Hitachi-GE Nuclear Energy, Ltd. Proprietary Information
Working on Wylfa Newydd:
Construction
23rd July 2015
Katsunori Mizukami
Director, Procurement & Sourcing Department, Hitachi GE Nuclear Energy, Ltd.
XE-GD-0134 Rev.0
Hitachi-GE Nuclear Energy, Ltd. Proprietary Information
Contents
2
1. Introduction
2. Construction Supply Chain Development for UK-ABWR
3. Some Key Objectives
4. Major FY2015 Activities
5. Timeframe Expected
6. Abbreviations
Hitachi-GE Nuclear Energy, Ltd. Proprietary Information
1-1. Introduction: Power Business in Hitachi, Ltd. (Five Main Segments)
3
Renewables
Nuclear Power (HGNE) Transmission & Distribution
Services & Others
Remote
Monitoring
System
High Voltage
Transformer
Power Gen. Solutions
Gas Insulated
Switchgear
Wind Power Generation
Systems
Solar Power Generation
Systems
Maintenance Services, Nuclear Fuel Cycle, etc.
Preventive Maintenance of GTCC Plants, etc.
Collaboration with Mitsubishi-Hitachi Power Systems, Ltd. (since 2014)
Boiling Water Reactor Nuclear Power Plants (ABWR, ESBWR)
473B\ (Revenues)
FY2014
15%
15%
26%
21% 23%
Power Systems Company Energy Solutions Company[ ] Since Apr. 2015
Hitachi-GE Nuclear Energy, Ltd. Proprietary Information
1-2. Introduction: ABWR – A Proven Technology
4
Source: www.iaea.org/INPRO/.
Safe, Reliable & Cost Competitive
Constructed to Time & to Budget
Modular Construction Techniques
for Ease of Site Installation &
Commissioning
Licensed in Japan, Taiwan, USA
Operational Kashiwazaki-Kariwa-6/7 Hamaoka-5 Shika-2
Under Construction Lungmen (Taiwan) Shimane 3 Ohma
Hitachi-GE Nuclear Energy, Ltd. Proprietary Information
1-3. Introduction: Project Structure
5
Hitachi, Ltd.
(Investor)
Potential O&M Partners
Tier-1 Delivery Team
(led by HGNE & UK Team)
Horizon Nuclear Power (Site License Holder & Operator)
Tier-2 Engineering & Other Services
Tier-2 Construction (C&B + Installation)
Tier-2 Hardware Supply
GDA Requesting
Party
HGNE as Technology
Leader
GNF (Nuclear Fuel Supply)
Hitachi-GE Nuclear Energy, Ltd. Proprietary Information
6
2-1. Construction Supply Chain Development for UK-ABWR: Tier-1 Delivery Team
6
Tier-1 Delivery Team (Indicative)
Management Organisation (let by HGNE & UK Team)
Core Engineering, Manufacturing,
& Hardware Purchase
Construction & Bulk / Other
Hardware Purchase
-Engineering -RPV, RIN, RCCV -Pedestal, Drywell -Tb. / Gen. -SRV, MSIV -Safety Pipe -Main I & C -Main Trans., etc.
-RCIC Pump
-Filter Vent Equip.
-EDG
-SFP / DSP Lining
etc.
HGNE or
Hitachi, Ltd. UK or European
Suppliers
UK Construction
Subcontractors
UK or European
Suppliers
-Construction
-HGNE to directly
participate in
the installation of
core portion of
the reactor
island.
-Non Safety Piping & Valves -Various Tanks & Heat Exchangers -Cable Tray & Conduit -Radwaste Facilities, etc.
Hitachi-GE Nuclear Energy, Ltd. Proprietary Information
7
2-2. Construction Supply Chain Development for UK-ABWR: Tier-2 Joint Studies
Developing HGNE understanding of UK construction landscape
Have worked with a range of UK Tier 2 subcontractors , aiding ABWR
knowledge transfer and building effective long-term relationships
Three phases: JS1 (FY2013) / JS2 (FY2014) / JS3 (FY2015)
Tier-2 Construction Joint Studies
Joint Study Scope Joint Study Partners
Civil & Building
Balfour Beatty
ConstructEnergy JV
Kier | Bam JV
Mechanical, Electrical & HVAC Doosan Babcock
Cavendish Nuclear
Electrical Balfour Beatty Bailey JV
Boulting
Others M+W Hargreaves (HVAC)
Bilfinger (Mechanical Piping)
Hitachi-GE Nuclear Energy, Ltd. Proprietary Information
3. Some Key Objectives
8
1. Timely construction price firming for Horizon
Early determination of major Tier-2 subcontractors
Front-loaded construction engineering with the
reflection of UK specials, the progress of GDA and
various hardware engineering
Generation of detailed scheduling with manpower
loading
Maximising local contents
Value for money
2. Transfer of HGNE’s ABWR construction
principles
Inside Tier-1 team & among all parties under Tier-2
Development of construction management manual
Formation of the team of QA/QC Oversight
Hitachi-GE Nuclear Energy, Ltd. Proprietary Information
4. Major FY2015 Activities
9
1. Major Tier-2 Qualification by HGNE or
Tier-1
Joint Study-3 (by HGNE)
RFP Activities for Partial Scopes)(by HGNE)
Tier-2 Selection (by Tier-1)
Preliminary Scope Determination
High Level Commercial Terms Negotiation
Review on Safety Culture & Culture of Continuous
Improvements
Capacity & Right First Time Capability Review
Financial Review
Review on Compliance and Pending Legal Issues,
etc.
2. Sourcing for Project Control Third Parties
Such as for QA/QC Oversight
3. Start Sourcing Maintenance Partners
Not only for construction scope but also for a variety
of hardware supply by HGNE from Japan
Hitachi-GE Nuclear Energy, Ltd. Proprietary Information
10
5. Timeframes Expected
‘15 ‘16 ‘17 ‘18 ‘19 ‘20 ‘21 ‘22 ‘23 ‘24 ‘25
Co
nstr
ucti
on
Construction + Commissioning
GDA (Completed)
(First Unit)
Tie
r-1
Tie
r-2
& u
nd
er
Price Firming
Including Major
Tier-2 Selection
Step-4 Step-3
Full Work NTP
Project Preparation
Full Work NTP by Scope JS
• Final Commitment for Oder by Tier-1 over Major Tier-2 Subs
• Selection & Commitment for Order by Tier-1on other Important Tier-2s
• Tier-2 Commitment for Order with important Tier-3 and other Subs
Only with
Major
Tier-2
COD: first half of 2020’s
FNC
range
EPC Project Execution
EPC Project Execution
Limited Prep.
Work
Hitachi-GE Nuclear Energy, Ltd. Proprietary Information
6. Abbreviations
11
ABWR=Advanced Boiling Water Reactor
C&B=Civil & Buildings
COD=Commercial Operation Date
DSP=Dryer Separator Pool
EDG=Emergency Diesel Generator
EPC=Engineering, Procurement and
Construction
ESBWR=Economic Simplified Boiling Water
Reactor
FD=Fuel Loading
FID=Final Investment Decision
FNC=First Nuclear Construction
FY=Fiscal Year (April to the following March
for HGNE)
GNF=Global Nuclear Fuels Americas
I&C=Instrument & Control
JS=Joint Study
MSIV=Main Steam Isolation Valve
NTP=Notice to Proceed
RCCV=Reinforced Concrete Containment
Vessel
RCIC=Reactor Core Isolation Cooling
RFP=Request for Proposal
RIN=Reactor Internals
RPV=Reactor Pressure Vessel
SFP=Spent Fuel Pool
SRV=Safety Relief Valve
Hitachi-GE Nuclear Energy, Ltd. Proprietary Information
XE-GD-0134 Rev.0