CHAPTER 12
Earthwork
8/9/2019 Civil Pp12
2/24
Civil Drafting Technology, 7thedition
Madsen, Shumaker, and Madsen
2010 Pearson Higher Education,
Upper Saddle River, NJ 07458. All Rights Reserved.2
Earthwork
Earthwork cutting (excavating) and filling areasof earth.
Cut removing earth from hillsides and high
spots. Fill adding earth to valleys and low spots. Borrow pit a cut that provides fill material. Cut from areas of higher elevation, fill areas of
lower elevation.
8/9/2019 Civil Pp12
3/24
Civil Drafting Technology, 7thedition
Madsen, Shumaker, and Madsen
2010 Pearson Higher Education,
Upper Saddle River, NJ 07458. All Rights Reserved.3
Why Layout Earthwork?
Determine how much material will be cut and
filled during a construction project.
Calculate construction costs: Building sites.
Fill material may need to be purchased.
Determine the proper amount of land to purchase for
roadway right-of-way. Analyze environmental impact.
8/9/2019 Civil Pp12
4/24
Civil Drafting Technology, 7thedition
Madsen, Shumaker, and Madsen
2010 Pearson Higher Education,
Upper Saddle River, NJ 07458. All Rights Reserved.4
Level Road Cut-and-Fill Layout:
Traditional Method
1. Layout the proposed road plan view.
8/9/2019 Civil Pp12
5/24
Civil Drafting Technology, 7thedition
Madsen, Shumaker, and Madsen
2010 Pearson Higher Education,
Upper Saddle River, NJ 07458. All Rights Reserved.5
Level Road Cut-and-Fill Layout:
Traditional Method
2. Determine the desired road elevation.
3. Identify the angle of repose: The slope of the cut and fill from the road. A ratio of run to rise.
For example, a 2:1 angle of repose means that for every 2 ofhorizontal distance, the slope rises or drops 1 vertically.
Determined based on the type of earth. Can be different angles for cut and fill.
8/9/2019 Civil Pp12
6/24
Civil Drafting Technology, 7thedition
Madsen, Shumaker, and Madsen
2010 Pearson Higher Education,
Upper Saddle River, NJ 07458. All Rights Reserved.6
Level Road Cut-and-Fill Layout:
Traditional Method
4. Generate the cut and fill layout. Use the angle of repose and contour lines to show
which areas are cut, and which areas are filled.
Cross-section method shown in Figure 12-1b and
Figure 12-1c
8/9/2019 Civil Pp12
7/24
Civil Drafting Technology, 7thedition
Madsen, Shumaker, and Madsen
2010 Pearson Higher Education,
Upper Saddle River, NJ 07458. All Rights Reserved.7
Level Road Cut-and-Fill Layout
8/9/2019 Civil Pp12
8/24
Civil Drafting Technology, 7thedition
Madsen, Shumaker, and Madsen
2010 Pearson Higher Education,
Upper Saddle River, NJ 07458. All Rights Reserved.8
Level Road Cut-and-Fill Layout: CADD
(AutoCAD)
1. Open the highway layout plan drawing.
2. Identify the angle of repose for the fill and cut areas.Example: both cut and fill have an angle of repose of2:1
3. Identify the contour interval. Example: 104. Multiply the angle of repose by the contour interval.
Example: 2 1 = 2 so 2 X 10 = 20
5. Use the distances calculated during step 4 to offset
both edges of the road, away from the centerlineseveral times. Example: offset distance is 20
8/9/2019 Civil Pp12
9/24
Civil Drafting Technology, 7thedition
Madsen, Shumaker, and Madsen
2010 Pearson Higher Education,
Upper Saddle River, NJ 07458. All Rights Reserved.9
Level Road Cut-and-Fill Layout: CADD
(AutoCAD)
6. Plot the outline of the cut and fill using a
spline. Spline points are located at the intersection of
contour lines, and the offset construction lines. The selected points represent locations of equal
elevation.
8/9/2019 Civil Pp12
10/24
Civil Drafting Technology, 7thedition
Madsen, Shumaker, and Madsen
2010 Pearson Higher Education,
Upper Saddle River, NJ 07458. All Rights Reserved.10
Inclined Road Cut-and-Fill Layout1. Layout the proposed road plan view.
2. Generate a profile view. Project the intersections of each contour line, and the road centerline from the
plan view, to the profile.
3. Identify the angle of repose. Example: 2:1
4. At a vertical projection line, subtract the elevation of the proposed roadfrom the elevation of the existing slope, and multiply the number by theangle of repose. Example: 185 - 180 = 5 so 5 X 2 = 10
5. Use the value determined in step 4 to identify the distance from verticalconstruction line, and the contour line. Example: 10 from the verticalconstruction line, along the 185 contour line identifies a cut and fill
outline point.6. Repeat steps 4 and 5 to define each point along the cut and fill outline.
7. Connect the points with a spline.
8/9/2019 Civil Pp12
11/24
Civil Drafting Technology, 7thedition
Madsen, Shumaker, and Madsen
2010 Pearson Higher Education,
Upper Saddle River, NJ 07458. All Rights Reserved.11
Inclined Road Cut-and-Fill Layout
8/9/2019 Civil Pp12
12/24
Civil Drafting Technology, 7thedition
Madsen, Shumaker, and Madsen
2010 Pearson Higher Education,
Upper Saddle River, NJ 07458. All Rights Reserved.12
Cross Sections
Display cut and fill characteristics
perpendicular to the road centerline.
Sectioned side view.
Provide measurements that can be used for
calculating the amounts of earth to be removed
from hills and filled into areas below the road
grade.
8/9/2019 Civil Pp12
13/24
Civil Drafting Technology, 7thedition
Madsen, Shumaker, and Madsen
2010 Pearson Higher Education,
Upper Saddle River, NJ 07458. All Rights Reserved.13
Cross Sections
8/9/2019 Civil Pp12
14/24
Civil Drafting Technology, 7thedition
Madsen, Shumaker, and Madsen
2010 Pearson Higher Education,
Upper Saddle River, NJ 07458. All Rights Reserved.14
Cross Sections with a CADD System
Demonstrate using a specialized CADD system
to generate cross sections.
8/9/2019 Civil Pp12
15/24
Civil Drafting Technology, 7thedition
Madsen, Shumaker, and Madsen
2010 Pearson Higher Education,
Upper Saddle River, NJ 07458. All Rights Reserved.15
Site Plan Cut-and-Fill Layout
1. Layout the site plan view.
8/9/2019 Civil Pp12
16/24
Civil Drafting Technology, 7thedition
Madsen, Shumaker, and Madsen
2010 Pearson Higher Education,
Upper Saddle River, NJ 07458. All Rights Reserved.16
Site Plan Cut-and-Fill Layout
2. Identify the angle of repose (the slope of the cutand fill from each of the site boundary lines).Example: Cut angle of repose = 2:1 Fill angle of repose = 1:1
3. Identify the contour interval. Example: 2
4. Multiply the angle of repose by the contour
interval. Example: Cut: 2 1 = 2 so 2 X 2 = 4 Fill: 11 = 1.5 so 1.5 X 2 = 3
8/9/2019 Civil Pp12
17/24
Civil Drafting Technology, 7thedition
Madsen, Shumaker, and Madsen
2010 Pearson Higher Education,
Upper Saddle River, NJ 07458. All Rights Reserved.17
Site Plan Cut-and-Fill Layout
5. Use the cut distancescalculated during step 4to offset all of the siteedges, away from the site
boundary several times.Example: cut offsetdistance is 4 fill offsetdistance is 3
8/9/2019 Civil Pp12
18/24
Civil Drafting Technology, 7thedition
Madsen, Shumaker, and Madsen
2010 Pearson Higher Education,
Upper Saddle River, NJ 07458. All Rights Reserved.18
Site Plan Cut-and-Fill Layout
6. Plot the outline of the cut and fill using a spline. Spline points are located at the intersection of contour
lines, and the offset construction lines.
The selected points represent locations of equalelevation. Areas above the desired level elevation are cut, and
areas below the desired level are filled.
8/9/2019 Civil Pp12
19/24
Civil Drafting Technology, 7thedition
Madsen, Shumaker, and Madsen
2010 Pearson Higher Education,
Upper Saddle River, NJ 07458. All Rights Reserved.19
Site Plan Cut-and-Fill Layout
8/9/2019 Civil Pp12
20/24
Civil Drafting Technology, 7thedition
Madsen, Shumaker, and Madsen
2010 Pearson Higher Education,
Upper Saddle River, NJ 07458. All Rights Reserved.20
Site Plan Cut-and-Fill with a CADD System
Demonstrate using a specialized CADD system
to generate site plan grading and contour lines.
8/9/2019 Civil Pp12
21/24
Civil Drafting Technology, 7thedition
Madsen, Shumaker, and Madsen
2010 Pearson Higher Education,
Upper Saddle River, NJ 07458. All Rights Reserved.21
Earthwork Calculations
Calculating how much earth must be cut and/or
filled for a specific project.
Allows for cost approximations and better
layout design.
Primary concern is to predict drainage
requirements.
8/9/2019 Civil Pp12
22/24
Civil Drafting Technology, 7thedition
Madsen, Shumaker, and Madsen
2010 Pearson Higher Education,
Upper Saddle River, NJ 07458. All Rights Reserved.22
Earthwork Calculations
Hydrologic study type of soils and ground
cover present, how water flows on the site, how
much water is absorbed, and the volume and
direction of water leaving the site. Borrow pit an area from which quantities of
earth is excavated to construct embankments
and fills.
8/9/2019 Civil Pp12
23/24
Civil Drafting Technology, 7thedition
Madsen, Shumaker, and Madsen
2010 Pearson Higher Education,
Upper Saddle River, NJ 07458. All Rights Reserved.23
Earthwork Calculations
Study the figures and follow the informationpresented in the Earthwork Calculations sectionof Chapter 12 to better understand how to estimate
barrow pit quantities, and other earth workvolumes. Specialized CADD programs and application
software can contain enough data for calculating
earthwork volumes.