INNOVATION AND ENGAGEMENT PUBLIC LECTURE 2010
Urban Design and the British Urban Renaissance
John Punter
Professor of Urban Design, Cardiff University
Design Commission for Wales
The book
• 20 academic authors evaluating progress in major British cities: based on city by city half day seminars with local practitioners: personal verdicts
• 8 Core City & 4 London case studies: • 4 Celtic Capitals as comparators
• Introductory analysis of renaissance agenda/achievements
• Summary conclusion and reflectionson city experiences
• Talk explores intro and conclusions• Strengths and weaknesses of design• Impetus for urban improvement
Urban renaissance precedes UTF
• Manchester, Birmingham, Glasgow lead the way 1988-1998
• Developers/housebuilders alert to opportunities in booming market 1996-9
• Much strategy/policy continuity at local level: UTF report reinforced trends
• BUT doubts about LPAs’ ability to maintain quality control through boom
• Difficult to measure UTF contribution but definitely changed perceptions of cities and increased attention to urban design
• Significant increase in design exemplars: but mediocrity still the norm
• Mix of positives and negatives, but only a decade of a 30 year project
Manchester 1996
Birmingham 1989
Key renaissance precedents
The UTF’s urban design agenda
• 105 recommendations: most accepted by government: wide range and agenda:
• Key areas explored in book
1. National urban design framework:
2. Housing supply, quality, sustainability:
3. Public realm and the environment:
4. Resources/skills for local government:
• Design-led? a conceit? design-informed but economic growth priorities of government
1999
Independent Report 2005
Urban Task Force recommendation (UTF 1999) Implementation/achievement by mid 2009
1 Local Authority single strategies for public realm Not achieved
2 Comprehensive green pedestrian routes Not achieved
3 Increase densities and advise on standards Increase achieved 25-40 du/ha 2007Little advice on density standards/design quality
4 Environmental/running cost rating for homes Code for Sustainable Homes introduced 2006Staged targets for carbon neutrality by 2016
5 Spatial masterplans for area regeneration Not made mandatory: improved advice and wider use
6/94 Design competitions: regeneration projects/major public buildings Minor achievement; more frequent use
7 Develop national urban design framework and best practice guidelines Ongoing but largely achieved: strong design supportand excellent manuals
8 Demonstration projects of design-led regeneration Not achieved: Millenium Communities continue slowly
9 Local architecture centres in major cities Largely achieved
10-13 Local transport plans, modal shift ambitions, homezones, funding Statutory plans but targets not being achieved:Inadequate funding but improvements evidentModal shift minor but public transport increase
19-20 Car parking standards maxima etc 1.5 cp spaces/du set 2000, but retreat to local determination post 2006
21-29 Increase resources for urban environmental management: new models and performance indicators
Minor funding increases only: performance indicators reformed but miss place quality. Success with parks via HLF
41-44, 47 New Development Plan system and policy support: all new plans by 2002
RSS/LDFs implemented but slow production and weak strategic vision: 12% 092012 new target for completion. Area Action Plans an unknown quantity
45-46 Streamlined control processes Significantly 71%LPAs meeting all 3 targets: Deregulation of minor applications ongoing
48, 54-56 Accelerate land release and ‘plan, monitor manage’ to ensure supply: sequential approach
Mechanisms implemented but major supply shortfall.Targets not achieved with local resistance and house builders marked under-supply.
49-53 Revise planning agreements, introduce impact fees and review affordable housing delivery
40 % of schemes deliver affordable but insufficient supply and impairs design. Community Infrastructure Levy legislated but implementation awaited
57-62 Brownfield targets raised and increase public land release
77% brownfield achieved in 2007. Significant achievement
64-71 Vacant land tax, CPO reforms, revolving funds for land assembly
Compulsory Purchase reforms but general land assembly more difficult through accounting matters
72-78 Improve environmental regulation for land, water, waste and ensure remediation
Some achievement but increased costs. Some allowances and simplification of licenses
79-80, 103-5 Market unpopular housing and incentivise more mixed social housing and home improvement in regeneration areas.
More than 50% now owned by Housing Associations through stock transfers and ALMOs but shortfall of social housing supply increased to 1.67m units
81-84 Measures to ensure empty property use, esp historic buildings, and harmonise VAT to encourage refurbishment
PPS 15 finally emerged but no Heritage Bill.Some funding for living over the shop but no VAT reform to aid conservation/rehabilitation
85-102 Increase LA funding and simplify and extend regeneration funding: trial PFI;
Major failure to improve LA funding esp for infrastructure: PFI shortcomings for design and sustainability. Homes and Communities Agency established as centralised and integrated regeneration body 2008 with generous funding.
1: National Urban Design Framework
• Major achievement: ODPM/CLG set comprehensive agenda/advice
• CABE’s research, advice, campaigns provided invaluable support
• All PPS redrafted: ‘good design indivisible from good planning’ (2005)(2007)
• Manual for Streets, Safer Cities, Accessibility, Arterials?
• Energy efficiency: CSH/green infrastructure being mainstreamed
• Place making agenda: more than a mantra? Corporate commitment? CG & LG
• Efficiency of development control improved: 71% meet all three speed targets
Critical weaknesses
• Failures of LA leadership to prioritise place making/value of urban design
• Local Development Frameworks: only 12% in place: low priority
• Failures of community involvement: little ‘front loading’: public ill-informed
• Few plan-led, proactive, policy-backed design regimes with effective SPD
• Skills deficit in control/policy/enhancement: now CSH/MfS/BfL skills to master
• Advice overload for LPA planners: haemorrhage of talent/skill to private sector
• Density/plot ratio weaknesses (PPS3) compounded by weak tall buildings policies
• How are LPAs to be supported in up-skilling and design delivery?
Plymouth
Bristol
Birmingham
Westminster
2 Housing supply, quality, sustainability?
• Brownfield success (77%) and increased ave. densities (44du/ha)
• S106 delivers significant mix: 10-40 %: half of all affordable housing
• But tends to drive density up and design quality down
• Small apartments half of production by 2007: demand conundrum
• Decent homes programme in Council sector a major success
• Council estate regeneration in early stages: mixed success: controversies
Leeds
2 Housing supply, quality, sustainability (continued).
• Homes and Communities Agency: positive if belated: reinforces quality (??) and social inclusion agendas:
• BfL monitoring reveals 18% ‘good+’ and 29% poor design: affordable does slightly better: new CLG targets for improvement
• Good residential design practices established in some projects; Enquiry by Design, Masterplans, Codes, etc.
• Positive introduction of Code for Sustainable Homes: delivery
challenges to 2016, and existing stock upgrade critical
• Eco-towns will advance sustainability thinking; green infrastructure vital to urban renaissance
ManchesterManchester: imagination ? or greed ?
South Somerset vs North Somerset
Critical weaknesses
• Failure to boost supply drives speculation, inflation, market imbalance
• Affordability crisis and lack of social mix feeds gentrification
• Lack of social housing supply enforces inclusion: reduces innovation
• Apartment development lacks design quality/ place making
• Sustainable Communities Plan 2003 flawed but supply boost vital: Anti-renaissance?
• SCP re-thinks envt, community, transport
• Housing Market Renewal: demolition, design, conservation concerns
• Existing housing needs energyprogramme
Housebuilding 1951-2007
0.0
50.0
100.0
150.0
200.0
250.0
300.0
350.0
400.0
450.0
1951
1954
1957
1960
1963
1966
1969
1972
1975
1978
1981
1984
1987
1990
/91
1993
/94
1996
/97
1999
/200
0
2002
/03
2005
/06
2 F
rom
Data for Figure 10.1 Housebuilding completions:1,2 by sectorUnited Kingdom Privateenterprise
Data for Figure 10.1 Housebuilding completions:1,2 by sectorUnited Kingdom Registeredsociallandlords
Data for Figure 10.1 Housebuilding completions:1,2 by sectorUnited Kingdom Localauthorities
Data for Figure 10.1 Housebuilding completions:1,2 by sectorThousands Allcompletions
Total
LAs
PvtRSL
Slow increase in production: 220k not achieved Affordability crisis: FTBs pay 12x income in SECouncil house sales > affordable productionApartments 2147% of production 9107: 2% >2bed
UK
Quadrant, Attwood Estate,Birmingham
North Peckham, Southwark
Estate Regenerationenvironment vs equity
Chimney Pot Park, Salford
Clevedon Park, Liverpool
Housing Market Renewal
3 Quality of the public realm and the urban environment
• Major successes in city centres: public realm improvements, retail design
• Manual for Streets advances: 20mph, Home Zone progress: arterials?
• Greenspace/green infrastructure now on urban agendas
• HLF fund improves best parks dramatically (x 6 Green Flag)
• Only modest success in improving management and maintenance and general liveability
• Poor/unsatisfactory neighbourhoods fall from 68% to 53%! (20017)
Seven Dials, Camden
Grey Street, Newcastle
Quality public realm‘shared space’
Critical weaknesses
• Single public realm strategies unrealised
• No major funding for green space programmes: ‘non statutory duty’
• Failures with congestion charging via referenda: London 1:25
• Minor increases in walking and cycling: some public transport revival
• Reliance on CCTV (78% crime budget) & ASBOs for policing
• Counter-terrorist design supplement: cure worse than disease?
• Community Empowerment Bill (2008) too little too late: needs resourcing
Bristol ‘Legible City’
4 Resources/skills for local government and regeneration
• Improved funding for local government (UTF and Lyons recommendations)
• Adequate infrastructure funding: CIL?
• Reforms of VAT to encourage more rehabilitation/conservation
• LA leadership on, and commitment to, planning and design
• Positive use of land disposal powers
• Improved s106 processes and levies
Critical weaknesses
• None of UTF/Lyons mechanisms to improve LA finances implemented
• S106 and CIL ambiguities around infrastructure funding
• Developers and LAs ratcheting up land values, maximising development for s106 funds and capital receipts: setting undesirable precedents
• LAs prioritise tax base and s106 receipts not proactive planning • Skills haemorrhage to private sector: wider skills challenge not met
• Service cuts and retrenchment to statutory functions
• Positive environmental enhancement lacks funding: future funding bleak
Overall: spatial renaissance in the cities?
• City centre focus: consumerist emphasis, expanded centres, public realm improved: dramatic re-population
• New dense apartment complexes but rarely neighbourhoods
• ‘Decent homes’ progress but estate regeneration slow/variable results
• Extensive gentrification, studentification: recession brings rental diversity
• City centre rim vs inner city benefits
• Mature suburbs neglected: NIMBYism cripples positive planning/ intensification • Edge city reduced
Suburbia everywhere
‘Rim of discontinuity’ Leeds
Neglected areas
Local responses and distinctive regimes• Each city has distinctive strengths and weaknesses: successes and failures
• Nottingham: land use, transportation, conservation, design integration: integrated thinking, strong officer continuity and leadership: good use of design strategies and briefs: ambitious design initiatives (comparisons with Edinburgh)
• Liverpool: Liverpool One achievement: Grosvenor and Urban Splash plus URC and CABE: but World Heritage tight rope with many schemes
• Sheffield: ‘a miserable disappointment no more’: Heart of the City officer-led, now successful partnership; project and public realm focus but inner city, apartment, equity concerns
• Manchester: ‘entrepreneurial, opportunistic, market oriented’: no LDF or strategy: Code now SPD: consultant briefs/negotiation: erratic quality control with CE interventions, but dynamic and forward thinking
• Birmingham: no longer in the vanguard: weakening control: towers: Big City Plan more boosterism/branding than design strategy? mould-breaking LDF?
Liverpool One Digbeth, Birmingham
Sheffield Nottingham
Local responses and distinctive regimes
• Leeds: lost its way with design strategy, apartment oversupply, tall buildings: policy and strategy ambiguities and weakening quality control: lacks direction
• Bristol: design disappointments/compromises with three major projects: transport weakness and LDF rejection: lacks resources for public initiative but avoids apartment blight
• Newcastle: city centre and Quayside successes but contested spaces: bold residential strategy aborted: deliverable and sustainable? Vibrancy vs inclusion?
• London: extremes and inequities: congestion charge, policy pragmatism and collaborative partnerships: iconic towers: masterplan/gentrification (Kings X) Global capital, privatism and limited trickle down (Isle of Dogs):
strategic urban design potential everywhere unrealised
Bristol Newcastle
London Leeds
A typology of design commitment
• Strong consistent control actively shaping development: WESTMINSTER, CAMDEN, EDINBURGH, NOTTINGHAM
• • Sophisticated controls vs entrepreneurial ethic
MANCHESTER, CITY OF LONDON, SOUTHWARK
• Strong focus on key city centre projects: laxer elsewhereLIVERPOOL, SHEFFIELD, NEWCASTLE?
• Strong design ethos waningBIRMINGHAM, LEEDS, GLASGOW, BRISTOL?
• Weak design frameworks: development priorityTHAMES GATEWAY, CARDIFF, BELFAST
• Generally place marketing eclipsing place makingMany different models of planning and design over time, weak plans
Liverpool
Sheffield
Whose city centre?
SheffieldBirmingham
Leeds
Urban design vs the iconic:the search for
the ‘Guggenheim
effect’
‘Starchitecture’, ‘Blobitecture’, ‘Bling’ and ‘Primarni’ design
Conclusions: the positives• Major city centres boosted: retail: repopulation: night time economy • Strong brownfield emphasis and significant average density increase
• Strong national urban design framework: good design ‘indivisible’
• Enhanced major parks/public spaces
• Significant improvement of extant • council housing stock
• Increase in design exemplars
• Energy efficiency/low carbon priorities firmly established in new construction
Conclusions: compromises
• Neoliberal governance emphasises development facilitation not quality control
• Competitiveness ethos widens inequalities/ environmental externalities
• City centres monopolise limited public resources : affluent consumer/tourist focus
• Housing supply shortages: social exclusion, gentrification, widened inequalities
• Development industry increasingly split niche vs volume builders on design quality
• LA’s development priorities driven by capital receipts/ economic priorities
• Over-development defeats deeper renaissance
Conclusions: place marketing not place making
• Much boosterism: lip service to ‘quality’ (icons, towers etc) but little consistent urban design
• Few LA leaders/councillors have planning/ design awareness or commitment
• LDFs / policy frameworks not a LA priority: perceived to subvert innovation/investment
• DC often lacks proactivity: close corporate working essential to quality place making
• But coordinated action and PPPs have
delivered key projects/public realm
Key priorities for the future
• LA’s need adequate tax base, infrastructure/enhancement funds
• Meeting housing demand and affordability: socially inclusive, energy efficient urban design a priority: NB CABE vs HCA on design standards
• Delivering on sustainability, renewable energy, traffic restraint and green infrastructure in all development
• Widening renaissance to inner and outer • suburbs: tackling disinvestment and • NIMBYism respectively
• Community involvement underdeveloped:• often hi-jacked by NIMBYist negativity
• Dearth of LPA design/sustainability skills: corporate design training required
BowZed
A closing window of opportunity?
• 1999-2009 was an opportunity largely missed: ‘initiativitus’
• Rising market drove renaissance but quality control not widely maintained
• Future public spending cuts will subvert much necessary enhancement
• LA impoverishment will intensify and design will be further sacrificed
• Improved resourcing/skills in LPAs very unlikely: HCA abolition?
• Housing supply will be sacrificed to NIMBYism: key design role?
• Widening inequalities expressed in differential design achievement: urban design reflects political economy
Cardiff: Renaissance City?
• 88% brownfield 2007: 100% to 2018
• 70-85% apartments: most of poor urban design
• Ratcheting up of heights and densities: 1336 storeys: 100320du/ha (450)
• 14% affordable: 6,775 families on waiting list: a sound LDP?
• Strong place marketing growth vision: ‘competitive city’ Vision
• Megaproject mentality: from Bay, Ultra, Sports Stadia/Village to SD2, Station & WIBP
• Focus groups not community empowerment and engagement
• Economic development insecurity/priority
• A lack of commitment to good design and planning for a sustainable city
• Special projects team promises delivery not planning intervention
• Cardiff needs to match European provincial cities quality of life/environment
• Struggles with weak infrastructure, tax base, and its cross-subsidy role for Wales
World Class Places (CLG 2009)a confusion of place marketing with place making?
Affirms some of the book’s conclusions
1, 3, 5 Strengthen central government leadership, policy, design
2 Encourage local civic leaders/government to prioritise quality of place:better assessment methods, ensure quality assessed in new CAAs, focus CG investment, train civic leaders, awards for quality places
4 Put public and community at the centre of place-shapingpublic involvement in visioning, engagement in public building design, community upkeep of public realm, engage in new home/neighbourhood design: what resources? tokenistic
6 Encourage higher standards of market-led development:clear LDF place ambitions: early joint working on apps; promote value of UD: proactive control
7 Strengthen quality of place skills, knowledge and capacity:strengthen advice, encourage skill sharing between LPAs, up-skill officers and councillors, but how?