Board of Visitors Buildings & Grounds CommitteeSeptember 11, 2020
Schematic Design Review: School of Data Science
LAMBETH FIELD RESIDENTIAL
EMMET/IVY GARAGE
JPJ
NORTH GROUNDS / ATHLETICS
IVY CORRIDOR - EXISTING CONDITIONS
3
LAMBETH FIELD RESIDENCES
EMMET/IVY GARAGE
JPJ
HOTEL
SDS
IRC
PHASE I INITIAL BUILDINGS
NORTH GROUNDS / ATHLETICS
4
PUBLIC SPACE CONNECTIONS
Upper Reach Arrival Court The Promenade The Green
5
SOCIAL & FOOD SERVICE
MECHANICAL BATHROOMS
CONFERENCE
‘HUB’RECEPTION & STUDENT SERVICESCORPORATE
ENTRANCE ENTRANCESOCIAL & CIRCULATION
STAIRS & SERVICE
ENTRANCE
SITE 1B
PONDTERRACEDLANDSCAPE
PLAZA
IVY CORRIDOR LANDSCAPE
STAIR
Working Environment 7,330 NSF Classrooms 6,380 NSFConference 6,400 NSFMeeting / Social 6,090 NSFSupport 2,890 NSFOutdoor Space 4,600 NSFGROUND FLOOR PLAN DIAGRAM
6
LONG SECTION THROUGH CENTRAL STAIR7
PROPOSED VIEW OF THE CENTRAL STAIR, LOOKING EAST8
Gallery
Hub Plaza
DETAIL SECTION OF HUB AND CANOPY9
PROPOSED VIEW OF THE HUB AND GALLERY, LOOKING NORTH10
PROPOSED AERIAL VIEW LOOKING WEST
11
MATERIAL PALETTE AND INSPIRATION
Panelized Brick in Metal Surround Portico and Brise-Soleil
The language of shutters and metal louvers
12
SUSTAINABILITY INITIATIVES 13
PROPOSED VIEW OF THE PORTICO LOOKING NORTHWEST14
PROPOSED VIEW FROM THE TERRACE LOOKING EAST15
PROPOSED VIEW OF THE SDS LOOKING EASTPROPOSED VIEW OF THE SDS LOOKING EAST 16
PROPOSED VIEW OF THE PORTICO LOOKING SOUTHWEST17
PROPOSED DUSK VIEW OF THE PORTICO LOOKING SOUTHWEST18
Schematic Design Review: UVA Hotel & Conference Center
Athletic District
Upper Reach Arrival Court
PUBLIC SPACE CONNECTIONS20
GROUND FLOOR PLAN DIAGRAM Phase 1
Conference & Meeting SpacesFood & Beverage SpacesPublic SpacesGuest RoomsSupport Spaces
Lobby Living Room
Junior Ballroom
Cafe
Meeting
Loading
Existing Parking Garage
Covered Accessto Parking
Lower Entry
Main Entry
21
PROPOSED VIEW OF THE HOTEL ENTRY LOOKING NORTH22
Durable and resilient exterior materials
PV-ready roof structure
Roof mounted HVAC for efficient heating/cooling
Improved comfort to building and plaza from
canopy solar shading
District-wide stormwater retention
Stream & Planting enhances microclimate and biodiversity
Trees provide solar shading in the summer
LEED Certified
Building design coordinated with UVA
2030 Sustainability goals
Building design will implement UVA 2050 Fossil Fuel Free goals
HCC to implement sustainable and healthy practices:Non-toxic cleaningRecycling & composting
Electrical Load will allow the Kitchen to abandon Fossil Fuel in 10 years
SUSTAINABILITY INITIATIVES 23
PROPOSED VIEW LOOKING EAST TOWARDS LOBBY24
SERRATED BRICK FAÇADEPre-cast panels
RED BRICKMultiple Products under consideration
MULLIONS AND FRAMESBronze Paint
ARTICULATED PRECAST PANELS“Swiss Coffee” color toneSandblasted with Exposed Aggregate
FLAT PRECAST PANELS“Swiss Coffee” color toneHoned Finish
MATERIAL PALETTE 25
PROPOSED VIEW LOOKING WEST ALONG PROMENADE26
PROPOSED VIEW LOOKING NORTHWEST TOWARDS CAFÉ AND PORCHES27
Schematic Design Review: Smith Hall Renovation
SMITH HALL
Aerial image highlighting Smith Hall relative to the existing Darden Inn and areas of intervention29
LAW SCHOOL
DARDEN BUSINESSSCHOOL
PARKING
MASSIE ROAD
SMITH HALL
RESIDENTIAL WING
MAIN HOUSE
CONFERENCE WING
Site Plan highlighting Smith Hall relative to the new Darden Inn
NEW DARDENINN
30
Proposed Passageway Connector Plaza, from Duffy Boulevard and from the Arboretum
31
Rendering from the Arboretum looking West towards Smith Hall
32
Slide Number 1Schematic Design Review: School of Data ScienceSlide Number 3Slide Number 4Slide Number 5Slide Number 6Slide Number 7Slide Number 8Slide Number 9Slide Number 10Slide Number 11Slide Number 12Slide Number 13Slide Number 14Slide Number 15Slide Number 16Slide Number 17Slide Number 18Schematic Design Review: UVA Hotel & Conference CenterSlide Number 20Slide Number 21Slide Number 22Slide Number 23Slide Number 24Slide Number 25Slide Number 26Slide Number 27Schematic Design Review: Smith Hall RenovationSlide Number 29Slide Number 30Slide Number 31Slide Number 32Slide Number 33