Download - About Gemini

Transcript
Page 1: About Gemini

85 km

Page 2: About Gemini

85 km

154 m

89 m

0,0m

18,6 m

24,6 m

130

m

220

m

27,5

- 37

,5 m

2009

2010

2011

2012

2013

2014

2015

2016

2017

February 2009:Permits granted, Typhoon O�shore starts development of Gemini in cooperation with BARD

August 2011:Typhoon O�shore acquires full control of Gemini from BARDStart redesign and optimalisation of Gemini

August 2013:Equity consortium completeEquity consortium publically announced upon providing EUR 40 million of bank guarantees to Dutch government

Q2 2014:Start construction

Q2 2016: First power to shore

December 2012:EIB board approval for EUR 500 million loan

May 2010:SDE granted

April 2012: Siemens Wind Power appointed as preferred supplier

January 2013:Negotiations with potential equity sponsors

November 2013:Commercial bank launch

Q1 2014:Financial close

Q2 2015:Installation foundations and turbines

Q1 2017:Full powerCommissioning commercial operations

Page 3: About Gemini

Official name Gemini

Status Under development

Area of windfarm 2 x 34 km2

Location North of the Dutch coast

Country Netherlands

Distance from shore 85 km

Water depth 28 - 36 m

Developer Gemini

EPC/BOP Van Oord Offshore Wind Projects BV

Construction Start estimated Q2 2014

Operator Northland Power Inc.

Operation and maintenance WTG Siemens Wind Power

Commission Year estimated Q1 2017

Total Capacity to be installed 600 MW

Annual Estimated Production ~2,6 TWh/Year

Transformer 2 Offshore substations

Transformer 1 Onshore transformer station

Infield Voltage Level 33 kV

Export Voltage Level 220 kV

Export Cable Length/Material 110 km /Copper

Transmission Type HVAC

Manufacturer turbine Siemens

Model SWT4.0 - 130

Rated Power pr. Turbine 4.0 MW

Number of Turbines 150

Rotor Diameter 130 m

Rotor Area 13.300 m2

Rotor Speed (rated) 5013 rpm

Hub Height (above average sea level) 88,5 m

Blade Type B63

Blade Length 63 m

Page 4: About Gemini

Equity sponsors