A9
INV ERNESS
HIGHLAND M AIN
LINE RAILW AY
INSHES
INV ERNESS CAM PUS CRADLEHALL
RESAURIE
U1124 CAULFIELDROAD
U1058 CAULFIELDROAD NORTH
B9006 CULLODENROAD
IN08.11
IN08.31
IN19.16
IN19.15
NCN1/LP11
LP4
LP1W N2
RoW 1
LP5
LP7
RoW 2
LP2
W N INV ERNESSCAM PUS a
b
?
N
© Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668. 0 0.5 10.25 Kilometres
Figure 16.2a
Legend
A96 Dualling Inverness to Nairn (includingNairn Bypass) Scheme Proposals500m Study Area
%2! Bus Stop*Path Start/End PointCore Path**Local Path (LP)**Wider Network (WN)**National Cycle Network (NCN)***Rights of Way****
DDDD NMU Route DiscontinuedShared Use Path for NMUsCrossingProposed FootwaySegregated Cyclist and Pedestrian Path
Client
ProjectA9/A96 Inshes to Sm ithton
95 Bothwell Street, Glasgow, G2 7HX, UK.Tel: +44(0)141 243 8000
www.jacobs.com
Rev
Drawing title
Scale
Drawing number
Jacobs No.DO NOT SCALE@ A3
© Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party.
B2103501BIM No.
Figure 16.2a
DM RB Sta ge 3 EIARPotentia l Im pa c ts on Non-M otorised
User (NM U) Routes a nd Proposed M itiga tion
C00
Drawing Status A – APPROV ED AS STAGE COM PLETESheet 1 of 2
1:12,500
Rev. Rev. Date Purpose of revision Apprv'dRev'dCheckdOrig/Dwn
A9-A96IS-JAC-EGN-XXX-FG-EN-1602
A9
INV ERNESS
HIGHLAND M AIN
LINE RAILW AY
INSHES
INV ERNESS CAM PUS CRADLEHALL
RESAURIE
U1124 CAULFIELDROAD
U1058 CAULFIELDROAD NORTH
B9006 CULLODENROAD
IN08.11
IN08.31
IN19.16
IN19.15
NCN1/LP11
LP4
LP1W N2
RoW 1
LP5
LP7
RoW 2
Gra d e-Sepa ra tedNM U Und erpa ss
JLA3: NCN1/LP11Red irec ted
JLA1: LP5Red irec ted
LP2JLA2: LP2 Red irec ted
IN08.11
IN08.31
IN19.16
IN19.15
NCN1/LP11
LP4
LP1W N2
RoW 1
LP5
LP7
RoW 2
Gra d e-Sepa ra tedNM U Und erpa ss
JLA3: NCN1/LP11Red irec ted
JLA1: LP5Red irec ted
LP2JLA2: LP2 Red irec ted
W N INV ERNESSCAM PUS
?
N
Data sources:*NaPTAN**The Highland Council***Sustrans****ScotWays
PM CA KL DGCEIAR PublicationSEPT 2019C00
Proposed Scheme(DMRB Stage 3 design)
Ba seline
Proposed M itiga tion