8/14/2019 Den So 080926 New Inj1 Install
1/16
Revision Date:10/05/2008
ESTIMATION
Messrs : Sankyu - Thai Co.,Ltd.
Wellgrow Industrial Estate Ph III
90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,A.Bangpakong
Chachoengsao 24180 . Tel 038-522280 - 7 Fax. 038-522287
Attn. : Mr. Surathep Lertsara
Manager
CC. :
Project: Toshiba Injection Machine Installation
Locatio: Wellgrow Industial Estate
Title of works : New Toshiba Injection1 Machine Install
Job No.: SKT 080926
Revisio: 0
EIR ENGINEERING CO.,LTD.
228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 10270
Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .com
228/94 5 . . . . 10270
8/14/2019 Den So 080926 New Inj1 Install
2/16
Revision Date:10/05/2008
8/14/2019 Den So 080926 New Inj1 Install
3/16
Revision Date:10/05/2008
8/14/2019 Den So 080926 New Inj1 Install
4/16
Revision Date:10/05/2008
8/14/2019 Den So 080926 New Inj1 Install
5/16Page 5 of 16 EIR Engineering Co.,Ltd.
EIR ENGINEERING CO.,LTD.228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 102
Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .co
QUOTATION
Quotation: SKT 080926
Messrs. : Sankyu - Thai Co.,Ltd. Date : 10 October 2008
: Wellgrow Industrial Estate Ph III Validity of Quotation :
: 90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,Preparing Period :
: .A.Bangpakong Chachoengsao 24180 Delivery :
Tel. : Tel 038-522280 - 7 Fax. 038-522288 Revised : 0
Attn. : Mr. Surathep LertsaraP/O No.
:
: Manager
1) Price ( Baht ### Excluded Vat 7%
2) Project Toshiba Injection Machine Installation
3) Title of work New Toshiba Injection1 Machine Install
4) Term of Payment Within 30 days
Item Description uantitUnit Amount
1 DIRECT COST 1 LOT 204,650.00
2 INDIRECT COST 1 LOT 7,500.00
3 EXPENSE & PROFIT 1 LOT 31,822.50
TOTAL 243,972.50VAT 7% 17,078.08
FINAL AMOUNT 261,050.58
We hope that our confirmation will meet with your requirement and look forward to receiving your val
Your Faithfully,
8/14/2019 Den So 080926 New Inj1 Install
6/16Page 6 of 16 EIR Engineering Co.,Ltd.
Sukhon Thewaran
Manager
8/14/2019 Den So 080926 New Inj1 Install
7/16Page 7 of 16 EIR Engineering Co.,Ltd.
0
uable order in due course
8/14/2019 Den So 080926 New Inj1 Install
8/16Page 8 of 16 EIR Engineering Co.,Ltd.
8/14/2019 Den So 080926 New Inj1 Install
9/16
EIR ENGINEERING CO.,LTD.228/94 Moo 5,Srinakarin rd.,T.Bang-muang , A.Muang , Samutprakar
Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @
SUMMARY OF QUOTATION
Bidder : EIR ENGINEERING CO.,LTD. Quotation No. : SKT 080926
Client : Sankyu - Thai Co.,Ltd. Date : ###
Project : Toshiba Injection Machine InstallatioRevision No. : 0
Title of : New Toshiba Injection1 Machine Install
ItemDescription Q'ty UnitUnit Cost Total Amount
1 Direct Cost
A New Toshiba Injection1 Machine Install 1 lot ### 204,650.00
Subtotal 1 ###
2 Indirect Cost
2.1 Site Staff and Supervisor 1 lot
2.2 Transportation 1 lot 5,000.00
2.3 Tool and consumption 1 lot 2,500.00
2.4 Site Expense 1 lot
1 Temporary Facilities
2 Small Construction Supplies
3 Utility Supply Costs
Subtotal 2 7,500.00
3 Expense & Profit 31,822.50
GRAND TOTAL ###
8/14/2019 Den So 080926 New Inj1 Install
10/16
10270
gmail .com
COST Different
8/14/2019 Den So 080926 New Inj1 Install
11/16
8453261.xlsBOQ Page 11 of16 EIR Engineering Co.,Ltd.
Estimation SheetClient Sankyu - Thai Co.,Ltd. Date : ###
Project Toshiba Injection Machine Installation Job Number : SKT 080926
Location Wellgrow Industial Estate Revision : 0
Title Of W New Toshiba Injection1 Machine Install
No. Description Q'ty Unit nit Pric Total Cost Remark
1 DIRECT COST
A New Toshiba Injection1 Machine Install
A1 NEW INJECTION M/C INSTALL WORK
- PM10 MDB PANEL 1 SET Existing
-ABB BREAKER T6N 800AT 3P MCCB 1 SET Existing
-Sub-Panel 250 A. 1 SET Existing
-NEW INJECTION MACHINE 700 A. 1 SET Existing
-CHILLER MACHINE 100 A. 1 SET Existing
-MOLD TEMP MACHINE 1 SET Existing
-HOPPER DRYER MACHINE 1 SET Existing
- JET LOADER 1 SET Existing
-CRUSHER 1 SET Existing
-WIRE AND CABLE CV 1 C - 185x3 (x2) sq. R,S,T 180 M 750.00 135,000.00 Inj. M/C
-WIRE AND CABLE THW 1C - 50 sq. G 30 M 207.00 6,210.00 Inj. M/C
-WIRE AND CABLE CV 4 C - 25 sq. 10 M Supply By Owner Chiller
-WIRE AND CABLE CV 4 C - 16 sq. 15 M Supply By Owner Mold Temp
-WIRE AND CABLE CV 4 C - 10 sq. 15 M 190.00 2,850.00 Dryer
-WIRE AND CABLE CV 4 C - 6 sq. 15 M Supply By Owner Jet Loader
-WIRE AND CABLE CV 4 C - 2.5 sq. 20 M Supply By Owner Crusher
-WIRING CONNECT ACCESSORIES 1 LOT 2,000.00 2,000.00
-FLEXIBLE CONDUI 3 " 3 M 400.00 1,200.00
-FLEXIBLE CONDUI 1 1/2 " 3 M 170.00 510.00
-FLEXIBLE CONDUI 1 1/4 " 3 M 140.00 420.00
-FLEXIBLE CONDUI 1 " 3 M 90.00 270.00
-FLEXIBLE CONDUI 3/4 " 3 M 65.00 195.00
-FLEXIBLE CONDUI 1/2 " 3 M 45.00 135.00
-FLEX CONDUIT ACCESSORIES 1 LOT 2,000.00 2,000.00
-CABLE RACK W:300 L:3000 1 LOT Supply By Owner
-CABLE RACK W:200 L:3000 6 SET 1,230.00 7,380.00
-SPECIAL TEE RACK W:200/300 1 SET 1,650.00 1,650.00
-CABLE RACK COVER W:300 1 LOT Supply By Owner
-CABLE RACK COVER W:200 6 SET 930.00 5,580.00
8/14/2019 Den So 080926 New Inj1 Install
12/16
8453261.xlsBOQ Page 12 of16 EIR Engineering Co.,Ltd.
-COVER SPECIAL TEE RACK W:200/300 1 SET 1,250.00 1,250.00
-CABLE RACK ACCESSORIES 1 LOT 2,000.00 2,000.00
-STEEL SUPPORT W:300 10 SET 150.00 1,500.00
-MISCELENEOUS 1 LOT 3,000.00 3,000.00
-PAINTING WORK 1 LOT 1,500.00 1,500.00
- LABOR CHARGE 1 LOT ### 30,000.00
TOTAL A1 ###
TOTAL A ###
8/14/2019 Den So 080926 New Inj1 Install
13/16
8453261.xlsBOQ Page 13 of16 EIR Engineering Co.,Ltd.
MD Ratio
Materials 1.10
install 1.000 350.00 400.00
Material Cost Labour Cost
Q'ty Unit Unit Price Total Cost nit M/D otal M/D Unit Price labour cost
180 M 609.00 109,620.00
30 M 159.00 4,770.00
- M 450.00 -
- M 280.00 -
- M 190.00 -
- M 130.00 -
20 M 73.00 1,460.00
1 LOT ### 2,000.00
3 M 400.00 1,200.00
3 M 170.00 510.00
3 M 140.00 420.00
3 M 90.00 270.00
3 M 65.00 195.00
3 M 45.00 135.00
1 LOT ### 1,000.00
4 SET ### 4,884.00
4 SET ### 4,884.00
1 SET 440.00 440.00
4 SET 756.00 3,024.00
4 SET 756.00 3,024.00
Cost /m Offer /md
8/14/2019 Den So 080926 New Inj1 Install
14/16
8453261.xlsBOQ Page 14 of16 EIR Engineering Co.,Ltd.
1 SET 300.00 300.00
1 LOT ### 2,000.00
10 SET 100.00 1,000.00
1 LOT ### 2,500.00
1 LOT ### 1,000.00
1 LOT ### 9,000.00
153,636.00
###
8/14/2019 Den So 080926 New Inj1 Install
15/16
8453261.xlsBOQ Page 15 of16 EIR Engineering Co.,Ltd.
Amount Different
Total Cost Cost
8/14/2019 Den So 080926 New Inj1 Install