All dimensions to be checked on site. Do not scale off this drawing for constructionpurposes. This drawing is the copyright of the Architect, and not to be reproducedwithout their permission. Ordnance Survey map information reproduced with permissionof HMSO Crown Copyright reserved. rg+p Ltd. Trading as rg+p.
HOUSE TYPE Beds NUMBER SQM SQM Total SQFT SQFt total %
B (Bungalow) 2b3p 2 62 124 667.37 1334.74 100.0%
Total 2 124 1334.74 100.0%
Total Site Area: 0.049 Hectares
Total Site Area: 0.121 Acres
Site Density: 40.98 DPH
ACCOMMODATION SCHEDULE
100-407 31-37 Overdale Road
N
Planning
17.04.19
GW
JRAll drawing informa on is based on OS mapdata and is subject to change a er receivingtopographical survey and services informa on.
Approximate Tree Loca on
1:500 @ A4
A Footprints amended 28.05.19
B Red line amended to includeentire proposed developmentarea & drawing status updatedto planning.
31.05.19/04/06/19
GW/CW
JR
YM
C House type amended toType G - 4B8P.
17.07.19 CW YM
D House type amended toType E - 5B8P. Scheduleamended.
17.12.19 GW
E House type amended toType H - 4B6P. Scheduleamended.
03.03.20 GDW JER
F House type & scheduleamended. Minor layoutamendments. Bin storageadded.
22.04.20 GDW JER
G 2m vis splays added to access 26.02.21 GDW JER
Revision: Date: Drawn: Check:
All dimensions to be checked on site. Do not scale off this drawing for constructionpurposes. This drawing is the copyright of the Architect, and not to be reproducedwithout their permission. Ordnance Survey map information reproduced with permissionof HMSO Crown Copyright reserved. rg+p Ltd. Trading as rg+p.
B Map crop to consolidate landownership discrepencies.
22.01.20 GW JR
C Blue lines removed as perplanning request.
28.01.20 GW
Revision: Date: Drawn: Check:
All dimensions to be checked on site. Do not scale off this drawing for constructionpurposes. This drawing is the copyright of the Architect, and not to be reproducedwithout their permission. Ordnance Survey map information reproduced with permissionof HMSO Crown Copyright reserved. rg+p Ltd. Trading as rg+p.
D Updated in accordance withrevised site layout. F3 boundarytype aded.
23.04.20 GDW JER
E F3 boundary type amended toall brick. Existing wall & boundaryphoto/notation added.
01.03.21 GDW JER
Existing boundary treatments - (A) brick and block wall to western boundary and (B) 1 metre block retainingwall to the southern boundary
A.
B.
Revision: Date: Drawn: Check:
All dimensions to be checked on site. Do not scale off this drawing for constructionpurposes. This drawing is the copyright of the Architect, and not to be reproducedwithout their permission. Ordnance Survey map information reproduced with permissionof HMSO Crown Copyright reserved. rg+p Ltd. Trading as rg+p.
A. Brick slips (Colour to match existing development)B. White UPVC window frames (VEKA Infinity)C. Grey concrete Roof TilesD. White UPVC Fascia & Barge BoardE. Black UPVC downpipe/guttersF. Door canopyG. Black composite door (Sovereign Group)
D
Revision: Date: Drawn: Check:
All dimensions to be checked on site. Do not scale off this drawing for construction purposes.This drawing is the copyright of the Architect, and not to be reproduced without their permission.Ordnance Survey map information reproduced with permission of HMSO Crown Copyrightreserved. rg+p Ltd. Trading as rg+p.
Survey Notes This plan should be used for its original purpose plan should be used for its original purpose plan should be used for its original purpose should be used for its original purpose should be used for its original purpose be used for its original purpose be used for its original purpose used for its original purpose used for its original purpose for its original purpose for its original purpose its original purpose its original purpose original purpose original purpose purpose purpose only. M-EC accepts no responsibility for its M-EC accepts no responsibility for its M-EC accepts no responsibility for its accepts no responsibility for its accepts no responsibility for its no responsibility for its no responsibility for its responsibility for its responsibility for its for its for its its its drawings if they are supplied to any other party if they are supplied to any other party if they are supplied to any other party they are supplied to any other party they are supplied to any other party are supplied to any other party are supplied to any other party supplied to any other party supplied to any other party to any other party to any other party any other party any other party other party other party party party other than the original client. The information shown has been surveyed in information shown has been surveyed in information shown has been surveyed in shown has been surveyed in shown has been surveyed in has been surveyed in has been surveyed in been surveyed in been surveyed in surveyed in surveyed in in in accordance to the accuracy of the base scale to the accuracy of the base scale to the accuracy of the base scale the accuracy of the base scale the accuracy of the base scale accuracy of the base scale accuracy of the base scale of the base scale of the base scale the base scale the base scale base scale base scale scale scale shown. Boundaries shown are physical site features and shown are physical site features and shown are physical site features and are physical site features and are physical site features and physical site features and physical site features and site features and site features and features and features and and and may not represent legally conveyed ownership. Man entry to sewers has not been undertaken. entry to sewers has not been undertaken. entry to sewers has not been undertaken. to sewers has not been undertaken. to sewers has not been undertaken. sewers has not been undertaken. sewers has not been undertaken. has not been undertaken. has not been undertaken. not been undertaken. not been undertaken. been undertaken. been undertaken. undertaken. undertaken. Depths and pipe sizes are estimated from ground and pipe sizes are estimated from ground and pipe sizes are estimated from ground pipe sizes are estimated from ground pipe sizes are estimated from ground sizes are estimated from ground sizes are estimated from ground are estimated from ground are estimated from ground estimated from ground estimated from ground from ground from ground ground ground level. This should be checked with local authority This should be checked with local authority This should be checked with local authority should be checked with local authority should be checked with local authority be checked with local authority be checked with local authority checked with local authority checked with local authority with local authority with local authority local authority local authority authority authority records or on site prior to the commencement of or on site prior to the commencement of or on site prior to the commencement of on site prior to the commencement of on site prior to the commencement of site prior to the commencement of site prior to the commencement of prior to the commencement of prior to the commencement of to the commencement of to the commencement of the commencement of the commencement of commencement of commencement of of of any works. Reference numbers allocated to manholes are numbers allocated to manholes are numbers allocated to manholes are allocated to manholes are allocated to manholes are to manholes are to manholes are manholes are manholes are are are assigned by ourselves and are for identification by ourselves and are for identification by ourselves and are for identification ourselves and are for identification ourselves and are for identification and are for identification and are for identification are for identification are for identification for identification for identification identification identification purposes only. Some services may have been omitted due to services may have been omitted due to services may have been omitted due to may have been omitted due to may have been omitted due to have been omitted due to have been omitted due to been omitted due to been omitted due to omitted due to omitted due to due to due to to to parked vehicles. This survey has been orientated to the Ordnance survey has been orientated to the Ordnance survey has been orientated to the Ordnance has been orientated to the Ordnance has been orientated to the Ordnance been orientated to the Ordnance been orientated to the Ordnance orientated to the Ordnance orientated to the Ordnance to the Ordnance to the Ordnance the Ordnance the Ordnance Ordnance Ordnance Survey (O.S) National Grid (OSGB36) via a Global (O.S) National Grid (OSGB36) via a Global (O.S) National Grid (OSGB36) via a Global National Grid (OSGB36) via a Global National Grid (OSGB36) via a Global Grid (OSGB36) via a Global Grid (OSGB36) via a Global (OSGB36) via a Global (OSGB36) via a Global via a Global via a Global a Global a Global Global Global Positioning System (GPS) and the O.S. Active System (GPS) and the O.S. Active System (GPS) and the O.S. Active (GPS) and the O.S. Active (GPS) and the O.S. Active and the O.S. Active and the O.S. Active the O.S. Active the O.S. Active O.S. Active O.S. Active Active Active Network (OS Net) A true OSGB36 coordinate has been established true OSGB36 coordinate has been established true OSGB36 coordinate has been established OSGB36 coordinate has been established OSGB36 coordinate has been established coordinate has been established coordinate has been established has been established has been established been established been established established established near to the site center via a transformation using to the site center via a transformation using to the site center via a transformation using the site center via a transformation using the site center via a transformation using site center via a transformation using site center via a transformation using center via a transformation using center via a transformation using via a transformation using via a transformation using a transformation using a transformation using transformation using transformation using using using the OSTN02 & OSGM02 transformation models. The OSTN02 & OSGM02 transformation models. The OSTN02 & OSGM02 transformation models. The & OSGM02 transformation models. The & OSGM02 transformation models. The OSGM02 transformation models. The OSGM02 transformation models. The transformation models. The transformation models. The models. The models. The The The survey has been correlated to this point and a has been correlated to this point and a has been correlated to this point and a been correlated to this point and a been correlated to this point and a correlated to this point and a correlated to this point and a to this point and a to this point and a this point and a this point and a point and a point and a and a and a a a further one or more OSGB36 points established to create a true O.S. bearing for angle orientation. No scale factor has been applied to the survey scale factor has been applied to the survey scale factor has been applied to the survey factor has been applied to the survey factor has been applied to the survey has been applied to the survey has been applied to the survey been applied to the survey been applied to the survey applied to the survey applied to the survey to the survey to the survey the survey the survey survey survey therefore the coordinates shown are not true O.S. the coordinates shown are not true O.S. the coordinates shown are not true O.S. coordinates shown are not true O.S. coordinates shown are not true O.S. shown are not true O.S. shown are not true O.S. are not true O.S. are not true O.S. not true O.S. not true O.S. true O.S. true O.S. O.S. O.S. coordinates. Please refer to the survey station table to enable establishment of the on site grid.