Introduction
Current Situation Sugarcane in Indonesia
• Total number of sugar-mill in Indonesia are 61 sugar-mill, with crushing capacity ranging 1000-12000 TCD, total crushing capacity is 225.018 TCD *)
• Total sugar-mill plantation in Indonesia is 418.259 ha (2010) which is concentrated in east java (45%) and Lampung (25%)
• Total Sugar production (2010) :2.214 Mio Tonnes Sugar, while the sugar demand is 5.4 Mio Tonnes *)
• Indonesian sugarmill Factories: mostly were old factories need to improve performance
*)Sources: Kompas Daily 29 July 2011
German-Indonesian Renewable Energy Days
Sugarcane Production global
Indonesia 418.259 70 29.278.130
German-Indonesian Renewable Energy Days
Sugarcane Processes and Material Balance
Mill Station
Purification
Station
Evaporati
-on Station
Cooking and
Centrifuge
Station
sugarcane
WhiteSugar
MolassesFilterCakeBagasse
Imbibitionwater
Chemicals
300 Kg of Bagasse ~ 100 kWh
60-70 Kg Sugar
1 tonne
Steam Consumption : 0.55 Tonnes steam/Tonnes SugarcaneElectricity consumption : 16-21 Kwh/Ton Tebu
German-Indonesian Renewable Energy Days
Primary Fuel Composition in Sugarmill
Additional fuel consumption is expected to be eliminated so that fuel can be met by bagasse
How to make its zero?
German-Indonesian Renewable Energy Days
How to make money from the bagasse?
• Thermal energy (steam) Processes ,turbine drive, drying, heating
• Electricity motor, pump, Fan
1. Plant Modernization & Improving efficiency 2. Utilizing bagasse surplus to generate electricity
(new configuration of COGEN)
German-Indonesian Renewable Energy Days
Bagasse as a Fuel
German-Indonesian Renewable Energy Days
Bagasse Analysis (Calorific value)
Parameter Status Unit Bagasse1 Bagasse 2 Bagasse 3 Method
Total Moisture ar % 54 50 38.8 ASTM.D 3302-10
Gross Calorific Value (GCV)
ar Kcal/Kg 2160 2377 2986 ASTM.D 5865-10
ar: as received
German-Indonesian Renewable Energy Days
Case Study: Bagasse Utilization for Electricity Production
Existing Plant Performance:• Sugarmill capacity 6000 TCD
• The average mechanical downtime of the mills per milling season has been found to be 5.09 %.
• Steam is generally produced at medium pressures of 20 kg/cm2, 325°C.
• The boiler fuel is mill bagasse, the fibrous residue of the cane milling process. Bagasse has a moisture content of 52
• Fiber Content of the cane averages 10-11% on cane. This is equivalent to 29.2% of bagasse.
• Thermal and Electrical energy requirements average between 55 Ton Steam and 21 kWh per ton of cane crushed
• Power generated : 3.97 MW (House load)
German-Indonesian Renewable Energy Days
Current situation in sugarmill industries
German-Indonesian Renewable Energy Days
Existing Configuration COGEN
To Process
Bagasse + MFO + Moulding
Boiler Back pressure turbine
To Condenser
Turbines
G
Steam 20 Bar
Steam 2 bar
German-Indonesian Renewable Energy Days
Modernization and Improving Efficiency
• Improving Capacity 6000 TCD to 7200 TCD
• Steam consumption become 0.5 TS/TCD
• Replacement of milling turbine to electric motor
• Increase Bagasse Surplus
German-Indonesian Renewable Energy Days
Bagasse Surplus
• The maximum commulative bagasse surplus which occured at the end of milling season is estimated around 94,000 ton at crushing capacity of7,200 TCD.
German-Indonesian Renewable Energy Days
New Configuration
To Process
Bagasse
Boiler
Extraction Condensing Turbine
Back pressure turbine
To Condenser
Electric Motor
Turbines
G
Steam 46 Bar
Steam 20 Bar
Steam 20 bar
G
Steam 2 bar
Back pressure turbine
German-Indonesian Renewable Energy Days
15
On-season 43,338 MWhOff-season 35,910 MWhTotal 79,248 MWh
Electricity generated for Grid
German-Indonesian Renewable Energy Days
New Configuration operation mode
• Cogeneration system will operated continuously forthe entire year (330 days)
• on-season, existing boilers operate 63.8 TPH andexisting alternator turbine operates 3.97 MW. Whilenew boiler operate at 104.8 TPH, extraction steam 54TPH at 20 kg/cm2 and turbine alternator operating at10 MW
• off-season, existing boiler and turbine is not operated,while one unit of a new boiler operates at 47.4 TPHand new turbine operate with condensing mode at9.975 MW (10 MW).
German-Indonesian Renewable Energy Days
Conclusion
• Bagasse Surplus can be utilize to produce electricity through cogeneration system in sugarmill (send to grid) , (7200 TCD 71.5 GWhr/year)
• The net electricity production will be of about 71.5 GWh will distributed to the grid as electricity sales that generate revenue annually about IDR 58.648 billion base on electricity selling price of IDR 820/kWh