Download - Annual Meeting September 5, 2017 Welcome to All Homeowners

Transcript
Page 1: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ Association

Annual Meeting

September 5, 2017

Welcome to All Homeowners

Page 2: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ Association

Meeting Agenda

• Welcome / Call to Order

• Introductions

– Directors

– Residents

• Mission

• 2016 Annual Meeting Minutes

• Treasurer’s Report

• Architectural Control Committee

• Accomplishments

Page 3: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ Association

Meeting Agenda (Continued)

• Goals

– Short Term

– Long Term

• Questions / Answers

• Directors –Terms

• Annual Dues Increase

• Vote

• Adjourn

Page 4: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ Association

Introduction

• Directors

– President – John Soucheck

– 1 st. Vice President – Connie Hill

• Also Chairperson of the Architectural Control

Committee

– 2 nd. Vice President – Gene Kaminski

– Secretary – Bobbie Bramblett

– Treasurer – Gopal Garg

• Thanks to this great group!

• Residents

Page 5: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ Association

Mission

– “Cause the common areas to be maintained”

(Bylaws VII, 2, g.)

– Guidance Documents

• Declaration of Restrictions – Rio Villa North

• Bylaws of Rio Villa North Homeowners’ Association

Page 6: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ Association2016 Annual Meeting Minutes

See Hand-Out

Page 7: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ AssociationTreasurer’s Reports

See Next Three Charts

Page 8: Annual Meeting September 5, 2017 Welcome to All Homeowners

RVNHOA Financials

Description FY-16 FY-17*

Operating Capital

Income $34,307.83 $21,599.58

Carry Over $134.65 $9,769.84

Total $34,442.48 $31,369.42

Expenses

Power & Light $3,902.67 $2,881.91

Lawn $8,209.71 $10,230.22

Pond $9,762.94 $1,070.48

Insurance $1,755.64 $1,720.23

Miscellaneous $1,041.68 $1,136.69

Total $24,672.64 $17,039.53

FY Net Carried Over $9,769.84 $14,329.89

Emergency Fund $7,510.00 $7,530.73

* Income includes Insurance payment of $2927.00

Notes:- FY starts on 1 September and ends on 31 August.

Page 9: Annual Meeting September 5, 2017 Welcome to All Homeowners

RVNHOA FY-18 Budget

Description FY-18 Comments

Operating Capital

Income $21,600.00 Includes Increase in dues

Carry Over FY-17 $14,329.89

Total $35,929.89

Expenses

Power & Light

Power $2,800.00

Lighting Maint/Repair $800.00 Includes 2 CB Boxes Replacement

Total $3,600.00

Lawn

Lawn Care $7,800.00

Landscaping $4,000.00 Mulching, Entry & pond Landscaping

Pest Control/Fertilization $900.00

Irrigation Maint/Repair $1,340.00

Sprinkler Encosure $900.00

Total $14,940.00

Page 10: Annual Meeting September 5, 2017 Welcome to All Homeowners

RVNHOA FY-18 Budget Cnt'd

Pond

Pond Care $1,200.00

Fountain Maint/Repair $500.00

Pond Retaining Wall Repair $6,000.00 North Wall Cost ??

Total $7,700.00

Insurance $1,900.00 $1,900.00

Miscellaneous

Culvert Head Repairing $6,000.00 4 Culverts @$1500.00 Each

Admin/Postage/Stationary $300.00

Incorporation/State Fee $70.00

Legal/Recording Fee $100.00

Post Office Box Fee $100.00

Signs Etc. $50.00

Website $0.00

Gazebo Repair & Painting $500.00

Other $500.00

Total $7,620.00

Grand Total $35,760.00

Notes:- FY starts on 1 September and ends on 31 August.

Page 11: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ Association

Architectural Control Committee

• Consists of one Board Member (Connie Hill) &

two At-Large Members (Gayle Cappola & Deb

Clark)

• This current Committee addressed and

approved the following requests:

– Four (4) paint requests approved

– Two (2) fence replacements approved

– Two (2) roof replacements approved

Page 12: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ AssociationAccomplishments

• Dead grass / sod replaced at pond at landscape

contractor cost

• Repaired fence at pond

• Signs at pond replaced

– “No Fishing”

– “Fence Climbing Prohibited”

• Landscaping at front replaced after truck

accident on 15 December 2016

Page 13: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ AssociationAccomplishments

• Replaced the “Deed Restricted Community” sign

at entry

• Pond aeration system received a major overhaul

– Aerator pump rebuilt

– Diffuser trays and membrane sticks replaced

• Rusted / non-operational electrical receptacles

on the gazebo and on concrete post at pond

replaced

• Pond fountain cleaned

Page 14: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ AssociationAccomplishments

• Deed Restrictions revised to add Fishing

Prohibition as approved at a Special meeting on

11 April

• All 2017 Homeowners due have been paid –

June

• Greenleaf (Landscape Contractor) contract

revised to provide regular application of fertilizer

and weed control

Page 15: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ AssociationAccomplishments - Continued

• Lake Doctor (Pond Contractor) contract revised

to a ‘hybrid’ type

– Applications every month in the Summer

– Applications every other month in the Winter

• Landscaping at pond supplemented with new

bushes

Page 16: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ AssociationGoals – Short Term

• Remove fence supports in pond area

• Replace two (2) circuit breakers boxes on

concrete post at pond area

• Replace dead plantings at entry

• Have fountain cleaned

• Gazebo

– Refurbish

– Re-stain

Page 17: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ AssociationFuture Concerns

• Repair of both sides of culvert under road exit

– Replace cement bags and rebar

Page 18: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ AssociationGoals – Long Term

• Stop Erosion and Restore Rear Pond Bank

Page 19: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ AssociationFuture Concerns

• Dredging of front detention areas

• Repair of brick wall along entry

– Big $$$$$

Page 20: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ AssociationQuestions / Answers

Open to the floor

Page 21: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ AssociationDirectors

• BY LAWS – ARTICLE IV

– Section1. NUMBER. The affairs of this Association shall

be managed by a Board of five (5) Directors who are

members of the Association in good sanding.

– Section 2. TERM OF OFFICE. The members shall elect

five (5) Directors for a term of two years. To ensure

continuity, three Directors will be elected in odd

numbered years and two Directors will be elected in

even numbered years.

Page 22: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ AssociationDirectors - Candidates

• Deb Clark

• Gayle Cappola

• ?????

• We need two (2) volunteers to round out the

ACC

• We need volunteers for the Christmas

decorating committee

Page 23: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ AssociationAnnual Dues

• Board of Directors recommend that the residents approve an increase in the annual dues of $50– Dues will increase from $250 to $300

– Last dues increase was in 2007

– Cost of Living Increase / Inflation since 2007

• Dues in nearby neighborhoods:– Rio Villa recently increases dues from $325 to $350

– Lake Washington – from $200 to $492 yearly

– West Melbourne – from $300 to $425 yearly

– Viera / Suntree – from $300 to $1,064

Page 24: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ Association

Vote

Page 25: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ Association

Vote Results

Page 26: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ Association

• A copy of tonight’s presentation will be posted to

the website in approximately one (1) week.

• The meeting minutes will be posted after the

Director’s monthly meeting in October.

– Review

– Amend

– Approve

Page 27: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ Association

Adjourn

See you next year!

Page 28: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ AssociationSidewalks

• What is the status of the sidewalks being put in

place?

• On indefinite hold!

• Required process to make a change to the

neighborhood has not been accomplished

– Petition stating wording and signed by 29 (40%) of

members in good standing

– Special meeting within 30 days

– At least 50% of the members must agree to the

change

Page 29: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ AssociationSidewalks

• Committee formed January 2016

– Chairperson – Mary Deverter

– Member – Bobbie Bramblett

– Member – Gopal Garg

• Met once

• Developed petition

Page 30: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ AssociationSidewalks

• Last time (September 2003) this issue was

brought up, it was soundly defeated

– No – 42

– Yes – 20

– No vote – 8

• Contrary to what has been said, there will be

significant cost impact to the Association

Page 31: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ AssociationSidewalks

Page 32: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ AssociationSidewalks

Page 33: Annual Meeting September 5, 2017 Welcome to All Homeowners

Rio Villa North Homeowners’ AssociationSidewalks

• Complete Sidewalks - $14,893

– North Only $7,190

– South Only $7,703

• Estimates are from December 2015

– Electrical – Bonner Electric LLC

– Landscaping & Irrigation – Green Leaf

• Estimates are preliminary

– After the sidewalks are in, the associated contractors

will determine if they need to be revised

• Permit fees are not included