8
LAKEGRANBURY
BRAZOSBEND
CITY OFGRANBURY
7
NORTH ELEVATEDSTORAGE TANK
1
WATERTREATMENTPLANT
6
KNOX 1 TANK
4
SCOUT CAMP TANK
2
EAST ELEVATEDSTORAGE TANK
9
567 LOOP N
HWY 377
PALU
XY H
WY
GLE
N R
OSE
HW
Y
FALL CREEK HWY
ACTON HWY
HWY 377TEMPLE
HALL HWY
PECK RD
OLD G
RANBU
RY H
WY
DAVIS RD
MEADOW
S DR
A
C
3
D
C
A
B
3
4
2
15
5
6
1
2
3
4
5
6
7
8
LEGEND
NEW WATER LINE IN UNDEVELOPED CITY OWNEDRIGHT-OF-WAY
NEW WATER LINE IN TxDOT RIGHT-OF-WAY
NEW WATER LINE IN CITY RIGHT-OF-WAY OREASEMENT
NEW WATER LINE IN PROPOSED EASEMENT(NOT YET ACQUIRED)
DEMARCATION BETWEENSECTION I AND SECTION II - PHASE A SCOUT CAMPTRANSMISSION IMPROVEMENTS
DEMARCATION BETWEENSECTION II - PHASE A AND SECTION II - PHASE BSCOUT CAMP TRANSMISSION IMPROVEMENTS
DEMARCATION BETWEENSECTION I AND SECTION III SCOUT CAMPTRANSMISSION IMPROVEMENTS
DEMARCATION BETWEENKNOX TANK WATER LINE ANDNEW HOSPITAL WATER LINE
CE KEYED LEGEND
WTP TRANSMISSION LINES
SECTION I SCOUT CAMP TRANSMISSION LINE
SECTION II - PHASE B SCOUT CAMP TRANSMISSION LINE
UPGRADED SCOUT CAMP PUMP STATIONIMPROVEMENTS
20" WATER LINE ATTACHED TO BRIDGE (TO REPLACEEXISTING 12-INCH)
20" KNOX TANK WATER LINE(TO REPLACE EXISTING 12-INCH)
NORTH ELEVATED TANK SITE VALVE IMPROVEMENTS
HWY 377 VALVE IMPROVEMENTS
MEANDER PUMP STATION VALVE IMPROVEMENTS9
A
B
C
D
EID KEYED LEGEND
SECTION III SCOUT CAMP TRANSMISSION LINE
SECTION II - PHASE A SCOUT CAMP TRANSMISSION LINE
NEW LAKEWOOD HILLS TIE-IN
MEANDER ELEVATED STORAGE TANK IMPROVEMENTS
NEW HOSPITAL WATER LINE
NEW 20" WATER LINE ON LAKE GRANBURY FLOOR(ALTERNATE LOCATION)
1
2
3
4
5
6
NSCALE IN FEET
2000 0 4000AERIAL MAP
PROJECT OVERVIEW(EID & CE PROJECT)
2017 DWSRFWATER SYSTEM IMPROVEMENTS
FOR THECITY OF GRANBURY
HOOD COUNTY, TEXAS
ENVIRONMENTAL AND CIVIL ENGINEERING402 Cedar Street325-698-5560 PE Firm Registration No. 1151
Abilene, Texas 79601
PG Firm Registration No. 50103RPLS Firm Registration Nos. 10011900 & 10007300
16-665101/06/2016