1
AMS Monthly Management Report to the IETF Q1 2011
Table of Contents
Site Selection Status 2011 - 2013 2
Registration Report – IETF 80 Prague, CZECH REPUBLIC
3
IETF Document Management Report • New Internet Drafts • Revised or Updated Internet Drafts • IESG Last Call Internet Draft Activity • Approved Internet Draft Activity
4
IETF Ticket Management 5 - 6
Intellectual Property Disclosures 7 – 8
Working Group Activity 9
IT Development Items 10
IETF Mail List Stats 11 - 12
IETF Website Stats • Ietf.org • Iab.org • Iaoc.ietf.org • trustee.ietf.org
Available online at: URL/usagedata
2
Site Selection Status 2011 – 2013
# Meeting Prequalify Site Visit Tech Visit Venue
Contract Hotel Contract
Host
81 Jul 2011 Canada: Quebec City
√ √ √ √ √ RIM
82 Nov 2011 Asia: Taipei √ √ √ √ √ TWNIC
83 Mar 2012 Europe: Paris √ √ √ √ √ NONE
84 Jul 2012 Canada: Vancouver
85 Nov 2012 North America: Atlanta (move from Fall 2010 )
√ N/A N/A √ √ NONE
86 Mar 2013 North America: Orlando
√ N/A N/A √ √ NONE
3
Registration Report – IETF 80 – Prague, Czech Republic
4
IETF Document Management Report Q1 2011
“New” refers to Internet Drafts presented for the first time “Revised or Updated” refers to Internet Drafts that were modified in some way, possibly more than once “Last Call” refers to the announcement to the community that the Internet Draft is about to be closed for comment “Approved” refers to Internet Drafts that are finished with the IESG Evaluation and have been passed to the RFC Editor for publication
5
IETF Ticket Management (ALL TICKETS) Q1 2011
Registrar – registration assistance; Action – technical issues; General – general IETF information; IESG – IESG support; Liaisons – Liaison submissions; IPR – IPR submissions; Meeting – request a meeting session; Mgmt – Mgmt Queue for Ray/Russ; Webex – Webex Requests; List-Manager – list management support
6
IESG Queue Ticket Management: Total Tickets Q1 2011
7
3rd Party IPR Disclosures
Date Discloser Possible Patent Owner Relevant IETF document or RFC
Research Status Verified
February 2, 2009
Yaron Sheffer
AT&T Bell Laboratories (possibly Alcatel-Lucent)
draft-sheffer-emu-eap-eke-01
Referred to Alcatel Lucent. Awaiting
Response. No
March 24, 2009
Yakov Rekhter
Cisco Systems draft-ietf-l3vpn-2547bis-
mcast-08
Cisco made specific disclosure Feb 2010 Yes
March 31, 2009
Enke Chen Redback Networks draft-margues-idr-best-external-01
Unable to Verify No
January 29, 2010
Simon Josefsson
University of California RFC 3447 Awaiting Response No
May 25, 2010
Yaron Sheffer
AT&T Bell Laboratories (possibly
Alcatel-Lucent)
draft-sheffer-ipsecme-hus-00
Awaiting Response. No
May 28, 2010
Martin Stiemerling
Telefonaktiebolaget LM Ericsson
draft-lindquist-sip-rtsp-01 Awaiting Response No
June 02, 2010
Priya Rajagopal
General Instrument Corporation
draft-lindquist-sip-rtsp-01 ED contacted counsel. Specific IPR
Disclosure filed August 2010
Yes
June 17, 2010
Martin Stiemerling
Telefonaktiebolaget LM Ericsson
draft-lindquist-sip-rtsp-02 ED contacted Ericsson general
counsel. Waiting on response.
No
July 12, 2010
Rene Struik Certicom Corporation draft-struik-ecc-efficiences-00
ED sent email to Certicom general
counsel. Waiting on response.
No
July 12, 2010
Rene Struik Certicom Corporation draft-ietf-roll-rpl-10 ED sent email to Certicom general
counsel. Waiting on response.
No
August 23, 2010
Tom Polk Huawei Symantec draft-dong-savi-cga-header-03
ED sent email to Huawei Symantec general counself.
Waiting for response
No
September 8, 2010
David Harrington
Enterasys Networks draft-ietf-geopriv-arch-02 ED contacted relevant patent attorneys.
Under Review Under Review
December 1, 2010
Rene Struik Certicom Corp
draft-igoe-secsh-x509v3-06
VERIFIED. See http://datatracker.iet
f.org/ipr/1468 Yes
December 9, 2010
Adrian Farrel
Nortel Networks draft-bhh-mpls-tp-oam-y1731-06
Awaiting Nortel response that they no
longer have a dept. that can assist with
these types of inquiries.
Unable to Verify
8
December 9, 2010
Adrian Farrel
Cisco Systems draft-bhh-mpls-tp-oam-y1731-06
Awaiting Response No
December 9, 2010
Adrian Farrel
ECI Telecom Ltd. draft-bhh-mpls-tp-oam-y1731-06
Awaiting Response No
March 25, 2011
Sean Turner
Certicom Corp draft-herzog-static-ecdh-06
Awaiting Response Under Review
9
Working Group Activity Q1 2011
New Working Groups January Audio/Video Transport Core Maintenance (avtcore) Audio/Video Transport Extensions (avtext) Audio/Video Transport Payloads (payload Metric Blocks for use with RTCP’s Extended Report Framework (xrblock) ControLling Multiple streams for tElepresence (clue) February NONE March Address Resolution for Massive numbers of hosts in the Data center (armd) Light-Weight Implementation Guidance (lwig) Verification Involving PSTN Reachability (vipr) Concluded Working Groups
January NONE February Crypto Forum Research Group (cfrg) Path Maximum Transmission Unit Discovery (pmutd) Scope Addressing Architecture Discussion(saad) IPv6 over IEEE 802.15.4 (lowpan) Lightweight Reachability softWires (lrw) Harnessing IP for Critical Communications Using Precedence (hiccup) Internet Area Proposed Working Group (intareawg) March Audio/Video Transport (avt) Next Steps in Signaling (nsis) Message Organization (morg) Multiple AoR reachabiliTy InformatioN Indication (martini)
10
IT Development Items In Progress or Complete
Additional Technical Tasks performed in Q1 2011 IETF Meeting Registration
Create ability for the registration system to automatically add subscribers to the various meeting mail lists. This is complete and will be available with IETF81 registration. (9.5 hours)
COMPLETED
IETF Meeting Registration
Companion registration and check in ability. (32. 5 hours) COMPLETED
IETF LOI System
Ability to link LOIs from Host web pages. Also the ability to have hardcopy requests for LOIs sent directly to the host via email (12 hours)
COMPLETED
IETF Social Event Registration System
Setup and deployment of IETF80 Social Event Registration System (19 hours) COMPLETED
Trace route Testing Page
Set up a trace route/testing page for the IETF Website to assist with IPv6 issue debugging (22 hours)
COMPLETED
IETF25 Webpage
Created photo upload page and IETF25 T-Shirt area for IETF Website (36 hours) COMPLETED
Public Interim Mtg Site
Created a Python script to generate a listing of the interim meeting files on a public web page, sortable by date and Working Group (17 hours)
COMPLETED
Nudge Tracker Compiled Nudge Report for January, February and March (34.5 hours) COMPLETED
Mailing List Management
Created (20 hours) -rtcweb, provreg, dtn-security, dtn-users, dtn-interest, nmrg, obscurity-interest, all dtn mailing lists including migrating archives, list settings and subscribers from external sources Migration -nmrg was a full migration from an external host
COMPLETED
11
Mail List Activity – Q1 2011
12
Top Related