UP
25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
A
B
C
48 49
MATCH
LIN
E
ENLARGEDPLAN ON
A4-10
ENLARGEDPLAN ON
A4-09
ENLARGEDPLAN ON
A4-11
ENLARGEDPLAN ON
A4-12
ENLARGEDPLAN ON
A4-13
ENLARGEDPLAN ON
A4-13
UnitNo.LL14
Type Unique005
UnitNo.LL16
Type Unique007
UnitNo.LL15
Type Unique002/003/006
UnitNo.LL17
Type Unique008
ENLARGEDPLAN ON
A5-3
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
A
B
C
MATCH
LIN
E
ENLARGEDPLAN ON
A4-08
ENLARGEDPLAN ON
A4-08
ENLARGEDPLAN ON
A4-09
ENLARGEDPLAN ON
A4-09
UnitNo.LL10
Type Unique001/004
UnitNo.LL13
Type Unique001/004
UnitNo.LL11
Type Unique002/003/006
UnitNo.LL12
Type Unique002/003/006
ENLARGEDPLAN ON
A5-2
9'-8 1/8"
ALL UNIT LAYOUTS AREDIAGRAMMATIC. DO NOT SCALE OFF
THIS DRAWING OR LAYOUT UNITINTERIORS UNLESS OTHERWISE NOTED.
SEE ACTUAL ENLARGED PLANS FORUNIT LAYOUTS AND DIMENSIONS,
UNLESS OTHERWISE NOTED.
GENERAL FLOOR PLAN NOTES:1. SEE GENERAL NOTES ON COVER SHEET A0.0 AND COORDINATE WITH ALL OTHER
DOCUMENTS OF SERVICE.2. CURRENT SCOPE OF WORK IS FOR PHASE 2 OF THE OVERALL PROJECT; CONSISTING
OF 8 RESIDENTIAL UNITS ON THE LOWER LEVEL, 24 RESIDENTIAL UNITS ON THE 1STFLOOR, 24 RESIDENTIAL UNITS ON THE 2ND FLOOR, 24 RESIDENTIAL UNITS ON THE3RD FLOOR, AND 2 LOFT UNITS IN THE BOILER HOUSE FOR A TOTAL OF 82RESIDENTIAL UNITS. FUTURE PHASES OF WORK WILL INCLUDE COMPLETION OF THEDEVELOPMENT OF MILL WEST'S LOWER LEVEL SPACES AND CONVERTING SPACE ONTHE FIRST AND SECOND FLOOR TO RESIDENTIAL UNITS. ALL WORK NEEDS TO BECOORDINATED WITH THE OVERALL PROJECT CONCEPT.
3. CONSTRUCTION MUST BE IN CONFORMANCE WITH GUIDELINES FOR REHABILITATIONOF HISTORIC BUILDINGS AND AS APPROVED BY STATE AND FEDERAL AGENCIES.ALL CONTRACTORS SHALL COORDINATE ACCORDINGLY.
4. ALL CONTRACTORS AND SUBCONTRACTORS SHALL COORDINATE WITH THEENVIRONMENTAL SYSTEM. COORDINATE ENVIRONMENTAL VENT RISERS WITHENVIRONMENTAL DRAWINGS AND ENGINEER FOR SIZES, SPECIFICATIONS, & ACCESSPOINTS. ALL THROUGH SLAB PENETRATIONS NEED TO BE COORDINATED WITHENVIRONMENTAL DRAWINGS, SEE SUB SLAB COORDINATION PLAN.
5. COORDINATE ALL SUB-SLAB PLUMBING WORK WITH PLUMBING DRAWINGS6. COORDINATE FINAL LOCATIONS OF ELECTRICAL TRANSFORMERS WITH ELECTRICAL
CONTRACTOR.7. COORDINATE ALL STRUCTURAL WORK WITH STRUCTURAL DRAWINGS.8. COORDINATE ENTRANCE ELEVATION, DUE TO RAISED SLAB, WITH CIVIL DRAWINGS &
PROVIDE ACCESSIBLE ENTRANCE AT NORTH WEST CORNER OF BUILDING.9. ALL DIMENSIONS ARE TO FACE OF FINISH UNLESS OTHERWISE NOTED.10. PLUMBING FIXTURE LAYOUTS ARE BASED ON FIXTURES AS DEPICTED ON
DRAWINGS. IF SIZES VARY FROM THIS SIZE, COORDINATE FIXTURE SIZE ANDLOCATION WITH PROJECT MANAGER.
11. ALL WORK AND PROCEDURES SHALL COMPLY WITH APPLICABLE AND CURRENTCODES, REGULATIONS, ORDINANCES, AND REQUIREMENTS OR AUTHORITIES HAVINGJURISDICTION, INCLUDING ACCESSIBILITY GUIDELINES WHERE APPLICABLE.CONFIRM SAME WITH LOCAL BUILDING INSPECTOR.
NN
Scale:
Project No.:
Drawn By:
670 N. COMMERCIAL ST.MANCHESTER, NH 03101
P: 603.622.6223F: 603.622.7342
www.bradysullivan.com
Sheet Issue Date:
Approved By:
THESE DRAWINGS HAVE BEENAPPROVED BY THE ARCHITECTAND HAVE BEEN ISSUED FORCONSTRUCTION.
INTERSTATE - 293
BRID
GE S
TR
EET
MERRIMACK RIVER
MCGREGOR STREET
FO
UN
DR
Y S
TR
EET
3 4A 4B 4C 4D
1A1B2
DO
CU
MEN
TS
of
SER
VIC
E
As indicated 10/9
/2014 1
1:3
3:0
1 A
M
A1-2
LO
WER
LEVEL
FLO
OR
PLAN
1049-0658
The L
ofts a
t M
illW
est
The A
nnex
02/06/2014
TR
70 F
oundry S
t.
Manchester, N
H 0
3102
CL
3/32" = 1'-0"1 Lower Level Floor Plan - North End
3/32" = 1'-0"2 Lower Level Floor Plans - South End
LL FLOOR UNIT SCHEDULE
UnitNo. Unit Type
UsableArea
010 Unique 001/004 800 SF011 Unique 002/003/006 1070 SF012 Unique 002/003/006 1050 SF013 Unique 001/004 770 SF014 Unique 005 1200 SF015 Unique 002/003/006 1090 SF016 Unique 007 1360 SF017 Unique 008 1270 SF
# ofBRs
12223233
# ofBAs
11111111
No.
Descrip
tio
nD
ate
1PR
OG
RES
S S
ET
12/0
6/2
013
2PER
MIT
SET
02/0
6/2
014
3D
OCU
MEN
T O
F S
ER
VIC
E06/2
7/2
014
UP DN
UP
DN
UP
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
A
B
C
48 49
ENLARGEDPLAN ON
SIMILAR TO
A4-04
ENLARGEDPLAN ON
A4-01
ENLARGEDPLAN ON
A4-01
ENLARGEDPLAN ON
A4-04
ENLARGEDPLAN ON
A4-01
ENLARGEDPLAN ON
A4-01
ENLARGEDPLAN ON
A4-01
ENLARGEDPLAN ON
SIMILAR TO
A4-01
ENLARGEDPLAN ON
SIMILAR TO
A4-01
ENLARGEDPLAN ON
SIMILAR TO
A4-06
ENLARGEDPLAN ON
SIMILAR TO
A4-01
ENLARGEDPLAN ON
A4-04
ENLARGEDPLAN ON
A4-13
ENLARGEDPLAN ON
A4-13
EQ EQ EQ EQ EQ EQ EQ EQ
5'-0
"
A1 A1 A1 A1 A1 A1
P
A1 A1 A1 A1 A1 A1
D D D D
D2
DDDD
D
DDDD
D2
5'-6" 5'-6"5'-6"5'-6"
18'-11" 17'-9"
Unit No.124Type 1A
Unit No.125Type 2A
Unit No.126Type 1A
Unit No.129Type 1A
Unit No.130Type 2A
Unit No.131Type 1A
Unit No.122Type 2A
Unit No.123Type 1A
F2
F2
D2
D
D
Unit No.127Type 5A
Unit No.128Type 5A
ENLARGEDPLAN ON
A5-3
ENLARGEDPLAN ON
A5-4
18'-7" 18'-8"
Unit No.132Type 132
Unit No.133Type 133
1 2 3 4 5 6 7 8 9 10 11 12 14 15 16 17 18 19 20 21 22 23 24 25
A
B
C
ENLARGEDPLAN ON
SIMILAR TO
A4-04
ENLARGEDPLAN ON
SIMILAR TO
A4-04
ENLARGEDPLAN ON
A4-04
ENLARGEDPLAN ON
A4-01
ENLARGEDPLAN ON
A4-04
ENLARGEDPLAN ON
A4-01
ENLARGEDPLAN ON
A4-01
ENLARGEDPLAN ON
SIMILAR TO
A4-04
ENLARGEDPLAN ON
SIMILAR TO
A4-01
ENLARGEDPLAN ON
A4-04
ENLARGEDPLAN ON
A4-04
ENLARGEDPLAN ON
SIMILAR TO
A4-04
EQ EQEQ EQ5'-6"5'-6"EQ EQ
5'-0
"5'-6" D D D D
DDDDDDDDDD
A1
A1
A1 A1 A1 A1 A1 A1 A1 A1 A1 A1D2
18'-7"18'-6 1/4" 18'-0 1/2"
14'-1 3/4"3'-6"
18'-0 3/4"
Unit No.112Type 2A
Unit No.113Type 2A
Unit No.114Type 2A
Unit No.118Type 2A
Unit No.117Type 1A
Unit No.119Type 1A
Unit No.120Type 1A
Unit No.121Type 2A
D2
D
Unit No.115Type 4A
Unit No.116Type 5A
5'-6" 5'-6"
Unit No.111Type 2A
Unit No.110Type 2A
ENLARGEDPLAN ON
A5-2
ENLARGEDPLAN ON
A5-1
ALL UNIT LAYOUTS AREDIAGRAMMATIC. DO NOT SCALE OFF
THIS DRAWING OR LAYOUT UNITINTERIORS UNLESS OTHERWISE NOTED.
SEE ACTUAL ENLARGED PLANS FORUNIT LAYOUTS AND DIMENSIONS,
UNLESS OTHERWISE NOTED.
GENERAL FLOOR PLAN NOTES:1. SEE GENERAL NOTES ON COVER SHEET A0.0 AND COORDINATE WITH ALL OTHER
DOCUMENTS OF SERVICE.2. CURRENT SCOPE OF WORK IS FOR PHASE 2 OF THE OVERALL PROJECT; CONSISTING
OF 8 RESIDENTIAL UNITS ON THE LOWER LEVEL, 24 RESIDENTIAL UNITS ON THE 1STFLOOR, 24 RESIDENTIAL UNITS ON THE 2ND FLOOR, 24 RESIDENTIAL UNITS ON THE3RD FLOOR, AND 2 LOFT UNITS IN THE BOILER HOUSE FOR A TOTAL OF 82RESIDENTIAL UNITS. FUTURE PHASES OF WORK WILL INCLUDE COMPLETION OF THEDEVELOPMENT OF MILL WEST'S LOWER LEVEL SPACES AND CONVERTING SPACE ONTHE FIRST AND SECOND FLOOR TO RESIDENTIAL UNITS. ALL WORK NEEDS TO BECOORDINATED WITH THE OVERALL PROJECT CONCEPT.
3. CONSTRUCTION MUST BE IN CONFORMANCE WITH GUIDELINES FOR REHABILITATIONOF HISTORIC BUILDINGS AND AS APPROVED BY STATE AND FEDERAL AGENCIES.ALL CONTRACTORS SHALL COORDINATE ACCORDINGLY.
4. ALL CONTRACTORS AND SUBCONTRACTORS SHALL COORDINATE WITH THEENVIRONMENTAL SYSTEM. COORDINATE ENVIRONMENTAL VENT RISERS WITHENVIRONMENTAL DRAWINGS AND ENGINEER FOR SIZES, SPECIFICATIONS, & ACCESSPOINTS. ALL THROUGH SLAB PENETRATIONS NEED TO BE COORDINATED WITHENVIRONMENTAL DRAWINGS, SEE SUB SLAB COORDINATION PLAN.
5. COORDINATE ALL SUB-SLAB PLUMBING WORK WITH PLUMBING DRAWINGS6. COORDINATE FINAL LOCATIONS OF ELECTRICAL TRANSFORMERS WITH ELECTRICAL
CONTRACTOR.7. COORDINATE ALL STRUCTURAL WORK WITH STRUCTURAL DRAWINGS.8. COORDINATE ENTRANCE ELEVATION, DUE TO RAISED SLAB, WITH CIVIL DRAWINGS &
PROVIDE ACCESSIBLE ENTRANCE AT NORTH WEST CORNER OF BUILDING.9. ALL DIMENSIONS ARE TO FACE OF FINISH UNLESS OTHERWISE NOTED.10. PLUMBING FIXTURE LAYOUTS ARE BASED ON FIXTURES AS DEPICTED ON
DRAWINGS. IF SIZES VARY FROM THIS SIZE, COORDINATE FIXTURE SIZE ANDLOCATION WITH PROJECT MANAGER.
11. ALL WORK AND PROCEDURES SHALL COMPLY WITH APPLICABLE AND CURRENTCODES, REGULATIONS, ORDINANCES, AND REQUIREMENTS OR AUTHORITIES HAVINGJURISDICTION, INCLUDING ACCESSIBILITY GUIDELINES WHERE APPLICABLE.CONFIRM SAME WITH LOCAL BUILDING INSPECTOR.
NN
Scale:
Project No.:
Drawn By:
670 N. COMMERCIAL ST.MANCHESTER, NH 03101
P: 603.622.6223F: 603.622.7342
www.bradysullivan.com
Sheet Issue Date:
Approved By:
THESE DRAWINGS HAVE BEENAPPROVED BY THE ARCHITECTAND HAVE BEEN ISSUED FORCONSTRUCTION.
INTERSTATE - 293
BRID
GE S
TR
EET
MERRIMACK RIVER
MCGREGOR STREET
FO
UN
DR
Y S
TR
EET
3 4A 4B 4C 4D
1A1B2
DO
CU
MEN
TS
of
SER
VIC
E
As indicated 10/9
/2014 1
1:3
3:2
0 A
M
A1-3
FIR
ST F
LO
OR
PLAN
1049-0658
The L
ofts a
t M
illW
est
The A
nnex
02/06/2014
TR
70 F
oundry S
t.
Manchester, N
H 0
3102
CL
3/32" = 1'-0"1 First Floor Plan - North End
3/32" = 1'-0"2 First Floor Plan - South End
1ST FLOOR UNITSCHEDULE
UnitNo. Unit Type Usable Area
110 2A 1050 SF111 2A 990 SF112 2A 1020 SF113 2A 1020 SF114 2A 1020 SF115 4A 1310 SF116 5A 1250 SF117 1A 1020 SF118 2A 1020 SF119 1A 1020 SF120 1A 1020 SF121 2A 1050 SF122 2A 1080 SF123 1A 1020 SF124 1A 1020 SF125 2A 1020 SF126 1A 1020 SF127 5A 1320 SF128 5A 1260 SF129 1A 1020 SF130 2A 1020 SF131 1A 1020 SF132 2030 SF133 UNIT 133 970 SF
# ofBAs
111111111111111111111111
# ofBRs
222223322222222223322221
No.
Descrip
tio
nD
ate
1PR
OG
RES
S S
ET
12/0
6/2
013
2PER
MIT
SET
02/0
6/2
014
3D
OCU
MEN
T O
F S
ER
VIC
E06/2
7/2
014
UPDN
DN
DN
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
A
B
C
48 49
ENLARGEDPLAN ON
SIMILAR TO
A4-07
ENLARGEDPLAN ON
A4-02
ENLARGEDPLAN ON
A4-02
ENLARGEDPLAN ON
A4-05
ENLARGEDPLAN ON
A4-02
ENLARGEDPLAN ON
A4-02
ENLARGEDPLAN ON
A4-05
ENLARGEDPLAN ON
A4-17
ENLARGEDPLAN ON
A4-16
ENLARGEDPLAN ON
A4-02
ENLARGEDPLAN ON
SIMILAR TO
SKA-9
ENLARGEDPLAN ON
SKA-9
EQ EQ EQ EQ 5'-6" 5'-6" EQ EQ EQ EQ
5'-0
"
5'-0
"
A2 A2 A2 A2 A2 A2 A2 A2 A2
DDD
D2
D
DDDDDDDDDD
18'-7" 18'-11" 17'-9" 18'-8"
Unit No.222Type 3B
Unit No.223Type 1B
Unit No.224Type 1B
Unit No.226Type 1B
Unit No.229Type 1B
Unit No.230Type 2B
Unit No.231Type 1B
A2 A2 A2
Unit No.225Type 2B
F2
D2
D2
D2
D
F3
Unit No.227Type 5B
Unit No.228Type 5B
5'-6" 5'-6"
Unit No.232Type 232
Unit No.233Type 233
ENLARGEDPLAN ON
A5-3
ENLARGEDPLAN ON
A5-4
1 2
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
A
B
C
ENLARGEDPLAN ON
SIMILAR TO
A4-05
ENLARGEDPLAN ON
A4-05
ENLARGEDPLAN ON
A4-05
ENLARGEDPLAN ON
A4-02
ENLARGEDPLAN ON
A4-05
ENLARGEDPLAN ON
A4-02
ENLARGEDPLAN ON
A4-02
ENLARGEDPLAN ON
A4-05
ENLARGEDPLAN ON
A4-05
ENLARGEDPLAN ON
SIMILAR TO
A4-05
ENLARGEDPLAN ON
SIMILAR TO
A4-02
ENLARGEDPLAN ON
SIMILAR TO
A4-05
EQ EQ EQ EQ 5'-6" 5'-6" EQ EQ EQ EQ5'-0
"
5'-0
"
A2 A2 A2 A2 A2 A2 A2 A2 A2 A2 A2 A2
D D D D
DDDDDDDDDD
D2
D2
18'-6 1/4" 18'-7" 18'-0 1/2" 18'-0 3/4"
Unit No.211Type 2B
Unit No.212Type 2B
Unit No.213Type 2B
Unit No.214Type 2B
Unit No.218Type 2B
Unit No.217Type 1B
Unit No.219Type 1B
Unit No.220Type 1B
Unit No.210Type 2B
Unit No.221Type 2B
F2
F2
D2
D
Unit No.215Type 4B
Unit No.216Type 5B
5'-6" 5'-6"
ENLARGEDPLAN ON
A5-1
ENLARGEDPLAN ON
A5-2
ALL UNIT LAYOUTS AREDIAGRAMMATIC. DO NOT SCALE OFF
THIS DRAWING OR LAYOUT UNITINTERIORS UNLESS OTHERWISE NOTED.
SEE ACTUAL ENLARGED PLANS FORUNIT LAYOUTS AND DIMENSIONS,
UNLESS OTHERWISE NOTED.
GENERAL FLOOR PLAN NOTES:1. SEE GENERAL NOTES ON COVER SHEET A0.0 AND COORDINATE WITH ALL OTHER
DOCUMENTS OF SERVICE.2. CURRENT SCOPE OF WORK IS FOR PHASE 2 OF THE OVERALL PROJECT; CONSISTING
OF 8 RESIDENTIAL UNITS ON THE LOWER LEVEL, 24 RESIDENTIAL UNITS ON THE 1STFLOOR, 24 RESIDENTIAL UNITS ON THE 2ND FLOOR, 24 RESIDENTIAL UNITS ON THE3RD FLOOR, AND 2 LOFT UNITS IN THE BOILER HOUSE FOR A TOTAL OF 82RESIDENTIAL UNITS. FUTURE PHASES OF WORK WILL INCLUDE COMPLETION OF THEDEVELOPMENT OF MILL WEST'S LOWER LEVEL SPACES AND CONVERTING SPACE ONTHE FIRST AND SECOND FLOOR TO RESIDENTIAL UNITS. ALL WORK NEEDS TO BECOORDINATED WITH THE OVERALL PROJECT CONCEPT.
3. CONSTRUCTION MUST BE IN CONFORMANCE WITH GUIDELINES FOR REHABILITATIONOF HISTORIC BUILDINGS AND AS APPROVED BY STATE AND FEDERAL AGENCIES.ALL CONTRACTORS SHALL COORDINATE ACCORDINGLY.
4. ALL CONTRACTORS AND SUBCONTRACTORS SHALL COORDINATE WITH THEENVIRONMENTAL SYSTEM. COORDINATE ENVIRONMENTAL VENT RISERS WITHENVIRONMENTAL DRAWINGS AND ENGINEER FOR SIZES, SPECIFICATIONS, & ACCESSPOINTS. ALL THROUGH SLAB PENETRATIONS NEED TO BE COORDINATED WITHENVIRONMENTAL DRAWINGS, SEE SUB SLAB COORDINATION PLAN.
5. COORDINATE ALL SUB-SLAB PLUMBING WORK WITH PLUMBING DRAWINGS6. COORDINATE FINAL LOCATIONS OF ELECTRICAL TRANSFORMERS WITH ELECTRICAL
CONTRACTOR.7. COORDINATE ALL STRUCTURAL WORK WITH STRUCTURAL DRAWINGS.8. COORDINATE ENTRANCE ELEVATION, DUE TO RAISED SLAB, WITH CIVIL DRAWINGS &
PROVIDE ACCESSIBLE ENTRANCE AT NORTH WEST CORNER OF BUILDING.9. ALL DIMENSIONS ARE TO FACE OF FINISH UNLESS OTHERWISE NOTED.10. PLUMBING FIXTURE LAYOUTS ARE BASED ON FIXTURES AS DEPICTED ON
DRAWINGS. IF SIZES VARY FROM THIS SIZE, COORDINATE FIXTURE SIZE ANDLOCATION WITH PROJECT MANAGER.
11. ALL WORK AND PROCEDURES SHALL COMPLY WITH APPLICABLE AND CURRENTCODES, REGULATIONS, ORDINANCES, AND REQUIREMENTS OR AUTHORITIES HAVINGJURISDICTION, INCLUDING ACCESSIBILITY GUIDELINES WHERE APPLICABLE.CONFIRM SAME WITH LOCAL BUILDING INSPECTOR.
Scale:
Project No.:
Drawn By:
670 N. COMMERCIAL ST.MANCHESTER, NH 03101
P: 603.622.6223F: 603.622.7342
www.bradysullivan.com
Sheet Issue Date:
Approved By:
THESE DRAWINGS HAVE BEENAPPROVED BY THE ARCHITECTAND HAVE BEEN ISSUED FORCONSTRUCTION.
INTERSTATE - 293
BRID
GE S
TR
EET
MERRIMACK RIVER
MCGREGOR STREET
FO
UN
DR
Y S
TR
EET
3 4A 4B 4C 4D
1A1B2
DO
CU
MEN
TS
of
SER
VIC
E
As indicated 10/9
/2014 1
1:3
3:3
7 A
M
A1-4
SECO
ND
FLO
OR
PLAN
1049-0658
The L
ofts a
t M
illW
est
The A
nnex
02/06/2014
TR
70 F
oundry S
t.
Manchester, N
H 0
3102
CL
3/32" = 1'-0"1 Second Floor Loft Plan - North End
3/32" = 1'-0"2 02 Second Floor Loft Plans - South End
2ND FLOOR UNITSCHEDULE
UnitNo. Unit Type Usable Area
210 2B 1040 SF211 2B 1010 SF212 2B 1010 SF213 2B 1010 SF214 2B 1010 SF215 4B 1280 SF216 5B 1290 SF217 1B 1020 SF218 2B 1010 SF219 1B 1020 SF220 1B 1020 SF221 2B 1040 SF222 3B 1250 SF223 1B 1020 SF224 1B 1020 SF225 2B 1010 SF226 1B 1020 SF227 5B 1330 SF228 5B 1150 SF229 1B 910 SF230 2B 870 SF231 2B 1020 SF232 UNIT 232 1020 SF233 UNIT 233 950 SF
# ofBAs
111111111111111111111111
# ofBRs
222223322222322223322221
No.
Descrip
tio
nD
ate
1PR
OG
RES
S S
ET
12/0
6/2
013
2PER
MIT
SET
02/0
6/2
014
3D
OCU
MEN
T O
F S
ER
VIC
E06/2
7/2
014
DN
DN
DNDNDN DN
DN
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
A
B
C
48 49
ENLARGEDPLAN ON
SIMILAR TO
A4-07
ENLARGEDPLAN ON
A4-03
ENLARGEDPLAN ON
A4-03
ENLARGEDPLAN ON
A4-03
ENLARGEDPLAN ON
A4-03
ENLARGEDPLAN ON
A4-03
ENLARGEDPLAN ON
A4-14
ENLARGEDPLAN ON
A4-15
ENLARGEDPLAN ON
SKA-5
ENLARGEDPLAN ON
SKA-5
ENLARGEDPLAN ON
A4-05
ENLARGEDPLAN ON
A4-05
5'-4
1/8
"
6'-4
1/8
"
5'-4
1/8
"
D2
A3
A3A3
A3
A3A3A3
A3
A3
A3A3
A3
DDDDDDDDDD
D DD
Unit No.323Type 1C
Unit No.324Type 1C
Unit No.325Type 2C
Unit No.326Type 1C
Unit No.329Type 1C
Unit No.330Type 2C
Unit No.331Type 1C
Unit No.332Type "A"
ACCESSIBLE
Unit No.322Type 3B
Unit No.333Type "A"
ACCESSIBLE
F2D2
D2
D
D2
Unit No.327Type 5C
Unit No.328Type 5C
18'-7" 18'-11" 17'-9" 19'-0 1/8"
ENLARGEDPLAN ON
A5-3
ENLARGEDPLAN ON
A5-4
1 23
4
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
A
B
C
ENLARGEDPLAN ON
SIMILAR TO
A4-05
ENLARGEDPLAN ON
A4-05
ENLARGEDPLAN ON
A4-05
ENLARGEDPLAN ON
A4-05
ENLARGEDPLAN ON
A4-05
ENLARGEDPLAN ON
SKA-5
ENLARGEDPLAN ON
SKA-5
ENLARGEDPLAN ON
A4-05
ENLARGEDPLAN ON
SIMILAR TO
A4-05
ENLARGEDPLAN ON
A4-03
ENLARGEDPLAN ON
A4-03
ENLARGEDPLAN ON
A4-03
EQ EQ EQ EQ
5'-4
1/8
"
3'-2
1/1
6"
2'-2
1/1
6"
EQ
EQ
5'-4
1/8
"
EQ
EQA1 A1 A1 A1 A1 A1
A1 A3A3
A3 A3
A3
D D D D
DDDDDDDDDD
D2
18'-6 1/4" 18'-10 1/2" 18'-3 1/2" 18'-0 3/4"
Unit No.311Type 2C
Unit No.312Type 2C
Unit No.313Type 2C
Unit No.314Type 2C
Unit No.317Type 1C
Unit No.318Type 2C
Unit No.319Type 1C
Unit No.320Type 1C
Unit No.321Type 2C
Unit No.310Type 2C
D
D2
F2
F2
Unit No.315Type 4C
Unit No.316Type 5C
ELECTRICALROOM
ENLARGEDPLAN ON
A5-2
ENLARGEDPLAN ON
A5-1
1'-11 1/16"
ALL UNIT LAYOUTS AREDIAGRAMMATIC. DO NOT SCALE OFF
THIS DRAWING OR LAYOUT UNITINTERIORS UNLESS OTHERWISE NOTED.
SEE ACTUAL ENLARGED PLANS FORUNIT LAYOUTS AND DIMENSIONS,
UNLESS OTHERWISE NOTED.
GENERAL FLOOR PLAN NOTES:1. SEE GENERAL NOTES ON COVER SHEET A0.0 AND COORDINATE WITH ALL OTHER
DOCUMENTS OF SERVICE.2. CURRENT SCOPE OF WORK IS FOR PHASE 2 OF THE OVERALL PROJECT; CONSISTING
OF 8 RESIDENTIAL UNITS ON THE LOWER LEVEL, 24 RESIDENTIAL UNITS ON THE 1STFLOOR, 24 RESIDENTIAL UNITS ON THE 2ND FLOOR, 24 RESIDENTIAL UNITS ON THE3RD FLOOR, AND 2 LOFT UNITS IN THE BOILER HOUSE FOR A TOTAL OF 82RESIDENTIAL UNITS. FUTURE PHASES OF WORK WILL INCLUDE COMPLETION OF THEDEVELOPMENT OF MILL WEST'S LOWER LEVEL SPACES AND CONVERTING SPACE ONTHE FIRST AND SECOND FLOOR TO RESIDENTIAL UNITS. ALL WORK NEEDS TO BECOORDINATED WITH THE OVERALL PROJECT CONCEPT.
3. CONSTRUCTION MUST BE IN CONFORMANCE WITH GUIDELINES FOR REHABILITATIONOF HISTORIC BUILDINGS AND AS APPROVED BY STATE AND FEDERAL AGENCIES.ALL CONTRACTORS SHALL COORDINATE ACCORDINGLY.
4. ALL CONTRACTORS AND SUBCONTRACTORS SHALL COORDINATE WITH THEENVIRONMENTAL SYSTEM. COORDINATE ENVIRONMENTAL VENT RISERS WITHENVIRONMENTAL DRAWINGS AND ENGINEER FOR SIZES, SPECIFICATIONS, & ACCESSPOINTS. ALL THROUGH SLAB PENETRATIONS NEED TO BE COORDINATED WITHENVIRONMENTAL DRAWINGS, SEE SUB SLAB COORDINATION PLAN.
5. COORDINATE ALL SUB-SLAB PLUMBING WORK WITH PLUMBING DRAWINGS6. COORDINATE FINAL LOCATIONS OF ELECTRICAL TRANSFORMERS WITH ELECTRICAL
CONTRACTOR.7. COORDINATE ALL STRUCTURAL WORK WITH STRUCTURAL DRAWINGS.8. COORDINATE ENTRANCE ELEVATION, DUE TO RAISED SLAB, WITH CIVIL DRAWINGS &
PROVIDE ACCESSIBLE ENTRANCE AT NORTH WEST CORNER OF BUILDING.9. ALL DIMENSIONS ARE TO FACE OF FINISH UNLESS OTHERWISE NOTED.10. PLUMBING FIXTURE LAYOUTS ARE BASED ON FIXTURES AS DEPICTED ON
DRAWINGS. IF SIZES VARY FROM THIS SIZE, COORDINATE FIXTURE SIZE ANDLOCATION WITH PROJECT MANAGER.
11. ALL WORK AND PROCEDURES SHALL COMPLY WITH APPLICABLE AND CURRENTCODES, REGULATIONS, ORDINANCES, AND REQUIREMENTS OR AUTHORITIES HAVINGJURISDICTION, INCLUDING ACCESSIBILITY GUIDELINES WHERE APPLICABLE.CONFIRM SAME WITH LOCAL BUILDING INSPECTOR.
Scale:
Project No.:
Drawn By:
670 N. COMMERCIAL ST.MANCHESTER, NH 03101
P: 603.622.6223F: 603.622.7342
www.bradysullivan.com
Sheet Issue Date:
Approved By:
THESE DRAWINGS HAVE BEENAPPROVED BY THE ARCHITECTAND HAVE BEEN ISSUED FORCONSTRUCTION.
INTERSTATE - 293
BRID
GE S
TR
EET
MERRIMACK RIVER
MCGREGOR STREET
FO
UN
DR
Y S
TR
EET
3 4A 4B 4C 4D
1A1B2
DO
CU
MEN
TS
of
SER
VIC
E
As indicated 10/9
/2014 1
1:3
3:5
9 A
M
A1-5
TH
IRD
FLO
OR
PLAN
1049-0658
The L
ofts a
t M
illW
est
The A
nnex
02/06/2014
TR
70 F
oundry S
t.
Manchester, N
H 0
3102
CL
3/32" = 1'-0"1 Third Floor Plan - North End
3/32" = 1'-0"2 Third Floor Plan - South End
3RD FLOOR UNIT SCHEDULE
UnitNo. Unit Type
UsableArea
310 2C 1050 SF311 2C 1010 SF313 2C 1010 SF314 2C 1010 SF315 4C 1080 SF316 5C 1620 SF317 1C 1130 SF318 2C 1010 SF319 1C 1130 SF320 1C 1130 SF321 2C 890 SF322 3B 910 SF323 1C 1130 SF324 1C 1130 SF325 2C 1010 SF326 1C 1130 SF327 5C 1440 SF328 5C 1130 SF329 1C 500 SF330 2C 860 SF331 1C 1130 SF332 332 TYPE "A" ACCESSIBLE 1130 SF333 333 TYPE "A" ACCESSIBLE 970 SF
# ofBAs
111111111111111111111111
# ofBRs
222223322221122223322221
No.
Descrip
tio
nD
ate
1PR
OG
RES
S S
ET
12/0
6/2
013
2PER
MIT
SET
02/0
6/2
014
3D
OCU
MEN
T O
F S
ER
VIC
E06/2
7/2
014