BESTSDI – Western Balkans Academic Education Evolution and Professional’s Sustainable Training for
Spatial Data Infrastructures
With the support of the Erasmus+ program: Higher Education – International Capacity Building N° 574150-EPP-1-2016-1-HR-EPPKA2-CBHE-JP
T3.3 Monitoring project success indicators
Deliverable D3.3.1 – Month 6
Version 0.1
Author(s)/Organisation(s)/Partner number:
Joep Crompvoets / KU Leuven / Partner number P1.2
Work Package / Task:
WP3 – Quality Plan / T3.3 – Monitoring of project success indicators
References:
Project Management Plan
Short Description:
This is an internal planning tool, aimed to monitor the organization of activities within the work package ensuring that the activities comply with planned results, milestones and budget consumption.
Keywords:
Monitoring, indicators, project success
The European Commission support for the production of this publication does not constitute endorsement of the
contents which reflects the views only of the authors, and the Commission cannot be held responsible for any use which
may be made of the information contained therein
BESTSDI – Western Balkans Academic Education Evolution and Professional’s Sustainable Training for
Spatial Data Infrastructures
With the support of the Erasmus+ program: Higher Education – International Capacity Building N° 574150-EPP-1-2016-1-HR-EPPKA2-CBHE-JP
Revision History:
Revision Date Author(s) Status Description
V0.1 19.12.2017 Joep Crompvoets Draft Initial draft
BESTSDI – Western Balkans Academic Education Evolution and Professional’s Sustainable Training for
Spatial Data Infrastructures
With the support of the Erasmus+ program: Higher Education – International Capacity Building N° 574150-EPP-1-2016-1-HR-EPPKA2-CBHE-JP
Page 3 of 16
Table of Contents
1. Introduction ............................................................................................................................... 4
2. Monitoring task performance ................................................................................................... 5
3. Monitoring status .................................................................................................................... 11
4. Risks ........................................................................................................................................ 12
5. Risk status .............................................................................................................................. 16
BESTSDI – Western Balkans Academic Education Evolution and Professional’s Sustainable Training for Spatial Data Infrastructures
With the support of the Erasmus+ program: Higher Education – International Capacity Building
N° 574150-EPP-1-2016-1-HR-EPPKA2-CBHE-JP
Page 4 of 16
1. Introduction
This deliverable D3.3.2 is the Monitoring report after 6 months of BESTSDI project execution
making use of the result indicators as presented in Deliverable D3.1.1 Quality Assurance Plan.
The overall objective of work package 3 is to define and implement quality assurance measures,
which ensure that the project meets its goals in the given timeframe and that the results will have
the expected impact. The work package is organised into three tasks, as follows:
- Task 3.1 Development of Quality Plan
- Task 3.2 Evaluation of project progress and results
- Task 3.3 Monitoring of project success indicators
This report refers to the execution of Task 3.3 after 6 months of BESTSDI. The main objective of
task 3.3 Monitoring of project success indicators is to continuously monitor through internal 3-
monthly reporting schemes and the procedures specified in D3.1 the progress of the project. Each
six month the current status of impact monitoring will be published.
The monitoring results are used by the project management to see how the aims of the project are
being fulfilled. It is the responsibility of the project management to promptly respond to any
indication of risk or deviation from the project plan and to initiate corrective actions.
Figures published in the final reports are used to assess the overall impact of the project and will
indicate whether the overall project aims were met. The overall score at the end of the project
should be 100% for each indicator.
The Quality Assurance Plan document was prepared by Task group 3.1 introducing the followed
procedures as well as listing the relevant result indicators. The monitoring reports are prepared by
the Task group members based on 3-monthly reports provided by the work group leaders/deputy
leader and task group leaders/deputy leaders. Draft monitoring reports are internally reviewed by
the task group and submitted by the task group leader to the Project coordinator. Adopted
monitoring reports will after approval by the PMB become public documents.
This report is structured as follows: Section 2 briefly presents the performance of monitoring with
the scores; Section 3 briefly reflects the status of the scoring results; Section 4 briefly presents the
performance of the risk assessment, and Section 5 briefly presents the status of the risks.
BESTSDI – Western Balkans Academic Education Evolution and Professional’s Sustainable Training for Spatial Data Infrastructures
With the support of the Erasmus+ program: Higher Education – International Capacity Building
N° 574150-EPP-1-2016-1-HR-EPPKA2-CBHE-JP
Page 5 of 16
2. Monitoring task performance
The followed procedures of the monitoring of the project success indicators are well introduced in
Deliverable 3.1-1 Quality Assurance Plan.
The monitoring is based om the scoring of Results Indicators. The aim of scoring the Results
Indicators is to support the objective of the Quality Assurance Plan to ensure that the project
results and outcomes are achieved. As such, they provide an indication of the project progress.
They are expressed as percentages of completion of each project result, to be measured on a
quarterly (3 months) basis. So, 100% means that the task has been fully accomplished.
Tables at the next pages present the scores of each accomplishment of each deliverable as part
of specific task. The tables clearly present the expected result type, Result due date, as well as
the percentages per 3 months. The tables group those tasks that are relevant for the execution of
each Work Package.
The result name** refers to those deliverables that are not accomplished on time and so need
attention for successful accomplishment.
BESTSDI – Western Balkans Academic Education Evolution and Professional’s Sustainable Training for Spatial Data Infrastructures
With the support of the Erasmus+ program: Higher Education – International Capacity Building
N° 574150-EPP-1-2016-1-HR-EPPKA2-CBHE-JP
Page 6 of 16
Results indicators
WP WP Leader
TG TG Leader
Result ID
Result name Result type Result due date
Percentage of completion PQ1* PQ2 PQ3 PQ4 PQ5 PQ6 PQ7 PQ8 PQ9 PQ10 PQ11 PQ12
WP1 UNSA
FCE
Task
1.1
UNIZG
FOG D1.1.1
Survey analysis **
Report M4 30 90
WP1 UNSA
FCE
Task
1.1
UNIZG
FOG D1.1.2 Repository** Repository M6 30 90
WP1 UNSA
FCE
Task
1.1
UNIZG
FOG D1.1.3 Task Report** Report M6 30 90
WP1 UNSA
FCE
Task
1.2 HBO D1.2.1 Survey** Report M4 30 90
WP1 UNSA
FCE
Task
1.2 HBO D1.2.2 Repository** Repository M6 30 90
WP1 UNSA
FCE
Task
1.2 HBO D1.2.3 Task Report** Report M6 0 90
WP1 UNSA FCE
Task 1.3
KU LEUVEN
D1.3.1 Survey analysis Report M4 30 100
WP1 UNSA FCE
Task 1.3
KU LEUVEN
D1.3.2 Task Report Report M6 0 100
WP1 UNSA FCE
Task 1.4
KU LEUVEN
D1.4.1 Core curriculum in GI-N2K CDTool
Report M8 0 20
WP1 UNSA FCE
Task 1.4
KU LEUVEN
D1.4.2 Task Report Report M12 0 0
WP1 UNSA FCE
Task 1.5
UKIM D1.5.1 Adaptation specification report*
Report M10 0 0
* PQx = Project quarter number WP WP
Leader TG TG
Leader Result ID
Result name Result type Result due date
Percentage of completion PQ1* PQ2 PQ3 PQ4 PQ5 PQ6 PQ7 PQ8 PQ9 PQ10 PQ11 PQ12
WP2A UKIM Task 2.1
UNIZG FOG
D2.1.1 Project curricula
Report M18 0 0
WP2A UKIM Task 2.2
UNIZG FGE
D2.2.1 Project LLL courses
Repository
M20 0 0
WP2A UKIM Task 2.3
UNIZG FOG
D2.3.1 Status analsyis
Report M6 0 100
WP2A UKIM Task 2.3
UNIZG FOG
D2.3.2 Equipment specification
Guidelines M11 0 50
BESTSDI – Western Balkans Academic Education Evolution and Professional’s Sustainable Training for Spatial Data Infrastructures
With the support of the Erasmus+ program: Higher Education – International Capacity Building
N° 574150-EPP-1-2016-1-HR-EPPKA2-CBHE-JP
Page 7 of 16
WP WP Leader
TG TG Leader
Result ID
Result name Result type Result due date
Percentage of completion PQ1* PQ2 PQ3 PQ4 PQ5 PQ6 PQ7 PQ8 PQ9 PQ10 PQ11 PQ12
WP2A UKIM Task 2.3
UNIZG FOG
D2.3.3 Equipment procurement(13 procurements)
Documents /Delivered goods
M17 0 10
WP2A UKIM Task 2.4
UNIST D2.4.1
Summer school Split '17 Report M7 0 10
WP2A UKIM Task 2.4
UNIST D2.4.2
Summer school Split '18 Report M22 0 0
WP2A UKIM Task 2.5
UPZ D2.5.1 Tailored curricula for
each partner (15 tailored curricula)
Repository
M22 0 0
WP WP Leader
TG TG Leader Result ID
Result name Result type Result due date Percentage of completion PQ1* PQ2 PQ3 PQ4 PQ5 PQ6 PQ7 PQ8 PQ9 PQ10 PQ11 PQ12
WP2B KU LEUVEN
Task 2.6
UNSA FAFS
D2.6.1 Addoption of new curricula, courses & parts of courses
Formal documents/ Reports
M36 0 0
WP2B KU LEUVEN
Task 2.7
PUT FGM
D2.7.1 Execution of study courses
Reports on execution
M30 (M36)
0 0
WP2B KU LEUVEN
Task 2.7
PUT FGM
D2.7.2 Execution of LLL courses
Reports on execution
M30 (M36)
0 0
WP2B KU LEUVEN
Task 2.8
KU LEUVEN
D2.8.1 Analysis reports on satisfaction
Report M31 0 0
WP2B KU LEUVEN
Task 2.9
HBO D2.9.1 Finalized of new
curricula, courses & parts of courses
Report M34 0 0
WP WP Leader
TG TG Leader
Result ID
Result name Result type
Result due date
Percentage of completion PQ1* PQ2 PQ3 PQ4 PQ5 PQ6 PQ7 PQ8 PQ9 PQ10 PQ11 PQ12
WP3 HBO Task 3.1
UNIZG FOG
D3.1.1 Quality Assurance Plan
Document M11 0 0
WP3 HBO Task 3.1
UNIZG FOG
D3.1.2 Evaluation Plan
Document M11 0 0
WP3 HBO Task 3.2
HBO D3.2.1 Moodle platform for
reporting Website M12 0 0
BESTSDI – Western Balkans Academic Education Evolution and Professional’s Sustainable Training for Spatial Data Infrastructures
With the support of the Erasmus+ program: Higher Education – International Capacity Building
N° 574150-EPP-1-2016-1-HR-EPPKA2-CBHE-JP
Page 8 of 16
WP WP Leader
TG TG Leader
Result ID
Result name Result type
Result due date
Percentage of completion PQ1* PQ2 PQ3 PQ4 PQ5 PQ6 PQ7 PQ8 PQ9 PQ10 PQ11 PQ12
WP3 HBO Task 3.2
HBO D3.2.2.1
Evaluation Year 1 Repository
M12 0 0
WP3 HBO Task 3.2
HBO D3.2.2.2
Evaluation Year 2 Repository
M24 0 0
WP3 HBO Task 3.2
HBO D3.2.2.3
Evaluation Year 3 Repository
M34 0 0
WP3 HBO Task
3.3
KU
LEUVEN
D3.3.3.1 Quality Assurance
Monitoring
Report**
Report M6 0 0
WP3 HBO Task 3.3
KU LEUVEN
D3.3.3.2 Quality Assurance Monitoring Report
Report M12 0 0
WP3 HBO Task 3.3
KU LEUVEN
D3.3.3.3 Quality Assurance Monitoring Report
Report M18 0 0
WP3 HBO Task 3.3
KU LEUVEN
D3.3.3.4 Quality Assurance Monitoring Report
Report M24 0 0
WP3 HBO Task 3.3
KU LEUVEN
D3.3.3.5 Quality Assurance Monitoring Report
Report M30 0 0
WP3 HBO Task 3.3
KU LEUVEN
D3.3.3.6 Final Quality Assurance Monitoring Report
Report M36 0 0
WP WP Leader
TG TG Leader
Result ID
Result name Result type Result due date Percentage of completition PQ1* PQ2 PQ3 PQ4 PQ5 PQ6 PQ7 PQ8 PQ9 PQ10 PQ11 PQ12
WP4 UNS FTS
Task 4.1
UNIZG FOG
D4.1.1 Communication plan developed
Document M12 0 10
WP4 UNS FTS
Task 4.1
UNIZG FOG
D4.1.2.1
Report & statistics Reports M16 0 0
WP4 UNS FTS
Task 4.1
UNIZG FOG
D4.1.2.2
Report & statistics Reports M24 0 0
WP4 UNS FTS
Task 4.1
UNIZG FOG
D4.1.2.3
Report & statistics Reports M36 0 0
WP4 UNS FTS
Task 4.2
UNIZG FGE
D4.2.1 Execution LLL courses
Reports M36 0 0
BESTSDI – Western Balkans Academic Education Evolution and Professional’s Sustainable Training for Spatial Data Infrastructures
With the support of the Erasmus+ program: Higher Education – International Capacity Building
N° 574150-EPP-1-2016-1-HR-EPPKA2-CBHE-JP
Page 9 of 16
WP WP Leader
TG TG Leader
Result ID
Result name Result type Result due date Percentage of completition PQ1* PQ2 PQ3 PQ4 PQ5 PQ6 PQ7 PQ8 PQ9 PQ10 PQ11 PQ12
WP4
UNS FTS
Task 4.3
UNIST
D4.3.1
Tools for disemination
Website Facebook Reesearhgate Linkendin Twiter
M1
100 100
WP4 UNS FTS
Task 4.3
UNIST D4.3.2
Material for disemination
Documents /Leaflets /Adverts
Entire project lifetime
0 0
WP4 UNS FTS
Task 4.3
UNIST
D4.4 Plan for Dissemination and Exploitation of Results developed
Document Guidelines
M12 0 0
WP4
UNS FTS
Task 4.5
UKIM
D4.5.1 Presentation of reports, articles, presentations on external events, ets.
Documents /Reports /Repository
M36 0 5
WP4
UNS FTS
Task 4.5
UKIM
D4.5.2 Presentation of reports, articles, presentations on self organized events
Documents /Reports /Repository
M36 0 5
WP4 UNS FTS
Task 4.5
UKIM D4.5.3 Usage of other
tools of result presentation
Documents /Reports /Statistics
M36 0 0
WP4 UNS FTS
Task 4.5
UKIM
D4.5.4 BESTSDI Info – internal e-newsletter (monthly)
Digital newsletter
M36 10 20
WP4
UNS FTS
Task 4.5
UKIM
D4.5.5 BESTSDI e-Newsletter – external e-newsletter (quarterly)
Digital newsletter
M36 0 0
BESTSDI – Western Balkans Academic Education Evolution and Professional’s Sustainable Training for Spatial Data Infrastructures
With the support of the Erasmus+ program: Higher Education – International Capacity Building
N° 574150-EPP-1-2016-1-HR-EPPKA2-CBHE-JP
Page 10 of 16
WP WP Leader
TG TG Leader
Result ID
Result name Result type Result due date Percentage of completition PQ1* PQ2 PQ3 PQ4 PQ5 PQ6 PQ7 PQ8 PQ9 PQ10 PQ11 PQ12
WP4 UNS FTS
Task 4.5
UNS FTS
D4.5.6 Country regulation rules
Report M20 0 0
WP4 UNS FTS
Task 4.5
UKIM D4.5.7 Regulation of
project results usage
Agreement M36 0 0
WP WP Leader
TG TG Leader
Result ID
Result name Result type Result due date
Percentage of completition PQ1* PQ2 PQ3 PQ4 PQ5 PQ6 PQ7 PQ8 PQ9 PQ10 PQ11 PQ12
WP5 UNIZG FOG
Task 5.1
UNIZG FOG
D5.1.1 Project bodies appointed
Document M1 100 100
WP5 UNIZG FOG
Task 5.1
UNIZG FOG
D5.1.2 Project Management Plan
Document M1/M11 10 10
WP5 UNIZG FOG
Task 5.2
UNIZG FOG
D5.2.1 TG5.2 Meeting minute
Document +M1 after meeting
10 20
WP5 UNIZG FOG
Task 5.2
UNIZG FOG
D5.2.2 Internal Project Progress Reports to PMB (semi-annualy)
Report Prior event
0 0
WP5 UNIZG FOG
Task 5.2
UNIZG FOG
D5.2.3 Project bodies minutes (PMB, PSC, AC)
Documents +M1 after meeting
0 0
WP5 UNIZG FOG
Task 5.2
UNIZG FOG
D5.2.4 Interim Progres Report
Document M18 0 0
WP5 UNIZG FOG
Task 5.2
UNIZG FOG
D5.2.5 Final Report Document M36 0 0
WP5 UNIZG FOG
Task 5.2
UNIZG FOG
D5.2.6 Final Conference in Sarajevo
Report M36 0 0
WP5 UNIZG FOG
Task 5.3.
UNIZG FOG
D5.3.1 Periodic National Progress Report
Report Prior PMB meeting
0 0
BESTSDI – Western Balkans Academic Education Evolution and Professional’s Sustainable Training for Spatial Data Infrastructures
With the support of the Erasmus+ program: Higher Education – International Capacity Building
N° 574150-EPP-1-2016-1-HR-EPPKA2-CBHE-JP
Page 11 of 16
3. Monitoring status
The following results/deliverables need attention as they are not accomplished on time:
- D1.1.1 Survey analysis – 90% accomplished; should have been accomplished in Month 4
- D1.1.2 Repository – 90% accomplished; should have been accomplished in Month 6
- D1.1.3 Task report – 90% accomplished; should have been accomplished in Month 6
- D1.2.1 Survey – 90% accomplished; should have been accomplished in Month 4
- D1.2.2 Repository – 90% accomplished; should have been accomplished in Month 6
- D1.2.3 Task report – 90% accomplished; should have been accomplished in Month 6
- D3.3.3.1 Quality Assurance Monitoring report – 0% accomplished; should have
accomplished in Month 4
BESTSDI – Western Balkans Academic Education Evolution and Professional’s Sustainable Training for Spatial Data Infrastructures
With the support of the Erasmus+ program: Higher Education – International Capacity Building
N° 574150-EPP-1-2016-1-HR-EPPKA2-CBHE-JP
Page 12 of 16
4. Risks
A risk register was set-up aiming at identifying the project risks and at supporting the implementation of a risk mitigation strategy. This risk register is well introduced in D3.1-1 Quality Assurance Plan As part of the regular quarterly evaluation of project monitoring, all Work package leaders and Task leaders are requested to participate in detecting and classifying risks, in particular for the package/task they are responsible for. All identified risks have to be assessed on a monthly basis. If new risks are identified by Work package leaders or Task group leaders, the risk register has to be updated. The risk register will be reviewed on Project Management Board meetings. This work is, and will be, done by classifying each risk according to a series of variables, assigning values to be selected from predefined lists, presented at the next pages. The tables presented briefly describe the potential risk(s) for each task, the risk manager, risk type (as defined in D3.1.1 Quality Assurance Plan), and risk status.
BESTSDI – Western Balkans Academic Education Evolution and Professional’s Sustainable Training for Spatial Data Infrastructures
With the support of the Erasmus+ program: Higher Education – International Capacity Building
N° 574150-EPP-1-2016-1-HR-EPPKA2-CBHE-JP
Page 13 of 16
WP WP
Leader TG TG Leader
Risk
ID Risk description
Risk
opening
date
Risk manager
Risk type
Risk
status
Probability
of occurence
Expected
impact
CAPA(
s) ID(s) closed
CAPA(
s) ID(s) open
WP1 UNSA FCE
Task 1.1 UNIZG FOG R1.1
Insufficient number of partners providing reports on current status or with low quality
16/10/17 UNIZG FOG Technical No
WP1 UNSA FCE
Task 1.2 HBO R1.2 Insufficient number of existing learning resources
16/10/17 HBO Technical No
WP1 UNSA FCE
Task 1.3 KU LEUVEN R1.3 Insufficient number of public and business entities participated in survey
16/10/17 KU LEUVEN Technical No
WP1 UNSA FCE
Task 1.4 KU LEUVEN R1.4 Insufficient number of learning units in project curricula
16/03/17 KU LEUVEN Technical No
WP1 UNSA FCE
Task 1.5 UKIM R1.5 Insufficient Number of partner universities prepared adapted curriucla
16/03/18 UKIM Technical No
WP2A UKIM Task 2.1 UNIZG FOG R2.1 Insufficient number and low quality of courses in project curricula
16/03/17 UNIZG FOG Technical No
WP2A UKIM Task 2.2 UNIZG FGE R2.2 Insufficient number and low quality of LLL courses
16/09/17 UNIZG FGE Technical No
WP2A UKIM Task 2.3 UNIZG FOG R2.3 Equipment purchase & installation delayed or not happened
16/12/16 UNIZG FOG Technical No
WP2A UKIM Task 2.4 UNIST R2.4 Insufficient number of teachers trained
16/06/17 UNIST Technical No
WP2A UKIM Task 2.5 UPZ R2.5 Too low number of adapted curricula
16/03/18 UPZ Technical No
WP2B KU LEUVEN
Task 2.6 UNSA FAFS R2.6
Too low percentage of courses implemented at partner Univerties as compared to expectation
16/03/18 UNSA FAFS Technical No
WP2B
KU
LEUVEN
Task 2.7 PUT FGM R2.7 Too low number of student
being educated 16/03/18 PUT FGM Technical No
WP2B KU LEUVEN
Task 2.8 KU LEUVEN
R2.8-1 Too low percentage of course evaluation being submitted
16/10/18 KU LEUVEN Technical No
WP2B KU LEUVEN
Task 2.8 KU LEUVEN
R2.8-2 Too low degree of satisfaction in course evaluation
16/10/18 KU LEUVEN Technical No
BESTSDI – Western Balkans Academic Education Evolution and Professional’s Sustainable Training for Spatial Data Infrastructures
With the support of the Erasmus+ program: Higher Education – International Capacity Building
N° 574150-EPP-1-2016-1-HR-EPPKA2-CBHE-JP
Page 14 of 16
WP2B KU LEUVEN
Task 2.9 HBO R2.9-1 Too many courses with updating needs
16/10/18 HBO Technical No
WP2B KU LEUVEN
Task 2.9 HBO R2.9-2 Too low percentage of updates according to needs
16/02/18 HBO Technical No
WP3 HBO Task 3.1 UNIZG FOG R3.1 Quality Assessment Plan not approved or repeatedly improved
16/09/17 UNIZG FOG Managemen
t No
WP3 HBO Task 3.2 HBO R3.2 Not all Quality evaluations are submitted & approved
16/10/16 HBO Managemen
t No
WP3 HBO Task 3.3 KU LEUVEN R3.3 Not all Project monitoring reports are approved
16/09/17 KU LEUVEN Managemen
t No
WP WP
Leader TG
TG
Leader
Risk
ID Risk description
Risk
opening
date
Risk
creator Risk type
Risk
status
Probability
of occurence
Expected
impact
CAPA(s) ID(s) closed
CAPA(s) ID(s) open
WP4 UNS FTS
Task 4.1
UNIZG FOG
R4.1 Communication Plan not approved or repeatedly improved
16/09/17 UNIZG FOG
Management No
WP4 UNS FTS
Task 4.2
UNIZG FGE
R4.2-1 Insufficient number of LLL courses being held with satisfactory evaluation
16/07/18 UNIZG FGE
Technical No
WP4 UNS
FTS
Task
4.2
UNIZG
FGE R4.2-2
Insufficient number of attendees on LLL courses who completed the satisfactory
evaluation 16/10/18
UNIZG
FGE Technical No
WP4 UNS FTS
Task 4.3
UNIST R4.3 Not all planned promotion materials are produced
16/10/16 UNIST Technical No
WP4 UNS FTS
Task 4.4
UNS FTS
R4.4-1 Not all planned dissemination events are organized
16/09/17 UNS FTS Technical No
WP4 UNS FTS
Task 4.5
UNS FTS
R4.4-2 Too low number of participants at own dissemination events
16/09/17 UNS FTS Technical No
WP4 UNS FTS
Task 4.4
UNS FTS
R4.4-3 Too low number of presentations at external events
16/10/16 UNS FTS Technical No
WP4 UNS FTS
Task 4.5
UKIM R4.5 Not all partners signed the consortium agreement
16/10/18 UKIM Contractual No
WP WP
Leader TG
TG
Leader
Risk
ID
Risk description
Risk
opening
date
Risk
creator Risk type
Risk
status
Probability
of occurence
Expected
impact
CAPA(s) ID(s)
closed
CAPA(s) ID(s)
open
WP5 UNIZG FOG
Task 5.1
UNIZG FOG
R5.1 No Project Management plan 16/10/16
16/11/17
UNIZG FOG
Management No
WP5 UNIZG FOG
Task 5.2
UNIZG FOG
R5.2 Too low number of event Minutes submitted
16/10/16 UNIZG FOG
Technical No
WP5 UNIZG FOG
Task 5.2
UNIZG FOG
R5.21 No frequent submissions of Project Progress reports
16/10/16 UNIZG FOG
Technical No
BESTSDI – Western Balkans Academic Education Evolution and Professional’s Sustainable Training for Spatial Data Infrastructures
With the support of the Erasmus+ program: Higher Education – International Capacity Building
N° 574150-EPP-1-2016-1-HR-EPPKA2-CBHE-JP
Page 15 of 16
WP5 UNIZG FOG
Task 5.2.
UNIZG FOG
R5.22 No frequent submissions of project bodies minutes
16/10/16 UNIZG FOG
Technical No
WP5 UNIZG FOG
Task 5.2
UNIZG FOG
R5.23 No Interim Progress Report submissions 16/01/18 UNIZG FOG
Technical No
WP5 UNIZG FOG
Task 5.2
UNIZG FOG
R5.1-4 No Final Report submission 16/05/19 UNIZG FOG
Technical No
WP5 UNIZG FOG
Task 5.2
UNIZG FOG
R5.2-5 No Final Conference in Sarajevo held 16/06/19 UNIZG FOG
Technical No
WP5 UNIZG
FOG
Task
5.3.
UNIZG
FOG R5.3
No Periodic National Progress Report
submissions 16/08/17
UNIZG
FOG Technical No