGTON GATEWAY RAILROAD
FLORIDA CENTRAL RAILROAD CO.
Fulton County Railway, LLC.
FULTON COUNTY RAILROAD
FILLMORE AND WESTERN RAILWAY
FLORIDA NORTHERN RAILROAD COMPANY INC.
FORT WORTH & WESTERN RAILROAD
Gulf, Colorado & San Saba Railway
Respondent Names
Respondent
112
GDLK
GFRR
GLC
GMRC
GNBC
GNRL
GNRR
GNWR
GRNW
GRYR
GS
GSM
GTRA
GWR
GWWL
HERQ
HRRC
IAIS
IHB
INRD
IORY
JCIV
KCS
KCT
KFR
KJRY
KNOR
KNWA
KRR
KYLE
LAJ
LBWR
LI
LSRC
LVRR
MACZ
MBRR
MBTA
MCRL
Codes
GRAND ELK RAILROAD, LLC.
GEORGIA AND FLORIDA RAILWAY, INC.
GREAT LAKES CENTRAL RAILROAD
GREEN MOUNTAIN RAILROAD CORPORATION
GRAINBELT CORPORATION
GNP RAILWAY INC.
GEORGIA NORTHEASTERN RAILROAD COMPANY, LLC
GENESEE AND WYOMING RAILROAD COMPANY
Great Northwest Railroad, LLC
Grenada Railroad, LLC
Georgia Southern Railway Company
GREAT SMOKEY MOUNTAIN RAILWAY
GOLDEN TRIANGLE RAILROAD, LLC
GREAT WESTERN RAILWAY COMPANY
Genesis Worldwide Logistics LLC
Herzog Railraod Services
HOUSATONIC RAILROAD COMPANY, INC.
Iowa Interstate Railroad
Indiana Harbor Belt Railroad Company
The Indiana Rail Road Company
INDIANA & OHIO RAILWAY COMPANY
Jacintoport International LLC
The Kansas City Southern Railway Company
KANSAS CITY TERMINAL RAILWAY COMPANY
KETTLE FALLS INTERNATIONAL RAILWAY, LLC.
KEOKUK JUNCTION RAILWAY COMPANY
KLAMATH NORTHERN RAILWAY COMPANY
Kanawha River Railroad
KIAMICHI RAILROAD CO., LLC.
KYLE RAILROAD CO.
LOS ANGELES JUNCTION RAILWAY COMPANY
Lubbock & Western Railway, L.L.C.
LONG ISLAND RAILROAD
LAKE STATE RAILWAY COMPANY
LYCOMING VALLEY RAILROAD
MARYLAND TRANSIT ADMINISTRATION
Meridian & Bigbee Railroad, LLC.
Massachusetts Bay Transportation Authority
Massachusetts Coastal Railroad LLC
Respondent Names
Respondent
113
MDDE
MDS
MEC
MH
MNA
MNBR
MNCW
MNNR
MNR
MOR
MRA
MRL
MSDR
NCTC
NCVA
NECR
NERR
NHN
NHRR
NJTR
NKCR
NMRX
NOGC
NOPB
NPB
NSCR
NYA
NYSW
OCTL
OERR
OHCR
OHIO
OMTX
PAL
PAS
PCC
PCJX
PNWR
PR
Codes
MARYLAND AND DELAWARE RAILROAD COMPANY
MERIDIAN SOUTHERN RAILWAY
Maine Central Railroad Company
MOUNT HOOD RAILWAY COMPANY
MISSOURI & NORTHERN ARKANSAS RAILROAD CO., INC.
Meridian and Bigbee Railroad, LLC
Metro-North Commuter Railroad Company
MINNESOTA COMMERCIAL RAILWAY
Maine Northern Railway Company
MOR, LLC.
Mineral Range Inc.
Montana Rail Link
MISSISSIPPI DELTA RAILROAD
North County Transit Coaster
NORTH CAROLINA & VIRGINIA RAILROAD CO., LLC
NEW ENGLAND CENTRAL RAILROAD, INC.
NASHVILLE & EASTERN RAILROAD
New Hampshire North Coast Railroad
New Hope & Ivyland Railroad
NEW JERSEY TRANSIT RAIL OPERATIONS
NEBRASKA KANSAS & COLORADO RAILNET, INC.
NEW MEXICO DEPARTMENT OF TRANSPORTATION
NEW ORLEANS & GULF COAST RAILWAY CO., INC.
NEW ORLEANS PUBLIC BELT RAILROAD CORP
Norfolk & Portsmouth Belt Line Railroad Company
NORTHSTAR COMMUTER RAIL
NEW YORK AND ATLANTIC RAILWAY COMPANY
The New York Susquehanna and Western Railway Corp.
OIL CREEK & TITUSVILLE LINES, INC.
Oregon Eastern Railroad
Ohio Central Railroad, Inc.
Ohio Terminal Railway Co.
OmniTRAX Inc.
PADUCAH & LOUISVILLE RAILWAY COMPANY
Pan Am Southern LLC.
Palouse River & Coulee City Railroad, LLC
PENINSULA CORRIDOR JOINT POWERS BOARD
PORTLAND AND WESTERN RAILROAD INC.
Palmetto Railroad
Respondent Names
Respondent
114
PSRM
PW
RJCP
SAPT
SBG
SCAX
SCCT
SCIH
SCX
SDTI
SEPA
SFRV
SGSC
SIRS
SJVR
SKOL
SLC
SLGW
SLR
SLRG
SLWC
SM
SMRT
SNC
SOU
SRN
SS
ST
STE
SW
SYSI
TASD
TIBR
TMBL
TNMR
TPW
TRC
TRMW
TRRA
Codes
PACIFIC SOUTHWEST RAILWAY MUSEUM
PROVIDENCE AND WORCESTER RR COMPANY
R. J. Corman Railroad Company/Pennsylvania Lines
SAVANNAH PORT TERMINAL RAILROAD
Savage Bingham & Garfield Railroad Company
Southern California Regional Rail Authority
SANTA CLARA COUNTY TRANSIT DISTRICT
SOUTH CHICAGO & INDIANA HARBOR RAILWAY
Santa Cruz and Monterey Bay Railway Co.
SAN DIEGO METROPOLITAN TRANSIT SYSTEM
Southeastern Pennsylvania Transportation Authority
South Florida Regional Transportation Authority
SGS Petroleum Service Corporation
Savage Industrial Rail Services, Inc.
San Joaquin Valley Railroad Co.
South Kansas and Oklahoma Railroad Company
San Luis Central Railroad Company
Salt Lake, Garfield & Western Railway Company
ST. LAWRENCE & ATLANTIC RAILROAD COMPANY
SAN LUIS & RIO GRANDE RAILROAD
Stillwater Central Railroad Company, LLC
St. Mary's Railroad Company
Sonoma Marin Area Rail Transit (SMART)
Saratoga & North Creek Railway, LLC
Norfolk Southern Railway Company
SABINE RIVER & NORTHERN RAILROAD COMPANY
SAND SPRINGS RAILWAY COMPANY
SPRINGFIELD TERMINAL RAILWAY COMPANY
STOCKTON TERMINAL AND EASTERN RAILROAD
Southwestern Railroad, Inc.
SAVAGE YARD SERVICES INC
Terminal Railway Alabama State Docks
Timberrock Railroad Company, LLC
Tacoma Municipal Belt Line Railway
TEXAS & NEW MEXICO RAILWAY COMPANY
Toledo, Peoria and Western Railway Corp.
TRONA RAILWAY COMPANY
Tacoma Rail
Terminal Railroad Association of St. Louis
Respondent Names
Respondent
115
TSR
TSRR
TSWS
TXN
TXNW
UFRC
UP
VR
VSOR
WATX
WE
WHIR
WNYP
WPRR
WSS
WTJR
WTLC
WVC
WW
XAHM
XAIR
XAMA
XAWS
XBBR
XBCP
XBRI
XCAI
XCHS
XCIH
XCPT
XCRB
XCSG
XCSK
XCVA
XCWW
XDOO
XFBR
XFLD
XFMC
Codes
TEXAS STATE RAILROAD
TENNESSEE SOUTHERN RAILROAD COMPANY, LLC
Terminal Switching Services
Texas New Mexico Railway, LLC.
TEXAS NORTHWESTERN RAILWAY COMPANY
UTAH FRONTRUNNER COMMUTER RAIL
Union Pacific Railroad Company
Valdosta Railway, L.P.
VICKSBURG SOUTHERN RAILROAD
WATCO Switching
Wheeling & Lake Erie Railway Company
Whirlpool Corporation
WESTERN NEW YORK & PENNSYLVANIA RAILROAD
WILLIAMETTE AND PACIFIC RAILROAD, INC.
WINSTON-SALEM SOUTHBOUND RAILWAY
WICHITA, TILLMAN AND JACKSON RY. CO., INC.
West Texas and Lubbock Railway Company
WEST VIRGINIA CENTRAL RAILROAD
WINCHESTER AND WESTERN RAILROAD COMPANY
American Honda Motors
Airgas Carbonic Industries, Inc.
American Auto Works, LLC
Archer Western Contractors
Bombardier Mass Transit Corporation
BP Cherry Point Refinery
BALFOUR BEATTY RAIL, INC.
Cargill, Inc.
CHS, INC.
Chemsolv Inc.
Center Point Terminal Company
Colo Railroad Builders
Certainteed Saint-Gobain
CSX Transportation Storekeeper
CEVA Logistics
CW&W CONTRACTORS
Dooleys Petroleum Inc.
Fibrant LLC
Florida Distillers Company
FREEPORT-MCMORAN INC.
Respondent Names
Respondent
116
XFUJ
XGEI
XGEO
XGLK
XHLL
XICB
XLCS
XLOV
XLTC
XMAG
XMDA
XMKW
XMPM
XMSW
XMVM
XNSD
XQDI
XRJC
XRMA
XRNN
XRPI
XRRP
XSBK
XSER
XSNJ
XSRS
XSSP
XSTH
XTEC
XTGS
YVRR
ZAAO
ZABC
ZABS
ZACR
ZADN
ZAEM
ZAEN
ZAEO
Codes
Fuji Hunt Photo Chemicals
GULFMARK ENERGY, INC.
Georgia Pacific, LLC.
Great Lakes Water Authority
Holland LP
INCOBRASA INDUSTRIES, LTD
Lamberts Cable Splicing Company, LLC.
Loveland Products Inc.
Lambent Technologies Corporation
Matheson Gas Company
Midland Asphalt Materials Inc.
MarkWest Hydrocarbon, L.L.C.
MOMENTIVE PERFORMANCE MATERIALS, INC.
MI SWACO
McKenzie Valve & Machining Co.
New South Distribution, Inc.
Quality Distribution Inc.
R. J. Corman Construction
Rocky Mountain Agronomics, Inc.
Roadrunner Transportation
Rail Pros, Inc.
Railroad Protective Services, Inc.
Superior Bulk Logistics, Inc.
Sem Minerals
SOUTHERN NEW JERSEY LIGHT RAIL GROUP, LLC
Sperry Rail Service (SPRQ)
Solvay Specialty Polymers USA LLC
Sawtooth NGL Caverns
Techno Adhesives Company
Trans-Global Solutions, Inc.
Yadkin Valley Railroad Co.
AOC LLC
ABC COKE
ABF Freight System, Inc.
ADM CORN PROCESSING
THE ANDERSONS, INC.
Agri-Empresa Transload & Storage, LLC
Altex Energy, Ltd.
ARLANXEO Canada Inc.
Respondent Names
Respondent
117
ZAEX
ZAFQ
ZAG
ZAGA
ZAGP
ZAGT
ZAHL
ZAID
ZAIV
ZAKN
ZALA
ZALG
ZALQ
ZALTI
ZAMC
ZAMRI
ZAMV
ZAND
ZAPM
ZARGR
ZARJ
ZARK
ZASR
ZASY
ZAUL
ZAVX
ZAXI
ZBAC
ZBADG
ZBAK
ZBAN
ZBAS
ZBCU
ZBEP
ZBGL
ZBHM
ZBMR
ZBMS
ZBRM
Codes
ALPHA EXPLOSIVES
Afton Chemical Corporation
Ash Grove Cement Company
Airgas Carbonic
AG PROCESSING INC.
AmeriGas Propane L.P.
Ashland, Inc.
Austin Industries, Inc.
Addivant
Akzo Nobel Functional Chemicals LLC
ALON ASPHALT
Amalgamated Sugar Company
Airgas, an Air Liquide Company
Altivia Petrochemicals, LLC
ARCHER DANIELS MIDLAND CO.
AMERICAN RAILCAR INDUSTRIES
AMVAC CHEMICAL CORPORATION
THE ANDERSONS, INC.
Ascend Performance Materials LLC
American Refining Group, Inc.
Arrow Material Services
ARKEMA, INC.
AMERICAN SYNTHETIC RUBBER COMPANY
Americas Styrenics
ALLIED UNIVERSAL CORPORATION
AdvanSix
Axiall Corporation
Base, Inc.
BADGER STATE ETHANOL
BAKER PETROLITE CORPORATION
Bulk Trans, Inc.
BASF CORPORATION
Blue Cube Operations LLC - Olin Chlor Alkali Logis
Buckeye Partners
Brenntag Great Lakes, LLC
BHS Specialty Chemical Products
Benchmark River & Rail Terminals
BRENNTAG MID-SOUTH, INC.
Blue Racer Midstream, LLC
Respondent Names
Respondent
118
ZBRP
ZBRY
ZBSN
ZBTA
ZBTC
ZBTM
ZBUT
ZBWW
ZBYS
ZCAB
ZCAM
ZCAU
ZCBK
ZCCF
ZCCM
ZCCN
ZCDA
ZCDY
ZCEE
ZCEF
ZCELA
ZCFC
ZCHX
ZCHY
ZCIE
ZCJZ
ZCLQ
ZCLX
ZCMA
ZCME
ZCMP
ZCNC
ZCNL
ZCORN
ZCOV
ZCOY
ZCPSI
ZCRY
ZCRZ
Codes
BRENNTAG PACIFIC, INC.
Berryman Chemical, Inc.
Basin Transload, LLC
Bio Trans Modal, LLC
BULK TRANSPORTATION COMPANY
Buckeye Terminals LLC-Macungie
BioUrja Trading LLC
BUTTONWILLOW WAREHOUSE COMPANY
Battery Solutions
CABOT CORP.
CALIFORNIA AMMONIA COMPANY
Carbellus, LLC.
C&C Bulk Liquid Transfer, Inc.
Consumer Co-Op Refiners
CARGILL-CORN MILLING DIVISION
Clearon Corporaton
Canada Colors & Chemicals LTD.
Cody Group Inc.
Centennial Energy
CHIEF ETHANOL FUELS
Celanese
Chemours Co. FC, LLC
CLEAN HARBORS ENVIRONMENTAL SERVICES, INC.
Catalyst & Chemical Containers, Inc.
CENTRAL INDIANA ETHANOL
Caljet of America
CORN LP
CHEMTRADE LOGISTICS
CMA-CGM (AMERICA)
Calumet Montana Refining, LLC
CHEMICAL PRODUCTS CORPORATION
CHEROKEE NITROGEN
Canal Terminal Company
CORN PLUS
Covestro LLC.
Coastal Energy Corporation
CROP PRODUCTION SERVICE, INC.
CHEMTRADE REFINERY SERVICES, INC.
Cornerstone Chemical Company
Respondent Names
Respondent
119
ZCSF
ZCSPI
ZCT
ZCUI
ZCYS
ZDAK
ZDCM
ZDCU
ZDET
ZDKR
ZDMX
ZDNA
ZDPM
ZDSP
ZDUB
ZDUK
ZDUP
ZDYI
ZEACH
ZECD
ZECDP
ZECQ
ZEJO
ZEME
ZEMER
ZEMT
ZENK
ZEPC
ZEPG
ZEPZ
ZEQU
ZESG
ZESR
ZETT
ZEVC
ZEVD
ZFAL
ZFAS
ZFBB
Codes
Chemical Systems of Florida, Inc.
CHEMICAL SPECIALTIES, INC.
COLONIAL TERMINALS
Chevron USA, Inc.
Cornerstone Systems (CTSQ)
DAK AMERICAS LLC
DOVER CHEMICAL CORP.
The Dow Chemical Company
DIDION ETHANOL
DELEK REFINING, LTD.
DuPont de Mexico S.A. de C.V
Diageo Americas Supply, Inc.
DCP MIDSTREAM
DIMMITT SULFUR PRODUCTS, LTD
DU BOIS Chemicals
DUKE ENERGY
E.I. DUPONT DE NEMOURS AND COMPANY
DYNO NOBEL, INC.
EASTMAN CHEMICAL COMPANY
EMCO CHEMICAL DISTRIBUTORS, INC.
EPCO CARBON DIOXIDE PRODUCTS
E & C Chemicals, Inc
Exxon Mobil-Joliet Refinery
Emerald Performance Materials
EMERALD SERVICES, INC.
Emerald Transformer
EnLink Midstream
Enterprise Products Operating LLC
EASTERN PROPANE GAS, INC.
Enterprise Products Operating LLC
EQUISTAR CHEMICALS LP
Energy Services Group, Inc.
Eco Services Operations Corp.
Endeavor Tank & Transport LLC
EVONIK CYRO LLC
Evonik Corporation
Forbo Adhesives LLC
Fort Amanda Specialities LLC
FIREBIRD BULK CARRIERS, INC.
Respondent Names
Respondent
120
ZFBI
ZFCQ
ZFEQ
ZFFP
ZFGC
ZFHR
ZFIC
ZFIT
ZFKP
ZFLS
ZFMB
ZFMJ
ZFNS
ZFON
ZFOR
ZFOT
ZFPC
ZFPI
ZFRR
ZFSQ
ZFTP
ZFUR
ZFVP
ZFXI
ZGDB
ZGDE
ZGEO
ZGEPA
ZGEU
ZGFE
ZGPE
ZGPF
ZGSR
ZGSZ
ZGUS
ZHAR
ZHCG
ZHCH
ZHCM
Codes
FALCON BRIDGE LIMITED
FMC CORPORATION - HYDROGEN PEROXIDE DIVISION
Feed Energy Company
FLEXIBLE FOAM PRODUCTS
FERRELL GAS, INC.
Flint Hills Resources
Flint Group North America
Fortron Industries
Foremark Performance Chemical
Frontier Logistical Services
Flambeau River Papers
FMC, INDUSTRIES
FNS, INC.
Fonbrai Inc.
HollyFrontier El Dorado Refining LLC
FARSTAD OIL COMPANY
FORMOSA PLASTICS CO.
FOAMEX PRODUCTS INC.
FRONT RANGE ENERGY LLC
Quimica Fluor S.A. de C.V.
FERTILIZANTES TEPEYAC/PRODUCTORA DEFERTILIZANTES
First Union Rail Corporation
First Virgina Propane, Inc.
FXI
GDB INTERNATIONAL, INC.
Garmi Del Norte, S.A. DE C.V.
Geo Specialty Chemicals, Inc.
Georgia Pacific Company
GIBSON ENERGY LLC
Greenfield Ethanol, Inc.
Green Plains, Inc.
Georgia-Pacific Chemicals LLC.
Gas Supply Resources, LLC.
SGS North America, Inc., Petroleum Service Corp.
GELITA USA
Harcros Chemicals Inc.
HUNTSMAN CORPORATION
HELENA CHEMICAL COMPANY
HCH Marketing Co.
Respondent Names
Respondent
121
ZHEI
ZHFA
ZHFR
ZHLA
ZHLR
ZHMS
ZHNI
ZHRM
ZHUN
ZHWS
ZHYC
ZIEL
ZIML
ZIP
ZIRO
ZIRR
ZITH
ZIVE
ZIWI
ZIWT
ZJCC
ZJMA
ZJRS
ZKAE
ZKAT
ZKDM
ZKEL
ZKEM
ZKEN
ZKKC
ZKML
ZKMQ
ZKOR
ZKPI
ZKRA
ZKTS
ZKWS
ZKYE
ZLAS
Codes
HEXION Inc.
HollyFrontier Cheyenne Refining
HollyFrontier Refining & Marketing LLC
HAPAG - LLOYD AMERICA, INC.
Husky Lima Refinery
Husky Marketing and Supply Co.
Honeywell International, Inc.
HOLLY ENERGY PARTNERS
Huntsman Chemical Corporation
Hiram Walker & Sons, Inc.
HYDRITE CHEMICAL CO.
Chemco Ireland Limited
IMTT - Lemont
INTERNATIONAL PAPER COMPANY
IRVING OIL COMPANY
Ironedge Resources
Interstate Chemical Inc.
Indorama Ventures
International Waxes, Inc.
Infiltrator Water Technologies
JCI JONES CHEMICALS, INC.
Johns Manville
J. R. SIMPLOT COMPANY
Kappa Ethanol
Kane Transport
Kinder Morgan Energy Partners, L.P.
KAAPA ETHANOL LLC
Kemira Water Solutions
KENNECOTT CORP.
KIK Custom Products, Inc.
Kinder Morgan Liquids Terminals, LLC
Kinder Morgan
KERN OIL AND REFINING COMPANY
Koppers Inc.
KRATON
KELLERSTRASS
KEMIRA WATER SOLUTIONS
Keyera Corp.
LOUISIANA SPECIALTY PRODUCTS, INCORPORATED
Respondent Names
Respondent
122
ZLDE
ZLDI
ZLDR
ZLEA
ZLGD
ZLHP
ZLSH
ZLUB
ZLUIN
ZLWD
ZMAF
ZMAX
ZMFQ
ZMGP
ZMHO
ZMIP
ZMKJ
ZMNE
ZMNP
ZMNT
ZMNX
ZMQE
ZMRK
ZMSL
ZMTE
ZMTR
ZMUN
ZMUSK
ZMWE
ZNAL
ZNBA
ZNBX
ZNCS
ZNDM
ZNGE
ZNGL
ZNPT
ZNSL
ZNSS
Codes
LYONDELL CHEMICAL CO.
Linde North America, Inc.
Louis Dreyfus Company LLC
LaCrosse Solutions
Legend LLC
LBC Houston
Lone Star NGL Hattiesburg LLC
Lubrizol Corporation
LUCITE INTERNATIONAL
LWD INCORPORATED
Maverick Fuel Oil Terminal
METHANEX METHANOL COMPANY
Mosaic Fertilizer LLC
MGP Ingredients, Inc.
Monument Chemical Houston, Ltd.
MAERSK LINE, INC.
Mizkan Americas, Inc.
McNeil PPC, Inc.
Marathon Petroleum Company
MARTIN OPERATING PARTNERSHIP LP
Maintex, Inc.
MARQUIS ENERGY, LLC
Maersk Line
MicroSource LLC
Motiva Enterprises LLC
MONTANA RESOURCES
The Mundy Companies
MUSKET CORPORATION
Midwest Renewable Energy, LLC
Nalco Company
Noble Americas Corporation
NELSON BROTHERS
Nease Corporation
Domtar Paper Company LLC
NuGen Energy LLC
NGL Supply Wholesale, LLC
NewPort Tank Containers, Inc.
NGL SUPPLY COMPANY, LTD.
Northern Star Cooperative Service
Respondent Names
Respondent
123
ZNXE
ZOBC
ZOCC
ZOEE
ZOKH
ZOLI
ZOMP
ZONB
ZONG
ZOTER
ZOTT
ZPAE
ZPCSI
ZPCSS
ZPCU
ZPGW
ZPHO
ZPLA
ZPLS
ZPME
ZPMS
ZPNF
ZPNQ
ZPOL
ZPOTS
ZPPJ
ZPRG
ZPRX
ZPVS
ZQTL
ZRAI
ZRAS
ZRBA
ZRCA
ZRFC
ZRKM
ZRKP
ZRLG
ZRPM
Codes
Nexeo Solutions Company
OLD BRIDGE CHEMICAL, INC.
Occidental Chemical Corporation
One Earth Energy, LLC
ONEOK Hydrocarbon, L.P.
OLIN CORPORATION
OMEGA PARTNERS, LLC
O'NEILL VINTNERS & DISTILLERS
Conagra
ODFJELL TERMINALS (HOUSTON), INC.
Oiltanking Texas City L.P.
PACIFIC ETHANOL, INC.
P-C Sales & Services, Inc.
PCS SALES (USA), INC.
Polynt Composites USA, Inc.
Pengrowth Energy Corporation
PCS PHOSPHATE COMPANY
PINE LAKE CORN PROCESSORS
PLAINS LPG SERVICES LP
Plymouth Energy
Plains Midstream Canada, LLC
PCS Nitrogen Fertilizer
PENCCO, Inc.
POOLE CHEMICAL CO.
POTASH CORPORATION
Pro Petroleum Incorporated
PREMCOR REFINING GROUP INC.
PRAXAIR, INC.
PVS Chemicals, Inc.
QUALITY TRANSLOAD
Rainy Lake Oil
Royal Adhesives & Sealants
RB Manufacturing - Hillsborough
Ruetgers Canada, Inc.
Superior Refining Company
Rocky Mountain Transload
Rockville Propane Terminal LLC.
Rail Link
Renewable Product Marketing Group, LLC
Respondent Names
Respondent
124
ZRSH
ZRSO
ZRTLS
ZRVI
ZSAB
ZSAM
ZSASN
ZSCC
ZSHEL
ZSHIN
ZSHL
ZSI
ZSIND
ZSIQ
ZSKE
ZSKI
ZSKS
ZSLH
ZSMC
ZSMZ
ZSNA
ZSNG
ZSOC
ZSOLI
ZSRE
ZSRZ
ZSSCO
ZSSQ
ZSUF
ZSVC
ZSXL
ZSYM
ZTCML
ZTCZ
ZTDL
ZTERM
ZTIL
ZTIM
ZTLY
Codes
RSI LOGISTICS, INC.
Rail Solutions LLC
RAIL TERMINAL SERVICES
Servichem, Inc.
SABIC Innovative Plastics
Styrolution America LLC
SASOL CHEMICALS NORTH AMERICA
SHELL CHEMICAL LP
SHELL CHEMICALS CANADA
Savage Safe Handling
Shell Canada Products
Southern Ionics, Inc.
SEELER INDUSTRIES
SI Group, Inc.
Snake River Petroleum LLC
Safety-Kleen Systems, Inc.
Sekisui Chemical Company
Splash Products, Inc.
Scott Petroleum Corporation
SAIA Motor Freight Line LLC
Schneider National Carriers, Inc.
Sun Gas Corporation
SHELL OIL COMPANY
SOLUTIA, INC.
Suncor Energy Products, Inc.
St. Paul Park Refining Co. LLC
SAVAGE SERVICES CORPORATION
ED Staub & Sons
Suffolk Solutions Inc.
SOLVAY CHEMICALS, INC.
Siouxland Energy and Livestock Cooperative
Symrise
TECK COMINCO METALS LTD.
Samuel Coraluzzo Co., Inc.-Torrissi Transport
TDC LLC
TESORO REFINING AND MARKETING COMPANY
TERRA INTERNATIONAL
Tilden Mining Company
TATE & LYLE INGREDIENTS AMERICAS, INC.
Respondent Names
Respondent
125
ZTMT
ZTPE
ZTRG
ZTRSP
ZTSS
ZTTM
ZTTP
ZTUI
ZTYR
ZUCL
ZUNC
ZUPZ
ZURC
ZUSEP
ZUTC
ZVALM
ZVCL
ZVES
ZVGT
ZVLQ
ZVPK
ZVRI
ZVSA
ZVSC
ZVSE
ZVSI
ZVSW
ZVTM
ZVTZ
ZVUS
ZWDB
ZWEB
ZWEN
ZWHS
ZWLL
ZWLT
ZWMS
ZWPCO
ZWRB
Codes
TransMontaigne Product Services, Inc.
Texpar Energy LLC
Toledo Refining Company LLC
TROPICAL SHIPPING USA, LLC
Tessenderlo Kerley, Inc.
Tradebe Treatment and Recycling, LLC
Tristar Transload PNW, Inc.
Turner Industries, LLC
TYREE OIL
UNIVAR CANADA LTD.
Union Carbide Corporation
United Petroleum Transports, Inc.
UNITED REFINING COMPANY
U.S. ENERGY PARTNERS, LLC
UNION TANK CAR COMPANY
Valero Marketing and Supply Company
Vale Canada Limited
Veolia ES Technical Solutions, L.L.C.
VAN-G LOGISTICS
VALERO LP
Vopak USA
Virginia International Terminals, Inc.
Vopak Terminal Savannah
Valley Solvents & Chemicals
VERASUN ENERGY
Vertellus Agriculture & Nutrition Specialties LLC
Vopak Terminal South Wilmington
Vopak Terminals of Canada
VOPAK TERMINAL DEER PARK
Viscofan USA, Inc.
Western Dubuque Biodiesel LLC
WEBB CHEMICAL SERVICE CORP.
Walter Energy
White Springs Agricultural Chemicals
The Williams Companies, Inc.
WOLF LAKE TERMINALS, INC.
WILLIAMS MIDSTREAM
Western Petroleum Company
WRB Refining, LLC
Respondent Names
Respondent
126
ZWRC
ZWRE
ZWSA
ZZAR
ZZBT
ZZCT
ZZIE
ZZPR
ZZSG
Codes
WYOMING REFINING COMPANY
WESTERN REFINING COMPANY
WESTWOOD SHIPPING LINES, INC.
The Andersons, Inc.
Bulk Transfer, LLC.
CTI, Inc.
Ziegler Chemicals & Minerals Corp.
Prestone Products
Solar Gas, Inc.
Respondent Names
Respondent
Top Related