OpenArchitecturalDesignCompetition fortheDesignofDESCOHeadOfficeBuilding
DHAKAELECTRICSUPPLYCOMPANYLIMITED(DESCO)inAssociationwithInstituteofArchitectsBangladeshOPENARCHITECTURALDESIGNCOMPETITIONfortheDesignofDESCOHeadOfficeBuildingatPlotno49/A,DhakaMymensinghRoad,Nikunja(North),Khilkhet,Dhaka.
COMPETITIONBRIEFTwostaged,National,Anonymousarchitecturaldesigncompetition: JointlyOrganizedby InstituteofArchitectsBangladesh (IAB)&DhakaElectricSupplyCompanyLimited(DESCO).
ARCHITECTURALCONTRIBUTION
Competitionsareauniqueway toprovideopportunity to thearchitects forexperimentation,brain storming, thoughtprovocationandcreativity. It is amotivationforarchitectstosearchanswersfortheirquestions,builduptheirunderstandingaboutsociety,humanbeing,context,economyetc.,andthusreflectingtheirthoughtsintophysicalenvironmentthrougharchitecturaldepiction.Entrantsarefreetoexploreasfarastheyarewillingtopushthebarsetoutforthecompetition,butnotbreakingthem,toavoiddisqualification.
Page.2
OpenArchitecturalDesignCompetition fortheDesignofDESCOHeadOfficeBuilding
ABOUTDHAKAELECTRICSUPPLYCOMPANYLIMITED(DESCO)HISTORYIn theprevailing socioeconomic andpolitical environment it is a great challenge in earning customer confidence for apublic sectorutility company InBangladesh.Butdespiteallrealitiesandconfrontingallchallenges,DhakaElectricitySupplyCompanyLtd(DESCO)iscommittedtoachievethedistinctionoftheleadingmostcompanyinthecontextofearningcustomersconfidence.TheemergenceofelectricityuseinourpartoftheworldwhereBangladeshissituateddatesback140years.ActuallyelectricitycamehereonlytwoyearsaftertheusestartedinerstwhileKolkata.ABritishcompanyon24June1879firstsetthemillstoneofelectricityuseinKolkata.Graduallyafterwardslimitedscaleuseof electricity started indifferentpartsof undivided India.But the first formaluseof electricity started from the first thermalpowerplantbyCalcuttaElectricitySupplyCorporation(CESC)inApril1899underthepatronageofLordCurzon.NawabofDhakaintroducedelectricityinBangladeshin1901.OnlyAhsanManzilusedtoenjoytheprivilegeofusingelectricityinitially.Electricityuseforgeneralcitizensstartedin1930.AcompanynamedDEVCOwascreatedforpowerdistributioninDhaka.Theyusedtogeneratepowerintheirownplantand supply. It continued till 1947. Pakistan government took it over in 1957. In 1947, other thanDhaka 17 other districtswere partially under powergeneration and distribution coverage. After creation ofWater and Power Development Board in 1959 power generation and distribution came underexclusivegovernmentcontrol.AfterindependenceofBangladesh,WAPDAwasdividedintotwoparts.Theresponsibilityofpowergenerationanddistributionwasvestedonthepowerwing of WAPDA. From 1972 till 1991, BPDB was exclusively responsible for power distribution in the entire country. After the creation of RuralElectrificationBoard(REB)in1977thetaskofsupplyingpowerinruralareaswasgraduallyhandedovertoREB.NowREBisdischargingthisresponsibilitythrough72PollyBidyutSamity(PBS).From19711991thePowerSectorwasdependentonloansandassistanceofdevelopmentpartnersanddonoragencies.Butchangingparadigminglobalscenario generated encouragement among investment communities for investment in Bangladesh power sector. But at the same time donor agenciesofferedfinancialassistanceattachingvariouscovenantsforreformsandrestructuring.Onthebackdropofabove,DhakaElectricSupplyAuthority(DESA)washandedovertheresponsibilityfromBPDBforsupplyingpowerinDhakaMetropolisandadjacentareas(Narsingdi,Gazipur,Narayanganj,MunshiganjandManikganj).DESAwascreatedwith threemajorobjectives. Thesewere:Reducing staggering system loss, increase revenuecollectionandensuringbettercustomerservices.DESAwascreatedthroughaPresidentialOrderin1990andstartedoperationin1991.
Page.3
OpenArchitecturalDesignCompetition fortheDesignofDESCOHeadOfficeBuilding
After5yearsofDESA,anewpublicsectorcompanynamedDhakaElectricSupplyCompanyLtd(DESCO)wascreatedin1996underCompanyAct1994,withasmallareaMirpurwashandedovertoDESCOfromDESA.DESCOstartedoperationaftertwoyearsofcreationwithonly90MWpowerdistributionand71,161customers.Nowin2015,DESCOsupplieselectricitytoalmost7,05,000customers.Startingwithasystemlossofabout47%ithasmanagedtobringitdownto8.37%.Itisnowafinanciallyviable,profitearningPublicUtilityCompany.DESCO is working tomeet the future demand, better customer service expectation of the customer andmodern power distribution system by 2030expecting2.8millionofconsumers.VISION&MISSIONVisionTobeanenablerofeconomicdevelopmentandsocialprogressbyprovidingsafe,reliableandsustainableelectricity.MissionBringing comfort to customers, supporting business and commerce and building strong communities. Achieving andmaintaining the highest degree ofefficiency,reliabilityandresponsivenessforvarietyofcustomers.
CORPORATEPHILOSOPHY
DESCOwillachievetheirvisionthroughtheircorecorporateprinciple.Safety:Placingthesafetyofourcommunities,customersandemployeesfirst;CustomerFocus:Providingsuperiorservicetohelpcustomersmoreeffectivelymanagetheiruseofelectricity;OperationalExcellence:Incorporatingcontinuousimprovementtodeliversafeanddependableelectricityataffordableprices;PerformanceDrivenCulture:Fosteringastrongvaluesandperformancebasedculturedesignedtoattract,developandretainbesttalents.
Page.4
OpenArchitecturalDesignCompetition fortheDesignofDESCOHeadOfficeBuilding
ABOUTCOMPETITIONCRITERIA Thearchitecturaldesigncompetitionwillbeanopenprocedureintwostages,whichwillhighlightoutstanding
intermsofidea,sustainableandmostinnovativegreenBuildingsolution.ProjectCost:ApproximatelyTk.100crore.FirstStage:ThefirststageconsistsinfindinganadequateapproachtotheSpecificationsandprogramofthecompetition.ThisstagemustenabletheCommissioningOrganizationtoassess,howtheprojectwillbeassimilatedonsite,itsarchitecturalquality,theextenttowhichtheprojectmeetstheobjectivesoftheprogram,howtheprojectdealswith the issue of functionality and access, cost effective use of space, energy efficiency, local resources andsustainabilitywithuniversal/handicappedaccessfacilities.Sixentrants(Maximum)willbeinvitedtoparticipateinthesecondstage.SecondStage:ThesecondstagemustallowtheselectedcandidatestodeveloptheirprojectsonthebasisoftheJuryreportandanindividualassessment.Participantswillsubmitapreliminaryestimatedcostoftheproject.
SITE Plot49/A,Nikunja(North),Khilkhet,DhakaSizeoftheland:40.25katha(28,980sq.ft.)North&South:161ft.;East&West:180ft.HeightLimit:146ft.asperCivilAviationclearance.
PRIZES FirstStage:NoprizesshallbeawardedintheFirstStage,buteachofthecompetitors(maximumsix)selectedfortheSecondStageshallreceiveanhonorariumofTk.2,50,000.00(TakaTwoLacFiftyThousandOnly).SecondStage:1stprize:Certificate+Tk.5,00,000.00(TakaFiveLacOnly)2ndprize:Certificate+ACrestfromDESCO3rdprize:Certificate+ACrestfromDESCO
Page.5
OpenArchitecturalDesignCompetition fortheDesignofDESCOHeadOfficeBuilding
JURORS 1.Ar.NahasAhmedKhalil2.Ar.ABMMahbubulMalik3.Ar.MohammadFoyezUllah4.Mr.Md.AbdullahAlMasudChowdhury5.Engr.Md.RabiulHasnat
ELIGIBILITY 1.TheeligibilityoftheArchitect(TeamLeader)willbeaccordingtoguidelinesoftheImaratNirmanBidhimala,2008.2.Everyparticipantshouldbeanarchitectrepresentinganarchitecturalconsultancyfirm.
REGISTRATION 1.SUBMITRegistrationFeetoIABofficeandobtainaRegistrationNumberfromDec26,2015toJan10,2016.RegistrationfeeTK3,000/(nonrefundable)2.DownloadRegistrationFormfromwww.iab.com.bd3.FilluptheRegistrationFormandmailtodesco.iabcompetition@iab.com.bd4.Oneregisteredparticipantcansubmitonlyoneproposal.
QUERIES 1.DownloadQueriesFormfromwww.iab.com.bd2.Fillupandmailtodesco.iabcompetition@iab.com.bd
TIMELINE FirstStage:AnnouncementinNewspaper Dec14,2015CORRIGENDUM(Announcement) Dec24,2015Registrationopens Dec26,2015Jan10,2016ReceivingQueries Jan07,2016 Jan13,2016ReplytoQueriesbyemail Jan16,2016DesignSubmission Mar10,2016JuryProceedings,AnnouncementofResultsandExhibitionopening Mar12,2016Mar16,2016SecondStage:LettertoShortListedFirms Mar14,2016HandingOveroftheJury'sFirstStageReport Mar18,2016DesignSubmission May07,2016JuryProceedingsandAnnouncementofResult May09,,2016
SUBMISSIONVENUE WillbeInformedlater.PUBLICATION TheremaybeaPublicationwithalltheEntries.
Page.6
OpenArchitecturalDesignCompetition fortheDesignofDESCOHeadOfficeBuilding
SUBMISSIONREQUIREMENTCHECKLISTFORFIRSTSTAGE Items Quantity/Specifications Remarks 1 DECLARATIONFORM Oneno. DownloadtheDECLARATIONFORMfromWebsite
www.iab.com.bd,fillup,print&SignbeforesubmitDownloadtheWhiteEnvelop,TypeReg.No.(xxxxx)&print.SubmittheDECLARATIONFORMonSubmissiondayinTheWhiteEnvelope.
2 SPACEPROGRAMCHECKLIST Oneno. DownloadtheCHARTfromWebsite,fillup&printPUTyourRegistrationNo.atthecenterofthebackofthepagebeforesubmit.
3 DRAWINGSHEETS 3Sheets,Landscape,A1size Page1:forConcept
scale=1:200 Page2:forDrawingsPlans,Elevations,SectionsShowingNorthUpWard Page3:for3Dimages,Perspective
4 MODEL Oneno.Base:24x24Sizescale_1:200showingNorthUpward
5 REPORT 4to6pages,Portrait,A4sizeFontArial10pt
6 CD Oneno.containing1.softcopyofconceptualdrawingand3Dimage2.photosofmodel3.report
SubmissionRequirementCheckListforSecondStagewillbeinformedlatter.Notes:A25.4mmx25.4mmblankboxtobeput,25.4mmoffsetfromtheUpperRightcorneroftheDrawingsheets,Modeltobeplaced.TheNorthsigntobeputontheLowerRightcorner.TheNorthtobedirectedtowardsUpwardinalldrawings&model.
Page.7
OpenArchitecturalDesignCompetition fortheDesignofDESCOHeadOfficeBuilding
DISQUALIFICATION Anentryorentrantwillbedisqualifiedif
TheydonotcomplywiththeEligibilityRequirements. TheydonotcomplywiththeEntryRequirements. Theentryisreceivedafterthelodgmentdeadline. TheentrantimproperlyattemptstoinfluencethedecisionoftheJury. The entrant has communicated directly with any member of the Jury, employee involved in the competition, or any coordinator or advisors
engagedbytheIAB/DESCOforthePurposesofthecompetition. Anyname,signorsymbolondrawings,modeloranysubmittalthathelpstotraceTheparticipantwilldisqualifytheentry. AnydeviationoftheNotesabovemaycausedisqualification.
LEGALANDREGULATORYPRINCIPLES
Entry in this competition implies agreement by theOrganizer (IAB andDESCO), the Jury and the candidates to abide by the terms of the competitionregulations,specificationsandprogram,andtherepliesgiventoEntrants'queries.SubmissionofanentryconstitutesacceptanceofthedecisionsoftheJuryandthedecisionofDESCO,whichshallbefinal.TheCommissioningOrganizationundertakestofollowanimpartialprocedurefortheselectionofcandidates.Noappealshallbeadmitted.Byparticipatinginthecompetition,candidatesconfirmtheiracceptanceoftheseregulations,specificationsandprogram,andaffirmthattheyareacquaintedwithandwillstrictlyabidebytheTimetableforthesuccessivestages.
PROPRIETY
Competitors(oranyrepresentativeofacompetitor)mustnotatanytimebeforetheJurymakesfinalannouncementofawinner,contactorintervieworattempttointerviewortodiscussortoattempttodiscusswithJurymembers,employees,Competitioncoordinatorandauthorizedrepresentatives,anymatteraboutthecompetitionoranyotherentrantSubmittedinresponsetoThiscompetition.Thejuryreservestherighttorejectanyentrylodgedbyacompetitorwhichcontravenesthiscondition.
COPYRIGHT
EntrantsretaincopyrighttotheirentriesbutwillgiveIABandDESCOaperpetual,royaltyfreelicensetousetheirentriesforthefollowing:Informing and consulting the community through an exhibition. Documenting the competitive process for internal reporting, public notification; andInclusiononIABwebsiteorinanypublicationpreparedbytheIABonthecompetitionProcessandoutcomes.
Page.8
OpenArchitecturalDesignCompetition fortheDesignofDESCOHeadOfficeBuilding
PROGRAMPleaseDOWNLOADtheOrganogramandFunctionalSpaceRequirementChecklistfromwww.iab.com.bd
GeneralFacilitiesandRequirements:
OverallCapacityandFloorareaoftheComplex:ComplexshallbeasperRAJUKapprovedLayoutplanwithwellairventilatedsystemandthereshallbecapacityofofficearrangementsofheadofficeofficersandstaffsofDESCOtocarryouttheirofficialactivities.Allfacilityistodevelopedwithin;
MaximumcoverageoflandforthebuildingasperRAJUKruleandcosteffectiveuseofspace. Carparkingandutilityfacilityin03nos.Basement. Lobby:Centrallocationforbuildingdirectory,schedules,andgeneralinformation. Bank,ATM,VendingStation,Waitingroom,Reception,OfficeRoomforbuildingmaintenance,ConvenienceStore,Kiosk,orVendingMachines
inthegroundfloor
DESCOOFFICE
ManagingDirectorsOffice ManagingDirectorOfficewithmeetingarrangementsfor20persons,spaceforrestingandprayer,washroom/toiletfacilitiesinafloor.
ExecutiveDirectorsOffice
OfficeoftheExecutiveDirectors(AdministrationandHR) OfficeoftheExecutiveDirectors(Procurement) OfficeoftheExecutiveDirectors(Operation) OfficeoftheExecutiveDirectors(Engineering) OfficeoftheExecutiveDirectors(Finance)RoomsforDirectorswithmeetingarrangementfor12persons,spaceforrestingandprayer,washroom/toiletfacilitiesinafloor. StaffOfficerofManagingDirectorandExecutiveDirectorsroom. MeetingRoom:acommonmeetingroomofsittingarrangementsof15Personsateachdirectorate Waitingspace:visitorsroomintheManagingDirectorsandExecutiveDirectorsfloors
Page.9
OpenArchitecturalDesignCompetition fortheDesignofDESCOHeadOfficeBuilding
Officeforseniorofficers(ChiefEngineers/GeneralManagers):OfficeroomsforChiefEngineers/GeneralManagerswitharrangementsforrest,prayerandtoiletfacilities.
Officeforseniorofficials: SuperintendingEngineers/DeputyGeneralManagersofficewithtoiletfacilities ExecutiveEngineers/Managersofficewithtoiletfacilities SubdivisionalEngineers/DeputyManagersoffice. AssistantEngineer/AssistantManager. Officeforothersofficialsshallbeinopenspacewithcubicalsystemandcommontoiletfacilities. OpenWorkingspaceforsupportingstaffs:inopenspaceadjacenttoconcernofficer,andwithcommontoiletfacilities. Waitingspace:visitorsroomintheManagingDirectorsandExecutiveDirectorsfloors GeneralStorage:Foritemssuchasstationery,equipment,andinstructionalmaterials.
ManagingDirector/ExecutiveDirector/SeniorofficersroomsizeshallbearrangedandmaintainonthebasisoftheRankandLevelaccordingly.
DESCObuildingshouldincorporateanumberofspacetypestomeettheneedsofstaffandvisitors.ItmustbeabletoaccommodatethespecificspaceandequipmentneedsoftheDESCO.Specialattentionshouldbemadetotheentryspaces,conferenceroomsandotherareaswithpublicaccess.
DESCOBOARDANDCHAIRMANSOFFICE:
BoardChairmansofficewithresting,prayerandwashroom/toiletfacilities. RoomforBoardDirectors:Acommonroom/LoungeshallbeprovidedforthemembersoftheBoardwithIndividualcabinetfacilityandwash
room/toiletfacilities. BoardMeetingRoom:arrangementsof50persons intheBoardRoomwithOtherfacilities includespaceforsupportingstaff,toiletfacilities,
spacefordocumentpreservationandothers. OfficeoftheCompanySecretary(GeneralManagerwitharrangementsforrestingandprayer,toiletfacilities. Officeforotherofficials:providedinopenspacecubicalsystemandcommontoiletfacilities. Sittingarrangementsforsupportingstaffsshallbeprovidedinopenspaceadjacenttoconcernofficerwithcommontoiletfacilities. GeneralStorage:Foritemssuchasstationery,equipment,andinstructionalmaterials.
Page.10
OpenArchitecturalDesignCompetition fortheDesignofDESCOHeadOfficeBuilding
Seniorofficer's/othersofficialroomssizeandfacilitiesshallbearrangedandmaintainonthebasisoftheRankandlevelaccordingly.
Conference/MultiPurpose/SeminarHall:
MultiPurposeHall:AMultipurposeHallofcapacityaround1,000personswithperfectionandpantryspaceandbackstagefacilities.shall SeminarRoom:SeminarRoomshallbeofcapacityupto250peoplesperfectionandpantryspace.Thereshallberearrangementsfacilitiesof
thesizeoftheroom.
GuestHouse:
Buildingshallhaveaccommodationfor04VIPGuestsuiteswithallfacilities.
OthersFacilities:
PrayerRoom:Thereshallbeseparateprayerroomformaleandfemale(male175,female25)personsatatime. CommonToilet:Thereshallbesufficientcommontoilet/washfacilitiesateachfloorindifferentside/cornerswithseparateMaleandFemale
toiletoptions. HealthClub&GYM:GYMfacilities.IndoorHealthZone,MedicalCentreandrelevantfacilitiespreferablyinthesamefloor. Child/BabyCareCentre:Ababycareroomandfacilityforthefemaleemployees(1015babies) Cafeteria/DiningHall:Thereshallbeonecafeteria/DinningforOfficerswithmaximumcapacityof50personsandaVIPCuisine.Onecafeteria
forStaffswithmaximumcapacityof70persons.KitchenandServicesroomshallbeprovidedfortheCafeterias. KitchenandServicesRoom:KitchenandServicesspaceshallbefortheinthedifferentfloors. Library andArchive Facilities: There shall be commonarchiveand library in the same floorof thebuilding, there shallbe arrangements for
documentpreservationforeachdivision/department. AccessofCorridor:Congestedcorridorsarenotencouraged.Sufficientlightingandventilationsystemsshallbeincorporatedforthecorridor. EntryandExitoptionsforvehicles:Thereshallbeseparateentryandexitoptionsforvehiclesandpedestrians. Generator:StandbyGeneratorshallbeprovidedforPump,Lift,Airconditions,safety security system and some emergency lights at
corridors.Othergenerallightsshallbeoperatedbysolarpowersysteminthedaytime.
Page.11
OpenArchitecturalDesignCompetition fortheDesignofDESCOHeadOfficeBuilding
CommunicationSystem:spaceandprovisionsforTelephone,PABX,Internet,andOpticalFibercableconnectivityforthecomplex. SafetyandSecurity:Sufficientsecurityarrangementsshallbeprovided for thecomplex.Onesecurityand firecontrol room,(the firefighting
system,accesscontrolandothers.Closedcircuitcameraforbothdaynightsystemsshallbeincorporate). ProvisionforSurfaceParkingAreas. Airconditioning:Space forCentralAirconditioningsystem.TheCompressor,Chiller,Pumps,Energymanagementsystem(substation,switch
gear,PFIplant,metering,Energycontrollingsystemetc.)Andcoolingtower. Basement:Thereshallbe03(three)nos.ofBasementatthebuilding. SewerageTreatmentSystem:ModernSewerageTreatmentSystemshallbeprovidedforthecomplex.
ElectricalSubstationandGeneratorroommaybeplacedatbasement01andcarParkingshallbeplacedatothertwobasements.Thereshallbedrivers
waitingroominthebasement.
SCADAandDataCenter:
SupervisoryControlDataAcquisition(SCADA):Around8000(eightthousandsft)offloorspaceshouldbeprovidedtoaccommodatetheSCADAsystemandcontrolroomwithappropriatefloorheight.
Data Center: Around 4000(Four thousand sft) of floor space at suitable floor should be provided to accommodate the Data Center withappropriatefloorheight.
Separateaccessfortherentedoutoffices:SeparateentryandexitfacilitiesshouldbeprovidedfortheotherRentedoutofficeareas. WallDigitalDisplay:AbigDigitaldisplayscreenontheouterwallshouldbeprovidedatanysuitableposition.
OperationandMaintenanceSpaces:
ServerroomandComputer/InformationTechnology(IT)Closets. MaintenanceClosets. GeneralStorage:Foritemssuchasstationery,equipment,andinstructionalmaterials.
RentableOfficeSpace:
DESCOwillrentouttheirextraSpace Maintainingall theenvironmentalandsustainableconsideration,natural lighting,naturalventilation, spatial relationshipof IndoorandOut
DoorSpacewouldbeappreciable.
Page.12
OpenArchitecturalDesignCompetition fortheDesignofDESCOHeadOfficeBuilding
SITE,LANDAREA&FARAddress:Plotno49/A,DhakaMymensinghRoad,Nikunja(North),Khilkhet,Dhaka.DhakaMymensinghroadontheEastside.Sizeoftheland:40.25katha(28,980sq.ft.)North&South:161ft.;East&West:180ft.HeightLimit:146ft.asperCivilAviationclearance.
Page.13
OpenArchitecturalDesignCompetition fortheDesignofDESCOHeadOfficeBuilding
FARCalculationTotalLandarea : 40.25katha(28,980sq.ft.)Existingroadwidth : 300ft(100M)ApplicableFAR : NRMaximumgroundcoverage : 50%ofthetotallandMaximumBuildingHeight: 146MaximumBuiltArea:
Page.14
OpenArchitecturalDesignCompetition fortheDesignofDESCOHeadOfficeBuilding
TERMS&CONDITIONSAFTERTHEFINALRESULT
SELECTIONOFARCHITECT&FIRM
1. TheArchitecturalFirm(consistsofArchitect/Architects)winningtheFirstPrizeshallbeformallyappointedbyDESCOinaccordancewiththeAgreementalongwithConditionsofEngagementsof IABunlessandthe fees forArchitectural,Structural,Electrical&MechanicalandPlumbingConsultancyservicesshallbe5.30%(FivepointThreezeropercent)ofthetotalconstructioncost(ThetotalfeeswillbeconsideredincludingVATandAIT),unlessthereisanyvalidreasontodeclinesuchappointmentundertheIABCodeofEthicsandProfessionalConductortheIABCompetitionRegulations.Insuchcase,theArchitect/ArchitecturalFirmofthe2ndbestawardeddesignshallbeappointedasthearchitectandthearchitect,ifrequired,shallhavetomakeanyreasonablemodificationstohis/herdesigninaccordancewiththerecommendationsofthejury.Ifthesameprocessfailsforthe2ndbestdesign,thenthe3rdbestawardeddesignshallbeappointedasthearchitect,andshallhavetomakemodificationsinthesameway,ifrequired.
2. DESCOcanappointthefirstprizewinnerforFulltimesupervisionoftheprojectwithafeeupto2.2%(TwopointTwopercent)(ThetotalfeeswillbeconsideredincludingVATandAIT)ofthetotalprojectcostorreservestherighttoappointanyotherwinner(shortlistedforsecondstage)ratherthanthefirstprizewinnerforthisjobwiththesamefee.
3. DESCOmayappointthefirstprizewinnerfortheirofficeInteriorDesignoftheprojectorreservestherighttoappointanyotherwinner(shortlistedforsecondstage)ratherthanthefirstprizewinnerforthisjob.Feeforthisjobwillbefixedupontheagreementofbothparties.
4. ThefirstprizewinnersprizemoneyshallbeconsideredasAdvancePaymenttothecommissionedarchitect(s)andshallbeadjustedwiththewinningArchitectstotalfee.
5. Ifthejuryisnotsatisfiedabouttheabilityofthe1stprizewinningarchitecttocarryouttheproject,theyshall,inconsultationwiththewinner,adviseDESCOthatanestablishedArchitect/Consultantacceptabletothepromoterbeappointedincollaborationwiththe1stprizewinnerincarryingoutthework.
6. AnydisputeonthetermsandconditionsofappointmentpriortosigningoftheAgreementshallbesettledbyapersonnominatedbyIAB,ifnecessary,asarbitratorbetweenDESCOandthewinner.ThedecisionoftheArbitratorshallbefinalandbindingonDESCO&theWinner.
7. If,foranyunavoidablereason,DESCOwantstocancelthecompetitionaftertheentriesarereceived,theentrieswillbeevaluated&theprizeswillbeawarded.Insuchcase,thecopyrightandauthorshipofthedesignswillremainwiththerespectivearchitectsandAMIshallreturnallthesubmitteddesignstothem.NoneofthesubmitteddesignscanbeexecutedbyAMIoranyotherarchitectappointedbyDESCO.
Page.15
OpenArchitecturalDesignCompetition fortheDesignofDESCOHeadOfficeBuilding
EVALUATIONCRITERIA
Criteria Achievements Remarks
A.Achievementintermsoffreshnessofideas&architecturalthinking
B. Sustainability
1.EnergyEfficiency:
2.EcologicalIssues:
3.SpatialIssues:
C. Functional&Aestheticissues
Page.16
OpenArchitecturalDesignCompetition fortheDesignofDESCOHeadOfficeBuilding
CALENDAR
Su M T W Th F Sa Su M T W Th F Sa Su M T W Th F Sa Su M T W Th F Sa Su M T W Th F Sa Su
December,2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31January,2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31February,2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29March,2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31April,2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30May,2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31June,2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30July,2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
RegistrationOpen AnswertoQuery JuryResultExhibition
ReceivinigQuery DesignSubmission