7/30/2019 A Project Report Submitted in Partial Fulfillment Of
1/14
a.
1
A Project report submitted in partial fulfillment of
The requirement for the degree of
Masters of Computer Applications
ENGINEERING COLLEGE AJMER
BADLIYA CHAURAYA
AJMER
7/30/2019 A Project Report Submitted in Partial Fulfillment Of
2/14
a.
2
7/30/2019 A Project Report Submitted in Partial Fulfillment Of
3/14
a.
3
S.No. Contents Page
no.
1. Title of the project 4
2. Introduction(Abstract)
3. Certificate from
organization
4. Contents
5. Acknowledgement
6 Platform used
7 Front & back-end used
8 Project Analysis
9 Feasibility study & cost
benefit analysis
10 Project design
11 Table structure
12 Coding
13 Form design
7/30/2019 A Project Report Submitted in Partial Fulfillment Of
4/14
a.
4
14 Future scope of the
project
.15 Refrences
7/30/2019 A Project Report Submitted in Partial Fulfillment Of
5/14
a.
5
Hotel Management System
INTRODUCTION(ABSTRACT):-
The field of computers has taken a giant leap at the threshold of
twentieth century.
Computers have become an integral part of modern man all over the
globe. The proverb
Need is the mother of invention is proving equally correct in case of
computers.
Computers have already had a considerable impact on many aspects
of our
society. Medicine, law enforcement, government, banking, education,
transportation,
planning these are only some of the fields in which computers are
already playing the
highly significant role. Over the next few years you can expect a vast
increase in the
range of computer applications and a corresponding increase in theeffect computers will
have on our daily lives.
7/30/2019 A Project Report Submitted in Partial Fulfillment Of
6/14
a.
6
.
A research work owes its success from commencement to
completion, to the people in love with researchers at various
stages. Let we express our gratitude to all those who helped us in
various stage of this study. First, we would like to express our
sincere gratitude indebtedness to Mr. Nitin Jain (Principal, IPS). We
would also like thanking all the people who have helped us in the
project deve lopment & we are also grateful to our guide Mr.Yogesh
Sharma for the help provided in completion of the project, whichwas assigned to us.
Last but not least, we pay our sincere thanks and gratitude to all
the Staff Members of I.T Department for making our project
valuable and fruitful. We are also thankful to all my colleagues for
their co-operation and support.
7/30/2019 A Project Report Submitted in Partial Fulfillment Of
7/14
a.
7
The existing system is manual. It maintains hugerecords for various departments. The book keepingprocedure istedious and is prompt to errors. Very careful handling isneededin manual systems. Even a very minute mistake may lead toimbalanced results. Manual processes results in waste oftime
and energy.In the earlier system the inventory report iscalculated manually. Whenever the accounting is to beperformed. That information must be extracted from the filesand the calculation will have to check by the Concernperson.The existing system leads to a lot of problems. Theexisting system consumed a lot of stationary cost. Daily
transactions are maintained in journals. These journalentries arethen posted on to the ledger accounts correspondingly.PROPOSED SYSTEM:This project integrates all Operation processes in thecomputer to synergies the important resources of MaterialandMoney. The department people can gather the needed
information at their desk without any manual burdens.This project reduces manual burdens andautomates the functions of various departments. In manualprocess, to decide the Room booking details, vacatingdetailshave to be verified each time. But with this project theseprocessare automatedandno manual checking is required.
7/30/2019 A Project Report Submitted in Partial Fulfillment Of
8/14
a.
8
This project reports can be automatically generated.The processes of creating reports are manually very tediouswhich are made very easy and automatically through thisproject. The reports produced helps in making managementdecision easily. With this project, since all information aboutprevious years is readily available, such reports can be
producedwithin few seconds.Thus the project eliminates many difficultiessaving a lot of time and energy, which could be used forsomeother constructive purpose towards the organizationssuccess.ADVANTAGES:
1. Less effort2. Quick reference3. Future enhancement
7/30/2019 A Project Report Submitted in Partial Fulfillment Of
9/14
a.
9
Feasibility is the determination of whether or not a project is worth doing.
The process followed in making this determination is called a feasibility
study. This type of study determines if a project can and should be taken.
This project has also undertaken in the scope of feasibility study. As in the
manual system there are so many deficiencies so to overcome from these
deficiencies new computerized system required. But whether the new
system is feasible in the realistic condition or not for this purpose we have
seen this project from different criterias. Many feasibility studies are
necessary for both users and analysts.
I. Technical feasibility
II. Operational feasibility
III. Economic feasibility
During technical analysis the technical merits of the system concept are
evaluated, at the same collecting additional information about
performance, reliability, maintainability and produce ability. In some cases,
it also includes a limited amount of research and design.
7/30/2019 A Project Report Submitted in Partial Fulfillment Of
10/14
a.
10
Technical analysis begins with an assessment of the viable of the proposed
system. What technologies are required to accomplish system function and
performance? What new method algorithms or processes are required and
what is their development risk? How will these technologies affect cost?
Technical feasibility is frequently the most difficult area to assess at this
stage of the product engineering process. Because objectives functions and
performance are somewhat hazy anything seems possible if the right
assumptions are made. It is essential that the process of analysis and
definition to be conducted in parallel with an assessment of technical
feasibility.
The considerations those are normally associated with technical feasibility
include:
:
Can the system element to design so that necessary function and
performance are achieved within the constraints uncovered during analysis?
Resource Availability: Are skilled staff available to develop the system
element in question are the other necessary resources (hardware and
software) available to build the system?
out by a small group of people who are familiar with It is
mainly related to human organizational and political aspects. The points to
be considered are:
1) What changes will be brought with the system?
7/30/2019 A Project Report Submitted in Partial Fulfillment Of
11/14
a.
11
2) What organizational structures are disturbed?
3) What new skills will be required?
Do the existing staff members have these skills? If not, can they be trained
in due course of time?
This feasibility study is carried information system techniques, who
understand the parts of the business that are relevant to the project and
are skilled in system analysis and design process.
From Office management point of view it is operationally feasible
because workload also reduced and they can utilize their valuable time
in other value addition activities. Proposed System is beneficial only if
that can termed into information system that will meet the operating
requirements of the organization. This test of feasibility asks if the
system will work when it si developed and installed.
This is an important question that would help us perceive any resistance
that might come form the end user community. Top management iscommitted to this project and is highly supportive. End user community
has
been suffering from the ill effects of the existing system and perceives
that the proposed system would ease their work. There was no resistance
from the employees for the proposed system as they were happy to learn
that the manual system is bight automated.
End user community was tiered getting a lashing from their management
that they are not providing right and the accurate information. They have
spent countless nights in re-working to providing accurate information.
However, the problem of timeliness still persists. The users of the proposed
7/30/2019 A Project Report Submitted in Partial Fulfillment Of
12/14
a.
12
system welcomed the change as they knew that the new system would
bring right, useful information as and when required.
:
Economic analysis is the most frequently used method for evaluating the
effectiveness of a candidate system. More commonly known as
cost/benefit analysis, the procedure is to determine the benefit s and
savings that are expected from a candidate system and compare them
with costs. If benefits outweigh costs, then the decision is made to design
and implement the system. This is an ongoing effort that improves in
accuracy at each phase of the system life cycle.
Cost benefit analysis is complicated by criteria that very with the
characteristics of the system to be developed the relative size of the
project and the expected return on investment desired as part of a
companys strategic plan. In addition many benefits derived from
computer based system are ignitable (e.g. better design quality through
iterative intimation, increase customer satisfaction throw programmable
control, and better business, decisions through reformatted and pre-
analysis sales data ). Direct quantities comparisons may be difficulty to
achieve.
7/30/2019 A Project Report Submitted in Partial Fulfillment Of
13/14
a.
13
Any Process that is only in the planning stage andneeds to be converted into reality requires three importantstepsnamely planning, analysis and design. All the above threedesignis very important. It is conversion of the ideas intoreality by putting together all ideas block and achievingrealism.
System design is the process of planning a new business orone to replace or complement an existing system. Itdescribeshow a system will meet the requirement identified during thesystem analysis. It also describes the data .Calculations tobeperformed and data stored desired. In short, system designstated how to accomplish the objectives. Many tools assist
system design, including data flow diagram.
7/30/2019 A Project Report Submitted in Partial Fulfillment Of
14/14
a.
1.An Integrated approach to Software Engineering :
Pankaj Jalote
2.The Complete Reference JAVA 2 : Herbert
Schildt
3.Software Engineering A practitioners approach :
Roger S. Pressman
Top Related