CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
Beams for EuropeanNeutrino Experiments
(BENE) subtitle:
A Network aiming at a consensual road map for accelerator based neutrino programs in Europe
A complex multi-parameter problem
International Design Studies of future Neutrino facilities
(IDS)
FP7R&D program(s)of next European Accelerator Neutrino Facility
“Euroν”in world wide collaboration
IDS
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
Since CARESG Apr 11
Joint BENE & 3rd ISS meeting RAL 24-25 Apr
28 April LOI !!!! BENE Midterm Report gets yellow in May
Open BENE SG 4 Jul CERN (FP7)
CERN Council Strategy Document
4th meeting of the ISS at UCI (21-23 Aug)NuFact06 (24-30) “End” of the ISS, next steps
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
2005 06 07 08 09 10 11 19
Int. Scoping Study(*)
Design Study
BENE : the longer term plan
CDR … at the time of end of LHC paymentfirst LHC resultsILC decision
be ready to catchany construction window
Physics
feasibility
Feasibility & TPW
HIPPI, HARP
MERIT
MICE
PRISM, EMMA
NB Betabeam CDR End 2009 !
Construction window
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
Milestones & Deliverables BENE III period Jan 06 - Jun07
BENESG1/ month
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
NNN06, Seattle
Open SG, CERN NBI, CERN
ISS/IDS, 21-22
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
NuFact06
NuFact high energy stategy
.1 Mton magnetic detector
NNN06Betabeam/SuperBeam low energy strategy
0.5-1.0 Megaton Water(HyperK, UNO, Memphys)
.1 Megaton Li-Ar
Japan, DUSEL ….. Frejus, Gran Sasso+FNAL
USNF,UKNF ..
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
stronger BENE SG
PHYSICS Mezzetto (Padua) + Donini (Madrid)
DRIVER Zito (CEA)
TARGET Bennet (RAL)
COLLECTION Dracos (IN2P3)
NOVEL BEAMS MUFRONT Long (ICL)
MUEND Meot (CEA/IN2P3) BETABEAM Lindroos
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
V. Palladino
NuFact06
UC Irvine, Tue Aug 29, 2006
EuropeanRegional Outlook
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
what have we got in Europe? how much is that worth? the CNGS
OPERAIcarus
BENE and HIPPI
ISS Groups
HARP
MICEMERIT
Betabeam DS
Laguna
SPL CDR2
The CERN Council Strategy Document
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
The CNGS has started
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
PreliminaryCourtesy P. Sala and E. Gschwendtner
comparison measurement-simulation, horizontal pit1
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
-157.5 -146.3 -135 -123.8 -112.5 -101.3 -90 -78.75 -67.5 -56.25 -45 -33.75 -22.5 -11.25 0 11.25 22.5 33.75 45 56.25 67.5 78.75 90 101.25
112.5 123.75
135 146.25
157.5
cm
ch
arg
es
/po
t
meas: nominal
sim: nominal
μ/p just about right
High intensity mid october
Thanks, Malika & Konrad et al. !
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
OPERA : it is worth silver ( detection) νμ/νe →ν t
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
ICARUS & beyond …. worth platinum νμ→νe
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
WithinCARE(ECFA) 3Networks
BENE 2004-2008
A new accelerator neutrino facility?
and 4 “JRAs”
HIPPI
CARECoordinated AcceleratorR&D in Europe
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
BENE/CARE 2004-2008 rooted in the Muon Study Groups, active since 1998
the UKNF includes new Cockroft & Adams Institutes!
France: CEA, CNRS-IN2P3
Germany: TUM, GSI, FZJ
Spain : CSIC + Universities
Italy :INFN Labs & Universities
UK : CCLRC & Universities
B : Louvain
CH : PSI & Universities
CERN worth travel money
hopefullythe embryo of a real continentalcollaboration
NB : HIPPI is worth a lot 3.6 M from EC only
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
Betabeam Design Study 2005-2008
worth several M (1 from EU, within Eurisol)
echo of progress at Nufact06 with Fabich’s plenary talk and
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
Nobel class contribution: superior production of Li & B parents
C. Rubbia
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
ISS Detector Group : worth gold?Blondel, Soler
Super Minos, INO ……….. Hyper-CDHS
νe → νμ
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
ISS Physics Group :
ISS Accelerator Group :EU effort not yet adequate UKNF, CEA ……
we need the CERN divisions
very solid: Long ….. Donini, Gomez-Cadenas, Hernandez, Huber,
King, Lindner, Mezzetto, Winter & many more boosted the work of comparison, systematics included
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
Superconducting Proton Linac (SPL) : CDR2
5 GeV appear possible
a 4 MMWBackbone
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
At last, large angle data from HARP
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
Muon Ionization Cooling Experiment at RALMuon Ionization Cooling experiment at RAL
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
Pivot Target & Collection CERN PS Experimentcan we digest the MMW?
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
The CERN Council Strategy Process
Almost one year long
Two CERN task forcesPAF = proton accelerators for the future POFPA = physics opportunities of future proton accelerators
……many other input from all sectors in Europe
Orsay Preparatory Open Symposium Jan 30-Feb1
Zeuthen Closed Meeting of the strategy group May 2-6
Special session of Council in Lisbon Jul 14
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
BENE’s document to Council
outline and plea for
a timely R&D program
CERN Yellow Report 2006-05available at
http://bene.web.cern.ch/bene/
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
nice words…. but, any place for ν’s in PAF?
HIPPI+FETS
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
nice words …. but, Єuros from labs, agencies and EC?
creation of a continental collaboration with a leading CERN kernel with regular and adequate participation & funding from each national lab and national agency
richness of options makes consensus more laboriousNB legitimate different scientific interests do exist
need an unprecedented level of coherence & good will otherwise ….. LHC upgrade, ILC, CLIC ….
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
ISS (and IDS) in a nutshell
• Physics boosted comparison unprecedently, including systematics
• Accelerator updated NuFact Baseline, defined R&D priorities started exploring sinergies with Superbeams
• Detector rejuvenated simulations, established baselines for the few main options, defined R&D priorities
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
Set one up in Europe!
OK !!!
OKOK OK?
FP7 EU ν Collaboration
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
a European Neutrino Oversight Body
for BENE and future initiatives to report to
to bring about the indispensable consensus
PAF shows the way MMW Driver, Target, Collectors ….. everybody needs them
Present highest priority aim:
need advice & help of CARE & ESGARD
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
Reserves
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
A complete Euro-Neutrino Design Study physics, accelerators, detectors, baselines
• ISS= International Scoping Study … American and Asian collaborations as full partners
June 2005 to late 2006: mostly neutrino factory & superbeams define priorities and ways of Design Study consolidate regional & international collaboration us in EU, gain support of Council and ECFA
• IDS = International Design Study (neutrino factory & superbeams & betabeam)
start late 2006 or early 2007 achieve higher funding, start design effort
us in EU, prepare FP7 Proposal (March 2007, it seems) structure EU collaboration, get CERN involved as much as possible
• FP7 DS = EC (support for EU effort in the) Design Study … CNGS & beyond
aiming at first EC funds Jan 1, 2008 inter-twined with IDS
keeping American and Asian collaborations as full partners …. T2K , Nova
Goal: Conceptual Design Report of a European Precision Neutrino Facility by end 2010
is next natural step for accelerator is next natural step for accelerator νν ISS & IDS/FP7 DSISS & IDS/FP7 DS
BENE
CDHSCHARM I/II CHORUS NOMADOPERAICARUS
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
conceptual feasibility study of the following components: a high power proton driver of at least 4-5 GeV the engineering of the handling, containment and safety aspects of a hi power target & collection station a performing and cost effective muon phase rotation and cooling channel non-scaling FFAGs for acceleration of muons (and possibly protons) an optimised storage ring for muons higher intensity and higher gamma beta beams
technical preparatory (R&D) projects, aiming at demonstrating:the existence of at least one adequate choice of target an extended lifetime of the horn prototypes at high rate and radiationmuon ionization cooling, by completion of the MICE experimental program operation of a non-scaling FFAG RF cavities and kicker magnets for fast manipulation of muon beams
+ specific detector R&D and design efforts on : photo detector development for very large far detectorsdevelopments of the liquid argon technique including the presence of magnetic fieldstudy and tests of a magnetic calorimeter susceptible to be built with a mass of up to 100 kton. detectors dedicated for tau detection such as the emulsion cloud chamberlast but not least the necessary near detector concepts and beam instrumentation
guessing the Content of the Design Study
pre-submitting it now to ECFA/ESGARD scrutiny
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
CARESG, 13 Sep 2006 V. Palladino Report on BENE Activities
Agenda of the BENE day at RAL
>> Fri Apr 28 Morning : general introduction >> >> 9:00 Status and prospect of the ISS, towards the IDS (Dornan) >> 9:10 Address from ESFRI Chair (J. Wood)>> 9:40 News from EC (R. Aleksan, tbc) >> 10:00 FP7 (DS, JRA's) and general outlook in EU (Edgecock) >> 10:30 US contributions to the IDS (A.Bross) >> >> 10:40 Break >> >> 11:00 Japan contribution to the IDS (Kuno) >> 11:20 Other contributions to the IDS (Mondal, tbc) >> >> 12:00 General Discussion until lunch >> >> >> Fri Apr 28 Afternoon : EU contributions to the IDS(*) > >> 1) Initiative in the Physics studies sector (Mezzetto/Donini 20') >> 2) Initiative in the Proton driver sector(Cavata 10') >> 3) Initiative in the Target sector (Bennett 10') >> 4) Initiative in the Collection sector (Dracos 10') >> 5) Initiative in the Muon Front End sector (Long 10') >> 6) Initiative in the Muon Back End sector (Meot 10') >> 7) Initiative in the Betabeam sector (Lindroos 15-20') >> 8) Initiative in the Neutrino detector sector (Blondel 20')
General Discussion on EU contributions to the IDS (introduced & chaired by R. Garoby)
(*) NB this will be match very closely our requests to FP7