BLACK OUT

( Total break down)   Prime considerations of

plant  safety and parameters.  island operation  Monitoring of Keyparameters duringisland operation.  Procedure of feed back

for oter unit au!iliaries.

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 2/41

  BLACK OUT 

All te Unit trips at B"P# tat meanstotal electrical supply failure and nobackup supply from system and oter

sources are a$ailable

#tation outgoing feeder ig $oltagelines circuit breakers are open

#tation %.C system a$ailable and in

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 3/41

  Plant #afety

Considerations Turbine lube oil system

Hydrogen Seal Oil System

RAH and GRF rotation

Condenser pressuremonitoring

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 4/41

  Plant #A'(T)CO*#+%(,AT+O*#

.We a!e to prote"t ea" e#uipment at plantspe"ially Ce"k all running o$ %&C operatedemergen"y ba"k up au'iliaries su" as %C

H seal oil pump %C turbine lube oilpumps

%rain steam lines against water ammering

*ote+ Confrmation rom local is mustManager operation should himsel

check the oil o! rom sight glasses andtur"ine and #A$ turning

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 5/41

  #aring te

responsibilities,a" sta- and o."er o$ operationsould "learly know teirresponsibility and a"tion to do

troug emergen"y operation SO/sduring bla"k out &re!iew and dis"ussemergen"y SO/S in normal

en!ironment $or "lari0"ation&/roper "ommuni"ation among

operation sta- and o."ers play a

!ital role Set all "ommuni"ation

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 6/41

Prime considerations in

Black outstart te unit au'iliaries by starting%iesel ,ngine Generator (%,G) as perSO/

,nergi1e ,mergen"y bus bars A2CA 3A2C2

,nergi1e units 4&4 56 au' bus22,322F

,nergi1e ligting trans$ormers

Cange o!er %C dri!en pumps to A&C

,ner i1e 2atter "ar ers o$ 7

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 7/41

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 8/41

+# LA*% OP(,AT+O*

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 9/41

%& LA'( O)*#AT%O'

  Te term :s land operation is useddue to te similarity o$ same

s"enario $a"ed at any :s land in teo"ean were you a!e to sur!i!edwit out te assistan"e o$ rest o$ te

world and depends on te $a"ilitiesa!ailable at :s ;and $or li!ing till teassistan"e re"ei!ed $rom rest o$ teworld &

:

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 10/41

-eneral *ote

• +n general as per protection logicunits at B"P# &ere not facilitate tore/syncroni0ed &it net&ork after

attaining +s land conditions on deadbus bar.

• Unit no 1 and 2 are no& madea$ailable by (3M after modi4cation in

logic5 #OP is de$eloped &it teconsultation &it (3M

&ic must be re$ie&ed periodically

during normal conditions byo eration sta6 and o7cers

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 11/41

  Tis operation is re"ommendedonly $or restoration o$ emergen"yessential au'iliaries o$ te units

be"ause unit on :sland may be"omeunstable upon starting o$ any 4&4 56au'iliaries&

A$ter te syn"roni1ation witnational grid unit start up a"ti!itiesmay be started&

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 12/41

+s Land Operation

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 13/41

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 14/41

MO*+TO,+*- O'

K() PA,AM(T(,#%U,+*- +# LA*%

OP(,AT+O*

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 15/41

+s Land Operation

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 16/41

*CR sta- 

  Case A

*ote any prote"tion relays and alarmoperated on prote"tion panel

• Coordinate "ontrol to stabili1ed tesystem $re#uen"y and !oltage&

• H:TAS sele"tor reset to auto ormanual(<=>4)

• Re syn"roni1ed te unit on :s ;and&

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 17/41

  Actions re8uired to stabili0ed

te unit during +s Land operationCase A or B

Boiler operator

?aintained Fuel oil 3 gas burner inletpr to sa$e !alue <pper Si' burner will"ut o- as per logi"&

?aintained 2oiler drum le!el put"ontrol on manual i$ re#uired&

• Control ?ain steam temperature well

abo!e tripping !alue(re@ignite upper

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 18/41

Turbine Operator.• Obser!e C6 and CR6 position and load

!ariation&

• ?aintained RH pressure to around 9 bar toa!oid re!erse power prote"tion&

• Ce"k H/ and ;/ bypass operation put

"ontrol on manual i$ re#uired "oordinatewit boiler operator regarding drum le!el

• Ce"k and "ontrol H/ Heater and ;/Heater le!el "ontrol $rom lo"al open

bypass !al!e $rom lo"al i$ re#uired&

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 19/41

+s Land Operation

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 20/41

*CR

:n "ase o$ 5,SC total supply $ailureand <nits > or 4 or bot a!e sa$eisolation on :S;A*% mode $ollowing

steps will be taken $or teir sa$e re@syn"roni1ation on 8 56 G:S %ead2us 2ar&

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 21/41

• All indi"ations and prote"tion relaysoperated on te <nits 8 56 linesand station trans$ormers at 2/S

end will be re"orded and"ommuni"ated to ;%C as early aspossible&

•  Te status o$ 8 56 Cir"uit 2reakers(O/,* or C;OS,) o$ O3H linesunitsand startup trans$ormers sould be

pysi"ally "e"ked noted open as

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 22/41

• :t sould be ensure tat all trippedunit au'iliary Trans$ormers ?ain :n$eed 2reakers (==22, B 4= 22, 3

==22F B 4=22F) sould be in OFF position

•   4 &A$ter ensuring "learan"e o$

te bus bar unit > or 4 generator"ir"uit

breaker will be "losed on 8 56

%ead 2us as $ollows

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 23/41

• At U*+T 2

• Syn&"ir"uit o- 

Syn&key on manual• /&2 (main release) press down on

"ontrol panel& <nit 4 willsyn"roni1ed on dead bus bar&

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 24/41

• At U*+T 1

• Syn& Cir"uit OFF

 Syn&Cir"uit&5ey set on ?anual (4&4k! syn&key to be insert) at unit >

• /&2 press down ( pro!ided $or tepurpose at unit >)unit no&> willsyn"roni1ed on dead bus bar&

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 25/41

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 26/41

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 27/41

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 28/41

• 4&4 56 bus bar A2CA3A2C2 souldpre$erably be energi1ed eiter onauto(depending upon te "3o sele"tor

position) or manual in order to energi1eessential au'iliaries o$ te unit on :S;A*% &

• First try to energi1e te emergen"y busbar (A=2CA@A2CA3A=2C2@A2C2) $rom

te unit on :sland operation upon $ailingto do so ten allow to syn"roni1e $romany %,G on emergen"y bus bar &%,Gsmay be started $or standby wit breaker

  o en&

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 29/41

  Actions re8uired to

stabili0ed te unit during +s Landoperation

Case A or B

Boiler operator• ?aintained Fuel burner inlet pr to

sa$e !alue Si' burner will "ut o- as

per logi"&• ?aintained 2oiler drum le!el put

"ontrol on manual i$ re#uired&

• Control ?ain steam temperature well

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 30/41

Turbine Operator.• Obser!e C6 and CR6 position and load

!ariation&

• ?aintained RH pressure to around 9 bar toa!oid re!erse power prote"tion&

• Ce"k H/ and ;/ bypass operation put

"ontrol on manual i$ re#uired "oordinatewit boiler operator regarding drum le!el

• Ce"k and "ontrol H/ Heater and ;/Heater le!el "ontrol $rom lo"al open

bypass !al!e $rom lo"al i$ re#uired&

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 31/41

•Actions re8uired at

te units &ic arenot facing +s Land

operation in case Btotal break do&n

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 32/41

BO+L(, #+%(

•  A$ter loss o$ au'iliary ele"tri" power"on0rm tat RAH is rotating on air motor&Open Air Heater bypass gas damper and

"lose Air Heaters inlet gas dampers& :$ airsupply o$ RAH dri!e is lost rotate AirHeaters by manual andle operation(ensure motor breaker ra"ked out)

 – Open F%F inlet !anes E outlet dampers$or natural dra$t purging $or at least 8minutes

 –

Wen au'iliary power is a!ailable putAir Heaters on ele"tri" dri!e& Close boiler

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 33/41

Turbine #ide

• Ce"k tat turbine emergen"y lube oil pumpand %C seal oil pump $or Generator a!estarted&("e"k on lo"al)

• Open "ondenser !a"uum breaker and "ut o-

"ondenser gland steam system as perpro"edure

• Wen AC au'iliary power is a!ailable "arry out$ollowing operations+

• Start TO/ O/ /ut turbine on turning gear &• Start open E "lose "ooling system pump

• Start Generator seal oil pump 6a"uum pp o$ Hseal system(<= E>4)

•  Turbine oil tank !apors e'tra"tor

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 34/41

 ack 'eed Line

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 35/41

+s Land conditionCase B

• ,nergi1e witout delay te 4&4 56emergen"y bus A2CA 3 A2C2 $rom teunit wi" is on :s land operation to ensure

instrument air "ompressor supply&• Wen unit on :s land is establised and

A2CA32 $ed $rom unit supply "on0rmopening o$ 4&4 56 breakers o$ start up =

and

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 36/41

• ,nergi1e manually te oter start upemergen"y bus A2CA32 andA=2CA 32 by "losing te tie breakers

• Similarly energi1e 22,322F bus barby "losing "oupling breakers andenergi1e 788 6 busses and %&C

"argers at ea" unit• Coordinate wit "ontrol $or ba"k $eed

$rom system

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 37/41

 Total 2reak %own

• Ask "ontrol $or ba"k $eed $rom any$eeder

• Ce"k te system !oltage on te$eeder $rom wi" "ontrol pro!ideba"k $eed

• Close 8 56 breaker o$ start up

A2CT

• Ce"k te 4&4 56 !oltage at A2CA32

• Syn"roni1e te ba"k $eed supply

$rom %,Gs i$ running&

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 38/41

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 39/41

2a"k $eed line up

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 40/41

7/18/2019 Black Out is Land Operation

http://slidepdf.com/reader/full/black-out-is-land-operation 41/41

&

T9A*K )OU