DOD Protocol & Guidance forConducting Integrated Facility
Watershed ImpactAssessments
Developed by the USAEC for DOD
Presented by Georgette MyersU.S. Army Environmental Center (USAEC)
Heather Cisar, LMINDIA Conference – April 9, 2003
Agenda
§ Protocol DevelopmentàBackground
àApproach
àObjectives
àImplementation
àBenefits for DoD
§ Overview of FinalProtocol
3
Background
Why Develop a DOD WatershedAssessment Protocol?§ Integrated Federal Strategies &
Agreements & New ComplianceRequirements§ Crosswalks Between Regulations§ Automation Of Data Collection &
Reporting§ Watershed Approach Used To Address
Regulatory Requirements§ No Standard DoD Approach Exists
Pro
toco
l Ove
rvie
w
WATER QUALITY
RCRA
SDWATOSCA
ESA
CAA FIFRA
CWA CERCLA
Haz.Waste&MaterialStorage,Landfills,OB/OD,SludgeMgmt
Cleanup &Restoration
Drinking Water Treatment & SourceWater Protection, Pesticide Application,
Deposition from Air Emissions
Construction &Maintenance,WastewaterTreatment
Storm waterRunoff fromMissionActivities
Land Use Planning to ProtectSpecies & Habitat
NEPA
Approach - Step 1:Determine the Need
5
Approach (cont.)
§ Step 2: Determine Best Practices toIncorporate into Protocol• Review existing studies & Provide
Recommendations on Methods to Usefor DOD Protocol
§ Step 3: Test Protocol at FiveInstallations• Army: Ft. Stewart, McAlester• Navy/Marines/Air Force: Mayport;
Beaufort; Moody
Pro
toco
l Ove
rvie
w
6
Objectives
§ Provide Standard Methods EasilyModified to Site Conditions§ Provide Step-by-Step User Friendly
Product That Is Web Interactive§ Use Key Performance Metrics to
Determine Current Conditions &Track Results§ Identify and Assess Potential
Impacts of an Installation’s LandUse Conditions and Activities toWatershed
Pro
toco
l Ove
rvie
w
7
Objectives (cont.)
§ Involve Stakeholders§ Provide Prioritized List of
Installation Impacts & Solutions § Enable Easy Access to Wealth of
Existing Data§ Identify Innovative Yet Proven
Solutions§ Identify Partnerships & Funding
SourcesPro
toco
l Ove
rvie
w
8
Implementation
§ Implement at Installations That Are:• In Impaired Watersheds or Source Water
Protection Zones• Have Recurring Non-compliance Under
Any Regulation That Identifies WaterQuality Issues or will have newrequirement due to TMDL development
• Identified by DOD As Mission EssentialInstallations
§ Re-evaluate Based on TMDL 303dList Schedule
Pro
toco
l Ove
rvie
w
9
Benefits to DOD Facilities
§ Holistic Approach toEnvironmentalManagement andPlanning
§ Use by All PillarsCould ReduceRedundancy
§ Allows QuickResponse toAddressing DODEnvironmentalIssues &Requirements
§ ProvidesJustification forFuture POMs
§ Assist DOD inPrioritizing byMission, ComplianceStatus, and FutureStationing / Re-Alignment
§ Could Assist in theReduction ofEnvironmentalLiabilities
Pro
toco
l Ove
rvie
w
10
Overview: Final Protocol Phases
Phase 1Quick
ScreeningAnalysis Phase 2
Assess Receiving Watersheds Conditions
and Key Progress Metrics
Phase 3 Assess Potential
Impact of Installation Activities
A. Develop a baseline of physical characteristics
B. Identify potential impacts activities
Phase 4Identify Cost-Effective
Solutions to Mitigate HighPriority Impacts
Phase 5Identify Partnerships &
Funding Sources
Phase 6Implement Solutions,
Track Progress & ReassessOn a Regular Basis
11
Phase IQuick Screening Analysis
See Handout
12
Phase II: Develop a WatershedPriority Score (WPS)
Using EPA’s Indicator Watershed ScoreIdentify Installation’s Watershed Using EPA
Surf Your Watershed
Pro
toco
l Ph
ases
http:// http:// www.www.epaepa..govgov//wateratlaswateratlas/geo//geo/maplistmaplist.html..html.
13
Phase III. Develop a TotalActivity Burden Score (TABS)
§ Identify Installation PhysicalCharacteristics§ Develop “Activity Impact Score”
(AIS)§ Add WPS and AIS= TABS§ Develop Baseline and Prioritize
Activities§ Integrate with GIS
Pro
toco
l Ph
ases
14
Sample GIS OutputValidation of Site Activities in Relationship
to 303(d) Listed Impaired Waterbodies
Watershed boundaries
Significant ActivitiesImpaired waterbodies
15
Phase IV. Develop Solutions
GoalGoal:Reduce Activity Impacts (TABS) to
the greatest amount for the leastamount of cost
ApproachApproach:Select Innovative Solutions That Are
Low Cost, Low Maintenance &Effective in Reducing Pollutants in
Water Bodies
Pro
toco
l Ph
ases
16
Phase V. Identify Partners
Guidance for Potential PartnersGuidance for Potential Partners§ Regulators§ Citizens Groups§ Private Landowners
Reasons for PartnershipsReasons for Partnerships§ Technical Expertise§ Provide Media Relations§ Support Educational Programs
Pro
toco
l Ph
ases
17
Phase VI. Implement Solutions,Track Progress & Reassess
àTracking key performancemetricsàReducing installationenvironmental burden score
Pro
toco
l Ph
ases
•Identify Funding Sources•Template for Project Sheets•Method for Tracking Progress
QUESTIONS?