ISITEP Project Coordinator
Head of Product Appraisal, Selex [email protected]
Achieving Public Safety and Disaster Relief Cooperation on the field
among different European Country teams
ISITEP: Main Facts
Goal
• Achieving Public Safety and Disaster Relief Cooperation on the field• Among different European Country teams
ISIT
EP
: Pro
ject
Pre
sent
atio
n 13
-2-2
014
Budget
• 15 million euros costs• 10 million euros funding by European Commission (7th Framework
Program) • + coordinated Norway-Sweden ISI project
Partners
• 28 organizations (15 partners + 13 members of the advisory boards)• Including 16 end-users
• (Polices, Civil Protections, State Security Ministers of Interior-Justice, • from 15 countries
ISIT
EP
: Pro
ject
Pre
sent
atio
n 13
Deliveries
• Bilateral Agreements ( generalized Norway-Sweden model )• Processes (required in main PPDR interoperability events)• Technology (interconnected TLC networks, smart terminals, protocols) • Tools (for logistics abd training)
2
Presentation outline
Achieving Public Safety and Disaster Relief Cooperation on the field among different European Country teams
ISIT
EP
: Pro
ject
Pre
sent
atio
n 13
-2-2
014
Why• we need it
What• to implement
1
2
ISIT
EP
: Pro
ject
Pre
sent
atio
n 13
How• we validate it3
3
Why: Public Protection
EU Radio interconnections
Survey 02-12-2013
ISIT
EP
: Pro
ject
Pre
sent
atio
n 13
-2-2
014
• The cooperation need is so high that interim solutions are developed, even if they are not operationally sufficient
ISIT
EP
: Pro
ject
Pre
sent
atio
n 13
4
The approach: Public Protection
• European Countries exposed to increasing trans-national crime • Trans-national crime (drugs, human trafficking, smuggling…) requires joint
police operations on the field:• cross-border pursuit of criminals, cross-border patrols and controls, joined
investigation teams, international observations, controlled deliveries.
.European cross border Police cooperation is
an effective approach for improving citizens’ security
ISIT
EP
: Pro
ject
Pre
sent
atio
n 13
-2-2
014
Cooperation on the field requires :• bi/multilateral agreement in place
ISIT
EP
: Pro
ject
Pre
sent
atio
n 13
• bi/multilateral agreement in place
• Jointly agreed procedures
• Interoperable communications at service and voice level
5
Why: Disaster Relief
SwedenNorway
ISIT
EP
: Pro
ject
Pre
sent
atio
n 13
-2-2
014
Common border: 1619 km 9 500 000 inhabitants528 000 km220 persons per km2
5 000 000 inhabitants324 000 km2 + 61 500 km215 persons per km2
ISIT
EP
: Pro
ject
Pre
sent
atio
n 13
When dealing with emergencies
we must forget about our national borders.
Norway-Sweden ISI6
The approach: Disaster Relief
• Growing impact of natural or man-made emergencies in the last decades:• Financial costs double every 12 years; in 2011, 300 natural disasters with 27,000 deaths
and 380 billion Euros of damage (source United Nations Office for Disaster Risk Reduction )
• National Budget mainly decreasing, but Pressure for more efficient and cost effective usage of available resources
• Resource demand concentrated in unplanned time frames different across Countries and
• the more the cooperating resources available on the field, the more the effectiveness (e.g. less casualties, …) (if within 72 hours)
ISIT
EP
: Pro
ject
Pre
sent
atio
n 13
-2-2
014
ISIT
EP
: Pro
ject
Pre
sent
atio
n 13
European Union shall mobilize Member States resources to assist other Member States in case of terrorist attacks or \in case of natural/man-made disasters (Lisbon Treaty)
Sharing resources at European level improves effectiveness of fire fighting, civilian protection, medical and rescue operations
7
The l’Aquila case IS
ITE
P: P
roje
ct P
rese
ntat
ion
Dra
ft 4-
4-20
14IS
ITE
P: P
roje
ct P
rese
ntat
ion
Dra
ft 4
Click to start video
ISITEP deliveries
Cooperation: problems and ISITEP answers
••
Cooperation Problems
• legal shield abroad
• Unclear which country’s national guidelines should apply - for Common Procedures
Bilateral Agreement model
•
•
guidelines should apply - for management and collaboration, and for practical rescue work
• Difficult coordination with local resources
• Language problems and different terminology
ISIT
EP
: Pro
ject
Pre
sent
atio
n 13
-2-2
014
Common ProceduresWorkflow on terminals
Language translator
Functional numbering calls
Geographically assisted call
•
•
• Contacts made through mobile phone is not logged or tracked
• Difficulties in establishing communication between rescue workers at the site
ISIT
EP
: Pro
ject
Pre
sent
atio
n 13
Language translator
message based commandsystem
Connected TLC networks cross Europe
9
ISITEP Model
• Interoperability on the field can be achieved addressing coherently all the legal-technical «layers» involved in PPDR operations
• ISITEP will address al the involved layers in a specific framework
ISIT
EP
: Pro
ject
Pre
sent
atio
n 13
-2-2
014
• ISITEP will address al the involved layers in a specific framework
ISIT
EP
: Pro
ject
Pre
sent
atio
n 13
10
Project Consortium
• Advisory board
• Brussels Local Police (Belgium)
• Belgian Civilian Protection (Belgium)
• Guardia Nacional Republicana (Portugal)
• JRC (European Joint Research Center)
End users PartnersService Public Federal Interieur / Belgian Federal Police (BFP, BE)Norwegian Ministry of Justice and Public Safety (DNK, NO)Swedish Civil Contingencies Agency (MSB, SE)Ministry of Security and Justice (VenJ, NL)
ISIT
EP
: Pro
ject
Pre
sent
atio
n 13
-2-2
014
• Industry
• Selex ES (IT: TETRA Manufacturer/Operator)
• Motorola Solutions (DK, UK, PL: Tetra Manufacturer)
• Cassidian Finland (FI: Tetra Manufacturer)
• Cassidian SAS (FR: Tetrapol Manufacturer)
• Amper Sistemas (ES Tetra-Tetrapol integrator)
• Research Center
• TNO (NL)
• University of Rome Tre (IT)
• JRC (European Joint Research Center)
• Gendarmerie (France)
• Federal Agency of Radio (Germany)
• Ministery of Citizen Protection (Greece)
• TCCA (TETRA + Critical Communications Association)
• National Centre of Emergency (Norway)
• Guardia Civil (National Police Spain)
• Federal Police (Switzerland)
Ministry of Security and Justice (VenJ, NL)
ISIT
EP
: Pro
ject
Pre
sent
atio
n 13
• Devoteam (ES, IT; Software R&D)
• University of Rome Tre (IT)
• UPC (ES; Universitat Politècnica de Catalunya)
• ISCOM (IT; Istituto Superiore delle Comunicazioni e delle Tecnologie dell‘Informazione)
• SMEs
• Net Technologies (GR: Tetra R&D and consultancy)
• Devoteam (ES, IT; Software R&D)
• Federal Police (Switzerland)
• Federal Office for Civil Protection(Switzerland)
• The Sweden National Police Board (Sweden)
• State Security (Belgium)
ISITEP is an end-user driven project 11
ISITEP DemosIS
ITE
P: P
roje
ct P
rese
ntat
ion
13-2
-201
4IS
ITE
P: P
roje
ct P
rese
ntat
ion
13
12
Backup
ISITEP: Project Presentation 13-2-2014
The ISITEP Deliveries (1/2)
ISITEP will deliver a framework with four components:
1) A Mission oriented framework :• A standardized model for the business processes and workflows required in main PPDR • A standardized model for the business processes and workflows required in main PPDR
interoperability events harmonizing organizations, procedures and technology and taking into account organizations, procedures and legal agreements
• The model will be based on the inventory from the European working groups that study the best cooperation standards and practices to carry out these missions, and will use as main reference the Norway-Sweden current agreement
2) A European Inter System Interface (ISI) cloud network• This network integrates the PPDR national/regional infrastructures to allow roaming capability
services and associated applications within a secure framework
ISIT
EP
: Pro
ject
Pre
sent
atio
n 13
-2-2
014
services and associated applications within a secure framework• This capability is obtained interconnecting networks through proper gateways based on evolution
of ETSI ISI standardISIT
EP
: Pro
ject
Pre
sent
atio
n 13
15
The ISITEP Deliveries (2/2)
3) Enhanced User Terminals
• The enhanced terminal includes a new programmable terminal connected to existing Tetra-Tetrapol terminals.Tetrapol terminals.
• For an effective communication interoperability on the field, minimum functions are to be implemented at terminal and network level, e.g location assisted roaming, function based numbering, location dependent call, certified short message order application, translation engines, Workflow manager, Adaptive user interface, a common framework for application development
4) Supporting tools
• Infrastructures dimension tool based on statistics of PPDR events
ISIT
EP
: Pro
ject
Pre
sent
atio
n 13
-2-2
014
• Training and simulation tools• Business sustainability tool for ISI delivery, for estimating savings from cooperation through
the ISITEP interoperability framework
ISIT
EP
: Pro
ject
Pre
sent
atio
n 13
16
The European PPDR Integrated Network
ISITEP ISI NetworkIS
ITE
P: P
roje
ct P
rese
ntat
ion
13-2
-201
4IS
ITE
P: P
roje
ct P
rese
ntat
ion
13
17
Project StructureIS
ITE
P: P
roje
ct P
rese
ntat
ion
13-2
-201
4IS
ITE
P: P
roje
ct P
rese
ntat
ion
13
18
Top Related