3 Powered By Neofima Energy Stnricta""
NEW TECH ENGINEERING . DAILY DRILLING REPORT -
County: Lea
OPERATOR; DCP Midstream Letic SL WeD No-:J_
Property ID;
Drill ing Supervisor-. K h t Fetlerolf
Drill ing Suptrvbor.
Phot*: 325-206-2229
Phone:
Drtg. Connector tylcr well service
Tool pusher: PHONE NUMBER:
HofeSUe: ' 7 -500 t ,
Footage L*M 24 tars: 90
2. Move in rig up/Rig down move ofl
G. L EWv.:_
K S to BHF:
Prop. T . a 9137
Date Last BOP Test: ^
AFE#
Dayi Chg. To Wel t .
LAST CASLNC: 20" Conductor CSC SHOE TEST: _
MOO PRESENT OPERATIONS: Drill ing 17-1/2' 81 90*
A F E - D H G 3 2^04,025
Cum. Monthly rl( r»p»lr: Hr
T O HRS. CODE DESCRIPTION DAILY A C T I V I T Y
Dmtc: 10/20/2007
DISTRIBUTION OF HOURS
CATEGORIES
CUM.
TOTALS
Move in rig and rip UP
Spud well at 4:00 A M on Sunday. 2I-Ocl-07. Drilling & 90*
EVALUATION
DRILLING
COST
SURVEY INFORMATION DEVIATION SURVEYS: DIRECTIONAL CO.
DEPTH ANGLE AZM TVD V.S. COORDINATES DLS DIRECTIONAL HOLE TARGETS
TARGET TVD
TARGET AZM
TARGET+N AS
TARGET +E/-W
TARGET TVD
TARGET AZM
TARGET+N AS
TARGET +E/-W
TARGET TVD
TARGET AZM
TARGET+N AS
TARGET +E/-W
TARGET TVD
TARGET AZM
TARGET+N AS
TARGET +E/-W
TARGET INCL. TARGET INCL. + UP/-DOWN TARGET INCL.
bfUD LOGGER NAM£:_
MUD LOGGER PHONE:
MUD LOGGERS REPORT BACK GROUND GAS
CONNECTION GAS:
TRIP GAS:
SHOW GAS:
DOWNTIME GAS:
LITHOLOGY:
COMMENTS:
PROPERTIES Tjpe Mud: Spud Mud MIT> COMPANY: Eagle Drilling Fluids MUD ENGINEER: Ron Bailey
PHONE NUMBER: 432-664-3690
D«ily Cost: S493.9Q
D A I L Y M U D ADDITIVES:
DEPTH TIME MW vis PV YP GELS PH API WL HTHP
WL CAKE
PM
LIME
PF
ES
CL
PPM
TOTAL
a TOTAL
SALT
V.
SAND SOLIDS OIL WATER
LCM
PPB ECD
| 0.00
BIT DATA
BiTNO SIZE M f 8 Type Soil) No. Jds-32nds
Depth
Out
Dairy
Feet
Total
Fed Hrs.
Total
Hrs
Daily
Ft/Hr
Total
FUHr. WOB RPM
BIT GRADE "
BiTNO SIZE M f 8 Type Soil) No. Jds-32nds
Depth
Out
Dairy
Feet
Total
Fed Hrs.
Total
Hrs
Daily
Ft/Hr
Total
FUHr. WOB RPM INN OUTER BEARINGS GAGE
1 17-1/2* Smith TXC1 6028429 16-16-16 90 30 2.0 2 45
PUMP D o r T ROD ROD b the dla. Of the pis bin rod on dual action pump*
D b h r ^ m p u M p „ A T A
T b for triplex pimp
D 2
ROD b the dla. Of the pis bin rod on dual action pump*
D b h r ^ m p u M p „ A T A
T b for triplex pimp D 2
ROD b the dla. Of the pis bin rod on dual action pump*
D b h r ^ m p u M p „ A T A
T b for triplex pimp
PUMP
NO. TYPE HP
*,i
EPF.
Stroke
Lenjrth Size SPM GPM Press DPAV DCAV HHP
Bil
HHP
%HHP
At Bil HHP/IN J
SLOW PUMP RATES PUMP
NO. TYPE HP
*,i
EPF.
Stroke
Lenjrth Size SPM GPM Press DPAV DCAV HHP
Bil
HHP
%HHP
At Bil HHP/IN J SPM PSI SPM PSI
1 DB700 575 60 16.0 5.5 0 0 0 0.00 0.00 0.00
2 DB700 575 60 16.0 5.5 0 0 0.00
BOTTOM HOLE ASSEMBLY OD ID LENGTH OD_
DRILL PIPE 1:
BHA NO.: DRILL PIPE 2 :
4.50 3.83 90.00 j DRILL COLLARS 1
DRILL COLLARS 2
8.00 DRILL PIPE 1:
BHA NO.: DRILL PIPE 2 : 0.00 0.00 0.00 |
DRILL COLLARS 1
DRILL COLLARS 2 7.00 Total Leant* 10.00 | H R S O H B H A | 0
ITEM 1 Description Length O D . I.D. Top Conn Bottom Conn TOP TO BIT REMARKS
Managed by New Tech Engineering HPowered By NeoFirma Energy Service*"
3 Powered By NeoFirma Energy Services™
NEW TECH ENGINEERING • - DAILY DRILLING REPORT . .
County. Lea
OPERATOR; DCP Midstream Lease AWefl No-: 1 D«yj from Spud 1 THtr. 10/21/2007 Property ID: MSnUflirnON OF HOURS
Drill ing Supervisor: KirkFeHerolf P „ D e ; 325-206-2229 r > p t i l : 580 CATEGORIES DAILY
CUM.
TOTALS
Drill ing Scpervttorr P b o « : T V D : 580.0 1. Dri l l rotating 11.50 13.50
Drtg. Contractor Tyler weH service X i z # : 2 Hole She: 17.500 _ 2. Circulate A condition 0.50 0.50
Toolpushcr: PHONE NUMBER: Footage Last 24 t i n : 490 3. Directional/Deviation survey 0.25 0-25
4. Rig up easels' run casing 2.00 2.00
G. L Elev.: R K B to G. L. 1 8 ft 5. Rig up con enters/ cementing 4.00 4.00
K B to BHF: Date Last BOP Test: na Days Chg. To Wel t 6. Wait on cement 4.00 4.00
Prop.T.D. 9137 AFE* AFE-DHC: 5 2,304,025 7. Other not listed 1,75 1.75
8. Move tu rig up/Rig down move of 22.00
LAST CASINO: 20" Conductor CSG SHOE TEST: EMW Cum. Monthly rh; repaln Hrs.
owopRESENTOPERATloNS: Waiting on cemenl
FROM T O HRS. CODE DESCRIPTION D A I L Y A C T I V I T Y
600 945 3.75 1 Drill jnfl to 277
945 1000 025 3 Totco survey O) 277 1/dee. 1000 1400 4.0 1 DriHinBlo484' •
1400 1745 3.75 1 Dri U inc to 580"
1745 1815 0.5 2 Circulate bottoms UD 1815 2000 1.75 7 POOH to nm caana 2000 2200 2.0 4 R i e u o & r a n 13 i t so f 13-3/8"casinE to 580" 2200 200 4.0 5 Cemenl 13-3/8" casina w275 sk o f 12.8 ODE lead(35:65 Poz:Class"C" + 6%BWOC Benton-
iie + 2% BWOC Calcium Chloride} and 200 sx o f 14.8 w e tail (C_ss"C" + 2% BWOC Calci
um ChlorideV Circulated 104 sx of cement lo surface and bumped the phic with 500 DS-
t Float did m*1 hnM held 100 rwi on wans
200 600 4.0 6 Wfn'rine on r m i f n l
TOTALS 24.00 48.00
D R I L L I N G 11.50 13.50
EVALUATION 0.00 0.00
DAILY CUM
DRILLING INTANG. S45,155.00 $685,079.53
P.U. Wt. S. 0 . Wt. String Wt. Rol. Amps/Trq.: COST TANG. 125.690.00 525,690.00
SURVEY INFORMATION TOTALS 370,845.00 57)0,769.53
DEVIATION SURVEYS: DIRECTIONAL CO.
COORDINATES
SUPERVISOR!}-
DIRECTIONAL HOLE TARGETS
TARGET TVD: _
TARGET AZM: _
TARGET +N/-S: _
TARCET +E/-W:
TARGET INCL.:
MUD LOGGER NAME: _
MUD LOGGER PHONE _
MUD LOGGERS REPORT BACKGROUND GAS_
CONNECTION GAS:_
TR1PGAS:_
SHOW GAS:_
DOWNTIME GAS:_
LITHOLOGY:
COMMENTS:
MUD PROPERTIES Type Mud: Spud Mud MUD COMPANV: Eagle Drilling Fluids MUD ENGINEER: Ron Bailey Daily Cost: S0.00 Cm: 1493.90
PHONE NUMBER: 432.664.3690
DALL-V MUD ADDITIVES;
DEPTH TIME MW VIS FV YP GELS PH API WL HTHP PM PF CL TOTAL TOTAL % LCM ECD
WL CAKE LIME ES PPM CL SALT SAND SOLIDS OIL WATER PPB ECD
0.00
BIT DATA Depth Dairy Total Total Daily Total BIT GRADE
BIT NO SIZE Mfg Type Serial No. Jds-32nds Out Fect Feet Hrs. Hrs FL/Hr FtJHr. WOB RPM INN OUTER BEARINGS GAGE
1 17-1/2" Smith Re-Tip 16-16-16 580 490 580 11.5 14 ! 43
| PUMP D o r T ROD ROD b the dla. O f the piston rod on dual iction pumps
D 2 D i i for duplex pump PUMP DATA
D 2 T h far triplex pump PUMP DATA
PUMP •A Stroke Liner Pump Surface Bit H HHP SLOW PUMP RATES
NO. TYPE HP EFF. Lemrth Size SPM GPM Press DPAV DCAV HHP HHP At Bit HHP/TN1 SPM PSI SPM PSI
1 DB700 575 60 16.0 5.5 I 0 0 0 0.00 0.00 0.00
2 OB700 575 60 16.0 5.5 | 0 0 0.00
I
BOTTOM HOLE ASSEMBLY OD ID LENGTH OD
DRILL PIPE 1 :
BHA NO.: 1 DRILL PIPE 2 :
4.50 3.83 58O.0O DRILL COLLARS 1
DRILL COLLARS 2
8.00 DRILL PIPE 1 :
BHA NO.: 1 DRILL PIPE 2 : 0.00 0.00 0.00
DRILL COLLARS 1
DRILL COLLARS 2 7.00 Toial Length 12.B7 | H R S O N B H A | I 2
ITEM Description LenfEih O.D. I.D. Top Conn Bottom Com TOP TO BIT REMARKS
1 17-1/2- Bit 1.50 17.50 7-5/8" Res 1.5
•> Bit Snh t 17 ROD 6 - 5 f f l - R » 7-5/8* Res ?R7
Managed by NewTech Engineering 21 Powered By NeoFirma Energy Services ~
3 Powered By NeaRrtn* Eneryj scuriceV
NEW TECH ENGINEERING DAILY DRILLING REPORT
County; Lea.
OPERATOR; DCP Midstream D«y» from Spud Date: 10/22/2007 Property ID: DISTRIBUTION OF HOURS
Dril l ing Supervisor. KiAFct tero l f Pbcj* : 325-206-2229 y ^ p ^ . 645 CATXCOR1ES DAILY
CUM.
TOTALS
Dril l ing Supervisor: Phone: TVD: 645.0 I . Dri l l rotating 1.00 14.50
D r i f t Contractor tyler well service Rig 2 Hole Stte: 12-250 „ 2. Circulate & condition 0.50
Tool pusher: PHONE NUMBER: Footage Last 24 hrs: 65 3. Directional/Deviation survey 075
4. Rig up casers/ run casing 2.00
C. L . Elev.: R K B to G. L . 18f t 5. Rig up can enters/ cemenlbu? 4.00
K B to BHT: Date L a j t BOP Test na Days Chg. To Wel t 6. Wait on cement 4.00
Prop. T.D. 9137 AFES .AFE-DHC- 5 2,304,025 7. Nipple up BOPs/Nipple down BOI 6.50 6.50
B. Test BOPs 2.50 2.50
LAST CASING: 13 3/8 CSC SHOE TEST: EMW C u Monthly rfe repair: H n 9. Pick up /Lay down BHA 1.50 1.50
10. Pick up /Lay down drill string • 2.00 2.00
w o PRESENT OPERATIONS: Drilling 12 1/4 hole U . Other not listed 10JO 1275
FROM T O HRS. CODE DESCRIPTION D A I L Y A C T I V I T Y 12. Move in rig up/Rig down move o 22.00 600 930 3.5 7 WOC-Cut o f f l 3 3/8-930 1100 1.5 11 Weld on heaitest to 370#s OK 1100 1400 3.0 N U / BOPE *™ V 1" ilnwn'moSe
1400 1900 5.0 ] ) N U BOPE choke
1900 2000 1.0 Function test BOPE.iesJ blinds & choke line to lOO0#s
2000 2030 0.5 1] Unload heavv wt dri l l oioe to rack
2030 2200 1.5 PU.MU.BHA. 2200 2400 2.0 10 Pick up & nm
2400 200 2.0 Jl RU H2S eaui—lent
200 330 1.5 TIH tajt UD la} 522\tesl casing to 600#s held OK Tor 30 min.
330 100 1.5 u Drill nirt it t^-rt CHWIF tn fiOMs
500 600 1.0 1 n r i n ; n t . i ? ? i h f > i , . ( f f l f i 4 V
TOTALS 24.00 72.00
D R I L L I N G 1.00 14.50
EVALUATION 0.00 0.00
DAILY CUM
DRILLING 1NTANG. 539.275.00 5724,354.53
P.U. Wt. S. O. Wi . Strinp. Wt. Rot. Amps/Trq^ COST TANG. £0.00 $25,650.00
SURVEY INFORMATION TOTALS 339,275.00 5750,044.53
DEVIATION SURVEYS: DIRECTIONAL CO-
COORDINATES
SUPER VISOR:|
DIRECTIONAL HOLE TARGETS
TARGET TVD:_
TARGET AZM _
TARGET +N/-S:_
TARGET+E/-W:
TARGET INCL.:
MUD LOGGER NAME; _
MUD LOGGER PHONE:_
MUD LOGGERS REPORT BACK GROUND GAS _
CONNECTION GAS:_
TRIP GAS: _
SHOW GAS: _
DOWNTIME GAS: _
LITHOLOGY:
COMMENTS:
MUP PROPERTIES Type Mud: Spud Mud MUD COMPANY: Eagle Drilling Fluids MUD ENGINEER: Ron Bailey Daily Cost: 50.00 Cum: 5493.90
PHONE NUMBER: 432.664.3690
DAILY MUD ADDmvES: _
DEPTH TIME MW VIS PV YP GELS PH API WL HTHP
WL CAKE
PM
LIME
.PF
ES
CL
PPM
TOTAL
CL
TOTAL
SALT
% SAND SOLIDS
% OIL
W
WATER
LCM
PPB ECD
0.00
B I T D A T A
BIT NO SIZE Mfg Type Serial No. Jets-32nds
Depth
Out
Daily
Fect
Total
Feet Hrs.
Total
Hrs
Daily
FtTHr
Total
FUHr. WOB RPM
BIT GRADE
BIT NO SIZE Mfg Type Serial No. Jets-32nds
Depth
Out
Daily
Fect
Total
Feet Hrs.
Total
Hrs
Daily
FtTHr
Total
FUHr. WOB RPM INN OUTER BEARINGS GAGE
2 12.25 STC FDS PG6481 3-16s 65 65 1.0 1 65
PUMP D o r T ROD ROD b the dia. Of the piston rod on dual action pumps
D b f o r d w l n p . n . p P U M P D A T A l is for triplei pwnp
D 2
ROD b the dia. Of the piston rod on dual action pumps
D b f o r d w l n p . n . p P U M P D A T A l is for triplei pwnp D 2
ROD b the dia. Of the piston rod on dual action pumps
D b f o r d w l n p . n . p P U M P D A T A l is for triplei pwnp
PUMP
NO. TYPE HP
•a EFF.
Stroke
Size SPM GPM Press DPAV DCAV
Surface
HHP
Bit
HHP
%HHP
Al Bit HHP/IN5
SLOW PUMP RATES PUMP
NO. TYPE HP
•a EFF.
Stroke
Size SPM GPM Press DPAV DCAV
Surface
HHP
Bit
HHP
%HHP
Al Bit HHP/IN5 SPM PSI SPM PSI
1 DB700 575 60 16.0 5.5 0 0 0 0.00 0.00 0.00
2 DB700 575 60 16.0 5.5 0 0 0.00
BOTTOM HOLE ASSEMBLY OD ID LENGTH , QD
DRILL PIPE 1 :
BHA NO.: 1 DRILL PIPE 2 :
4.50 3.83 645.00 DRILL COLLARS 1
DRILL COLLARS 2
8.00 DRILL PIPE 1 :
BHA NO.: 1 DRILL PIPE 2 : 0.00 0.00 0.00
DRILL COLLARS 1
DRILL COLLARS 2 7.00 Total Length 12.87 | H R S O N B H A | 1 3
ITEM Description Lenrnh O.D. I.D. Top Conn Bottom Conn TOP TO BIT REMARKS
1 17-1/2' Bit 1.50 17.50 7-5/8" Ree l.S
7 Rit Snh 1 37 800 fi-VK" Reo 7-VX- Ree 2.87
Managed by NewTech Engineering 35Powered By Neoftrnta Energy Sendee*""'
3 Powered By NeoFirma Energy Services""
NEW TECH ENGINEERING DAILY DRILLING REPORT
County: Lea
OPERATOR; DCP Midstream Lew & Wdl No-: ! Date: 10/23/2007 Property ID: DISTRIBUTION OF HOURS
Drill ing Supervisor: Kirk Fettcrolf Phone: 325-206-2229 Depth: 1523 CATEGORIES DAILY
CUM
TOTALS
Dril l ing Supervisor: Pbone: T V D : 1923.0 1. Dr i l l rotating 15.50 30.00
Drtg. Contractor tyler well service Rig/ / : 2 Hole Sue: 12750 ta 2. Circulate &, condition 0.50
Tool pusher: PHONE NUMBER: Footage Last 24 hrs: 1278 3. Direct) onal/DeviatioQ survey 0.50 0.75
4. Rig upcasers/ran casing 2.00
G, L . Elev.: RKB to G. L> 1 8 ft 5. Rig up cemenlcrs/ cementing 4.00
K B to BHP: Dale Last BOP Test: na Days Chg. To W e l t 6. Wait on cement 4.00
Prop. T.D. 9137 A FES AFE-DHC: S2.3W.025 7. Nipple up BOPs/Nipple down BOl 6.50
8.TestBOPs 2.50
LAST CASING: 13 3/8 CSG SHOE TEST: EMW Ci*n. Moothr, r l i rrpalr: Hrs. 9. Pick up /Lay down BHA 1.50
10. Pick up /Lay down drill string 2.00
0«B PRESENT OPERATIONS: Drilling @ 1668" 3* pm 11. Other not listed 8.00 2025
FROM TO HRS. CODE DESCRIPTION D A I L Y A C T I V I T Y 12. Move in rig up/Rig down moveo 22.00
600 1400 8.0 11 Dri l l out to 59T/RU to run leak o(T testiest oDenhole lo 1 2DPE no uressre drno test
held OK.
1400 2000 6.0 1 Drillina from I318--to 1596' 200Q 2030 0.5 3 WLS B 1490* 3/4 dee. RS
2030 2200 1.5 1 Drillina from 1490" to 1569"
2200 600 8.0 1 driJiins fromlSeyto 1923*
TOTALS 24.00 96.00
DRILLING 15.50 30.00
EVALUATION O.OO 0.00
DAILY CUM
DRILLING INTANG. S52.696.00 J777.050.53
P. U . Wt S. O. Wt. Sirina W t Rot. AmpsTrq.: COST TANG. $0.00 $25,690.00
SURVEY INFORMATION TOTALS S52.696.00 $802,740.53
DEVIATION SURVEYS: DIRECTIONAL CO.
COORDINATES DIRECTIONAL HOLE TARGETS
TARGET TVD:_
TARGET AZM: _
TARGET+N/-S:_
TARGET +E/-W:
TARGET INCL: . * UP / - DOWN
MUD LOCCER NAME: _
MUD LOGGER PHONE:
MUD LOGGERS REPORT BACK GROUND GAS _
CONNECTION GAS:_
TRIP GAS:_
SHOW GAS:_
DOWNTIME CAS:_
LITHOLOGY:
PROPERTIES Type Mud: Drilling mud
DAILY MUD ADDITIVES;
MUD COMPANY.- Eagle Drilling Fluids MUD ENGLNEER: Ron Bailey Daily Cost? S46.00
PHONE NUMBER: 432.664.3690
DEPTH TIME MW VIS PV YP GELS PH API WL HTHP
WL CAKE
PM
LIME
PF
ES
CL
PPM •
TOTAL
CL
TOTAL
SALT
% SAND
% SOLIDS OIL
W
WATER
LCM
PPB ECD
1622 8.8 32 3 4/5 9.500 ).1 1.100 1 95.6 8.8D
BIT DATA
BIT NO SIZE Mfg Type Serial No. Jets-32nds
Depth
Out
Daily
Feci
Total
Fect Hrs.
Total
Hrs
Dairy
FL/HT
Total
FL/HT. WOB RPM
BIT GRADE
BIT NO SIZE Mfg Type Serial No. Jets-32nds
Depth
Out
Daily
Feci
Total
Fect Hrs.
Total
Hrs
Dairy
FL/HT
Total
FL/HT. WOB RPM INN OUTER BEARINGS GAGE
2 12.25 STC FDS PG84B1 3- 16s 1278 1343 15.5 17 81 25 65
PUMP D o r T ROD ROD b the dia. Of rhe piston rod on dual action pumps
D b b r d q t a p - P p l J M p D A T A
T is for triples pump
D 2
ROD b the dia. Of rhe piston rod on dual action pumps
D b b r d q t a p - P p l J M p D A T A
T is for triples pump D 2
ROD b the dia. Of rhe piston rod on dual action pumps
D b b r d q t a p - P p l J M p D A T A
T is for triples pump
PUMP
NO. TYPE HP
• i i
EFF.
Stroke
Size SPM GPM Press DPAV DCAV
Surface
HHP
Bit
HHP
V. HHP
Al Bit HHP/IN1
SLOW PUMP RATES PUMP
NO. TYPE HP
• i i
EFF.
Stroke
Size SPM GPM Press DPAV DCAV
Surface
HHP
Bit
HHP
V. HHP
Al Bit HHP/IN1 SPM PSI SPM PSI
1 DB7D0 575 60 16.0 5.S 0 0 0 0.00 0.00 0.00
2 DB700 575 60 16.0 5.5 0 0 0.00
I
BOTTOM HOLE ASSEMBLY OD ID LENGTH OD
DRILL PIPE 1 :
BHA NO.: 1 DRILL PIPE 2 :
4.50 3.83 1923.00 DRILL COLLARS I
DRILL COLLARS 2
8.00
Total Length . HRS ON BHA
DRILL PIPE 1 :
BHA NO.: 1 DRILL PIPE 2 : 0.00 0.00 0.00
DRILL COLLARS I
DRILL COLLARS 2 7.00 Total Length 2.87 . HRS ON BHA 28
ITEM Description Leneth O.D. I.D. Top Conn Bottom Com TOP TO BIT REMARKS
1 17-1/2* Bit 1.50 17.50 7-5/8- Ree 1.5
2 Bit Suh 1 17 son fi-WT Rep 7 - W Ref 2S7
Managed by NewTech Engineering 3 Powered By NeoFirma Energy Service*™
3 Powered By NeoFirma Energy Service*""
NEW TECH ENGINEERING DAiLV DRILLING REPORT
Rie Phone: County: Lea R i v Fa i :
OPERATOR; DCP Midstream Date: 10/24/2007
Properly ID: DISTRIBUTION OP HOURS
Dri l l ing Supervisor: Kirk F«tero l f phone: 325-206-2229 r^pu , . 2679 CATEGORIES DAILY
CUM.
TOTALS
Dri l l ing Supervisor: Phone: T V D : 2679.0 1. Dr i l l rotating 22.50 52.50
Dri£. Contractor tyler well service Rfe tt; 2 Hole Size: 12.250 to 2. Circulate & condition 0.50 1.00
Toolpmhcr: PHONE NUMBER: Footage Last 24 hrs: 756 3. Direcu'onaVDeviatioD survev 1.00 1.75
4. Rig up casers/ run casing 2.00
G. L Elev.: R K B to G. L . 18 ft 5. Rig up cemenlers/ cementing 4.00
K B to BHF: Date Last BOP Test: 22/OctA)7 Days Chg. To Welt 6. Wait on cement 4.00
Pro pi T. ft 9137 AFE* AFE-DHC: 52304,025 7. Nipple up BOPs/Nipple down BO! 6.50
8. Test BOPs 2.50
LAST CASING: 13 3/8 CSG SHOE TEST: 12 EMW Cum. Moodily rfr npmin Hrs. 9. Pick up /Lay down BHA 1.50
10. Pick up /Lay down drill string 2.00
0600 PRESENT OPERATIONS: POOH for a new biL 11. Other not listed 20.25
F R O M TO HRS. CODE DESCRIPTION DAILY A C T I V I T Y 12. Move in rig up/Rig down move o 22.00
600 930 3.5 Drilling from 1819" to 2007 930 945 0.25 WLS131961' f l d e a . ) 945 1400 425 Drillina from 200T to 2195*
1400 1415 025 Wireline Survev 2429" (2 dea. 1
1415 2200 7.75 DritlinE from 2195" to 2495"
2200 500 7.0 Drinine from 2495' to 2705". rale of uenetration droiroed from 70 FPM to 10 FPM
500 530 0.5 Wireline Survev @> 2&79 fI-1/2 dee.) 530 600 0.5 Pump SWCCD for a bit trio
TOTALS 24.00 120.00
D R I L L I N G 22.50 52 JO
EVALUATION 0.00 0.00
DAILY CUM
DRILLING DNTANG. S28.050.00 $805.100.53
P. U. Wt. S.O. WL StrinftWL Rol. Ampt/Trq.: COST TANG. SO.OO $25,690.00
SURVEY INFORMATION TOTALS 528,050.00 5830,790.53
DEVIATION SURVEYS: DLRECTIONAL CO.
COORDINATES
SUPERVISOR:!
DIRECTIONAL HOLE TARGETS
TARGET TVD: _
TARGET AZM: _
TARGET+N7-S:_
TARGET+E/-W:
TARGET INCL: + UP/-DOWN
Nam LOGGER NAME: _
MUD LOGGERPHONE
MUD LOGGERS REPORT BACK GROUND GAS_
CONNECTION GAS:_
TRLP GAS:_
SHOW GAS: _
DOWNTIME GAS:_
LITHOLOGY: _
COMMENTS:
PROPERTIES Type Mud: Drilling mud MUD COMPANY: Eagle Drilling Fluids MUD ENGINEER: Ron Bailey
PHONE NUMBER: 432.664.3690 DAILY MUD ADOrnVES:
DEPTH j »T1ME MW VIS PV YP GELS PH API WL j HTHP
j WL CAKE
PM
LIME
PF
ES
CL
PPM
TOTAL
CL
TOTALl %
SALT | SAND
% SOLIDS
•A
OIL
•A
WATER
LCM
PPB ECD
I I 0.00
BIT DATA
BIT NO SIZE Mfe Type Serial No. Jets-32«is
Depth
Out
Daily
Feet
Total
Feet Hrs.
Total
Hrs
Daily
FL/Hr
Tola!
WOB RPM
BIT GRADE
BIT NO SIZE Mfe Type Serial No. Jets-32«is
Depth
Out
Daily
Feet
Total
Feet Hrs.
Total
Hrs
Daily
FL/Hr
Tola!
WOB RPM INN OUTER BEARINGS GAGE
2 12.25 STC FDS PG64B1 3-16s 756 2099 3.5 20 105 25 65
PUMP D o r T ROD ROD Is Ow dia. Ofthe piston rod on dual action pumps
D i . t o , d « p l „ ^ p p U M p D A T A
T b for triplex pump
D 2
ROD Is Ow dia. Ofthe piston rod on dual action pumps
D i . t o , d « p l „ ^ p p U M p D A T A
T b for triplex pump D 2
ROD Is Ow dia. Ofthe piston rod on dual action pumps
D i . t o , d « p l „ ^ p p U M p D A T A
T b for triplex pump
PUMP
NO. TYPE HP
'A
EFF.
Stroke
Leap*
Liner
Size SPM GPM Press DPAV DCAV
Surface
HHP
Bil
HHP
*A HHP
At Bit HHP/IN1
SLOW PUMP RATES PUMP
NO. TYPE HP
'A
EFF.
Stroke
Leap*
Liner
Size SPM GPM Press DPAV DCAV
Surface
HHP
Bil
HHP
*A HHP
At Bit HHP/IN1 SPM PSl SPM PSI
1 (OB700 575 60 16.0 5.5 0 0 0 0.00 0.00 0.00
2 DB700 575 60 16.0 5.5 0 0 0.00
BOTTOM HOLE ASSEMBLY OD ID LENGTH OD
DRILL PIPE 1 :
BHA NO.: 1 DRILL PIPE 2 :
4.50 3.83 2679.00 DRILL COLLARS 1
DRILL COLLARS 2
8.00 DRILL PIPE 1 :
BHA NO.: 1 DRILL PIPE 2 : 0.00 0.00 0.00
DRILL COLLARS 1
DRILL COLLARS 2 7.00 Total Length 12.87 | H R S O N B H A | 3 2
ITEM Description Lenpth OD. I.D. Top Conn Bottom Conn TOP TO BIT REMARKS
1 17-1/2- Bit 1.50 17.50 7-5/8- Rett J.5
2 Bi l Rub 1 37 son (LVB-Re* 7--JB- R « 2 87
Managed by N e w T e c h E n g i n e e r i n g 3 Powered By NeoHrnia Energy Services'"
3 Powered By NeoFirma Energy Services'"
NEW TECH ENGINEERING DAILY DRILLING REPORT
County: Lea
OPERATOR: DCP Midstream Lease & Well Na: 1
Property ID:
Drill ing Supervisor: Kirk Faterolf
Drill ing Supervisor:
Drig. Contractor tyler well service
Toolpushcr:
G. L . E l e v - _
K B to BHF:
PHONE NUMBER: _
R K B to G. L, 1 8 fl
Pbone: 325-206-2229
Phone:
R t g « : 2
Depth: 2945
T V D : 2945.0
Hole Sue: " 2 5 0 b
Footage Last 24 hrs: 266
2. Wash & ream
3. Circulate & condition
4. Rig repair
Prop. T.D. 9137
Date Last BOP Test ra
AFEJf
DaysChg.To Welfc_
5. DtTOp'onal/Devifltion survey
AFE-DHC: S 2,304,025
6. Rig up casers/ run casing
7. Rig up cemcnters/ cementinjj
8. Wail on cemenl
LAST CASING: 133/8 CSG SHOE TEST: 1 n. MeutUy rh; repair: _ 9. Nipple up BOPs/NippIe down BOI
woo P R E S E N T OPERATIONS: Drilling ahead (S 2 W
> HRS. C O D E DESCRIPTION D A I L Y A C T I V I T Y
r j . t r : 10/25/2007
DISTRIBITION OF HOURS
CATEGORIES
11. Pick up/Lay down BHA
12. Pick up /Lay down drill string
CUM.
TOTALS
71.00
025
2.00
025
2.00
2.00
4.00
4.00
6.50
1.50
2.00
1.75
2225
22.00
circulate sweep 13. Trippuig/foTbit/rmidmotor/mwd
Trip out o f bole for bil 14. Other not listed
replace break out cable 15. Move in rig up/Rig down ci
Continue to TOH
Pick up new b i t T I H
Ream 30* to bottom
Drla. from 2705 lo 2757
LMe from 2757 to 2787
WLS (32741'2 deg
Prig from 2787 to 2850'
Prig from 28Sffto 294 V
EVALUATION
SURVEY INFORMATION Rot. Amps/Trq.:
DRILLING
COST
DEVIATION SURVEYS: DIRECTIONAL CQ.
DEPTH ANGLE AZM TVD V.S. COORDINATES DLS DIRECTIONAL HOLE TARGETS 2679 1.5 2678.36 55.49 55.49 0.00 0.00 TARGET TVD:
2741 2.0 2740.33 57.39 57.39 0.00 0.00 TARGET A Z M :
TARGET +N/-S:
TARGET +E/-W:
TARCETINCL.: . . + UP/-DOWN
MUD LOC CER NAME: _
MUD LOGGER PHONE
MUD LOGGERS REPORT BACK GROUND GAS
CONNECTION GAS:.
TRIP GAS:
SHOW CAS:
DOWNTIME GAS:
LITHOLOGY:
COMMENTS:
MUD PROPERTIES Type Mud:
DAILY MUD ADDTTTVEi
Drilling mud MUD COMPANY: Eagle Drilling Fluids MUD ENGINEER:
PHONE NUMBER:
Ron Bailey Da3y Cost S741.35 Cum: J128125 Type Mud:
DAILY MUD ADDTTTVEi 5:
MUD COMPANY: MUD ENGINEER:
PHONE NUMBER: 432.664.3690
Da3y Cost Cum:
DEPTH TIME MW VIS PV YP GELS PH AP1WL HTHP
WL CAKE
PM
LIME
PF
ES
CL
PPM
TOTAL
CL
TOTAL
SALT
*A
SAND
*A
SOLIDS
•A
OIL
tt
WATER
LCM
PPB ECO
2945 500 9.9 33 3 4 4,5 10 232 13200 3 3.0 94.8 9.90
B I T D A T A
BIT NO SIZE Mfe Type Serial No. JeB-32nds
Depth
Out
Daily
Feet
Tola!
Feel Hrs.
Total
Hrs
Daily
FL/Hr
Tola!
FL/Hr. WOB RPM
BIT GRADE
BIT NO SIZE Mfe Type Serial No. JeB-32nds
Depth
Out
Daily
Feet
Tola!
Feel Hrs.
Total
Hrs
Daily
FL/Hr
Tola!
FL/Hr. WOB RPM INN OUTER BEARINGS GAGE
1 17-1/2" Smith Re-Tip mi!9585 16-16-16 560 0 580 11.5 25 23
PUMP D o r T ROD ROD b the dia. Of the piston rod on dual action punpi
D b l b r ^ p - p p u v l p D A T A
T a for triplex pump
D 2
ROD b the dia. Of the piston rod on dual action punpi
D b l b r ^ p - p p u v l p D A T A
T a for triplex pump D 2
ROD b the dia. Of the piston rod on dual action punpi
D b l b r ^ p - p p u v l p D A T A
T a for triplex pump
PUMP
NO. TYPE HP %
EFF.
Stroke
Length Size SPM GPM DPAV DCAV
Surface
HHP
Bil
HHP
'A HHP
Al Bit HHP/IN 1
SLOW PUMP RATES PUMP
NO. TYPE HP %
EFF.
Stroke
Length Size SPM GPM DPAV DCAV
Surface
HHP
Bil
HHP
'A HHP
Al Bit HHP/IN 1 SPM PSI SPM PSI
1 DB700 575 60 16.0 5.5 6 22 500 4 6 6.46 2.57 0.40 0.02 3 250 2 2
2 DB700 575 60 16.0 5.5 0 5 0.00
BOTTOM HOLE ASSEMBLY OD ID LENGTH OD
DRILL PIPE I :
B H A N O . : 2 DRILL PIPE 2 •
4.50 3.83 2945.00 DRILL COLLARS I
DRILL COLLARS 2
8.00
Total Length HRS ON BHA
DRILL PIPE I :
B H A N O . : 2 DRILL PIPE 2 • O.OO 0.00 0.00
DRILL COLLARS I
DRILL COLLARS 2 7.00 Total Length 2.87 HRS ON BHA
ITEM Description Lcntfh O.D. I.D. Top Corn Bono ci Corn TOP TO BIT REMARKS
I 17-I/2" Bit 1.50 17.50 7-5/8" Res 1.5
2 Ril Sub 1 37 son ft-WRee 7-5/8" Rec 287
Managed by N e w T e c h E n g i n e e r i n g 21 powered By NeoFirma Energy Services'*'
3 Powered By Neofirma Energy S e r v k e » m
NEW TECH ENGINEERING DAILY DRILLING REPORT
County: Lea
OPERATOR.- DCP Midstream Lease £ WeH No..-J Pair: 1006/2007
Property ID: DISTRIBUTION OF HOURS
Drill ing Supervisor Kirk Fetterolf phone: 325-206-2229 Depth: 3245 CATEGORIES DAILY
CUM.
TOTALS
Driltiag Supervisor: Pbooe: TVD: 3245.0 1. Dri l l rotating 23.50 94.50
Drfz. Contractor tykr weH service RJeft 2 HoleSke: 122 50 to 2. Wash SL ream 025
Too) pusher: PHONE NUMBER: Footage Last 24 hrs: 300 3. Circulate & condition 2.00
4. Service and lubricate rig 025 025
G. L . Elev.: RKB to G. L . 1* fl 5. Rigrcpair 025
K B to BHF: Date Last BOP Test na Days Chg. To Wel t 6. Directional/Deviation survey 025 225
Prop. T.D. 9137 AFE* AFE-DHO 5 2,304,025 7. Rig up casers/ nm casinB 2.00
8. Rig up ceraenters/cementing 4.00
LAST CASING: 13 3/8 CSG SHOE TEST: 1 2 EMW Cum. Moodilj riz rapain Hrs. 9. Wai lon cemenl 4.00
10. Nipple up BOPs/Nippk down B< 6.50
W i0S PRESENT OPERATIONS: Drilling ahead @ 3245 I l .TestBOPs 2.50
FROM T O HRS. CODE DESCRIPTION D A I L Y A C T r V I T Y 12. Pick up /Lay down BHA 1.50
600 1215 6.25 1 DrlE from 2945" to 3039* 13, Pick up /Lay down drill string 2.00
1215 1230 0.25 4 Rie service 14. TripptnR/for bil/mud motor/mwd 1.75
1230 1245 0.25 6 WLS 2993'2 1/2 dee. 15. Other not listed 2225
1245 1400 1.25 1 Drla. from 303Tio3051 ' 16. Move in rig up/Rig down move o 22.00
1400 2200 8.0 1 Drill f rom 3051' to 3164" 2200 600 8.0 1 Drle.from3164'lo3245'
TOTALS 24.00 168.00
D R I L L I N G 23.50 94.50
EVALUATION 0.00 0.00
DAILY CUM
DRILLING INTANG. 530^00.00 5874.391.88
P.O. Wt. S.O.WL StrinRWt. Rot. AmpsTrq j COST TANG- 50.00 525,690.00
SURVEY INFORMATION TOTALS $30,300.00 5900,081.88
DEVIATION SURVEYS: DIRECTIONAL CO.
COORDINATES DIRECTIONAL HOLE TARGETS
TARGET T V D : _
TARGET A Z M : _
TARGET+N/-S:_
TARCET +E7-W:
TARCETINCL:
MUD LOGGER NAME: _
M l ID LOGGER PHONE:
MUD LOGGERS REPORT BACK GROUND GAS
CONNECTION GAS:
TRIP GAS:
SHOW GAS:
DOWNTIME GAS;
LITHOLOGY:
PROPERTIES Tyfw Mud: Drilling mud
DAILY MUD ADDITIVES:
D COMPANY: Eagle Drilling Fluids MUD ENGINEER: Ron Bailey
PHONE NUMBER: 432.664.3690
DEPTH TIME MW VIS PV YP GELS PH API WL HTHP
WL CAKE
PM
U M E
PF
ES
CL
PPM
TOTAL
CL
TOTAL
SALT
"A
SAND %
SOLIDS
*A
OIL
% WATER
LCM
PPB ECD
3245 10.1 32 6 3 5/6 10.500 6 2.4 95.0 10.10
BIT DATA
BIT NO SIZE Mfg Type Serial No. Jets -32ods
Depth
Out
Daily
Fed
Total
Feet Hrs.
Total
Hrs
DaDy
FiJHr
Total
FL/Hr. WOB RPM
BIT GRADE
BIT NO SIZE Mfg Type Serial No. Jets -32ods
Depth
Out
Daily
Fed
Total
Feet Hrs.
Total
Hrs
DaDy
FiJHr
Total
FL/Hr. WOB RPM INN OUTER BEARINGS GAGE
2 12.25 STC FDS PG6481 3-16s 300 2665 23.5 44 61 25 65
PUMP D o r T ROD ROD is the dia. Of dte pbton rod on dual action pumps
D U ! ~ d « p l „ , » » p p u M p D A T A
T Is for triplex pump
D 2
ROD is the dia. Of dte pbton rod on dual action pumps
D U ! ~ d « p l „ , » » p p u M p D A T A
T Is for triplex pump 0 2
ROD is the dia. Of dte pbton rod on dual action pumps
D U ! ~ d « p l „ , » » p p u M p D A T A
T Is for triplex pump
PUMP
NO. TYPE HP
% EFF.
Stroke
Length Size SPM GPM Press DPAV DCAV
Surface
HHP
Bit
HHP
•A HHP
AlBi t HHP/IN1
SLOW PUMP RATES PUMP
NO. TYPE HP
% EFF.
Stroke
Length Size SPM GPM Press DPAV DCAV
Surface
HHP
Bit
HHP
•A HHP
AlBi t HHP/IN1 SPM PSI SPM PSl
1 DB700 575 60 16.0 5.5 6 22 50D 4 6 6.46 2.57 0.40 0.02 3 250 2 2
2 DB700 575 60 16.0 5.5 0 5 0.00
BOTTOM HOLE ASSEMBLY OD ID LENGTH OD
DRILL PIPE 1 :
B H A N O . : 2 DRILL PIPE 2 :
4.50 3.83 3245.00 DRILL COLLARS 1
DRILL COLLARS 2
8.00 DRILL PIPE 1 :
B H A N O . : 2 DRILL PIPE 2 : 0.00 0.00 0.00
DRILL COLLARS 1
DRILL COLLARS 2 7.00 Total Lenglh |0.00 | H R S 0 N B H A | 3 5
ITEM Descri prion Length OJ>. I.D. Top Conn Bottom Conn TOP TO BIT REMARKS
Hanaoedby N e w T e d i E n g i n e e r i n g ZPowerrd By NeoFirma Energy S e r v k » '
3 Powered By NeoFtrmi Energy Servkea**'
NEW TECH ENGINEERING DAILY DRILLING REPORT
Ri i Phone: C >unrv: Lea Hi K Fax: R i i C Hi
OPERATOR; DCP Midstream Lease & Wrfl No.: 1 Days from Spud 7 Date: 10/27/2007 OPERATOR;
Property ID: DISTRIBUTION OF HOURS
Dril l ing Supervisor
Drill ing Supervisor:
Drtg. Contractor
Kiric Fetterolf Pbooe: 325-206-2229
Footage L
Depth: MOO CATEGORIES DAILY
CUM.
TOTALS Dril l ing Supervisor
Drill ing Supervisor:
Drtg. Contractor
Pbooe:
RJg ff:
NE NUMBER: Footage L
TVD: 3400.0 1. Dr i l l rotating 15.50 110.00
Dril l ing Supervisor
Drill ing Supervisor:
Drtg. Contractor tykrweB service
Pbooe:
RJg ff:
NE NUMBER:
2
Footage L Hole She: 1 2 - 2 5 Q to
i s t H h r s : 155
2. Wash & ream 0.50 0.75 Toolpwher:
G. U Elev.:
K B to BHF:
Prop. T.D.
PHO
Pbooe:
RJg ff:
NE NUMBER: Footage L Hole She: 1 2 - 2 5 Q to
i s t H h r s : 155 3. Circulate A condition 2.00 Toolpwher:
G. U Elev.:
K B to BHF:
Prop. T.D.
PHO
4. Service and lubricate rig 025 0.50
Toolpwher:
G. U Elev.:
K B to BHF:
Prop. T.D.
RKB to G. L ,
Date Last BOP Test
AFE*
CSC SHOE TEST:
IS ft 5. Rig repair 0.75 1.00
Toolpwher:
G. U Elev.:
K B to BHF:
Prop. T.D.
RKB to G. L ,
Date Last BOP Test
AFE*
CSC SHOE TEST:
na D i y s C hg. To Wel t 6. Direcdonal/Devialion survey 025 2.50
Toolpwher:
G. U Elev.:
K B to BHF:
Prop. T.D. 9137
RKB to G. L ,
Date Last BOP Test
AFE*
CSC SHOE TEST:
D i y s C
AFE-DHC: $2404,025 7. Rig up casers/run casing. 2.00
Toolpwher:
G. U Elev.:
K B to BHF:
Prop. T.D.
RKB to G. L ,
Date Last BOP Test
AFE*
CSC SHOE TEST:
D i y s C
8. Rig up c em enters/ cementing 4.00
LAST CASING: 13 3/8
RKB to G. L ,
Date Last BOP Test
AFE*
CSC SHOE TEST: 12 EMW Clan. M m tbrj rie rtpaln Hrs. 9. Wait on cement 4.00 LAST CASING:
RKB to G. L ,
Date Last BOP Test
AFE*
CSC SHOE TEST: EMW Clan. M m Hrs.
10. Nipple up BOPs/Nipple down BC 6.50 MOB PRESENT OPERATIONS:
FROM TO HRS. CODE
Drilling ahead |2! 3245 l l .Tes tBOPs 2.50 MOB PRESENT OPERATIONS:
FROM TO HRS. CODE DESCRIPTION DAILY A C T I V I T Y 12. Pick up /Lay down BHA 1.50 600 1100 5-0 1 DrlE.from 3235'to 3289" 13. Pick up/Lay down drill string 2.00 1100 1115 0.25 4 Service rig 14. Trippine/for bit/mud motor/mwd 6.75 8.50 I D S 1130 0.25 6 WLSf5>3243' 125 dee. 15. Outer not listed 22.25 1130 1630 5.0 1 Drle 3289' to 3343' 16. Move in rig up/Rig down move o 22.00
1630 1930 3.0 14 Trio out o f hole 1930 2300 3.5 14 Trio in hole w bit S 4 2300 2345 0.75 5 Repair hi eh drum clutch 2345 2400 0.25 14 TIH 2400 2430 0.5 2 Wash 60" lo bottom
2430 600 5.5 1 Drilling from 3343' to 340ff
TOTALS 24.00 192.00
DRILLING 15.50 110.00
EVALUATION 0.00 0.00
DAILY CUM DRILLING
COST INTANG. 537,832.00 5912223.88
P. U . W l . S. O. Wt. String Wt. Rot AmpsTrq j
DRILLING
COST TANG. 50.00 S25.690.OO
SURVEY INFORMATION
DRILLING
COST
TOTALS 537,832.00 $937,913.88
DEVIATION SURVEYS: DIRECTIONAL CO. SUPERVISOR:!
DEPTH ANGLE AZM TVD VS. COORDINATES DLS DIRECTIONAL HOLE TARGETS MUD LOGGER NAME:
MUD LOGGER PHONE: 3243 1.8 3241.96 76.55 76.55 0.00 0.00 TAR
TAR
GET TVD: MUD LOGGER NAME:
MUD LOGGER PHONE: 3305 1.0 3303.94 78.04 78.04 0.00 0.00
TAR
TAR SET A Z M :
MUD LOGGER NAME:
MUD LOGGER PHONE:
TARGET+N/-S:
TARGET +E/-W; MUD LOGGERS REPORT TARGET+N/-S:
TARGET +E/-W; BACK GROUND GAS
TARGET+N/-S:
TARGET +E/-W;
CONNECTION GAS:
TRIP GAS:
SHOW GAS:
DOWNTIME GAS:
LITHOLOGY:
CONNECTION GAS:
TRIP GAS:
SHOW GAS:
DOWNTIME GAS:
LITHOLOGY:
TARCETINCL: + UP/. DOWN
CONNECTION GAS:
TRIP GAS:
SHOW GAS:
DOWNTIME GAS:
LITHOLOGY:
TARCETINCL: + UP/. DOWN
CONNECTION GAS:
TRIP GAS:
SHOW GAS:
DOWNTIME GAS:
LITHOLOGY:
TARCETINCL: + UP/. DOWN
CONNECTION GAS:
TRIP GAS:
SHOW GAS:
DOWNTIME GAS:
LITHOLOGY:
COMMENTS: COMMENTS:
MUD PROPERTIES Type Mod: Drilling mud MUD COMPANY: Eagle Drilling Fluids MUD ENGINEER:
PHONE NUMBER:
Ron Bailey Dairy Cost: S32.00 Cum 51.31325 Type Mod: MUD COMPANY: MUD ENGINEER:
PHONE NUMBER: 432.554.3690
Dairy Cost: Cum
DAILY MUD ADDITIVES: Pacer 4.Lime 4 DAILY MUD ADDITIVES: DAILY MUD ADDITIVES:
DEPTH TIME MW VIS PV YP GELS PH API WL HTHP
WL CAKE
PM
LIME
PF
ES
CL
PPM
TOTAL
CL
TOTAL
SALT SAND
% SOLIDS OIL
% WATER
LCM
PPB ECD
3400 600 10.5 33 5 4 4/5 9 3.1 1 2 3.200 3800 13200 3 3.0 94.8 2 10.50
BIT DATA
BIT NO SEE Mfg Tyre Serial No. Jets - 32nds
Depth
Out
Daily
Feet
Total
Feet Hrs.
Tola]
Hrs
Dairy
FL/Hr
Total
FL/Hr. WOB RPM
BIT GRADE
BIT NO SEE Mfg Tyre Serial No. Jets - 32nds
Depth
Out
Daily
Feet
Total
Feet Hrs.
Tola]
Hrs
Dairy
FL/Hr
Total
FL/Hr. WOB RPM INN OUTER BEARINGS GAGE
3 12.25 STC F 2 5 c PG6461 3-16s 3343 98 638 51.0 51 13 25 65
57 57 15.5
PUMP D o r T ROD ROD is the dia. Of the pbton rod on dual action pumps
D b f o d ^ c p - , , , p u M p D A T A
T is far triplex pump
D 2
ROD is the dia. Of the pbton rod on dual action pumps
D b f o d ^ c p - , , , p u M p D A T A
T is far triplex pump D 2
ROD is the dia. Of the pbton rod on dual action pumps
D b f o d ^ c p - , , , p u M p D A T A
T is far triplex pump
PUMP
NO. TYPE HP EFT.
Stroke Liner
Size SPM CPM
Pump
Press DPAV DCAV
Surface
HHP
Bil
HHP
V.HHP
Al Bil HHP/IN 3
SLOW PUMP RATES PUMP
NO. TYPE HP EFT.
Stroke Liner
Size SPM CPM
Pump
Press DPAV DCAV
Surface
HHP
Bil
HHP
V.HHP
Al Bil HHP/IN 3 SPM PSl SPM PSl
1 DB700 575 60 16.0 5.5 6 22 500 4 6 6.46 Z 5 7 0.40 0.02 3 250 2 2 2 DB700 575 60 16.0 5.5 0 5 0.00
BOTTOM HOLE ASSEMBLY OD fD LENGTH OD
DRILL PIPE 1
BHA NO.: 2 DRILL PIPE 2
4.50 3.83 3400.00 DRILL COLLARS 1
DRILL COLLARS 2
8.00
Total Length HRS ON BH/
DRILL PIPE 1
BHA NO.: 2 DRILL PIPE 2 0.00 0.00 0.00
DRILL COLLARS 1
DRILL COLLARS 2 7.00 Total Length 0.00 HRS ON BH/ 1102 ITEM Description Lert(Bh O.D. I D . Top Conn Bottom Conn TOP TO BIT REMARKS
Managed by NewTech Engineering 21 powered By NeoFirma Energy Service*'
3 Powered By NeoFtrnvi Energy Services7"
NEW TECH ENGINEERING DAILY DRILLING REPORT
County: Lett
OPERATOR: DCP Midstream Uut A WeO No.: 1 Pitt: 10/28/2007
Property VL>. DISTRIBUTION OF HOURS
Dril l ing Supervisor: Kirk Fetterolf phone: 325-206-2229 Depth: 3555 CATEGORIES DAILY
CUM.
TOTALS
Dril l ing Supervisor: Phone: T V D : 3555.0 1. Dri l l rotating 23.50 133.50
Drle, Contractor tyler weH service R i e « ; 2 Hole She: 12-250 ta 2. Wash &. ream 0.75
Tool pusher; PHONE NUMBER: Footage Last 24 hrs: 155 3. Circulate & condition 2.00
4. Service and lubricate rig 0.25 0.75
C L . Elev.: R K B to G. L 18f t 5. Rig repair 1.00
K f i t o BHF: Date Last BOP Test: na Days Chg. To Welb 6. Directional/Deviation survey 025 2.75
Prop.T.D. 9137 AFES AFE-DHC; $ 2,304,025 7. Rig up casers/ nm casing 2.00
8. Rig up cemoilers/ cementing 4.00
LAST CASING; 13 3/8 CSG SHOE TEST: 12 EMW Cum. Moondj rfe repalrt Hrs. 9. Wai l on cement 4.00
10. Nipple up BOPsMpple down BC 6.50
M oo PRESENT OPERATIONS: Chilling ahead (2)3555,7 to 11 fph l l .Tes tBOPs 2.50
FROM T O HRS. CODE DESCRIPTION D A I L Y A C T r V I T Y 12. Pick up /Lay down BHA 1.50
600 730 1.5 I D r l c f3343 ' to 3400* 13. Pick up/Lay down drill string 2.00
730 745 0.25 4 RiE service 14. Trippine/for bit/mud moior/mwd 8.50 745 1400 625 1 drle from 3413* to 3476' 15. Other not listed 22.25
1400 2100 7.0 1 DriUina from 3476' to 355? 16. Move in rig irp/Rig down move o 22.00
2100 400 7.0 1 Drle from 3555 to 360P 400 415 0.25 6 W L S f f i 3555-1.5 dee 415 600 1.75 1 D r k from 3601'to 3620-
TOTALS 24.00 216.00
DRILLING 23.50 133.50
EVALUATION 0.00 0.00
DAILY CUM
DRILLING INTANG. $40,375.70 $952,599.58
P. U . W L S. O. Wt. String Wt. Rot. Amps-Trq.: COST TANG. 50.00 $25,690.00
SURVEY INFORMATION TOTALS 540.375.70 $978289.58
DEVIATION SURVEYS: DIRECTIONAL CO.
COORDINATES
SUPERVISOR^
DIRECTIONAL HOLE TARGETS
TARGET TVD:_
TARGET AZM: _
TARGET +N/-S:_
TARGET +E/-W:
TARGET INCL:
MUD LOGGER NAME: D ° ° Mcgennis
MUD LOGGER PHONE 4324160051
MUD LOGGERS REPORT BACK GROUND GAS 9 0
CONNECTION GAS: 45
TRIP GAS:
SHOW GAS: 0
DOWNTIME GAS: 0
LITHOLOGY: 90%flnhy,10WdolJraceofshale
COMMENTS: No shows.
MUD PROPERTIES Type Mud: Drilling mud MUD COMPANY: Eagle Drilling Fluids MUD ENGINEER: Ron Bailey
DAILY MUD ADDITIVES: 4 £cL3 sks paper.4 lime
Daily Cost Si00.70 Cum: SI.413.95
PHONE NUMBER: 432.664.3690
DEPTH TIME MW VIS PV YP GELS PH API WL HTHP
WL CAKE
PM
LIME
PF
ES
CL
PPM
TOTAL
CL
TOTAL
SALT
% SAND
t i
SOLIDS
•Ji
OIL
V.
WATER
LCM
PPB ECD
3501 530 10.5 32 5 3 4 10 2 3800 13200 3 3.0 94.6 10.50
BIT DATA
BIT NO SIZE Mfg Type Serial No. Jets - 32nds
Depth
Out
Daily
Feet
Total
Fect Hrs.
Total
Hrs
Dairy
FL/Hr
Total
FL/Hr. WOB RPM
BIT GRADE
BIT NO SIZE Mfg Type Serial No. Jets - 32nds
Depth
Out
Daily
Feet
Total
Fect Hrs.
Total
Hrs
Dairy
FL/Hr
Total
FL/Hr. WOB RPM INN OUTER BEARINGS GAGE
3 12.23 STC GF37Y PJ0035 13.13.13 155 212 23.5 75 3 65 70
2 12.2S STC FDS PG6481 3-16s 25 65
PUMP D o r T ROD ROD is the dia. Of the pbton rod on dual action pumps
D is Tor duplex punp p u M p D A T A
T ts for triplei pump
D 2
ROD is the dia. Of the pbton rod on dual action pumps
D is Tor duplex punp p u M p D A T A
T ts for triplei pump D 2
ROD is the dia. Of the pbton rod on dual action pumps
D is Tor duplex punp p u M p D A T A
T ts for triplei pump
PUMP
NO. TYPE HP EFF.
Stroke Liner
Size SPM GPM Press DPAV DCAV
Surface
HHP
Bit
HHP
%HHP
Al Bit HHP/IN5
SLOW PUMP RATES PUMP
NO. TYPE HP EFF.
Stroke Liner
Size SPM GPM Press DPAV DCAV
Surface
HHP
Bit
HHP
%HHP
Al Bit HHP/IN5 SPM PSI SPM PSI
1 DB7CJ0 575 60 16.0 5.5 6 22 500 4 6 6.46 2.57 0.40 0.02 3 250 2 2
2 DB700 575 60 16.0 5.5 0 5 0.00
BOTTOM HOLE ASSEMBLY OD ID LENGTH OD
DRILL PIPE 1:
B H A N O . - 2 DRILL PIPE 2 :
4.50 3.83 3555.00 DRILL COLLARS I
DRILL COLLARS 2
8.00 DRILL PIPE 1:
B H A N O . - 2 DRILL PIPE 2 : 0.00 0.00 0.00
DRILL COLLARS I
DRILL COLLARS 2 7.00 Total Length \ 0.00 ( H R S 0 N B H A | 1 2 5
ITEM Description Lenffth O.D. I.D. Top Cora Bonom Conn TOP TO BIT REMARKS
Managed by NewTech Engineering 2Powered By Neofirma Energy Service**"
3 Powered By NeoFSrma Energy Servkea"*
NEW TECH ENGINEERING DAILY DRILLING REPORT
OPERATOR; DCP Midstream oc A WeD Mo,: 1 Property ID:
Driffing Supervisor. Kirk Fetterolf Drilling Supervisor:
Phone: 325-206-2229
Drig. Contractor tyler well service Tootposher:
Rig#:A_ FHONE NUMBER:
Depth: 3855 TVD: 3855.0
Hole Sue: >2.2i0 h
Footaee Last 24 ism 300 2. Wash & ream
G. L. Elev.:_ KB to BHF:
RKB lo C. L. 1 8 8
Prop. TJX °'37 Dale Last BOP Teste na
A FEW
Days Chg. To Welt AFE-DHO S 2,304,025
LAST CASING: 13 3/8 CSG SHOE TEST: 12 On. Monthly rig repair;
Mao PRESENT OPERATIONS: Drilling ahead @ 3855* very hard formation.
FROM TO HRS. CODE DESCRIPTION DAILY ACTIVITY
4. Service and lubricate rig
6. DgrePonal/Dcv jetton survey
DISTRIBUTION OP HOURS
CATEGORIES
3. Circulate & condition
5. Rig repair
7. Riff up casera/ nm casing 8. Rig up cementers/ cementing 9. Wail on cemenl 10. Nipple up BOPs/Nipple down BC
12. Pick up /Lay down BHA
CUM.
TOTALS 157.00
0.75
0.75 1.00 3.25 2.00 4.00 4.00 6.50 2.50 1.50 2.00 8.50
2225 22.00
Drle from 3620* to 3695'of very hard fonnalion.changing the drilling parameters in an- 13.PicktJp/lJiydowTidrillst dattemt lo increase the optimized drilling rate of 10-12 FPH 14. Tripping/for bit/mud motor/mwd Prig form 3695' to 376T IS. Other nol listed Drilcfrom 3767 lo 3851' 16. Move in rig up/Rig down move o WLSia3805'l/2deg Prig from 3851'io 3855'
String Wt. SURVEY INFORMATION
Rot AmpsTra.:
DEVIATION SURVEYS: DIRECTIONAL CO-COORDINATES
SUPERVlSOR:|
DIRECTIONAL HOLE TARGETS TARGET TVD:_ TARGET AZM: _ TARGET+N/-S:_
TARGET+EMV:
TARGET LNCL:
DRILLING
COST
MUD LOGGER NAME: Don Mcgetuus
MUD LOGGER PHONE 4324160081
MUD LOGGERS REPORT BACK GROUND GAS 9 3
CONNECTION GAS: 68 TRIP GAS:
SHOW GAS: DOWNTIME GAS: 93
LITHOLOG Y: 80% AnhyJ0%Dolo.
COMMENTS: No shows.had some gas from 3796' to 381g.wc also had a heavy trace of shale in this area
MUD PROPERTIES Type Mud: Drilling mud MUD COMPANY: Eagle Drilling Fluids MUD ENGINEER: Ron Bailey Daily Cost si 33.10 Cum: SI ,547.05
PHONE NUMBER: 432,664.3S90
DAILY MUD ADDITIVES: ,
DEPTH TIME MW vis PV YP GELS PH API WL HTHP
WL CAKE
PM
LIME
PF
ES
CL
PPM
TOTAL
CL
TOTAL
SALT
% SAND
I t
SOLIDS
l i
OIL WATER
LCM
PPB ECD
3805 500 10.5 31 4 5 3/4 10 3 3.0 94.6 10.50
B I T D A T A
BIT NO SIZE Mfg Type Serial No. Jcu-32nds
Depth
Out
Daily
Fect
Total
Feet Hrs.
Total
Hrs
Dairy
FtTHr
Total
Ff_/Hr. WOB RPM
BIT GRADE
BIT NO SIZE Mfg Type Serial No. Jcu-32nds
Depth
Out
Daily
Fect
Total
Feet Hrs.
Total
Hrs
Dairy
FtTHr
Total
Ff_/Hr. WOB RPM INN OUTER BEARINGS GAGE
3 12.25 STC GF37Y PJ0035 13.13,13 300 512 23.5 98 5 65 70
2 12.25 STC FDS PG6481 3-16s 25 65
PUMP D o r T ROD ROD b the dia. Of the pbton rod on dual action pumps
Disforduplespurop p u M p D A T A
T b for triplei pump
D 2
ROD b the dia. Of the pbton rod on dual action pumps
Disforduplespurop p u M p D A T A
T b for triplei pump D 2
ROD b the dia. Of the pbton rod on dual action pumps
Disforduplespurop p u M p D A T A
T b for triplei pump
PUMP
NO. TYPE HP
14
EFF.
Stroke
Length
Liner
SPM GPM Press DPAV DCAV
Surface
HHP
Bit
HHP
•it HHP
At Bit HHP/IN3
SLOW PUMP RATES PUMP
NO. TYPE HP
14
EFF.
Stroke
Length
Liner
SPM GPM Press DPAV DCAV
Surface
HHP
Bit
HHP
•it HHP
At Bit HHP/IN3 SPM PSl SPM PSl
1 DB700 575 60 16.0 5.5 6 22 500 4 6 6.46 2.57 0.40 0.02 3 250 2 2
2 DB700 575 60 16.0 5.5 0 5 0.00
BOTTOM HOLE ASSEMBLY OD ID LENGTH OD
DRILL PIPE l :
BHA NO.: 2 DRILL PIPE 2 :
4.50 3.83 3855.00 DRILL COLLARS I
DRILL COLLARS 2
8.00 DRILL PIPE l :
BHA NO.: 2 DRILL PIPE 2 : 0.00 0.00 0.00
DRILL COLLARS I
DRILL COLLARS 2 7.00 Total Length |o.OO | HRS ON B H A | 149
ITEM Description Length O.D. I.D. Top Conn Bottom Com TOP TO BFT REMARKS
Managed by New Tech Engineering 39 Powered By Neoflrma Energy Services'"
3 Powered By NeoFtroia Energy Service**
NEW TECH ENGINEERING DAILY DRILLING REPORT
OPERATOR: LXTMdstreara Lease & Well Na: 1 Days from Spud 10 Dttr: 10/303007
Property IDi OISTRIBUnON OF HOURS
Drill ing Supervisor: Kirk Fetterolf P b o D e ; 325-206-2229 Depth: 3855 CATEGORIES DAILY
CUM.
TOTALS
Drill ing Supervisor: Phone: T V D : 3855.0 ] . Drill rotating 23.50 180.50
Drtg. Contractor tyler well service R i e f l : 2 Hole Size: 12.250 ta 2. Wash & ream 0.75
Tool pusher: PHONE NUMBOfc Footage Last 24 hrs: 0 3. Circulate & condition 2.00
4. Service and lubricate rig 0.25 1.00
a L . Elev.: RKB to G. L . 1 8 ft 5. Rig repair 1.00
K B t a BHF: Date Last BOP Tesr. na Days Chg. To Wel t 6. Directional/Deviation survey 025 3.50
Prop. TJX 9137 AFE# AFE-DHC: $2,304,025 7. Rig up casers/ run casing 2.00
S. Rig up conaiiejsf cemeaWig 4.00
LAST CASING: 13 3/8 CSC SHOE TEST: 1 2 EMW CUB. Meothh rie rrt-uri Hrs. 9. Wait on cement 4.00
10. Nipple up BOPsVNippIe down BC 6.50
M ot PRESENT OPERATIONS: Drill ing ahead @4102'very hard formation. I l .TestBOPs 150
PROM TO HRS. CODE DESCRIPTION D A I L Y A C T I V I T Y 12. Pick up /Lay down BHA 1.50
600 800 2.0 1 Drltr from 3855' to 3882' 13. Pick up /Lav down drill string 2.00
800 815 0.25 4 ROE service 14. Tripping/for bit/mud motor/mwd 8.50
81S 1400 5.75 1 Drle from 3882* to 3945' 15. Other not listed 2225
1400 2200 8.0 I DRLG from 3945" to 40231 16. Move in rig up/Rig down move o 22.00
2300 230 4.5 ! DRLG from 4023'to 4071'
230 245 0.25 6 WLS <d> 402T 1 den.
245 600 3.25 1 Drill from 4071' to 4102'
Very hard formation continue to charise drilling parameters lo gain a hizher drillirui
rate.
TOTALS 24.00 264.00
D R I L L I N G 23.50 180.50
EVALUATION 0.00 0.00
DAILY CUM
DRILLING INTA2VC. 128,965.25 $1,020,811.93
P.U. WL S.O.WL SlringWt. Rot.Amps/Trq.: COST TANG. 50.00 S25.690.00
SURVEY INFORMATION TOTALS S28.96525 $1,046^01.93
DEVIATION SURVEYS: DIRECTIONAL CO.
DEPTH ANGLE AZM TVD VS. COORDINATES DLS DIRECTIONAL HOLE TARGETS
3805 1.5 3803.79 90.03 60.03 0.00 o.oo TARGETTVD:
4025 1.0 4023.78 92.70 9 2 7 0 0.00 0.00 TARGET AZM:
TARGET +N/-S:
TARGET+E/-W:
TARGET INCL.: *UP/-DOWN
MUD LOGGER NAME: Q° n McgCniMS
MUD LOGGER PHONE: 4324160081
MUD LOGGERS REPORT BACK GROUND GAS 6 8
CONNECTION GAS: 41
TRIP GAS:
DOWNTIME GAS: 41
LITHOLOGY: 30% dolomitc.70% anhydrite
COMMENTS: at 3929*
PROPERTIES Type Mud: Drilling mud MUD COMPANY: Eagle Drilling Fluids
DAILY MUD ADDITIVES: Sure sweep ]/4.paper 8sks
MUD ENGINEER: Ron Bailey
PHONE NUMBER: 432.664.3690
Da2y Cost: SI 90.25 Cum: SI,737JO
DEPTH TIME MW VIS PV YP GELS PH AP1WL HTHP
WL CAKE
PM
LIME
PF
ES
CL
PPM
TOTAL
CL
TOTAL
SALT SAND SOLIDS
% OIL
% WATER
LCM
PPB ECD
4023 600 10.4 32 3 5 3/3 9 3 3.2 1.3 94.0 10.40
B I T D A T A
BUNO SIZE Mfg Type Serial No. Jcts-32ods
Depth
Out
Daily
Feel
Total
Fect Hrs.
Total
Hrs
Daily
FlJHr
Total
FL/Hr. WOB RPM
BIT GRADE
BUNO SIZE Mfg Type Serial No. Jcts-32ods
Depth
Out
Daily
Feel
Total
Fect Hrs.
Total
Hrs
Daily
FlJHr
Total
FL/Hr. WOB RPM INN OUTER BEARINGS GAGE
3 12.25 STC GF37Y PJ0035 13.13,13 0 512 23.5 122 4 65 70
2 12.25 STC FDS PG64B1 3-16s 25 I 65
PUMP D o r T ROD ROD b the dia. Of the pbton rod on dual action pumps
DbbrAvtap-v PUMP .DATA T b for triples pump
D 2
ROD b the dia. Of the pbton rod on dual action pumps
DbbrAvtap-v PUMP .DATA T b for triples pump D 2
ROD b the dia. Of the pbton rod on dual action pumps
DbbrAvtap-v PUMP .DATA T b for triples pump
PUMP
NO. TYPE HP
V,
EFF.
Stroke
Lcnath
Li ncT
Size SPM GPM
Pump
Press DPAV DCAV
Surface
HHP
Bit
HHP
KHHP
At Bit HHP/IN 3
SLOW PUMP RATES PUMP
NO. TYPE HP
V,
EFF.
Stroke
Lcnath
Li ncT
Size SPM GPM
Pump
Press DPAV DCAV
Surface
HHP
Bit
HHP
KHHP
At Bit HHP/IN 3 SPM PSl SPM PSl
1 DB700 575 60 16.0 5.S 6 22 500 4 6 6.46 Z 5 7 0.40 0.02 3 250 2 2
2 DB700 575 60 16.0 5.5 0 5 0.00
BOTTOM HOLE ASSEMBLY OD ID LENGTH OD_
DRILL PIPE I : 4.50 3.83 3855.00 i DRILL COLLARS 1
DRILL COLLARS 2
8.00
E H A N O . : 2 DRILL PIPE 2 : 0.00 0.00 0.00 |
DRILL COLLARS 1
DRILL COLLARS 2 7.00 Total Length j 0.00 | HRS ON B H A I 172
ITEM Description Lennh OJ>. LD. Top Conn Bottom Com TOP TO BIT REMARKS
Managed by NewTech Engineering 3 powered By Neofirma Energy Services'"
3 Powered By NeoFirma Energy Services'"
NEW TECH ENGINEERING DAILY DRILLING REPORT . - -
County: Lea
OPERATOR: DCP Midstream Date 10/31/2007
Property ID: DISTRIBUTION OF HOURS
Drill ing Supervisor: Kirk Fetterolf phone: 325-206-2229 Depth: « 1 2 CATEGORIES DAILY
CUM.
TOTALS
Dri l l ! no Supc r v b o n Phone: T V D : 42120 1. Dr i l l rotating 12.75 19325
Dr l& Contractor tyler well service RIe #: 2 Hole Sue: ! 2 - 2 5 0 la 2. Wash &. ream 5.00 5.75
Toolpusher: PHONE NUMBER: Footage Last 24 hrs: 357 3. Circulate A condition 1.75 3.75
4. Service and lubricate rig 0.25 125
G. L . Elev.: RKB to G. L. I 8 ft 5. Rig repair 1.00
K B to BHF: Date Last BOP Test: na Days Chg. To Wel t 6. Directional/Deviation survey 3.50
Prop. T.D. 9137 A FEW AFE-DHC S 2304.025 7. Rift up casers/ run casing 2.00
8. Rig up eem enters/ cementing 4.00
L A S T CASING: 13 3/8 CSG SHOE TEST: 12 EMW C m. Monthly rtj repair: Hrv 9. Wait on cement. 4.00
10. Nipple up BOPs/Nippk down BC 6.50
OD PRESENT OPERATIONS: Trip OUt of hole for logs 11. Test BOPs 2.50
FROM T O HRS. CODE DESCRIPTION D A I L Y A C T I V I T Y 12. Pick up /Lay down BHA 1.50
600 1315 7.25 1 DrlB from 4102 lo 4163' 13. Pick up /Lay down drill string 2.00
1315 1330 0.25 4 Rig service 14. Tripping/for bit/mud motor/mwd 225 10.75
1330 1400 0.5 1 Drle &om4163*to4170' 15. Short trip 1.50 1.50
1400 1900 5.0 1 Drle from 4I7f f to 4212* 16. Other not listed 0.50 22.75
1900 2030 1.5 3 Circulate & run sweeps on hole. 17. Move in rig up/Rig down move o 22.00
2030 2200 1.5 15 TOOH to DC had to work ihroueh lieht soot (S3 1500".
2200 2230 0.5 16 Trip in hole with DP 2230 330 5.0 2 WASH &. REAM TO 4212'
330 345 025 3 CIRCULATE RUN SWEEP.WLS <3> 4212' 1/2 DEG.
345 600 2.25 14 TRIP OUT OF HOLE FOR LOGS.
TOTALS 24.00 288.00
DRILLING 12.75 193.25
EVALUATION 0.00 O.OO
DAILY CUM
DRILLING INTANG. $36,375.00 $1,057,186.93
P.U. WL S .O.Wl. String Wt. Rot. AmpsTrq j COST TANG. S0.00 525,690.00
SURVEY INFORMATION TOTALS S36.375.O0 SI ,082,876.93
DEVIATION SURVEYS: DIRECTIONAL CO-
COORDINATES DIRECTIONAL HOLE TARGETS
TARGET T V D : _
TARGET AZM: _
TARGET -tW-S:_
TARGET +E/-W:
TARGET INCL.:
MUD LOGGER NAME: D ° n McgCtUUS
MUD LOGGER PHONE 4324160081
MUD LOGGERS REPORT BACKGROUND GAS_
CONNECTION GAS:_
TRIP GAS:_
SHOW GAS:_
DOWNTIME G AS: _
LITHOLOGY:
COMMENTS:
_ _ _ MUD PROPERTIES :
Type Mud: Drilling mud M U D COMPANY: Eagle Drilling Fluids MUD ENGINEER: Ron Bailey DaDy Cote SO.OO Cum: SI,737JO
PHONE NUMBER: 432-664.3690
DAILY MUD ADDITIVES:
DEPTH TIME MW VIS PV YP GELS PH API WL HTHP
WL CAKE
PM
LIME
PF
ES
CL
PPM
TOTAL
CL
TOTAL
SALT
tt
SAND %
SOLIDS
tt
OIL
tt
WATER
LCM
PPB ECD
0.00
BIT DATA
BIT NO SIZE Mfe Type Serial No. Jets - 32nds
Depth
Out
Daily
Feet
Total
Fed Hrs.
Total
Hrs
Dairy
FL/Hr
Total
Ft.Hr. WOB RPM
BIT GRADE
BIT NO SIZE Mfe Type Serial No. Jets - 32nds
Depth
Out
Daily
Feet
Total
Fed Hrs.
Total
Hrs
Dairy
FL/Hr
Total
Ft.Hr. WOB RPM INN OUTER BEARINGS GAGE
3 12.25 STC GF37Y PJQ035 13.13.13 357 659 12.8 134 6 65 70
2 12.25 STC FDS PG64B1 3- 16s | 2 5 65
PUMP D o r T ROD ROD b the ilia. Of the piston rod on dual action pumps
D b r „ d ^ p « p p l ) M p „ A T A
T u for rriptel pianp
D 2
ROD b the ilia. Of the piston rod on dual action pumps
D b r „ d ^ p « p p l ) M p „ A T A
T u for rriptel pianp D 2
ROD b the ilia. Of the piston rod on dual action pumps
D b r „ d ^ p « p p l ) M p „ A T A
T u for rriptel pianp
PUMP
NO. TYPE HP
tt
EFF.
Stroke
Size SPM GPM Press DPAV DCAV HHP
Bit
HHP
H HHP
At Bit HHP/TN1
SLOW PUMP RATES PUMP
NO. TYPE HP
tt
EFF.
Stroke
Size SPM GPM Press DPAV DCAV HHP
Bit
HHP
H HHP
At Bit HHP/TN1 SPM PSI SPM PS!
1 DB700 575 60 16.0 5.5 6 22 500 4 6 6.46 Z 5 8 0.40 0.02 3 250 2 2
2 DB700 575 60 16.0 5.5 0 5 0.00
BOTTOM HOLE ASSEMBLY OD ID LENGTH OD
DRILL PIPE 1 :
BHA NO.: 2 DRILL PIPE 2 :
4.50 3.83 4212.00 DRILL COLLARS 1
DRILL COLLARS 2
8.00 DRILL PIPE 1 :
BHA NO.: 2 DRILL PIPE 2 : 0.00 0.00 O.OO
DRILL COLLARS 1
DRILL COLLARS 2 7.00 Toial Length 10.00 [ HRS ON B H A I 185
ITEM Description Length O.D. I.D. Top Conn Bottom Com TOP TO BIT REMARKS
Managed by NewTech Engineering 21 Powered By NeoFirma Energy Services™
3 Powered By NeoFirma Energy Services'"
NEW TECH ENGINEERING DAILY DRILLING REPORT
County: Lea
OPERATOR: DCP Midstream Lease & Well No,: 1 Property ID:
Drilling Supervisor: Kirk Fetterolf Drilling Supervisor: _
Drtg. Contractor tylcr well service Toolpusher:
Phone: 325-206-2229 Pbooe: Rig*r:2_
PHONE NUMBER:
Depth: 4212 TVD; 4212.0
Hole SUe: '2-250 t
FooUge Last 24 hrs: 0
G-L. Elev.:_ KB to BHF:
Prop. T.D. 9137
LAST CASING: 13 3/8
Date Last BOP Test: rut AFE*
Days Chg. To WeLfc
CSC SHOE TEST: J
AFE-DHC: S 2304,025
Cum. Monthly rig repair: _
6. E>uTctioTtal/Deviaiion survey
Hrs
WM PRESENT OPERATIONS: Running 9 J/8 > HRS. CODE DESCRIPTION DAILY ACTIVITY
Date: 11/1/2007 DISTRIBUTION OF HOURS
CATEGORIES
1. Drill misting 2. Wash & ream 3. Circulate &. condition 4. Service and lubricate rig 5. Rig repair
7. Rig up casers/ run casing 8. Rig up ceroenters/ cementing
10. Nipple up BOPs/Nipple down BC
12.Picktrp/LayoownBHA
CUM.
TOTALS
193.25 825 6.75 125 1.00 330 2.00 4.00 4.00 6.50 2.50 1.50 2.00
28.75 1.50 0.50
22.75 22.00
TTH, 13. Pictup/Lav down drill string Circulate & condition hole run sweep lo clean hole. 14. Tripping/for hit/mud motor/mwd Safety meeting,with ria crew on TOH 15. Short trip
915 1000 1130 1400 1530 1545
Continue to Trip in hole 16. Safety meeting 17. Other not listed
Wash 45* to bottom 18. Move in rig. Up/Rig down move o Circulate & run sweeps to clean hole. safety meeting on WLS.Triping
Cl p3 fm-13 3/8 cnmte and cement was suhmj'ed tr> NMOCD RcTiliimheraer was broke down f-rom 6 nm to 11 am
String WL
SURVEY INFORMATION DEVIATION SURVEYS: DIRECTIONAL CO.
COORDINATES
SUPERVISOR^
DIRECTIONAL HOLE TARGETS TARGET TVT>._ TARGET AZ.M'_ TARGET+N/-S:_
TARGET+E/-W:
TARGET INCL.:
DRILLING COST
MUD LOGGER NAME: Don Mcgennis MUD LOGGER PHONE 4324160081
MUD LOGGERS REPORT BACK GROUND GAS CONNECTION GAS:.
TRIP GAS: SHOW GAS:
DOWNTIME GAS: LITHOLOGY: 70%Anhy,30%shale
COMMENTS: from3 94 3'Grayburg formation
MUD PROPERTIES Type Mud: Drilling mud MUD COMPANY: Eagle Drilling Fluids
DAILY MUD ADDmvES: liroe 3.paper 2
MUD ENGINEER: Ron Bailey DaDy Cost: 30.00 Cum: SI.737.30 PHONE NUMBER: 432.664.3690
DEPTH TIME MW VIS PV YP GELS PH API WL HTHP
WL CAKE
PM
LIME
PF
ES
CL
PPM
TOTAL
CL
TOTAL
SALT
tt SAND
tt
SOLIDS
tt OIL
tt
WATER
LCM
PPB ECD
4212 1530 9.3 33 5 4 4/4 9.500 2 4100 19000 4 1.0 95.1 9.30
BIT DATA
BIT NO SIZE Mfg Type Serial No. Jcu-32nds
Depth
Out
Dairy
Feel
Total
Feel Hrs.
Total
Hrs
Daily
FL/Hr
Total
FL/Hr. WOB RPM
BIT GRADE
BIT NO SIZE Mfg Type Serial No. Jcu-32nds
Depth
Out
Dairy
Feel
Total
Feel Hrs.
Total
Hrs
Daily
FL/Hr
Total
FL/Hr. WOB RPM INN OUTER BEARINGS GAGE
3 12.25 STC GF37Y PJ0035 13,13.13 0 669 0.0 134 6 65 70
2 12.25 STC FDS PG6481 3-16s 25 65
PUMP D o r T ROD ROD is the dia. Of the pbton rod on dual action pumps
D b i . i « n m p u M p D A T A
T is for triples pump
D 2
ROD is the dia. Of the pbton rod on dual action pumps
D b i . i « n m p u M p D A T A
T is for triples pump D 2
ROD is the dia. Of the pbton rod on dual action pumps
D b i . i « n m p u M p D A T A
T is for triples pump
PUMP
NO. TYPE HP
tt
EFF.
Stroke
Size SPM ( GPM Press DPAV DCAV HHP
Bit
HHP
ttHHP
At Bit HHP/IN1
SLOW PUMP RATES PUMP
NO. TYPE HP
tt
EFF.
Stroke
Size SPM ( GPM Press DPAV DCAV HHP
Bit
HHP
ttHHP
At Bit HHP/IN1 SPM PSI SPM PSI
1 DB700 575 60 16.0 5.5 6 22 500 4 6 6.46 Z 5 7 0.40 0.02 3 250 2 2
2 DB7QQ 575 60 16.0 5.5 0 5 0.00
BOTTOM HOLE ASSEMBLY OD ID LENGTH OD
DRILL PIPE 1 :
BHA NO.- 2 DRILL PIPE 2 :
4.50 3.83 4212.00 DRILL COLLARS 1
DRILL COLLARS 2
8.00 DRILL PIPE 1 :
BHA NO.- 2 DRILL PIPE 2 : 0.00 0.00 0.00
DRILL COLLARS 1
DRILL COLLARS 2 7.00 Total Length 10.00 | H R S O N B H A | 1 8 5
ITEM Description Loijrth OD. LD. Top Conn Bottom Conn TOP TO BIT REMARKS
Managed by NewTech Engineering Z Powered By Neofirma Energy Services*
3 Powered By NeoFirma Energy Services
NEW TECH ENGINEERING DAILY DRILLING REPORT . ..
RtePhonr County: L« RIe Fax:
OPERATOR; DCP Midstream D.te; 11/2/2007
Property ID: DISTRIBVTION OF HOURS
Dril l ing Supervisor. Kirk Fetterolf Pbone- 325-206-2229 Depth- 4212 CATEGORIES DAILY
CUM.
TOTALS
Dril l ing Supervisor Pbooe: T V D : 4212.0 1. Drill rotating 193.25
Drig. Contractor tylerwdl service Rieff : 2 Hole She: '2-250 u • 2. Wash &. team 8.25
Tool pusher: PHONE NUMBER: Footage Last 24 h n : 0 3. Circulate & condition 2.25 9.00
4. Service and lubricate rig 1.25
G. L, Elev.: RKB to G. L . 18 ft 5. Rig repair 1.00
K B to BHF: Date Last BOP Test: na Days Chg. To Wel t 6. Directional/Deviation survey 3.50
Prop. T.D, 9137 AFEtf AFE-DHC- * 2,304,025 7. Wireline Logs/open/cased hole 6.00 6.00
8. Rig up casers/ run casing 1.50 3.50
LAST CASING: 13 3/8 CSG SHOE TEST: 12 EMW Cum. Moothrj rig rtpain H n 9. Rig up cemeniers/ cementing 2.75 6.75
10. Wait on cemenl 4.00
oo PRESENT OPERATIONS: Running 9 J/8 11. Nipple up BOPs/Nipple down BC 11.50 18.00
FROM TO HRS. CODE DESCRIPTION D A I L Y A C T I V I T Y 12. Test BOPs 2.50
600 730 1.5 8 Ran 95its 9 5/8 40S i55 carina EOC ® 4217.Held safety meetinE w/casine crew. 13. Pick up /Lay down BHA 1.50
730 845 1J25 3 Rie down casins crew.RU Ss. circulate casine. 14. Pick up /Lay down drill string 2.00
845 1130 2.75 9 RIB UP HaUiburtonJteld safety meet inc with cemeniers .cemenl casirui with 1325sx rvoe 15. Trippui|/for bit/mud motor/rawd 28.75
C cement lead.tail in with 325 sxprerniurn plus ohm down® 1130 BJTJ-Russell Bentlev in 16. Short trip 1.50
touch with NMOCD.Circulale 43bbls lo reserve pit. 17. Safety meeting 0.50
1130 1400 2.5 11 RD cementers et slios w 80k Dulled on nine 18. Other nol listed 22.75
1400 1830 4.5 I I Cut off casiriE-NU B section,test same 19. Move in rig up/Rig down move o 22.00
1830 2200 3.5 11 Nitrate up BOPE
2200 2300 1.0 11 NU-BOPE
2300 500 6.0 7 UP Schlumbereer to run temp survev.at reouesi of NMOCD
500 600 1.0 3 T M ROPF elaclf choke mnmfnlrl Vellv vnlvr* In ?Sf) CS low IftOnS* hinh
TOTALS 24.00 336.00
DRILLING 0.00 193.25
EVALUATION 6.00 6.00
DAILY CUM DRILLING INT A N G. 582,944.00 S1.I94.802.37
P. U. Wt. S. O. Wt. Slrinn W t Rot. Amps/Trq.: COST T A N G S113J75.00 SI 39,265.00
SURVEV INFORMATION TOTALS 5196,519.00 Sl.334,067.37
DEVIATION SURVEYS: DIRECTIONAL CO.
4210.72 97.04
COORDINATES DIRECTIONAL HOLE TARGETS
TARGET T V D : _
TARGET A Z M : _
TARGET +-N/-S: _
TARGET +E/-W:
TARGET INCL:
MUD LOGGER NAME: D ° n McgentUS
MUD LOGGER PHONE: 4324160081
MUD LOGGERS REPORT BACK GROUND GAS
CONNECTION GAS:
TRIP GAS:
SHOW GAS:
DOWNTIME GAS:
LITHOLOGY:
PROPERTIES Type Mud: Drilling mud M U D COMPANY: Eagle Drilling Fluids
D A I L Y M U D ADDITIVES: 6 paper,3 super sweep
MUD ENGINEER: Ron Bailey Patty COST S69.00 Cum: J 1,806JO
PHONE NUMBER: 432.664.3690
DEPTH TIME MW VIS PV YP GELS PH API WL HTHP
WL CAKE
PM
LIME
PF
ES
CL
PPM
TOTAL
CL
TOTAL
SALT
•.4
SAND
% SOLIDS
«.i
OIL %
WATER
LCM
PPB ECD
4212 1414 9.2 2B 1 4.4 7 0 1600 11800 0 1.0 99.6 9.20
BIT DATA
BIT NO SIZE Mfg Type Serial No. Jets - 32nds
Depth
Out
Daily
Feet
Total
Feet Hrs.
Total
Hrs
Daily
FlJrlr
Total
FL/Hr. WOB RPM
BIT GRADE
BIT NO SIZE Mfg Type Serial No. Jets - 32nds
Depth
Out
Daily
Feet
Total
Feet Hrs.
Total
Hrs
Daily
FlJrlr
Total
FL/Hr. WOB RPM INN OUTER BEARINGS GAGE
3 12.25 STC GF37Y PJ0035 13,13.13 0 669 0.0 134 6 65 70
2 12.25 STC FDS PG6481 3-16S 25 65
PUMP DorT ROD ROD b the dia. Or the pbton rod on dual action pumps
PUMP DATA T fa for triples pump
D 2
ROD b the dia. Or the pbton rod on dual action pumps
PUMP DATA T fa for triples pump
D 2
ROD b the dia. Or the pbton rod on dual action pumps
PUMP DATA T fa for triples pump
PUMP
NO. TYPE HP %
EFF.
Stroke
Length Size SPM GPM Press DPAV DCAV
Surface
HHP
Bit
HHP
W HHP |
At Bit IHHP/TN3
SLOW PUMP RATES PUMP
NO. TYPE HP %
EFF.
Stroke
Length Size SPM GPM Press DPAV DCAV
Surface
HHP
Bit
HHP
W HHP |
At Bit IHHP/TN3 SPM PSI SPM I PSl
1 DB700 575 60 16.0 5.5 6 22 500 4 6 6.46 2.57 0.40 0.02 3 250 2 |2
2 DB700 575 60 16.0 5.5 0 5 0.00
I BOTTOM HOLE ASSEMBLY
OD ID LENGTH OD_
DRILL PIPE I :
B H A N O . : 2 DRILL PIPE 2 :
4.50 3.83 4212.00 DRIL1
DRIL
COLLARS 118.00 DRILL PIPE I :
B H A N O . : 2 DRILL PIPE 2 : 0.00 0.00 0.00
DRIL1
DRIL L COLLARS 2j 7.00 Total Length 10.00 | HRS ON BHA] 185
ITEM Description Lenjrth O.D. I.D. Top Conn Bottom Conn TOP TO BIT REMARKS
Managed by N e w T e c h E n g i n e e r i n g 21 Powered By NeoFirma Energy Services'"
3 Powered 8y NeoFirma Energy Services™
NEW TECH ENGINEERING DAILY DRILLING REPORT
County: Lea
OPERATOR: DCP Midstream Less* & Wen No.: 1 Property ID:
Days (rrxu Spud 14
Drilling Supervisor: KiA Fetterolf Drilling Supervison _
Drlg. Contractor tyler weil service Toolpushcr:
Phone: 325-206-2229
Pbooe: Rlg«:2
Depth: 4212
PHONE NUMBER:
TVD: 4212.0 Hole Siie: 1 2 2 5 0 h
Footsge Lest 24 hn: 0
G. L. Ekv-: KB to BHF:_
Prop. TJX °137
LAST CASING: 13 3/8
RKB to G. L, J Date Last BOP Test J]
AFEA _ Days Chg. To Welt
AFE-DHC: 1 2304,025
CSG SHOE TEST: 12 a. MonAJy rie repair: _
TO
MOO PRESENT OPERATION: Rimiurtg 9.5/8
HRS. CODE DESCRIPTION DAILY ACTIVITY
4. Service and lubricate rig
9. Rig up cemeniers/cerocniing
Date-. 11/3/2007 DISTRIBUTION OP HOURS
CATEGORIES
1. Drill rotating
3. Circulate & condition
S. Rig repair 6. Directional/Deviation survey 7. Wireline Logs/open/cased hole 8. Rig up casers/nm casing
10. Wait on cement 11. Nipple up BOPs/Nipple down BC
CUM.
TOTALS
8.2S 9.00 1.25 1.00 3.50 6.00 3.50 6.75 4.00
18.00 2.50 1.50 2.00
29.25 1.50 1.00 0.50
28.75 22.00
Tesl Casing lo 1500 osi with rie pumps 13. Pick up /Lay down BHA PI) BHA fBit 8-7' DC. 6.5' DC) 14. Pick up /Lay down drill string
15. Tripping/for bit/mud motor/mwd 16. Short trip
Wash &. Drilling, cement from 3985' lo 4168* to ihe top of Ihe tloaL 17. Drill cement/float equipment Tesl Casing to 1500 psi with the rig pumps 18. Safety meeting Drill float equipment from 4168' lo 4212' 19. Other nol listed Test formation to 12.0 ppg EMW. held OK 20. Move in rig up/Rig down move i Drilling io 4595' (Includes 1 additional hr for time change)
EVALUATION
Siring WL SURVEY INFORMATION
RoL Amps/Trq.:
DEVIATION SURVEYS: DIRECTIONAL CO-COORDINATES
SUPERVISOR "
DIRECTIONAL HOLETARGETS TARGET TVD: _ TARGET AZM: _ TARGET +N/-S:_
TARGET +E/-W:
TARGET INCL.:
DRILLING
COST
MUD LOGGER NAME: Don McgOUUS
MUD LOGGER PHONE: 4324160081
MUD LOGGERS REPORT BACK GROUNDGAS_ CONNECTION GAS:_
TEJPGAS;_ SHOW GAS:_
DOWNTIME GAS:_ LITHOLOGY:
COMMENTS:
MUD PROPERTIES Type Mud: Drilling mud MUD COMPANY: Eagle Drilling Fluids MUD ENGINEER: Ron Bailey D»3yCost: S0.00 Cum: Sl.806.30
PHONE NUMBER: 432.664.3690 DAILY MUD ADDITIVES:
DEPTH TIME MW VIS PV YP GELS PH API WL HTHP
WL CAKE
PM
UME
PF
ES
CL
PPM
TOTAL
CL
TOTAL
SALT
n SAND
•a SOLIDS OIL
S
WATER
LCM
PPB ECD
I 0.00
BIT DATA
BIT NO SIZE Mfg Type Serial No. jEts-32nds
Depth
Out
Daily
Feet
Total
Feel Hrs.
Total
Hrs
Dairy
FL/Hr
Total
FL/Hr. WOB RPM
BIT GRADE
BIT NO SIZE Mfg Type Serial No. jEts-32nds
Depth
Out
Daily
Feet
Total
Feel Hrs.
Total
Hrs
Dairy
FL/Hr
Total
FL/Hr. WOB RPM INN OUTER BEARINGS GAGE
3 12.25 STC GF37Y PJ0035 13.13,13 0 859 16.5 151 6 65 70
2 12.25 STC FDS PG6461 3-16s 25 65
PUMP D o r T ROD ROD b the dia. Of the pbton rod on dual action pumps
D b f c r a ^ c p ^ p p u v I p „ A T A
T fa for triples pump
D 2
ROD b the dia. Of the pbton rod on dual action pumps
D b f c r a ^ c p ^ p p u v I p „ A T A
T fa for triples pump D 2
ROD b the dia. Of the pbton rod on dual action pumps
D b f c r a ^ c p ^ p p u v I p „ A T A
T fa for triples pump
PUMP
NO. TYPE HP %
EFF.
Stroke
Size SPM GPM Press DPAV DCAV
Surface
HHP
Bit
HHP
SHHP
At Bil HHP/IN3
SLOW PUMP RATES PUMP
NO. TYPE HP %
EFF.
Stroke
Size SPM GPM Press DPAV DCAV
Surface
HHP
Bit
HHP
SHHP
At Bil HHP/IN3 SPM PSI SPM PSl
1 DB700 575 60 16.0 5.5 6 22 500 4 6 6.46 • 2.58 0.40 0.02 3 250 2 2
2 OB700 575 60 16.0 5.5 0 5 0.00
BOTTOM HOLE ASSEMBLY ID LENGTH
DRILL PIPE t :
BHA NO.: 2 DRILL PIPE 2 :
4.50 3.83 4212.00 DRILL COLLARS 1
DRILL COLLARS 2
8.00 DRILL PIPE t :
BHA NO.: 2 DRILL PIPE 2 : 0.00 0.00 0.00
DRILL COLLARS 1
DRILL COLLARS 2 7.00 Total Length 10.00 | H R S O N B H A | 2 0 1
ITEM Description Lenirth O.D. LD. Top Conn Bottom Com TOP TO BIT REMARKS
Managed by NewTech Engineering 21 Powered By NeoFirma Energy Services'"
3 Powered By NeoFirma Energy Services'''
Property IT* DISTRIBUTION OP HOURS
CUM.
Drill ing Supervisor: KirkFetterolf Phone: 325-206-2229 r^p t fe 5180 CATEGORIES DAILY TOTALS
Dril l ing Supervisor Phone: T V D : 5180.0 1. Dr i l l rotating 24.00 233.75
Drig. Contractor tyler well service Rie t): 2 Hole Size: 8 7 5 0 to 2. Wash & ream 8.25
Tool pusher: PHONE NUMBER- Footage Last 24 hrs: 968 3. Circulate & condition 9.00
4. Service and rubricate rig' 1.25
G. L, Elev.: RKB to G. L . I 8 fl 5. Rig repair 1.00
K B to BHF: Dale Last BOP Test 11.2.07 Days Chg. To W e l t 6. Directional/Deviation survey 3.50
Prop. T.D. 9137 AFEff AFE-DHC: 52,304,025 7. Wireline Logs/op* si/cased bole 6.00
8. Rig up casers/ run casing 3.50
L A S T CASING: 9 5/8 CSC SHOE TEST: 12 EMW Cum. Monthly rir rtpmSr. Hrs. 9. Rig up cetnenLers/ cementing 6.75
10. Wait on cement 4.00
MOO PRESENT OPERATIONS: Drlg 8 3/4 hole @ 5180 11. Nipple up BOPs/Nipple down BC 18.00
FROM T O HRS. CODE DESCRIPTION D A I L Y A C T I V I T Y 12-TestBOPs 2.50
600 600 24.0 I Drillinfi from 459? 105175 13. Pick up /Lay down BHA 1.50
14. Pick up /Lay down drill string 2.00
15. Trippmg/forbil/rnud motor/mwd 2925 16. Short trip 1.50
17. Dr i l l cement/float eouipment 1.00
18. Safety meeting OJO
19. Other not listed 28.75
20. Move in rig up/Rig down move o 22.00
TOTALS 24.00 384.00
DRILLING 24.00 233.75
EVALUATION 0.00 6.00
DAILY CUM
DRILLING fNTANG. S30.832.50 SU65.409.87
P U WL S. O. Wt. String WL Rol. Amps/Trq.: COST TANG. 50.00 5139,265.00
SURVEY INFORMATION TOTALS $30,832.50 SI,404.674.87
NEVV TECH ENGINEERING DAILY DRILLING REPORT
County: Lea
OPERATOR: DCP Midstream * & Well No.: 1 Date: 11/4/2007
DEVIATION SURVEYS: DIRECTIONAL CO-
COORDINATES DIRECTIONAL HOLE TARGETS
TARGET TVD:
TARGET A2M:
TARGET+N/-S:
TARGET +E7-W:
TARGET INCL;
MUD LOGGER NAME: Don Mcgennis
MUD LOGGER PHONE: 4324160081
MUD LOGGERS REPORT BACK GROUND GAS
CONNECTION GAS:
TRIP GAS:
SHOW GAS:
DOWNTIME GAS:
LITHOLOGY: 10% iimestone.80% dolomtLe.10% sand
PROPERTIES Type Mad: Drilling mud MUD COMPANY: Eagle Drilling Fluids
DAILY MUD ADDrnvES; 20 gal c202.4 sxcostic.lO cals 9390.5 gals 120,5 sx nitrate.
MUD ENGINEER: Ron Bailey Daily Cose S57.50
PHONE NUMBER: 432.664.3690
DEPTH j TIME MW VIS PV YP GELS PH API WL HTHP
WL CAKE
PM
LIME
PF
ES
CL
PPM
TOTAL
CL
TOTAL
SALT
•A
SAND
li
SOLIDS OIL WATER
LCM
PPB ECD
4996 |600 9.6 29 1 4.4 9.500 3 1600 11800 0 0.8 99.6 9.61
BIT DATA
BIT NO SIZE Mfg Type Serial No. Jeu-32nds
Depth
Out
Dairy
Feet
Total
Feet Hrs.
Total
Hrs
Daily
FL/Hr
Total
FL/Hr. WOB RPM
BIT GRADE
BIT NO SIZE Mfg Type Serial No. Jeu-32nds
Depth
Out
Dairy
Feet
Total
Feet Hrs.
Total
Hrs
Daily
FL/Hr
Total
FL/Hr. WOB RPM INN OUTER BEARINGS GAGE
3 12.25 STC GF37Y PJ0035 13.13.13 96B 1837 16.8 168 11 65 70
2 12.25 STC FDS PG6481 3-16s 25 65
PUMP D o r T ROD ROD is tht dia. Or the pbton rod on dual action pumps
D b b r A v k . w p u M p „ A T A
T b for triples pump
D 2
ROD is tht dia. Or the pbton rod on dual action pumps
D b b r A v k . w p u M p „ A T A
T b for triples pump D 2
ROD is tht dia. Or the pbton rod on dual action pumps
D b b r A v k . w p u M p „ A T A
T b for triples pump
PUMP
NO. TYPE HP •/.
EFF.
Stroke
s " SPM GPM Press DPAV DCAV HHP
Bil
HHP
%HHP
At Bil HHP/IN 3
SLOW PUMP RATES PUMP
NO. TYPE HP •/.
EFF.
Stroke
s " SPM GPM Press DPAV DCAV HHP
Bil
HHP
%HHP
At Bil HHP/IN 3 SPM PSI SPM PSI
1 DB700 575 60 16.0 5.5 6 22 500 10 43 6.46 2.56 0.40 0.04 3 250 2 2
2 DB700 575 60 16.0 5.5 0 20 0.00
BOTTOM HOLE ASSEMBLY OD ID LENGTH Op_
DRILL PIPE 1 :
BHA NO.: 2 DRILL PIPE 2 :
4.50 3.83 5180.00 DRILL COLLARS 1
DRILL COLLARS 2
8.00 DRILL PIPE 1 :
BHA NO.: 2 DRILL PIPE 2 : 0.00 0.00 0.00
DRILL COLLARS 1
DRILL COLLARS 2 7.00 Total Length [0.00 | H R S 0 N B H A | 2 1 8
ITEM Description LeniHh O.D. l.D. Top Coon Bottom Cram TOP TO BIT REMARKS
MAnaoedby NewTech Engineering 23 Powered By NeoFirma Energy Servicea'*
3 Powered Br NeoFirma Energy Services'"
NEW TECH ENGINEERING DAILY DRILLING REPORT
County: Lea Rig F a x :
OPERATOR: DCP Midstream Lease & WrD N I L : 1 Days from Spud 16 Date: 11/5/2007
Property ID: DISTRIBUTION OF HOURS
Drill ing Supervisor: •Cirk Fetterolf Phone: 325-206-2229 Dentin 5175 CATEGORIES DAILY
CUM.
TOTALS
Drill ing Supervisor: Pbooe: T V D : 5)75.0 1. Dr i l l rotating 2.00 235.75
Brig. Contractor tyler well service Rig #: 2 Hole Sue: &-750 ta 2. Wash A ream 8.25
Toolpusher: PHONE NUMBER: Footage Last 24 hrs: -5 3. Circulate & condition 3.00 12.00
4. Service and lubricate rig 1.00 2.25
G. L Elev.: R K B to G . L '8 ft 5. Rig repair 1.00
K B to BHF: Date Last BOP Test: 11.2.07 Days Chg. To Well: 6. Directional/Deviation survey 3.50
Prop. T.D. 9137 A FES AFE-DHC: S2J04.025 7. Wireline Logs/open/cased hole 6.00
8. Rig up casers/run casing 3.50
LAST CASING: 9 5/8 CSG SHOE TEST: 12 EMW Cum. Mooditj rle repair? Hrs. 9. Rig up cementers/ cementing 6.75
10. Wait on '•TTiTt 4.00
ot 00 PRESENT OPERATIONS: TOOH with DST ioois 11. Nipple up BOPs/Nipple down BC 18.00
FROM T O HRS. CODE DESCRIPTION D A I L Y ACTrvTTY I2.TeslBOPs 2.50
600 800 2.0 1 Drle from 5175' to 524T 13. Pick up /Lav down BHA 5.00 6.50
800 1100 3.0 3 Circulate & soot hiRh vis. 32 Pill 14. Pickup /Lav down drill string 2.00
1100 1330 2.5 15 Set kelrv back held safety meetine.TOOH for DST. 15. Tripping/for hil/mud motor/mwd 9.00 38.25
1400 1600 2.0 13 Lav down 7* DCs & TBS 16. Short trip 1.50
1500 1700 2.0 13 Pick up & make uo DST tools 17. Dri l l cement/float equipment 1.00
1700 2100 4.0 15 Trio in hole under f u l l hvdramadc 18. Safety meeting 0.50
2100 2200 1.0 19 DST tesl #1 from 5006' lo 5012'.sliehl blow on DP. 19. Other nol listed 4.00 32.75
2200 100 3.0 19 Finish up DST tesLRiE down tools. 20. Move in rig up/Rig down move o 22.00
130 400 2.5 15 Chain out of hole
410 445 0.75 13 Lav down DST tools
450 500 0.25 13 Mate im BHA H*ld w f r t v mn-tino
500 600 1.0 4 Mate no Bit Pie wvir*-Crew chnTIPr
TOTALS . 24.00 408.00
D R I L L I N G 2.00 235.75
EVALUATION 0.00 6.00
DAILY CUM
DRILLING INTANG. $47,990.53 $1,313,400.40
P.U. Wt. S.O.WL SlrinnWt. Rot. AmpsTrq.: COST TANG. 10.00 513935.00
SURVEY INFORMATION TOTALS $47,990.53 51,452^65.40
DEVIATION SURVEYS: DIRECTIONAL CO.
COORDINATES
SUPER VISOR:]""
DIRECTIONAL HOLE TARGETS
TARGET TVD:_ TARCET A2M:_
TARGET+N/-S:_ TARGET+E/-W:
TARGET INCL:
MUD LOGGER NAME: Don McgeniUS
MUD LOGGER PHONE: 4324160081
MUD LOGGERS REPORT BACK GROUND GAS 5 3
CONNECTION GAS: 53
DOWNTIME GAS: 0
LITHOLOGY: 80% Dolomite 20% sand
COMMENTS: Delaware Sands
PROPERTIES Type Mud: Drilling mud MUD COMPANY: Eagle Drilling Fluids
DAILY MUD ADDITIVES: Nitiales 10 mnnlnirl 150 ppm.
MUD ENGINEER: Ron Bailey Daily Cost mOO
PHONE NUMBER: 432.664.3690
DEPTH TIME MW VIS PV YP GELS PH API WL HTHP
WL CAKE
PM
LIME
PF
ES
CL
PPM
TOTAL
CL
TOTAL
SALT
W
SAND
H
SOLIDS
% OIL
•A
WATER
LCM
PPB ECD
5090 2315 9.2 29 1 10 3000 1420CH 1 0.8 199.3 9.20
BIT DATA
BIT HO SIZE M6j Type Serial No. Jtas-32ods
Depth
Oat
Dairy
Feet
Total
Feet Hrs.
Total
Hr*
Dairy
F L / H T
Total
F t f H i . WOB RPM
BIT GRADE
BIT HO SIZE M6j Type Serial No. Jtas-32ods
Depth
Oat
Dairy
Feet
Total
Feet Hrs.
Total
Hr*
Dairy
F L / H T
Total
F t f H i . WOB RPM INN OUTER BEARINGS GAGE
3 12.25 STC GF37Y PJ0035 13.13.13 -5 1832 2.8 170 11 65 70
2 12.25 STC FDS PG6481 3-16s 25 65
PUMP D o r T ROD ROD b the dia. Of Ihe piston rod on dual action pumps
D b f o r d ^ P - P p l J M p D A T A
T b for triplex pump
D 2
ROD b the dia. Of Ihe piston rod on dual action pumps
D b f o r d ^ P - P p l J M p D A T A
T b for triplex pump D 2
ROD b the dia. Of Ihe piston rod on dual action pumps
D b f o r d ^ P - P p l J M p D A T A
T b for triplex pump
PUMP
NO- TYPE HP EFF.
Stroke brer
Size SPM GPM Press DPAV DCAV
Surface
HHP
Bit
HHP
'A HHP
Al Bit HHP/IN 1
SLOW PUMP RATES PUMP
NO- TYPE HP EFF.
Stroke brer
Size SPM GPM Press DPAV DCAV
Surface
HHP
Bit
HHP
'A HHP
Al Bit HHP/IN 1 SPM PSI SPM PSI
1 DB700 575 60 16.0 5.5 6 22 500 10 43 6.46 2.56 0.40 0.04 3 250 2 2
2 DB700 575 60 16.0 5.5 0 20 0.00
BOTTOM HOLE ASSEMBLY OD ID LENGTH OD
DRILL PIPE 1 :
BHA NO.; 2 DRILL PIPE 2 :
4.50 3.83 5175.00 DRILL COLLARS 1
DRILL COLLARS 2
8.00 DRILL PIPE 1 :
BHA NO.; 2 DRILL PIPE 2 : 0.00 0.00 0.00
DRILL COLLARS 1
DRILL COLLARS 2 7.00 Total Length [0.00 | H R S O N B H A | 2 2 1
ITEM Description Length O.D. I.D. Top Com Bottom Com TOP TO BIT REMARKS
Managed by N e w T e c h E n g i n e e r i n g Z Powered By Neofimvi Energy Services-
3 Powered By NeoFirma Energy Seavkcj™
NEW TECH ENGINEERING DAILY DRILLING REPORT |||lf|
B i t
OPERJ VTOR: DCP Midstream
O
Lease* W
Prope
untv:Lea Rb
11 No.: 1
Fax :
Days fr
•690
o o Spud 17 ' Dale: 11/
jwarav.TarcsV B i t
OPERJ
O
Lease* W
Prope -ty ID:
Fax :
Days fr
•690
DISTRIBUTION OF HOURS
Drilling Sup
Drill ing Sop
Drle, Co
ervtsor: Kirk Fetterolf I
I
<E NUMBER:
bone: 325-206-2229
Footage La
Depth: -
Fax :
Days fr
•690 CATEGORIES DAILY
CUM.
TOTALS Drilling Sup
Drill ing Sop
Drle, Co
I
I
<E NUMBER:
boor:
Footage La
T V D : 5690.0 1. Dri l l rotating 16.75 252.50
Drilling Sup
Drill ing Sop
Drle, Co DtrsjctortyterweD service
I
I
<E NUMBER:
R i E « : 2
Footage La
talc She: 8.750 ta
s i 24 hrs: 515
2. Wash A ream 0.50 8.75
Tool
G . L
K B tc
Pro
pusher. PHO
I
I
<E NUMBER: Footage La
talc She: 8.750 ta
s i 24 hrs: 515 3. Circulate A condition 12.00 Tool
G . L
K B tc
Pro
PHO
4. Service and lubricate rig 2.25
Tool
G . L
K B tc
Pro
Elev.: RKB t
Date Last BG
CSC SHC
o G . L . 18 A 5. Rig repair 1.00
Tool
G . L
K B tc
Pro
BHF:
RKB t
Date Last BG
CSC SHC
PTest: 11.2,07 DaysC! hg. To Wel t 6. DrrecD'onal/Deviation survey 1.00 4.50
Tool
G . L
K B tc
Pro p. TJX 9137
RKB t
Date Last BG
CSC SHC
AFE#
DaysC!
AFE-DHC: 52,304.025 7. Wireline Logs/open/cased hole 6.00
Tool
G . L
K B tc
Pro
RKB t
Date Last BG
CSC SHC
DaysC!
8. Rig up casers/ run casing 3.50
LAST CASING: 9 5/8
RKB t
Date Last BG
CSC SHC ETEST: ' 2 JvIW Cum. Moot: Myricnpoln I Irs. 9. Rig up cemeniers/ cementing 6.75 LAST
RKB t
Date Last BG
CSC SHC JvIW Cum. Moot: Irs.
10. Wait on cement 4.00
MOB PRESENT OPER,
FROM T O HRS. CODE
*TiONS: Drilling ahead @ 56901 11. Nipple up BOPs/Nipple down BC 18.00 MOB PRESENT OPER,
FROM T O HRS. CODE DESCRIPTION D A I L Y A C T I V I T Y 12.TeslBOPs 2.50
600 630 0.5 13 I-av down test tools 13. Pick up /Lay down BHA 1.50 8.00
630 645 025 15 TOOH 14. Pick up /Lay down driD string 2.00
645 745 1.0 13 I^vdown tools A load out truck 15. Tripping/for bit/mud motor/mwd 4.25 42.50
745 1145 4.0 15 Pick up BHA Trio in hole 16. Short trip 1.50
1145 1215 0.5 2 Wash A ream 40" lo bottom 17. D r i l l cement/float equipment 1.00
1215 1400 1.75 1 Drla from 5247 to 5280' <® 30PH 18. Safety meeting 0.50
1400 1900 5.0 1 Drle. from 5280' to 5426* Ava.28"PH 19. Other not listed 32.75
1900 1930 0.5 6 WLS ©5326 ' 1 dee 20. Move in rig up/Rig down move o 22.00
1930 2200 2.5 1 Drle from 5426* to 5487
2200 500 7.0 1 Drle from 5487 to 5676' 25TH
500 510 0.5 6 W I S ffiKAW 1 ?5dM>
530 600 0.5 1 Th-W fmm 5f5irr lr» 5690'
TOTALS 24.00 432.00
DRILLING 16.75 252.50
EVALUATION 0.00 6.00
DAILY CUM
DRILLING
COST
INTANG. 536.369.40 51,349.769.80
P U Wi S O.Wt. StrinaWL Rot. Amps/Trq.:
DRILLING
COST TANG. 50.00 5139,265.00
SURVEY INFORMATION
DRILLING
COST
TOTALS 536,369.40 51.489.034.80
DEVIATION SURVEYS: DIRECTIONAL CO. SUPERVISOR:!
DEPTH ANGLE AZM TVD VS. COORDINATES DLS DIRECTIONAL HOLE TARGETS MUDLOC4
MUDLOGG
SER NAME: DonMcgennis
53B0 1.0 5378.57 115.53 115.53 0.00 0.00 TAR
TAR
TAR(
TARG
GET TVD:
MUDLOC4
MUDLOGG ERPHONE 4324160081
5630 1.3 5628.52 120.44 120.44 0.00 0.00
TAR
TAR
TAR(
TARG
SET A Z M :
TAR
TAR
TAR(
TARG
ET+N/-S: MUD LOGGERS REPORT
TAR
TAR
TAR(
TARG ET+E/-W: BACK GROUND GAS
0% dolimite
TAR
TAR
TAR(
TARG
CONNECTION GAS:
TRIP GAS:
SHOW GAS:
DOWNTIME GAS:
LITHOLOGY:
30
0% dolimite
CONNECTION GAS:
TRIP GAS:
SHOW GAS:
DOWNTIME GAS:
LITHOLOGY: 0% dolimite
TAR * UP/-DOWN
CONNECTION GAS:
TRIP GAS:
SHOW GAS:
DOWNTIME GAS:
LITHOLOGY:
0
0% dolimite
TAR GET INCL: . . * UP/-DOWN
CONNECTION GAS:
TRIP GAS:
SHOW GAS:
DOWNTIME GAS:
LITHOLOGY:
30
0% dolimite
TAR * UP/-DOWN
CONNECTION GAS:
TRIP GAS:
SHOW GAS:
DOWNTIME GAS:
LITHOLOGY: 80% limestone^ 0% dolimite
COMMENTS: Last Zone Glorita COMMENTS:
MUD PROPERTIES Type Mud
DAILY MUD ADDITIVE
Drilling mud MUD COMPANY: Eaqle Drilling Fluids MUD ENGINEER:
PHONE NUMBER:
Ron Bailey DaDy Cost. S94.40 Cum 51,95820 Type Mud
DAILY MUD ADDITIVE S:
MUD COMPANY: MUD ENGINEER:
PHONE NUMBER: 432.664.3690
DaDy Cost. Cum
DEPTH TIME MW VIS FV YP GELS PH API WL HTHP
WL CAKE
PM
LIME
PF
ES
CL
PPM
TOTAL
CL
TOTAL
SALT
% SAND
% SOLIDS
W
OIL %
WATER
LCM
PPB ECD
2960 600 9.3 29 1 10.500 2400 11000 0.6 99.1 8.31
BIT DATA
BIT NO SIZE Mfg Type Serial No. Jets-32nds
Depth
Out
Daily
Fect
Total
Fed Hrs.
Total
Hrs
Daily
FL/Hr
Total
FlJHr. WOB RPM
BIT GRADE
BIT NO SIZE Mfg Type Serial No. Jets-32nds
Depth
Out
Daily
Fect
Total
Fed Hrs.
Total
Hrs
Daily
FL/Hr
Total
FlJHr. WOB RPM INN OUTER BEARINGS GAGE
3 12.26 STC GF37Y PJ0035 13.13.13 515 2347 16.B 1B7 13 65 70
2 12.25 STC FDS PG6481 3- 16s 25 65
PUMP D o r T ROD ROD is hr dia. Of Ac piston rod on dual action pumps
n p , e * p u r a p PUMP DATA riplei pump
D 2 D is for
hr dia. Of Ac piston rod on dual action pumps
n p , e * p u r a p PUMP DATA riplei pump D 2 T b for
hr dia. Of Ac piston rod on dual action pumps
n p , e * p u r a p PUMP DATA riplei pump
PUMP
NO. TYPE HP %
EFF.
Stroke
Leru-th
Liner
SPM GPM Press DPAV DCAV HHP
Bit
HHP
%HHP
At Bit HHP/IN3
SLOW PUMP RATES PUMP
NO. TYPE HP %
EFF.
Stroke
Leru-th
Liner
SPM GPM Press DPAV DCAV HHP
Bit
HHP
%HHP
At Bit HHP/IN3 SPM PSI SPM PSI
1 DB700 575 60 16.0 5.5 6 22 500 10 43 6.46 2.56 0.40 0.04 3 250 2 2
2 DB700 575 60 16.0 5.5 0 20 0.00
BOTTOM HOLE ASSEMBLY OD ID LENGTH OD
DRILL PIPE 1
BHA NO.: 2 DRILL PIPE 2
4.50 3.83 5690.00 DRILL COLLARS 1
DRILL COLLARS 2
8.00
Total Length HRS ON BHA
DRILL PIPE 1
BHA NO.: 2 DRILL PIPE 2 0.00 0.00 0.00
DRILL COLLARS 1
DRILL COLLARS 2 7.00 Total Length 0.00 HRS ON BHA 1238 ITEM Description Lemrth O.D. LD. Top Com Bottom Conn TOP TO BIT REMARKS
Managed by N e w T e c h E n g i n e e r i n g 3 Powered By NeoFirma Energy Services'
3 Powered By NooRrma Energy Service*"*
NEW TECH ENGINEERING DAILY DRILLING REPORT
County: Let
OPERATOR: DCP Midstream UaseAWeONo.: 1 _
Property ID:
Days from Spud 18 Date: 11/7/2007
Dril l ing Supervisor.^
DriiHng Supervisor: _
Phone: 325-206-2229
Phone:
Drig. Contractor tyler well service
Toolpusher:
Rlgtt : 2
PHONE NUMBER:
Depth: 5950
T V D : 5950.0
Hole Sue: 8-750 b
Footage Last 24 hrs: 260
G. L , Elev^_
KB to BHF:
R K B t o G . L ' » f t
Prop. TJX 9137
LAST CASING: 9 5/8
Date Last BOP Test: 11/2J07
AFE#
Days Chg, To W e l t
AFE-DHC: S 2,304.025
CSG SHOE TEST: C m M a n i J J j rig repair;
0600 PRESENT OPERATIONS: lost circulation @ 5950*^100118 premix lank w L C M
> HRS. CODE DESCRIPTION D A I L Y A C T I V I T Y
DISTRIBUTION OF HOURS
CATEGORIES
3. Circulate & condition
4. Lost Returns
5. Service and lubricate rig
6. Rig repair
7. Directional/Deviation survey
8. Wireline Logs/open/cased hole
g upcasers/nm casing
10. Rig up cemeniers/ cementing
12. Nipple up BOPs/Nipple down BC
CUM.
TOTALS
8.75
12.00
15.00
225
1.00
4.50
6.00
3.50
6.75
4.00 18.00
2.S0
8.00
2.00
42.50
1.50
1.00
0.50
32.75
22.00
Drif l from SeW to 5926' 1400
1500
1630
1700
Drle from 59261 lo 595Q'@35' perhr 14. Pick up /Lav down BHA
Lost circulation ® 5950'.POOH 4 sufs mix L C M p i l l t o 50+ vis.8.7 wt. 15. Pick up /Lay down drill string
Pump L C M pill with no returns 16. Tripping/for bit/mud motor/mwd
POOH four s1ds.rn.tx L C M pi l l Io 50+ vis o f fiber plug A nut shelisTIH spot L C M plug,N- 17. Short trip
18. D r i l l cement/float equipment
2030 2200
Mud up pits to 32 vis.wt 8.7 19. Safety meeting
Mix L C M lo 50+ vis.WT 8.7.TM pump pill at 5926'POOH lo 4168'JJo rt 20. Other nol listed
es per min with rig pump,950fls no returns 21. Move in rig up/Rig down move o
Pimrned lolal o f 1200 bbls lost.
EVALUATION
SURVEY INFORMATION DEVIATION SURVEYS: DIRECTIONAL CO.
COORDINATES
SUPERVISOR^!
DIRECTIONAL HOLE TARGETS
TARGET T V D : _
TARGET A Z N L _
TARGET +N/-S:_
TARGET+E/-W:
TARGET INCL:
DRILLING
COST
MUD LOGGER NAME: Don Mcgenms
MUD LOGGER PHONE 4324160081
MUD LOGGERS REPORT BACK GROUND GAS 25
CONNECTION GAS:
TRIP GAS:
SHOW GAS:
DOWNTIME GAS:
LITHOLOGY: 90% limestone, 10% dolomite
COMMENTS:
PROPERTIES Type Mud: Drilling mud M U D COMPANY: Eagle Drilling Huids MUD ENGINEER: Ron Bailey Dairy Cost: S1.33129
PHONE NUMBER: 432.664.3690
DAILY MUD ADDmVES: 1 caustk.23 paper, 3 soda ashj!70 salt eel .45 starch. 110 fiber plug.90 pronto plug.
DEPTH TIME MW VIS pv YP GELS PH API WL HTHP
WL CAKE
PM
LIME
PF
ES
CL
PPM
TOTAL
CL
TOTAL
SALT
V.
SAND %
SOLIDS
% OIL WATER
LCM
PPB ECD
4168 534 B.7 26 1 10 600 12000 99.7 8.71
BIT DATA
BIT NO SIZE Mfg Typo Serial No. Jets-32nds
Depth
Out
Daily
Feet
Total
Fect Hrs.
Total
Hrs
Dairy
FL/Hr
Total
Ft/Hr. WOB RPM
BIT GRADE
BIT NO SIZE Mfg Typo Serial No. Jets-32nds
Depth
Out
Daily
Feet
Total
Fect Hrs.
Total
Hrs
Dairy
FL/Hr
Total
Ft/Hr. WOB RPM INN OUTER BEARINGS GAGE
4 12.25 STC GF37Y PJ0035 13,13.13 260 2607 16.8 17 155 65 70
2 12.25 STC FDS PG6481 3-16s 2705 25 65
PUMP D o r T ROD ROD h the dia. Of the pbton rod on dual action pumps
" " " ' f 1 ™ ' PUMP DATA T is for triplex pump
D 2
ROD h the dia. Of the pbton rod on dual action pumps
" " " ' f 1 ™ ' PUMP DATA T is for triplex pump D 2
ROD h the dia. Of the pbton rod on dual action pumps
" " " ' f 1 ™ ' PUMP DATA T is for triplex pump
PUMP
NO. TYPE HP
s EFF.
Stroke
Lensrth
liner
Size SPM GPM PZ DPAV DCAV HHP
Bit
HHP
14 HHP
At Bit HHP/IN1
SLOW PUMP RATES PUMP
NO. TYPE HP
s EFF.
Stroke
Lensrth
liner
Size SPM GPM PZ DPAV DCAV HHP
Bit
HHP
14 HHP
At Bit HHP/IN1 SPM PSI SPM PSI
1 DB700 575 60 16.0 5.5 6 22 500 10 43 6.46 2.56 0.40 0.04 3 250 2 2
2 DB700 575 60 16.0 5.5 0 20 0.00
BOTTOM HOLE ASSEMBLY OD ID LENGTH OD
DRILL PIPE I : 4.50 3.83 15950.00 DRILL COLLARS 1
DRILL COLLARS 2
8.00
Total Length HRS ON BHA I HA NO.: 2 DRILL PIPE 2- 0.00 0.00 0.00
DRILL COLLARS 1
DRILL COLLARS 2 7.00 Total Length 0.00 HRS ON BHA 255
ITEM Description Lemah O.D. LD. Top Conn Bottom Conn TOP TO BIT REMARKS
Managed by N e w T e c h E n g i n e e r i n g 2Powered By NeoFtrma Energy Services'"
2" Powered By NcoHrxna Energy Services"*
NEW TECH ENGINEERING DAILY DRILLING REPORT
County: Lee
OPERATOR: DCP Midstream Date 11/8/2007
Property ID: DtSTRIBlTloN OF HOURS
Dri l l ing Supervisor: K u t Fetterolf pbooe: 325-206-2229 Depth: 5950 CATEGORIES DAILY
CUM.
TOTALS
Dri l l ing Supervisor: Pbooe; T V D : 5950.0 1. Dr i l l rotating 261.50
D r i f t Contractor tyler well service Rie #: 2 Hole She: 8 7 5 0 b> 2. Wash ft ream 8.75
Toolpusher; PHONE NUMBER: Footage Last 24 hrs: 0 3. Circulate ft condition 1.00 13.00
4. Lost Returns 3.00 18.D0
G-L-Elev.: R K B to G. L . 18 ft 5. Service and lubricate rig 2.25
K B b a BHF: Date Last BOP Test: 11/2/07 Days Chg. To Wel t 6. Rig repair 1.00
Prop. T.D. 9137 AFE# AFE-DHC: * 2,304,025 7. Directional/Deviation survey 4.50
8. Wireline Logs/opt a/cased hole 6.00
LAST CASING: 95/8 CSG SHOE TEST: ' 2 EMW Cum. Mcothly r t i repair: Hrs. 9. Rig up casers/ run casing 3.50
10. Rig up cemecters/ cementing 1.00 7.75
oo PRESENT OPERATIONS: lost circulation iSl 5950".mixing premix lank w L C M 11." Wail on cement 1 - 4.00
FROM T O HRS. CODE DESCRIPTION D A I L Y A C T I V I T Y 12. Wai l on service company ! 5.00 5.00
600 800 2.0 4 mix L C M in slug Dit 13. Nipple op BOPs/Nipple down B< 18.00
800 845 0.75 4 T I H to s t» l L C M olue at 595C 14. Test BOPs 2.50
845 915 0.5 3 Soot L C M DhiB.No returns. 15. Pick up /Lay down BHA 7.50 15.50
915 930 0.25 3 TOOH 5 stds. 16. Pick up /Lay down drill string 2.00
930 945 0.25 3 P U k e l r v x l e a r D P o f L C M 17. Tripping/for bit/mud motor/mwd 5.25 47.75
945 1100 115 18 TOH to HWDP 18. Short trip 115 2.75
1100 1115 015 4 Attemo to f i l l holePumoed 300 bbls Hole would not fi lL 19. Dr i l l cement/float equipment 1.00
1115 1230 125 17 T O O H w i l h D P 20. Safety meeting 0.50
1230 1900 6.5 15 Made a precautionary wiper trip while mobilizing Halliburton. 21 . Other not listed 32.75
1900 7400 5.0 12 Waiting on 2-7/8" handling tools for fiberglass tubing, tools 3rd party soureed bv Ha- 22. Move in rig up/Rig down move o 22.00
llihirrtnn 2400 100 1.0 15 PrrMfA snfrtv mretinp with crews repntdinn nfrVinp im 7-7/R" fihrrolnee tuhino Pic
ked UP 15 its f402'1 o f tubine. Made un Halliburton tubine release tool on too of f t -
berelass tubine.
100 430 3.5 17 Trip in hole with 4-1/2" DP. tripped in slowly with 402' o f fiberglass tubing on bott
om. Place bttm of fiberelass tbe at 5900*. 50" above TD to ensure the fiberglass iba
was not damaged. Tubing release tool was al 5500"
430 51X1 0.5 10 Prr-inh safetv meeting with cementing ft rie crews. Rifieed uo cement ine eauipment.
son 530 05 i n Pumped Lost Circulation cement iob: 30 bbls Fresh Water 12 bbls Flo-Check 5 bbls
FrMh WnlfT 4? K h k o r U 1 rmn Thiv-O-Tmrar ennint 1? hhle 14 *! nno n « « V " 7-
% CaCI rrtCTitnrrH with 7R hhle nfFrr-ih W " ' " " ™ 1 h i inrnf l <*r+\ hnll with 1000 r«i enr-
face nrcssiire to release from the fiberplayi tnhinp
530 600 0.5 17 Tripping out o f the hole with 4-1/2* drill nine TOTALS 24.00 480.00
D R I L L I N G 0.00 261.50
EVALUATION 0.00 6.00
DAILY CUM
DRILLING INTANG. S6I.181.00 SI,414,602.20
P.U. Wl . S .O.WL StrinRWt. Rol. Amps/Trq.: COST TANG. SO.00 SI 39165.00
SURVEY INFORMATION TOTALS S61.181.00 11,553,867.20
DEVIATION SURVEYS: DIRECTIONAL CO.
COORDINATES
SUPER V1SOp3[
DIRECTIONAL HOLE TARGETS
TARGET T V D : _
TARGET A Z M : __
TARGET+N/-S:_
TARGET +E/-W:
TARGET ISO.:
MUD LOGGER NAME: DonMcgCnnis
MUD LOGGER PHONE 4324)60081
MUD LOGGERS REPORT BACK GROUND GAS _
CONNECTION GAS:_
TRIP GAS:_
SHOW GAS: _
DOWNTIME GAS:_
LITHOLOGY:
COMMENTS:
PROPERTIES Type Mud: Drilling mud MUD COMPANY: Eagle Drilling Fluids MUD ENGINEER: Ron Bailey
PHONE N U M B E R 432.664.3690
Dairy Cost: S0.00 Cum: S3.289.49
DAILY MUD ADDITIVES:
DEPTH TIME MW VIS PV YP GELS PH API WL HTHP
WL CAKE
PM
LIME
PF I CL
ES j PPM
TOTAL
CL
TOTAL
SALT SAND %
SOUDS
% OIL
I t
WATER
LCM
PPB ECD
I 0 0.00
BIT DATA
BIT NO SIZE Mfe Type Serial No. Jets-32nds
Depth
Out
Dairy
Feet
Total
Feel Hrs.
Total
Hrs
Daily
FL/Hr
Total
FL/Hr. WOB RPM
BIT GRADE
BIT NO SIZE Mfe Type Serial No. Jets-32nds
Depth
Out
Dairy
Feet
Total
Feel Hrs.
Total
Hrs
Daily
FL/Hr
Total
FL/Hr. WOB RPM INN OUTER BEARINGS GAGE
3 12.25 STC GF37Y PJ0035 13.13.13 0 2607 9.0 196 13 65 70
2 1Z25 STC FDS PG6481 3-16s 25 65
PUMP D o r T ROD RODbfhedia . Of the pbton rod on dual action pomps
D b r o r d u p l o ^ p p U M p D A T A
T b for triples pump
D 2
RODbfhedia . Of the pbton rod on dual action pomps
D b r o r d u p l o ^ p p U M p D A T A
T b for triples pump D 2
RODbfhedia . Of the pbton rod on dual action pomps
D b r o r d u p l o ^ p p U M p D A T A
T b for triples pump
PUMP
NO. TYPE HP
14
EFF.
Stroke
LenRth Size SPM GPM DPAV DCAV
Surface
HHP
Bit
HHP
•A HHP
At Bil HHP/IN' SLOW PUMP RATES PUMP
NO. TYPE HP
14
EFF.
Stroke
LenRth Size SPM GPM DPAV DCAV
Surface
HHP
Bit
HHP
•A HHP
At Bil HHP/IN' SPM PSI SPM PSl
1 DB700 575 60 16,0 5.5 6 22 500 10 43 6.46 2.56 0.40 0.04 3 250 2 2
2 DB700 575 60 16.0 5.5 0 20 0.00
I
BOTTOM HOLE ASSEMBLY OD ID LENGTH . OD
DRILL PIPE 1 :
BHA NO.: 2 DRILL PIPE 2 :
4.50 3.83 5950.00 DRILL COLLARS 1
DRILL COLLARS 2
8.00 DRILL PIPE 1 :
BHA NO.: 2 DRILL PIPE 2 : 0.00 0.00 0.00
DRILL COLLARS 1
DRILL COLLARS 2 7.00 Total Lcnjih [0.00 | H R S O N B H A | 2 6 4
ITEM Description Length O D . l.D. Top Coral Bottom Conn TOP TO BIT REMARKS
Managed by N e w T e c h E n g i n e e r i n g 21 Powered By NeoFirma Energy Services'"
3 Powered By KeoFlrrna Energy Sendees*"
NEW TECH ENGINEERING DAILY DRILLING REPORT
County: Lea
OPERATOR: DCP Midstream Lease & Wed No.: 1 Date: 11/9/2007
Property Oh DISTRIBUTION OF HOURS
Drill ing Supervisor: Kirk Fetterolf Phone: 325-206-2229 r > p t n : 6177 CATEGORIES DAILY
CUM,
TOTALS
Drill ing Supervisor: Phone: T V D : 6177.0 1. Dri l l rotating 12.75 27415
Drlg. Contractor tyler well service Rigitf: 2 Hole Size: 8.750 to 2. Wash & ream 8.75
Toolpusher: PHONE NUMBER: Footage Lasl 24 hrs: 227 3. Circulate & condition 1.50 14.50
4. Lost Returns 18.00
G. L . Elev.: R K B to G. L . "8 ft 5. Service and lubricate rig 2.25
KB to BHF: Date Last BOP Test: 1 1 M 7 Daj-s Chg. To Wri t 6, Rig repair 1.00
Prop. T.D. 9137 AFE# AFE-DHC: S 2,304.025 7. Directional/Deviation survey 0.25 4.75
8. Wireline Logs/open/cased hole 6.00
LAST CASING: 95/8 CSC SHOE TEST: EMW Cum. Mootbrj ris rtpain Hrs. 9. Rig up cascrs/ run casing 3.50
10. Rig up cementer s/ cementing 7.75
W w PRESENT OPERATIONS: Drilling ahead @617T with circulation commg & going 11. Wait on cement 3.75 7.75
FROM TO HRS. CODE DESCRIPTION D A I L Y A C T r v r r v 12. Wait on service company 5.00
600 730 1.5 15 TOH.lav down c em em ine tools. 13. Nipple up BOPs/Nipple down BC 18.00
730 1115 3.75 11 woe 14.TestBOPs 2.50
1115 1245 1.5 3 A tempi to load hole pumping 35 sora f4.5bbl per stroke amoble to fill hole from surfac- 15. Pick up /Lay down BHA 1.50 17.00
e. 16. Pick up /Lay down drill string 3.00 5.00
1245 1400 1.25 17 Pick UD BHA .TIH with 83/4 bit. 17. Tripping/for bil/mud moior/mwd 1.25 49.00
1400 1700 3.0 16 Trio in hole .lav down 30 its drill Dine. 18. Short trip 2.75
1700 2200 5.0 1 Tag on cement & fiberglass tubing (3)5545.Unable to maintain circulatiDiscontinue to dr 19. Dr i l l cement/float equipment 1.00
i l l and run 25 to 30St)m on nump-Reain &. drill fiberglass tubine and cemenL 20. Safety meeting 0.50
2200 545 7.75 1 Drle from 5942* to 617T using 25 to 35 SPM on pump gaining circulation.Ocasional v.pu 21. Other not listed 32.75
mp sweep while fu l l circulation was present 22. Move in rig up/Rig down move o 22.00
545 600 015 7 R)tnWI.S(?r)finV 1 75dep
TOTALS 24.00 504.00
D R I L L I N G 12.75 274.25
EVALUATION 0.00 6.00
DAILY CUM
DRILLING INTANG. SO.00 51,414,60210
P. U . WL S. O. Wt. Siring Wl . Rot. Amps/Trq.: COST TANG. 50.00 S139165.00
SURVEY INFORMATION TOTALS $0.00 51,553,867.20
DEVIATION SURVEYS: DIRECTIONAL CO.
6129.40 131.37 131.37 0.00 COORDINATES DIRECTIONAL HOLE TARGETS
TARGET TVD:_
TARGET AZM:_
TARGET +N/-S:_
TARGET+E/-W:
TARCET1NCL:
MUD LOCCER NAME: Don McgenoiS
MUD LOGGER PHONE 4324160081
MUD LOGGERS REPORT BACK GROUND GAS 2_
CONNECTION GAS: 0
TRIP GAS:_°_
SHOW GAS:
DOWNTIME GAS:^
LITHOLOGY: Dolimiie & limestone.
COMMENTS: No returns
MUD PROPERTIES Type Mud: Drilling mud MUD COMPANY: Eagle Drilling. Fluids MUD ENGINEER: Ron Bailey Dairy Cost: SO.00 Cum: 13189.49
PHONE NUMBER; 432.664.3690
DAILY MUD ADDITIVES:
DEPTH TIME MW VIS PV YP GELS PH API WL HTHP
WL CAKE
PM
LIME
PF
ES
CL
PPM
TOTAL
CL
TOTAL
SALT
tt
SAND
tt
SOLIDS
tt
OIL
tt
WATER
LCM
PPB ECD
6131 545 8.7 29 10 83000 B.71
BIT DATA
BIT NO SIZE Mfg Type Serial No. Jets - 32ndi
Depth j Daily
Out | Feet
Total
Feel Hrs.
Total
Hrs
Daily
FL/Hr
Total
FL/Hr. WOB RPM
BIT GRADE
BIT NO SIZE Mfg Type Serial No. Jets - 32ndi
Depth j Daily
Out | Feet
Total
Feel Hrs.
Total
Hrs
Daily
FL/Hr
Total
FL/Hr. WOB RPM INN OUTER BEARINGS GAGE
3 12.25 STC GF37Y PJ0035 13.13.13 1227 2B34 12.8 209 14 65 70
2 12.25 STC FDS PG6481 3-16s 1 25 65
PUMP D o r T ROD ROD b the dia. Of the pbton rod on dual action pumps
D i . r . , d u p i a p m p p U M p D A T A
T b for triples pump
D 2
ROD b the dia. Of the pbton rod on dual action pumps
D i . r . , d u p i a p m p p U M p D A T A
T b for triples pump D 2
ROD b the dia. Of the pbton rod on dual action pumps
D i . r . , d u p i a p m p p U M p D A T A
T b for triples pump
PUMP
NO. TYPE HP
tt
EFF.
Stroke Lima
Size SPM GPM Press DPAV DCAV HHP
Bil
HHP
ttHHP
At Bit HHP/IN'
SLOW PUMP RATES PUMP
NO. TYPE HP
tt
EFF.
Stroke Lima
Size SPM GPM Press DPAV DCAV HHP
Bil
HHP
ttHHP
At Bit HHP/IN' SPM PSl SPM PSI
1 DB700 575 60 16.0 5.5 6 22 500 10 43 6.46 2.56 0.40 0.04 3 250 2 2
2 DB700 575 60 16.0 5.5 0 20 0.00
BOTTOM HOLE ASSEMBLY OD ID LENGTH OD
DRILL PIPE 1
BHA NO.: 2 DRILL PIPE 2
4.50 3.83 6177.00 DRILL COLLARS 1
DRILL COLLARS 2
8.00
Total Length HRS ON BHA
DRILL PIPE 1
BHA NO.: 2 DRILL PIPE 2 0.00 0.00 0.00
DRILL COLLARS 1
DRILL COLLARS 2 7.00 Total Length O.OO HRS ON BHA 276
ITEM Description Length O.D. I.D. Top Conn Bottom Conn TOP TO BIT REMARKS
Managed by NewTech Engineering 21 powered By NeoFirma Energy Services'*'
3 Powered Bf NeoFl res* Energy Services'"
NEW TECH ENGINEERING DAILY DRILLING REPORT
County: Lea
OPERATOR: DCP Midstream Lease & WeD No.: 1 Days from Spud 22 Date: 11/1 1/2007 Property LD: DISTRIBUTION OP HOURS
Drilling Supervisor: Kirk Fetterolf Phone: 325-206-2229 r ^ p ^ 6908 CATEGORIES DAILY
CUM.
TOTALS
Drilling Superv isor. Pbont: TVD: 6908.0 1. Drill rotating 2315 297.50
Drift. Contractor tyler well service Rlg«: 2 Hole She: 8-750 to 2. Wash & ream 8.75
Toolpusher: PHONE NUMBER: Footage Last 24 hrs: 731 3. Circulate & condition 14.50
4. Lost Returns 18.00
G. L. Elev.: RKB to G. L. '8 ft 5. Service and lubricate rig 0.25 2.50
KB to BHF: Date Last BOP Test: 11/2/07 Days Chg, To Welt 6. Rig repair 1.00
Prop. T.D. 9137 AFE* APE-DHC; * 2.304,025 7. Directional/Deviation survey 0.50 515
8. Wireline Logs/open/cased hole 6.00
LASTCASLNC: 95/8 CSG SlOE TEST: 12 EMW Cum. Mccthtj rfc rtpain Hrs. 9. Rig up casers/ run casing 3.50
10. Rig up cementers/ cementing 7.75
oo PRESENT OPERATIONS: Drilling ahead at 6908* (SJ 25 to 30*ph 11. Wail on cement 7.75
FROM TO HRS. CODE DESCRIPTION D A I L Y A C T I V I T Y 12. Wail on service company 5.00
600 1300 7.0 I Drk. from 6177 to 6334'wilh oarcal returns. 13. Nipple up BOPs/Nipple down BC 18.00 1300 1315 0.25 5 PJg service 14. TesBOPs 2.50 1315 1400 0.75 I Drle from 6334' to 635Circulation showing sicrts of improvement 15. Pick up /Lay down BHA 17.00
1400 2115 7.25 1 Drig from 6359* to 664TParcet returns to full retumsjio tighl hole while receDacarj- 16. Pick up /Lay down drill string 5.00
ng DiDe. 17. Tripping/for bit/mud motor/mwd 49.00
2115 2145 0.5 7 Wire line survev.® 6601' 2 dee. 18. Short trip 2.75
2145 2200 015 1 Drle from 664T to 665T full circulation for returns. 19. Drill cement/float equipment 1.00
2200 515 7.25 1 Drill from 665? lo 6898' still running LCM sweeps to man tain full circulation. 20. Safety meeting 0.50
515 600 0.75 1 Drk. from 6B98* lo 6900" with good circulation to surface. 21. Other not listed 32.75
22. Move in rig up/Rig down move o 22.00
TOTALS 24.00 528.00
D R I L L I N G 2315 297.50
EVALUATION O.OO 6.00
DAILY CUM
DRILLING INTANG. 117,487.72 51,434,439.92
P. U. Wt S. O. WL String WL Rot. Amps/Trq.: COST TANG. 50.00 5139165.00
SURVEY INFORMATION TOTALS 517,487.72 SI,573,704.92
DEVIATION SURVEYS: DIRECTIONAL CO. COORDINATES DIRECTIONAL HOLE TARGETS
TARGET TVD:_ TARGET AZM: _ TARGET +N/-S:_
TARGET +E/-W:
TARGET INCL-:
MUD LOGGER NAME: Don McgCTtnis MUD LOGGER PHONE 4324160081
MUD LOGGERS REPORT BACK GROUND GAS 30 CONNECTION GAS: 20
TRIP GAS: 0 SHOW GAS: 22'
DOWNTIME GAS: 30 LITHOLOGY: 70% hmestonel0% shale.10% Dolonu'le.
COMMENTS* Trace show @ 6410" to 6420* ROP Ihrougb bone springs
stm.
MUD PROPERTIES Type Mud: Drilling mud MUD COMPANY: Eagle Drilling Fluids MUD ENGINEER: Ron Bailey Daily Cost: 52,933.72 Cum: S61231I
PHONE NUMBER: 432.664.36gQ DAILY MUD ADDirrvES: Paper 26 sk.gcl 190,rnica 37sk,caustic 18 sk,starch 62 sk,defoamer 15 gaiF-Flug 3Q.cotten seed hauls 101 skjiut plug 60 sks
DEPTH TIME MW VIS PV YP GELS PH API WL HTHP
WL CAKE
PM
LIME PF
ES
CL
PPM
TOTAL
CL
TOTAL
SALT SAND %
SOLIDS
% OIL
M
WATER
LCM
PPB ECD
6375 1435 [S.S 3D 1 9 10000 1 0.0 9S.0 5.900 a. 51 BIT DATA
BIT NO SIZE Mfg Type Serial No. Jds-32r>ds
Depth
Out
Dairy
Feet
Total
Feet Hrs. Total
Hrs
Daily
FtyHr
Total
FL/Hr. WOB RPM
BIT GRADE
BIT NO SIZE Mfg Type Serial No. Jds-32r>ds
Depth
Out
Dairy
Feet
Total
Feet Hrs. Total
Hrs
Daily
FtyHr
Total
FL/Hr. WOB RPM INN OUTER BEARINGS GAGE 3 12.25 STC GF37Y PJ0035 13.13.13 731 3565 23.3 232 15 55 70
2 1Z25 STC FDS PG6481 3-16s 25 65
PUMP DorT ROD ROD b the dia. Of the piston rod on dual action pumps
D b l b r d ^ p ^ p PUMP DATA T b for triples pump
D 2
ROD b the dia. Of the piston rod on dual action pumps
D b l b r d ^ p ^ p PUMP DATA T b for triples pump D 2
ROD b the dia. Of the piston rod on dual action pumps
D b l b r d ^ p ^ p PUMP DATA T b for triples pump
PUMP
NO. TYPE HP
'A
EFF. Stroke Length
Liner Size SPM GPM
Pump
Presi DPAV DCAV HHP
Bit
HHP
• i HHP
Al Bit HHP/IN1
SLOW PUMP RATES PUMP
NO. TYPE HP
'A
EFF. Stroke Length
Liner Size SPM GPM
Pump
Presi DPAV DCAV HHP
Bit
HHP
• i HHP
Al Bit HHP/IN1 SPM PSI SPM PSI 1 DB700 575 60 16.0 5.5 6 22 500 10 43 6.46 2.56 0.40 0.04 3 250 2 2
2 DB700 575 60 16.0 5.5 0 20 0.00
BOTTOM HOLE ASSEMBLY OD ID LENGTH OD
DRILL PIPE 1: BHA NO.: 2 DRILL PIPE 2:
4.50 3.S3 6908.00 DRILL COLLARS 1
DRILL COLLARS 2
8.00
Total Length HRS ON BHA
DRILL PIPE 1: BHA NO.: 2 DRILL PIPE 2: 0.00 0.00 0.00
DRILL COLLARS 1
DRILL COLLARS 2 7.00 Total Length 0.00 HRS ON BHA 300
ITEM Description Length O.D. I.D. Top Coon Bottom Conn TOP TO BIT REMARKS
Managed by NewTech Engineer ing 21 powered By NeoFirma Energy Services'*'
3 Powered By NeoFirma Energy Services'"
NEW TECH ENGINEERING DAILY DRILLING REPORT
Comity: Lea
OPERATOR: DCP Midstream Lease 4. Well No.: 1 Days from Spud 24 Date; 11/13/2007
Property ID: DISTRIBUTION Op HOURS
Drill ing Supervisor: Kirk Fetterolf Phone: 325-206-2229 Depth: T714 CATEGORIES DAILY
CUM.
TOTALS
Dril l ing Supervisor: Pbooe: T V D : 7714.0 1. Dr i l l rotating 23.75 32115
Drta, Qmfractar tyler well service R i g * 2 Hole She: 8.750 ta 2. Wash & ream 8.75
Toolpusher: PHONE NUMBER: Footage Last 24 hrs: 7714 3. Circulate & condition 14.50
4. Lost Returns 18.00
G. L . Elev.: RKB to G. L . 18 ft 5. Service end rubricate rig 0.25 2.75
KB to BHF: Date Last BOP Test: 11/2/07 Days Chg. To Wel t 6. Rig repair 1.00
Prop-T.D. 9137 AFE# AFE-DHC: S 2304.025 7. Drntto'crnaVDeviarjon survey 5.25
8. Wireline Logs/open/cased hole 6.00
LAST CASING: 9 5/8 CSG SHOE TEST: 12 EMW Cum. Menduy rie rrpaur Hrs. 9. PJg up casers/ run casing 3.50
10. PJg up cemeniers/ cementing 7.75
« 4>o PRESENT OPERATIONS: Drilling ahead al 7714" @ 25 to 30*ph I I . Wait on cement 7.75
FROM TO HRS. CODE DESCRIPTION D A I L Y A C T I V I T Y 12. Wait on service company 5.00
600 630 0.5 1 Drle from 7118* lo 7149" with Good returns. 13. Nipple up BOPs/Nipple down BC 18.00
630 645 0.25 5 Rig service 14.TeslBOPs 2.50
645 830 1.75 1 Drill from 7149* lo 7212" O 20 to 25 FPH wiih good returns. 15. Pick up /Lay down BHA 17.00
830 900 0.5 1 Wireline survev fS 7166' 2 des. 16. Pick up /Lay down drill string 5.00
900 14O0 5.0 1 Drie from 7212* to 7354' |3 20 TO 25" PH. & 75% returns lo o i l 17. Tripping/for bit/mud motor/mwd 49.00
1400 2200 8.0 1 Drle from 7354' to 7530" iS 20 to 25" PH with 50% returns to oitxontinue to mix & oum- 18. Short trip 2.75
p L C M slug with L C M at 30# per bbl. 19. Dr i l l cement/float equipment 1.00
2200 600 8.0 1 Drie from 7530'io 7714' al 20 to 25" PH.75% returns to oit 20. Safety meeting 0.50
21. Other not listed 32.75
22. Move in rig up/Rig down move o 22.00
TOTALS 24.00 552.00
D R I L L I N G 23.75 321.25
EVALUATION 0.00 6.00
DAILY CUM
DRILLING LNTANG. 110,90815 SI,445348.17
P. U . WL S. O. Wt. String Wt. Rot. Amps/Trq.: COST TANG. S0.00 SI 39165.00
SURVEY INFORMATION TOTALS SI 0.90815 S1.584.613.I7
DEVIATION SURVEYS: DIRECTIONAL CO-
COORDINATES DIRECTIONAL HOLE TARGETS
TARGET TVD: _
TARGET A Z M : _
TARGET +N/-S: _
TARGET+E/-W:
TARCEXINCL: + UP/-DOWN
M U D LOGGER N A M E : Don Mcgcitnis
MUD LOGGER PHONE: 4324160081
MUD LOGGERS REPORT BACK GROUND GAS 26,300
CONNECTION GAS:_26
TRIP GAS:
SHOW GAS: °
DOWNTIME GAS:
LITHOLOGY: 70% limestone ,30% sand
PROPERTIES Type Mud: Drilling mud M U D COMPANY: Eagle Drilling Fluids MUD ENGINEER: Ron Bailey
PHONE NUM BER: 432.664.3690
DaDy Cost: S90815 Cum: S7.13l.46
DAILY MUD ADDrmTS:
DEPTH TIME MW VIS PV , YP GELS PH AP1WL HTHP
WL CAKE
PM
• LIME
PF
ES
CL
PPM
TOTAL
CL
TOTAL
SALT %
SAND
% SOLIDS
% OIL
•A
WATER
LCM
PPB ECD
7430 1647 8.5 29 10 12000 1 98.7 8.51
BIT DATA
BIT NO SIZE Mfg Type Serial No. Jets • 32nds
Depth
Out
Dairy
Feet
Tola!
Feet Hrs.
Total
Hrs
Daily
FL/Hr
Total
FL/Hr. WOB RPM
BIT GRADE
BIT NO SIZE Mfg Type Serial No. Jets • 32nds
Depth
Out
Dairy
Feet
Tola!
Feet Hrs.
Total
Hrs
Daily
FL/Hr
Total
FL/Hr. WOB RPM INN OUTER BEARINGS GAGE
3 12.25 STC GF37Y PJ0035 13.13.13 606 4371 23.8 256 17 65 70
2 12.25 STC FDS PG6481 3- 16s 25 65
PUMP D o r T ROD ROD is me dia. Ofthe pbton rod on dual action pumps
D i W c J ^ p ™ , p u M p D A T A
I n f e r triples pump
D 2
ROD is me dia. Ofthe pbton rod on dual action pumps
D i W c J ^ p ™ , p u M p D A T A
I n f e r triples pump D 2
ROD is me dia. Ofthe pbton rod on dual action pumps
D i W c J ^ p ™ , p u M p D A T A
I n f e r triples pump
PUMP
NO. TYPE HP EFF.
Stroke
Size SPM GPM Press DPAV DCAV HHP
Bit
HHP
•*HHP
At Bit HHP/IN1
SLOW PUMP RATES PUMP
NO. TYPE HP EFF.
Stroke
Size SPM GPM Press DPAV DCAV HHP
Bit
HHP
•*HHP
At Bit HHP/IN1 SPM PSl SPM PSl
1 DB700 575 60 16.0 5.5 6 22 500 10 43 6.46 2.56 0.40 0.04 3 250 2 2
2 DB700 575 60 16.0 5.5 0 20 0.00
BOTTOM HOLE ASSEMBLY OD ID LENGTH ; OD
DRILL PIPE 1 :
BHA NO.: 2 DRILL PIPE 2 :
4.50 3.83 7714.00 DRILL
DRJL
COLLARS 1 [8.00 DRILL PIPE 1 :
BHA NO.: 2 DRILL PIPE 2 : 0.00 0.00 0.00
DRILL
DRJL L COLLARS 2[7.00 Total Length 10.00 | HRS ON BHA1323
ITEM Description Lernrth O.D. I.D. Top Corn Bonom Conn TOPTOBIT REMARKS
Managed by NewTech Engineering Z Powered By Nesftrma Energy Services'"
3 Powered By NeoFirma Energy
NEW TECH ENGINEERING DAILY DRILLING REPORT
County: Lea
OPERATOR: DCP Midstream Lease & Welt No.: 1 LW: 11/14/2007
Properly B> DISTRIBUTION OF HOURS
Drill ing Supervisor: Kirk Fetterolf pboac: 325-206-2229 ' r^ptf , ; 8278 CATEGORIES DAILY
CUM,
TOTALS
Dril l ing Supervisor: Phone: T V D : 8278.0 1. Dr i l l rotating 23.00 34415
Dr l& Contractor tyler well service Rig tt: 2 Hole She: 8 7 5 0 lo 2. Wash & ream 8.75
Toolpusher: PHONE NUMBER: Footage Last 24 hrs: 564 3. Circulate A condition 14.50
4. Lost Returns 18.00
G. L . Elev.: R K B lo G. L . 1 8 ft 5. Service and lubricate rig 0.50 3.25
KB to BHF: Date Last BOP Test: 11/2/07 Days Chg, To W e f t 6. Rig repair 1.00
PropiT.D. 9137 AFE# AFE-DHC: S 2,304,025 7. Directional/Deviation survey 0.50 5.75
8. Wireline Logs/open/cased hole 6.00
LAST CAS ING: 9 5/8 CSG SHOE TEST: 12 EMW Cast MeotWyrlf repair: Hrs. 9. Rig up casers/ run casing 3.50
10. Rig up cemeniers/ cementing 7.75
two PRESENT OPERATIONS: MBingahead at 8278 @ 10 to 20 fph 11. Wail on cement 7.75
FROM T O HRS. CODE DESCRIPTION D A I L Y A C T I V I T Y 12. Wait on service company 5.00
600 915 315 1 Drle from 7714' to 7809" using 8.8to 8,9 freshwater.* oumDtnE a lObblLCMslus con 13. Nipple up BOPs/Nipple down BC 18.00
sisting of 20#per bbl L C M lo man tain circulation. 14.TestBOPs 2.50
915 930 0.25 5 Change out corrosion ring 15. Pick up /Lay down BHA 17.00
930 945 0.25 5 Rig service 16. Pick up /Lay down drill string 5.00
945 1400 4.25 1 Continue to drill From 7807 lo 7896' ahead using 8.9 cut brineJhtmo L C M sweeps everv 17. Tripping/for bil/mud motor/mwd 49.00
20" 18. Short trip 2.75
1400 1530 1.5 I Drila from 780T to 7896'wjth 50k on bit at 65 rpm.pumpins 20 bbl sweeps everv 20 to 19. Dri l l cemenl/floal equipment 1.00
30" of hole drilled to maintain circulation. 20. Safety meeting 0.50
1530 1600 0.5 7 Ran wireline survev ffl788ff= 3/4 deg. 21. Other not listed 32.75
1600 2300 6.0 I Drilling ahead from 7934' to 8041' w 8.8 waiet.65 rpra JOk on biLal 15 to 2D" per hoo- 22. Move in rig up/Rig down move o 22.00
rdrillinp limestone and dolomite.
2200 600 8.0 1 D H B from 8041' In 8275" with 50* nn hit f r t mm mntimie to ffltmn sweerrt to maintain c-
irculation.
Ran WLS at 8237/ 1/2 deg. drilling ahead at 20 fool per hr.
i TOTALS 24.00 576.00
D R I L L I N G 23.00 34415
EVALUATION 0.00 6.00
DAILY CUM
DRILLING INTANG. $30,965.25 SI,476313.42
P.U. Wt S. O. Wl . String Wt. Rol. Amps/Trq.: COST TANG. 50.00 SI 39165.00
SURVEY INFORMATION TOTALS 130,96515 51,615,578.42
DEVIATION SURVEYS: DIRECTIONAL CO.
COORDINATES DIRECTIONAL HOLE TARGETS
TARGET TVD: _
TARGET AZM: _
TARGET +N/-S: _
TARGET +E/-W:
TARGET INCL:
MUD LOGGER NAME: Don Mcgennis
MUD LOGGER PHONE: 4324160081
MUD LOGGERS REPORT BACK GROUND GAS 4 0
CONNECTION GAS:
TRIP GAS:
SHOW GAS:
DOWNTIME GAS:
LITHOLOGY: 100% dolomite with trace of limestone &
COMMENTS: No shows
PROPERTIES Type Mud: Orilling mud MUD COMPANY: Eagle Drilling Fluids MUD ENGINEER: Ron Bailey Daily Cost: S90815
PHONE NUMBER: 432.664.3690
DAILY MUD ADDITIVES: lOcousticlO paper. 1 supcrsweeplO dcfomer 9 nitratelO newcide,78 saltgel.63 starch JO fiberplug.120 pronto plug,97 cotten seed hauls.43 mica.60cal carb.70 fresh water gel
DEPTH TIME MW vis PV YP GELS PH API WL [HTHP
I WL CAKE
PM
LIME
PF
ES
CL
PPM
TOTAL
CL
TOTAL
SALT SAND SOLIDS OIL WATER
LCM
PPB ECD
530 9.2 29 10 I 12000 1.3 1 98.7 9.21
BIT DATA
BIT NO SIZE Mfg Type Serial No. Jets - 32ods
Depth
Out
Dairy
Feet
Total
Feet Hrs.
Total
Hrs
Dairy
FL/HT
Total
FL/Hr. WOB RPM
BIT GRADE
BIT NO SIZE Mfg Type Serial No. Jets - 32ods
Depth
Out
Dairy
Feet
Total
Feet Hrs.
Total
Hrs
Dairy
FL/HT
Total
FL/Hr. WOB RPM INN OUTER BEARINGS GAGE
3 12.25 STC GF37Y PJ0035 13.13,13 564 4935 23.0 279 18 65 70
2 1Z25 STC FDS PG6481 3-16s 25 65
PUMP D o r T ROD ROD b the dia. Of Che pbton rod on dusl action pumps
D U f o r ^ ^ p ^ p p u M p „ A T A
T b for triples pump
D 2
ROD b the dia. Of Che pbton rod on dusl action pumps
D U f o r ^ ^ p ^ p p u M p „ A T A
T b for triples pump D 2
ROD b the dia. Of Che pbton rod on dusl action pumps
D U f o r ^ ^ p ^ p p u M p „ A T A
T b for triples pump
PUMP
NO. TYPE HP
% EFF.
Stroke
Lenirrh Size SPM GPM
Pump
Press DPAV DCAV
Surface
HHP
Bit
HHP
%HHP
At Bit HHP/IN 3
SLOW PUMP RATES PUMP
NO. TYPE HP
% EFF.
Stroke
Lenirrh Size SPM GPM
Pump
Press DPAV DCAV
Surface
HHP
Bit
HHP
%HHP
At Bit HHP/IN 3 SPM PSI SPM PSI
1 DB700 575 60 16.0 5.5 6 22 500 10 43 6.46 2.55 0.40 0.04 3 250 2 2
2 DB700 575 60 16.0 5.5 0 20 0.00
BOTTOM HOLE ASSEMBLY OD ID LENGTH OD
DRILL PIPE 1.
BHA NO.: 2 DRILL PIPE 2 :
4.50 3.83 8278.00 DRILL COLLARS 1
DRILL COLLARS 2
8.00
Total Length HRS ON BHA
DRILL PIPE 1.
BHA NO.: 2 DRILL PIPE 2 : 0.00 0.00 0.00
DRILL COLLARS 1
DRILL COLLARS 2 7.00 Total Length 0.00 HRS ON BHA 346
ITEM Description Length O.D. I.D. Top Com Bottom Coon TOP TO BIT REMARKS
Managed by NewTech Engineering 21 powered By NeoFirma Energy Semces*"
3 Powered By Noofinna Energy Services"*
NEW TECH ENGINEERING DAILY DRILLING REPORT
County: Lea
OPERATOR: DCP Midstream LHtc: 11/1S/2O07
Property ID: DISTRIBUTION OF HOURS
Dril l ing Supervisor: Kirk Fetterolf phone: 325-206-2229 Depth: 8 7 3 5
CATEGORIES DAILY
CUM.
TOTALS
Drill ing Supervisor Phone: T V D : 8735.0 1. Dri l l rotating 2215 366.50
Drie, Contractor tyler weH service Rig ft 2 Hole Size: 8.750 to 2. Wash & ream 8.75
Toolpusher: PHONE NUMBER: Foots gt Last 24 hrs: 457 3. Circulate & condition 14.50
4. Lost Returns 18.00
C. L . Elev.: RKB toG. L . I 8 R 5. Service and lubricate rig 0.25 3.50
KB to BHF: Date Last BOP Test H/2/07 Days Chg. To W e l t 6. Rig repair 1.00
Prop. T D . 9137 A FEZ* AFE-DHC: 3 2304,025 7. Directional/Deviation survey 115 7.00
8. Wireline Logs/open/cased hole 6.00
LAST CASING: 9 5/8 CSG SHOE TEST: ' 2 EMW Curn. Moothlj r l - r*p*lr: Hrs. 9. Rig up casers/ run casing 3.50
10. Rig up cem enters/ cementing 7.75
06 oo PRESENT OPERATIONS.- Drilling ahead at 8735 @ 10 l o 2 0 f p h 11. Wail on cement 7.75
FROM T O HRS. CODE DESCRIPTION D A I L Y A C T I V I T Y 12. Wai l on service company 5.00
600 615 015 5 rie service 13. Nipple up BOPs/Nipple down BC 18.00
615 645 0.5 7 Wireline survev fSl 8232' 1/2 den. 14. Tesl BOPs 2.50
645 1245 6.0 I Drie from 8278* to 8530" dolomiteJimeslooe using 8.8 F water (_> 20to 25' PH 15. Pick up /Lay down BHA 17.00
1245 1315 0.5 7 Ran WLS <3> 8464' 1 1/2 des 16. Pick up /Lay down drill string 5.00
1315 1400 0.75 1 Drie from 8530* to 85451 usine 8.8 wt. F waterJ0K on bit65 rom. 17. Tripp truVfoT bit/mud moior/mwd 49.00
1400 2200 8.0 i DTIE from 8545" to 8665' using S.Swt waler.50 to 60 K on biL60 rom maintains 20 lo 2- 18. Short trip 2.75
yoe rh r . 19. Dr i l l cemenl/float equipment 1.00
2200 2215 015 20 Held safety mestinaJroper lefting techecks 20. Safety meeting 015 0.75
2215 545 7.5 1 Drie ahead from 8041' to 8278" continue to using fresh waler A rjumping Lcm sweeps bew- 21. Other not listed 32.75
een connections 22. Move in rig up/Rig down move o 22.00
545 600 015 7 WT.R (!5) 871V1 3/4 dec
Regain mixing starch at 8700"
TOTALS 24.00 600.00
DRILLING 22.25 366.50
EVALUATION 0.00 6.00
DAILY CUM
DRILLING INTANG. $7,604.19 51,483,917.61
P. U. W l S. O. WL String WL Rot. Amps/Trq.: COST TANG. SO.00 1139165.00
SURVEY INFORMATION TOTALS S7.604.19 SI,623,182.61
DEVIATION SURVEYS: DIRECTIONAL CO.
COORDINATES
SUPERVISOR^
DIRECTIONAL HOLE TARGETS
TARGET TVD:_
TARGET AZM-_
TARGET+N/-S:_
TARCET +E/-W:
TARGET INCL.:
Mini LOCCER NAME: Don Mcgermis
MUD LOGGER PHONE 432416O081
MUD LOGGERS REPORT BACK GROUND GAS •»
CONNECTION GAS: 30
TRIP GAS:
SHOW GAS: J>
DOWNTIME GAS: 35
LITHOLOGY: 90yid>3loroiie,10% limestone.Trace of shale
COMMENTS: No shows
MUD PROPERTIES Type Mud: Drilling mud MUD COMPANY: Eagle Drilling Fluids MUD ENGINEER: Ron Bailey ' Dafly Cost: SI34.19 Cum: S8.173.90
PHONE NUM HER: 432.664.3690
DAILY MUD ADDITIVES:
DEPTH TIME MW VIS PV YP GELS PH APIWL HTHP
WL CAKE
PM
LIME
PF
ES
CL
PPM
TOTAL
CL
TOTAL
SALT SAND
% SOLIDS
% OIL
H
WATER
LCM
PPB ECD
8657 2130 9.0 31 2/2 9 2100 92000 2 98.5 9.01
BIT DATA
BIT NO SIZE Mfg Type Serial No. Jets • 32r__
Depth
Out
Daily
Feel
Total
Feet Hrs.
Total
Hrs
Dairy
FL/Hr
Total
FL/Hr. WOB RPM
BIT GRADE
BIT NO SIZE Mfg Type Serial No. Jets • 32r__
Depth
Out
Daily
Feel
Total
Feet Hrs.
Total
Hrs
Dairy
FL/Hr
Total
FL/Hr. WOB RPM INN OUTER BEARINGS GAGE
3 12.25 STC GF37Y PJ0035 13.13.13 457 5392 22.3 301 18 65 70
2 1Z25 STC FDS PG6481 3-16s 25 65
PUMP D o r T ROD ROD fa thedix Ofthe piston rod on dual action pumps
D f a b r - * , , - * p U M p D A T A
T b for triples pump
D 2
ROD fa thedix Ofthe piston rod on dual action pumps
D f a b r - * , , - * p U M p D A T A
T b for triples pump D 2
ROD fa thedix Ofthe piston rod on dual action pumps
D f a b r - * , , - * p U M p D A T A
T b for triples pump
PUMP
NO. TYPE HP EFF.
Stroke
Length
Liner
Size SPM GPM Press DPAV DCAV
Surface
HHP
Bil
HHP
V, HHP
Al Bit HHP/INJ
SLOW PUMP RATES PUMP
NO. TYPE HP EFF.
Stroke
Length
Liner
Size SPM GPM Press DPAV DCAV
Surface
HHP
Bil
HHP
V, HHP
Al Bit HHP/INJ SPM PSI SPM PSI
1 DB700 575 60 16.0 5.5 6 22 500 10 43 6.46 2.55 0.40 0.04 3 250 2 2
2 DB700 575 60 16.0 5.5 0 20 0.00
BOTTOM HOLE ASSEMBLY OD ID LENGTH OD
DRILL PIPE 1 :
BHA NO.: 2 DRILL PIPE 2 :
4.50 3.83 8735.00 DRILL
DRIL
COLLARS 1 [8.00 DRILL PIPE 1 :
BHA NO.: 2 DRILL PIPE 2 : 0.00 0.00 0.00
DRILL
DRIL L COLLARS 2| 7.00 Toial Length (0.00 | HRS ON B H A I 369
ITEM Description LeoEtb O.D. I.D. Top Conn Bottom Com TOP TO BIT REMARKS
Managed by NewTech Engineering ~Powered By NeoFirma Energy Service-*"
3 Powered By NeoFinn> Energy Services"*
NEW TECH ENGINEERING DAILY DRILLING REPORT
County: Lea
OPERATOR: DCP Midstream Days from Spud 27 Datr: 11/16/2007 Property ID: DISTRIBUTION OP HOURS
Drill ing Supervisor. Kirk Fetterolf p_ne: 32S-206-2229 Depth: 9213 CATEGORIES DAILY
CUM.
TOTALS
Dril l ing Supervisor: Phone: TVD: 9213,0 1. Drill rotating 10.75 37715
Drie. Contractor tyler well service Rig tt: 2 Hole Size: 8-750 _ 2. Wash & ream 8.75
Toolpusher: PHONE NUMBER: Footage Last 24 hrs: 478 3. Circulate & corn-lion 8.00 22.50
4. Lost Returns 18.00
G. L . Elev.: RKB to G- L 18 ft 5. Service and lubricate rig 3.50
K B to BHF: Date Last BOP Test: M/2/07 Days Chg To Welt 6. Rig repair 1.00
Prop. T.D. 9137 AFE# AFE-DHC: 3 2,304,025 7. Directional/Deviation survey 5515 6215
8. Wireline Logs/open/cased hole 6.00
LASTCASINC: 95/8 CSC SHOE TEST: 12 EMW C m . Maoddy rfc rrp-tr: Hrs. 9. Rig up casers/nm casing 3.50
10. Rig up cemcntcrs/ cementing 7.75
0W0 PRESENT OPERATIONS: T D Well @ 9213' (30110 11. Wail on cement 7.75
FROM T O HRS. CODE DESCRIPTION DAILY ACTrVFTY 12. Wait on service company 5.00
600 615 015 7 Ran Wireline survev (3 8735* 1.25 des. 13. Nipple up BOPs/Nipple down BC 18.00
615 1400 7.75 1 Drle from 8735" lo 8950* 50 lo 60K on bit,65 rpm.eood circulation 14.TestBOPs 2.50
1400 2200 8.0 3 Drle from 8950* to 9120'.usinpl 40 to 50 K on biu55 ipmjnaintaine eood circulab'on. 15. Pick up /Lav down BHA 17.00
2200 2215 0.25 20 Safetv mectini! with BOP drill. 16. Pick up /Lay down drill string 5.00
2215 115 3.0 1 Drie from 91201 to 9212" TD the hole as to Alberto Gurterez. 17. Tripping/for bit/mud motor/mwd 49.00
115 315 2.0 18 Circulate hole clean & spot mud D_1 at 9212'shorttriD to Drill collars lallv out of 18. Short trip 3.75 6.50
hole. 19. Drill cement/float equipment 1.00
315 415 1.0 20 Safety meeting on Tripinc out of hole 20. Safety meeting 115 2.00
415 600 1.75 18 Continue to Strap Out of hole on short trip. 21. Other not listed 32.75
22. Move in rig up/Rig down move o 22.66
TOTALS 79.00 679.00
DRILLING 10.75 377.25
EVALUATION 0.00 6.00
DAILY CUM
DRILLING INTANG. 5142,884.19 SI.626.SD1.80
P.U. Wt S.O.Wt. StrinftWt. RoLArnus/Tiq.: COST TANG. SQ.QQ SI 39165.00
SURVEV INFORMATION TOTALS $142,884.19 31,766,066.80
DEVIATION SURVEYS: DIRECTIONAL CO. . COORDINATES DIRECTIONAL HOLE TARGETS
TARGET TVD:_ TARGET AZM: _ TARGET+N/-S:_
TARGET +E/-W:
TARGET INCL:
MUD LOGGER NAME: Don McECTi MUD LOGGER PHONE 4324160081
MUD LOGGERS REPORT BACK GROUND GAS_ CONNECTION GAS:_
TRIP GAS:_ SHOW GAS: _
DOWNTIME GAS:_ UTHOLOGY:_
COMMENTS:
MUD PROPERTIES Type Mud: Drilling mud MUD COMPANY: Eagle Drilling Fluids MUD ENGINEER: Ron Bailey Dairy Cost: SI34.I9 Cum: S8.308.09
PHONE NUMBER: 432.664.3690 DAILY MUD ADorrrvES: I Caustic.8 paper. 1 soda ashJ newcide.5 s_ltgei,43 starcb,9 pronto Phig.13 cotten seed hulls.
DEPTH TIME MW VIS PV YP GELS PH API WL HTHP
WL CAKE
PM
LIME
PF
ES
CL PPM
TOTAL
CL
TOTAL
SALT
% SAND SOLIDS OIL
% WATER
LCM
PPB ECD
8657 2120 9.0 31 5 2-2 a 92000 98.5 9.01
B I T D A T A
BIT NO SIZE Mfg Type Serial No. Jcts-32r_
Depth
Out
Dairy Feet
Total
Feet Hrs.
Toial
Hrs Dairy
FL/Hr
Total
FL/HT. WOB RPM
BIT GRADE
BIT NO SIZE Mfg Type Serial No. Jcts-32r_
Depth
Out
Dairy Feet
Total
Feet Hrs.
Toial
Hrs Dairy
FL/Hr
Total
FL/HT. WOB RPM INN OUTER BEARINGS GAGE
3 12.25 STC GF37Y PJ0035 13.13.13 478 5870 10.B 312 19 65 70
2 12.25 STC FDS PG6481 3-16s 25 65
PUMP D o r T ROD ROD fa the dia. Of the piston rod on dual action pumps
D . b r ^ m PUMP DATA T b for triples pomp
D 2
ROD fa the dia. Of the piston rod on dual action pumps
D . b r ^ m PUMP DATA T b for triples pomp D 2
ROD fa the dia. Of the piston rod on dual action pumps
D . b r ^ m PUMP DATA T b for triples pomp
PUMP
NO. TYPE HP EFF.
Stroke
Lenjrt- Size SPM GPM Press DPAV DCAV
Surface HHP
Bit
HHP
«*HHP
At Bit HHP/IN5
SLOW PUMP RATES PUMP
NO. TYPE HP EFF.
Stroke
Lenjrt- Size SPM GPM Press DPAV DCAV
Surface HHP
Bit
HHP
«*HHP
At Bit HHP/IN5 SPM PSI SPM PSI
1 DB700 575 60 16.0 5.5 6 22 500 10 43 6.46 2.55 0.40 0.04 3 250 2 2
2 DB700 575 60 16.0 5.5 0 20 0.00
BOTTOM HOLE ASSEMBLY OD ID LENGTH OD
DRILL PIPE I :
BHA NO.: 2 DRILL PIPE 2 :
4.50 3.83 (92I3.00 ] DRILL DRIL
COLLARS 1 [8.00 DRILL PIPE I :
BHA NO.: 2 DRILL PIPE 2 : 0.00 0.00 . 0.00 | DRILL DRIL L COLLARS 2| 7.00 Total Length (0.00 | HRSONBHA|380
ITEM Description Length O.D. LD. Top Conn Bottom Corn TOP TO BIT REMARKS
\
Managed by N_wTech ErKjineering 3 powered By NeoFirma Energy Service"*
3 Powered By NeoFirma Energy Services'"
NEW TECH ENGINEERING DAILY DRILLING REPORT
County: Lea
OPERATOR. DCP Midstream Lease & WeO No.: I Properly I Eh
Day. frocn Spud 28 Date: 11/17/2007
Drilling Supervisor: Kirk Fetterolf Drilling Sup*r>
Brig. Coptractor tyler well service PHONE NUMBER: _
Pbonc: 325-206-2229
Pbooe: RJgffc 2
Depth: 9213 TVD: 9213.0
Hole She: 8 7 3 0 i Footage Last 24 hn: 0
G. L. Elev.:_ KB to BHF:
RKB to G. L. '&ft
Prop. T.D. 9137 Dale Last BOP Test: 11/2/07
AFE* Days Chg. To Welt
AFE-DHC: S 2,304.025
LAST CASING: 9 5/8 CSG SHOE TEST: J 2 Com. Mooihlj rif npaln
0600 PRESENT OPERATIONS: Logging well
> HRS. CODE DESCRIPTION DAILY ACTIVITY
6. Rig repair
DISTRIBUTION OF HOURS
CATEGORIES
3. Circulate & condition
5. Service and lubricate rig
7. Directional/Deviation survey 8. Wireline Logsfepen/cased hole 9. Rig up casers/ run casing 10. Rig up cemeniers/ cementing
12. Wail on service company
CUM.
TOTALS
8.75 27.50 18.00 3.50 1.00
62.25 14.50 3.50 7.75 7.75 5.00
18.00 2.50
17.00 s.oo
59.50 6.50 1.00 2.00
32.75 22.00
Strap Out of hole with Drill pipe 13. Nipple up BOPs/Nipple down BC
1130 1400 1500 1600 1630 2130 2200
TIH with Drill pipe Mix mud & circ able hole 15. Pick up /Lay down BHA Continue lo mix &. condition mud losing aprox. 150 bbls per hr. 16. Pick up /Lay down drill string CCmlmrje to mix & condition mud with aprox. losing 150 bbls per hr. 17. Tripping/for bit/mud motor/mwd
18. Short trip TOul of hole for logs 19. Drill cement/float equipment Rig up loggerssheld safety meeting. 20. Safety meeting Log well & mix mud lo majlain hole for loEging- 21. Other not listed
22. Move in rig up/Rig down move o Ran, pisiform express at 0130 included was the Compensated nertron den.fitv.caliner.Dua-
E VALUATION
SURVEY INFORMATION DEVIATION SURVEYS: DIRECTIONAL CO-
COORDINATES
SUPER vi soitlj
DIRECTIONAL HOLE TARGETS TARGET TVD:_ TARGET AZM: _ TARGET +N/-S:_
TARGET +E/-W:
TARGET INCL:
DRILLING
COST
MUD LOGGER NAM_ DonMcgenius MUD LOGGER PHONE 4324160081
MUD LOGGERS REPORT BACK GROUND GAS CONNECTION GAS:
TRIP GAS: SHOW GAS:
DOWNTIME GAS: LITHOLOGY;
PROPERTIES Type Mud: Drilling mud MUD COMPANY: Eagle Drilling Fluids MUD ENGINEER: Ron Bailey
PHONE NUMBER: 432.664.3690 DAILY MUD ADDITIVES:
DEPTH TIME MW VIS PV YP GELS PH API WL HTHP
WL CAKE
PM
U M E
PF
ES
CL
PPM
TOTAL
CL
TOTAL
SALT
W
SAND %
SOUDS
H
OIL
W
WATER
LCM
PPB ECD
0.00
B I T D A T A
BIT HO SIZE M f j Type Serial No. Jets • 32nds
Depth
Out
Daily
Feci
Total
Feet Hrs.
Total
Hrs
Daily
Fu/Hr
Total
FL/Hr. WOB RPM
BIT GRADE
BIT HO SIZE M f j Type Serial No. Jets • 32nds
Depth
Out
Daily
Feci
Total
Feet Hrs.
Total
Hrs
Daily
Fu/Hr
Total
FL/Hr. WOB RPM INN OUTER BEARINGS GAGE
3 12.25 STC GF37Y PJD035 13.13.13 0 5870 0.0 312 19 65 70
2 1225 STC FDS PG6481 3-16s 25 65 PUMP D o r T ROD ROD b die du. Of A . polon rod on diul action p r o p .
PUMP DATA T is for triples pump
• 2
ROD b die du. Of A . polon rod on diul action p r o p .
PUMP DATA T is for triples pump D 2
ROD b die du. Of A . polon rod on diul action p r o p .
PUMP DATA T is for triples pump
PUMP
NO. TYPE HP
W
EFF.
Stroke
Leneth
Liner
Size SPM GPM Press DPAV DCAV HHP
Bit
HHP
%HHP
At Bit HHP/IN1
SLOW PUMP RATES PUMP
NO. TYPE HP
W
EFF.
Stroke
Leneth
Liner
Size SPM GPM Press DPAV DCAV HHP
Bit
HHP
%HHP
At Bit HHP/IN1 SPM PSI SPM PSI 1 DB700 575 60 16.0 5.5 6 22 500 10 43 6.46 2.58 0.40 0.04 3 250 2 2
2 DB70D 575 80 16.0 5.5 0 20 0.00
BOTTOM HOLE ASSEMBLY OD. ID LENGTH OD
DRILL PIPE 1 :
BHA NO.: 2 DRILL PIPE 2 :
4.50 3.83 9213.00 DRILL COLLARS 1 DRILL COLLARS 2
8.00 DRILL PIPE 1 :
BHA NO.: 2 DRILL PIPE 2 : 0.00 0.00 0.00 DRILL COLLARS 1 DRILL COLLARS 2 7.00 Total Length f 0.00 | HRSONBHA.3B0
ITEM Description Length OJ>. I.D. Top Conn Bottom Com TOP TO BIT REMARKS
Managed by NewTech Engineering 21 powered By NeoFirma Energy services'"
13 Powered By NeoFinna Energy Service*)"1
NEW TECH ENGINEERING DAILY DRILLING REPORT
County: Leo
OPERATOR; LOT Midstream Days from Spud 29 Date: 11/18/2007 Property ID: DISTRIBUTION OP HOURS
Drilling Supervisor. Kirk Ferterolf p^o^ 325-206-2229 Depth: 9 2 , 3
CATEGORIES DAILY
CUM.
TOTALS
Drilling Supervisor: Phone: TVD: 9213.0 I . Drill rotating 377.25 Drift. Contractor tyler well service Rig #•. 2 Htile Size: 8-75t> in 2. Wash ft ream 8.75
Toolpusher: PHONE NUMBER- Footage Last 24 hrs: 0 3. Circulate ft condition 12.75 40.25 4. Lost Returns 18.00
G. L, Elev.; RKB to G. L- 18 ft 5. Service and lubricate rig 3.50 KB lo BHF: Date Last BOP Test: 11/2/D7 Dajs Chg. To Welh fi.Rignrpair 1.00
Prop. T.D. 9137 AFE# AFE-DHC 52.304,025 7. DirecUonaVDeviHlion survey 62.25 8. Wireline Logs/opt ai/cased hole 8.00 22.50
LAST CASING: 9 5/8 CSC SHOE TEST: 12 EMW Ciua. Monday rttnpaln Hrs. 9. Rig up casers/ run casing 3.50 10. Rig up cemeniers/ cementing 7.75
M ot PRESENT OPERATIONS: Logging well 11. Wait on cement 7.75 FROM TO HRS. CODE DESCRIPTION DAILY ACTIVITY 12. Wail on service company 5.00 600 845 2.75 3 Strap Out of hole with Drill nine 13. Nipple up BOPs/Nipple down BC 18.00 845 1130 2.75 18 Trip in hole.circulaie 20 ft of filLcodiiion hole ft mix mud. 14.TestBOPs 2.50 1130 1400 2.5 3 Mix mud & condition hole 15. Pick up /Lay down BHA 17.00 1400 1500 1.0 3 Condition hole with mud & LCM rru\turc. losing aprox. 120 bbls per hr. 16. Pick up /Lay down drill siring 5.00 1500 2130 6.5 3 Circulate hole for Iocs 17. Tripping/for bil/mud motor/mwd 59.50 2130 2200 0.5 21 Held safetv meeui.e_RII looeers 18. Short trip 2.75 9.25 2200 600 8.0 8 Loe well with schlumberger 19. Drill cement/float equipment 1.00
20. Safety meeting 2.00 21. Other not listed 0.50 33.25 22. Move in rig up/Rig down move o 22.00
TOTALS 24.00 727.00 DRILLING 0.00 377.25
EVALUATION 8.00 22.50 DAILY CUM
DRILLING INT AN G. 50.00 Jl .629,151.80 P. U. Wt S. O. Wl. String Wl. Rot Amps/Trq.: COST TANG. S0.00 3139,265.00
SURVEY INFORMATION TOTALS 50.00 53,768,416.80 DEVIATION SURVEYS: DIRECTIONAL CO.
COORDINATES DIRECTIONAL HOLE TARGETS TARGET TVD:_ TARGET AZM_ TARGET+N/-S:_
TARGET+E/-W:
TARGET INCL.:
MUD LOGGER NAME: Don McgCntUS MUD LOGGER PHONE: 4324160081
MUD LOGGERS REPORT BACK GROUND GAS CONNECTION GAS:
TRIP GAS: SHOW GAS:
DOWNTIME GAS: LITHOLOGY:
MUD PROPERTIES Type Mud: Drilling mud MUD COMPANY Eagle Drilling Fluids MUD ENGINEER: Ron Bailey Dafly Cost: S2.0I4.0
PHONE NUMBER: 432.664.3690 3ALLY MUD ADDITIVES:
DEPTH TIME MW vis FV YP GELS PH API WL HTHP
WL CAKE
PM LIME
PF ES
CL PPM
TOTAL CL
TOTAL
SALT SAND SOLIDS OIL WATER
LCM
PPB ECU
0.00 BIT D ATA
BIT NO SIZE Mfg Type Serial No. lets - 32nds
Depth
Out
Daily
Feet
Total
Feel His.
Total Hrs
Dairy FL/Hr
Total
FL/Hr. WOB RPM
BIT GRADE
BIT NO SIZE Mfg Type Serial No. lets - 32nds
Depth
Out
Daily
Feet
Total
Feel His.
Total Hrs
Dairy FL/Hr
Total
FL/Hr. WOB RPM INN OUTER BEARINGS GAGE
PUMP DorT ROD ROD b lhc dia. Of the piston rod on dual action pumps
O b ^ d ^ p u c . . p u M p D A T A
T b for triples pump
ROD b lhc dia. Of the piston rod on dual action pumps
O b ^ d ^ p u c . . p u M p D A T A
T b for triples pump
ROD b lhc dia. Of the piston rod on dual action pumps
O b ^ d ^ p u c . . p u M p D A T A
T b for triples pump
PUMP NO. TYPE HP
% EFF.
Stroke
Size SPM GPM Press DPAV DCAV HHP Bit
HHP SHHP
At Bil HHP/IN5
SLOW PUMP RATES PUMP NO. TYPE HP
% EFF.
Stroke
Size SPM GPM Press DPAV DCAV HHP Bit
HHP SHHP
At Bil HHP/IN5 SPM PSI SPM PSl
0 0 0.00 0.00 0.00
0 0.00
BOTTOM HOLE ASSEMBLY OD ID LENGTH OD
DRILL PIPE I :
BHA NO.: 2 DRILL PIPE 2 :
4.50 3.83 9213.00 DRILL COLLARS 1
DRILL COLLARS 2
8.00 DRILL PIPE I :
BHA NO.: 2 DRILL PIPE 2 : 0.00 0.00 O.OO
DRILL COLLARS 1
DRILL COLLARS 2 7.00 Total Length j 0.00 | H R S O N B H A | 3 8 0
ITEM Description Length O.D. I.D. Top Conn Bottom Com TOP TO BIT REMARKS
Managed by NewTech Engineering 21 Powered By NeoFtrma Energy Services'"
3 Powered By NeeFlrrna Energy Services'
NEW TECH ENGINEERING U9NI DAILY DRILLING REPORT
Bit
OPER
Phone: County: Lea RL e Fax:
Date:
Bit
OPER ATOR: DCP Midstream LcueA W Prop*
eSNo.:!
RL
Days (rom Spud 30 Date: 11/19/2007 LcueA W Prop* rty ID: DISTRIBUTION OF HOURS
Drilling Supervisor: Drilling Supervisor:
Drlg. Contractor
Kirk Fenerolf
NE NUMBER:
Pbooe: 325-206-2229
Footage L
Depth: 9213 CATEGORIES DAILY
CUM.
TOTALS Drilling Supervisor: Drilling Supervisor:
Drlg. Contractor NE NUMBER:
Phone:
Footage L
TVD: 9213.0 1. Drill rotating 377.25 Drilling Supervisor: Drilling Supervisor:
Drlg. Contractor tyler well service NE NUMBER:
Rtea:2 Footage L
Hole SUe: 8 - 7 5 0 to est 24 hrs: 0
2. Wash &. ream 0.25 9.00 Toolpusher:
G. L. Elev.: KB to BHF:
Prop.T.D.
PHO NE NUMBER: Footage L Hole SUe: 8 - 7 5 0 to est 24 hrs: 0 3. Circulated condition 6.00 46.25 Toolpusher:
G. L. Elev.: KB to BHF:
Prop.T.D.
PHO
4. Lost Returns 18.00
Toolpusher:
G. L. Elev.: KB to BHF:
Prop.T.D.
RKB Date Last B
to G. L> IBft 5. Service and lubricate rig 1.25 4.75
Toolpusher:
G. L. Elev.: KB to BHF:
Prop.T.D.
RKB Date Last B JPTest: Uf2J07 DaysC hg. To Weft 6. PJg repair 1.00
Toolpusher:
G. L. Elev.: KB to BHF:
Prop.T.D. 9137
RKB Date Last B
AFE# DaysC
AFE-DHG J 2,304,025 7. DiiectioruuTDeviatioD survey 6215
Toolpusher:
G. L. Elev.: KB to BHF:
Prop.T.D.
CSG SHOE TEST:
8. Wireline Logs/open/cased hole 22.50 LAST CASING: 9 5/8 CSG SHOE TEST: 12 EMW Cum. Monthly rig repair: Hrs. 9. Rig tip casers/ run casing 3.50 LAST CASING: CSG SHOE TEST: EMW Cum. Monthly rig repair: Hrs.
10. Rig up cemeniers/ cementing 7.75 OfiOO PRESENT OPER
FROM TO HRS. CODE ATiONS: Cut off 150" drilling line. 11. Wail on cement 7.75 OfiOO PRESENT OPER
FROM TO HRS. CODE DESCRIPTION DAILY ACTIVITY 12. Wait on service company 5.00 600 715 1.25 5 Ris servicccut 150* drilling line ] 3. Nipple tip BOPs/Nipple down BC 18.00 715 900 1.75 17 TTH with work string. H.TestBOPs 2.50 900 915 0.25 2 Wash & ream 60" of hole 15. Pick up /Lay down BHA 17.00 915 1400 4.75 3 Circulate & condition hole jnix mud 16. Pick up /Lay down drill string 13.00 18.00 1400 1530 1.5 18 TOOH with 30 stds DP 17. Tripping/for bit/mud rooior/mwd 1.75 61.25 1530 1645 1.25 3 CONDITION HOLE 18. Short trip 1.50 10.75 1645 1845 2.0 16 LAY DOWN DP 19. Drill cement/float equipment 1.00 1845 2000 1.25 16 RU lav down machine 20. Safety meeting 0.25 2.25 2000 2015 0.25 20 Held safety meeting on laing down DP.. 21. Other not listed 33.25 2015 600 9.75 16 Lay down 4.5 DP & 7* DCs 22. Move in rig up/Rig down move o 22.00
TOTALS 24.00 751.00 DRILLING 0.00 377.25
EVALUATION 0.00 22.50 DAILY CUM
DRILLING
COST INTANG. 33.911.96 31,633,063.76
P.U. Wt. S.O.Wt. Siring Wl. RoLAmps/Trqj DRILLING
COST TANG. 30.00 $139,265.00 SURVEY INFORMATION
DRILLING
COST
TOTALS 33,911.96 31,772328.76 DEVIATION SURVEYS: DIRECTIONAL CO. SUPERVISOR:!
DEPTH ANGLE AZM TVD V.S. COORDINATES DLS DIRECTIONAL HOI F TARGETS MUD LOC
MUDLOCC
GER N it MF- LVin Mcgennis TARGET TVD: TARGET AZM TARGET+N/-S:
TARGET +E/-W:
MUD LOC
MUDLOCC ERPHONE 4324160081 TARGET TVD: TARGET AZM TARGET+N/-S:
TARGET +E/-W:
TARGET TVD: TARGET AZM TARGET+N/-S:
TARGET +E/-W: MUD LOGGERS REPORT
TARGET TVD: TARGET AZM TARGET+N/-S:
TARGET +E/-W: BACK GROUND GAS
TARGET TVD: TARGET AZM TARGET+N/-S:
TARGET +E/-W:
CONNECTION GAS TRIP GAS
SHOW GAS DOWNTIME GAS
LITHOLOGY
CONNECTION GAS TRIP GAS
SHOW GAS DOWNTIME GAS
LITHOLOGY
TARGET INCL: + UP / - DOWN
CONNECTION GAS TRIP GAS
SHOW GAS DOWNTIME GAS
LITHOLOGY
TARGET INCL: + UP / - DOWN
CONNECTION GAS TRIP GAS
SHOW GAS DOWNTIME GAS
LITHOLOGY
TARGET INCL: + UP / - DOWN
CONNECTION GAS TRIP GAS
SHOW GAS DOWNTIME GAS
LITHOLOGY
COMMENTS: COMMENTS:
MUD PROPERTIES Type Mud: Drilling mud MUD COMPANY: Eagle Drilling Fluids MUD ENGINEER; Ron Bailey Dairy Cost: 31,561.96 Cum 3)1,884.13 Type Mud: MUD COMPANY:
PHONE NUMBTR- 432.664.3690 Dairy Cost: Cum
DAILY MUD ADDITTVES: DAILY MUD ADDITTVES: DAILY MUD ADDITTVES:
DEPTH TIME MW VIS PV YP GELS PH API WL HTHP WL CAKE
PM LIME
PF ES
CL PPM
TOTAL CL
TOTAL SALT
H SAND SOLIDS OIL WATER
LCM PPB
ECD
0.00
BIT DATA
BIT NO SIZE Mfg Type Serial No. Jets-32nds Depth Out
Daily Feet
Total Feet Hrs.
Total Hrs
Daily FL/Hr
Total FL/Hr. WOB RPM
BIT GRADE BIT NO SIZE Mfg Type Serial No. Jets-32nds
Depth Out
Daily Feet
Total Feet Hrs.
Total Hrs
Daily FL/Hr
Total FL/Hr. WOB RPM INN OUTER BEARINGS GAGE
3 12.25 STC GF37Y PJ0035 13.13.13 0 5870 0.0 312 19 65 70 2 1Z25 STC FDS PG6481 3-16s 25 65
PUMP DorT ROD BOD fa the dia. OI the pbton rod on dual action pumps
D b r o r d ^ p - p PUMP D A T A T a for triples pump
D 2 BOD fa the dia. OI the pbton rod on dual action pumps
D b r o r d ^ p - p PUMP D A T A T a for triples pump D 2
BOD fa the dia. OI the pbton rod on dual action pumps
D b r o r d ^ p - p PUMP D A T A T a for triples pump
PUMP NO. TYPE HP
W EFF.
Stroke Size SPM GPM Press DPAV DCAV
Surface HHP
Bil HHP
%HHP At Bit HHP1N3
SLOW PUMP RATES PUMP NO. TYPE HP
W EFF.
Stroke Size SPM GPM Press DPAV DCAV
Surface HHP
Bil HHP
%HHP At Bit HHP1N3 SPM PSl SPM PSI
1 DB700 575 60 16.0 5.5 6 22 500 10 43 6.46 2.58 0.40 0.04 3 250 2 2 2 DB700 575 60 16.0 5.5 0 20 0.00
BOTTOM HOLE ASSEMBLY OD ID LENGTH OD
DRILL PIPE 1 BHA NO J 2 DRILL PIPE 2
4.50 3.83 9213.00 DRILL COLLARS 1 DRILL COLLARS 2
8.00 Total Length HRS ON BHA
DRILL PIPE 1 BHA NO J 2 DRILL PIPE 2 0.00 0.00 0.00
DRILL COLLARS 1 DRILL COLLARS 2 7.00 Total Length 0.00 HRS ON BHA |3S0
ITEM Description Lenph O.D. LD. Top Com Bottom Com TOP TO BIT REMARKS
Managed by N e w T e c h E n g i n e e r i n g 31 Powered By Neofirma Energy Services'''
3 Powered By Neofii—a Energy Service*™
NEW TECH ENGINEERING DAILY DRILLING REPORT
County: Lea
OPERATOR: DCP Midstream Lease & WeD Na: 1
Property ID:
D»j i from Spud 31
Dril l ing Supervisor: Kirk Fetterolf
Dri l l ing Supervisor: _
Phone: 325-206-2229
Pbooe:
Drlg. Contractor tyler well service
Toolpusher: R i g # : _ _
PHONE NUMBER:
Depth: °213
TVD: 9213.0
Hole She: 8-750 „
Footage Last 24 h n : 0
G. L Elev.:_
K B to BHF:
Prop. T.D. ° ' 3 7
Date Last BOP Test: HQAT7
AFE#
Days Chg. To W e l t
AFE-DHC: S 2.304,025
LAST CASING: 95/8 CSC SHOE TEST: J 2 Cum. MoothJj rig repair?
K M PRESENT OPERATIONS: Lay do WO DCs
) HRS. CODE DESCRIPTION DAILY A C T I V I T Y
DISTRIBUTION OF HOURS
CATEGORIES
3. Circulate A condition
5. Service and lubricate rig
6. Rig repair
7. Du^tioruuVDcvialion survey
8. Wireline Logs/open/cased hole
9. Rig up casers/ run casing
10. Rig up cemcnters/ cementing
11. Wait on cemenl
12. Wait on service company
CUM.
TOTALS
9.00
51.50
18.00
4.75
1.00
62.25
22.50
16.75
10.75
7.75
5.00
18.00
2.50
19.50
18.00
61.25
10.75
1.00
2.25
33.25
22.00
Lay down DCs & BHA 13. Nipple up BOPs/Nipple down BC
RU Casing crewjield safety meeting
IS. Pick up /Lay down BHA
2000
2145
2245
RD casing crew. 16. Pick up /Lay down drill string
RU HaloTiuriorLcirculale hole with rig pump. 17. Tripping/for bit/mud motor/mwd
Cement 1st stage cement o f 7" casing wiih625 sks H L Premium 12.7 wL50/50 poz 14.8 J ju - 18. Short trip
mpplug heldOK 19. Dri l l cement/float equipment
Circulate hole from D V tool with rig pump.
21. Other not listed
22. Move in rig up/Rig down move o
EVALUATION
SURVEY INFORMATION DEVIATION SURVEYS: DIRECTIONAL CO.
COORDINATES
SUPERVISOR:!
DIRECTIONAL HOLE TARGETS
TARGET T V D : _
TARGET AZM: _
TARGET +N/-S: _
TARGET -t E/-W:
TARGET INCLJ
DRILLING
COST
M U D LOCCER NAME* DonMcgennis
MUD LOGGER PHONE: 4324160081
MUD LOGGERS REPORT BACK GROUND GAS_
CONNECTION GAS:_
TRIPGAS:_
SHOW GAS: _
DOWNTIME GAS:_
LITHOLOGY:
COMMENTS:
MUD PROPERTIES Type Mud: Drilling mud M U D COMPANY-. Eagle Drilling Fluids MUD ENGINEER: Ron Bailey Daily Cost: SO.00 Cum: SI1.884.13
PHONE NUMBER: 432.664.3690
DAILY MUD ADDITIVES: _ _ _ _ _ _ _ _ _ _ _ _ _
DEPTH TIME MW v i s PV YP GELS PH API WL HTHP
WL CAKE
PM
UME
PF
ES
CL
PPM
TOTAL
CL
TOTAL
SALT
*A
SAND SOLIDS %
OIL
W
WATER
LCM
PPB ECD
0.00
BIT DATA
BIT NO SEE Mfg Type Serial No. Jets-32nds
Depth
Out
Dairy
Feel
Total
Feet Hrs.
Total
Hrs
Daily
Ft/Hr
Total
Ft/Hr. WOB RPM
BIT GRADE
BIT NO SEE Mfg Type Serial No. Jets-32nds
Depth
Out
Dairy
Feel
Total
Feet Hrs.
Total
Hrs
Daily
Ft/Hr
Total
Ft/Hr. WOB RPM INN OUTER BEARINGS GAGE
3 12.25 STC GF37Y PJ0035 13,13.13 0 5870 0.0 312 19 65 70
2 1Z25 STC FDS PG6481 3-16s 25 65
PUMP D o r T ROD ROD b the dia. Of the piston rod on daal action pumps
D b b r b * . — p u M p D A T A
T a for mple i pump
D 2
ROD b the dia. Of the piston rod on daal action pumps
D b b r b * . — p u M p D A T A
T a for mple i pump D 2
ROD b the dia. Of the piston rod on daal action pumps
D b b r b * . — p u M p D A T A
T a for mple i pump
PUMP
NO. TYPE HP %
EFF.
Stroke
Size SPM GPM %Z DPAV DCAV
Surface
HHP
Bil
HHP
SHHP
Al Bit HHP/IN5
SLOW PUMP RATES PUMP
NO. TYPE HP %
EFF.
Stroke
Size SPM GPM %Z DPAV DCAV
Surface
HHP
Bil
HHP
SHHP
Al Bit HHP/IN5 SPM PSl SPM PSI
1 DB70O 575 60 16.0 5.5 6 22 500 10 43 6.46 2.58 0.40 0.04 3 250 2 2
2 DB700 575 60 16.0 5.5 0 20 0.00
BOTTOM HOLE ASSEMBLY OD ID LENGTH OD
DRILL PIPE 1 •
BHA NO.: 2 DRILL PIPE 2 :
4.50 3.83 9213.00 DRILL COLLARS 1
DRILL COLLARS 2
8.00 DRILL PIPE 1 •
BHA NO.: 2 DRILL PIPE 2 : 0.00 0.00 0.00
DRILL COLLARS 1
DRILL COLLARS 2 7.00 Total Length |0.00 | HRS ON B H A ! 380
ITEM Description Lenffth O.D. I.D. Top Cona Bottom Conn TOP TO BIT REMARKS
Managed by N e w T e c h E n g i n e e r i n g 33 powered By f*eoFirma Energy Services'"
3 Powered By NeoFirma Energy Service*"*
NEW TECH ENGINEERING [ l l f l S DAILY DRILLING REPORT ^ ^ ^ Q
Ri .Phoa-
OPERATOR: DCP Mids—earn
C
L m i W
Prope
ountv: Lea Rig f a l :
eU No.: 1 Dajs from Spud 32 Date: 11/21/2007
Ri .Phoa-
OPERATOR:
C
L m i W
Prope rtylD-. DISTRIBUTION OF HOURS
Dri l l ing Supervisor:
Dri l l ing Supervisor:
Drig. Contractor
Kirk Fetterolf
NE NUMBER:
Phone: 325-206-2229
Footage L
Depth: M l 3 CATEGORIES DAILY
CUM.
TOTALS Dri l l ing Supervisor:
Dri l l ing Supervisor:
Drig. Contractor
NE NUMBER:
Pbooe:
Footage L
T V D : 9213.0 1. Dr i l l rotating 377.25
Dri l l ing Supervisor:
Dri l l ing Supervisor:
Drig. Contractor tyler well service
NE NUMBER:
R i a « : 2
Footage L
Hole She: 8 7 5 0 -
u t 24 hrs: 0
2. Wash & ream 9.00 Tool pusher:
a L . Elev.:
K B to BHF:
Prop. TJX
PHO NE NUMBER: Footage L
Hole She: 8 7 5 0 -
u t 24 hrs: 0 3. Circulate & condition 2.50 54.00 Tool pusher:
a L . Elev.:
K B to BHF:
Prop. TJX
PHO
4. Lost Returns 18.00
Tool pusher:
a L . Elev.:
K B to BHF:
Prop. TJX
R K B to a L 18f t 5. Service and lubricate rig 4.75
Tool pusher:
a L . Elev.:
K B to BHF:
Prop. TJX
Date Last B(
CSG SH
5PTest 11/7707 Daj-s C hg. To W e l t 6. Rig repair 1.00
Tool pusher:
a L . Elev.:
K B to BHF:
Prop. TJX 9137 Date Last B(
CSG SH
AFE#
Daj-s C
AFE-DHC: 5 2,304,025 7. Directional/Deviation survey 62.25
Tool pusher:
a L . Elev.:
K B to BHF:
Prop. TJX
Date Last B(
CSG SH
Daj-s C
8. Wireline Logs/open/cased hole 22.50
LAST CASING: 95/8
Date Last B(
CSG SH DETEST: 12 EMW Com. Mont iily Ht r*t»lr: Irs. 9. Rig up casers/ run casing 16.75 LAST CASING:
Date Last B(
CSG SH EMW Com. Mont Irs.
10. Rig up cemeniers/ cementing 0.50 11.25
MOB PRESENT OPERATIONS:
FROM T O HRS. CODE
Rigging down r i g j t i g released iSf 18:00 11-20-07 11. Wait on cement 7.75 MOB PRESENT OPERATIONS:
FROM T O HRS. CODE DESCRIPTION D A I L Y A C T I V I T Y 12. Wait on service company 5.00
600 830 2.5 3 Pumo sta EC 2 13. Nipple up BOPs/Nipple down BC 5.00 23.00 830 900 0.5 10 RD Halliburton 14. Test BOPs 2.50 900 1400 5.0 13 N D BOPs. set s l i t* on 7". cut-off 7 ' and N U *C" section, test "C" section lo 3000 ps- 15. Pick up /Lay down BHA 19.50
i . test good 16. Pick up /Lay down drill string 18.00
1400 1800 4.0 22 JelPils 17. Tripping/for bit/mud molor/mwd 6125
1800 2400 6.0 22 Release Rig at 18:00 hrs 20-Nov-07 18. Short Irip 10.75 19. Dr i l l cement/float equipment 1.00
20. Safety meeting 2.25
21 . Other not listed 3325
22. Move in rig up/Rig down move o 10.00 32.00
TOTALS 18.00 793.00
D R I L L I N G 0.00 37725
EVALUATION 0.00 22.50
DAILY CUM DRILLING
COST INTANG. 5573395.00 52206,458.76
P U. Wt. S.O.Wt. Suing W l . RoL Amps/Trq.:
DRILLING
COST TANG. 5301.470.00 5440.735.00
SURVEY INFORMATION
DRILLING
COST
TOTALS 5874.865.00 52,647,193.76
DEVIATION SURVEYS: DIRECTIONAL CO. SUPERVISOR:!
DEPTH ANGLE AZM TVD VS. COORDINATES DLS DIRECTIONAL HOLE TARGETS MUD LOGO ER NAME:
MUD LOGGER PHONE:
Don Mcgennis
TARGET TVD:
TARGET A Z M :
TARGET+N/-S:
TARGET +E/-W:
MUD LOGO ER NAME:
MUD LOGGER PHONE: 4324160081 TARGET TVD:
TARGET A Z M :
TARGET+N/-S:
TARGET +E/-W:
MUD LOGO ER NAME:
MUD LOGGER PHONE: TARGET TVD:
TARGET A Z M :
TARGET+N/-S:
TARGET +E/-W: MUD LOGGERS REPORT
TARGET TVD:
TARGET A Z M :
TARGET+N/-S:
TARGET +E/-W: BACK GROUND GAS
TARGET TVD:
TARGET A Z M :
TARGET+N/-S:
TARGET +E/-W:
CONNECTION GAS:
TRIP GAS:
SHOW GAS:
DOWNTIME GAS:
LITHOLOGY:
CONNECTION GAS:
TRIP GAS:
SHOW GAS:
DOWNTIME GAS:
LITHOLOGY:
TARGET INCL.: + UP/-DOWN
CONNECTION GAS:
TRIP GAS:
SHOW GAS:
DOWNTIME GAS:
LITHOLOGY:
TARGET INCL.: + UP/-DOWN
CONNECTION GAS:
TRIP GAS:
SHOW GAS:
DOWNTIME GAS:
LITHOLOGY:
TARGET INCL.: + UP/-DOWN
CONNECTION GAS:
TRIP GAS:
SHOW GAS:
DOWNTIME GAS:
LITHOLOGY:
COMMENTS: COMMENTS:
MUD PROPERTIES Type Mud:
DAILY MUD ADDITIVE
Drilling mud MUD COMPANY: Eagle Drilling Fluids MUD ENGINEER:
PHONE NUMBER;
Ron Bailey Daily Cost: $0.00 Cum SI 1.884.13 Type Mud:
DAILY MUD ADDITIVE S:
MUD COMPANY: MUD ENGINEER:
PHONE NUMBER; 432.664.3690
Daily Cost: Cum
DEPTH TIME MW VIS FV YP GELS PH API WL HTHP
WL CAKE
PM
LIME
PF
ES
CL
PPM
TOTAL
CL
TOTAL
SALT
S
SAND SOLIDS OIL
% WATER
LCM
PPB ECD
0.00
B I T D A T A
BIT NO SIZE Mfg Type Serial No. Iets-32nds
Depth
Out
Daily
Feet
Total
Feet Hrs.
Total
Hrs
Dairy
FUHr
Total
FL/Hr. WOB RPM
BIT GRADE
BIT NO SIZE Mfg Type Serial No. Iets-32nds
Depth
Out
Daily
Feet
Total
Feet Hrs.
Total
Hrs
Dairy
FUHr
Total
FL/Hr. WOB RPM INN OUTER BEARINGS GAGE
3 12.25 STC GF37Y PJ0035 13.13.13 0 5670 0.0 312 19 65 70
2 12.25 STC FDS PG6461 3-16s 25 65
PUMP D o r T ROD ROD b the dia. Of the piston rod on dual action purops
D b ' * ' " 1 " " ™ ' PUMP DATA T fa for triplex pump
D 2
ROD b the dia. Of the piston rod on dual action purops
D b ' * ' " 1 " " ™ ' PUMP DATA T fa for triplex pump D 2
ROD b the dia. Of the piston rod on dual action purops
D b ' * ' " 1 " " ™ ' PUMP DATA T fa for triplex pump
PUMP
NO. TYPE HP
H
EFF.
Stroke
Lcnjrth Size SPM GPM Press DPAV DCAV
Surface
HHP
Bit
HHP
•A HHP
At Bit HHP/IN1
SLOW PUMP RATES PUMP
NO. TYPE HP
H
EFF.
Stroke
Lcnjrth Size SPM GPM Press DPAV DCAV
Surface
HHP
Bit
HHP
•A HHP
At Bit HHP/IN1 SPM PSI SPM PSI
1 DB700 575 60 16.0 5.5 6 22 500 10 43 6.46 2.58 0.40 0.04 3 250 2 2
2 DB700 575 60 16.0 5.5 0 20 0.00
BOTTOM HOLE ASSEMBLY OD ID LENGTH OD
DRILL PIPE I
BHA NO.: 2 DRILL PIPE 2
4.50 3.83 9213.00 DRILL COLLARS 1
DRILL COLLARS 2
8.00
Total Length HRS ON BHA
DRILL PIPE I
BHA NO.: 2 DRILL PIPE 2 0.00 0.00 0.00
DRILL COLLARS 1
DRILL COLLARS 2 7.00 Total Length 0.00 HRS ON BHA |380
ITEM De—ripiion Length OD. LD. Top Conn Bottom Conn TOP TO BIT REMARKS
Managed by NewTech Engineer ing S3 Powered By r+eoFirm* Energy Services™
Top Related