Download - DCO Site Boundary - Highways England

Transcript
Page 1: DCO Site Boundary - Highways England

River Great Ouse

River Kym

Duloe Brook

RiverIvel

RiverGreatOuse

Begwary Brook

EasternBrook

Bourn Brook

RiverGreatOuse

Stone Brook

RiverGreatOuse

Millbridge Brook

River Kym

Abbotsley & Hen Brook

River Ivel

PottonBrook

Colmworth Brook River Great Ouse

Duloe Brook

Dean Brook

Fox Brook

GransdenBrook

Banh

amDe

anBro

ok

West Brook

Small

Brook

Honeydon Brook

South Brook

Gallow Brook

Contains OS data © Crown Copyright and database right 2018Filen

ame:

P:\Pr

opos

als\S

ubmi

ssion

s\201

7\Env

ironm

ent -

A428

Blac

k Cat\

GIS\

02_M

aps\P

EIR

Repo

rt\Fig

13.2

Water

Env

ironm

ent F

lood Z

ones

- A42

8 PEIR

2019

0513

.mxd

SW MM JG 13/05/19SO60541541

FOR INFORMATION

THIS DRAWING IS TO BE READ IN CONJUNCTIONWITH ALL OTHER RELEVANT DOCUMENTATION.

N

1:70,000

03/05/19 P01JGSWFIRST ISSUE

0 1 2 3 4 5Kilometers Location | Type | Role | Number

Highways England Pin | Originator | VolumeRev

THIS DOCUMENT HAS BEEN PREPARED PURSUANT TO AND SUBJECT TO THETERMS OF AECOM'S APPOINTMENT BY ITS CLIENT. AECOM ACCEPTS NO

LIABILITY FOR ANY USE OF THIS DOCUMENT OTHER THAN BY ITS ORIGINALCLIENT OR FOLLOWING AECOM'S EXPRESS AGREEMENT TO SUCH USE, ANDONLY FOR THE PURPOSES FOR WHICH IT WAS PREPARED AND PROVIDED.

Drawing Number

Drawing Title

Project Title

Development Consent Order Number

Purpose of Issue

This map is based upon Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty's Stationery Office © Crown copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. Highways England 100030649 2018

Revision Details ByCheck Date Suffix

Internal Project No

Scale @ A3 Zone

Designed

Suitability

Drawn Checked Approved Date

NOTES

Client

Woodlands Manton Lane Manton Industrial Estate Bedford MK41 7LW

Highways England

LegendDCO Site BoundaryThe Scheme1km Study Area2km Study AreaWFD Moderate Ecological PotentialWFD Good Ecological PotentialWFD Poor Ecological StatusOrdinary Watercourse (When not aWFD Reporting Reach)Main River (When not a WFDReporting Reach)

Flood Zone 1All areas not marked as Flood Zone 2or Flood Zone 3 are within Flood Zone1.Flood Zone 3Flood Zone 2

FIGURE 13.2ENVIRONMENT AGENCYFLUVIAL FLOOD ZONES

A428 BLACK CATTO CAXTON GIBBET

PRELIMINARY ENVIRONMENTALINFORMATION REPORT

Contains public sector information licensed under the Open Government Licence v3.0.