Design problems: at the beginning, it is not clear how to attain the requirements
- Proposed problem: How to realise the idea technical object process.
- Production problem: Processing of material and creation of an object with prescribed functions.
- Diagnosis problem: Monitoring of the quality of the object at the time of preparation.
- Liquidation problem: Already at the time of production, it is essential to consider liquidation, optionally, recycling of the product after end of life.
Solution of design problem
Time
Pre-computer phase Computer phase
Application of computer technology
30352
Phases of the computerised solution of the design problem
- Computerised phase - prehistoric- introduction of computers in the solution of technical tasks;- numerically controlled machines and DNC machines in production.
- Computerised phase - historic- introduction of mini-computers in industry;- application of the end element method in the dimensioning of the design.
- Current phase- full-featured design of the technical object as a 3D object;- design of the object with regard to future functionality;- virtual prototyping.
- Future phase- increase in computer performance, artificial intelligence, virtual reality.
40352
Structure and character of classic engineering
Classic progress of product design runs according to the scheme:
1) Technical object design draft
2) Verification of the draft
3) Technological preparation of production
4) Planning of capacity
5) Testing of quality
6) Decision concerning series production
50352
Structure of concurrent engineering
- co-ordinated, systemic and team approach to innovation of engineering products;
- performance of related activities concurrently by a team of designers under the guidance of the project co-ordinator;
- the full knowledge management process is fully supported by information and computer technologies;
- one of the methods for attaining changes in corporate processes in the area of the designed process with production processes within reach.
60352
Tools of Concurrent Engineering
- QFD (Quality Function Deployment)
- DFA (Design for Assembly) - DFM (Design for Manufacturing) - DFE (Design for Environment)
- FMEA (Failure Mode and Effect Analysis)
70352
numerical production procedures, content chain of CAD design, CAM production programming, CNC
machining and CAQ measurement
short production time
high production quality
fundamental services for change management of the product and its repairs after wear in series
production
80352
- For concurrent performance of consequential activities, it is essential to ensure easy projection of the results of subsequent activities in preceding activities.
- To this purpose, an object model of the product is created in a consistently parametric description already at the ideal design and industrial design stage.
- This abstract model and its functional computer simulation make it possible to replace the phase of experimental verification of technology.
90352
Problem of concurrent engineering – need for high computer performance (models consisting of millions of polygons).
Effort at display of only the visible part, function of the invisible objects, various levels of object detail after rendering.
PDM (Product Data Management) – storage, update and sharing of data about documents that contain the precise product specifications;
- better hand-over of production documentation between the individual specialised suppliers.
100352
Labour
- The basic aspect of project success is mainly the conduct of the workers involved in the project.
- An attempt is made to change it by means of created methodology, proposed processes, perfected tools, but also application of new principles.
BASIC ATYPICAL MANIFESTATIONS:• Information about the planned duration of the activity, apart
from the essential parts, also includes a certain time reserve.• It is rare that the activity result is transferred onwards before
the planned deadline (Parkinson's Project Law: „The least duration of the activity is as long as its time interval.“)
110352
• The activity is most often started at the last moment (Student Syndrome – the same principle as applies to preparation for examinations). The sources have many objective reasons over which they do not have much influence.
• The people are mostly pessimistic concerning the availability of sources in the planned term.
120352
Design for X (DFX) Design for X (DFX) is one of the most efficient approaches
to the realisation of Concurrent Engineering. It targets a limited number, let's say, 7 +/- 2, substantial elements at once. This makes it possible to make best use of the available resources.
DFA , DFM , DFE , DFS ….
Where is it applied?
- Where it is suitable, it is never too late, it is never too early, it is only a matter of where it is helpful.
product design stages
lifecycle
140352
Application of DFX• Product analysis - collect and clarify information, which concern the products or product.
• Process analysis - applies to the collection, processing and presentation of specific process
data.
• Measuring of performance - determination of interaction in a form that corresponds with the
performance indicators.
• Emphasis by means of Benchmarking - the objective is to understand whether the monitored product or process
is good or not and what factors contribute to this. Benchmarking is targeted at setting the standards and comparison of the performance indicators of the tested product or process with these standards.
150352
• Diagnosis for improvement - diagnosis of the causes of the weakness (or strength) of certain
areas.
• Recommendation of changes - scrutiny of the largest number of possible improvements in a given
area. The precision of product or process re-design depends on specific circumstances.
• Setting of priorities - the objective of this step is to determine
the vital areas for further research and solve immediate trivial issues, such that, attention may be focussed on important problems and hopeful solutions.
IMPROVED MODELS
160352
Quality Policy
Company target: Make a product that is environmental-friendly and with the features that fulfil, but also surpass the expectations of the customers. It wants to enchant the customers in such a way as for them to return to it with confidence.
170352
Certification of the Quality System-Proving that the company quality system complies with ISO 9000 international standards.
Progress of certification:Phase 1 – Proving the validity of the applied documentation and solution of all
ISO 9000 requirements.Phase 2 – Compliance with the rules in practice. Each employees may be asked about the objectives and principles of quality assurance. The quality system is further verified and perfected by means of internal (systemic) audits. The certificate is withdrawn upon ascertaining any serious deficiencies.
180352
Quality Audit
Systém Audit(Orientation on the systém)
Process Audit(Orientation on the
production processes)
Product Audit(Orientation on the product)
Testing of the individual quality assurance systém elements in terms of their
existence and applicability in practice.
Testing of the given procedures and working
processes in terms of compliance with them and
their purpose.
Test of the given products (parts, assemblies) as to
whether they comply with the pre-determined quality
features.
190352
Methods for search of ideas- Brainstorming/Brain writing
Purpose: Acquisition of the largest number of ideas.Brainstorming – ideas taken down by the head of the group.Brain writing – each participant writes down his ideas on open cards.
Principles:Participation of only competent persons (optimum 6 - 8), duration 20 - 30 minutes; several people should not talk at the same time and it is forbidden to criticise other ideas, or advance reasons in support of own ideas.
The result of the meeting is sent further for processing.
200352
The Ishikawa diagram – fishbone diagram
Principle - The diagram is a graphic representation of various factors, which
influence the consequence, i.e. for instance, quality of a certain process and hence, also the resultant process product.
Advantages- search for the most probable causes of the problem, classification and
categorisation of the possible causes. Procedure identical to brainstorming;
- the heterogeneity and not the quantity of the possible causes is decisive. An omission may have a great effect on the quality.
210352
Fluctuation of the length of the cut
pieces
People
Inadequate training
Inadequate communication
Changing operators
MaterialEnvironmentMethod
Incorrect setting of steel type
Non-uniform conveyer speed
The operators have no direct control
Declining steel temperature
Steel quality
Obsolete machines
Maintenance
Machines
Inadequate number of precision machines
Practical demonstration
220352
1. Write the solution topic on the upper edge of a large sheet of paper.2. Draw a horizontal line of the through the centre of the sheet
(backbone of diagram) and enter the consequence in the right part of the diagram (substance of the problem).
3. The group members must agree on the basic areas in which we shall search for these causes. These may, for instance, be Material, Equipment, Environment, Methods, People.
4. The agreed areas for possible causes are marked on the diagram as the major branch leading to the backbone.
5. Each proposal entered in the appropriate area as an auxiliary branch leading to the main branch.
6. We further specify all the general causes.7. The individual workers as per own opinion designate 3 main
causes, which are eventually marked with a points value.8. Based on the evaluation allocated by all the participants, the
main assumed causes that must mainly be solved are determined.
230352