DATA CENTERS 2012
Eficiencia, Disponibilidad y Seguridad
Javier García Tobío
Managing Director
Centro de Supercomputación de Galicia
21 de noviembre 2012, Madrid
CESGA MISSION STATEMENT
To provide high performance computing and advanced
communications resources and services to the
scientific community of Galicia and to the Spanish
National Research Council (CSIC), as well as, to
institutions and enterprises with RTD activity.
To promote high quality research in Computational
Science in close collaboration with the research
community from Galicia as well as from other
regions or countries all over the world; contributing in
this way to the advancement of science, to transfer
technology to industry and administrations, and
as consequence, to the wellbeing of society as a
whole.
CESGA BOARD OF TRUSTEES
• Non Profit Foundation
• Regional Government of Galicia
• National Reseach Council of Spain
PARTNERS
CESGA USER COMMUNITY
Universities of Galicia
Regional Research Centres
Spanish National Research Council Centres
Other National and Foreign Institutions:
Hospitals: RTD Departments
Private Companies
Technological Centres
Other Non Profit RTD Centres
Excellence in Management
ISO
9001:2008 Quality Management
UNE166002
R&D Management
CESGA IS:
• Service Provider
Computing e-Learning &
Collaboration tools
Data Storage Technology Transfer to
Industry
Communications GIS
Training Courses
Project Management
PR & Communication
CESGA IS:
Research Centre:
Joint RTD&i Project Promoter
Projects (2001-2011)
-UE 30
-National 19
-Regional 70
-With Industry & Others 31
Total 150
CESGA IS:
Outstanding e-Infrastructures for RTDi
– Computing platforms
– Data storage servers
– Communications network
Evolution of CPU usage
Computing users
RECETGA exchanged traffic
CESGA’S STAFF
CESGA: A selection of significant Projects
Galician Regional Weather Forecasting Service
Galician Regional Weather Ocean Service
More detailed Climate simulations to better inform the Intergovernmental Panel on Climate change (IPCC)
UVIGO
Juan Antonio Añel Cabanelas
Puertos del Estado
Spanish Port Authority
Enrique Álvarez Fanjul
European IBI Area: Ocean Forecasting Service
Oceanographic simulation to better understand fisheries population dynamics
Instituto Español de Oceanografía
Manuel Ruiz Villarreal
Galician Public Health Administration
ULTRASEQUENCING SERVICE: complete genomes sequencing
FGMX – USC – CHUS - CESGA
Ángel Carracedo
Fundación Galega de Medicina Xenómica
Molecular Docking to Design of malaria drugs on the fast track
Scientists Against Malaria
Hugo Gutierrez de Terán
Fundación Galega de
Medicina Xenómica
Molecular Docking techniques aimed at design of Alzheimer drugs
UAB – USC - FGMX
Xavier Daura
Hugo Gutierrez de Terán
Simulation aimed at the optimization of radiotherapy treatment dosage
CHUVI-CHUS-USC-CESGA
Proxecto e-IMRT
New material Design for nuclear plant safety
Instituto de Fusión Nuclear UPM
Sergio Eduardo Courtin Vega
Computational fluid dynamics for new turbine design
CENER
Sugoi Gómez
CTAG : Galician Automotive Technology Centre
Numerical Simulation
for Engineering
Large scale electromagnetism simulation for improved radar systems
UVIGO – UNEX – CESGA
Fernando Obelleiro Basteiro
Exploring complexity to better describe Ecological networks
Estación Biológica de Doñana
CSIC
Jordi Bascompte
European Grid Initiative (EGI): Monitoring & Accounting Service
CESGA DATA CENTRE
FINIS TERRAE SUPERCOMPUTER
CESGA DATA CENTRE: FinisTerrae
PLAN DE EFICENCIA ENERGÉTICA DEL CESGA
33
Análisis de la situación de partida (2008)
34
Puntos existentes que favorecen el ahorro energético • Free Cooling- Enfriadoras
• Recuperación Calor-Enfriadora
• Bomba de calor
Sistema de Climatización
1 2 3 4 5 6 7 8
EQUIPOS L-15
ENFRIADORAS
RECUPERACIÓN
CALOR ENFRIADORA
SALA CPD
GF1
GF2
FAN-COILS
OFICINAS
SIST. PASILLOS
B.C
DEMANDA FRÍO SALA CPD
35
• Detectores de presencia sala CPD
• Lámparas fluorescentes con balasto electrónico zona centra planta primera
Sistema de Iluminación
36
Toma de datos
Esquemas unifilares
Planos del edificio
Datos técnicos y manuales de equipos
Datos de consumos energéticos
Registros de consumos y facturación
37
Medidas eléctricas
1. Interruptor General
2. PP SAI 1
3. PP SAI 2
4. UPS 60
5. UPS 120
6. Climatización CPD
7. Climatización Centro
8. Enfriadora 2
9. SAI Climatizadora 2
10. Interruptor General de
Iluminación
11. Interruptor General
Alumbrado Sótano (IGALS)
12. Iluminación. Exterior
13. Iluminación CPD
14. Iluminación Pasillo
15. Iluminación Planta Baja
16. Iluminación Planta Primera
38
Medidas de iluminación, temperatura y humedad (1/3)
39
Medidas de iluminación, temperatura y humedad (2/3)
40
Medidas de iluminación, temperatura y humedad (3/3)
41
Medidas termográficas
42
Distribución de consumos en el edificio
43
Distribución de consumos de fuerza
44
Distribución de consumos de climatización
45
Distribución de consumos de iluminación
46
Recomendaciones de mejora
Mejoras en el control
Mejoras en la iluminación
Mejoras en la climatización
Mejoras en servidores de computación
Mejoras en el agua
Sustitución de fuentes energéticas
CLIMATIZACIÓN
Enfriadoras: 2 x 580 KW8
Climatizadoras: 8 x 150 Kw
GRUPO y UPS
CIERRE DE PASILLOS FRIOS
CIERRE DE PASILLOS FRIOS
CIERRE DE PASILLOS FRIOS
CIERRE DE PASILLOS FRIOS
CONCLUSIONES: ahorros obtenidos
-Mecanismos de ahorro energético de los
servidores:
33.900 €/año
- Consolidación de nodos SVG:
6.300 €/año
- Consumo discos vs Cintas:
575 €/año
- Free-AIR Cooling:
260.000 €/año
CONCLUSIONES: ahorros obtenidos
- Cierre de pasillos: 6 ºC descenso temperatura y
aumento de temperatura pasillos fríos a 27ºC
105.000 €/año
- Climatizadoras: ventiladores de velocidad variable
30.000 €/año
- Suspensión/apagado automático de nodos inactivos:
22.000 €/año
- Renovación parcial de nodos Finis Terrae
70.000 €/año
TRABAJO ACTUAL Y FUTURO
- Optimización del uso de jerarquías
internas de memoria.
- Planificador de trabajos considerando el
coste del KWh según hora y día.
- Aprovisionamiento de energías
renovables.
CESGA: a way to make EUROPE
EUROPA NA MIÑA
REXIÓN