CUADRO DE CARGAS : TABLERO T-1 FAC. DIV.
(DEPARTAMENTOS) 0.60
RECEPTOR AREA (m2)
PROMEROS 45m2 45.00 1,500.00
SIGUIENTES 45m2 O FRACCION 30.00 1,000.00
LAVADORA / SECADORA (3,500 W) 1500 1,500.00
25% 2000 500.00
MAXIMA DEMANDA TOTAL 4,500.00
POTENCIA A CONTRATAR 4.50 x 0.6 = 2.7 KW
CUADRO DE CARGAS : TABLERO T-2
(DEPARTAMENTOS DUPLEX)
RECEPTOR AREA (m2)
PROMEROS 45m2 45.00 1,500.00
SIGUIENTES 45m2 O FRACCION 45.00 1,000.00
SIGUIENTES 90m2 O FRACCION 25.00 1,000.00
LAVADORA / SECADORA (3,500 W) 1500 1,500.00
25% 2000 500.00
MAXIMA DEMANDA TOTAL 5,500.00
POTENCIA A CONTRATAR 5.50 x 0.6 = 3.3 KW
CUADRO DE CARGAS : TABLERO T-SG
(SERVICIOS GENERALES MODULOS: I, II, IV)
RECEPTOR PUNTOS Watt F.D.
28 50.00 1,400.00 1.00 1,400.00
TOMACORRIENTES 11 100.00 1,100.00 0.50 550.00
CENTRAL DE INTERCOMUNICADORES 1 500.00 500.00 0.80 400.00
1 500.00 500.00 0.80 400.00
TOTAL 3,500.00 2,750.00
POTENCIA A CONTRATAR 2.75 x 0.7 = 1.9 kW
MAXIMA DEMANDA
MAXIMA DEMANDA
CARAGA INSTALADA
MAXIMA DEMANDA
ALUMBRADO: INGRESO HALL, ESCALERAS.
CENTRAL DE ALARMA CONTRA INCENDIOS.
CUADRO DE CARGAS : TABLERO T-SG
(SERVICIOS GENERALES MODULOS: I-8, II-8, II-C, VII)
RECEPTOR PUNTOS Watt F.D.
32 50.00 1,600.00 1.00 1,600.00
TOMACORRIENTES 22 100.00 2,200.00 0.50 1,100.00
ASCENSOR 1 10,000.00 10,000.00 0.80 8,000.00
CENTRAL DE INTERCOMUNICADORES 1 500.00 500.00 0.80 400.00
1 500.00 500.00 0.80 400.00
TOTAL 14,800.00 11,500.00
POTENCIA A CONTRATAR 11.50 x 0.7 = 8.0 kW
CUADRO DE CARGAS : TABLERO T-SG
(SERVICIOS GENERALES MODULOS: III, V, VI)
RECEPTOR Watt F.D.
16 50.00 800.00 1.00 800.00
TOMACORRIENTES 11 100.00 1,100.00 0.50 550.00
CENTRAL DE INTERCOMUNICADORES 1 500.00 500.00 0.80 400.00
1 500.00 500.00 0.80 400.00
TOTAL 2,900.00 2,150.00
POTENCIA A CONTRATAR 2.15 x 0.7 = 1.5 kW
CARAGA INSTALADA
MAXIMA DEMANDA
ALUMBRADO: INGRESO HALL, ESCALERAS.
CENTRAL DE ALARMA CONTRA INCENDIOS.
AREA o PUNTOS
CARAGA INSTALADA
MAXIMA DEMANDA
ALUMBRADO: INGRESO HALL, ESCALERAS.
CENTRAL DE ALARMA CONTRA INCENDIOS.
Página 3 de 21
CUADRO DE CARGA
DE LOS MODULOS
ACOMETIDA CANT. RECEPTOR TAB. % CARGA M.D. (W)
MODULO I
B.M. "1"
1 SERVICIOS GENERALES T-SG 2,750.00 2,750.00
1 DEPTOS DUPLEX T-2 5,500.00 1.00 5,500.00
2 DEPTOS DUPLEX + TIPICO T-1 + T-2 10,000.00 0.65 6,500.00
2 DEPTOS TIPICOS T-1 4,500.00 0.40 3,600.00
5 DEPTOS TIPICOS T-1 4,500.00 0.30 6,750.00
MAXIMA DEMANDA B.M. 1 (W) 25,100.00
B.M. "2"
1 DEPTOS DUPLEX T-2 5,500.00 1.00 5,500.00
2 DEPTOS DUPLEX + TIPICO T-1 + T-2 10,000.00 0.65 6,500.00
2 DEPTOS TIPICOS T-1 4,500.00 0.40 3,600.00
5 DEPTOS TIPICOS T-1 4,500.00 0.30 6,750.00
MAXIMA DEMNADA B.M. 2 (W) 22,350.00
MAXIMA DEMANDA TOTAL DEL EDIFICIO (W) 47,450.00
ACOMETIDA CANT. RECEPTOR TAB. % CARGA M.D. (W)
MODULO I-B
B.M. "1"
1 SERVICIOS GENERALES T-SG 11,500.00 11,500.00
1 DEPTOS DUPLEX T-2 5,500.00 1.00 5,500.00
2 DEPTOS DUPLEX + TIPICO T-1 + T-2 10,000.00 0.65 6,500.00
2 DEPTOS TIPICOS T-1 4,500.00 0.40 3,600.00
11 DEPTOS TIPICOS T-1 4,500.00 0.30 14,850.00
MAXIMA DEMANDA B.M. 1 (W) 41,950.00
B.M. "2"
1 DEPTOS DUPLEX T-2 5,500.00 1.00 5,500.00
2 DEPTOS DUPLEX + TIPICO T-1 + T-2 10,000.00 0.65 6,500.00
2 DEPTOS TIPICOS T-1 4,500.00 0.40 3,600.00
11 DEPTOS TIPICOS T-1 4,500.00 0.30 14,850.00
MAXIMA DEMNADA B.M. 2 (W) 30,450.00
MAXIMA DEMANDA TOTAL DEL EDIFICIO (W) 72,400.00
BANCO DE MEDIDORE
S
M.D. PARCIAL (W)
BANCO DE MEDIDORE
S
M.D. PARCIAL (W)
Página 4 de 21
ACOMETIDA CANT. RECEPTOR TAB. % CARGA M.D. (W)
MODULO II
B.M. "1"
1 SERVICIOS GENERALES T-SG 2,750.00 2,750.00
1 DEPTOS DUPLEX T-2 5,500.00 1.00 5,500.00
2 DEPTOS DUPLEX + TIPICO T-1 + T-2 10,000.00 0.65 6,500.00
2 DEPTOS TIPICOS T-1 4,500.00 0.40 3,600.00
5 DEPTOS TIPICOS T-1 4,500.00 0.30 6,750.00
MAXIMA DEMANDA B.M. 1 (W) 25,100.00
B.M. "2"
1 DEPTOS DUPLEX T-2 5,500.00 1.00 5,500.00
2 DEPTOS DUPLEX + TIPICO T-1 + T-2 10,000.00 0.65 6,500.00
2 DEPTOS TIPICOS T-1 4,500.00 0.40 3,600.00
5 DEPTOS TIPICOS T-1 4,500.00 0.30 6,750.00
MAXIMA DEMNADA B.M. 2 (W) 22,350.00
MAXIMA DEMANDA TOTAL DEL EDIFICIO (W) 47,450.00
ACOMETIDA CANT. RECEPTOR TAB. % CARGA M.D. (W)
MODULO II-B
B.M. "1"
1 SERVICIOS GENERALES T-SG 11,500.00 11,500.00
1 DEPTOS DUPLEX T-2 5,500.00 1.00 5,500.00
2 DEPTOS DUPLEX + TIPICO T-1 + T-2 10,000.00 0.65 6,500.00
2 DEPTOS TIPICOS T-1 4,500.00 0.40 3,600.00
11 DEPTOS TIPICOS T-1 4,500.00 0.30 14,850.00
MAXIMA DEMANDA B.M. 1 (W) 41,950.00
B.M. "2"
1 DEPTOS DUPLEX T-2 5,500.00 1.00 5,500.00
2 DEPTOS DUPLEX + TIPICO T-1 + T-2 10,000.00 0.65 6,500.00
2 DEPTOS TIPICOS T-1 4,500.00 0.40 3,600.00
11 DEPTOS TIPICOS T-1 4,500.00 0.30 14,850.00
MAXIMA DEMNADA B.M. 2 (W) 30,450.00
MAXIMA DEMANDA TOTAL DEL EDIFICIO (W) 72,400.00
BANCO DE MEDIDORE
S
M.D. PARCIAL (W)
BANCO DE MEDIDORE
S
M.D. PARCIAL (W)
Página 5 de 21
ACOMETIDA CANT. RECEPTOR TAB. % CARGA M.D. (W)
MODULO II-C
B.M. "1"
1 SERVICIOS GENERALES T-SG 11,500.00 11,500.00
1 DEPTOS DUPLEX T-2 5,500.00 1.00 5,500.00
2 DEPTOS DUPLEX + TIPICO T-1 + T-2 10,000.00 0.65 6,500.00
2 DEPTOS TIPICOS T-1 4,500.00 0.40 3,600.00
11 DEPTOS TIPICOS T-1 4,500.00 0.30 14,850.00
MAXIMA DEMANDA B.M. 1 (W) 41,950.00
B.M. "2"
1 DEPTOS DUPLEX T-2 5,500.00 1.00 5,500.00
2 DEPTOS DUPLEX + TIPICO T-1 + T-2 10,000.00 0.65 6,500.00
2 DEPTOS TIPICOS T-1 4,500.00 0.40 3,600.00
11 DEPTOS TIPICOS T-1 4,500.00 0.30 14,850.00
MAXIMA DEMNADA B.M. 2 (W) 30,450.00
MAXIMA DEMANDA TOTAL DEL EDIFICIO (W) 72,400.00
ACOMETIDA CANT. RECEPTOR TAB. % CARGA M.D. (W)
MODULO III
B.M. "1"
1 SERVICIOS GENERALES T-SG 2,150.00 2,150.00
1 DEPTOS DUPLEX T-2 5,500.00 1.00 5,500.00
2 DEPTOS DUPLEX + TIPICO T-1 + T-2 10,000.00 0.65 6,500.00
2 DEPTOS TIPICOS T-1 4,500.00 0.40 3,600.00
5 DEPTOS TIPICOS T-1 4,500.00 0.30 6,750.00
MAXIMA DEMANDA TOTAL DEL EDIFICIO (W) 24,500.00
ACOMETIDA CANT. RECEPTOR TAB. % CARGA M.D. (W)
MODULO IV
B.M. "1"
1 SERVICIOS GENERALES T-SG 2,750.00 2,750.00
1 DEPTOS DUPLEX T-2 5,500.00 1.00 5,500.00
2 DEPTOS DUPLEX + TIPICO T-2 5,500.00 0.65 7,150.00
2 DEPTOS TIPICOS T-1 4,500.00 0.40 3,600.00
10 DEPTOS TIPICOS T-1 4,500.00 0.30 13,500.00
MAXIMA DEMANDA TOTAL DEL EDIFICIO (W) 32,500.00
ACOMETIDA CANT. RECEPTOR TAB. % CARGA M.D. (W)
MODULO V
B.M. "1"
1 SERVICIOS GENERALES T-SG 2,150.00 2,150.00
1 DEPTOS DUPLEX T-2 5,500.00 1.00 5,500.00
2 DEPTOS DUPLEX + TIPICO T-1 + T-2 5,500.00 0.65 3,575.00
2 DEPTOS TIPICOS T-1 4,500.00 0.40 3,600.00
5 DEPTOS TIPICOS T-1 4,500.00 0.30 6,750.00
MAXIMA DEMANDA TOTAL DEL EDIFICIO (W) 21,575.00
BANCO DE MEDIDORE
S
M.D. PARCIAL (W)
BANCO DE MEDIDORE
S
M.D. PARCIAL (W)
BANCO DE MEDIDORE
S
M.D. PARCIAL (W)
BANCO DE MEDIDORE
S
M.D. PARCIAL (W)
Página 6 de 21
ACOMETIDA CANT. RECEPTOR TAB. % CARGA M.D. (W)
MODULO VI
B.M. "1"
1 SERVICIOS GENERALES T-SG 2,150.00 2,150.00
1 DEPTOS DUPLEX T-2 5,500.00 1.00 5,500.00
2 DEPTOS DUPLEX + TIPICO T-1 + T-2 5,500.00 0.65 3,575.00
2 DEPTOS TIPICOS T-1 4,500.00 0.40 3,600.00
5 DEPTOS TIPICOS T-1 4,500.00 0.30 6,750.00
MAXIMA DEMANDA TOTAL DEL EDIFICIO (W) 21,575.00
ACOMETIDA CANT. RECEPTOR TAB. % CARGA M.D. (W)
MODULO VII
B.M. "1"
1 SERVICIOS GENERALES T-SG 11,500.00 11,500.00
1 DEPTOS DUPLEX T-2 5,500.00 1.00 5,500.00
2 DEPTOS DUPLEX + TIPICO T-1 + T-2 5,500.00 0.65 3,575.00
2 DEPTOS TIPICOS T-1 4,500.00 0.40 3,600.00
11 DEPTOS TIPICOS T-1 4,500.00 0.30 14,850.00
MAXIMA DEMANDA TOTAL DEL EDIFICIO (W) 39,025.00
BANCO DE MEDIDORE
S
M.D. PARCIAL (W)
BANCO DE MEDIDORE
S
M.D. PARCIAL (W)
CUADRO DE CARGAS AREAS COMUNES
(ETAPA I)
RECEPTOR AREA (m2) W/m2 P.I. F.D.
7,257.00 5.00 36,285.00 1.00 36,285.00
GUARDIANIA 4.56 25.00 114.00 0.80 91.20
TOTAL 36,399.00 36,376.20
LOCAL COMUNAL
AREA CONSTRUIDA 250.00 18.00 4,500.00 1.00 4,500.00
EQUIPOS 500.00 0.80 400.00
CARGAS ESPECIALES 1,000.00 0.80 800.00
BOMBA DE AGUA (2 x 1/2HP) 750.00 0.80 600.00
TOTAL 6,750.00 6,300.00
POTENCIA TOTAL DE LA ETAPA 42.7 kW
CUADRO DE CARGAS AREAS COMUNES
(ETAPA II)
RECEPTOR AREA (m2) W/m2 P.I. F.D.
9,685.00 5.00 48,425.00 1.00 48,425.00
GUARDIANIA 4.56 25.00 114.00 0.80 91.20
TOTAL 48,539.00 48,516.20
POTENCIA TOTAL DE LA ETAPA 48.5 kW
CUADRO DE CARGAS AREAS COMUNES
(ETAPA III)
RECEPTOR AREA (m2) W/m2 P.I. F.D.
6,139.00 5.00 30,695.00 1.00 30,695.00
GUARDIANIA 4.56 25.00 114.00 0.80 91.20
TOTAL 30,809.00 30,786.20
LOCAL MINISOL
AREA CONSTRUIDA 480.00 25.00 12,000.00 1.00 12,000.00
ILUMINACION EXTERIOR 2,000.00 0.80 1,600.00
REFRIGERACION Y EXTRACCION DE AIRE 5,000.00 0.80 4,000.00
BOMBA DE AGUA (2 x 2HP) 3,000.00 0.80 2,400.00
TOTAL 22,000.00 20,000.00
POTENCIA TOTAL DE LA ETAPA 50.8 kW
CARAGA INSTALADA
MAXIMA DEMANDA
AREA DE CIRCULACION, ESTACIONAMIENTO, JARDIN.
CARAGA INSTALADA
MAXIMA DEMANDA
AREA DE CIRCULACION, ESTACIONAMIENTO, JARDIN.
CARAGA INSTALADA
MAXIMA DEMANDA
AREA DE CIRCULACION, ESTACIONAMIENTO, JARDIN.
CUADRO DE CARGAS AREAS COMUNES
(ETAPA IV)
RECEPTOR AREA (m2) W/m2 P.I. F.D.
5,765.00 5.00 28,825.00 1.00 28,825.00
ESTACIONAMIENTO EN SOTANO 1,260.00 5.00 6,300.00 1.00 6,300.00
BOMBA DE AGUA (5x10HP) 62,664.00 0.80 50,131.20
BCI (20HP) 36,554.00 0.80 29,243.20
GUARDIANIA 4.56 25.00 114.00 0.80 91.20
TOTAL 134,457.00 114,590.60
POTENCIA TOTAL DE LA ETAPA 114.6 kW
CUADRO DE CARGAS AREAS COMUNES
(ETAPA V)
RECEPTOR AREA (m2) W/m2 P.I. F.D.
9,222.00 5.00 46,110.00 1.00 46,110.00
ESTACIONAMIENTO EN SOTANO 1,710.00 5.00 8,550.00 1.00 8,550.00
BOMBA DE AGUA (6x14HP) 62,664.00 0.80 50,131.20
BCI (49HP) 36,554.00 0.80 29,243.20
GUARDIANIA 4.56 25.00 114.00 0.80 91.20
TOTAL 153,992.00 134,125.60
POTENCIA TOTAL DE LA ETAPA 134.1 kW
CARAGA INSTALADA
MAXIMA DEMANDA
AREA DE CIRCULACION, ESTACIONAMIENTO, JARDIN.
CARAGA INSTALADA
MAXIMA DEMANDA
AREA DE CIRCULACION, ESTACIONAMIENTO, JARDIN.
CUADRO DE CARGAS AREAS COMUNES
(ETAPA VI)
RECEPTOR AREA (m2) W/m2 P.I. F.D.
6,988.00 5.00 34,940.00 1.00 34,940.00
ESTACIONAMIENTO EN SOTANO 850.00 5.00 4,250.00 1.00 4,250.00
BOMBA DE AGUA (6x14HP) 62,664.00 0.80 50,131.20
BCI (49HP) 36,554.00 0.80 29,243.20
GUARDIANIA 4.56 25.00 114.00 0.80 91.20
TOTAL 138,522.00 118,655.60
LOCAL COMUNAL
AREA CONSTRUIDA 250.00 18.00 4,500.00 1.00 4,500.00
EQUIPOS 500.00 0.80 400.00
CARGAS ESPECIALES 1,000.00 0.80 800.00
BOMBA DE AGUA (2 x 1/2HP) 750.00 0.80 600.00
TOTAL 6,750.00 6,300.00
LOCAL DE EDUCACION
AREA CONSTRUIDA 2,000.00 28.00 56,000.00 15,000.00 1.00 15,000.00
41,000.00 0.50 20,500.00
COMPUTO 10,000.00 0.80 8,000.00
CARGAS ESPECIALES 5,000.00 0.80 4,000.00
BOMBA DE AGUA (4HP) 3,000.00 0.80 2,400.00
TOTAL 74,000.00 49,900.00
POTENCIA TOTAL DE LA ETAPA 174.9 kW
CUADRO DE CARGAS AREAS COMUNES
(ETAPA VII)
RECEPTOR AREA (m2) W/m2 P.I. F.D.
3,421.00 5.00 17,105.00 1.00 17,105.00
ESTACIONAMIENTO EN SOTANO 1,850.00 5.00 9,250.00 1.00 9,250.00
BOMBA DE AGUA (6x14HP) 62,664.00 0.80 50,131.20
BCI (49HP) 36,554.00 0.80 29,243.20
GUARDIANIA 4.56 25.00 114.00 0.80 91.20
TOTAL 125,687.00 105,820.60
POTENCIA TOTAL DE LA ETAPA 105.8 kW
CARAGA INSTALADA
MAXIMA DEMANDA
AREA DE CIRCULACION, ESTACIONAMIENTO, JARDIN.
CARAGA INSTALADA
MAXIMA DEMANDA
AREA DE CIRCULACION, ESTACIONAMIENTO, JARDIN.
MODULO I MODULO I-B MODULO II MODULO II-B MODULO II-C MODULO III MODULO IV MODULO V MODULO VI MODULO VII
M.D. (W) 47,450.00 72,400.00 47,450.00 72,400.00 72,400.00 24,500.00 32,500.00 21,575.00 21,575.00 39,025.00
ETAPA I 6 4 382,700.00
ETAPA II 7 9 7 1 2 1 1,027,925.00
ETAPA III 2 5 4 621,750.00
ETAPA IV 3 3 5 5 769,200.00
ETAPA V 5 6 2 1 855,475.00
ETAPA VI 4 3 3 480,500.00
ETAPA VII 2 2 3 3 530,400.00
POTENCIA TOTAL TOTAL 4,667,950.00
CADRO DE CARGA TOTAL
TOTAL (KW) POT. (KVA) S.E. (KVA) TIPO DE SUBESTACION
ETAPA I 382.70 0.5 191.35 42.68 234.03 260.03 S.E. BOVEDA
ETAPA II 1,027.93 0.5 513.96 48.52 562.48 624.98 S.E. CONVENCIONAL
ETAPA III 621.75 0.5 310.88 50.79 361.66 401.85 S.E. CONVENCIONAL
ETAPA IV 769.20 0.5 384.60 134.13 518.73 576.36 S.E. CONVENCIONAL
ETAPA V 855.48 0.5 427.74 174.86 602.59 669.55 S.E. CONVENCIONAL
ETAPA VI 480.50 0.5 240.25 114.59 354.84 394.27 S.E. CONVENCIONAL
ETAPA VII 530.40 0.5 265.20 105.82 371.02 412.25 S.E. PEDESTAL
TOTAL (KW) 3,005.35
TIPOS DE SUBESTACIONES
TIPOS DE SUBESTACIONES
SE CONVENCIONAL 1260 0.8 1008 7x5m2
SE PEDESTAL 630 0.8 504 3.5x3m2
SE BOVEDA 400 0.75 300 4x2m2
POT. TOTAL DE ETAPAS
(W)
MAX. DEM. (KW)
FACT. SIMULT.
POT. SUB (KW)
POT. AREAS COMUNES
(KW)
POTENCIA (KVA)
%UTIL POT (KVA)
POT UTIL (KVA)
DIMENCIONES
ALIMENTADORES DE ACOMETIDAS DE BANCOS DE MEDIDORES
M.D. In (AMP) I.D. (1.25xIn) ALIMENTADOR CODIGO CAJA TOMA
MODULO IB.M. 1 25,100.00 82.44 103.04 3-1x35mm2 NYY - 50mmΦ B F1
B.M. 2 22,350.00 73.40 91.75 3-1x35mm2 NYY - 50mmΦ B F1
MODULO I-8B.M. 1 41,950.00 137.78 172.22 3-1x70mm2 NYY - 65mmΦ C F1
B.M. 2 30,450.00 100.01 125.01 3-1x70mm2 NYY - 65mmΦ C F1
MODULO IIB.M. 1 25,100.00 82.44 103.04 3-1x35mm2 NYY - 50mmΦ B F1
B.M. 2 22,350.00 73.40 91.75 3-1x35mm2 NYY - 50mmΦ B F1
MODULO II-8B.M. 1 41,950.00 137.78 172.22 3-1x70mm2 NYY - 65mmΦ C F1
B.M. 2 30,450.00 100.01 125.01 3-1x70mm2 NYY - 65mmΦ C F1
MODULO II-CB.M. 1 41,950.00 137.78 172.22 3-1x70mm2 NYY - 65mmΦ C F1
B.M. 2 30,450.00 100.01 125.01 3-1x70mm2 NYY - 65mmΦ C F1
MODULO III B.M. 1 24,500.00 80.47 100.58 3-1x35mm2 NYY - 50mmΦ B F1
MODULO IVB.M. 1 #REF! #REF! #REF! 3-1x16mm2 NYY - 40mmΦ A F1
B.M. 2 #REF! #REF! #REF! 3-1x35mm2 NYY - 50mmΦ B F1
MODULO V B.M. 1 21,575.00 70.86 88.57 3-1x35mm2 NYY - 50mmΦ B F1
MODULO VI B.M. 1 21,575.00 70.86 88.57 3-1x35mm2 NYY - 50mmΦ B F1
MODULO VII B.M. 1 39,025.00 128.17 160.21 3-1x95mm2 NYY - 65mmΦ D F1
Long (m)
II 23.75 23.75 0.85 230 70.14 87.67 19 70II 23.75 47.5 0.85 230 140.28 175.35 11 120II 23.75 71.25 0.85 230 210.42 263.02 154 120
Long (m)
II-B 36.2 36.2 0.85 230 106.91 133.63 95 95VII 19.5 55.7 0.85 230 164.49 205.62 19 95
TIPO DE MODULO
Potencia Diver.(kW)
Potencia Acumulad.
(kW)Cos f Tension
(V)Corriente
(A)
Corriente Diseño
(A)
Secc (mm2)
TIPO DE MODULO
Potencia Diver.(kW)
Potencia Acumulad.
(kW)Cos f Tension
(V)Corriente
(A)
Corriente Diseño
(A)
Secc (mm2)
S
LrIKV N
25.1
1 0.63 0.271 0.42 0.181 8.87 3.85
9.91 4.31
1 3.51 1.531 1.08 0.47
4.59 2.00
Nº de conductores / fase
Caida de Tension
(V)
Caida de Tension
(%)
Nº de conductores / fase
Caida de Tension
(V)
Caida de Tension
(%)
CUADRO DE CLAVES DE ALIMENTADORES Y/O
CIRCUITOS EN BUZONES
CLAVE CONDUCTOR
1
AB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
BB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
2
CB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
DB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
3
EB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
FB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
4
G B1 3-120 mm2 (NYY)
H B1 3-120 mm2 (NYY)
I B1 3-120 mm2 (NYY)
JB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
5
AB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
BB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
CB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
DB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
EB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
FB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
6
G B1 3-120 mm2 (NYY)
H B1 3-120 mm2 (NYY)
I B1 3-120 mm2 (NYY)
JB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
7
AB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
BB1 3-120 mm2 (NYY)
ALIMENTADOR Y/O RECEPTOR
BANCOS
7
BB2 3-120 mm2 (NYY)
8 AB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
9
CB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
DB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
EB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
FB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
10
CB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
EB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
11
G B1 3-120 mm2 (NYY)
H B1 3-120 mm2 (NYY)
I B1 3-120 mm2 (NYY)
JB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
12
H B1 3-120 mm2 (NYY)
I B1 3-120 mm2 (NYY)
JB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
13
I B1 3-120 mm2 (NYY)
JB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
14 JB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
15 3-120 mm2 (NYY)
16 3-120 mm2 (NYY)
17 3-120 mm2 (NYY)
18 BOMBA DE AGUA 3-120 mm2 (NYY)
19 POZO DE TIERRA 3-120 mm2 (NYY)
20 VARIOS 3-120 mm2 (NYY)
BANCO DE MEDIDORES
TAB. DE SERVICIOS GENERALES
ALUMBRADO EXTERIOR Y OTROS
CUADRO DE CLAVES DE ALIMENTADORES Y/O
CIRCUITOS EN BUZONES
ELECTROCUCTO
4 DUCTOS DE 4 VIAS
2 DUCTOS DE 4 VIAS
1 DUCTOS DE 4 VIAS
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1 DUCTOS DE 4 VIAS
1 DUCTOS DE 2 VIAS
2 DUCTOS DE 4 VIAS
1 DUCTOS DE 4 VIAS
2 DUCTOS DE 4 VIAS
1 DUCTOS DE 4 VIAS
1 DUCTOS DE 4 VIAS
1 DUCTOS DE 2 VIAS
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
CUADRO DE CLAVES DE ALIMENTADORES Y/O
CIRCUITOS EN BUZONES
CLAVE CONDUCTOR
1
A B1 3-120 mm2 (NYY)
B B1 3-120 mm2 (NYY)
C B1 3-120 mm2 (NYY)
D B1 3-120 mm2 (NYY)
2
EB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
FB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
GB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
3
A B1 3-120 mm2 (NYY)
B B1 3-120 mm2 (NYY)
C B1 3-120 mm2 (NYY)
D B1 3-120 mm2 (NYY)
EB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
FB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
GB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
4
A B1 3-120 mm2 (NYY)
B B1 3-120 mm2 (NYY)
C B1 3-120 mm2 (NYY)
D B1 3-120 mm2 (NYY)
5
A B1 3-120 mm2 (NYY)
B B1 3-120 mm2 (NYY)
C B1 3-120 mm2 (NYY)
6A B1 3-120 mm2 (NYY)
B B1 3-120 mm2 (NYY)
7 A B1 3-120 mm2 (NYY)
8
EB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
FB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
GB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
9
EB1 3-120 mm2 (NYY)
ALIMENTADOR Y/O RECEPTOR
BANCOS
9
EB2 3-120 mm2 (NYY)
FB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
10 EB1 3-120 mm2 (NYY)
B2 3-120 mm2 (NYY)
11 3-120 mm2 (NYY)
12 3-120 mm2 (NYY)
13 3-120 mm2 (NYY)
14 BOMBA DE AGUA 3-120 mm2 (NYY)
15 POZO DE TIERRA 3-120 mm2 (NYY)
16 VARIOS 3-120 mm2 (NYY)
BANCO DE MEDIDORES
TAB. DE SERVICIOS GENERALES
ALUMBRADO EXTERIOR Y OTROS
CUADRO DE CLAVES DE ALIMENTADORES Y/O
CIRCUITOS EN BUZONES
ELECTROCUCTO
3 DUCTOS DE 4 VIAS
1 DUCTOS DE 4 VIAS
1 DUCTOS DE 4 VIAS
1 DUCTOS DE 2 VIAS
1 DUCTOS DE 2 VIAS
2 DUCTOS DE 4 VIAS
1 DUCTOS DE 4 VIAS
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1 DUCTOS DE 4 VIAS
1 DUCTOS DE 2 VIAS
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ
1T - 100 mmΦ