Engineering Internship
Trevor Smandra
Part I | AutoCAD Revision
I | Pumps (Before)
Why doesn’t this work?
• Not enough detail to distinguish type of pump
• Incorrect dimensioning = layout problems
I | Pumps (After)
Centrifical Pump Diaphragm Pump PD Pump
I | Steam Cooker
Before:
After:
I | Equipment Naming Convention
Part II | Okara Pump Test
II | Okara Pump Test
II | Okara Pump Test
Part III | Solid Modeling
3D Reverse Engineering of:• Centrifuge• Slurry Tank Grinder
Why?• Having a 3D representation of large pieces of equipment helps when
designing/implementing changes and modifications
III | Centrifuge
III | Slurry Tank Grinder
III | Other 3D Models
Gondola Cart:
III | Other 3D Models
New Table Design:
Part IV | Raw & RTE Separation
• Created new proposed layout of Bean Room & Tofu Room
• Why?• Separate raw material from RTE to decrease
contamination risk• Establish a better flow of movement in production• Utilize space more efficiently
IV | First Proposed Layout
IV | New Proposed Layout
Top Related