Olivier Brunner, on behalf of RF/MK.
RF/MK: 2014 in a nutshell
What we do…
High Power RF Systems (352 MHZ - 12 GHz)
High Efficiency Power Sources
High Voltage Systems
High Gradient Accelerating Structures
Who we are… 36 persons 9 status
• FELL• DOCT• PJAS• STAFF• VISC• COAS• ADMI• DOCT• TRN
14 nations• Scotland• Italy• Russia• Holland• Spain• Germany• Swizerland• France• Belgium• Japan• Finland• Hungary• Greece• Pakistan
a big THANK YOU to everyone !!!
The LHC RF System
LS1 activities: Upgrade, Repair, Commissioning
• HV connectors repair campaign (>100)• New crowbar systems• Replacement of obsolete equipment (e.g. Tetrode):R&D in
progress• New arc detectors (License agreement signed with an external company)
• Control system upgrade• Reliability is a key issue here
Energetic & sporting activities
Diet plans: http://www.eatingwell.com/nutrition_health/weight_loss
Installation: equipment, waveguides, water cooling, local cabling LEP equipment: 20 – 30 year old! , CW klystrons now being pulsed 6 HPRF units fully commissioned / on schedule Reliability is a key issue here
Linac 4 – HPRF system installation and commissioning
Linac 4 – HPRF development
3 post phase tuner• 352MHz, 1.5 MW peak• WR 2300, L = 1500 mm, r1=70mm, r2 = 40mm • VSWR ≈ 1.2 [depth 0 -> 100 mm]• S11 ≤ -30 dB [depth 0 -> 90 mm]• Range: ≈ max 60˚
CTF3 Facility
CTF3 maintenance, upgrade & operation :• 11 S Band and 1 L Band power sources• Complexe waveguide systems• HV system upgrade (thyratron replacement by solid state devices)
Plateform for experiments
The test Beam Line (TBL): a small scale version of a CLIC decelerator
Experimental demonstration of the:• deceleration process • beam dymanic issues• power production in PETS• power transfer to accelerating structures• main beam acceleration => high gradients
Drive Beam front-end developments
Gun SHB 1-2-3 PB Buncher Acc. Structures
500 MHzModulator-klystrons, 1 GHz,
20 MW
~ 140 keV ~ 12 MeV
Diagnostics
Beam dynamics studies completed Gun and buncher prototypes being
constructed
Zone with welding defect
Thales Electron Devices:10 beam multi beam klystrons77 % efficiency calculated
Toshiba:6 beam multi beam klystrons75 % efficiency calculated
Delivery and test in 2016
Drive Beam front end RF power
• Development of a very high efficiency L-band multi-beam klystron with industry
• 1 GHz, 20 MW, 150 ms, 50 Hz, > 70% efficiency
First CLIC prototype module installed in CLEX
TD26R05CC
Zone with welding defectOur range: 100 MV/m CLIC 50 MV/m low-β proton therapy linacs
High Gradient Activities
State-of-the-acceleration: Normal conducting:
≈30 MV/m SwissFEL Superconducting:
31.5 MV/m ILC LHC < 8MV/m Not only for CLIC !
Applications of High Gradient Linac Technology
High Gradient Structures
222
mm
Production of RF accelerating structures is very challenging
It comprises subsequent steps and quality analysis control
High Gradient Testing – Xbox1
TD26R05CC
Full-fledged CLIC accelerating structure TD26R05CC build by CERN is successfully processed in XBOX1 up to 107 MW/m at 250 ns pulses
High Gradient Testing – Xbox2
High Gradient Testing – Xboxe3
Presented by Igor
MERRY CHRISTMASS AND HAPPY NEW YEAR