Brussels April 16th 2007
Association of the French Consultants in Petroleum
Association of 70 Individual Members & 7 Partners Members(SME) with its communication/cooperation network between specialists.
Aiming at assisting the NOC/IOC’s in :
-The oil/gas fields development/operation covering the production, transportation (pipelines) and treatment installations
- The assessment, training & coaching of the operation team.
Brussels April 16th 2007
Les Métiers des Experts
ACP
Association of the French Petroleum Consultants
Geology – Geophysics – Drilling – Complétion – Production -
Gisement – Reservoir - Diagraphies
Pipelines –Installations –Refinery –Petrochimical
Strategy –Evaluation –Management –Finances
Quality – Safety –Environment - CDM
Training - Maintenance
Brussels April 16th 2007
EXPERIENCE IN TRAINING PROJECTS
Key expertise of the ACP members
Engineering/Management Training Centers
Engineering/Implementation Training Projects
Brussels April 16th 2007
EXPERIENCE ON TRAINING PROJECTS IN CENTRAL ASIA
Turkmenbashi Refinery Training Center, Apr 98 to Sept 99
Preparation in France and Turkmenistan/ Assessment/ Training needs/ Training/ Final Assessment Training modules in Russian, theoretical (Polytechnicum University), practical (ACP experts & contractors) and simulator (RSI, ACP partner).
Logistics : contractors (RSI, Polytechnicum, DCS, UOP process), equipment & tools (computers, simulators…) manuals, translation & interpretation
The training 20 star operators, 60 new operators; 26 weeks training plan covering-Background recap-General chemistry (Anal lab, English, Measur & Control, Maintenance, Safety)-Applied training (Advanc English & PC, applied Physics & Chemistry, Oil & Gas products, Process simulation, Instrum & DCS, Operation & safety)
Brussels April 16th 2007
EXPERIENCE ON TRAINING PROJECTS IN CENTRAL ASIA
Kashagan ENI Training Center, Jan 05 to Dec 06Modules developed abroad (ENI Petroleum University), 18 sessions of 22 weeks (60 students/session) :
Exploration, Production and Processing of hydrocarbonsReservoirWell completionOil & Gas : definitions, process & mechanical equipment, treatment plant
-KCO production facilities description-Process general description-Measurement & Control-Materials and assembling-Maintenance-Basic HSE-Field practice-Assessment
15 classrooms, including Multimedia/IT room and Library 3 Workshops and 1 Chemical Laboratory with chemicals storage Process Training Area with Process and Drilling Simulators Dynamic simulator that replicates Eskene West & ‘D’ Island processes
The Atyrau Training Centre
Brussels April 16th 2007
EXPERIENCE ON TRAINING PROJECTS IN CENTRAL ASIA
Khiva UrgenchTransGas Training Center (TACIS project), July 05 to Dec 06.Pipeline engineers/technicians :Uzbekistan, Turkmenistan, Kazakhstan, Kyrgyzstan
Preparation in France and in Uzbekistan/ Assessment/ Training needs/ Training/ Final Assessment
Training modules in Russian, theoretical (Gubkin Institute); practical (TECHNIPIPE/ACP experts) and “train the trainers”.
Brussels April 16th 2007
Technical Audit Pipelines @ PNIS
Khiva Training Center
Training Plan made up of 8 Modules designed after Competence/knowledge assessment
Modules 1 & 2 : engineering, design, construction and maintenance of pipelines (Khiva, Almaty & Moscow)
Module 3 : Inspection (using tools sourced from European suppliers)
Brussels April 16th 2007
Technical Audit Pipelines @ PNIS
Khiva Training Center
Module 4 : On site Above ground Inspections (in Bishkek area)
Module 5 : On line Pigging (in Samarkand with Rosen) of 40’’ x 156 km.
Modules 6 & 7 : PNIS implementation operation & maintenance (theory only)
Module 8 : Train the trainers (for the Beneficiaries to be able to train in their own countries)
Brussels April 16th 2007
POPULATION TO BE HIRED YEARLY
OPERATION/MAINTENANCE
employees new employment
Tukmengas prod population 6000
Tukmennefte prod population 6000
Offshore dragon oil, Petronas, Wintershall 1000
On shore Mitro, ENI, CNPC 1000
Galkynysh (Petrofac) 2000
Total production 16000 1200
Refineries 700 53
Turkmentransgas, Turkmengas, Turkmennefte 6000 450
Total up/downstream 1703
New project production 400
New project petrochemical 400
New project pipeline 500
Total up/downstream with New projects 3003
replacemenent rate 7,5%
Brussels April 16th 2007
3000 TECHNICIAN TO BE TRAINED EVERY YEAR
OPERATION/MAINTENANCE
How to be efficient : adapted to local context and linked to education
-limited to job requirement
-enhancement of entry level
How to increase productivity of investment : broad (national) approach
-qualification training direction (operators and maintenance)
Top Related