COMPANY PROFILE 2016
PAGE 01
TABLE OF CONTENTS
COMPANY PROFILE 2016
1.0 PROFILE1.1 AN OVERVIEW
1.2 COMPANY ORGANISATIONAL CHART
1.3 STATE ORGANISATIONAL CHART
1.4 OUR KEY PEOPLE
2.0 CONSTRUCTION2.1 CURRENT CONSTRUCTION
2.2 PROJECT TIMELINE
2.3 COMPLETED PROJECTS
3.0 FINANCIAL CAPABILITY3.1 CORPORATE STRUCTURE
3.2 FINANCIAL SNAPSHOT
3.3 FINANCIAL
3.4 KAJIMA CORPORATION
4.0 THE KAJIMA CORPORATION
5.0 AWARDS & ACCREDITATIONS5.1 AWARDS
5.2 SAFETY FIRST
5.3 ACCREDITATIONS
6.0 CONTACT INFORMATION
1.0 PROFILE
1.0 PROFILE
COMPANY PROFILE 2016
PAGE 03
COMPANY PROFILE 2016 | 1.0 PROFILE
1.1 AN OVERVIEW
Icon Co is no stranger to remarkable growth. Since the company began in 1997, Icon Co has steadily made its mark on the Australian urban landscape, with over 120 projects delivered across the country and $2 Billion in work completed.
Already a respected and established firm in Victoria and NSW, Icon Co continues to expand, with operations now in Queensland. We’re more than 300 people strong and counting.
Founded by Directors Nicholas Brown and Ashley Murdoch, the extended management team has over 100 years combined experience in the construction and development industry.
We believe our business success in a competitive market is largely due to our consistency of service. Projects are regularly delivered ahead of time and the provision of quality products and cost-effective solutions mean clients can be assured of project completion on time, on budget and to the highest standards.
Now put that together with Kajima Corporation. Almost a national institution, Kajima was founded in feudal Japan in 1840 and has been instrumental in transforming Japan into the modern economic powerhouse it is today. Kajima Corporation enjoys a globally significant position in construction, operating in 50 countries around the world. They are recognised as being at the forefront of innovation and outstanding technical capabilities.
Aside from bolstering our financial stability, the strategic partnership with Kajima brings a new level of service and possibilities to Icon Co and our clients – from design and construction planning, through to project management and delivery.
Our corporate values of professionalism, reliability, integrity, innovation and forward thinking remain at the heart of our company and will continue to form everything we do.
Every so often, a strategic partnership
is formed which strengthens, enhances
and redefines a company. We believe our
future with iconic Japanese construction
firm Kajima Corporation exemplifies such
a partnership.
FORGING INTO THE FUTURE WITH KAJIMA CORPORATION
PAGE 04
COMPANY PROFILE 2016 | 1.0 PROFILE
1.2 COMPANY ORGANISATIONAL CHART
Nicholas Brown
Managing Director
Louis Raunik
Director
Michael Sisson
CFO
Nicholas Murdoch
Group CFO
Victoria New South Wales
Robert Menelle David Down
Dvora Rabinowicz Estimators
Julian Doyle
Director
Andrew Ford
CFO
Peter Gallart Design Manager
Mark Spry
Director
-
CFO
Queensland
Michael Gleecher Bass Adasi Ryan Soh
Estimators
Business Development
Manager
Sam Reid WHS&E Manager
Ron Waldron
CFO
Ben Bowden Operations Manager
Stuart Northcote Estimator
Trent Jensen BDM /Design Manager
Jason Holloway WHS&E Coordinator
Robin Riley Commercial Manager
Rhys Gilhome Design Manager
Vince D’Amico Business Development
Manager
Gary Mundy WHS&E Manager
Zafer Tillem General Manager
James Ellisdon
Group Commercial Manager
Jason Coombes Commercial Manager
Chris Bellemore Operations Manager
PAGE 05
COMPANY PROFILE 2016 | 1.0 PROFILE
1.3 VIC ORGANISATIONAL CHART
•••••••
•••
•••••••
•••
•••
••
PAGE 06
COMPANY PROFILE 2016 | 1.0 PROFILE
1.3 NSW ORGANISATIONAL CHART
Peter Gallart
Design Manager
Jason Coombes
Commercial Manager
• Design Management • Company Procedures • Site Teams • Work Health & Safety • Environmental Management • Staff Training • HR
• Preconstruction Services • Tender Programming • Construction Management
Planning • Tender Submissions
• Business Reporting • Insurances • Bank Guarantees • Payroll • Head Office Management • Office Administration • IT
Julian Doyle
Construction Director
• Cost Planning • Tendering
Chris Bellemore
Operations Manager
Andrew Ford
CFO
Business Development
• Head Contract Conditions • Subcontract Letting Process • Payment Schedules • Risk Analysis • Australian Standards • Security of Payments
• Business Development • Client Liaison • Tender Submissions • Marketing • Accreditation
Finance Manager Pre-Construction Manager Estimators
Michael Gleecher
Bass Adasi
Ryan Soh
Sam Reid
WHS&E Manager
Nicholas Brown
Managing Director
PAGE 07
COMPANY PROFILE 2016 | 1.0 PROFILE
1.3 QLD ORGANISATIONAL CHART
Nicholas Brown Managing Director
Nicholas Murdoch Group CFO
Ben Bowden Operations Manager
Stuart Northcote Estimator
Mark Spry Construction Director
James Ellisdon Commercial Manager
• Design Management • Business Development • Client Liaison • Tender Submissions • Marketing • Accreditation • Company Procedures
• Preconstruction Services • Tender Programming • Construction Management
Planning
• Business Reporting • Insurances • Bank Guarantees • Payroll • Head Office Management • Office Administration • IT
Ron Waldron CFO
• Preconstruction Services • Tender Programming • Construction
Management Planning • New Business • Client Liaison
Trent Jensen Business Development
Jason Holloway WHS & E
• Work Health Safety • Environmental
Management • Staff Training • HR
Robin Riley Commercial Manager
• Head Contract Conditions • Subcontract Letting
Process • Payment Schedules • Risk Analysis • Australian Standards • Security of Payments
PAGE 08
With over 100 years of combined experience in the construction industry,
the senior management team at Icon Co is well placed to lead our national growth.
Our highly nimble and client focused management style means our Executive
Team are approachable and readily accessible at every stage of the project.
1.4 OUR KEY PEOPLE
Nicholas is a co-founder of Icon Co, with 25 years’ experience in the building and construction industries, including a tenure at Case Meallin & Associates Project Managers. Nicholas has vast experience in residential, commercial and industrial construction project management. He leads Icon Co’s construction arm.
COMPANY PROFILE 2016 | 1.0 PROFILE
Louis joined Icon Co in 2007 and has over 30 years’ experience in the construction industry. Prior to joining Icon Co, Louis was Construction Director at Mirvac Constructions and Vice President of the Master Builders Association of Victoria. Drawing expertise from the below builds, Louis is well placed to oversee all Icon Co construction activities in Victoria. Past contracts include:
- Crown Casino and Entertainment complex ($1.2BN)
- The Southgate mixed use development ($200M)
- The first five towers and infrastructure (including wharf and promenade) at Yarra’s Edge Docklands ($500M)
- Apartments and infrastructure at Beacon Cove ($200M)
- The redevelopment and expansion of Waverly Gardens shopping centre ($150M)
LOUIS RAUNIKConstruction Director – VIC & QLD
Julian has an extensive knowledge of domestic and international construction sectors. Along with leading the NSW construction team, Julian is responsible for business integration. He’s past experience is drawn from Lend Lease and he established Sunland Constructions in Victoria in 2003. Julian’s background has encompassed contracts including:
- The Renzo Piano Tower ($240M)
- D1 Tower in Dubai ($500M)
- Versace Hotel Dubai ($350M)
- Circle on Cavil – 2 towers of 70 and 50 storeys ($330M)
- The delivery of Stage 2 of New Quay, Docklands.
JULIAN DOYLEConstruction Director – NSW
NICHOLAS BROWNManaging Director
- QLD Schools PPP – 10 schools ($350M)
- 180 Brisbane Office 30 level tower ($210M)
- The Single Leap PPP for the Department of Defence ($105M)
- Translation Research Institute & Pharmaceutical Manufacturing facility ($240M)
- Gold Coast Private Hospital – 280 Bed Private Hospital ($148M)
- UQ Advanced Engineering Centre Research and Learning Building ($110M)
- The Darwin International Airport Expansion Project ($50M)
Mark has over 25 years’ experience in the large scale construction industry drawn Fletcher Construction, John Holland, and from 2010 – 2014, Mark was State Manager (QLD/NT) for Watpac Construction with an annual turnover of approximately $400M. He was responsible for leading, building and managing the organisation and delivering a range of projects for both Government Institutions and Private Clients. Past contracts include:
MARK SPRYConstruction Director – QLD
PAGE 09
1.4 OUR KEY PEOPLE
COMPANY PROFILE 2016 | 1.0 PROFILE
Nicholas held senior financial positions in a range of construction and development groups over the last 15 years before re-joining Icon Co in 2012. Nicholas has a complete breadth of experience from corporate structuring, project financing and reporting through to audit and financial reporting.
Zafer has 14 years’ experience in the Australian commercial and residential construction sectors. He is skilled in project estimation, coordination and construction logistics. Zafer coordinates Icon Co’s considerable portfolio of design and construction contracts from concept to delivery.
NICHOLAS MURDOCHGroup CFO
ZAFER TILLEMGeneral Manager – VIC
2.0 CONSTRUCTION
COMPANY PROFILE 20162.0 CONSTRUCTION
2.1 CURRENT CONSTRUCTION
COMPANY PROFILE 2016
PAGE 12
2.1 CURRENT CONSTRUCTION
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
STATE PROJECT ADDRESS TYPE VALUE
VIC Emmy Monash Aged Care 7 & 9 Hawthorn Road, Melbourne Aged Care $43 Million
560 Flinders 560 Flinders Street, Melbourne Residential $30 Million
Air Services Melbourne & Brisbane Airports Airport $20 Million
Only Flemington 1 Ascot Vale Road, Flemington Residential $93 Million
The Fawkner 499 St Kilda Road, Melbourne Residential $83 Million
Shadow Play 105 Clarendon Street, Southbank Residential $126 Million
Cantala 1 Wilks Street, Caulfield North Residential $26 Million
NSW B1 Square 27-31 Belmore Road, Burwood Residential/Retail $102 Million
88 Archer Street 88 Archer Street, Chatswood Serviced Apartments $54 Million
Capitol 253-255 Oxford Street, Bondi Junction Residential/Retail $38 Million
Garden House 822 Elizabeth Street, Waterloo Residential $49 Million
Bosco 186 Great North Road, Five Dock Residential $62 Million
The Uptown 1-31 Victoria Street, Roseville Residential $79 Million
Paragon 1-5 Link Road, Zetland Residential $75 Million
Opal Tower Cnr Australia Avenue and Herb Elliott Avenue,Sydney Olympic Park
Residential $155 Million
PAGE 13
2.1 CURRENT CONSTRUCTION
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
QLD Newstead Central (Stage 1) 1019 Ann Street, Newstead Residential $37 Million
Atria North (Stage 6) 310 Macarthur Avenue, Hamilton Residential $31 Million
Air Services Melbourne & Brisbane Airports Airport $20 Million
Haven (Gasworks 4) 63 Skyring Terrace, Newstead Residential $75 Million
Oxley & Stirling 9 Christie Street, South Brisbane Residential $75 Million
Buranda TOD (Stage 1) Cnr O’Keefe & Gillingham Streets, Buranda Residential $175 million
PAGE 14
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
Project: 97 Bed Aged Care Facility | Value: $43 Million | Client: Emmy Monash Architect: Bates Smart | Completion Date: April 2016 | Construction Time: 18 Months
Construction of the new facility includes laundry, kitchen and serveries, as well as a new link across the title boundary to join into the south side of the exiting Emmy Monash facility.
Emmy Monash Aged Care is an award winning not-for-profit aged care provider that delivers residential aged care and independent living to the Jewish community of Melbourne.
The acquired sites at 7 and 9 Hawthorn Road have adjoining boundaries to these existing facilities, and construction will combine these two sites into a single lot, built into a 4 level, 97-bed aged care facility over a basement, which includes carparking.
7 & 9 HAWTHORN ROAD, MELBOURNE
EMMY MONASH AGED CARE
PAGE 15
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
27-31 BELMORE STREET, BURWOOD
B1 SQUARE
Project: 210 Residential Apartments plus Retail and Commercial | Value: $102 Million | Client: B1 Goldfield Development Pty Ltd Architect: Marchese Partners | Completion Date: April 2016 | Construction Time: 29 Months
The project consists of 210 apartments across 3 twenty storey towers, sitting on top of a 3 level, 9,000m2 retail/commercial complex, and 6 level subterranean public car park.
The challenge for the project will be to excavate around, and build the structure over a major live Sydney Water sewer line located immediately below the lowest basement slab. In addition, the integration of a number of highly engineered temporary structures is required to enable continuous public vehicular access, (5,500 cars per day), through the site and into Burwood Plaza Shopping Centre on the adjoining block.
PAGE 16
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
Project: 149 Residential Apartments plus Retail | Value: $37 Million | Client: Metro Property Development Architect: Group GSA Pty Ltd | Completion Date: June 2016 | Construction Time: 16 Months
Design and construction of Newstead Central (Stage 1) consists of 149 luxury one and two bedroom apartments across 16 levels located in Ann St, Newstead.
The building is to be built over an existing basement structure, adjacent to an existing commercial hotel precinct.
The development will include eleven storeys of occupied apartment levels, plus a rooftop garden, three storeys of screened podium car park, and a ground level retail and entry lobbies.
1019 ANN STREET, NEWSTEAD
NEWSTEAD CENTRAL (STAGE 1)
PAGE 17
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
560 Flinders Street is a 29 level building consisting of a single level basement, 132 apartments and 2 retail tenancies. The site is confined to 290m2 within the Melbourne CBD which will require detailed and ongoing management of site logistics. The façade comprises a series of angled picture windows which alternate in direction per floor creating a kaleidoscopic reflection of the surrounding city.
Project: 132 Residential Apartments plus Retail | Value: $30 Million | Client: Flinders Lodge Pty Ltd Architect: Elenberg Fraser | Completion Date: June 2016 | Construction Time: 19 Months
560 FLINDERS STREET, MELBOURNE
560 FLINDERS
PAGE 18
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
Project: 212 Serviced Apartments plus Retail | Value: $54 Million | Client: Visionary Investment Group Pty Ltd Architect: Marchese Partners | Completion Date: July 2016 | Construction Time: 22 Months
The project comprises of 212 serviced apartments with ground floor/basement retail. The 12 storey building will be embellished with a significant art installation on its northern facade and forms the final piece of the multi-million dollar Civic Centre precinct developed by Willoughby Council.
88 ARCHER STREET, CHATSWOOD
88 ARCHER ST
PAGE 19
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
Project: 100 Residential Apartments plus Retail | Value: $38 Million | Client: Legacy Property Architect: Mijollo International | Completion Date: July 2016 | Construction Time: 24 Months
Capitol Bondi Junction consists of 100 apartments across 18 levels, with 2 levels of retail and 3 levels of below ground basement car park in addition.
The slender building structure incorporates a combination of precast concrete blade walls with full height window and balcony door glazed panels. The facade of the building is made up of adjustable floor to floor vertical louver panels with shading and privacy and gold coloured “apollic” bands to the slab edges.
253-255 OXFORD STREET, BONDI JUNCTION
CAPITOL
The roof top at level 21 is the building’s common B.B.Q area comprising of bench seating, paving and landscaping.
The project also incorporates road widening to Oxford Street and Pine Lane, including main services relocation and installation works.
PAGE 20
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
822 ELIZABETH STREET, WATERLOO
GARDEN HOUSE
Project: 161 Residential Apartments | Value: $49 Million | Client: 822 Developments Pty Ltd Architect: JPR Architects | Completion Date: September 2016 | Construction Time: 22 Months
Garden House is located at the corner of McEvoy and Elizabeth St Waterloo and comprises 161 apartments, in 4 individual 6 storey buildings over a common basement with 100m2 of retail space.
Logistical challenges for construction of the project include the constraints of working on two busy thoroughfares close to the CBD.
Hi-RES IMAGE TO BE SUPPLIED
PAGE 21
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
Project: 152 Residential Apartments | Value: $62 Million | Client: Australian Executor Trustees Architect: Bates Smart | Completion Date: June 2017 | Construction Time: 24 Months
The development will comprise a range of residential options, including: 1, 2 and 3 bedroom apartments plus 2 storey apartments. A total of 152 dwellings and two levels of basement car parking contained within four buildings.
The internal finishes consist of timber floors, reconstituted stone benches, stainless steel appliances, open shelving, recessed LED lighting and built-in storage.
The Project is set to deliver a unique residential development that reflects the neighbourhood and its inhabitants.
186 GREAT NORTH ROAD, FIVE DOCK
BOSCO APARTMENTS
PAGE 22
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
Project: 70 Apartments & 11 Townhouses | Value: $31 Million | Client: Australand Northshore Pty Ltd (Frasers Property Group) Architect: Arkhefield | Completion Date: January 2017 | Construction Time: 16 Months
Situated just 6kms from Brisbane’s CBD, the Atria Apartments at Hamilton Reach have been thoughtfully designed to echo our unique Queensland lifestyle. Stage 6 of this project consists of the construction of Atria Buildings 4, 5 & 6.
Buildings 4 & 5 consist of 11 two storey, luxury town houses with a terrace pool and Building 6 is a five storey tower consisting of 70 high end apartments with a single storey basement.
MACARTHUR AVENUE, HAMILTON REACH
ATRIA NORTH (STAGE 6)
PAGE 23
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
Project: 220 Residential Apartments | Value: $79 Million | Client: Chiwayland & Longton Architect: MD + A Architects | Completion Date: August 2017 | Construction Time: 14 Months
The project comprises 220 apartments, ranging from 2 to 3 bedroom across 6 buildings and will be delivered in 3 stages.
The intention of The Uptown design has been to produce an elegant response that celebrates and enhances the spirit of Roseville whilst delivering new landmark residences for the future.
1-31 VICTORIA STREET, ROSEVILLE NSW
THE UPTOWN
PAGE 24
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
Project: 229 Residential Apartments plus Retail Centre | Value: $75 Million | Client: Gasworks Parkside Pty Ltd (via Marquee Projects) Architect: Cottee Parker | Completion Date: April 2017 | Construction Time: 23 Months
Design and construction of the $75 million prestigious Haven project within the Gasworks precinct, Newstead, Queensland.
The 25 level building consists of 229 apartments over 2 basements. Beneath the apartment tower is a highly finished retail centre to complement the surrounding Gasworks and James Street Markets area.
The apartment mix consists of 72 one bed, 142 two bed and 15 three bed apartments/skyhomes. Other amenities within the development include roof pools and gardens and designer foyers.
63 SKYRING TERRACE, NEWSTEAD
HAVEN (GASWORKS 4)
PAGE 25
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
Project: 192 Residential Apartments | Value: $75 Million | Client: HiFu Investments Pty Ltd Architect: Turner | Completion Date: August 2017 | Construction Time: 19 Months
The development will comprise a range of residential options, including 1, 2 and 3 bedrooms apartments with several apartments being 2 storey. A total of 192 dwellings, basement car parking, 5,000 m2 of retail space, childcare, gym, restaurants and cafes are contained within 3 buildings around a landscaped public plaza.
The Project is to be built over an existing Sydney Water culvert, partially rebuilt during the Early Works phase.
1-5 LINK ROAD, ZETLAND NSW
PARAGON
PAGE 26
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
Project: 409 Residential Apartments | Value: $93 Million | Client: Caydon Architect: DKO | Completion Date: May 2017 | Construction Time: 21 Months
Located 4km from Melbourne’s CBD, Only Flemington will set new benchmarks in inner city living. It will be a distinctive 22-storey landmark, comprising a tower with three unique facades set on the podium. The building features visionary shared spaces for residents and a sophisticated design that celebrates its high profile location opposite the world famous Flemington Racecourse.
1 ASCOT VALE ROAD, FLEMINGTON
ONLY FLEMINGTON
PAGE 27
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
Project: 219 Residential Apartments | Value: $72 Million | Client: Aria Property Group Architect: Ellenberg Fraser | Completion Date: August 2017 | Construction Time: 19 Months
Design and construct of a residential tower consisting of 219 apartments over 14 levels, plus 4 levels of basement car parking. There is also a level 15 roof top pool, BBQ, media room and gymnasium area. The project features curved facade elements with an hourglass shape to the building in the north or south elevations.
The site is located in South Brisbane only 3km from Brisbane CBD.
9 CHRISTIE STREET, SOUTH BRISBANE
OXLEY & STIRLING
PAGE 28
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
Project: 253 Residential Apartments | Value: $84 Million | Client: Fawkner Centre Residences Pty Ltd Architect: KPDO | Completion Date: August 2017 | Construction Time: 17 Months
The Fawkner introduces a selection of large residential apartments over 19 levels. The brilliant exterior façade responds to its parkland surroundings, with new gardens on the ground floor and podium, creating high quality spaces for residents and visitors.
Facilities include: ground floor Seating Lounge and Executive Seating Area, Private Meeting Room, Theatre, temperature-controlled Cellar, 20 metre Lap Pool, Gymnasium, Sauna and Steam Rooms, Children’s Care Centre and Sundeck.
499 ST KILDA ROAD, MELBOURNE
THE FAWKNER
PAGE 29
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
Project: 1,610 Student Accommodation Apartments | Value: $175 Million | Client: Wee Hur (Buranda 1) Pty Ltd Architect: Woods Bagot | Completion Date: December 2017 | Construction Time: 26 Months
Stage 1 of the development consists of two mixed use towers, comprising student accommodation and retail outlets, located between the railway line (to the North) and bus station (to the west).
The development includes Building 2 (25 storey tower) and Building 3 (13 storey tower) including approximately 1610 rooms with their associated facilities and landscaped areas. A 4 level basement to accommodate 400 cars, a mixture of retail tenancies at ground and lower ground levels and recreation and indoor/outdoor facilities at podium levels.
The upgrade of infrastructure services and connections with neighbouring authorities (including QR, DTMR an d Council) internally and externally to the site also form part of works under the contract.
Experienced student accommodation provider UniLodge will be the operator of the facility once handed over.
CNR O’KEEFE & GILLINGHAM STREETS, BURANDA
BURANDA TOD (STAGE 1)
PAGE 30
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
Project: 494 Residential Apartments plus Retail | Value: $126 Million | Client: BPM Corp Architect: Elenberg Fraser | Completion Date: May 2018 | Construction Time: 30 Months
The majestic Shadow Play Residential tower project is comprised of a 46 Level Apartment Building delivering 494 apartments, with associated communal facilities, Ground Floor feature Lobby and Retail spaces, Building and Apartment Services, Utilities, Car parking and Plant.
105 CLARENDON STREET, SOUTHBANK
SHADOW PLAY
PAGE 31
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
Project: 369 Residential Apartments plus Retail| Value: $155 Million | Client: Australia Avenue Developments Pty Ltd Architect: Bates Smart| Completion Date: July 2018 | Construction Time: 33 Months
This 34 storey development will comprise a total of 369 apartments, including 1, 2, 3 and 4 bedroom options as well as 135 m2 retail/commercial space, childcare centre and a community centre.
98 BENNELONG PARKWAY, SYDNEY OLYMPIC PARK NSW
OPAL TOWER
2.2 PROJECT TIMELINE
COMPANY PROFILE 2016
PAGE 33
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
2.2 PROJECT TIMELINE
2016 2017
PROJECT Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
Emmy Monash, Melbourne
$43M
560 Flinders, Melbourne
$30M
Cantala, Caulfield South
$26 M
Air Services, Melbourne & Brisbane Airports
$20M
Only Flemington, Flemington
$93M
The Fawkner, Melbourne
$84M
Shadow Play, Southbank
$126M
CONSTRUCTION VICTORIA
PAGE 34
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
2.2 PROJECT TIMELINE
2016 2017
PROJECT Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
B1 Square, Burwood
$102M
88 Archer Street, Chatswood
$54M
Capitol, Bondi Junction
$38M
Garden House, Waterloo
$49M
Bosco,Five Dock
$62M
The Uptown,Roseville
$79M
Paragon,Zetland
$75M
Opal Tower,Sydney Olympic Park
$155M
CONSTRUCTION NEW SOUTH WALES
PAGE 35
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
2.2 PROJECT TIMELINE
2016 2017
PROJECT Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
Newstead Central (Sg. 1), Newstead
$37M
Atria North (Stage 6), Hamilton
$31M
Haven (Gasworks 4), Newstead
$75M
Air Services,Melbourne & Brisbane Airports
$20M
Oxley & StirlingSouth Brisbane
$75M
Buranda TOD (Stage 1)Buranda
$175M
CONSTRUCTION QUEENSLAND
2.3 COMPLETED CONSTRUCTION
COMPANY PROFILE 2016
PAGE 37
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
Project: 97 Residential Apartments | Value: $37 Million | Client: Michael Yates & Co Architect: Bird De La Coeur | Completion Date: November 2015 | Construction Time: 24 Months
The project comprised 26 storeys, encompassing 97 apartments over 19 levels and six levels of car parking. Construction took place on a small site with a detailed logistics plan requiring careful planning and rigorous project management. Construction challenges included the underpinning of adjoining buildings to maintain structural integrity and meet building and site safety requirements.
18 YARRA STREET, SOUTH YARRA
YARRA HOUSE
PAGE 38
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
21 ROBERTS STREET, COLLINGWOOD
YORKSHIRE BREWERY
The redevelopment of the significant 1880’s built “Yorkshire Brewery” in Abbottsford consists of 365 private apartments.
Construction encompassed 5 buildings over a double level basement, including the restoration/modification of an existing heritage listed brew tower, a 16 level apartment tower, a 13 level apartment tower and a series of townhouses. The brew tower itself was once the tallest building in Melbourne.
Project: 365 Residential Apartments | Value: $82 Million | Client: SMA Projects Australia Architect: Hayball | Completion Date: October 2015 | Construction Time: 17 Months
PAGE 39
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
CNR KENSINGTON & BROADWAY, CHIPPENDALE
THE OLD CLARE HOTEL
Project: 62 Hotel Rooms and 3 restaurants | Value: $23 Million | Client: Sonrac Developments Architect: Tonkin Zulaikha Greer | Completion Date: August 2015 | Construction Time: 18 months
The project flawlessly incorporated major alterations and additions to the existing heritage listed Clare Hotel, located on Kensington Street, Chippendale.
The works included demolition and strip out of existing buildings, excavation works, an upgrade of the existing structure, new services infrastructure, additions to existing buildings, and new high specification fit out works to suit 62 hotel-rooms, offices, back of house areas, common areas, lobbies, and three “cold-shell” restaurants.
PAGE 40
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
26-56 ROTHSCHILD AVENUE, ROSEBERY
OTTO STAGES 1 & 2
Project: 295 Residential Apartments (Stage 1 & 2) plus Retail | Value: $88 Million | Client: Capital Corporation Architect: Turner Studios | Completion Date: July 2015 (Stage 2) | Construction Time: 22 Months
The Project is divided into three large portions. The northern portion provides a new 4,500sqm public park. The middle and southern portions, divided by a new public road, comprise residential buildings ranging in height from two to eight storeys defining the street edges that form central communal courtyards upon car park podiums.
Construction stage one includes 155 residential apartments, single-level and double storey walk up apartments, and 327sqm of retail space on the ground level. The building comprises of CSM basement walling and precast external facades.
Construction of Stage 2 includes 140 residential apartments over two building structures.
The project incorporates several leading edge engineering systems and will deliver an architectural product within a commercially feasible budget.
PAGE 41
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
Oxley comprises 234 apartments across 4 buildings facing 2 street fronts. The site is situated on approximately 4000sqm of land in the heart of Collingwood.
The development has a 2 level split basement, spacious common landscaped areas to ground floor and a sun-deck to level 4.
Project: 345 Residential Apartments | Value: $55 Million | Client: Urban Inc. Architect: Elenberg Fraser | Completion Date: June 2015 | Construction Time: 19 Months
46 - 74 STANLEY STREET, COLLINGWOOD
OXLEY
PAGE 42
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
The Grand 8 project comprises 54 apartments across 11 storeys on a compact 290sqm site.
With an alpolic feature and a distinctive northern façade, the structure incorporates an intricate, thermally efficient timber framework.
The building was constructed on a small site in a busy inner-city area with restricted vehicle access. Quick construction cycle times required an efficient materials procurement processes.
Project: 54 Residential Apartments | Value: $13 Million | Client: Mider Architect: Artisan Architects | Completion Date: February 2015 | Construction Time: 12 Months
263 FRANKLIN STREET, MELBOURNE
GRAND 8
PAGE 43
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
Setting a new standard in quality student accommodation, Urbanest Wattle Street comprises 5 buildings surrounding 2 central courtyards covering approximately 15,000sqm of gross built area.
The 5 towers range in height from 3 storeys to 8 storeys in response to the surrounding built form.
The buildings contain 665 beds in 430 rooms with ground floor courtyards, administration office and communal recreational spaces all tailored to meet the needs of students and based on previous experience in urbanest developments.
In keeping with the inner city location and the student market, the development has no car parking spaces but provides secure parking for 86 bicycles and 30 motorcycles.
Project: 430 Student Rooms | Value: $37 Million | Client: Urbanest Wattle Street Pty Ltd Architect: Group Gsa Pty Ltd | Completion Date: December 2014 | Construction Time: 12 Months
445-483 WATTLE STREET, ULTIMO
URBANEST STUDENT ACCOMMODATION
PAGE 44
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
Icon Co’s Tooronga Car Park construction coincided with ongoing developments in the broader Tooronga Village area.
At 7 storeys, the structure features 1,250 car spaces including two car links and one pedestrian link between a major adjoining supermarket and another adjacent car parking facility.
The project demonstrated Icon Co’s versatility and flexibility in the commercial construction space.
Project: 1,250 Car Parking Spaces | Value: $21 Million | Client: EPC Pacific Architect: The Buchan Group | Completion Date: November 2014 | Construction Time: 10 Months
800 TOORAK ROAD, GLEN IRIS
TOORONGA CAR PARK
PAGE 45
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
Botanic is a residential development which consists of 79 Apartments spanning 6 levels above a basement carpark. The Project is clad with a mixture of precast, full height glazing and frameless balustrades.
The majority of the existing trees to the site were retained and feature prominently in the final landscape design of the Project.
The apartments deliver finishes with timber flooring, marble benchtops, and round mosaic feature tiles to the bathrooms.
14-18 FINLAYSON STREET, LANE COVE
BOTANIC
Project: 79 Residential Apartments | Interiors: SJB Interiors | Value: $24 Million | Client: Lane Cove Apartments Pty Ltd Architect: Mijollo International | Completion Date: September 2014 | Construction Time: 14 Months
PAGE 46
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
Project: 411 Residential Apartments | Interiors: Rothe Lowman | Value: $114 Million | Client: Little Projects Architect: Rothe Lowman | Completion Date: June 2014 | Construction Time: 24 Months
Comprising six buildings titled: Silo, Rye, Malt, Grain, Seeds and Stables, this project encompasses 411 apartments.
Its contemporary design complements the classic art deco architecture of the original factory facades surrounding it. This unique community of six distinctive buildings combines apartment living, townhouses, retail and commercial spaces.
Construction included conservation works to the existing, heritage-listed facade, installation of an articulated facade and excavation of a basement extending over 1.2 hectares.
170 EDWARDS STREET, BRUNSWICK EAST
TIP TOP
PAGE 47
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
Project: 182 Residential Apartments plus Retail | Interiors: Hecker Guthrie | Value: $51 Million | Client: Fridcorp Architect: Ellenberg Fraser | Completion Date: May 2014 | Construction Time: 21 Months
The Avenue rises 16 storeys, incorporating 182 apartments, including two basement levels and a retail space at ground level.
Its signature feature is a striking curved concrete structure and glass curtain wall facade extending across the full extent of the building. Fully openable casement windows were incorporated into the facade system, allowing apartment balconies to be discretely concealed.
681-709 CHAPEL STREET, SOUTH YARRA
AVENUE
PAGE 48
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
Project: 500 Residential & Serviced Apartments | Interiors: SJB Interiors | Value: $119 Million | Client: Salta Properties Architect: SJB Architects | Completion Date: March 2014 | Construction Time: 20 Months
The Green Square project includes a partially suspended amenities building with a pool, gym and BBQ area, designed as an outdoor recreational hub. Its large courtyard or ‘green square’ is positioned at the centre of four surrounding buildings. This includes a unique lightweight structure housing 6 levels of apartments on the roof of an existing building.
Features include large louvred picture frame windows installed at the elevation fronting Victoria Street and apartment balustrades enhanced with Digiglass images of local flora. The project incorporates approximately 500 apartments, including 90 Serviced apartments.
609 VICTORIA STREET, ABBOTSFORD
GREEN SQUARE
PAGE 49
1-8 NIELD AVENUE, GREENWICH
AURALIA GREENWICH
Project: 131 Residential Apartments | Value: $37 Million | Client: Waterbrook At Greenwich Pty Ltd Architect: Marchese & Partners | Completion Date: March 2014
These six residential apartment blocks include a two-level basement car park that extends across all six blocks.
Designed by architects Marchese & Partners, 131 units were built on this extremely steep 7570m2 site, posing a challenge for materials handling and excavation.
Added to this was the fact that the site was landlocked, with access restricted to a single road.
Well-articulated soft landscaping design was applied to 50% of the site, including fully-grown trees, which complement the established natural habitat of the area.
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
PAGE 50
COMPANY PROFILE 2016 | 2.0 CONSTRUCTION
Project: 303 Residential Apartments plus Retail | Value: $90 Million | Client: East Quarter Hurstville Architect: Kann Finch Group Architects | Completion Date: December 2013 | Construction Time: 19 Months
These apartments and retail areas include three buildings, two at 12 levels and one at 16 levels over a four-level basement.
303 apartments and 10 retail spaces in total, the project includes 3500m2 central open air plaza and a 16 level perforated metal screen on Building E.
The two-level penthouse apartments cantilever dramatically three metres past the building’s edge.
A challenge during construction was the four-level basement, built eight metres below the water table.
93 FOREST ROAD, HURSTVILLE
EAST QUARTER
3.0 FINANCIAL CAPABILITY
3.0 FINANCIALCAPABILITY
COMPANY PROFILE 2016
PAGE 52
FINANCIAL SNAPSHOT
COMPANY PROFILE 2016 | 3.0 FINACIAL CAPABILITY
3.1 CORPORATE STRUCTURE
KAJIMA CORPORATION$6B Market Cap
ICON CO VIC
30%70%
100%
NAB$100M Bank Guarantee Facility
SMBC $100M Line of Credit KAJIMA CONSTRUCTION AUSTRALIA
ICON CO VIC* ICON CO NSW* ICON CO QLD*
100%
ICON CO*
OLD CO
KAJIMA AUSTRALIA
CLIENT FINANCIER
Building Contract5% Bank Guarantee
*Commenced trading 1 April 2015
PAGE 53
FINANCIAL SNAPSHOT
We are a financially robust company, further enhanced by the investment partnership with
Kajima Corporation. Clients and financial institutions alike can bank on our profitability and
financial stability. Our estimated turnover for 2015 is E$550 million with over $700 million
in contracts currently under construction.
21 >120>$1.46B CONTRACTS UNDER
CONSTRUCTIONAWARDED
CONTRACTSCONTRACTS COMPLETED
E.$910MFY16 TURNOVER
NILDEBT AT FEB16
1.5xQUICK RATIO
AT NOV15
COMPANY PROFILE 2016 | 3.0 FINACIAL CAPABILITY
3.2 FINANCIAL SNAPSHOT
PAGE 54
COMPANY PROFILE 2016 | 3.0 FINACIAL CAPABILITY
Icon Co provides bank guarantees to support construction contracts with their clients. The current arrangements with the National Australia Bank include a Bank Guarantee facility of $100 million.
Additionally, as part of Icon Co’s relationship with Kajima Corporation, it has a bank guarantee facility through Sumitomo Mitsui Banking Corporation totalling $100m.
BANK GUARANTEE FACILITY
The following information can be supplied upon request subject to a signed Confidentiality Agreement:
• Management Accounts for the 2015 year March - onward
• Cash Flow Forecasts for the 2015 and 2016 calendar year
• Balance sheet - Kajima Corporation - Kajima Australia
FINANCIAL ACCOUNTS
BANK GUARANTEE FACILITY BACKED BY
$5.3B GLOBAL CONSTRUCTION GIANT KAJIMA
FULL UNCONDITIONAL BANK GUARANTEE
FOR PROJECT VALUE
3.3 FINANCIAL
FY16 TURNOVER
E.$1.54B
NILDEBT AT FEB16
PAGE 55
COMPANY PROFILE 2016 | 3.0 FINACIAL CAPABILITY
FINANCIAL OVERVIEW
3.4 KAJIMA CORPORATION
SUMMARY RESULTS (A$M) (2) FY10 FY11 FY12 FY13 FY14 (3)
Revenue 14,194 15,608 15,900 16,286 18,133
Profit before Tax 277 41 251 222 162
Total Assets 17,612 18,054 18,052 19,159 19,692
Total Liabilities 14,900 15,305 14,646 15,261 15,014
Net equity 2,712 2,748 3,406 3,899 4,678
NOTES: (1) As at 14 August 2015.
Exchange rate A$/JPY: 91.77
(2) Exchange rate A$/JPY: 93.40
(3) Year end 31 March 2015
SOURCE: Kajima Corporation Website
- Annual Results presentation
(March 2015)
Kajima Corporation boasts annual turnovers of around AUS$17 billion and a market capitalisation of A$8.022 billion(1).
Kajima Corporation is involved in the construction of commercial properties, power plants, residential complexes and hotels, as well as retail, education/research/cultural centres and medical and welfare facilities.
The company is also extremely competitive in railways, dams, tunnels, bridges, roads and other civil engineering projects.
Bolstering Icon Co’s growth into the Tier 1 market is the Japanese construction giant Kajima Corporation. Founded in 1840 and headquartered in Tokyo, Kajima Corporation is one of Japan’s largest construction companies. The company and its subsidiaries are engaged in building, construction, architectural design, civil engineering and real estate development activities worldwide.
Kajima Corporation have been an integral part of Japan’s transition from a feudal society into a modern economic powerhouse. Today, they enjoy a globally significant position in construction, with a presence in 23 countries around the world. The company is at the forefront of the latest technologies, best practices and new developments in the industry.
PAGE 56
COMPANY PROFILE 2016 | 3.0 FINACIAL CAPABILITY
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
Mar
-12
Jun-
12
Sep-
12
Dec
-12
Mar
-13
Jun-
13
Sep-
13
Dec
-13
Mar
-14
Jun-
14
Sep-
14
Dec
-14
A$
FY13A REVENUE BREAKDOWN
SHARE PRICE IN A$ (1)
JAPAN 81%ASIA 9%NORTH AMERICA 8%EUROPE 1%OTHER 1%
KAJIMA CORP. (PARENT COMPANY)BUILDING CONSTRUCTION 46%REAL ESTATE AND OTHER 3%DOMESTIC SUBSIDARIES & AFFILIATES 20%OVERSEAS SUBSIDARIES & AFFILIATES 14%CIVIL ENGINEERING 17%
JAPAN 81%ASIA 9%NORTH AMERICA 8%EUROPE 1%OTHER 1%
KAJIMA CORP. (PARENT COMPANY)BUILDING CONSTRUCTION 46%REAL ESTATE AND OTHER 3%DOMESTIC SUBSIDARIES & AFFILIATES 20%OVERSEAS SUBSIDARIES & AFFILIATES 14%CIVIL ENGINEERING 17%
JAPAN 81%ASIA 9%NORTH AMERICA 8%EUROPE 1%OTHER 1%
KAJIMA CORP. (PARENT COMPANY)BUILDING CONSTRUCTION 46%REAL ESTATE AND OTHER 3%DOMESTIC SUBSIDARIES & AFFILIATES 20%OVERSEAS SUBSIDARIES & AFFILIATES 14%CIVIL ENGINEERING 17%
CAPITALISATION (AS AT 9 FEB.)
Share price $5.79/¥541.00
Shares Outstanding 1,038.3m
Market Capitalisation $6,014.0m
Net Debt (cash) (2) $2,256.1m
EV Adjusted $8,426.5m
NOTES: (1) Exchange rate AUD/JPY: 93.40
(2) Including minority interests
JAPAN 81%ASIA 9%NORTH AMERICA 8%EUROPE 1%OTHER 1%
KAJIMA CORP. (PARENT COMPANY)BUILDING CONSTRUCTION 46%REAL ESTATE AND OTHER 3%DOMESTIC SUBSIDARIES & AFFILIATES 20%OVERSEAS SUBSIDARIES & AFFILIATES 14%CIVIL ENGINEERING 17%
3.4 KAJIMA CORPORATION
PAGE 57
COMPANY PROFILE 2016 | 3.0 FINACIAL CAPABILITY
3.4 KAJIMA CORPORATION’S GLOBAL REACH
KAJIMA OVERSEAS ASIA PTE LTD
KAJIMA USA INC
KAJIMA EUROPE LTD
CHUNG-LU CONSTRUCTION CO LTD
KAJIMA CORPORATION (CHINA) CO LTD
KAJIMA SHENYANG CONSTRUCTION MANAGEMENT & CONSULTING CO LTD
GLOBAL SUBSIDIARIES
4.0 THE KAJIMA CORPORATION
4.0 THE KAJIMA CORPORATION
COMPANY PROFILE 2016
PAGE 59
KEIO UNIVERSITY HIYOSHI CAMPUS FOURTH BUILDING, INDEPENDENCE WING
SCHOOL OF PHARMACY, IWAKI MEISEI UNIVERSITY
The construction of the Fourth Building Independence Wing at Hiyoshi was part of Keio University’s 150th anniversary celebrations. The building is used for lectures and classes catering for up to 10,000 students. As the focal point of the campus with 35 large and small learning spaces, the build capitalises on the site’s elevation of approximately nine meters between its lowest and highest points. The
removal of a retaining wall that stood above the adjoining main road allowed the development of a 180m-long walkway and green area that add to the town’s rich scenery. The building’s exterior complements the rows of cherry and zelkova trees, while the atrium and avenue, with blended lines of sight, are designed to encourage natural interaction.
The most distinctive feature from the construction of this Pharmacy School building is the wide shade panelling which showcases across the entire south facade. The texture and colour palette to the panels blends effortlessly with that of the other school buildings, and the scale of this feature portrays a modern, urban feel. These 60% shade panels allow adequate light to enter the building, whilst simultaneously reducing the thermal load, enabling the building
to achieve the top “S rank” in the Comprehensive Assessment System for Building Environmental Efficiency (CASBEE) classification. During daylight the ever-changing campus scenery is visible through the panels, while at night the same panels allow light to escape and softly illumine the campus. In this way the building has become a central backdrop for campus life. In contrast to the exterior, the interior spaces are a body of colour.
4.0 KAJIMA CORPORATION AND SUBSIDIARIES’ PROJECTS
COMPANY PROFILE 2016 | 4.0 THE KAJIMA CORPORATION
Client: Keio University | Location: Yokohama-City, Kanagawa | Floor Area: 18,400m2 | Completion: March 2009
Client: Meisei Gakuen | Location: Iwaki-City, Fukushima | Floor Area: 11,000m2 | Completion: February 2007
EDUCATION
PAGE 60
MARINA BAY FINANCIAL CENTRE
MARUITO NAMBA BUILDING
Located in the middle of the Marina Bay business and shopping district, the Marina Bay Financial Centre was designed by BFC Development, a joint venture between three major Asian real estate developers. It stands as one of the largest mixed-use developments in Singapore, comprising three office towers and one residential tower.
Kajima Corporation entered into a joint venture with Tiong Seng Contractors to build Tower One (32 stories) and Tower Two (52 stories), which were completed in 2010.
Basic design and design consultant services were provided by the US firm Kohn Pedersen Fox Associates PC, which designed Roppongi Hills in Tokyo. The facility is leased to both local and overseas financial institutions.
Situated west of Namba, Osaka, this complex contains a combination of commercial, office, and hotel facilities, as well as underground commercial facilities directly linked to JR Namba Station and the Osaka Municipal Subway network’s Namba Station via an underground walkway. The facility forms a new underground mall network that has contributed to the revitalization of the local area. The façade comprises of a delicate grid pattern in harmony with its surroundings, while the 144-meter silhouette is a prominent marker on the city’s north–south thoroughfare and for the adjacent district’s skyline.
Hotel Monterey Grasmere Osaka occupies the upper levels of the building, giving the guest rooms, restaurants and banquet halls an enchanting view of the cityscape at night. One of the hotel’s highlights is a charming thatched-roof chapel—standing in a large atrium—inspired by Brockhampton All Saints’ Church in Herefordshire, England.
COMPANY PROFILE 2016 | 4.0 THE KAJIMA CORPORATION
Client: Cheung Kong (Holdings)/Hutchison Whampoa, Hongkong Land, and Keppel Land | Location: Singapore Floor Area: 150,500m2 approx. | Completion: 2010
Client: Maruito Shoten Co., Ltd. | Location: Osaka-City, Osaka | Floor Area: 123,000m2 | Completion: June 2009
COMMERCIAL
4.0 KAJIMA CORPORATION AND SUBSIDIARIES’ PROJECTS
PAGE 61
AULANI, DISNEY RESORT AND SPA
BONNET CREEK RESORT
This build was Disney’s first-ever, stand-alone hotel/timeshare resort. Located on 81,000m2 fronting Lagoon 1 in Oahu’s Ko Olina Resort Community & Marina, the resort and spa consists of two 15-story wings, housing 1,066 guestrooms and suites, and 27,000m2 of parking.
Original construction included extensive water features such as a lazy river waterway, multiple pools, private salt water snorkeling lagoon, a koi pond, toddler play areas and an imposing mountain with two waterslides befitting Disney’s reputation for magic and creativity.
Themed bar and dining areas, world-class Laniwai Spa, Kid’s Club, as well as meeting rooms and ballroom facilities were main features of the original construction. Guestroom tower structures are post-tensioned concrete on caisson foundations.
Unique features include 12km of fiberglass logs adorning the building facades, an expansive 15m tall main lobby resembling an old Hawaiian canoe house, angled balconies for increased ocean view rooms, and the use of artwork and artistry to tell a story of old Hawaii. This was the first resort in Hawaii to obtained LEED Silver Certification.
KUD provided Development Services and a Completion Guaranty for a $425 million resort project.
The hotel complex is located on 93,000m2 within the Bonnet Creek Resort adjacent to Interstate 4 and the entrance to Disney World. The project includes a 1,000-room four-star Hilton Hotel and a 500-room 5-star Waldorf Astoria Hotel, the first new Waldorf Astoria to be built since the original in New York. The establishment
features amenities such as the Guerlain Spa, a 3,700m2 formal pool area, a 7,300m2 family water recreation area and a myriad of meeting and conference options, all overlooking the Waldorf Astoria Golf Course and Clubhouse.
COMPANY PROFILE 2016 | 4.0 THE KAJIMA CORPORATION
Client: Disney Vacation Development, Inc | Location: Ko Olina, Hawaii | Floor Area: 121,000m2 | Completion: 2012
Client: Brooksville Development Corporation | Location: Orlando, Florida | Floor Area: 167,000m2
HOTEL / RESORTS
4.0 KAJIMA CORPORATION AND SUBSIDIARIES’ PROJECTS
© Ed Gross/The Image Group
PAGE 62
AT&T PARK
LINCOLN FINANCIAL FIELD
As completion guarantor and project developer for the San Francisco Giants’ baseball stadium, KUD was responsible for all elements of the planning, design and construction of this 40,000-seat venue.
KUD’s successful track record and ability to support the funding package allowed the team’s owners to obtain private financing for the stadium without public subsidies – a feat unprecedented in recent sports facility development in the United States.
The new stadium is situated on 51,000m2 of waterfront property and has been the catalyst for the regeneration of the wider China Basin area that includes a new research campus for the University of California, the regeneration of commercial office and retail space, and the addition of several thousand housing units.
The Philadelphia Eagles Stadium is a state-of-the-art, $500 million, 68,500 seat football stadium that has set new standards in the NFL.
KUD worked in partnership with the Eagles to develop a project program that incorporated a unique design approach and stadium delivery methodology within an agreed budget. KUD’s completion guaranty was considered by the lenders to be an important component of the project financing.
A partnering strategy was implemented at an early stage to select the design, construction and community partners for the project and to ensure a smooth development process. KUD and the client worked hand-in-hand with the selected project team to establish a solid foundation for a seamless delivery process that sheltered the franchise from completion risks.
COMPANY PROFILE 2016 | 4.0 THE KAJIMA CORPORATION
Client: San Francisco Giants Baseball | Location: San Francisco, California | Floor Area: 51,000m2 | Completion: 2000
Client: Lincoln Financial Group | Location: Philadelphia, Pennsylvania | Floor Area: 61,000m2 | Completion: 2003
SPORTS
4.0 KAJIMA CORPORATION AND SUBSIDIARIES’ PROJECTS
PAGE 63
SOUTH EASTERN REGIONAL MEDICAL CENTRE
J.WAYNE AND DELORES BARR WEAVER TOWER AT BAPTIST MEDICAL CENTRE
Construction of this fully digital cancer treatment healthcare facility was complete in only 55 weeks.
Cancer Treatment Centres of America (CTCA) at South-eastern Regional Medical Centre includes two linear accelerator vaults, a full range of diagnostic imaging services, and state of the art radiation and infusion therapy departments.
Twenty-five private inpatient rooms, surgical suites, an outpatient clinic, rehabilitation and physical therapy departments, kitchen, dining room , and chapel are also part of the facility.
CTCA includes a residential tower for the convenience of outpatients and their families.
J. Wayne & Delores Barr Weaver Tower is a 12-story hospital tower that connects to Baptist Hospital and Wolfson Children’s Hospital at Baptist Medical Centre. The facility contains 156 patient beds – 48 paediatric beds (24 of which are ICU) and 108 adult beds (12 of which are ICU).
Floors 1, 3 and 4 are dedicated to paediatrics, and floors 6-10 are dedicated to adult services. All surgery suites are located on the second floor, and the 11th floor houses Lyerly Neurosurgery.
The tower has a total of seven operating suites.
Project scope included the renovation of active OR’s and PACU areas in the existing hospital, along with the removal, reconfiguration and reattachment of a pedestrian bridge which spans Interstate 95.
COMPANY PROFILE 2016 | 4.0 THE KAJIMA CORPORATION
Client: CTCA | Location: Newhan, Atlanta GA | Floor Area: 21,000m2 | Completion: 2012
Client: Baptist Health System Inc | Location: Jacksonville, Florida | Floor Area: 32,000m2 | Completion: 2012
HEALTHCARE
4.0 KAJIMA CORPORATION AND SUBSIDIARIES’ PROJECTS
PAGE 64
GRAND MID TOWERS OMIYA
THE PARKHOUSE SHINJUKU TOWER
This residential apartment building project comprises two 30-story towers with 941 units. The site is 400m southeast of Omiya Station along the historical approach to Hikawa Shrine, and the design incorporates elements that reflect the grand estates that were prominent in the area during its heyday as a shrine town, including a front gate, an outer wall, a cloister and a garden. It also includes a living environment with ample greenery, together with tight security.
To ensure harmony with the surrounding scenery, the project includes two towers rather than one, and the facade design on each side is divided into three, lessening the oppressive feeling of vast volume. Use of the newly developed “hybrid double-tube” construction framework eliminates the post-and-beam style interior, allowing for optimally sized skeleton-infill housing units with exceptional lighting, ventilation and views.
This 20-story residential complex stands on a triangular site of approximately 4,800m2 bounded by two of Tokyo’s major arterial roads. The complex shape has been segmented to achieve simplification and harmony with the surrounding cityscape. The site design attains a gentle flow from an adjoining public park to the privacy of residential garden space. The development targets urban dwellers who lead active lifestyles, and provides security, sound insulation and privacy.
The building also employs a base-isolated structure, features ample disaster back-up systems, utilizes renewable energy sources, and maintains a 24-hour security system using a direct-supply high-voltage power source. Such amenities respond to increasing demands in the area of life continuity performance (LCP), and contribute to an advanced residential development that achieves a balance between security and environmental performance in a central urban setting.
COMPANY PROFILE 2016 | 4.0 THE KAJIMA CORPORATION
Client: Kintetsu Real Estate Co.,Ltd, Kajima Corporation, Odakyu Real Estate Co., Ltd. | Location: Omiya-ku, Saitama-City, Saitama Floor Area: 100,000m2 | Completion: South Tower: March 2011, North Tower: September 2011
Client: Mitsubishi Jisho Residence Co., Ltd., Heiwa Real Estate Co., Ltd. | Location: Kitashinjuku, Shinjuku-ku, Tokyo Floor Area: 30,000m2 | Completion: March 2012
RESIDENTIAL
4.0 KAJIMA CORPORATION AND SUBSIDIARIES’ PROJECTS
5.0 AWARDS & ACCREDITATIONS
5.0 AWARDS AND ACCREDITATIONS
COMPANY PROFILE 2016
PAGE 66
COMPANY PROFILE 2016 | 5.0 AWARDS AND ACCREDITATIONS
5.1 AWARDS
MASTER BUILDERS ASSOCIATION EXCELLENCE IN HOUSING AWARDS
INTEGRATED HOUSING (OPEN PRICE)
URBANEST, ULTIMO, NSW
Setting a new standard in quality studentaccommodation, Urbanest Wattle Streetcomprises 5 buildings surrounding 2 centralcourtyards covering approximately 15,000sqmof gross built area.
The 5 towers range in height from 3 storeys to8 storeys in response to the surrounding builtform.
2015
AUSTRALIAN INSTITUTE OF BUILDING: PROFESSIONAL EXCELLENCE IN BUILDING FOR RESIDENTIAL CONSTRUCTION $50M TO $100M
EAST QUARTER, HURSTVILLE, NSW
Completed c.3 months early, this impressive residential and commercial construction includes three buildings of up to 16 levels each, as well as a 3,500m2 central open air plaza.
The award is Icon Co’s first in NSW, reflecting its rapidly growing presence and strong reputation in the State.
2014
AUSTRALIAN PROPERTY INSTITUTE HERITAGE AWARD
UDIA AWARD FOR EXCELLENCE IN URBAN RENEWAL
TIP TOP, BRUNSWICK, VIC
Comprising six buildings titled: Silo, Rye, Malt, Grain, Seeds and Stables, this project encompasses 411 apartments.
Construction included conservation works to the existing, heritage-listed facade, installation of an articulated facade and excavation of a basement extending over 1.2 hectares.
2014
PAGE 67
COMPANY PROFILE 2016 | 5.0 AWARDS AND ACCREDITATIONS
5.1 AWARDS
DESIGN DEVELOPMENT AWARDS
HARPER LANE, ST KILDA, VIC
Located in busy Inkerman Street, the Harper Lane project features extensive use of vegetation and natural products to foster a sense of community among its residents.
The development includes three buildings, comprising 61 apartments and a café.
2012
AUSTRALIAN PROPERTY INSTITUTE HERITAGE AWARD
DRILL HALL, MELBOURNE, VIC
The Royal Melbourne Regiment Drill Hall consists of 59 residential apartments over 8 levels, built above an existing red brick heritage building.
The new residential portion forms an imposing contemporary structure, yet at the same time, retains the distinctive charm and appeal of its period features.
EXCELLENCE IN CONSTRUCTION OF COMMERCIAL BUILDINGS: SPECIAL COMMENDATION
28 -30 BEACONSFIELD PARADE, PORT MELBOURNE, VIC
This landmark beachfront building comprises four two-storey penthouses, 12 elegant apartments, plus two ground floor commercial tenancies and a basement carpark.
20082012
PAGE 68
COMMERCIAL ARCHITECTURAL AWARD
ICE CREAM FOLLY, DOCKLANDS, VIC
A successful entry to an architectural design competition, the Ice Cream Folly structure was manufactured in entirety off site, then craned into position.
The Royal Australian Institute of Architects commended Icon Co for its efforts on a particularly difficult site
2003
COMPANY PROFILE 2016 | 5.0 AWARDS AND ACCREDITATIONS
5.1 AWARDS
PAGE 69
COMPANY PROFILE 2016 | 5.0 AWARDS AND ACCREDITATIONS
Nothing is of higher importance to us than the health and safety of our people and as such, we maintain a leading
OH&S record. Our Lost Time Injury record is more than four times better than the industry average and we proudly
hold a zero rate of infringement notices in the last five years. What’s more, all site staff have attained Level 2 First Aid
certificates and more than half of our site based employees have achieved OH&S Certificate Three or better.
0 INFRINGEMENT NOTICES
IN LAST 5 YEARS
33%BETTER WORK COVER INSURANCE RATE THAN INDUSTRY AVERAGE
c.67%OF EMPLOYEE BASE
CERTIFIED OH&S LEVEL 3
4.1xLOWER LOST TIME INJURY RECORD
THAN INDUSTRY AVERAGE
100%OF SITE STAFF CERTIFIED
LEVEL 2 FIRST AID
5.2 SAFETY FIRST
PAGE 70
COMPANY PROFILE 2016 | 5.0 AWARDS AND ACCREDITATIONS
0
2
4
6
8
10
12
Nov
-11
Jan-
12
Mar
-12
May
-12
Jul-1
2
Sep-
12
Nov
-12
Jan-
13
Mar
-13
May
-13
Jul-1
3
Sep-
13
Nov
-13
Jan-
14
Mar
-14
No. of LTIs per million hours worked
ICON COINDUSTRY AVERAGE
0
2
4
6
8
10
12
Nov
-11
Jan-
12
Mar
-12
May
-12
Jul-1
2
Sep-
12
Nov
-12
Jan-
13
Mar
-13
May
-13
Jul-1
3
Sep-
13
Nov
-13
Jan-
14
Mar
-14
No. of LTIs per million hours worked
ICON COINDUSTRY AVERAGE
0
2
4
6
8
10
12
Nov
-11
Jan-
12
Mar
-12
May
-12
Jul-1
2
Sep-
12
Nov
-12
Jan-
13
Mar
-13
May
-13
Jul-1
3
Sep-
13
Nov
-13
Jan-
14
Mar
-14
No. of LTIs per million hours worked
ICON COINDUSTRY AVERAGE
OUR SAFETY PERFORMANCE AT A GLANCE• We lead the industry in OH&S compliance.
Our unparalleled Safety Performance Record demonstrates our commitment to safety and we are proud of our achievements in this area.
• Our OH&S reputation sets an enviable industry standard:
- there have been no WorkSafe infringement or improvement notices issued to Icon Co in the past five years;
- we maintain a Work Cover insurance rate of 1.13 which is 33% lower than the industry average for the past three years;
- 33 of around 50 site based employees have achieved OH&S certificate three or better;
- all site staff have attained Level 2 First Aid certificates;
- Lost Time Injury (LTI) average is 2.3 LTI’s per million hours worked, which is 4.1 times better than the industry average of 9.3.
Safety alliances and accreditations.
We understand the importance of setting and maintaining high safety standards. Icon Co is FSC accredited under the Australian Government Building and Construction OH&S Scheme, which allows us to enter into contracts for building works funded directly or indirectly by the Australian Government.
Icon Co is a proud member of the Victorian Construction Safety Alliance along with 15 other Tier 1 builders. We are also members of the Environmental Protection Authority (EPA) Victoria, Worksafe Victoria and representative of the safety division of the CFMEU.
Protecting our subcontractors.
Icon Co subcontractors are issued with a pre commencement check sheet identifying OH&S requirements and rigorous OH&S compliance checking process is carried out before commencement of any contract, without exception.
5.2 SAFETY FIRST
PAGE 71
COMPANY PROFILE 2016 | 5.0 AWARDS AND ACCREDITATIONS
5.3 ACCREDITATIONS
Our Integrated Management System (IMS) is independently certified to AS4801, ISO9001 and ISO14001. Our IMS links with our QA Systems and Environmental Management Plan, which outlines our commitment to responsible environmental management.
6.0 CONTACT INFORMATION
6.0 CONTACT INFORMATION
COMPANY PROFILE 2016
PAGE 73
6.0 CONTACT INFORMATION
COMPANY PROFILE 2016 | 6.0 CONTACT INFORMATION
ICON CO (VIC) PTY LTDABN 54 604 790 132
110 Cubitt Street Richmond VIC 3121
T +61 3 9429 6099 F +61 3 9429 8022
ICON CO (NSW) PTY LTDABN 16 604 790 409
Level 1, 135-153 New South Head Road Edgecliff NSW 2027
T +61 2 9327 8444
F +61 2 9327 8744
ICON CO (QLD) PTY LTDABN 33 169 394 058
Level 1, 1 Gardner Close Milton QLD 4064
T +61 7 3368 0000 F +61 7 3368 0099
WWW.ICONCO.COM.AU