18.01.06 J. Jones (Imperial College London), Alt. GCT Mini-Meeting
Source Card Design Status and Plans
J. Jones (Imperial College London), Alt. GCT Mini-Meeting 218.01.06
Overview
Source Card Tasks Separate e/γ from jets Condense 2x68-way SCSI (RCT) 4x1.4Gbit/s optical fibre BC0 sync. checking (compare TTC with BC0 embedded in data) Autocalibrated delay to phase match data on different channels (if required) USB 2.0 interface for diagnostic/testing (borrowed from IDAQ-APVE) Swtiches data between channels to provide ‘split’ information to leaf cards
Extra features On-board temperature/status monitoring Read out either during gaps in data (via concentrator card)…or via USB Data capture from RCT (for debugging) Internal test pattern generation (up to 1024BX) for testing leaf cards, etc… Can (in theory) scale to 2 x required bandwidth (pin-compatible part)
J. Jones (Imperial College London), Alt. GCT Mini-Meeting 318.01.06
Board Layout (Preliminary) 6/8-layer 6U VME form factor USB 2.0 (Cypress SX2) TTCrx & QPLL 2xVHDCI SCSI for RCT input 4xOptical SFP output & SerDes Linear supplies for fast components Switch-mode (TI) for logic
Either: 2 x XC3S1000-4FT256 (~£80) Simpler design Longer latency
Or: 1 x Xilinx Spartan 3 4-8 x Xilinx Coolrunner-II CPLD More complex design Lower Latency
J. Jones (Imperial College London), Alt. GCT Mini-Meeting 418.01.06
Functional Issues (To Be Discussed)
Clock Distribution Direct from QPLL Split by dedicated clock buffer (made by TI) No PLL in splitter to minimise jitter Max skew ~500ps (OK for 80MHz)
SerDes TLK2501 seems like a good choice with bandwidth margin
ECL Termination Scheme Have a version done, but would like to discuss with Wisconsin first Similar to Bristol IM, with a few extra tweaks / options Use same buffers (they have wide common-mode range, +5V to -4V)
J. Jones (Imperial College London), Alt. GCT Mini-Meeting 518.01.06
Source Card Latency RCT->Leaf (Maximum Limit)
Madison Cable (quoted from datasheet)1.5ns/ftAssume 5ft max. length => 1.5x5 = 7.5ns delay
ECL Buffers 2.5ns-6ns (4ns typical)
FPGA/CPLDFPGA (XC3S1000): 5ns in IOBs, at a guess >5ns trace delay = 10nsCPLD (Coolrunner-II): 3.8ns-7.1ns total delay
SerDes38 [email protected] (625ps) = 23.75ns
PCB TrackingAssume 10-inch@300ps/inch = 3ns
Optical Fibre (20m)50ns-75ns?
Estimated Total:7.5+6+(3.8<->10)+23.75+3 = 44.05ns-50.25ns ~ 2BX + 2-3BX
J. Jones (Imperial College London), Alt. GCT Mini-Meeting 618.01.06
Source Card Skew (Maximum Limit)
Madison Cable (quoted from datasheet)
0.025ns/ft maximum
Assume 5ft max. length => 0.025x5 = 0.175ns skew
ECL Buffers
1ns max. (part-part)
FPGA/CPLD
Negligible skew (can be controlled)
SerDes
N/A
PCB Tracking
Can (will) be controlled
Estimated Total:
0.175+1 = 1.75ns << 12.5ns clock
J. Jones (Imperial College London), Alt. GCT Mini-Meeting 718.01.06
Build Plan & Price (Guess)
Schematic
ME
Layout
S. Greenwood (IC) – She’s starting now
Manufacture (awaiting quote from Cemgraft)
Have checked, they’re not too busy a.t.m.
Cemgraft (assembly/parts)
ExceptionPCB (PCB manufacture)
Good experience with complex high-speed boards in the past
18 RCT crates x 6 cables / 2 => 54 cards
Should be < £1000 / card => ~£60,000 for 60 required (with spares)
J. Jones (Imperial College London), Alt. GCT Mini-Meeting 818.01.06
Schedule
Schematic (1-2 months)
Aim to finish ASAP, but I’m kinda busy until 3am… (APVE, SLHC)
Preferrably draft end of January, but definitely end of February
Layout (2 months)
End of February latest
Parts (?)
Critical parts ordered by end of January
Not fancy parts
Should be able to get prototype parts by submission date
Firmware (2 months)
Me & A. Rose? (Some firmware adopted from IDAQ or written now)
Aim to prototype with testing end of March
I suspect this may be optimistic, parts will probably cause delays
March is contingency (leaf card is probably not available by then?)