1ECSO 10/2010

An FDOT Project:Urban Roadway Design Example

Presented By:

Vern Danforth P.E.,

Florida Department of Transportation

Engineering CADD Systems Office

[email protected]

Overview GEOPAK Corridor Modelinga Bentley Systems Product

2

Example:Typical Section Exhibit

ECSO 10/2010

So, Lets start here!

3

Example:Typical Section Exhibit

ECSO 10/2010

Slightly modified!

4

Example:Project Plan

ECSO 10/2010

5

Example:Project Cross Section

ECSO 10/2010

6

Example:3D Project Model

ECSO 10/2010

7

Corridor Modeling:

Template Library(s)Retrieve Standards ComponentsRetrieve Component GroupsRetrieve Typical SectionsCreate/Edit Job SectionsAssign Rules and ParametersDefine Geometry Constraints

Roadway DesignerTarget Graphics Elements Template(s) Station LimitsPoint ControlsSuper elevationMilling/Overlay CriteriaEnd Condition ExceptionsParametric Constraints

ECSO 10/2010

itl

ird

Its a designers toolkit!

Broad Strokes

Trim Out to Finish

8

Demonstration:Appling “variations” to a Project Template

Project TemplateMedian crossovers Left Turn lanes in the median Traffic Separators Meandering sidewalk Variable width sidewalk Hand Rails on sidewalk -720

Gravity Walls –751Urban Driveway Locations –i

Project Roadway DesignerSpecial Ditch Profile – 717

Retaining Walls –722Intersections-dempsy

ECSO 10/2010

...As the design

dictates!

9

Designing in 3D, WIIFM

DESIGN TIN OR DTMSurface Model Analysis Tools

contours, slope vectors, drainage

R/W limit boundary or hullWetland ImpactsRe-Wall LimitsGravity Wall Location Needs

VISUALIZE3D Perspectives of Roadway Designwalk the designdrive alongfly overRenderPhoto-matchAnimate

INTEGRATE other 3D MODELSDrainage Existing UtilitiesProposed UtilitiesStructures/BridgesGoogle warehouse3D CellsEtc.

OUTPUT Automated Machine GuidanceLand XML Cross Sections at any interval

ECSO 10/2010

...What's in it for

me!

10

…in closing

Questions…

Follow-up…

…on behalf of the entire ECSO office.

Thank you for attending !