October 26, 1988 t
Docket No. 50-601 and 50-605ProjectNos. 669, 675, and 676
MEMORANDUM FOR: L. Shao, DirectorDivir. ion of Engineering and
System Technology, NRR
B. Grimes, DirectorDivision of Reactor Inspection
and Safeguards, NRR
F. Congel, DirectorDivision of Radiation Protection
and Emergency Preparedness, NRR
J. Roe, DirectorDivision of Licensee Performance and
Quality Evaluation NRR
R. W. Houston, DirectorDivision of Safety Issue Resolution, RES
B. Sheron, Director ,
Division of Systems Research, RES
FROM: Charles L. Miller, DirectorStandardization and Non-Power
Reactor Project Directorate '
Division of Reactor Projects III, !Y,'
Y and Special Projects, NRR
SUBJECT: STATUS REPORT ON STANDARD PLANT DESIGN TECHNICAL REVIEWS i
Attached is the October status report con: erring the current rovirw milestonesfor each of the standard plant projects (EPRI, ABWR, RESAft SP/90, and CE'
System 80+).
Note the "Due Date" column reflects dates established in the January 25, 1938'
"Revised Prograin Plan for Standard Plant Reviews" or dates fer which modifica.tion was agreed to by PDSNP and the review branch.
CONTACT:1 T. Kenyon, NRR/PDSNP [492-1120
ranua%1 i i'
A
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ .
: :-
..
-
. .
.g..
e
The column "Expected Input Date" reflects input from appropriate technicalbranch management. Category 1 items have been discussed with the appropriateAssistant Directors. I request any problems in meeting these input dates beidentified to me by the appropriate Assistant Director within a week of receiptof this memo.
...{ i, . N D.h -[1, 6 .s...
Charles L. Miller, DirectorStandardization and Non-Power
Reactor Project DirectorateDivision of Reactor Projects III, IV,
Y and Special Projects NRR
Enclosure:As stated
cc: T. Murley,
J. Sniezek'
F. Miraglia| D. Crutchfield
L. Rubenstein'
J. RichardsonC. Y. ChengL. B. MarshC. McCrackenA. ThadaniJ. JoyceJ. MaukF. RosaJ. CraigM. W. HodgesB. GrimesR. EricksonD. MatthewsR. BarrettL. CunninghamJ. ZwolinskiS. WeissW. Regan, Jr.J. MurphyG. BagchiS. Newberry
.
.
_ _ _ _ _ _ _ _ . _ - _ _ _ _ - _
. _ _ - _ _
October 26, 1988.
*. .
-2
i
The colur.n "Expected Input Date" reflects input from appropriate technicalbranch managerent. Category 1 items have been discussed with the appropriate|
Assistant Directors. I request any problems in meeting these input dates beidentified to me by the appropriate Assistant Director within a week of receiptof this meno.
/s/Charles L. Miller, DirectorStandardization and Non-Power
Reactor Projett DirectorateDivision of Reactor Projects III, IV,
V and Special Projects, NRR
Enclosure:As stated
cc: T. PurleyJ. SniezekF. MiragliaD. Crutchfieldt.. RubensteinJ. RichardsonC. Y. ChengL. B. MarshC. ftcCrackenA. ThadaniJ. JoyceJ. ItaukF. RosaJ. CraigM. W. HedgesB. GriresR. EricksonD. MatthewsR. BarrettL. CunninghamJ. ZowlinskiS. WeissW. Regan, Jr.J. MurphyG. BagchiS. Newberry
DISTRIEUTION:Docket File EHyltonNRC PDR DScaletti
h (/dP95hP Reading TrenyonCVissing hLeng yChiller LRubenstein \
FDSNP[L AD:PDShP
EHylpon:cw Chiller10/4/88 10/ /88
_ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ -
. _ _ - _. .
- *
. ..
~ ~
Date October 26 1988
-.
! REVIEW STATUS REPORT ON~,
WESTI EPOUSE RSAR SP/9_0PDA REVIDI
!
1 Expected
Division / Due InputBranch Reviewer Mocales Subject * Milestone Date Date Cat.** Comments
4
DEST /EMTB Johnson 1, 4, 5, 648, 7, Materials Engineering Draft SER 3/31/88 4/29/88 4 Completei 10 to P.M. 5/5/88
| DEST /EMEB Rajan/ Brassier *** 1, 4, 5, 7 Mechanical Engineering Draft SER 10/31/88 10/31/88 2 DSER in typingto P.M.
DEST /ESGB ' Staley 3 Hydrology Draft SER 3/31/88 3/30/88 4 Completeto P.M.
i
i Giese-Koch 3 Geology & Seismology Draft SER 3/31/88 3/30/88 4 Completeto P.M.
4
Chan 7 Civil Engineering Draft SER 4/29/88 4/28/88 4 Completeto P.M.
See Septem6er 29,1987 meno for complete listing of review assignments*
Category definitions:**
1. AD or above attention requested2. Branch Chief attention requested3. On schedule4. Complete
*** Brasener providing assistanceI
I
l
,
!~
^
,.,.,
*| . .
| Date: October 26,1988 ,
'
.
REVIEW STATUS REPORT ONl. . .
PDA KI. VIEW
(Cont.)
ExpectedDivision / Duc InputBranch Reviewer Modules Subject * Milestone Date Date Cat.** Commients
|
DEST /ECEB Wing 1, 6&8, ID, 13 Chemical Engineering Draft SER 3/31/88 3/17/88 4 Couplete
Notley 13 Fire Protection Draft SER 7/15/88 9/01/88 4 Completeto P.M.
DEST /SICB Burrows 9, 13, 15 Instrumentation & Draft SER 3/31/88 4/07/88 4 CospleteControls to P.M.
,
DEST /SELB Trehan 9, 13 Electrical Engineering Draft SER 3/31/88 4/13/88 4 Completeto P.M.
DEST /SPLB Shum(lead) 1, 10, 13 Containment Systems Draft SER 6/21/88 6/21/88 4 Completeto P.M.
Shum (lead) 688, 10, 12, 13 HVAC Systems, Waste Draft SLR 6/21/88 6/21/88 4 CompleteManagement, Steam & to P.M.Power Conversion
See Septem6er 29,1987 meno for complete listing of review assigemaats*
Category definitions:**1. AD or above attention requested2. Branch Chief attention requested3. On schedule4. Complete
. . _ - - . . _ . - - _ - - - - _ - . . . . . . , . -. . - _. -- -. .- - _ - _ .
_- ._ . _ __ . - -- - . ..-
*-. ..
Date: Octooer 26,1988 ," l
.
-
REVIEW STATUS REPORT Op.
PDA KtVIEW(cont.)
ExpectedDivisten/ Due Input
Branch Reviewer Modules Subject * Milestone Date Date Cat.** Comments
|
| DEST /SPLB Shum(lead) 4, 6&8, 7, 13 Plant Systems Draft SER 6/21/88 G/21/AR 4 Complete(cont.) to P.M.
DEST /SPLB Tinkler IE PRA Review DSER 11/14/88 11/14/88 2re: PRA
| DEST /SRXB Liang 1, 4, 5, 658 Reactor Systems Draft SER 6/28/88 6/28/88 4 Complete9, 10, 11, 12 to P.M.
; DEST /SRXB Liang 16 PRA Review DSER 11/14/88 11/14/88 3 Reviewers| re: PRA providing| Assistance to
SPLB
DRIS/RSGB Mendelsohn 2 Physical Security Draft SER 3/31/88 3/22/88 4 Completeto P.M.
DLPQ/LQAB Spraal 13 Quality Assurance Draft SER 4/29/88 4/06/88 4 Complete| to F.M.|
See September 29, 1987 seno for complete listing of review assignments*
Category definitions:"*
1. AD or above attention requested2. Branch Chief attention requested3. On schedule4. Complete
. - , - - _ _ _ - - - _ - , - , , _ _- - _ _ __ . _ -_ . _ _ . .. ._ .. . . _ _ .
. _ _ _ . .. _ ___ _
|- -
-. ...
t-
Date: October 26, IE8 [
,
*
|| REVIEW STATUS REPORT ON
~ *
| WESHRGNUU5E EL5AR SP/90PDA METIEW
| (Cont.)
Expected,
Division / Due Input|
Brcnch Reviewer Modules Subject * Milestone Date Date Cat.** Comments
! DLPQ/LHFB Lapinski 15 Control Room / Human Graft SER 3/31/88 5/05/88 4 Complete! Factors Engineering to P.M.
DREP/PRPB Spickler 1, 3, 4, S. Radiological Accident Draft SER 8/01/88 8/12/88 4 Complete6&8, 9, 10 Analysis to P.M.
Skopec 12 Process & Effluent Draft SER 7/15/88 7/13/88 4 Complete
|' Radiological to P.M.
Monitoring 1 SamplingSystems
DREP/PRAB Margulies 16 PRA Review DSER 11/14/88 11/14/88 3t
| re: PRA
| RES/PRA Chelliah/BNL 16 Probabilistic Safety Draft 7/15/88 7/15/88 4 Complete
| Study - back end SER toP.M.j
See Septester 29, 1987 meno for complete listf- '' review assignments*
Category definitions:**1. AD or above attention requested2. Branch Chief attention requested3. On schedule4. Complete
r
,- . . - - _ .. -.--_,- -- _ . - -- - , , . _ . _ . . - . - - - . - - - -_ . - . - - . - . - . - - _ . _ . -. _ - . .
__ - _ - _ - _ -- -
~,.,.,
~
Date: October 2ti.1988 |
.
REVIEW STATUS REPORT ONGE AFWR
*
FDA/DC Rt. VIEW-
ExpectedDivision / SRP Due InputBranch Reviewer Chapter Subject Milestone Date Date Ca t.* Cosmients
DEST /SPLB Chandrasekaran 9 Plant Systems RAIs to 9/30/85 4P.M.
j DEST /SPLb Chandrasekaran 11 Plant Systems RAIs to 9/30/88 2- P.M.
, DEST /SRXB Thomas 5, 6, 15 Reactor Systems RAIs to 10/01/88 10/01/88 4 a revisedP.M. schedule has'
been developedso as not to
i slip the SERissue date
J (3/30/89) DEST'
has agreed tothe proposedschedule
DEST /SELB Lazevnick 8, 9 Power Systems RAls to 9/30/88 ? 2P.M.
DEST /ECEB Witt 7,8,9,11,12,13 Chemical Engineering RAIs To 9/30/88 8/14/88 414, & 17 P.M.
DRIS/RSGB Mendelsohn 13 Safeguards RAIs to 9/30/88 4P.M.
3DLPQ;iOAB Sprual 17 QA RAIs to - -
P.N.
* Category definitions:1. AD or above attention requested2. Branch Chief attention requested3. On schedule4. Complete
._
"..-.
' "' Date: October 26, 1988 ,
-.
REVIEW STATUS REPORT ONGE ABI5t
FDA/DC n VIEW'"
(Cont.)
ExpectedDivision / SRP Due InputBranch Reviewe - Chapter Subject Milestone Date Date Cat.* Comments
DREP/PRPB Brown 15 Radiation Protection Draft 7/31/88 9/30/88 2 8/19/88 mensSER committing to
to 9/30/88 SERinput
DREP/PRP8 Pederse.1 12 Radiation Pr7tection RAI to 9/30/88 10/29/83 4P.M.
DEST /EMEB Rajan 4, 5, 6, 15 Mechanical Eng|neering Draft 7/31/88 9/29/88 4(Code Cases) SER
-
DEST /EMEB Rajan 1, 2, 3 Mechanical Engineering RAls to 6/30/88 9/13/88 :1 P.M.
* Category definitions:1. AD or above sttention requested2. Branch Chief attention requested3. On schedule4. Complete
. __ . - - _ _ - - _ _ . _ - - _ _ . _-_ - .- . . - _ . - - - _ - - - . . , - . _ - . . . - _ . - _ . . . .
- . - --_
' ,=.*,
~
Date: October 26,1988
REVIEW STATUS REPORT ON .
CE 5Y5ILM 80+Ct551.E-DC REVIEW
, ,
ExpectedDivision / Due InputBranch Reviewer Chapter Subject Milestone Date Date Cat.* Cossents |
DEST /EMTB M. Hum 4 Rev 8 R? actor PAI 07/10/88 10/13/88 4
DEST /EMTB M. Hum 5 Rev B Reactor Coolant System RAI 07/10/88 10/13/88 4,
DEST /EMEB J. Rajan 5 Rev C Reactor Cooling System RAI 09/30/68 09/30/88 No Comments
DEST /SRIB L.Kopp 5 Rev C Reactor Cooling System RAI 09/30/88 09/30/88 2|
| DEST /EMTB M. Hum 5 Rev C Reactor Coolant System RAI 09/30/88 10/13/88 4
DEST /SPLB J. Raval 5 Rev C Reactor Coolant System RAI 09/30/88 09/30/88 4
DEST /ECEB ' F. Witt 5 Rev C Reactor Coolant System RAI 09/30/88 10/26/68 3
| DEST /SPLB J. Raval 6 Rev C Engineered Safety Features PAI 09/30/88 09/30/88 4
|
| DEST /ECEB F. Witt 6 Rev C Engineered Safety Features RAI 09/30/88 10/26/88 3
DEST /EMTB M.11um 6 Rev 'J Engineered Safety Features RAI 09/30/88 10/13/88 4
DEST /SPLB J. Raval 10 Rev C Steam & Power Conversion RAI 09/30/88 09/30/88 4System
DEST /ECEB F. Witt 10 Rev C Steam & Power Conversion RAI 09/30/88 10/26/88 3System
* Category definition:1. AD or above attention requested2. Bran ( Chief attention requested3. On schedule4. Complete
.._ _ . _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
. - .,.
,
Date: October 26, 1988 ,
REVIEW STATUS REPORT ON -
CE SYSTEM 60+CESSAR-DC RtWIEW
''
(Cont'd)
ExpectedDivision / Due Input
Brrcch Reviewer Chapter Subject Milestone Date Date Cat.* Comments
DEST /EMTB M. Hum 10 Rev C Steam & Power Conversion RAI 09/30/88 10/13/88 4System
RES/DRAA/ E. Che111ah Base Line Sase Line PRA Comments 10/30/88 10/30/88 3
PRAB PRA|
DEST /ESGB N. Ror.ney 2 REY D Site Characteristics RAI 12/30/88 12/30/88 3 j
DREP/PREB R. Van Niel 2 PEV D Site Characteristics RAI 12/30/88 12/30/88 3
DEST /ESGB N. Romney 2 REV D Structures Components RAI 12/30/88 12/30/08 3
DEST /EMEB J. Rajan 3 REV D Structures, Components RAI 12/30/88 12/30/88 3
DEST /EMTB H. Hum 3 PEV D Structures, Components RAI 12/30/88 10/17/88 4
DEST /SPLB J. Raval 3 REV D Structures, Components RAI 12/30/88 12/30/88 3
DEST /SRDB L. Kopp 4 REV D Reactor RAI 12/30/88 12/30/88 3
DEST /EMTB M. Hum 4 REV D Reactor RAI 12/30/88 10/17/88 4
DEST /EMEB J. Rajan 5 REV D Reactor Coolant System RAI 12/30/88 12/30/88 3
o Category definition:1. AD or above attention requested2. Branch Chief attention requested3. On schedule4. Complete
. . - -.. - - - - - - - - - - - - - - - - -
.
,
~
Date: October 26,1988'
REVIEW STATUS REPORT ON-
CE 3Y31tn 50+CE353NICRTfDi
'
(cont'd)
Espected
Division / Due InputBranch Reviewer Chapter Subject Milestone Date Date Cat.* Comments
DEST /SRX8 L. Kopp 5 REY D Reactor Coolant System RAI 12/30/88 12/30/88 3
DEST /EMT8 M. Hun 5 REV D Reactor Coolant System RAI 12/30/88 12/30/88 4
DEST / SPL8 J. Raval 5 REV D Reactor Crolant System RAI 12/30/88 12/30/88 3
DEST /SPL8 F. Witt 5 REY D Reactor Coolant System RAI 12/30/8" J/30/88 3
DREP/RGS8 8. Mendelsohn 5 REY D Reactor Coolant System RAI 12/30/88 12/30/88 3
DEST /SPL8 J. Raval 6 REY D Engineered Safety RAI 12/30/88 12/30/88 3Features'
DEST /SRIB L. Kopp 6 REV D Engineered Safety RAI 12/30/88 12/30/88 3Features
DEST /ECE8 F. Witt 6 REY D Engineered Safety RAI 12/30/88 12/30/88 3
Features|
|
* Category definition:1. AD or above attention regsested2. Branch Chief attention requested3. On schedule4. Complete
-. ___ _ _ _ _ _
' *-
. ,..
.
' '
Date: October 26,1988 ,
REVIEW STATUS REPORT ON'
-
CE SY5ILM 80+CEI5XIF-UC'ETTEW
*
(Cont'd)
ExpectedDivision / Due input
Branch Reviewer Chapter Subject Milestone Date Date Cat.* Comments
DEST /ENTB M. Hum 6 REY D Engineered Safety RAI 12/30/88 12/30/88 4
Features
DEST /SICB J. Stewart 7 REV D Instrumentation & R4I 12/30/88 12/30/88 3Controls
DLPQ/LHFB G. Lapinski 7 REV D Instrumentation & RAI 12/30/88 12/30/88 3Controls
DLPQ/LHFB G. Lapinski 18 REV D Human Factors Engineering RAI 12/30/88 12/30/88 3
* Category defiettion:1. AD or above attention rysted2. Branch Chief attention raluested3. On schedule4. Complete
- , _ - _ _ _ . _ _ _ _ _ _ __ _.__ _ _ _ . _ _ _ .__ _ _
. - _ _ _ _ _ - - -- ,
~
.''* .
Date: October 26, 1988 ,
*
REVIEW STATUS REPORT ON .
SYSItn 80 ct55AF-F~
,KtTIEW
ExpectedDivision / Due Input
Branch Reviewer Chapter Subject Milestone Date Date Cat.* Comments
DEST /SRIB C. 1.iang TAC 66400, ASPSS ISSUE Final SER open open 3 Wating res-to P.M. ponse from
CE on RAI
DEST /EMEB J. Rajan TAC 66401 Steam Gen. Tube Vibration RAIs to oper. open 3 Waiting res-P.M. posse frem
CE on RAI
DEST /EM'8 W. Wickman TAC 66401, Steam Gen. Tube Vibration RAls to open open 3 Waiting res-P.M. ponse from
CE on RAI
DREP/PRPB 1. Spickler tan. 66400 ASPSS ISSUE (SFT Rupture) Final SER open open 3 Waiting res-to SRIB/PM ponse from
CE on RAI
|
| Category definition:*
| 1. AD or above attention requested| 2. Branch Chief attention requested
| 3. On schedule4. Coglete'
** Close out issue
1
!
. __ _.__ _ ___ _ __ _ ... _... _ .____ _ __ _ _ _ - _ . _ _ ,_ __ , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ __ ._,_ _ _ __
_ . _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
',.*-.
Date: October 26,1988 ,
.
REVIEW STATUS REPORT ONCE 5T5ItR 80+
CE N'
AEFTUFICTAFERS
ExpectedDivision / Due InputBranch Reviewer Chapter Subject Milestone Date Date Ca t.* Comments
RES/SAIB C. Ferrell Topic Paper Set 10 ARSAP Issues RAI 06/15/88 09/16/88 4 CommentsNo. I provided
CE at meeting6/21/88
RES/SAIB C. Ferrell, et al Topic Paper Set 6 ARSAP Issues RAI 06/30/88 08/30/PA 1
No. 2
RES/SAIR C. Ferrell, et al Topic Paper Set 3 ARSAP Issues RAI 10/30/88 10/30/88 3No. 3
RES/SAIB C. Ferrell, et al Topic Paper Set 1 ARSAP !ssue RAI 11/9/88 11/9/88 3No. 4
|
|
* Category definition:1. AD or above attention requested2. Branch Chief si.*ention requested3. On schedule4. Complete
__ ._ . . . _ . _ _ _ . _ _ .__ _ .-_ _ _ _. . _ ___ _ _ _ - _ _ _ _ - - _ _ _. __ . _ _ _ _._
- .__. ._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _
' ,*'* .
Date: October 26,1988
REVIEW STATUS REPORT ONEPRI'5 ALuit utguisuutun D0a91ENT
, |,
l
Ezpected |
Division / Due InsutBranch Revleuer Chapter Subject * Milestone Date Date Ca t.* Comments
DEST /EMER Rajan 5 Eng. Safety Systems DSER to 10/28/88 " 2
|P.M.
|
| DEST /ENTS Tsao 5 Eng. Safety Systems DSER to N/A 4 Reviewer willP.M. have no 1spet
DEST /51CB Stewart 5 Eng. Safety Systems DSER to 10/28/88** 2P.M.
DEST /SELB Lazevnick 5 Eng. Safety Systems DSER to 10/28/98 3P.M.
-
DEST /SPLB Shun 5 Eng. Safety Systems DSER to 10/28/88** 2P.M.
| DEST /SRX8 Schwenk 5 Eng. Safety Systems DSER to 10/28/fl8** 3 7/8/88 DSERP.M. Input necd
revision
Category Definition:*
1. AD or above attention requested2. BC attention requested3. On schedule4. CompleteDue date revised to reflect receipt**
of additional information dated 08/16/88and ACRS schedule
-_ _ _ _ _ _ _ _ _ . _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ . . - _ _ - _ _ . . _ _ . - _ . _ . . _ . _ _ . . _ . _ - _ _ _ _ _ _-- -
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . . _ _ _ . _ _ _ _ . . _ _ _
~*
. .,,.
t. .
Date: October 26, 1988r
-
.
REYIEW STATUS REPORT ON~ ' EPRI'5 ALUR RtqulNU4t.N15 DOGNOIT -
(Cont.)
ExpectedDivision / Due InputBranch Reviewer Chapter Sub,)ect* Milestone Date Date Cat.* Ceauents
|
| DREP/RPB Martin 5 Eng. Safety Systems DSER to N/A 4
| P.M.
DEST /ECEB Parczewsti 5 Eng. Safety Sysi. ems DSER to 10/28/88** 4P.M.
DREP/RAB Kelly 5 Eng. Safety Systems DSER to N/A 4P.M.
DRIS/RSGB ' Mendelsohn 5 Eng. Safety Systems DSER to N/A 4P.M.
DEST /ESGB Rinaldi 5 Eng. Safety Systems DSER to N/A 4P.M.
Dt.PQ/LHF8 Correia 5 Eng. Safety Systems DSER to N/A 4P.M.
Note: Aapter 6 '8vilding Arangements" review begins 11/17/88.
Category Definition:*
1. AD or above attention requested2. BC attention requested3. On schedule4. CompleteDue date revised to reflect receipt**
of additional information dated 08/16/.*3and ACRS schedule