Top Related
ALCPG Software Status: Simulation & Reconstruction Norman Graf (for the sim/reco team) LCWS 2010, Beijing March 27, 2010.
SB2009/ Low energy running for ILC International Workshop on Linear Colliders 2010 Andrei Seryi John Adams Institute 19 October 2010.
J. Brau LCWS 2006 - Bangalore March, 2006J. Brau LCWS 2006 March, 2006 10 The Macropixel Array is Critical • Big Pixel size (initially 50 um x 50 um) limits the tolerance to higher
1 Pixel readout for a TPC LCWS 2010 – Tracking TPC R&D session 27 March 2010 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay groups.
Swapan Chattopadhyay (CI) Andrei Seryi (JAI) EuCARD, EuroNNAc Workshop, 3 - 6 May'11.
July 2, 2010 10th ATF2 Project Meeting Philip Bambade, Andrei Seryi, Toshiaki Tauchi Summary for TB.
Summary of LCTW09 Roman Pöschl LAL Orsay LCWS 2010 Beijing/China March 2010.
ILC Accelerator Technical Issues Nick Walker LCWS 2005 Stanford University 18.3.2005.