Download - DK ENGINEERING CONSULTANCY JOINT STOCK …€¦ · Aspen Exchanger Design & Rating (EDR ... NEC Acostix: All sound calculations for sound ... Internal part procurement for Slug Catcher

Transcript
Page 1: DK ENGINEERING CONSULTANCY JOINT STOCK …€¦ · Aspen Exchanger Design & Rating (EDR ... NEC Acostix: All sound calculations for sound ... Internal part procurement for Slug Catcher

Head office: �Dong Xuyen Industrial Zone, Rach Dua Ward, Vung Tau City, S.R. VietnamBranch office: No. 02 Pham Ngoc Thach Street, Ward 9, Vung Tau City, S.R. VietnamTel: �+84 254 3596 970Fax:+� 84 254 3596 566Website:h� ttp://www.dkengineering.com.vnE-mail:d� [email protected] Code:3� 500816144

DK ENGINEERING

DK ENGINEERING CONSULTANCY JOINT STOCK COMPANY

Page 2: DK ENGINEERING CONSULTANCY JOINT STOCK …€¦ · Aspen Exchanger Design & Rating (EDR ... NEC Acostix: All sound calculations for sound ... Internal part procurement for Slug Catcher

DK ENGINEERING

DK ENGINEERING J.S.C

ABOUT US HUMAN RESOURCE

Delivering solution, Expanding customer value

3

With experienced Technical & Managing Staff whom have being taken part into many onshore & offshore projects in the field of Oil and Gas which include: Civil, Structure, Process, Mechanical and E&I for over 10 years, We assure that we will bring to you the best services with high quality, reliability, effective cost-benefit target, and best progress.

Managing Director

Deputy Directors

HR DeptEngineering

SectionProcurement

DeptAccountant

DeptFabrication

Section QHSE

Dept

Structure Dept

Piping Dept

E&I Dept

Process Dept

Mechanic Dept

Mechanical WS

E&I WS

QA/QC

R&DDept

Business Development Dept

2

Our team:- Management: 04- Fabrication section: 36 - Member: Unlimited- Engineering section: 40 - Member: 15- Procurement, business development: 10- R & D: 04- Accountant, admin: 10- QHSE: 06

ORGANIZATION CHART- GENERAL

COMPANY PROFILE

DK Engineering J.S.C was established in the year 2007 in Vietnam. With many years of experience in engineering for onshore/ offshore and Process equipment provider such as separation equipment, heat transfer equipment, measuring equipment, electrical and control cabinet. Our headquarter is located in Vung Tau City, Vietnam.

Our Vision

Becoming a favored company for onshore/offshore engineering consultancy and process equipment providing in the oil and gas industry.

Our Mission

Providing engineering consulting services and process equipment with innovative solutions, high quality, competitive prices and on time delivery for the customers.

Statement of Operation Policy

DK Engineering commits to deliver excellent services, equipment to the oil and gas customer. By providing the best engineering solutions, high quality fabrication for our customer, we always try our best to increase the customer value.

All DK Engineering employees commit to try our best and continuously improve on each task, products and services to ensure delivering high quality services and secure a sustainable growth since our establishment.

Page 3: DK ENGINEERING CONSULTANCY JOINT STOCK …€¦ · Aspen Exchanger Design & Rating (EDR ... NEC Acostix: All sound calculations for sound ... Internal part procurement for Slug Catcher

WORKSHOP, EQUIPMENT, MACHINES

COMPUTER SOFTWARE CAPABILITIES

4

We have specialized software to use for specific engineeringdisciplines as follows:

Process Engineering Aspen HYSYS: Process Simulation Aspen Exchanger Design & Rating (EDR): Heat Exchanger OLGA: The industry-standard tool for dynamic multiphase flow simulation NEC Acostix: All sound calculations for sound insulation of the enclosure walls, sound attenuators and louvers.

Mechanical Engineering PVElite: Pressure vessel and tank design analysis software MATHCAD: Programming software Microsoft Excel: In-house developed spreadsheets Solidworks Compress: Engineering for pressure vessel, ASME VIII-1 design capabilities

Electrical Engineering CAPTOR: Electrical system design

Structural/Civil Design Analysis Software Staad Pro Staad Offshore SACS: Offshore structural analysis SAP, Version 14: Structural analysis GRLWEAP: Pile driving simulation GEO SLOPE/W: Soil slope stability analysis

Pipeline Analysis Software CAESAR II: Piping stress analysis and design OFFPIPE: Pipeline installation analysis SAGE Profile: Pipeline stability and stress analysis Auto pipe: Pipeline stability and stress analysis

Project Management Microsoft Project Primavera

Drafting AutoCAD 3D Model/Drafting software PDMS: 3D computer aid design software Cadworx Smart plan 3D

5

DK ENGINEERING

DK ENGINEERING J.S.C Delivering solution, Expanding customer value

It. LIST OF TOOL AND EQUIPMENT Specification Unit

Q'ty

Bougth

Rend

I WELDING EQUIPMENT Ea 15

II LIFTING EQUIPMENT Set 27

IIICUTTING AND DRILLING

EQUIPMENTEa/Set 48

IV QA/QC EQUIPMENT Ea 11

V HAND TOOL Ea/Set 105

VI OTHER EQUIPMENT

1 Water jet CNC machine Ea 1

2 High pressure pump 37kg/cm3 Ea 1

3 Air compressor machine; 5HP 5 HP 10kg Ea 1

4 Water tanks Ea 1

CORE SERVICES

Work shop has been a fully equipped with equipment and machinery for simulation, testing and to serve the site fabrication and installation activities.

CNC Water Jet Cutting

Engineering Service

OnshoreProvide complete engineering solutions for onshore included process, mechanical, civil, structure, piping, electrical

and control for oil and gas industry, such as gas distribution, compressor station, metering station, pipeline, cathodic

protection system, oily water treatment system…

Offshore

Provide complete engineering for offshore included topside, jacket, subsea pipeline modification of existing system

included process, mechanical, piping, electrical and control system.

Separation Equipment: 2 Phase Separator, 3 Phase Separator, Filter Separator, Degasser,...

Heat Transfer Equipment: Shell an Tube Heat Exchanger Air Cooled Heat Exchanger Water Bath Heater, Fired Heater,

Electrical Heater, Cooling Tower,...

Measuring Equipment: all type of Gas Metering System Liquid Metering System Multiphase Metering System Metering Control System Sampling and Analysis Brownfield Metering Upgrades,...

Oily Water Treatment for Onshore and Offshore Gas Processing API/CPI Tank Produced Water Treatment System (IGF/CFU),...

Process/Compression Skid: Compressor Station, Gas Dehydration System, Generator/Compressor Enclosure,...

Utility Skid: Fuel Gas Treatment System, Chemical Injection Skid, Pump Skid, CO2/N2 Snuffing System, Pig Launcher, Pig Receiver, ...

Electrical & Instrument System: Electrical Cabinet, PLC Control Cabinet,...

Cathodic Protection System.

Equipment engineering/ fabrication

We provide engineering, procurement, fabrication and testing, installation of equipment as below:

Construction supervision consultant/Project Management

State of the art techniques in project management which requires broad range of knowledge are being applied in DK

Engineering to enable us to meet or exceed our customer's needs and expectations. Our project management

professionals combined detailed technical knowledge of management disciplines such as tendering, contracting, work

break down, cost estimating and control, scheduling and monitoring, project risk and change management, quality

management, stakeholder management with an extensive awareness of industry and customer drivers.

Procurement

“Exactly, quickly & competitive price” is our slogan. Let us to be your partner for an optimized & renovated products.

Familiar with materials and equipment in oil and gas industries compliance with International standards: ASME, ASTM,

BS, API,…

Qualified, experienced personnel in oil and gas projects.

Out source from all over the world as per Client's vendor list inspection companies: ABS, DNV, LR, ASME…

To Protect Onshore/Offshore Pipeline/Equipment

Page 4: DK ENGINEERING CONSULTANCY JOINT STOCK …€¦ · Aspen Exchanger Design & Rating (EDR ... NEC Acostix: All sound calculations for sound ... Internal part procurement for Slug Catcher

7

Delivering solution, Expanding customer valueDK ENGINEERING

DK ENGINEERING J.S.C

SOW: Engineering, fabrication Three-phase Separator Skid (No. 01) Project: Hornet Gas Field DevelopmentClient: Rhine Ruhr Pty Ltd - Year Built: 2014Design Pressure: 102 barg - Design Temperature: -10/100 C0

Construction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia

SOW: Engineering, fabrication Three-phase Separator Skid (No. 02) Project: Hornet Gas Field DevelopmentClient: Rhine Ruhr Pty Ltd - Year Built: 2015Design Pressure: 102 barg - Design Temperature: -10/100 C0

Construction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia

SOW: Calculation, Detail Design, Internal part procurement HP Separator Skid Project: Diamond Field Development ProjectClient: PVCL - Year Built: 2013Design Pressure: 133 barg - Design Temperature: 0/103 C0

Construction material: SA516 Gr.70N - ASME U stampInternal part: Rhine Ruhr/Australia

SOW: Calculation, Detail Design Allocation SeparatorProject: Su Tu Nau Field Development ProjectClient: Cuu Long JOC - Year Built: 2013Design Pressure: 31 barg - Design Temperature: 0/140 C0

Construction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia

SOW: Engineering, fabrication LP Separator VesselProject: Thai Binh-Ham Rong Gas Distribution And Gathering System ProjectClient: PVGAS SERVICE - Year Built: 2015Design Pressure: 46 barg - Design Temperature: -46/70 C0

ASME U stamp - Construction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia

SOW: Engineering, procurement, fabrication CO2 Compress Interstage SeparatorProject: Camau Fertilizer PlantClient: PVCFC - Year built: 2016

0Design Pressure: 90 barg - Design Temperature: -10/80 CConstruction material: SS 304 - ASME U stampInternal part: Rhine Ruhr/Australia

SOW: Provision of mobile 2 Phase Test Separator Skid Project: Bundled Phase 2 EPCI of Wellhead PlatformsClient: TNS/PTT Exploration - Year built: 2017Design Pressure: 35.5-56.3 barg Design Temperature: -29/135 C/ (-12) - 120 C0 0

Construction material: NACE CS +6MM CA+ANODES

SOW: Engineering, Internal part procurement Test Separator MBD-2920 Project: Su Tu Trang Field Development ProjectClient: Cuu Long JOC - Year Built: 2010Design Pressure: 50 barg - Design Temperature: -18.4/150 C0

Construction material: SA516 Gr.70N - ASME U-StampInternal part: FMC Technology

SOW: Engineering, fabrication for HHP SeperatorProject: Dai Hung Phase II DevelopmentClient: PVEP - Year of Completion: 2010Design Pressure: 38 barg - Design Temperature: -29/100 C0

Construction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia

SOW: Calculation, Detail Design, Internal part procurement PW Degasser SkidProject: Saraswati Oil Field Development Project - Phase 2Client: PETRO6-INDIA - Year Built: 2013

0Design Pressure: 10.34 barg - Design Temperature: 0/120 CConstruction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia

SOW: Calculation, Detail Design, Internal part procurement for Slug Catcher SkidProject: Dragon & Tortoise Field Development ProjectClient: VSP – PTSC M&C - Year built: 2010

0Design Pressure: 46 barg - Design Temperature: 0/120 CConstruction material: SA516 Gr.70N - ASME U-StampInternal part: Rhine Ruhr/Australia

SOW: Calculation, Detail Design Flare Scrubber SkidProject: Dragon & Tortoise Field Development ProjectClient: VSP – PTSC M&C - Year built: 2010Design Pressure: 50 barg - Design Temperature: -18.4/1500CConstruction material: SA516 Gr.70N - ASME U-StampInternal part: Rhine Ruhr/Australia6

SEPARATION EQUIPMENT

Page 5: DK ENGINEERING CONSULTANCY JOINT STOCK …€¦ · Aspen Exchanger Design & Rating (EDR ... NEC Acostix: All sound calculations for sound ... Internal part procurement for Slug Catcher

9

Delivering solution, Expanding customer valueDK ENGINEERING

DK ENGINEERING J.S.C

8

SOW: Engineering, procurement & fabrication supporting Utility Gas SkidProject: Pear Field DevelopmentClient: PVCL - Year built: 2008Design Pressure: 0-46 barg

0Design Temperature: AMB-65 C

SOW: Engineering, procurement, fabrication for Filter Separator (F-401A)Project: Phu My GDC Client: PVGAS - Year Built: 2015

0Design Pressure: 60 barg - Design Temperature: -10/65 CASME U stamp - Construction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia

SOW: Engineering, fabrication FilterProject: Ba Ria GDS Client: - Year Built: 2012PVGAS GPMBDesign Pressure: 40 barg - Design Temperature: -10/80 C0

Construction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia

SOW: Calculation, detail design Gas Filter Skid Project: Dai Hung Platform, Phase 2Client: PVEP POC - Year Built: 2010Design Pressure: 40 barg - Design Temperature: -10/80 C0

Construction material: SA516 Gr.70N

SOW: Engineering, fabrication & installation FilterProject: Thai Binh - Ham Rong Gas Distribution And Gathering SystemClient: - Year built: 2015PVGASDesign Pressure: 4600 kPag - Design Temperature: -29 C to 65 C 0 0

Construction material: CS +3mm CA + Internal Epoxy Coating

SOW: Calculating and engineering for Diesel Filter SkidProject name: BK3 - Bk10 Client: Vietsovpetro Joint VentureYear of Completion: 2012

FILTER/ FILTER SEPARATOR

SOW: Engineering, procurement and fabrication of Air CoolerProject: CCP PlatformClient: VIETSOVPETRO J.V - Delivery time: 2017Fin-Tube material: Copper Tube/Copper finsFans: 04 Blades, Aluminum, Moore/Motor: 10.5kW, Siemens

SOW: Engineering, procurement and fabrication of Air CoolerProject: Extension of gas compression capacity at Block 09-1Client: VIETSOVPETRO J.V - Delivery time: 2017Fin-Tube material: Carbon Tube/Aluminum finsFans: 06 Blades, Aluminum, Moore - Motor: 35kW, SiemensDesign pressure: 130barg

SOW: Engineering, procurement and fabrication of Tube Bundle for Air CoolerProject: GPP Dinh CoClient: Petrovietnam Gas Corporation - Delivery time: 2017Design pressure: 139 barg (Class 1500#)Fin tube material: SA 213/Aluminum fins - Fin Tube length: 10600mm

SOW: Engineering, procurement and fabrication Tube Bundle for Air coolerProject: Fabrication of Tube bundle for Air Cooler for PVCFCClient: PVCFC - Delivery time: 2017Fin tube material: SS 304/SS 304 finsFin Tube length: 9800mm

SOW: Engineering, procurement, fabrication Air Cooler Project: Diamond Development Project Client: PVCL - Delivery time: 2013Fin-Tube material: SA 179/AluminumFans: 06 Blades, Aluminum, Moore - Motor: 5kW, ABB

SOW: Engineering, procurement, fabrication Air CoolerProject: Dai Hung Gas Gathering ProjectClient: Dai Hung - Delivery time: 2014 Fin-Tube material: SA 269 316L/Aluminum Fans: 06 Blades, Aluminum, Moore - Motor: 15kW, ABB/Siemens

HEAT TRANSFER EQUIPMENT

Page 6: DK ENGINEERING CONSULTANCY JOINT STOCK …€¦ · Aspen Exchanger Design & Rating (EDR ... NEC Acostix: All sound calculations for sound ... Internal part procurement for Slug Catcher

TYPICAL COMPLETED PROJECTS

10

DK ENGINEERING

DK ENGINEERING J.S.C Delivering solution, Expanding customer value

SOW: Engineering, fabrication & installation of Suction Heater (HE-101) Project: Bitumen Storage And Distribution Terminal Project Client: Puma - Year built: 2016

0Design Pressure: 136/8 barg - Design Temperature: 0-300 CConstruction material: SA 179, U-Tube type

SOW: Engineering, fabrication & installation of Tube Bundle E-13Project: Heater Bundle Sai Gon PetroClient: Sai Gon Petro - Year built: 2016

0Design Pressure: 136/8 barg - Design Temperature: 0-300 CConstruction material: SA 179, U-Tube type

SOW: Detail Engineering, fabrication supporting for Tube Heat Exchanger Project: Gas Gathering System in Dragon - Tortoise FieldClient: PVGAS – PTSC M&C - Year built: 2013Design Pressure: 1.02-30 barg / Design Temperature: 0-190 0CConstruction material: SA 179M, Straight Tube type

SOW: Engineering, fabrication & installation of Heat ExchangerProject: LPG Thi Vai StorageClient: Petrovietnam Gas Corporation - Year built: 2014

0Design Pressure: 0-17.6 barg - Design Temperature: -45-95 CConstruction material: SS 316, Straight Tube type

SOW: Engineering, fabrication & installation of Heating coilProject: Phu-My Gas Distribution CenterClient: Petrovietnam Gas Corporation - Year built: 2014Design Pressure: 71 barg - Design Temperature: -10-1 000 CConstruction material: SA 106 Gr.B, Pipe

SOW: Engineering, fabrication & installation Heat Exchanger T-402 Project: MKC PlatformClient: - Year built: 2015VSPDesign Pressure: 13/56 barg - Design Temperature: 080-150 CConstruction material: Cu/Ni 90/10, Straight Tube type

SOW: Engineering, fabrication & installation Heat Exchanger T-102 Project: MKC PlatformClient: - Year built: 2017VSPDesign Pressure: 13/56 barg - Design Temperature: 080-150 CConstruction material: Cu/Ni 90/10, Straight Tube type

SOW: Engineering, fabrication & installation Heat Exchanger T-302 Project: MKC PlatformClient: - Year built: 2017VSPDesign Pressure: 13/56 barg - Design Temperature: 080-150 CConstruction material: Cu/Ni 90/10, Straight Tube type

SOW: Closed Drain Tank Electrical heater and HP Flare KO drum heaterProject: Thien Ung Wellhead PlatformClient: VSP - Year built: 2015Design Pressure: 47 barg - Design Temperature: 60-190 C0

Construction material: SS 316L - Heat Duty: 55kW & 75kW

SOW: Heat ExchangerEngineering, fabrication & installation of Project: TB-HR Gas distribution & gathering systemClient: PTSC PPS/PVGAS Corporation - Year built: 2015Design Pressure: 46 barg - Design Temperature: -29-90 0CConstruction material: SA 179, U-Tube type

SOW: Engineering, procurement, fabrication Tube bundle for Heat exchangerProject: FPSO RBII Client: PTSC PPS - Year built: 2015Design Pressure: 133 barg - Design Temperature: 60-177 0CConstruction material: SA 789 S32603, U-Tube type

SOW: Detail Engineering, fabrication supporting of Heat exchangerProject: Su Tu Vang CPP Client: CUU LONG JOC - Year built: 2013Design Pressure: 20.7/FV barg - Design Temperature: 19-232 0CConstruction material: SA 179M, Straight Tube type 11

HEAT TRANSFER EQUIPMENT

Page 7: DK ENGINEERING CONSULTANCY JOINT STOCK …€¦ · Aspen Exchanger Design & Rating (EDR ... NEC Acostix: All sound calculations for sound ... Internal part procurement for Slug Catcher

1312

DK ENGINEERING

DK ENGINEERING J.S.C Delivering solution, Expanding customer value

PROCESS/COMPRESSION SKID

SOW: Engineering, procurement, fabrication Ammonia Metering Package Project: Ammonia Plant Revamp Client: PVFCCo/PTSC - Year built: 2017Design Pressure: 0-27 barg / Design Temperature: 0-65 C0

Service: NH3 metering - Flow meter type: Coriolis Flow MeterMetering capacity: 10000000 m3/h - Accuracy: ±0.1 %

SOW: Engineering, procurement, fabrication for Gas Metering skid Project: Provision of Gas Metering Skid Client: PVEP POC/PTSC PPS - Year built: 2015Design Pressure: 0-27 barg - Design Temperature: 0-65 C0

Service: Gas metering - Flow meter type: Orifice Flow MeterMetering capacity: 10000000 m3/h - Accuracy: ±0.055 %

SOW: Engineering, procurement, fabrication for Gas Metering skid Project: Provision of Gas Metering Skid for Tan Phuoc Khanh Client: Tan Phuoc Khanh - Year built: 2011Design Pressure: 0-27 barg - Design Temperature: 0-65 C0

Service: Gas metering - Flow meter type: Turbine Flow MeterMetering capacity: 2200 SCMH - Accuracy: 0.5%

SOW: Engineering, procurement, fabrication for Gas Metering skidProject: Provision of Gas Metering Skid for PominaClient: Pominal Steel Corporation - Year built: 2010Design Pressure: 0-27 barg - Design Temperature: 0-65 C0

Service: Gas metering - Flow meter type: Turbine Flow MeterMetering capacity: 2200 SCMH - Accuracy: 0.5%

SOW: Engineering, procurement, fabrication for Gas Metering skidProject: Provision of Gas Metering Skid for Ton Phuong NamClient: Ton Phuong Nam Cor. - Year built: 2014Design Pressure: 0-17 barg - Design Temperature: 0-65 C0

Service: Gas metering - Flow meter type: Turbine Flow MeterMetering capacity: 2500 SCMH - Accuracy: 0.5%

SOW: Engineering, procurement, fabrication for Nh3 Refrigeration package Project: Ammonia Plant Revamp Project Client: Johnson Control/ PVFCCo - Year built: 2017Design Pressure: 125 bargDesign Temperature: -29/140 C0

Construction material: SA 516 Gr.60 - ASME U stampCompressor: Johnson Control/Singapore

SOW: Engineering, procurement, fabrication for Emergency Generator Enclosure Project: BK-TNG wellhead PlatformClient: Vietsovpetro Joint VentureYear built: 2015Size: max. Length: 12m, max. Wide: 5m, max. High: 4.65m; max. Weight: 63.500 ton.

MEASURING EQUIPMENT/METERING SKID

SOW: Engineering, fabrication for CPI SystemProject: Ca Mau Gas Processing Plant ProjectClient: - Year built: 2016POSCODesign Pressure: 0-6 barg - Design Temperature: 0/70 C0

Construction material: SA 36/SS 304Internal part: K-pack

SOW: Engineering, fabrication for CPI SystemProject: PM3 Ca Mau Booster Compressor StationClient: PVGAS/CAMAU GPMB - Year built: 2013Design Pressure: 0-6 barg - Design Temperature: 0/70 C0

Construction material: SA 36/SS 304Internal part: K-pack

OILY WATER TREATMENT FOR ONSHORE AND OFFSHORE GAS PROCESSING

SOW: Engineering & Provide Equipment and Packages: - Modified Cold Vent - Closed Drain Vessel - Fast stop Valve for gas turbine compressor - Seal gas system for gas turbine compressor - Nitrogen system - Open Drain Tank - Instrument Air Receiver Vessel - Utility Air ReceiveProject: PM3 Ca Mau Booster Compressor StationClient: PVGAS/CAMAU GPMB Year built: 2013

Pm3 Ca Mau Booster Compressor Station

Page 8: DK ENGINEERING CONSULTANCY JOINT STOCK …€¦ · Aspen Exchanger Design & Rating (EDR ... NEC Acostix: All sound calculations for sound ... Internal part procurement for Slug Catcher

14 15

DK ENGINEERING

DK ENGINEERING J.S.C Delivering solution, Expanding customer value

SOW: Engineering, fabrication & installation Chemical Injection SkidProject: BK.TNG Wellhead PlatformClient: - Year built: 2015VSPDesign Pressure: 0-42.2 barg / Design Temperature: AMB-65 C0

Service: Corrosion Inhibitor/Wax Inhibitor/ Reserve Demulsifier injectionPump: Chemical Injection Pump 0.1 L/hr, 0.2 L/hr & 31 L/hr

SOW: Engineering, procurement, fabrication supporting Chemical Injection SkidProject: Su Tu Trang Field DevelopmentClient: Cuu Long JOC - Year built: 2011Design Pressure: 0-86 barg / Design Temperature: AMB-65 C0

Service: Corrosion Inhibitor /Scale Inhibitor/ Demulsifier injectionPump: Chemical Injection Pump 0-3.8l/hr

SOW: Engineering, procurement, fabrication Chemical Injection SkidProject: Diamond Field DevelopmentClient: PVCL - Year built: 2013Design Pressure: 0-205 barg / Design Temperature: AMB-65 C0

Service: Corrosion Inhibitor/Wax Inhibitor/ Pour Point Depressant injectionPump: Chemical Injection Pump 50 L/hr, 110 L/hr & 70 L/hr

SOW: Engineering, fabrication & installation Chemical Injection SkidProject: Thai Binh - Ham Rong Gas Distribution And Gathering SystemClient: - Year built: 2015PVGASDesign Pressure: 0-46 barg / Design Temperature: AMB-65 C0

Service: Corrosion Inhibitor injectionPump: Chemical Injection Pump 2.0 l/hr

SOW: Engineering, fabrication & installation Phosphate Pump Injection SkidProject: Ammonia Plant Revamp ProjectClient: FVFCCo - Year built: 2017Design Pressure: 0-28 barg / Design Temperature: AMB-65 C0

Service: Phosphate InjectionPump: Phosphate Injection Pump 4 L/hr

SOW: Engineering, procurement, fabrication for Coagulant & Flocculent Injection Skid Project: Ammonia Plant Revamp ProjectClient: - Year built: 2017FVFCCoDesign Pressure: 0-4 barg / Design Temperature: AMB-65 C0

Service: Coagulant & Flocculent InjectionPump: Coagulant Injection Pump 4.63 L/hr, Flocculent Injection Pump: 2.55 L/hr

SOW: Engineering, procurement, fabrication Chemical Injection SkidProject: Su Tu Trang Field DevelopmentClient: JVPC - Year built: 2011Design Pressure: 0-15 barg / Design Temperature: AMB-65 C0

Service: Pour Point Depressant injectionPump: Chemical Injection Pump 40L/hr

SOW: Engineering, procurement, fabrication supporting Chemical Injection Pump skidProject: BKT Wellhead PlatformClient: VSP - Year built: 2010

0Design Pressure: 0-250 barg / Design Temperature: 0-65 CPump type: Dosing Pump, 25L/hr, API 675

SOW: Engineering, procurement, fabrication Chemical Injection Pump Skid Project: Su Tu Vang Platform - Client: PVGAS - Year built: 2015

0Design Pressure: 0-80 barg / Design Temperature: 0-65 CService: Corrosion Inhibitor injectionPump: Chemical Injection Pump 5 L/hr

SOW: Engineering Hypochlorite Injection Skid PK 5002 A/BProject: LPG Refrigerated Storage Thi VaiClient: PVGAS - Year built: 2011

SOW: Engineering, procurement, fabrication supporting Chemical Injection SkidProject: Pearl & Topaz field developmentClient: PVCL - Year built: 2010

0Design Pressure: 0-46 barg / Design Temperature: AMB-65 C

SOW: Engineering, fabrication for Odorant Injection PackageProject: Ca Mau Gas Processing Plant Project (PACKAGE-1)Client: - Year built: 2016POSCODesign Pressure:99.2/11.46 barg / Design Temperature: 0-70 C0

Service: OdorantDesign flowrate (l/hr): Max 10.8 - Min 0.72

UTILITY SKID

Page 9: DK ENGINEERING CONSULTANCY JOINT STOCK …€¦ · Aspen Exchanger Design & Rating (EDR ... NEC Acostix: All sound calculations for sound ... Internal part procurement for Slug Catcher

DK ENGINEERING

DK ENGINEERING J.S.C Delivering solution, Expanding customer value

SOW: Engineering, fabrication & installation Fuel Gas SkidProject: Thai Binh - Ham Rong Gas Distribution And Gathering SystemClient: - Year built: 2015PVGASDesign Pressure: 0-46 barg - Design Temperature: 0-90 C0

Service: Fuel GasHeater Bundle: 0.5kW

SOW: Engineering, procurement, fabrication Hot Water SkidProject: BK.TNG Wellhead PlatformClient: - Year built: 2015Vietsovpetro Joint VentureDesign Pressure: 0-14 barg - Design Temperature: 0-80 C0

Service: Hot WaterHeater Bundle: 58kW

SOW: Engineering, procurement & fabrication supporting Fuel Gas SkidProject: HT-MT Field developmentClient: - Year built: 2011Bien Dong POCDesign Pressure: 0-12 barg - Design Temperature: -29-130 C0

Heater: 1.8 Kw - Construction material: Super duplex

SOW: Engineering, procurement & fabrication supporting Fuel Gas Conditioning SkidProject: Te Giac Trang H04 Field DevelopmentClient: - Year built: 2012Hoang Long JOCDesign Pressure: 0-238 barg - Design Temperature: 0-125 C0

Service: Fuel Gas - Heater: 16 kW

SOW: Engineering, procurement & fabrication supporting Utility/Fuel Gas skid Project: Diamond Field DevelopmentClient: L - Year built: 2013PVCDesign Pressure: 0-17 barg - Design Temperature: 0-103 C0

Service: Utility/Instrument/Fuel GasElectrical Heater: 18kW - Air Cooler: 01 Bundle/Fan

16 17

RANG DONG FIELD DEVELOPMENT

MODIFICATION PIPING SYSTEM - RISER - BACH HO

The feasibility study for slot extension of WHP-S1

Engineering New WHP-NE structural feasibility study

Engineering for Additional POB To NULQ Living Quarters Module

OFFSHORE PROJECTUTILITY SKID

SOW: Engineering, procurement and fabrication of Pig SystemProject: Pig Trap For Ba Ria GDS ProjectClient: PVGAS GPMBYear built: 2012

Page 10: DK ENGINEERING CONSULTANCY JOINT STOCK …€¦ · Aspen Exchanger Design & Rating (EDR ... NEC Acostix: All sound calculations for sound ... Internal part procurement for Slug Catcher

CATHODIC PROTECTION SYSTEM

18

DK ENGINEERING

DK ENGINEERING J.S.C Delivering solution, Expanding customer value

19

ELECTRICAL AND INSTRUMENTATION SYSTEM

SOW: Engineering and installation Control Cabinet and Control System; The Purpose of cabinet is used to control the F&G system for rig BK16Project: BK-16 Platform Client: Vietsovpetro Joint Venture - Year: 2015

SOW: Modify HVAC system for FBSO Replace the soft starter 3RW4047 to control the Micro turbine system Replace and modify the logic controller of HVACProject: H01&H04 Well Head Platform, Te Giac Trang Field Development Client: Hoang Long JOC - Year: 2014

SOW: Engineering, fabrication, installation for Cathodic Protection System Project: Phu My Gas DistributionPlace of End user: Phu My, Ba Ria-Vung TauClient: Petrovietnam Gas CORP. - Year: 2014

SOW: Engineering, fabrication, installation for Cathodic Protection System Project: Thai Binh - Ham Rong Gas Distribution And Gathering SystemPlace of End user: Thai Binh, VietnamClient: Petrovietnam Gas CORP. - Year: 2015

SOW: Engineering and assembly Heater Control PanelProject: Thai Binh-Ham Rong Gas SystemPlace of End user: Onshore, Vietnam Client: Petrovietnam Gas CORP. - Year: 2014

SOW: Engineering, installation of UPS systemProject: Gas Distribution Center Project Place of End user: Onshore, Vietnam Client: Petrovietnam Gas CORP. - Year: 2016

SOW: Engineering, procurement & offshore installation Synchronizationn Cabinet.Project: TGT H01 Wellhead PlatformPlace of End user: Onshore, Vietnam Client: Hoang Long JOC - Year: 2015

SOW: Engineering Heater Control Panel; installation Power Control Panel Project: BK.TNG Well Head Platform Place of End user: Onshore, Vietnam Client: Vietsovpetro Joint Venture - Year: 2015

SOW: Engineering, fabrication,installation for Cathodic Protection SystemProject: Provision of ICCP for Nhon Trach 1 and Nhon Trach 2 planPlace of End user: Nhon Trach, Dong Nai Client: Petrovietnam Gas CORP. - Year: 2017

SOW: Provision of control cabinet for PCS, SSD and fire & gas systemProject: Ammonia Plant Revamp Place of End user: Onshore, Vietnam Client: Petrovietnam Fertilizer Chemical Corporation - Year: 2017

SOW: Engineering, fabrication, installation for Power Distribution Cabinet System Project: Power Distribution Cabinet System Of PVC-MSPlace of End user: Onshore, Vietnam Client: PVC-MS - Year: 2016

SOW: Explosion Proof Control Panel for Ammoniac Metering SystemProject: Ammoniac Metering ProjectPlace of End user: Onshore, Vietnam Client: - Year: 2017PVFCCo

Page 11: DK ENGINEERING CONSULTANCY JOINT STOCK …€¦ · Aspen Exchanger Design & Rating (EDR ... NEC Acostix: All sound calculations for sound ... Internal part procurement for Slug Catcher

20 21

DK ENGINEERING

DK ENGINEERING J.S.C Delivering solution, Expanding customer value

Rhine Ruhr - Australia

OUR MAJOR CUSTOMERSCERTIFICATE

Page 12: DK ENGINEERING CONSULTANCY JOINT STOCK …€¦ · Aspen Exchanger Design & Rating (EDR ... NEC Acostix: All sound calculations for sound ... Internal part procurement for Slug Catcher

2322

LIST OF MAIN PROJECTS

No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR

22 Rang Dong Field Development: Structure in-place reanalysis for WHP-S1, N1, CLPP

Rang Dong Field Development

2014

23

Reviewing the fatigue lives for existing pipelines-JVPC Rang Dong Field

Development 2014

24 Rang Dong Field Development:

Engineering Living Quarters Extension In NULQ NULQ Platform

2015

25

Pipe stress analysis of E1 -22P flown line & Gas lift line in WHP-E1 & WHP-S1

Rang Dong Field Development

2015

26

New WHP-NE Structural Feasibility Study -

Rang Dong Field Development

Rang Dong Field

Development

2015

27

The Feasibility Study for Slot Extension of WHP -S1

Rang Dong Field Development

2015

28

Site survey for S1 -8P and 2I-LTPT Gas lift line and modify EOR flow line

Rang Dong Field Development

2015

29

Modify of P1/P2 Pig Launcher & Pig Receiver-ECR-0393

Rang Dong Field Development

2016

23

Provision of Engineering Work Service for P5 & P3 (ECR-0401)

Rang Dong Field Development

2016

31

Provision of Engineering Work Service For E-07I WAG Flow line

Rang Dong Field Development

2016

32

Design and Installation of P5 Dewatering & Degassing

Line

Rang Dong Field Development

2017

33

Chemical Injection Skid –

CIS -

Pearl Platform

Pearl field Development

2007

34

Engineering for Close Drain Vessel -

Pearl Platform -

PCVL

Pearl field Development

2007

35

Engineering for Utility Gas Conditioning Skid (UGS) –

Pearl Platform-

PCVL

Pearl field Development

2008

36

Stress analysis piping -

Ruby B

Ruby B

2008

37

Engineering for Pour Point Depressant (PPD) Tank -

PCVL

Ruby B

2008

38

Engineering for Nitrogen Skid -

Pearl Project

Pearl project

2008

39

Engineering for Chemical Injection Skid -

TOPAZ

TOPAZ PLATFORM PROJECT

2008

40

Engineering for LP Test Separator

Ruby B

2011

41

Engineering for Utility Gas Scrubber –

Ruby B

Ruby B

2011

42

Provision, installation of 200A Ac tive Harmonic Filter

Topaz Platform

TOPAZ PLATFORM PROJECT

2011

43

Diamond Project: Calculation, engineering for:

1. Chemical Injection Skid

2. Fuel Gas Skid

3. Launcher

4. CO2 Vent Snuffing

5. LP-HP Separator Skid

6. Nitrogen

7. Open Drain Pump

8. Sample Connection

9. Tote Tank

DIAMOND DEVELOPMENT

PROJECT

2013

44

Provision of Designing Materials, Onshore Fabrication and Offshore Installation Off the VRC Pneumatic Starting System At RBDP-B Platform, Block 01&02, Offshore Vietnam

RBDP-B Platform, Block

01&02

2014

45

Calculation of Rolling Coil

-

2008

46

Engineering for Booster Compressor Suction Scrubber 230-V-2501

-

2011

47

Engineering for Super Gas Heater-

Booster Compressor Project

Booster compressor Project

2011

48

Injection Water Filter Skid

PETRO 6 -

INDIA

2012

49

Supply of Separator and PW Degasser Skid

2012

No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR

1

Engineering Chemical Injection Skids for Su Tu Trang Project: 1, ZZZ-4200 2, ZZZ-4815 3, ZZZ-4215

Su Tu Trang Field Development

2010

2

Engineering Pressure Vessels for Su Tu Trang Project: 1. Instrument Air Receiver-MBL-6470 2. Fuel Gas Scrubber-MBF-5730 3. Flare Scrubber -MBF-4324 4. Test Separator - MBD-2920 5. Hazardous Opened Drain Tank -ABJ-6201 6. Methanol Storage Tank - MBJ-4810 7. Pipeline Pig Launcher -KAH-3010 8. Pipeline Pig Receiver -KAQ-2020

Su Tu Trang Field Development

2010

3 Provision of Calculation, engineering for Heat Exchanger

Su Tu Vang Field 2012

4

Engineering for Su Tu Nau Field Development Project: A. Su Tu Nau South Platform 1. Allocation Separation 2. Production Pipeline Pig Launcher 3. Production Pipeline Pig Receiver 4. Fuel Gas Scrubber 5. Flare Scrubber 6.

Instrument Air Receiver

7.

Hazardous Open Drain Tank

B.

Su Tu Nau North Platform

1.

Production Pipeline Pig Launcher

2.

Fuel Gas Scrubber

3.

Flare Scrubber

4.

Instrument Air Receiver

5.

Hazardous Open Drain Tank

C. WHP -

B Platform 1.

Production Pipeline Pig Launcher

Su Tu Nau Field Development

2013

5

Calculation & Engineering for Anode -

STN-N & STN-S Caisson Project

Su Tu Nau Field Development

2013

6

Calculation of Life Raft

Rang Dong Field Development

2008

7

Engineering for Chemical Injection Skid -

JVPC

Rang Dong Field Development

2008

8

Provision of Pipe Stress Analysis

for Fuel Gas line to FSO

Rang Dong Field Development

2009

9

Pipe stress analysis for Rang Dong Field Development Project:

1. WHP-S1,

S1-8P Production Flow Line 2. WHP-N1, N1-5I

Flow Line

& Extension of N1w1

Manifold 3. WHP-N1, N1-6I

Flow Line

& Line No. 6"-Wi-F-993

4. CPC-CLPP,

CLPP Closed Drain Discharge Line ( ECR-270)

Rang Dong Field Development

2010

10

Engineering for Rang Dong Field Development Project:

1. Pump Skid

RDF-SK-4900 & RDF-SK-4901 2. Biocide

Injection RDF-Skid SK-4915

Rang Dong Field Development

2011

11

Engineering for CLPP Flare Boom

Rang Dong Field Development

2011

12

Structure Calculation for Basket

Rang Dong Field Development

2011

13

Engineering for CLPP Barge Bumper –

Rang Dong Field Development

CLPP Platform

2012

14

Calculation and engineering for Compression & Water Injection Structure Platform

Rang Dong Field Development

2012

15

Calculation and Engineering for Boat Landing -

JVPC

Rang Dong Field Development

2012

16

Engineering for C1 Temporary Ladder

Rang Dong Field Development

2012

17

Provision of Pipe Stress Analysis, Piping Isometric, Piping Arrangement Drawing

Rang Dong Field Development

2012

18

Pipe Stress Analysis for

C1-8P

Rang Dong Field Development

2012

19

Calculation, engineering for Pipe Stress Analysis

for Flow line & Gas lift -

WHP-E1A-16P

Rang Dong Field Development

2013

20

Engineering for Injection Compression Suction Scrubber Package

Rang Dong Field Development

2013

21

Rang Dong Field Development

Design, engineering Flare Boom for E1, CLPP

Rang Dong Field Development

2013

Page 13: DK ENGINEERING CONSULTANCY JOINT STOCK …€¦ · Aspen Exchanger Design & Rating (EDR ... NEC Acostix: All sound calculations for sound ... Internal part procurement for Slug Catcher

2524

Delivering solution, Expanding customer valueLIST OF MAIN PROJECTS

No.

PROJECT/WORK DESCRIPTION

PROJECT NAME

CLIENT

YEAR

50

Engineering for Te Giac Trang H01 project

1.Open & Close Drain Package

2.Fuel Gas Conditioning Skid

Te Giac T rang H01 project

2010

51

Engineering for Te Giac Trang -

H04 Project

1, Open & Closed Drain Package

2, Fuel Gas Conditioning Skid

3, Diesel Conditioning

Te Giac Trang -

H04 Project

2011

52

Provision of H4 EDG-MT Synchronization and Closed Drain Motor

Start Circuit Modification

Te Giac Trang - H04 Project

2015

53

Provision of closed Drain Motor A & B and start Circuit Modification

-

2016

54 Modification works during FPSO annual maintenance campaign in 2016

FPSO 2016

55 Engineering for Fuel Gas Skid - Bien Dong Phase 1 Project Bien Dong Phase

1 Project

BIEN DONG POC

2011

56 Engineering for liquid trap 2011

57 Provision of technical services for electrical and

instrument 2016

58

Engineering for HST-HSD Project

1. Closed Drain Vessels

2. Pig Launcher & Pig Receiver

3. Chemical Storage Tanks & Open Drain Tanks

HST-HSD Project

THANG LONG JOC

2011

59

Engineering for HST Full Field Development & HSD Early Production System Development:

Potable Water Tank, Flush Water Tank

HST-HSD Full Field

Development

2012

60

Engineering for HST Full Field Development & HSD Early Production System Development:

1.HST -

Diesel Loading Filter (01F-4410)

2.HSD -

Diesel Loading Filter (02F-4410)

3.HST -

Diesel Transfer Filter (01F-4420)

4.HSD -

Diesel Transfer Filter (02F-4420)

HST-HSD Full Field

Development

2012

61

Engineering for HST Full Field Development & HSD Early Production System Development:

1.HST -

close drain transfer pumps 01P-6010A/B

2.HSD -

open drain transfer pumps 02P-6110A/B

3.HSD -

close drain transfer pumps 02P-6010A/B

HST-HSD Full Field

Development

2012

62

Calculation, engineering for sand jetting –

HST-HSD Project

HST-HSD Full Field

Development

2012

63

Engineering for compact manifold of Thang Long –

Dong Do Project

Thang Long –

Dong Do Project

2012

64

Engineering for Atmospheric Rectangular Tank

Thang Long –

Dong Do Project

2012

65

Engineering for Thang Long –

Dong Do Pig Receiver/Launcher:

01 FWS Pig Launcher (Tag No. L -0921)

01 FWS Pig Launcher (Tag No. L -0901)

Thang Long –

Dong Do Project

2012

66

Engineering for Thang Long –

Dong Do Open Drain Pump Skid

Thang Long –

Dong Do Project

2012

67

Calculation, engineering for CO2 Vent Snuffing System -

Thang Long –

Dong Do Project

Thang Long –

Dong Do Project

2012

68

Calculation,

engineering for Nitrogen Bottle Rack Skid -

Thang Long –

Dong Do Project

Thang Long –

Dong Do Project

2012

69

Calculation, engineering for Sand Jetting -

Thang Long –

Dong Do Project

Thang Long –

Dong Do Project

2012

70

Engineering for Gas Filter, Gas

Scrubber, Flare Scrubber, Test Separator, HHP Separator

Dai Hung 2

2008

71

Engineering for chemical injection skid –

Dai Hung 2 (COR & PPD)

Dai Hung 2

2008

72

Provision for open drain tank –

Dai Hung 2 Project

Dai Hung 2

2010

73

Provision of Pressure Vessel &

Provision of Internal Part for Dai Hung 1

Dai Hung 1

2014

74

Engineering and fabrication for Metering Skid (Dai Hung GGP)

Dai Hung 2

2014

No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR

75 Engineering for modification of process equipment -

Dinh Co GPP Dinh Co GPP

project

PVGAS

2008

76 Calculation & Engineering for Chemical Tank 2008

77

Engineering for Dragon Tortoise Gas Utilization Project:

1.Close Drain Drum

2.Open Drain Tank

3.Slug Catcher

4.Flare Scrubber

Dragon tortoise gas utilization

project

2009

78 Design, engineering, cost estimate for construction of

bypass pipe for heaters E-401A/B/C at Phu My GDS Phu My GDS

2010

79 Design, engineering, cost estimate for modification of

isolated valves for PSVs -

Phu My GDS Phu My GDS

2010

80

Design, engineering, cost estimate for modification of instrument air system -

Phu My GDC

Phu My GDC

2010

81

Examining and verifying of engineering documents for Rang Dong –

Bach Ho pipeline improvement to 4 mill cubic meter of Gas/day

Rang Dong –

Bach Ho pipeline

2010

82

EPC of instrument air for PVGAS Service workshop

PVGAS Service

workshop

2011

83

Design, engineering, cost estimate for mattress covering Phu My –

HCM city pipeline

Phu My –

HCM city pipeline

2011

84

Installation supervision consultancy of Rang Dong –

Bach Ho pipeline improvement to 4 mill cubic meter of Gas/day

Rang Dong –

Bach Ho pipeline

2011

85

Design, engineering, cost estimate for mattress covering Bach Ho –

Long Hai pipeline

Bach Ho –

Long Hai pipeline

2011

86

Engineering for Thi Vai LPG refrigerated storage

Thi Vai LPG refrigerated

storage

2011

87

Engineering for Corrosion Inhibitor System

2011

88

Installation of E & I system, civil work -

low pressure gas distribution system for Pomina steel project

Pomina steel project

2012

89

Engineering for maintenance of Phu My -

HCM pipeline

Phu My -

HCM pipeline

2012

90

Examining and verifying of engineering documents for GPP Ca Mau –

PM3 Gas Booster Compression Package

GPP Ca Mau –

PM3 Gas Booster Compression

2012

91

Engineering for pig trap skid –

Ba Ria GDS

Ba Ria GDS

2012

92

Engineering for gas filter separator skid –

Ba Ria GDS

Ba Ria GDS

2012

93

Calculation, engineering for LPG Hai Phong storage widening

LPG Hai Phong storage

2012

94

Calculation, engineering for Heat Exchanger

2013

95

Modification for H6, H7, H9 & H11 -

Dinh Co -

Thị Vai piping

Dinh Co -

Thị Vai piping

2013

96

PM3 Ca Mau Booster Compressor Project:

1.

Gas turbine Compressor station detail design included:

-

Civil engineering

-

Structural engineering

-

Mechanical engineering

-

Piping engineering

-

Process engineering

-

E & I engineering

-

Gas turbine fuel gas system

-

Fire & Gas and firefighting engineering

2. Provide Equipment and Packages:

-

Modified Cold Vent

-

Closed Drain Vessel

-

Fast Stop Valve for Gas Turbine Compressor

-

Seal Gas System for Gas Turbine Compressor

-

Nitrogen System

-

Open Drain Tank

-

Instrument Air Receiver Vessel

-

Utility Air Receiver Vessel

-

Control System

PM3 Ca Mau Booster

Compressor Project

2013

97

Reanalysis for LPG Go Dau storage

LPG Compressor Go Dau

2014

98

Engineering, Provision of Inlet Gas Metering System at Dinh Co Gas Processing Plant (16” class 900; 3” class 600)

Dinh Co GPP Plant

2014

Page 14: DK ENGINEERING CONSULTANCY JOINT STOCK …€¦ · Aspen Exchanger Design & Rating (EDR ... NEC Acostix: All sound calculations for sound ... Internal part procurement for Slug Catcher

2726

Delivering solution, Expanding customer valueLIST OF MAIN PROJECTS

No.

PROJECT/WORK DESCRIPTION

PROJECT NAME

CLIENT

YEAR

99

Thai Binh -

Ham Rong Gas Distribution and

Gathering System Project, Block 102&106, Phase 01.

Engineering and fabrication for:

1. TBHR-PAC01-Corrosion Inhibitor Skid

2. TBHRPAC10-LP Separator/ Filter Separator

3. TBHRPAC11 -Condensate Preheater-Heater

4. TBHRPAC18 Cathodic Protection System

Thai Binh -

Ham Rong Gas

Distribution And Gathering System

Project, Block 102&106, Phase

01.

2014

100

Engineering & assembly Heater Control Panel For TB -HR Project

2014

101

Engineering, Provision of Heat Exchangers Thi Vai

Thi Vai

2014

102

Engineering and fabrication For Gas Pump Injection Skid (Gas Pump Skid ZZZ-4278) STV-RD

STV-RD

2014

103

Engineering, Provision of Gas Chromatograph GC-1601-DVK

GC-1601-DVK

2014

104

Engineering & installation for HVAC -04 system

2014

105

Engineering for SSIV Skid, 16" pipeline Rang Dong-Bach Ho/Riser Block

Rang Dong-Bach Ho/Riser Block

2015

106

Engineering & Procurement & Construction Module ER Probe

Construction Module ER Probe

2015

107

Report on technical evaluation & cost estimation for H1.H2.H4.H8.H13. L1-H3-L4-H5-H12-H14/2015

-

2015

108

Provision of Gas

Filter F-401A

Phu My Gas Distribution Project

2015

109

Provision of Heating Coil Water Bath

Phu My Gas Distribution Project

2015

110

Engineering Subsea check valve with spool in Rang Dong Field

Rang Dong Field

2015

111

Report on technical evaluation & cost estimation for

PM2.1& PM 4 Pipeline Rang Dong Field

2015

112 Engineering, fabrication, installation Phu My - Ho Chi Minh Pipeline - Install Pig Station at Nhon Trach GDS

Phu My Gas Distribution Project

2015

113 Modification Of CPP-STV Chemical Injection Package Su Tu Vang

Platform 2015

114 Provision, fabrication, of Filter Separator - GDC Phu My Phu My Gas

Distribution Project 2015

115 Provision of UPS Dinh Co Gas Distribution 2016

116 Provision of Pig Launcher CCP BACH HO PLATFORM 2016

117 Survey, report on technical evaluation & cost estimation for H1.3.5.8.9.14-2016 - 2016

118 Repairing the damaged points of fiber optic cable lines

No. 03 -

Liquid product route of PV Gas South East -

2016

119 Repairing the arisen defects at underground pipe line

PM2.1, PM2.2 and PM4 through the line No. 16. Phu My Gas

Distribution Project 2016

120 Surveying, calculating, assessing and suggesting the

solutions to solve the shake of device system at GDC

-

Phu My.

Phu My Gas Distribution Project

2016

121 Surveying, carrying out the Economic and technical

report for replacing the technological pipelines on Riser -

Bach Ho 5 platform

Bach Ho 5 platform.

2016

122

Basic Design Package of Improving LPG Recovery Efficiency of Dinh Co Gas Processing Plant

GPP Dinh Co

2016

123

Fabrication for SSIV Skid in Bach Ho Field

Bach Ho Field

2016

124

Engineering the Cuu Long compensative gas distribution pipeline for PV Gas D -

Nhon Trach Hiep Phuoc zone at GDC-PM in the NCS gas stop progress on September, 2016.

Phu My Gas

Distribution Project

2016

125

Surveying, calculating and engineering the gas distribution pipeline for PV Gas D -

Nhon Trach Hiep Phuoc zone at GDC-PM.

Phu My Gas Distribution Project

2016

126

Additional installation for valves at C-01 & C-05 tower in GPP Dinh Co

GPP Dinh Co

2016

127

Surveying, calculating, provide equipment, fabrication, installation for the Loading Arm at LPG Dinh Vu

LPG Dinh Vu

2016

128

Surveying, calculating safety assessment for the Go Dau LPG and LPG Dinh Vu

LPG Dinh Vu

2016

129

Design the process and instrument diagram for the air system Cuu Long basin.

Cuu Long basin.

2016

130

Surveying, calculating, assessing and suggesting the cable routes 3 at Tan Thanh, Ba Ria -Vung Tau

-

2016

No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR

131 Upgrade the Critical LSHH in GPP To Improve the Reliability

GPP Dinh Co

2017

132

Surveying, engineering upgrade processing piping system and Teflon of the support system on Riser Block -

Bach Ho platform and DGCP platform.

Riser Block - Bach Ho Platform

DGCP platform

2017

133

Engineering, replacing of Air Cooler Tube Bundles at Dinh Co GPP

Dinh Co GPP

2017

134

Provision of 02 flange protection cover

Flange protection cover

-

2017

135

Provision of ICCP for Nhon Trach 1 and Nhon Trach 2 plan at Nhon Trach GDS

Nhon Trach GDS

2017

136

Engineering, additional installing truck scale and loading arm at Thi Vai LPG station

Thi Vai LPG

2017

137

Research project for improving LPG recovery efficiency of LPG Thi Vai

Thi Vai LPG

2017

138

Engineering consultation, installation management for the gas supply system for

SOP Phu My at My Xuan A industrial zone

SOP Phu My at My Xuan A industrial

zone

2017

139

Engineering consultation, installation management for the gas supply system for

Thep Song Than at My Xuan A industrial zone

Thep Song Than at My Xuan A

industrial zone

2017

140

Repair Lower Column for LPG Go Dau Storage (KU-T101)

LPG Go Dau

2017

141

Engineering consulting for relocation the pipeline system of oil-contaminated at GDC Tien Hai

GDC Tien Hai

2017

142

Provision of 01 Suction Strainer

-

2017

143

Additional functions Line monitoring for important signals on CPP platform

CPP Platform

2017

144

Calculation, engineering for BK3/BK10 process equipment

BK3/BK10

2010

145

Calculation engineering for sprinkler vessel RC1-RC3 Production platform complex

RC1-RC3

2010

146

Calculation and consultancy of DK14-15M installation method statement

DK14

2011

147

Engineering for Offshore Store Containers

-

2013

148

Noise survey and remediation Intiarmada TGT1 FPSO

TGT1 FPSO

2014

149

EPC of Diesel generator enclosure

BK.TNG Wellhead Platform Project

2014

150

BK14/BT7 -

Engineering & assembly

PCS & DCI system/Marshalling cabinet GA/IA

BK14/BT7

2014

151

Engineering & Fabrication Portable Water Filter -

BK.TNG Wellhead Platform project

BK.TNG Wellhead Platform Project

2014

152

Engineering & Fabrication for BK.TNG Wellhead Platform Project:

1. Foam skid

2. Hot Water Skid

BK.TNG Wellhead Platform Project

2015

153

Provision of Chemical Injection Skid (68AQ-01)

BK.TNG Wellhead Platform Project

2015

154

Provision of Closed Drain

Vessel l& HP Flake K. O

Drum

BK.TNG Wellhead Platform Project

2015

155

Provision internal part for Thien Ung project

BK.TNG Wellhead Platform Project

2015

156

Provision, fabrication, installation for Electrical Cabinets for Hai Su Den rig

Hai Su Den rig

2015

157

Provision of Electrical and Instrument Material

RC9/RC5 Wellhead Platform Project

2015

158

Provision of Piping & Fittings

2015

159

Provision of service design and supply of internal of three phase oil and gas separator -

RP1 platform

Block 09-1

2016

160

Modification Works During FPSO Annual Maintenance Campaign In 2016

FPSO

2016

161

Provision of Internal parts -

Due to increased production capacity separator

Tho Trang Project

2016

162

Provision of KO Drum Vessel with U -Stamp, third party certificate

CCP Platform

2016

163

Provision of Sea Water/Gas Heat Exchanger T -102 & T-302)

MKC Platform

2017

164

Provision of equipment and material for Metering Unit of Gas-Saturated Crude Oil Production on BK-5 and BK-8/17 Platform (Block 09-1)

BK-5 and BK-8/17 Platform

(Block 09-1)

2017

165

Provision of Spare parts of automation system in compressor center platform for maintenance 4K-8K

-

2017

166

Purchasing Materials for modification pressure vessel from two-phase to three-phase on RP1 platform (Block 09.1)

RP1 platform (Block 09.1)

2017

167

Modification for the control systems and SSD1 & SSD2 emergency stop on the

compressor

platform

center

-

2017

168

Replace Internal Parts for Glycol Contactor T -311A/B in CCP Platform

T-311A/B in CCP Platform

2017

169

Engineering, procurement and fabrication Air Cooler

Extension of gas compression

capacity at Block 09-1

2017

Page 15: DK ENGINEERING CONSULTANCY JOINT STOCK …€¦ · Aspen Exchanger Design & Rating (EDR ... NEC Acostix: All sound calculations for sound ... Internal part procurement for Slug Catcher

2928

Delivering solution, Expanding customer valueLIST OF MAIN PROJECTS

No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR

205 Engineering for offshore facilities - BP Offshore Facilities BP 2007

206

Engineering for offshore container -

Schlumberger Container -

Schlumberger

2008

207

EPC of gas pipeline and Metering skid My Xuan Ceramics

Co., Ltd My Xuan Ceramics

Co., Ltd 2008

208

Engineering for HT Company workshop

Heat treatment company

Heat treatment company

2008

209

Design & Installation and commissioning of the LV & HV Electrical system of

the factory

Vietnam Meisheng Textiles

Vietnam Meisheng Textiles

2008

210

Engineering for pressure vessel -

LPG

2008

211

Engineering and Installation of 3000 kVA transformers for Meisheng Textiles factory

2009

212

Installation of electrical system 22kV

for Meisheng Textiles factory

2009

213

EPC of electrical distribution system after transformers output -

Meisheng Textiles Factory

2009

214

Supply of 01 No. MSB & 04 Nos. of SSB

2009

215

Engineering and installation of gas pipeline

SSC

SSC

2009

216

Engineering of offshore pipeline –

Van Phong Project

Van Phong Project

VAN PHONG

2009

217

Survey, design, engineering, cost estimate for construction of 8” nitrogen pipeline and 2” hydrogen pipeline

Air Liquide Vietnam

Air Liquide Vietnam

2010

218

EPC of Tan P huoc Khanh Gas pipeline and metering skid

Tan Phuoc Khanh

TPK Production and Commercial Co., Ltd

2010

219

Engineering for Air Receiver –

PV Shipyard

Air Receiver

PV SHIPYARD

2010

220

Engineering for modification of product input & output system

PMPC

PMPC

2010

221

Calculation engineering for life raft platform

Life raft platform

PVD Training

2010

222

EPC of Dong Xuyen port outdoor lighting system

Dong Xuyen Port

Dong Xuyen Port J.S.C

2011

223

Calculation and engineering for offshore containers

Baker Hughes

Baker Hughes

2011

224

Calculation, engineering for fixing boxes

2012

225

Engineering for Pressure Vessels -

DANIELI

DANIELI

2011

226

Engineering for Jack -

up

Jack -

up

R&D Co.,Ltd

2012

227

Engineering for Mixed Bed Vessels

Mixed bed vessels

GE

2012

228

Design, engineering, cost estimate for construction of PVPIPE sample work shop

PVPIPE sample work shop

PVPIPE J.S.C

2012

229

Survey and engineering HVAC system -

EPSO -

Block 12W Development Project

Block 12W Development Project

PV Tran

2012

230

Calculation, engineering for Degasser

Degasser

TNK

2012

231

Calculation, engineering River Water Switch

Room

for

Nui Phao Mining Project

Nui Phao Mining Project

ABB

2012

232

Engineering for gas pipeline 10" Nghe

An

Gas pipeline 10 " Nghe An

HDTDCTX Cua Lo

2013

233

Engineering the Import/Export Gas Pipeline for Processing Factory Condensate

Factory Condensate

PV OIL

2013

234

Engineering for modification of DK I/2 & I/9 Platform

DK I/2 & I/9 Platform

Ministry of Defense of Vietnam

2007

235

Engineering for modification of DK Platform

DK Platform

2008

236

Engineering for Modification of DK I/14 & I/15 Platform

DK I/14 & I/15 Platform

2012

237

Supply of Spreader Bar 40T & Plate Clamp for PV PIPE

-

PV Pipe

2014

238

Supply of Custody Gas Metering System for Ton Phuong Nam

-

Nhon Trach Gas Distribution Pipeline Project-Phase 2

Ton Phuong Nam

-

Nhon Trach Gas Distribution Pipeline

Project

Ton Phuong Nam

2014

239

Crude Oil Pipeline Underground Oil Storage –

Binh Son Refinery

Underground Oil Storage Terminal

PV OS

2014

240

Engineering

& assembly Control Panel for Yokogawa

-

Yokogawa

2014

No.

PROJECT/WORK DESCRIPTION

PROJECT NAME

CLIENT

YEAR170

Engineering for Alpha ECC workshop

ECC workshop

2008

171

Detailed engineering for Alpha ECC workshop including electrical system.

ECC workshop

2009

172

Re Analysis, engineering for transportation & replacement Inter Stage Cooler

Inter Stage Cooler

2015

173

Consulting, report on technical evaluation & cost estimation for external storage & gas pipeline form Hon La port to Kham Muon

Hon La port

2015

174

Engineering, fabrication, installation Heat Exchanger

Ruby B FPSO

2015

175

Engineering & Fabrication

for Central Fresh Water Cooling System -

Tam Dao 05 Jack -Up Rig

Tam Dao 05 Jack -Up Rig

SONDEX

2015

176 Engineering & Calculation for Duyen Hai 3 Extension Thermal Power Plant Project (1x688MW)

Duyen Hai 3 EVN TPMB3 2016

177 Nghi Son Refinery and Petrochemical Project Plem Valve replacement

Nghi Son Refinery And Petrochemical

JGCS 2016

178 Engineering & Calculation for Hydro Test Pig -

ASME Projects ASME Projects ASME PROJECTS 2016

179

Engineering, fabrication, installation Heat Exchanger

Heat Exchanger

E-13

SAIGON PETRO

2016

180

Provision of CPI Separator

Ca Mau Gas Processing Plant

Project

2016

181

Provision of Odorant Skid

2016182

Provision of Methanol Tank

2016

183

Engineering and fabrication for 3 phase Separator Skid

Hornet Gas Field

Development Project

Rhine Ruhr -

Australia

2014

184

Engineering and fabrication for 3 phase Separator Skid -

No.02

2015

185

Engineering and fabrication for Gas Dryer Cylinder (CDF-823AB)

REG project

2016

186

Engineering & Procurement Manual valve & Instrument for 2 phases Mobile Separator skid

Bundled Phases 2 EPCI Of Wellhead

Platforms, Pipelines and Tie-Ins

2016

187

Engineering & Procurement Manual valve & Instrument for next 3 MTS packages -

2 phases Mobile Separator skid

2017

188

Engineering, fabrication, installation

NH3 Metering Station

Ammonia Plant Revamp Project

2016

189

Provision of Phosphate Dosing Pump Skid & Anti -Scale Dosing Pumps

2016

190

Engineering, fabrication, installation

New Ammonia Refrigeration Package

2016

191

Engineering, fabrication, Installation

Coagulant –

Flocculent Dosing Package

2017

192

Provision of vibration processing services for PT04301 piping

PT04301

2015

193

Manufacturing, installation, commissioning of CO2 compress Interstage separator

Camau Fertilizer Plant

2016

194

Provision of E07604 Tube Bundles for PVCFC

E07604

2017

195

Engineering, fabrication, installation

Suction Heater (HE-101)

-

2016

196

Transfer UPS & CP electrical signal to ICSS system at Ham Rong Thai Binh GDC Station

Ham Rong Thai Binh GDC Station

2017

197

Upgrade and renovate Distribution Cabinet

-

2017

198

Provision of Air Cooler for Air Compressor on CCP Platform

CCP Platform

2017

199

Engineering for CNG Gas Station –

Dua A Chau

CNG Gas Station -

Dua A Chau

2017

200

Engineering for CNG Gas Station –

Thuan Dao Long An Industrial zone

CNG Gas Station -

Thuan Dao Long An Industrial zone

2017

201

Engineering Metering gas station at CNG Phu My factory

CNG Phu My factory

2017

202

Engineering for CNG Gas Station

-

Kolon

-

2017203

Design, Calculation and Feasibility Study -

Phase 2

Su Tu Trang Gas Pipeline Project

2017

204

Engineering, fabrication

Chemical Injection Package

Block 6.1 Phong Lan Dai Development

Project