Installation Guide
Connecting the Primary and Secondary Cabinets
Safety precautions
ZTE Corporation Address NO. 55, Hi-tech Road South, ShenZhen, P.R.China Area code518057 Website http://ensupport.zte.com.cn [email protected] Document versionSJ-20101011152815-002/ 2010-11-16 R1.1
Cabinet dimensions: 2250 mm 750 mm 700 mm (H W D)Weight:
Approximately 100 kgRectifier: 3.8 kg/setMonitoring unit: 2.2 kg
Connecting AC Input Cables
1
Put warning signs in the equipment room, specifically the power distribution box.
Fully insulate the terminals, contacts and other exposed parts and wear protective gloves during installation/connection process.
Before connecting any electrical cable, turn OFF all the switches and breakers and turn OFF the protection breaker outside the system.
Connecting Grounding Cables
DC Outputbreakers
AC Input breaker
AC SPD BATT breakers 3 and 4
DC SPD
PE(Groung bolt)
Connect the grounding cables to the nearest grounding point. The PE length cannot exceed 30 m. The grounding cable should be laid as short and straight as possible.
1. Connect the PE cable between the grounding bolt and grounding busbar of the equipment room.
2. Connect the GND cable between the working ground busbar of ZXDU68 W201 and grounding busbar of the equipment room.
L1L2L3
Color codeL1: YellowL2: GreenL3: RedN: BlueN
1. Connect the grounding busbar of the secondary cabinet to that of the primary cabinet.
2. Connect one of the output breakers (secondary cabinet) to the 63 A DC output breaker of the primary cabinet.
Configuration AC input voltage MCB/TerminalsThree-phase five-w ire (L1/L2/L3/N/PE) 220 V (80-300 V) 1*63 A/3P MCB
Do not reverse the live wires and neutral wire.
Make sure that the AC input power is cut off during the operation to connect theAC input cables.
.3.3
22
4.4
Installing the Cabinet
Installed expansion bolt
Flat washerSpring washerNut
525
690
5
2
5
690
Cabinet Bottom
Installation hole
Drill
WrenchTools:
Cabinet front
Tape measure
Angle square
Expansion bolt
Unit: mm
1. Prepare four M12 X 100 expansion bolts.2. Drill four holes (70 mm deep) with the same dimensions as the cabinet holes at the bottom.3. Install the four M12 X 100 expansion bolts into the holes (leave 30 mm of the bolt above the ground).4. Mount the cabinet on the floor and into the expansion bolts.5. Fasten the bolts to fix the cabinet in place.
Limit the vertical inclination of the cabinet to 5o by inserting metal plates at the bottom
700
ZXDUFront of cabinet
1000
750
Unit: mmCabinet dimensions: 2250 x 750 x 700
Cabinet position
600
ZXD2400 Rectifiers Monitoring unit
Signal Interface Board (SIB)
DC Outputbreakers
DC Power Distribution (3U)Power supply unit (8U)
+/GND
PEPE PE
Protection ground busbar of installation site
Color codePE: Yellow greenGND: Black
DC Power distribution (3U)
ZXDU68 W201 V4.0R06M03&M04DC Power System
Secondary Cabinet(V4.0R06M04)
26U
1 2
DC Output
DC Output
+/GND(Primary cabinet)
+/GND(Secondary cabinet)
Primary cabinet
Secondary cabinet
63 A breaker
1. Turn off the AC input breaker of the AC distribution box that powers the ZXDU68 W201 system.
2. Turn off the AC input breaker of the ZXDU68 W201 system.
3. Connect the neutral cable (N) of the AC input.
4. Connect the phase wires of AC input (L1/L2/L3).
Connecting Battery Cables
.5.5
www.zte.com.cn 1 of 4
Connect the negative cable first to ensure safety.
Do not connect positive and negative cables in reverse.
Tighten any loose detection cable after battery cable connection.
Cable colorBATT (+): RedBATT (-): Blue
BATT input 1 and 2+ +
Battery pack/rack Battery voltage MCB4*12 V battery cells 48 V 4*100 A MCB
Connecting plate1 3
1. Install the batteries into the cabinet.
2. Turn off the BATT breakers.
3. Connect the negative cables to the BATT breakers (battery packs of secondary cabinet connects to the battery breakers of primary cabinet power supply unit).
4. Connect the positive cables to the working ground busbars (GNDs of primary and secondary cabinets).
5. Install the connecting plates between battery cells.
6. Label with battery number and polarity. For example, mark battery 1 (+) on the positive cable and battery 1 (-) on the negative cable.
+/GND of the respectective cabinets
BATT 3 and 4 (Secondary cabinet)
2
1. Turn off the loads.
2. Turn off the DC output breakers.
3. Connect the negative terminal of a load to one of the DC output (-) breakers.
4. Connect the positive cable of a load to the working ground busbar (+/GND).
Color codeDC output (+):BlackDC output (-): Blue
DC Output
DC Power Distribution (Secondary Cabinet)
Power supply unit (Primary Cabinet)
The load current MUST NOT exceed the capacity of the breakers to avoid tripping of breakers and shutdown of loads.Tighten any loose detection cable after DC output cable connection.
-48 V
+/GND(Primary cabinet)
+/GND(Secondary cabinet)
Connecting DC Output Cables
DC Output
Load_ +
_ +Load
+ +BATT input 3 and 4
The negative cable is the first cable to be connected
Cabinet MCB DC voltage LLVD1: 1*6A + 3*20A LLVD2: 1*63A (Controls DCoutput of seondary cabinet)
Secondary cabinet LLVD2: 20*20A+2*10A
Primary cabinet
BATT 1 and 2 breakers (Primary cabinet)
Power supply unit (8U)
Communication equipment slots (21 U)
Primary Cabinet(V4.0R06M03
BATT breakers1 and 2
-
Performing Electrical Check
AC inputCheck both the AC distribution box and AC input breaker of the system.L1 N L1 - L2 L1 - PEL2 N L1 - L3 L2 - PEL3 N L2 - L3 L3 - PEBatteryCheck the positive and negative terminals of the battery pack for any short circuit.
DC outputCheck the Load (+) and Load (-) for any short circuit.
Checking for Short Circuit1Check the following cables for short circuit:
AC input cablesBattery cablesDC output cables
3 Checking Battery Voltage
2 Checking AC Input Voltage
If the the measured voltage is negative, the positive and negative terminals are reversely connected. Reconnect the cables.
The measured voltage must be positive and at least 43.2 V.
Measure the battery voltage between BATT (+) and BATT (-) through terminals of ZXDU68 W201.
.1.1
DO NOT install a faulty rectifier in the ZXDU68 W201 system. Make sure that no obstacle is blocked in the air vent of the rectifiers for good heat dissipation.
The following should be met for normal rectifier operationAC input voltage: 80 V300 VThe ZXD2400 V4.3 working status depends on the AC input voltage:
Installing the Monitoring Unit
The batteries and loads have not yet been connected to the system. As a result, the monitoring unit gives the DC Loop Break alarm and Bat Loop Break alarm.
Setting Output Relays
L1 L2
Multimeter
BATT breaker
Check in the ZXDU system
GND (+)
Black probeRed
probe
Installing the Rectifiers.2.2
2
Acceptance criteria
Before checking for short circuit, turn off the corresponding breaker. Locate any short circuit and eliminate it before proceeding to the next step.
www.zte.com.cn
.3.3
Rectifiers
1 2 3
1. Turn off the power switch of the monitoring unit.
2. Insert the monitoring unit into the slot provided and fasten the screw.
3. Turn on the monitoring unit (RUN indicator should glow and the main menu is displayed on the screen).
Enter
1. Set Relays Out
AC-in Switch Off
Relay: A2
1.Setup Para
Enter
Ent
Esc
EntEsc
Modify value
Pass: 0000_Msg Alm Ctrl Rec
Ent
Main menu Initial password: 0000
Output relays can be modified through the following path: Ctrl1.Setup Para3. Alarm ParaSet Relays out
ZXDU68 W201 V4.0R06M03&M04DC Power System Installation Guide
Measure the AC input voltages by referring to the table.
If N-PE voltage is approximately equal to L-N voltage, N and L cables are inversely connected. Reconnect the cables L and N.
4
Monitoring unit
Rectifiers
1 2 3 4
Monitoring unit
The ZXDU68 W201 system can normally work without the monitoring unit. However, the system will have no communication functions and the batteries will be in the floating charge mode.
Setting System Parameters
1 Correct parameter setting is very important to ensure that the monitoring unit functions as expected. The default values of the parameter may not meet the requirements. Therefore, some parameters need to be set in the system commissioning.
The parameters can be modified through the 1. Setup Para interface under the Ctrl menu
EntModify valueSave setting
Esc Quit
System parameter list
Battery parameter list
HandleStop pin
C heck item C riteriaN-PE
-
S/N Alarm Level Relay S/N Alarm Level Relay
1 Total Alarm - A1 20 DCArrester Brk. Minor alarm A4
2 AC Aux SW Of f Minor alarm A2 21 DCBreaker Alarm Minor alarm A4
3 AC Main SW Of f Major alarm A2 22 Battery Fault Major alarm A4
4 AC Power Of f Major alarm A2 23 Bat Under-Temp Minor alarm A4
5 ACArrester Brk. Minor alarm A2 24 Bat.Temp.Void Minor alarm A4
6 AC Under-Vol Minor alarm A2 25 Bat.Discharge Minor alarm A4
7 AC Ov er-Vol Minor alarm A2 26 Env Under-Temp Minor alarm A5
8 AC Phase Lost Minor alarm A2 27 Env Ov er-Temp Minor alarm A5
9 AC Current Ov er Minor alarm A2 28 Env Under-Hum Minor alarm A5
10 SMR Alarm Minor alarm A3 29 Env Ov er-Hum Minor alarm A5
11 SMR Abnormal Minor alarm A3 30 Smoke Alarm Minor alarm A5
12 DC Under-Vol Minor alarm A4 31 Flood Alarm Minor alarm A5
13 DC Ov er-Vol Minor alarm A4 32 Intrusion Alarm Minor alarm A5
14 DC Loop Break Minor alarm A4 33 Door Magnet Alm Minor alarm A5
15 Bat Loop Break Minor alarm A4 34 Glass Broken Minor alarm A5
16 Bat Under-Vol Major alarm A4 35 Env Un.LostTouch Minor alarm A5
17 Bat Ov er-Temp Minor alarm A4 36 HeatExch.Alm Major alarm A5
18 1st Shut-Down Major alarm A4 37 Env .Temp.Void Minor alarm A5
19 2nd Shut-Down Major alarm A4 38 Start GEN - None
Charging the Batteries1. Before turning on the battery breaker, measure the voltage of the battery pack and keep a record.2. Set the floating charge voltage equal to the terminal voltage of the battery pack. Menu path: Ctrl 1.Setup Para Batt Para Float Vol..3. Turn on the BATT breaker.4. Reset the floating charge voltage to the default (53.5 V).5. Start the equalized (boost) charge mode in the monitoring unit. Menu path: Ctrl 2. OAM 4.EQUAL...]
.1.1
Connecting Loads to the System1. Turn off the load.2. Turn on the corresponding DC output breakers of the system.3. Measure the DC output voltage and make sure that the positive and negative load cables are properly connected.4. Turn on the load.
.2.2
Acceptance Criteria
Negative voltage means the cables are inversely connected. Reconnect the cables.
+ - 48V48V DC input
Red probeBlack probe
Check load
Appendix: System Shutdown and Startup
Shutdown
The ZXDU68 W201 shutdown will cause the loads to be shut down.
1. Turn off the loads.2. Turn off all DC Output breakers.3. Turn off the BATT breakers.4. Turn off the monitoring unit.5. Turn off the AC Input breaker of the system.6. Turn off the AC input breaker powering the system.
Startup1. Turn on the AC input breaker powering the system.2. Turn on the AC input of the system.3 Turn on the monitoring unit.4. Turn on the BATT breakers.5. Turn on all DC output breakers.
The measured voltage should be positive (+) and within the range of 42-58 V
Alarms and their default output relays
Avoid DC short circuit during operation.
A large difference between the voltage of the battery pack and the floating charge voltage of the system can cause sparks and could result in flames.
Follow the sequence to connect the battery packs: Connect a battery pack with lower voltage > Connect a battery pack with higher voltage.
ZXDU68 W201 V4.0R06M03&M04DC Power System Installation Guide
ZTE Corporation Address NO. 55, Hi-tech Road South, ShenZhen, P.R.China Area code518057 Website http://ensupport.zte.com.cn [email protected] Document versionSJ-20101011152815-002/ 2010-11-16 R1.1
www.zte.com.cn 3 of 4
-
ZXDU68 W201 V4.0R06M03&M04DC Power System Installation Guide
ZTE Corporation Address NO. 55, Hi-tech Road South, ShenZhen, P.R.China Area code518057 Website http://ensupport.zte.com.cn [email protected] Document versionSJ-20101011152815-002/ 2010-11-16 R1.1
www.zte.com.cn 4 of 4
12 11 14
VL+ VL-X2-1
RL1
C1
C2
X3-B6X3-C6 X10-1
X11-1
ACDC
LNPE
RMT ALM COM EX PWM SBCUT
282726
1711 12 13 14 15 16
1(2)
3(4)
M2
ACDC
LNPE
RMT ALM COM EX PWM SBCUT
282726
1711 12 13 14 15 16
1(2)
3(4)
M3
ACDC
LNPE
RMT ALM COM EX PWM SBCUT
282726
1711 12 13 14 15 16
1(2)
3(4)
M4
ACDC
LNPE
RMT ALM COM EX PWM SBCUT
282726
1711 12 13 14 15 16
1(2)
3(4)
M1QFB1
100A
BATT 1
BATT 2
ST1
T1
+12V
ST2
T2
+12V
X3-C7X3-B7
1QFD1 6A
1QFD2 20A
1QFD3 20A
QFB3 100A
QFB4 100A
KMD1
KMD2
123456
X6
1
123456
X7
2
123456
X8
3
123456
X9
4
123
X10
123
X11
1 2 3
X1
1 2
X2
1A1B1C
32A32B32C
X3EX1
EX2
EX3
EX4
ALM1
ALM2
ALM3
ALM4
RMT1
RMT2
RMT3
RMT4
CUT1
CUT2
CUT3
CUT4
PWM
PWM
PWM
PWM
COM
COM
COM
COM
V
B
1
V
B
2
V
L
+
V
L
-
X3-C12X3-C9
48V-
12 11 14NL
-12VGND+12VVa
1
2
3
4
1
2
X1
X2
TRB
X1-1
X1-3
X4
BACK
Class B
DC SPD
Distribution
LLVD1 LLVD2
THUNDERACAIR0
1234567891011121314151617181920212223242526272829303132
X3A
1234567891011121314151617181920212223242526272829303132
X3B
1234567891011121314151617181920212223242526272829303132
X3C
RS6
IB2+IB1+
IB2-IB1-
IL+ IL-ACVa
RS1RS2RS3
RS4RS5
-12VFL-DC
+12VAGND AGND
AGND
PEN
AC Input380V 50Hz/60Hz
12
1X26-1X26-2 12
2
1QFD4 20A
X3-C11RS1
X3-B11RS2
X3-A9RS3
X3-C10RS4
X3-B10RS5
X3-A13
X3-B13
LLVD1
LLVD2
L1L2L3
11 14
QFA1 63A
L1' L2' L3' NX3-A15
X3-C14X3-B15X3-C15X3-A7
X2-2QFB2
100A
AC Input
AC SPD
AC Transducer
Rectifier
DC Bus Bar
Shunt and DC SPD
DC Contactor
AC Switch of Battery
DC Output
Battery
Battery ST
1 2
X4
1 2
X5
1 2
X12
12
X21RS485
AB
T
1
T
2
+
1
2
V
+
1
2
V
G
N
D
T
C
1 2
X24
1 2
X25
1 2 3 4
X23
1 2
X26
+
1
2
V
+
1
2
V
+
1
2
V
S
M
O
K
E
T
E
M
P
A
G
N
D
A
G
N
D
D
O
O
R
V
C
C
-
W
W
A
T
E
R
SIB X1
1 2 3 4 5 6
X17
1 2 3 4 5 6
X15
1 2 3 4 5 6
X16
1 2 3 4 5 6
X14
S
3
A
G
N
D
S
2
S
4
S
1
A
G
N
D
4
N
C
3
C
O
M
4
C
O
M
3
N
O
4
N
O
3
N
C
6
N
C
5
C
O
M
6
C
O
M
5
N
O
6
N
O
5
N
C
2
N
C
1
C
O
M
2
C
O
M
1
N
O
2
N
O
1
N
C
123456789
X22RS232
L+
L+2QFD 63A
BATT 3
BATT 4ZXDU68 W201(V4.0R06M04)
MV+
COMSIG
FAN2
MV+
COMSIG
FAN3
MV+
COMSIG
FAN1
LLVD2VL+
LLVD2VL+
LLVD2VL+
ZXDU68 W201(V4.0R06M04)3U
QFB3 100A
QFB4 100A
12
1X26-1X26-2 12
2
BATT 3
BATT 4ZXDU68 W201(V4.0R06M03)
1N5404
1N5404
1N5404
MV+
COMSIG
FAN2
MV+
COMSIG
FAN3
MV+
COMSIG
FAN1
1N5404LLVD2
VL+
LLVD2VL+
T1 40
T2 40
LLVD2VL+
T4 40
T3 30
RS62QFD1 20A
2QFD2 20A
VD3
VD4
2QFD3 20A
VD52QFD5 20A
2QFD6 20A
VD7
VD8
2QFD7 20A
2QFD8 20A
VD9
VD10
2QFD9 20A
VD11
2QFD10 20A
2QFD11 20A
VD12
VD13
2QFD12 20A
2QFD13 20A
VD14
VD15
2QFD14 20A
VD16
2QFD15 20A
2QFD16 20A
VD17
VD18
2QFD17 20A
2QFD18 20A
VD19
VD20
2QFD19 20A
VD21
2QFD4 20A
VD6
2QFD20 20A
2QFD21 10A
VD22
VD1
2QFD22 10A
VD2
L+
2QFD3 63ALLVD2
X3-A8
Electrical Connection Diagram of Secondary Cabinet (V4.0R06M04)
Electrical Connection Diagram of Primary Cabinet (V4.0R06M03)
-1-2
Page-3
Page-4