Environmental Monitoring Report
Environmental Monitoring Report (Revised) May 2020
MYA: Greater Mekong Subregion East-West Economic Corridor Eindu to Kawkareik Road Improvement Volume II July – December 2019 Prepared by Pyunghwa Engineering Consultant, Ltd., in Joint Venture with Korea Expressway Corporation and Construction, Research, Design and Consultancy Cooperative Ltd for the Department of Highways, Ministry of Construction of Republic of Union of Myanmar for the Asian Development Bank.
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
30
ANNEX 1
Status of the Consultant's Mobilization (July to December 2019)
The current status of the mobilization of Consultant staff is shown in the following table:
Ref.
Position Input (P-M)
Name
Date Progress
Mobilization Demobilization To
date V/O No.1
V/O No.2
V/O No.3
Balance Rate (%)
International Key Staff
KI-
01
Project
Manager/Contr
act
Management
specialist
39
Richard Joseph
CAMISE 10 Sep. 16 08 Apr. 17 6.901
Peter Dinan 23 Jun. 17 31 Oct. 17 4.067
Chang Dal KIM 02 Dec. 17 08 Jul. 18 7.267
Kyuho Yoon 09 Jul. 18 9 Dec. 19 13.675
Total 32.210 6.79 82.58
KI-
02
Senior
Resident
Engineer
33
Vimal Ranjith
DALUWATTE 09 Sep. 16 09 Dec. 16 3.000
Mohan Krishnan 01 Mar. 17 02 Aug. 17 4.867
Yong Bin CHO 25 Aug. 17 On-going 27.456
Total 35.323 6.0773 3.7540 90.39
KI-
03
Senior Bridge
Engineer 6 Hee Chul KANG
27 Oct. 16
13 Feb. 17
25 Oct. 17
17 Dec. 16
30 Mar. 17
24 Nov. 17
4.003 -1.9967 0 100.00
KI-
04
Senior
Material
Engineer
6
H.D.G
SARATHCHAN
DRA
27 Oct. 16
01 Feb. 17
10 Jan. 17
15 May.17 4.822
Jose B.
TEODORO 02 May.18 06 Jun. 18 1.168
Total 5.990 0.6334 -0.6434 0 100.00
KI-
05
Senior
Pavement
Engineer
3 Han Jun AHN 05 Nov. 17 04 Dec. 17 2.168 -0.8323 0 100.00
KI-
06
Senior
Resettlement
Specialist
3
Mohammad Isa
ANSARI
26 Dec. 16
07 Sep. 17
10 Feb. 17
21 Oct. 17 2.351
Criste Zuniga-
Navida
28 Oct. 18
19 May.19
19 Dec. 18
01 Jun. 19 2.849
Total 5.200 4.1631 -1.9964 0.0333 100.00
KI-
07
Senior
Environment
Specialist
9
Emmanuel S.
BATE
18 Apr. 17
13 Aug. 17
20 May.17
06 Sep. 17 2.167
Celestino ULEP
17 Jan. 18
01 Mar. 18
24 Jun. 18
03 Oct. 18
03 Jan. 19
10 Jul. 19
31 Jan. 18
15 Mar. 18
14 Jul. 18
13 Oct. 18
17 Jan. 19
23 Jul. 19
2.996
Total 5.163 -1.8033 0.6192 2.6526 66.05
KI-
08
Senior
Monitoring and
Evaluation
Specialist
3 Se Yoon OH
19 Nov. 17
17 Dec. 17
22 Apr. 18
25 Nov. 17
23 Dec. 17
28 Apr. 18
0.633 -1.0000 1.3667 31.65
31
KI-
09
Senior Social
Development
Specialist
3
Maria Lyra
Songco
ESTARIS
2.754 -0.2462 3.0800 3.0800 47.20
Ester Felix
04 Jan. 18
03 Mar. 18
20 May.18
23 Jun. 18
17 Feb. 18
17 Mar. 18
02 Jun. 18
01 Jul .18
National Key Staff
KN-
01
Deputy
Project
Manager
39
Soe Tint 12 Sep. 16 30 Nov. 16 2.633
Tha Kyaw Zan
01 Feb. 17
02 Jun. 17
22 Feb. 17
On-going 30.614
Total 33.247 5.7533 85.24
KN-
02
Resident
Engineer(1) 33
Htun Lwin
01 Nov. 16
01 Mar. 17
01 Jun. 17
30 Nov. 16
30 Apr. 17
30 Sep. 17
6.600
Tint Lwin Soe 01 Dec. 17 01 Aug. 18 8.033
Than Htwe 07 Oct. 17 On-going 2.833
Total 17.467 15.5333 52.93
KN-
03
Resident
Engineer(2) 33
Thein Tun 01 Nov. 16
01 Feb. 17
30 Nov. 16
28 Feb. 17 2.000
Aung Ngwe 22 Apr. 19 30 Nov. 19 6.490
Total 8.490 -8.0000 16.5097 33.96
KN-
04
Bridge
Engineer 33
Thaung Hlaing 01 Nov. 16 30 Nov. 16 1.000
Aung Myint
13 Feb. 17
01 Mar. 19
30 Sep. 18
On-going 27.770
Total 28.770 8.000 12.2300 70.17
KN-
05
Material
Engineer(1) 33
Tun Aung Kyaw 01 Nov. 16 30 Nov. 16 1.000
Aung Maung
01 Feb. 17
01 Mar. 19
01 Aug. 18
On-going 23.173
Total 24.173 8.8267 73.25
KN-
06
Material
Engineer(2) 33
Hla Kyi 01 Nov. 16
01 Mar. 17
30 Nov. 16
30 Sep. 17 7.667
Zaw Lwin 07 Oct. 19 On-going 2.833
Total 10.500 -15.0000 7.500 58.33
KN-
07 Surveyor 33 Tin Maung Thin 0 -6.00 -8.0000 19 0.00
KN-
08 QS Engineer 37
Nyunt Nyunt Tin 01 Mar. 17 31 Jul. 17 4.323
Myat Hnin Khine 19 Oct. 17 On-going 24.330
Total 28.653 8.000 16.3467 63.67
KN-
09
Resettlement/
Social
Development
Specialist
17
Khin Maung Latt 01 Nov. 16 30 Nov. 16 1.000
Than Naing Oo 01 Oct. 17 31 Jul. 18 9.633
Phyo Myint Oo 02 Oct. 18 30 Apr. 19 6.972
Total 17.605 6.0 -2.000 3.3946 83.83
KN-
10
Environmental
Specialist 33
Soe Myint 01 Nov. 16 30 Nov. 16 1.000
Thapye Myo Oo 12 Jan. 18 31 Jul. 18 6.633
Naing Win 02 Oct. 18 16 Nov. 18 1.533
Myo Min Kyaw 13 Dec. 18 28 Feb. 19 2.633
Phyo Myint Oo 15 May.19 31 Jul. 19 2.534
32
Nandar Kyaw 26 Sep. 19 On-going 0.734
Total 15.067 2.0000 19.9333 43.04
KN-
11
Benefit
Monitoring
Specialist
2 Win Myint 0 2 0.00
KN-
12
Finance
Specialist 4 Ohn Kyin 0 -3.0000 1 0.00
National Non Key Staff
NN-
01
Site Engineer/
Inspector(1) 33 Tin Win
01 Mar. 17
01 Mar. 19
01 Aug. 18
On-going 24.733 8.2667 74.94
NN-
02
Site Engineer/
Inspector(2) 33 Yan Paing Soe
01 Mar. 17
01 Mar. 19
01 Aug. 18
On-going 25.700 7.4998 14.7998 63.45
NN-
03
Site Engineer/
Inspector(3) 33
Swan Thura
Zaw
19 Apr. 17
04 Mar. 19
01 Aug. 18
On-going 22.967 10.0333 69.59
NN-
04
Site Engineer/
Inspector(4) 33 Zin Linn Htet
25 Apr. 18
01 Mar. 19
01 Aug. 18
On-going 11.233 -6.0000 15.7667 41.60
NN-
05
Site Engineer/
Inspector(5) 33 Kaung Zaw 03 Jun. 18 On-going 15.933 -5.0000 12.0667 56.90
NN-
06
Site Engineer/
Inspector(6) 33 Nay Myo Thu 01 Mar. 17 On-going 31.700 13.0000 14.3000 68.91
NN-
07
Site Engineer/
Inspector(7) 33 Zaw Win 01 Mar. 17 On-going 30.700 11.0000 13.3000 69.77
NN-
08
Site Engineer/
Inspector(8) 33 Saw Paing Oo 15 May.18 On-going 4.567 -13.0000 15.43333 22.83
NN-
09
Site Engineer/
Inspector(9) 33 Phyo Wai Zin
19 Apr. 17
01 Mar. 19
01 Aug. 18
On-going 23.100 9.9000 70.00
NN-
10
Site Engineer/
Inspector(10) 33
Kyaw Nyein
Chan Oo
01 May.17
04 Mar. 19
01 Aug. 18
On-going 22.667 10.3333 68.68
NN-
11
Laboratory
Technician(1) 33 Wah Wah Htike
01 May.17
01 Mar. 19
01 Aug. 18
On-going 21.633 2.2503 13.6170 61.36
NN-
12
Laboratory
Technician(2) 33 Htet Htet Hnin
01 May.17
01 Mar. 19
01 Aug. 18
On-going 21.600 11.4000 65.45
NN-
13
Laboratory
Technician(3) 33 Yu Zana
01 May.17
01 Mar. 19
01 Aug. 18
On-going 21.700 11.3000 65.75
NN-
14
Laboratory
Technician(4) 33
Aye Thida
05 Mar. 18
01 Mar. 19
01 Aug. 18
On-going 11.900 -7.0000 14.1000 45.76
Support Staff
1 Office
Administrator 48 Win Min 01 Sep. 17 On-going 26.000 22.000 54.16
2 Bilingual
Secretary (1) 44
Nan Su Yee Win 01 Sep. 17 01 Aug. 18 11.030
32.203 26.81 Thazin Thin 09 Dec. 19 On-going 0.767
Total 11.797
3 Bilingual
Secretary (2) 44 Nan Sagawar
01 Sep. 17
01 Nov. 18
01 Aug. 18
On-going 24.030 19.970 54.61
4 Bilingual
Secretary (3) 44
Naw Phyo Phyo
Khine 08 Nov. 17 01 Aug. 18 8.730
27.237 38.09 Su Myat Ko 01 Mar. 19 31 Sep. 19 6.700
Than Moe Aye 22 Oct. 19 On-going 1.333
Total 16.763
5 Security
Guard 39 Shwe Zin 01 Mar. 19 On-going 9.000 30.000 23.07
33
ANNEX 2
Status of the Contractor’s Mobilization (July to December 2019)
Lot 1: km 0+000 to km 40+440
No. Position Minimum
Requirement Name Status
1 Project Manager (LOT1&2) 1 Wang Yaolong On site
2 Construction Manager 1 Lv Hongliang On site
3 Senior Highway Engineer 1 Fan Pengfei On site
4 Senior Bridge Engineer 1 Fan Sheng tong On site
5 Geotechnical Engineer (LOT1&2) 1 U.N.O subcontractor
6 Quality Control Engineer 1 Yang Wen hui On site
7 Plant and Equipment Engineer 1 Li Yuliang On site
8 Quantity Surveyor (LOT1&2) 1 Bu Yunhua On site
9 Assistant Quantity Surveyor 1 Yang Chuan On site
10 Setting out Engineer 1 Deng Lei On site
11 Environment, Health & Safety Specialist 1 Ju Jian Bo On site
Total 11
No. Description Schedule Actual Remark
1 Professional 12 12
2 Technician 27 27
3 Skilled Worker 35 85
4 Unskilled Worker 102 330
Lot 2: km 42+160 and km 66+455
No. Position Minimum
Requirement Name Status
1 Project Manager (LOT1&2) 1 Wang Yao long On site
2 Construction Manager 1 Li Zhao On site
3 Senior Highway Engineer 1 Wang Meng On site
34
4 Senior Bridge Engineer 1 Cui Zhaofu On site
5 Geotechnical Engineer 1 U.N.O From subcontractor
6 Quality Control Engineer 1 Wang Xiaoping On site
7 Plant and Equipment Engineer
1 Wu Xin On site
8 Quantity Surveyor (LOT1&2) 1 Bu Yunhua
(Bruce) On site
9 Assistant Quantity Surveyor 1 He Zhixue On site
10 Setting out Engineer 1 Li Xiaoping On site
11 Environment, Health & Safety Specialist
1 Phae Phyo Win On site
Total 11
No. Description Schedule Actual Status
1 Professional 12 12
2 Technician 27 27
3 Skilled Worker 35 85
4 Unskilled Worker & subcontractors 102 330
Status of CSC Staffs (Environmental Specialists) Mobilization (July to December 2019)
Position Name Mobilization
Start End
International Celestino ULEP
10 July
7 Jan 20
24 Jan
23 July19
13 Jan 20
30 Jan 20
National U Phyo Myint Oo 15 May 19 31 July 19
Daw Nandar Aye 26 Sep 19 10 Jan 20
35
ANNEX 3
Status of the Contractor’s Equipment (July to December 2019)
No. Equipment Capacity Required LOT 1 & LOT2
Balance On site
To be Added
Total
1 Bulldozer 110 CV 7 7 7 0
2 Wheel Loader 7 7 7 0
3 Excavator 24 24 24 0
4 Backhoe Loader 2 2 2 0
5 Concrete Batching Plant 2 2 2 0
6 Asphalt Plant 120 ton/h 1 1 1 0
7 Crusher Plant 1 1 1 0
8 Aggregate Mixing Machine 1 1 1 0
9 Asphalt Paver 300 ton/h 1 1 1 0
10 Granular Material Paver 1 1 1 0
11 Motor Grader 12 feet 8 12 12 4
12 Concrete Agitator 6 m3 4 4 4 0
13 Vibratory Roller 12~16
ton 13 18 18 5
14 Sheep Foot Roller 1 1 1 0
15 Pneumatic Roller 10 ton 2 2 2 0
16 Dump Truck 12 ton 107 107 107 0
17 Water Tank Lorry 5 ton 14 18 18 4
18 Fuel Tank Lorry 2 2 2 0
19 Asphalt Distributor 1 1 1 0
20 Cargo Crane Truck 20 ton 2 2 2 0
21 Tractor with Trailer 1 1 1 0
22 Low Bed Trailer 1 1 1 0
23 Tractor-Truck 1 1 1 0
24 Forklift 1 1 1 0
25 Air Compressor various 2 2 2 0
26 Power Broom 2 2 2 0
27 Tower Light 0 6 6 6
28 Generator 14 14 14 0
29 Breaking Hammer 6 6 6 0
30 Jackhammer 6 6 6 0
31 Hammer Drill 1 2 2 1
32 Weighbridge 0 2 2 2
33 Gantry Crane 0 2 2 2
34 Balance Beam 1 1 1 0
Total 237 261 0 261 24
36
Status of Contractor’s EHSO for Lot 1 and Lot 2 Mobilization
Lot Position
Name Mobilization
Start End
1 Environmental Health
and Safety Officer Ju Jianbo 17 July 2016
On
going
2 Environmental Health
and Safety Officer Pyae Phyo 15 May 2017
On
going
37
ANNEX 4
ECC issued to the Sanfree Quarry
38
39
40
41
42
43
ANNEX 4a Environmental Approval for Lun Nya Asphalt Plant
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
ANNEX 5
MONTHLY NOISE MONITORING REPORTS FROM CONTRACTOR
60
December 2019
DATE MONITORED: 25/12/2019
MONITORING BY: Pyae Phyo(HSE Officer)
Station No
Km Chainage
Location Baseline dB(A)
Noise Level dB(A) Leq
Distance from source
(m)
Visual Dust
Date & Time Measured
1 AAQ01 Km 0+00 Start at Eindu 57 58 100m N/A 25/12/2019(7:30AM)
2 AAQ04 Km6+680 Khaneindo Middle School
58 52 100m N/A 25/12/2019(7:50AM)
3 AAQ05 Km9+690 Kawkadar High School 57 57 100m N/A 25/12/2019(8:30AM)
4 AAQ06 Km18+420 Thayagone Primary School
58 55 100m N/A 25/12/2019(9:15AM)
5 AAQ07 Km34+900 Thadao Village School 55 55 100m N/A 25/12/2019(9:45AM)
6 AAQ08 Km39+530 Gyaing High School 59 58 100m N/A 25/12/2019(10:35AM)
7 AAQ09 Km44+800 Kyondoe Hospital 59 56 100m N/A 25/12/2019(11:20AM)
8 AAQ10 Kyondoe Port Access
Pagoda near Kyondoe River Port
55 58 100m N/A 25/12/2019(11:55AM)
9 AAQ11 Km53+570 Ngar Tin Middle School
59 56 100m N/A 25/12/2019(13:00PM)
10 AAQ13 Km62+740 Kawkareik Middle School
55 57 100m N/A 25/12/2019(13:40PM)
11 AAQ14 KM 37+700 Batching Plant 51 55 100m N/A 25/12/2019(14:40PM)
12 AAQ15 Km 5+250 AC Plant 65 59 100m N/A 24/12/2019(9:30AM)
13 AAQ15 Sanfree Quarry/Crusher Plant 62 68 100m N/A 24/12/2019(11:00AM)
61
November 2019
DATE MONITORED: 26/11/2019
MONITORING BY: Pyae Phyo(HSE Officer)
Station No
Km Chainage
Location Baseline dB(A)
Noise Level dB(A) Leq
Distance from source (m)
Visual Dust
Date & Time Measured
1 AAQ01 Km 0+00 Start at Eindu 57 56 100m N/A 26/11/2019(7:00AM)
2 AAQ04 Km6+680 Khaneindo Middle School
58 55 100m N/A 26/11/2019(7:40AM)
3 AAQ05 Km9+690 Kawkadar High School 57 55 100m N/A 26/11/2019(8:30AM)
4 AAQ06 Km18+420 Thayagone Primary School
58 56 100m N/A 26/11/2019(8:50AM)
5 AAQ07 Km34+900 Thadao Village School 55 55 100m N/A 26/11/2019(9:35AM)
6 AAQ08 Km39+530 Gyaing High School 59 56 100m N/A 26/11/2019(10:15AM)
7 AAQ09 Km44+800 Kyondoe Hospital 59 55 100m N/A 26/11/2019(10:40AM)
8 AAQ10 Kyondoe Port Access
Pagoda near Kyondoe River Port
55 57 100m N/A 26/11/2019(11:25AM)
9 AAQ11 Km53+570 Ngar Tin Middle School
59 55 100m N/A 26/11/2019(12:40PM)
10 AAQ13 Km62+740 Kawkareik Middle School
55 54 100m N/A 26/11/2019(13:30PM)
11 AAQ14 KM 37+700 Batching Plant 51 53 100m N/A 26/11/2019(14:00PM)
12 AAQ15 Km 5+250 AC Plant 65 57 100m N/A 27/11/2019(9:00AM)
13 AAQ15 Sanfree Quarry/Crusher Plant 62 65 100m N/A 27/11/2019(13:00PM)
62
October 2019
DATE MONITORED: 24/10/2019
MONITORING BY: Pyae Phyo(HSE Officer)
Station No
Km Chainage
Location Baseline dB(A)
Noise Level dB(A) Leq
Distance from source (m)
Visual Dust
Date & Time Measured
1 AAQ01 Km 0+00 Start at Eindu 57 58 100m Yes 24/10/2019(7:30AM)
2 AAQ04 Km6+680 Khaneindo Middle School
58 54 100m N/A 24/10/2019(8:20AM)
3 AAQ05 Km9+690 Kawkadar High School
57 60 100m Yes 24/10/2019(8:50AM)
4 AAQ06 Km18+420 Thayagone Primary School
58 55 100m Yes 24/10/2019(9:30AM)
5 AAQ07 Km34+900 Thadao Village School
55 56 100m Yes 24/10/2019(10:30AM)
6 AAQ08 Km39+530 Gyaing High School 59 57 100m N/A 24/10/2019(11:00AM)
7 AAQ09 Km44+800 Kyondoe Hospital 59 54 100m N/A 24/10/2019(11:35AM)
8 AAQ10 Kyondoe Port Access
Pagoda near Kyondoe River Port
55 58 100m Yes 24/10/2019(12:20PM)
9 AAQ11 Km53+570 Ngar Tin Middle School
59 56 100m N/A 24/10/2019(13:00PM)
10 AAQ13 Km62+740 Kawkareik Middle School
55 55 100m Yes 24/10/2019(13:30PM)
11 AAQ14 Km 37+700 Batching Plant 51 53 100m N/A 24/10/2019(15:00PM)
12 AAQ15 Km 5+250 AC Plant 65 57 100m N/A 25/10/2019(10:30AM)
63
September 2019
DATE MONITORED: 25/09/2019
MONITORING BY: Pyae Phyo(HSE Officer)
Station No
Km Chainage
Location Baseline dB(A)
Noise Level dB(A) Leq
Distance from source (m)
Visual Dust
Date & Time Measured
1 AAQ01 Km 0+00 Start at Eindu 57 56 100m N/A 25/09/2019(7:00AM)
2 AAQ04 Km6+680 Khaneindo Middle School
58 55 100m N/A 25/09/2019(7:40AM)
3 AAQ05 Km9+690 Kawkadar High School
57 55 100m N/A 25/09/2019(8:30AM)
4 AAQ06 Km18+420 Thayagone Primary School
58 56 100m N/A 25/09/2019(8:50AM)
5 AAQ07 Km34+900 Thadao Village School 55 55 100m N/A 25/09/2019(9:35AM)
6 AAQ08 Km39+530 Gyaing High School 59 56 100m N/A 25/09/2019(10:15AM)
7 AAQ09 Km44+800 Kyondoe Hospital 59 55 100m N/A 25/09/2019(10:40AM)
8 AAQ10 Kyondoe Port Access
Pagoda near Kyondoe River Port
55 57 100m N/A 25/09/2019(11:25AM)
9 AAQ11 Km53+570 Ngar Tin Middle School
59 55 100m N/A 25/09/2019(12:40PM)
10 AAQ13 Km62+740 Kawkareik Middle School
55 54 100m N/A 25/09/2019(13:30PM)
11 AAQ14 Km 37+700 Batching Plant 51 53 100m N/A 25/09/2019(14:00PM)
12 AAQ15 Km 5+250 AC Plant 65 57 100m N/A 24/09/2019(10:30AM)
64
August 2019
DATE MONITORED: 23/08/2019
MONITORING BY: Pyae Phyo(HSE Officer)
Station No
Km Chainage
Location Baseline dB(A)
Noise Level dB(A) Leq
Distance from source (m)
Visual Dust
Date & Time Measured
1 AAQ01 Km 0+00 Start at Eindu 57 56 100m N/A 23/08/2019(7:30AM)
2 AAQ04 Km6+680 Khaneindo Middle School
58 55 100m N/A 23/08/2019(8:00AM)
3 AAQ05 Km9+690 Kawkadar High School
57 55 100m N/A 23/08/2019(8:20AM)
4 AAQ06 Km18+420 Thayagone Primary School
58 55 100m N/A 23/08/2019(8:40AM)
5 AAQ07 Km34+900 Thadao Village School 55 56 100m N/A 23/08/2019(9:15AM)
6 AAQ08 Km39+530 Gyaing High School 59 55 100m N/A 23/08/2019(9:35AM)
7 AAQ09 Km44+800 Kyondoe Hospital 59 56 100m N/A 23/08/2019(10:00AM)
8 AAQ10 Kyondoe Port Access
Pagoda near Kyondoe River Port
55 57 100m N/A 23/08/2019(10:15AM)
9 AAQ11 Km53+570 Ngar Tin Middle School
59 56 100m N/A 23/08/2019(10:40AM)
10 AAQ13 Km62+740 Kawkareik Middle School
55 55 100m N/A 23/08/2019(11:00AM)
11 AAQ14 Km 37+700 Batching Plant 51 54 100m N/A 23/08/2019(1:00PM)
12 AAQ15 Km 5+250 AC Plant 65 58 100m N/A 24/08/2019(8:30AM)
65
July 2019 DATE MONITORED: 27/07/2019
MONITORING BY: Pyae Phyo(HSE Officer)
Station No
Km Chainage
Location Baseline dB(A)
Noise Level dB(A) Leq
Distance from source (m)
Visual Dust
Date & Time Measured
1 AAQ01 Km 0+00 Start at Eindu 57 57 100m N/A 27/07/2019(7:45AM)
2 AAQ04 Km6+680 Khaneindo Middle School
58 55 100m N/A 27/07/2019(8:00AM)
3 AAQ05 Km9+690 Kawkadar High School
57 57 100m N/A 27/07/2019(8:20AM)
4 AAQ06 Km18+420 Thayagone Primary School
58 60 100m N/A 27/07/2019(8:40AM)
5 AAQ07 Km34+900 Thadao Village School 55 59 100m N/A 27/07/2019(9:15AM)
6 AAQ08 Km39+530 Gyaing High School 59 58 100m N/A 27/07/2019(9:35AM)
7 AAQ09 Km44+800 Kyondoe Hospital 59 56 100m N/A 27/07/2019(10:00AM)
8 AAQ10 Kyondoe Port Access
Pagoda near Kyondoe River Port
55 57 100m N/A 27/07/2019(10:15AM)
9 AAQ11 Km53+570 Ngar Tin Middle School
59 58 100m N/A 27/07/2019(10:40AM)
10 AAQ13 Km62+740 Kawkareik Middle School
55 58 100m N/A 27/07/2019(11:00AM)
11 AAQ14 Km 37+700 Batching Plant 51 53 100m N/A 27/07/2019(1:00PM)
12 AAQ15 Km 5+250 AC Plant 65 60 100m N/A 28/07/2019(8:30AM)
66
ANNEX 6
MONTHLY WATER QUALITY MONITORING REPORTS FROM CONTRACTOR
67
December 2019
DATE MONITORED: 26/12/2019
MONITORING BY: Pyae Phyo(HSE Officer)
Station No Km Chainage Temp oC pH
Conductivity μS/cm
DO mg
Visual (plume from work site?
Plume Oil Sheen
Construction wastes
1 WQ01 Km 6+820 24.1 7.2 22 4.72 N/A N/A N/A
2 WQ02 Km19+400 N/A N/A N/A N/A N/A N/A N/A
3 WQ03 Km25+290 N/A N/A N/A N/A N/A N/A N/A
4 WQ04 Km34+710 25.3 7.4 38 5.58 N/A N/A N/A
5 WQ05 Km42+160 25.5 7.6 85 5.55 N/A N/A N/A
6 WQ06 Km43+920 25.12 7.7 112 5.89 N/A N/A N/A
7 WQ07 Km47+800 25.1 7.5 88 4.15 N/A N/A N/A
8 WQ08 Km55+410 25.5 6.8 32 5.22 N/A N/A N/A
9 WQ09 Hlaing Bridge 25.2 7.2 116 6.11 N/A N/A N/A
68
November 2019
DATE MONITORED: 26/11/2019
MONITORING BY: Pyae Phyo(HSE Officer)
Station No Km Chainage Temp oC pH
Conductivity μS/cm
DO mg
Visual (plume from work site?
Plume Oil Sheen
Construction wastes
1 WQ01 Km 6+820 25.9 8.12 18 5.92 N/A N/A N/A
2 WQ02 Km19+400 N/A N/A N/A N/A N/A N/A N/A
3 WQ03 Km25+290 N/A N/A N/A N/A N/A N/A N/A
4 WQ04 Km34+710 26.8 7.20 45 5.15 N/A N/A N/A
5 WQ05 Km42+160 25.7 6.63 122 5.25 N/A N/A N/A
6 WQ06 Km43+920 26.2 7.35 134 5.35 N/A N/A N/A
7 WQ07 Km47+800 25.8 7.85 98 3.65 N/A N/A N/A
8 WQ08 Km55+410 25.2 5.22 48 5.72 N/A N/A N/A
9 WQ09 Hlaing Bridge 26.2 7.10 135 6.35 N/A N/A N/A
69
October 2019
DATE MONITORED: 26/10/2019
MONITORING BY: Pyae Phyo(HSE Officer)
Station No Km Chainage Temp oC pH
Conductivity μS/cm
DO mg
Visual (plume from work site?
Plume Oil Sheen
Construction wastes
1 WQ01 Km 6+820 24.6 6.45 58 4.45 N/A N/A N/A
2 WQ02 Km19+400 25.4 5.20 42 4.85 N/A N/A N/A
3 WQ03 Km25+290 N/A N/A N/A N/A N/A N/A N/A
4 WQ04 Km34+710 N/A N/A N/A N/A N/A N/A N/A
5 WQ05 Km42+160 25.9 7.9 142 5.10 N/A N/A N/A
6 WQ06 Km43+920 26.8 7.67 165 4.90 N/A N/A N/A
7 WQ07 Km47+800 N/A N/A N/A N/A N/A N/A N/A
8 WQ08 Km55+410 N/A N/A N/A N/A N/A N/A N/A
9 WQ09 Hlaing Bridge 24.9 7.4 55 6.52 N/A N/A N/A
70
September 2019
DATE MONITORED: 25/09/2019
MONITORING BY: Pyae Phyo(HSE Officer)
Station No Km Chainage Temp oC pH
Conductivity μS/cm
DO mg
Visual (plume from work site?
Plume Oil Sheen
Construction wastes
1 WQ01 Km 6+820 26.9 8.12 18 5.92 N/A N/A N/A
2 WQ02 Km19+400 25.6 7.18 15 4.25 N/A N/A N/A
3 WQ03 Km25+290 25.8 6.85 39 6.42 N/A N/A N/A
4 WQ04 Km34+710 26.8 7.20 45 5.55 N/A N/A N/A
5 WQ05 Km42+160 25.7 6.73 131 5.25 N/A N/A N/A
6 WQ06 Km43+920 26.2 7.35 134 5.35 N/A N/A N/A
7 WQ07 Km47+800 26.8 7.85 98 3.65 N/A N/A N/A
8 WQ08 Km55+410 25.2 5.22 48 5.72 N/A N/A N/A
9 WQ09 Hlaing Bridge 26.2 7.10 135 6.35 N/A N/A N/A
71
August 2019
DATE MONITORED: 26/08/2019
MONITORING BY: Pyae Phyo(HSE Officer)
Station No Km Chainage Temp oC pH
Conductivity μS/cm
DO mg
Visual (plume from work site?
Plume Oil Sheen
Construction wastes
1 WQ01 Km 6+820 27.9 8.15 19 6.22 N/A N/A N/A
2 WQ02 Km19+400 28.6 7.98 13 4.19 N/A N/A N/A
3 WQ03 Km25+290 28.2 6.41 40 6.12 N/A N/A N/A
4 WQ04 Km34+710 26.8 7.20 45 5.55 N/A N/A N/A
5 WQ05 Km42+160 25.7 7.33 125 5.25 N/A N/A N/A
6 WQ06 Km43+920 26.2 7.25 92 5.35 N/A N/A N/A
7 WQ07 Km47+800 26.8 7.55 78 3.55 N/A N/A N/A
8 WQ08 Km55+410 25.9 6.25 35 5.92 N/A N/A N/A
9 WQ09 Hlaing Bridge 26.2 7.10 135 6.75 N/A N/A N/A
72
July 2019
DATE MONITORED: 28/07/2019
MONITORING BY: Pyae Phyo(HSE Officer)
Station No Km Chainage Temp oC pH
Conductivity μS/cm
DO mg
Visual (plume from work site?
Plume Oil Sheen
Construction wastes
1 WQ01 Km 6+820 25.9 5.69 19 7.24 N/A N/A N/A
2 WQ02 Km19+400 25.6 7.98 13 7.39 N/A N/A N/A
3 WQ03 Km25+290 26.2 6.41 40 7.01 N/A N/A N/A
4 WQ04 Km34+710 26.8 7.20 45 6.65 N/A N/A N/A
5 WQ05 Km42+160 25.7 7.33 125 5.75 N/A N/A N/A
6 WQ06 Km43+920 26.2 6.25 92 5.15 N/A N/A N/A
7 WQ07 Km47+800 26.8 6.95 78 4.95 N/A N/A N/A
8 WQ08 Km55+410 25.9 7.10 35 5.90 N/A N/A N/A
9 WQ09 Hlaing Bridge 25.6 7.5 135 5.95 N/A N/A N/A
73
ANNEX 7
MONTHLY AIR QUALITY MONITORING REPORTS FROM CONTRACTOR
74
December 2019
DATE MONITORED: 25/12/2019
MONITORING BY: Pyae Phyo(HSE Officer)
Station No Coordinates
TSP
(µg/m3)
24 hrs averaging
period
PM10
(µg/m3)
24 hrs averaging period
SO2
(µg/m3)
24 hrs averaging period
NO2
(µg/m3)
1 hr averaging period
CO2
(µg/m3)
1
AQ01
16°46'15.50"N 97°45'6.30"E 45.52 4.15 22.15 21.15 178.21
2 AQ02 16°44'47.36"N 97°48'17.22"E 38.22 4.35 31.34 24.22 58.65
3 AQ03 16°43'44.53"N 97°49'20.95"E 7.41 3.15 15.57 35.82 57.38
4 AQ04 16°43'34.53"N 97°53'29.84"E 10.15 4.46 9.31 25.71 122.22
5 AQ05 16°37'19.61"N 97°57'13.46"E 11.15 3.12 5.63 75.12 114.15
6 AQ06 16°36'33.27"N 97°59'40.95"E 13.38 4.82 18.12 20.64 191.14
7 AQ07 16°35'42.84"N 98° 2'25.69"E 6.14 5.68 9.65 18.31 112.11
8 AQ08 16°35'34.31"N 98° 2'22.15"E 12.41 4.42 5.65 28.42 95.23
9 AQ09 16°34'1.91"N 98° 6'42.98"E 4.62 2.83 17.45 8.45 78.22
10 AQ10 16°33'0.04"N 98°11'11.81"E 21.12 5.42 11.34 41.61 112.11
Myanmar National Environmental Quality
(Emission) Guidelines 50 20 200
75
November 2019 DATE MONITORED: 27/11/2019
MONITORING BY: Pyae Phyo(HSE Officer)
Station No Coordinates
TSP
(µg/m3)
24 hrs averaging
period
PM10
(µg/m3)
24 hrs averaging period
SO2
(µg/m3)
24 hrs averaging period
NO2
(µg/m3)
1 hr averaging period
CO2
(µg/m3)
1
AQ01
16°46'15.50"N 97°45'6.30"E 45.52 4.15 22.15 21.15 178.21
2 AQ02 16°44'47.36"N 97°48'17.22"E 38.22 4.35 31.34 24.22 58.65
3 AQ03 16°43'44.53"N 97°49'20.95"E 7.41 3.15 15.57 35.82 57.38
4 AQ04 16°43'34.53"N 97°53'29.84"E 10.15 4.46 9.31 25.71 122.22
5 AQ05 16°37'19.61"N 97°57'13.46"E 11.15 3.12 5.63 75.12 114.15
6 AQ06 16°36'33.27"N 97°59'40.95"E 13.38 4.82 18.12 20.64 191.14
7 AQ07 16°35'42.84"N 98° 2'25.69"E 6.14 5.68 9.65 18.31 112.11
8 AQ08 16°35'34.31"N 98° 2'22.15"E 12.41 4.42 5.65 28.42 95.23
9 AQ09 16°34'1.91"N 98° 6'42.98"E 4.62 2.83 17.45 8.45 78.22
10 AQ10 16°33'0.04"N 98°11'11.81"E 21.12 5.42 11.34 41.61 112.11
Myanmar National Environmental Quality
(Emission) Guidelines 50 20 200
76
October 2019 DATE MONITORED: 25/10/2019
MONITORING BY: Pyae Phyo(HSE Officer)
Station No Coordinates
TSP
(µg/m3)
24 hrs averaging
period
PM10
(µg/m3)
24 hrs averaging period
SO2
(µg/m3)
24 hrs averaging period
NO2
(µg/m3)
1 hr averaging period
CO2
(µg/m3)
1
AQ01
16°46'15.50"N 97°45'6.30"E 43.54 4.50 21.12 25.45 195.22
2 AQ02 16°44'47.36"N 97°48'17.22"E 60.12 4.20 21.34 25.32 68.25
3 AQ03 16°43'44.53"N 97°49'20.95"E 7.48 3.75 14.55 43.85 78.50
4 AQ04 16°43'34.53"N 97°53'29.84"E 9.15 5.56 8.42 27.62 132.22
5 AQ05 16°37'19.61"N 97°57'13.46"E 11.45 6.35 6.70 71.15 122.45
6 AQ06 16°36'33.27"N 97°59'40.95"E 18.35 6.62 24.12 30.24 215.14
7 AQ07 16°35'42.84"N 98° 2'25.69"E 7.10 5.18 7.85 25.42 132.55
8 AQ08 16°35'34.31"N 98° 2'22.15"E 16.43 5.32 4.55 26.40 145.22
9 AQ09 16°34'1.91"N 98° 6'42.98"E 5.61 1.70 12.48 7.42 83.12
10 AQ10 16°33'0.04"N 98°11'11.81"E 15.15 6.65 10.38 44.64 142.20
Myanmar National Environmental Quality
(Emission) Guidelines 50 20 200
77
September 2019 DATE MONITORED: 25/09/2019
MONITORING BY: Pyae Phyo(HSE Officer)
Station No Coordinates
TSP
(µg/m3)
24 hrs averaging
period
PM10
(µg/m3)
24 hrs averaging period
SO2
(µg/m3)
24 hrs averaging period
NO2
(µg/m3)
1 hr averaging period
CO2
(µg/m3)
1
AQ01
16°46'15.50"N 97°45'6.30"E 45.52 4.15 22.15 21.15 178.21
2 AQ02 16°44'47.36"N 97°48'17.22"E 38.22 4.35 31.34 24.22 58.65
3 AQ03 16°43'44.53"N 97°49'20.95"E 7.41 3.15 15.57 35.82 57.38
4 AQ04 16°43'34.53"N 97°53'29.84"E 10.15 4.46 9.31 25.71 122.22
5 AQ05 16°37'19.61"N 97°57'13.46"E 11.15 3.12 5.63 75.12 114.15
6 AQ06 16°36'33.27"N 97°59'40.95"E 13.38 4.82 18.12 20.64 191.14
7 AQ07 16°35'42.84"N 98° 2'25.69"E 6.14 5.68 9.65 18.31 112.11
8 AQ08 16°35'34.31"N 98° 2'22.15"E 12.41 4.42 5.65 28.42 95.23
9 AQ09 16°34'1.91"N 98° 6'42.98"E 4.62 2.83 17.45 8.45 78.22
10 AQ10 16°33'0.04"N 98°11'11.81"E 21.12 5.42 11.34 41.61 112.11
Myanmar National Environmental Quality
(Emission) Guidelines 50 20 200
78
August 2019 DATE MONITORED: 26/08/2019
MONITORING BY: Pyae Phyo(HSE Officer)
Station No Coordinates
TSP
(µg/m3)
24 hrs averaging
period
PM10
(µg/m3)
24 hrs averaging period
SO2
(µg/m3)
24 hrs averaging period
NO2
(µg/m3)
1 hr averaging period
CO2
(µg/m3)
1
AQ01
16°46'15.50"N 97°45'6.30"E 43.54 4.50 21.12 21.45 195.22
2 AQ02 16°44'47.36"N 97°48'17.22"E 60.12 4.20 21.34 25.32 68.25
3 AQ03 16°43'44.53"N 97°49'20.95"E 7.48 2.65 14.55 33.85 58.48
4 AQ04 16°43'34.53"N 97°53'29.84"E 9.15 5.56 8.42 27.62 152.22
5 AQ05 16°37'19.61"N 97°57'13.46"E 11.45 6.35 6.70 77.15 122.45
6 AQ06 16°36'33.27"N 97°59'40.95"E 18.35 5.62 24.12 30.24 245.14
7 AQ07 16°35'42.84"N 98° 2'25.69"E 7.10 5.78 7.85 25.42 132.55
8 AQ08 16°35'34.31"N 98° 2'22.15"E 16.43 5.62 4.55 26.40 155.22
9 AQ09 16°34'1.91"N 98° 6'42.98"E 4.61 1.70 12.48 7.42 83.12
10 AQ10 16°33'0.04"N 98°11'11.81"E 15.15 6.65 10.38 43.64 162.10
Myanmar National Environmental Quality
(Emission) Guidelines 50 20 200
79
July 2019 DATE MONITORED: 29/07/2019
MONITORING BY: Pyae Phyo(HSE Officer)
Station No Coordinates
TSP
(µg/m3)
24 hrs averaging
period
PM10
(µg/m3)
24 hrs averaging period
SO2
(µg/m3)
24 hrs averaging period
NO2
(µg/m3)
1 hr averaging period
CO2
(µg/m3)
1
AQ01
16°46'15.50"N 97°45'6.30"E 47.54 6.50 26.12 36.45 195.22
2 AQ02 16°44'47.36"N 97°48'17.22"E 40.12 6.20 27.34 40.32 98.25
3 AQ03 16°43'44.53"N 97°49'20.95"E 10.48 4.65 14.55 35.85 89.48
4 AQ04 16°43'34.53"N 97°53'29.84"E 32.15 7.5 7.42 44.62 132.22
5 AQ05 16°37'19.61"N 97°57'13.46"E 18.45 7.35 9.70 85.15 128.45
6 AQ06 16°36'33.27"N 97°59'40.95"E 22.35 6.62 18.12 48.24 172.14
7 AQ07 16°35'42.84"N 98° 2'25.69"E 20.10 6.78 9.85 61.42 137.55
8 AQ08 16°35'34.31"N 98° 2'22.15"E 16.43 7.62 5.55 38.40 112.22
9 AQ09 16°34'1.91"N 98° 6'42.98"E 22.61 6.70 11.48 24.42 64.91
10 AQ10 16°33'0.04"N 98°11'11.81"E 15.15 7.65 13.38 52.64 120.10
Myanmar National Environmental Quality
(Emission) Guidelines 50 20 200
L3310-MYA Safeguards Cover_environmentAnnex 1 to 7_L 3310_ SEMR_ July to Dec 2019 - Copy - CopyL3310-MYA Safeguards Cover_environment2020-130 Attachment 2