GENERAL NOTES
1. Orientation (a) Buildings should be oriented preferably N-S so as to allow maximum light andventilation inside. eeping in view the wind dire!tion and "#assthu$ if desired by the
users.
(b) %are should be ta&en to avoid dire!t glare of sunlight as far as possible.
(!) 'ight should preferably !ome from the NO*+, in s!hool bldg wor&shopslaboratories or any building reuiring more intensity of light.
(d) /or storage a!!n 0 hangers poly!arbonate sheets should be used for naturallight..
(e) *he layout0siting should be in !onformity of the approved onal plan0master plan.
2. 3linth 'evel (a) 3linth of the buildings should be de!ided in relation with the ad4oining roadspreferably higher than the road level so as to avoid siting of the bldgs in a low lyingarea. 5s general prin!iple the plinth height will be &ept 67 !m from av 8'.
(b) *he !utting and filling of the ground should be 4udi!iously de!ided &eepinge!onomy in view possibility of stepping of buildings to be fully explored in a pla!eswhere ground is sloping.
9. %ha44as0Sun Shades (a) Sun brea&ers0louvers should be provided espe!ially on the western side ofredu!e heat and spe!ifi!ally at pla!es where air !onditioning is reuired.
(b) Sun&en windows may be provided wherever feasible(!) %ha44as should be sloping downwards and should extend by 1::mm (minimum)on both sides of the windows
ZONAL SPECIFICATIONS CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
2/92
(d) 5t the 4un!tions of !ha44as and walls !overing shall be provided in !m (1;9) withadmixture of
-
7/26/2019 Zonal Specifications of Ceaf Delhi
3/92
(!) 'ong monotonous fa!ades should be avoided but if provided should be bro&enby off sets and different surfa!e finishes.
(d) ntran!e +alls 'obbies /oyers should be planned to enhan!e the grandeur ofthe buildings li&e +C bldgs Offrs Dess @ other impt bldgs as de!ided at board stage.
(e) Buildings should be planned to in!orporate the latest ar!hite!tural featuresin!luding flower boxes0lo!al materials0lo!al 5r!hite!ture to provide a distin!t identity.
(f) oof should be laid in slope .oof pro4e!tions should be ?::mm all around. Ef nowindows are provided on either side 9::mm roof pro4e!tion will be given. oof withparapet !an be planned if red for ar!hite!ture features.
(g) Stair!ase should always be planned in the !lo!& wise dire!tion. e for a man to wor& !omfortably in !ase of repairsand !utouts to be provided in the fa!ades to provide good air and !ir!ulation andventilation
(m) +eights0lo!ations of fitting and fixtures in &it!hen0toilets to be provided4udi!iously to fa!ilitate easy movement.
ZONAL SPECIFICATIONS - 9 - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
4/92
?. %olour S!heme (a) %olour s!hemes provided for internal0external walls should be pleasing andsamples must be put on the walls before doing the finishes. xt !olour s!heme will befollowed as per stn !olour s!heme.
(b) %olours li&ely to fade in short duration should be avoided.
(!) %olours preferably should be mat!hed in !ontrast to give pleasing appearan!e3ale yellow and Bri!& ed0*erra!otta !ombination to be avoided.
(d) /or impt buildings the external finish may be one of the following;-
(i) 8rit /inish
(ii) Fholpur stone0ed Stone
(iiii) 5!ryli! finish
A. Single living 5!!n (a) 3artition in !ubi!als to be of 8yp board0 !al!ium sili!ate.
(b) Stailess steel wash hand basin to be provided.
G. Stair !ase ailing No 3#% hand rail will be provided in adm a!!n0 Offrs Dess0 Offrs living .
ZONAL SPECIFICATIONS - 6 - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
5/92
ON5' F5*5
1. 8eographi!al Situation
(a) 3lains and semi-deserts.(b) 22:D above DS'.(!) 'atitude - 2G to 91(d) 'ongitude - A9 to AA
2. ain fall
(a) 5verage yearly
(i) Bi&aner 5rea - 2:!m
(ii) %handigarh 5rea - ?:!m(iii) 3alam 5rea - 7:!m(iv) 5mbala 5rea - 1::!m
(b) Dax rainfall re!orded in last 17 years (in 26 hrs)
(i) Bi&aner - 12.? !m(ii) 3alam - 29.9 !m(iii) %handigarh - 27!m
(!) En!iden!e of hail storm0max - Not very !ommon 1?: m0hour velo!ity.
(!) Dax si>e of hail experien!ed - 2.7 !m.in the area.
ZONAL SPECIFICATIONS - 7 - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
6/92
9.
-
7/26/2019 Zonal Specifications of Ceaf Delhi
7/92
(e) Nature of storm with rains0without rains0with snow.
-
7/26/2019 Zonal Specifications of Ceaf Delhi
8/92
(ii) %handigarh Sandy0%layey(iii) 3alam 8ravel0o!&s0%layey(iv) 5mbala 5rea Silty Sand
(b) Soil used for filling in foundation0floors. Ordinary soil.
(! ) Soil used for filling in formation of oads0berms. Ordinary soil.
(d) Behavior of soil with rise in moisture !ontent. Be!omes soft and plasti!.
(e) Daximum dry density a!hieved at OD%. 1?G: to 21:: g0%um
(f) Bearing !apa!ity of soil in dry and saturated !ondition.? to 17 *on0S metre
(g) 5ngle of repose of soil. 27 to 9: deg.
(h) Soil used in Dud 3hus&a for water proofing treatment. %layey soil.
(4) Soil strata upto depth of 1: metre below ground Sandy0%layey0gravel0o!&s
12. Daterials lo!ally available
(a) Brunt !lay Bri!&s %rushing strength of bri!&s Dinimum 1::g0S.!m for all pla!es ex!ept Bi&aner and Nal forBi&aner and Nal minimum !rushing strength of 97 g0S
!m.
(b) /ly 5sh bri!&s %rushing strength of bri!&s Dinimum 1::g0S.!m
ZONAL SPECIFICATIONS - G - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
9/92
Fistan!e from thermal power house;-(a) 3alam - J1:: m(b) %handi Nagar - J1:: m(! ) 8urgaon0 a4o&ri0Fhansa - J1:: m(d) 5mbala - K1:: m
(e) 3atiala - K1:: m(f) +alwara - K1:: m(g) Barnala - K1:: m(h) Sarwawa - K1:: m(4) %handigarh0 asuli - J1:: m(&) 5dampur - K1:: m(l) 5mritsar - K1:: m(m) Sirsa - K1:: m(n) Suratgarh - J1:: &m(o) Bi&aner0Nal - K1:: &m(p) Bisiana - J1:: &m
19. Fegree of inse!t infestation
(a)
-
7/26/2019 Zonal Specifications of Ceaf Delhi
10/92
Building Work
SlNo
Ite o! "ork S#e$i!i$%tion Stn& Re%rk&
1 2 9 6 7
1
5nti termitetreatment
3re-!onstru!tion anti termite treatment will beprovided to foundation tren!hes !olumn pitsfilling under floor 4un!tion of walls @ floor and soilalong external perimeter for building as per!lause 9.2? perimeter of building. of SS 2::6and ES ?919 3art E to EE. En !ase of pilefoundations anti termite treatment shall be!arried out to ba!& fill and under floors perimeterof building.
3ost anti termite treatment will be provided tobuilding where ever red as per SS 2::6 andES ?919 3art EEE.
%hemi!al for 5** will be C'loro#ro#'o&e orLind%ne ( EC *)
5ll Stns (a) *reatment will be got done fromspe!ialist agen!y .*he agen!y shouldbe the member of the 3est %ontrol
5sso!iation of Endia.
(b) En following a!!n anti termitetreatment will not be !arried out
(i) 5 @ B vehi!les garages repairbays apron0 hard standing rampsEnsp pits et!.(ii) En!inerator Sentry boxes0 Fhobi8hat Open shed where no timber isused.(iii) %% reservoirs0 O+*
!) *he !hemi!al used for 5nti termitetreatment should be got tested fromNational *est +ouse 5lipore %al!utta orany other approved test house0
laboratories.
(d) /or detailed instru!tions onantitermite treatment -in-%,s Bran!h *ENo ?-1:01IA9 @ subseuentamendments be referred.
ZONAL SPECIFICATIONS - 1: - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
11/92
1 2 9 6 7
2. /oundation(i) Sub Base
'ean !ement !on!rete 1;6;G type F2 using!rushed0 bro&en stone aggregate .
5llstations
Soil testing will be done for individualsite . /oundation will designed be as perthe the re!ommendation given in the
report.(ii) Dasonry infoundation uptoplinth level
Stone masonry stone masonry in 1; ? brought to !ourse atevery ?:!m and as spe!ified in SS.
B& masonry
B& wor& in %D (1;?) using bri!&s of !lass A7!ompressive strength of A7 g0Sm.
5llstations
Enside of the b& surfa!e in !onta!t withthe soil will be plastered in %D 1;6 @given two !oats industrial type ofbitumen G7027 L 1.2 g0SD at followingStns.
5mbala 3atiala +alwara Barnala.
5dampur @ 5mritsar.(iii) %olumn/ooting0aftfoundation
%% D-27( design mix) 2: mm !rushed stoneaggregate. 5ll
stations
(iv)3ile /oundation %% D-9: (design mix) using 2:mm graded!rushed stone aggregate .
5llstations
(a) 3ile fdn will be provided in areas withhigh water table or low lying areas withlow bearing !apa!ity.(b) Enitial load test as per ES-2I11 onpiles shall be !arried out to as!ertain the
load !arrying !apa!ity of pile.
(!) 3linthBeam0Band
%% D-27 design mix using 2:m gradedaggregate
5llstations
No F3% will be provided where plinthbeam 0band in provided. 3B0 /loor bandwill be provided at floor level
ZONAL SPECIFICATIONS - 11 - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
12/92
1. 2 9 6 7
9. Famp proof%ourse
6:mm thi!& 3%% (1;2;6) with 12.7mm stoneaggregate using integral water proofing!ompound as per manufa!turer,s instru!tions
over. 5 !oat of polymer modified bitumen L1.7&g0sm shall be applied over 3%%.
3olyethylene sheet 1:: mi!ron th will be providedover F3%
5llstations
5mbala5S5dampur+alwara3atialaBarnala
(a) F3% shall be provided over fullwidth of all internal and external wallsex!ept dwarf walls and partition walls
resting on the floor sub base.(b) F3% shall be provided in allopenings as per !lause 7.62.1 of SSI? and shall be sun&en at opening toallow flooring.(!) 5 moisture groove eual to thi!&nessof F3% will be provided at F3% level inext plaster
6. 3linth 3rote!tion 7: mm thi!& A7: mm wide 3%% D17 ( NominalDix) over 1:: mm thi!& 3%% 1;6;G type 2 using
6:mm stone aggregate .
5llstations
3linth prote!tion will be laid in a outwardslope of 1 in 12 and in alternate bays
not more than 2.7 m length. Hointsbetween two panels 12 mm wide will befilled up with mix of G7027 bitumen @sand.
7. Super Stru!ture(a) Bri!& Dasonry
/ire %lay b&sB& wor& in %D (1;?) using bri!&s of !lass for A7(!ompressive strength of A7g0Sm)/ly 5sh B&s;- /ly 5sh Bri!&s in !ement mortar1;?. *he bri!&s shall be uniform in shape andregular !orners of !lass A7.(!ompressive strengthof A7g0Sm)
5llstations
/ly ash b&s will be !onforming to ES@ to be used as per the lo!ation of thestn with respe!t to the thermal powerstation
(b) %% wor& 5ll %% w& for stru!tural members su!h asroof0floor slab lintels %ha44as beams !olumns.stair!ase bal!ony et! shall be 8rade D-27design mix using 2: mm graded !rushed stonedaggregate .
5llstations
%ha44as will be !asted to a slope of 1;9:with rounded !oving in 2::mm plasteredin 1;6 using water proofing !ompound .
ZONAL SPECIFICATIONS - 12 - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
13/92
1 2 9 6 7
(!) O+* %% D-9: (design mix) using 2:mm graded
!rushed stone5llstations
(d) Servi!e tan& %% D-27 (design mix) using 2: mm graded!rushed stone
5llstations
(e) 3artition
-
7/26/2019 Zonal Specifications of Ceaf Delhi
14/92
1 2 9 6 7
A. oof (a) /lat oof. %% D-27 design mix using 2:mm graded
!rushed stone aggregate. %% slab shall be laidflat 0or to a slope of 1;6: and will be finished evenand fair using wooden float at the time of !astingwithout using extra !ement0mortar.
5llstations
(i) oof pro4e!tion shall be min ?:: mmwith down ward fas!ia of 9:: mm .
(ii) 5 layer of polythene sheet 17:mi!ron thi!& shall be laid on finished flatsurfa!e of shuttering before laying %%for roof slabs
(b) 3ent roof (i) %% D-27 design mix using2: mm graded aggregate !rushed aggregate.
(ii) %orrugated0semi !orrugated 5% sheet of ?mmthi!&ness0%8E sheet0 3re!oated DS sheets withpurling on trusses of steel0tubular0gable walls
5llstations
( !) einfor!ementfor %%
(i) DS round 8de E of ES 692 (3art E) M1IG?..
(ii) +igh ield Strength Feformed bars ; ES M1AG? M 1IAI.
(iii) *D* bar
5llstations
Steel will be pur!hased from maimprodu!er or se!ondary produ!er as perpoli!y.
G.
-
7/26/2019 Zonal Specifications of Ceaf Delhi
15/92
(a) Dud 3hus&a (a) 5pply primer !onforming to ES; 99G6-1I?7 L:.7: &g0SD to the prepared surfa!e till thesurfa!e is properly impregnated and the solventoil in primer shall be allowed to evaporate
!ompletely.
(b) 5pply hot bitumen straight run grade 9:06:(8rade S-97) !onforming to ES; A9-1I?1 L :.A:&g0SD.
(!) 3olyethylene film 17: mi!ron (heavy duty)!onforming to ES; 27:G-1IAA laid with over lapsbonded with !old !ut ba!& bitumen adhesiveoverlaps being not less than 17: mm. *he filmshall be natural or bla!& in !olour.
(d) 5pply semi-hot straight run bitumen grade9:06: (8rade S-97) !onforming to ES A9-1I?1 L:.A: &g0SD over the raft paper and pasted onthe 3olyethylene film.
(e) Blinding material su!h as sand in dry!ondition L :.7 to 1 &g0SD shall be dusted overthe bitumen indi!ated in (e) above.
(g) Dud 3hus&a treatment min 7: mm and av thso as to a!hieve desired slope . Dud 3hus&a tobe !overed with 6:mm thi!& bri!& tiles topinggrouted in %D 1;9 @ pointed with %D 1;9 using!rude oil L7 P weight of !ement as per SS per
*o beprovidedas perremt
(ii) Ef no lea&age0seepage noti!ed thenonly further treatment to the roof will be!arried out. Ef seepage 0 lea&age isobserved same will re!tified by presser
grouting using polymers @ !ement .5fter the grouting the roof will befurther tested for water tightness byponding the roof for A2 hrs.
ZONAL SPECIFICATIONS - 17 - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
16/92
1 2 9 6 7
spe!ified in %lause 11.2? on page 11.1: of SS1II1 3art E.
(h) Dinimum 1: days !uring of roof surfa!e by&eeping surfa!e wet using gunny bags or anyother method approved by 8
(b)533 3olymeri!Dembrane
(i) 5ll Buildingex!ept garages ofall types
(i) *he surfa!e will be painted with one !oat ofprimer !onforming to ES 96GG L :.9 g0SD
(ii) 5 layer of 533 based polymeri! membrane 9mm thi!& (min) and weighing not less than 9.:
&g0SD reinfor!ed with polyester non woven mat1?:8SD th. *he membrane will be laid by tor!happli!ation. Side overlap of A7 mm @ endoverlaps of 1:: mm will be provided . *he 4oints 0overlaps will be sealed with tor!h appli!ation. /orparapet the membrane will be ta&en upto 9: !m@ then inserted inside the parapet in a groove.
(iii) 3%% padding in 1;2;6 type B: av 7: mm thwill be laid to a!hieve a slope of 1;6: in !ase offlat roof. *he uniform thi!&ness of 7: mm will beprovided in !ase roof is laid on slope.
(iv) 6: mm th b& tile to be laid in %D 1;? @ 4ointedin %D 1;9 using !rude oil L 7 P of weight of!ement. over 3%% padding.
5ll Stns
ZONAL SPECIFICATIONS - 1? - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
17/92
1 2 9 6 7
(v) %overed fillet in 3%% 1;2;6 type BO of radiusA7 mm to be provided at 4un!tion of roof @parapet.
(ii) 8arages of alltypes
17mm thi!& !ement plaster 1;6 with e over 2:mmthi!& s!reed in !ement mortar 1;6 4ointed andpointed in %D 1;9 .
ZONAL SPECIFICATIONS - 1A - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
18/92
1 2 9 6 7
I. Sun&en Slab 3roviding and laying water proofing treatment tosun&en portion of
-
7/26/2019 Zonal Specifications of Ceaf Delhi
19/92
1 2 9 6 7
1:. /looring(a) 3%% /loor(i) Fomesti! @
O*D
(i) 8round floor ;- 6:mm thi!& 3%% D2: grade( Nominal Dix) finished fair using extra !ementover 1:: mm thi!& 3%% 1;7 ;1: sub base type 2
over rammed earth. *op layer shall be laid inpanels using 6mm thi!& and 9Gmm wide glassdividing strips.
(ii) /irst floor and above (floor over %% slab)6: mm thi!& 3%% 1;2;6 type B-1 finished fairusing extra !ement laid over floor slab. 3%% tobe laid in panels using 6mm thi!& 9Gmm wideglass dividing strips.
5llstations
(ii) 8arages
(a) %ar0S!ooter0%y!les0 Dotor%y!le
(b) B #ehi!les-one ton0 *hree*onne0 /our *onne
(!) *ype % #eh
A7 mm thi!& 3%% D2: grade( Nominal Dix)laidin alternate panels over sub base of 1::mm thi!&3%% 1;7;1: type -2.over rammed earth
1:: mm thi!& 3%% D2: grade( Nominal Dix) laidin alternate panels over 1:: mm thi!& 3%%1;7;1: over rammed earth.
17: mm thi!& 3%% D2: grade( Nominal Dix) laidin alternate panels over 1:: mm thi!& 3%%1;7;1: over rammed earth over 17: mm th hard!ore.
5llstations
(a) xpansion0!onstru!tion0dummy4oints shall be provided as per design!onsiderations.(b)
-
7/26/2019 Zonal Specifications of Ceaf Delhi
20/92
1 2 9 6 7
(d ) 8arages oftra!&ed vehi!les.
Stone sets (granite0trap0basalt0 uart>ite) 17: mmthi!& laid and 4ointed in %D (1;9) over 2: mmthi!& !ement s!reed in %D (1;9) on 1:: mm D 2:
!on!rete (Nominal Dix) over A7 mm thi!&!ompa!ted
-
7/26/2019 Zonal Specifications of Ceaf Delhi
21/92
1 2 9 6 7
(! ) #itr if ied *ile (i) 8round /loor#itrified tile 1: -12 mm thi!& laid with 17mm thi!&s!reed in %D 1;6 over 27 mm thi!& 3%% D2:
grade (Nominal Dix) on sub base of 1:: mmthi!& 3%% 1; 7;1: type 2 .
(ii) /irst /loor @ above#itrified tile 1: mm thi!& laid with 17mm thi!&
s!reed in %D 1;6over 2: mm thi!&3%% D2: grade ( Nominal Dix) overfloor slab.
5t impt a!!n li&e DS EB guest rooms@ area as re!ommended by BOOvitrified !erami! tile 1: mm th of si>e
?:x?: !m or more will be provided
(d) ota Stone/looring
(i) 8round /loor1G-2: mm thi!& mirror polished &ota stone
flooring set with neat !ement slurry mixed with!olour to mat!h the !olour of stone over 9:mm3%% D-2: (Nominal Dix) B1 over 1:: mm thi!&3%% 1;7;1: type 2.
5llstations
(i) ota stone will be provided atntran!e hall passage !orridor
verandah where heavy wear and tearis li&ely to be there.
(ii) /irst /loor @ above1G-2: mm thi!& mirror polished &ota stoneflooring set with neat !ement slurry mixed with!olour to mat!h the !olour of stone over 2: mm3%% D2: grade ( Nominal Dix)
(ii) 3attern of ota0 marble will beprovided in entran!e hall 5dm blo!& 0*e!hni!al a!!n Offrs Dess. SN%OsDess et!.
(e) Darble/looring0 graniteflooring
(i) 8round /loor2:mm thi!& white marble stone flooring set withneat !ement slurry mixed with !olour to mat!hthe !olour of stone over 9:mm 3%% D2: grade (Nominal Dix) over 1:: mm thi!& 3%% 1;7;1:type 2.
ZONAL SPECIFICATIONS - 21 - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
22/92
1 2 9 6 7
(ii) /irst /loor @ above1G-2: mm thi!& mirror polished marble stone
flooring set with neat !ement slurry mixed with!olour to mat!h the !olour of stone over 2:mm3%% D2: grade ( Nominal Dix).
(f) *erra>>o/looring
(i) 2:-22 mm thi!& fa!tory made terra>>o tiles inwhite !ement laid over 17 mm !ement s!reed in%D 1;6 set with neat white !ement slurry mixedwith !olour to mat!h the !olour of tile over 9:mm3%% D2: grade ( Nominal Dix) over 1:: mmthi!& 3%% 1;7;1: type 2
(ii) /irst /loor @ above2:-22 mm thi!& terra>>o tiles in white !ement laidover 17 mm !ement s!reed in %D 1;6 set withneat white !ement slurry mixed with !olour tomat!h the !olour of tile over 2: mm 3%% D2:grade ( Nominal Dix)
5llstations
(g) 5!idesistan!e/looring
2: mm thi!& a!id esistant tiles !onforming to ES-667A laid over two !oats of a!id primer s!reedand mortar.
5llstations
*iles shall be provided &eeping in viewthe type0!on!entration of 5!id anduality of dis!harge as permanufa!turer,s instrns.
(h) 3#% /looring. 2 mm th 3#% floor laid over 3%% floor withadhesive.
5llstations
ZONAL SPECIFICATIONS - 22 - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
23/92
1 2 9 6 7
(4) /loor forme!hani!al
laundries
9:mm thi!& granolithi! !on!rete finished withsodium sili!ate treatment as per SS over 1::
mm thi!& 3%% 1;2;6 over 17:mm thi!& hard!ore.
5llstations
(&)
-
7/26/2019 Zonal Specifications of Ceaf Delhi
24/92
1 2 9 6 7
(iv) %% Shelves and 3ro4e!tions7mm thi!& plaster in %D 1;9finished smooth.
(b) xternal3laster.
(i) B& masonry17mm thi!& in !ement mortar in %D 1;6 mixedwith approved water proofing !ompound as permanufa!turer,s instns.
(ii) Stone masonry2:mm thi!& in two layers !onsisting of first layer1:mm thi!& in %D 1;6 and top layer 1: mm thi!&in %D 1;? mixed with water proofing !ompoundas per manufa!turer,s instrns
5llstations.
(d) Bearing 3laster 2: mm thi!& in !m (1;6) over full width of bearingwith two layers of bitumen impregnated paper!onforming to ES-7196-1IAA.
5llstations
(e) 3ointing (i) B& masonryeyed pointing in %D 1;9 .
5llstations.
Stone masonry3ointing as per ar!hite!tural reuirement in %D1;9.
12. S&irting 17: mm high S&irting will be provided mat!hingwith floor.
5llstations
ZONAL SPECIFICATIONS - 26 - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
25/92
1 2 9 6 7
19. Fado %erami! gla>ed *ile.e tile
over 1:mm thi!& s!reed in %D 1;9.
5ll
stations
*o be provided in &it!hen bath and
toilets of offi!ers trs laboratories hospnit!hes over sin&s0
-
7/26/2019 Zonal Specifications of Ceaf Delhi
26/92
1 2 9 6 7
(iii) /ly proof shutters
92097 mm thi!& fa!tory made fly proof door as
per ES 1::9 (1IGA) from se!ond !lass +ed0 power !oated windowswill be provided in !ase of spe!ifi! reuirement@ if in!luded in 55
(iii) =3#% windows !an be provided as per ar!hremt.
aluminium will be 17 mi!ron. Se!tions ofthe aluminium window will be fromEndal0+indal!o0 Hindal.
(iii) =3#% windows !an also beprovided in te!hni!al a!!n0 single living 0Desses.
(d) Steel doors Steel doors with angle iron frame with 1.: mmthi!& 3BE sheet !overing.
5ll Stns /or Stores otstradesman shopshopping !omplex et!.
(e)
-
7/26/2019 Zonal Specifications of Ceaf Delhi
28/92
1 2 9 6 7
(iii) Deat safe @other items of&it!hen.
(aa) /rame. 2nd!lass hard wood(ab) Shutters. 1G mm thi!& one side prelaminated parti!leboard phenol formaldehyde
bonded exterior grade.
5ll stns (i) Built in furniture shall be provided asindi!ated and authorised in -in-%typi!al drawings.
(ii) En SD Barra!&s built in furniture i.e.writing table @ boo&shelf shall beprovided as authori>ed vide 8OE DOFletter No ?77G20C90?9) poli!y-1)16?60Fo-EE0F (ing i) 90607 mm thi!& plain frosted0pin headed sheetglass as per remt
ii) 7.7mm thi!& wired0sheet glass for windowpanes0north light gla>ing in fa!tories wor&shopand at other pla!es where sho!& absorbing isred.
iii) 7.7 mm heat absorbing !oloured glass of(!alorex brand) of red thi!&ness for 5% rooms
(iv) /loat glass for large gla>ing area.
5llstations
/rosted0figured glass shall be providedin all windows0 ventilators of
-
7/26/2019 Zonal Specifications of Ceaf Delhi
29/92
1 2 9 6 7
(v) Fouble glass for sound proofing @ heatinsulation
1? Dosuito proofing SS wire mesh of wire dia :.7? mm andapertures of 1.1? mm.
5llstations.
1A. 8uard Bars08rills (i)
-
7/26/2019 Zonal Specifications of Ceaf Delhi
30/92
1 2 9 6 7
%eiling*hree !oats of white wash as spe!ified.(b)Darried 5!!n
-
7/26/2019 Zonal Specifications of Ceaf Delhi
31/92
1 2 9 6 7
%upboard @ wardrobes*wo !oats syntheti! enamel paint on internalplastered surfa!e over a !oat of primer 5ll
stations(b) xternal finish 3lastered03ointed surfa!es(i) *wo !oats of !ement base paints over a !oatof primer
(ii) *wo !oats of !olour wash over a !oat of whitewash.
5llstations
Superior finish li&e grit wash weatherproof paint will be provided if in!luded in
55
-
ZONAL SPECIFICATIONS - 91 - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
32/92
Intern%l W%ter Su##l
1 2 9 6 7
1 8eneral 5ll plumbing wor& in!luding it!hen0*oilets0
-
7/26/2019 Zonal Specifications of Ceaf Delhi
33/92
1 2 9 6 7
6 e of water meter for Offi!ers and other paying!onsumers shall be 27 mm dia.
5ll Stns
7 3ipe and/ittings 5ll pipes for internal water supply shall be of mildsteel galvani>ed tubes (pipes) of medium grade asper ES ; 129I (3art-E).
/itting of 8E 3ipes shall be mild steel galvanised ormalleable !ast iron pipe fitting galvanised as per ES-129I (3art-EE) and ES-1GAI (3art E to Q).
5ll Stns
? Bib taps @ stopvalves
Bib taps and stop valves shall be 3*D* (ESE mar&ed)for H%O0O Dd a!!n @ O*D a!!n ex!ept offi!ersmess single offi!ers trs adm blo!& DE room.
5ll Stns
A /an!y type bibtapes0stop!o!&s
%ast !opper alloy ni!&el !hromium plated fan!y typefittings for Offi!ers toilets adm blo!& H%O,S mess DErooms @ in other important bldgs bib taps and stopvalves shall be of fan!y type of !ast !opper alloyni!&el !hromium plated !onforming to ES M GI91 andas per !lause 1G.17 of SS 1II1 (3art-E).
5ll Stns
G Self !losing Self !losing taps shall be of H5%O or euivalent tapspattern !onforming to ES ; 1A11 and !lauses 1G.1A ofSS 1II1 (3art E)
5ll Stns *hese will be provided only on spe!ifi!reuirement.
ZONAL SPECIFICATIONS - 99 - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
34/92
1 2 9 6 7
1: 3iller taps0single
hole basinmixer
(i) 3illar taps shall be with !apstan head ni!&el!hromium plated !onforming to ES ; 1AI7 and !lause
1G.1? of SS (3art E) 1II1 ex!ept in offi!er,s toiletsand important bldgs where pillar taps shall be fan!ytype !onforming to ES GI96 and !lause 1G.1?.1 ofSS 1II1 3art E.
(ii) En D+ SSC and DE rooms pillar taps fan!y typewith elbow handle shall be provided .
5ll Stns Single hole basin mixer will beprovided in offrs a!!n on
-
7/26/2019 Zonal Specifications of Ceaf Delhi
35/92
SANITAR+ FITTINGS,SEWAGE
1. 2 9 6 7
1 /lushing %istern 3#% low level /lushing %istern 1: 012.7 liters!apa!ity for n
-
7/26/2019 Zonal Specifications of Ceaf Delhi
36/92
1 2 9 6 7
7 ain
-
7/26/2019 Zonal Specifications of Ceaf Delhi
37/92
ROA-S, PAT.
SerNo
Etem Spe!ifi!ation Station emar&s
1 (a) Soling (i)17: mm (spread thi!&ness) with bro&enboulders or uarried stone intersti!esfilled surfa!e formed and rolled and!onsolidated to reuired gradient and!amber.
5ll other stns *ype of aggregate will be as peravailability in the lo!al area.
(b)e) for se!ond layer spread rolled and
!onsolidated to red gradient and !amber .
5ll stns *hi!&ness of soling and
-
7/26/2019 Zonal Specifications of Ceaf Delhi
38/92
(d) 5sphalti!%on!rete
Bituminous semi dense asphalti! !on! 27 mm 09:mm !onsolidated with 7.7P binder!ontent(G:01:: straight run bitumen)
SerNo
Etem Spe!ifi!ation Station emar&s
(d) dging B&0Stone dging 5ll stns
(e) erb Stone 3%% D27 grade 5ll Stns
.(f) /oot 3ath0 +ard
standing3%% 3ath
(i) 3%% D 2:( Nominal Dix) A70 1:: mm thi!&laid over 1:: mm th stone hard !ore. *op of the!on!rete will be !heuered finish.
(ii) Enterlo!&ing 3avers 7: mm th D 97 gradeover 1:: mm th 3%% 1;7;1: type 2
(iii) 3%% !heuered tile 2:-22 mm th of si>e27:x27: mm laid over 2: mm th s!reed 1;6over 3%% 1;6;G type F2.
(iv) Fesigners tile li&e =ltra of different si>es as
per remt laid over 2: mm th s!reed 1;6 over3%% 1;6;G type F2.
5ll stns
ZONAL SPECIFICATIONS - 9G - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
39/92
2
E3tern%l W%ter Su##l
1 2 9 6 7
1 3ipes 3ipes of si>es above G: mm bore shall be du!tileiron as per ES-G92I for pipes and ES-I729 for fittingsand upto G: mm of galvani>ed iron medium uality8E pipes as per ES-129I 3art E.
5ll Stns
2 %.E /ittings *hese shall be as per ES-179G (3art to QQEEE). -do-
9 F.E /ittings *hese shall be as per ES- I729. -do-
6 Slui!e valve Slui!e valves shall be as per ES-AG: -do-
7 'aying0Hointing of pipes 3ipes shall be laid and 4ointed as spe!ified in SSand ES-9116.
-do-
?
-
7/26/2019 Zonal Specifications of Ceaf Delhi
40/92
Intern%l Ele$tri$ Su##l
SerNo
Etem Spe!ifi!ation Station emar&s
. es of aluminum !ondu!tor !ables shall be asunder ;-
(i) 'ighting and fan !ir!uit - 1.7 s mm
!ables(ii) 3ower !ir!uit !ables - 2.7:s mm(iii) Sub main !ables - 6 s mm0? S mm
+owever higher si>es of !able shall be determinedas per a!tual load.
(d) a!h lighting0fan sub !ir!uit shall have not morethan eight points of lights0fans075 so!&et outlets.'oad on ea!h sub-!ir!uit shall be limited to G::
-
7/26/2019 Zonal Specifications of Ceaf Delhi
41/92
1 2 9 6 7
(f) /lame proof ele!tri!al wiring shall be provided inDaga>ine bldg0xplosive stores along with flameproof fittings and !ontrol swit!hes.
(g) Dulti stranded aluminum !ondu!tor !ables shouldbe provided.
(h) *erminal boxes shall be of pressed steel of1.?mm thi!& and shall be sun& in wall and be!overed with ba&elite sheet 9 mm thi!&. *hese shallbe earthed.(&) /or wiring explosive bldgs solid drawn rigid steelele!tri! resistant welded (
-
7/26/2019 Zonal Specifications of Ceaf Delhi
42/92
1 2 9 6 7
2 Swit!hes 3iano type swit!hes (ESE mar&ed) shall be used. 5ll stns
9 Dulti 3urpose So!&et
outlets
7 5mp plug so!&et shall be 2 pin and 9 pin type. 17
5mps plug so!&et shall be 9 pin 7 5mps and 9 pin 175mps type. 5ll so!&et out lets shall be fixed atheight of 1.2 m from floor level.
5ll stns
6 arthing arthing shall !omply with ES-9:69 and as per!lause 1I.19A to 1I.16? and as shown in ele!tri!alplate of SS 3art E 1II1.
5ll stns
7 Esolators D%Bs and FBs Esolators and D%Bs shall be of suitable rating tomat!h the !ir!uit reuirement. Fistribution boardsshall be fa!tory made.
5ll stns
? Deter Boxes0Swit!h
Boxes
DS sheet type meter boxes0swit!h boxes shall be
used. No wooden !omponent shall be provided inthese boxes.
5ll stns
A. Dis!ellaneous (a)
-
7/26/2019 Zonal Specifications of Ceaf Delhi
43/92
1 2 9 6 7
(e) Et shall be ensured that swit!h for one of the lightpoints in bed room of md offi!er,s a!!n shall be nextto the bed.
(f) 1: 5mps D%B S3N' with en!losure on EE nd !lass+< board 2: x 2: x 6 !m will be provided in maintoilet for 8eysers.
(g) /or fixing battens fittings boards et! inele!trifi!ation wor& wooden gutties shall not be used.Only rawl plug03#% expendable sleeves shall beused.
(h) 6: mm dia 8E 3ipe light grade will be laid below//' in stair !ase and along wall for the main swit!h
board all !on!ealed.
5ll stns
G xhaust /an (a) 29: mm sweep for &it!hen of Dd offi!ers a!!n.(b) Suitable si>e for ea!h !oo& house and otherauthorised lo!ations.
5ll stns
I 8eysers 8eysers shall be of standard ma&e ESE mar&edverti!al type and installed with the following ;-(a) 3lug and so!&et(b) #ent pipe(!) /usible plug(d) 3ressure redu!ing valve in !ase of multi storyed
bldgs.(e) Safety valve(f) 3roper earth !onne!tion(g) Separate inlet pipe line from tan& to geysers
5ll stns
ZONAL SPECIFICATIONS - 69 - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
44/92
1. 2. 9. 6. 7.
1: *elephone !onne!tion So!&et with !on!ealed !onduit upto the external wallof bldg at following lo!ations ;-(a) Dd Offi!ers 5!!n
(b) %ivilian type E# @ # a!!n(! )Offi!ers0*e!h bldgs(d) Enstitution bldg.
5ll stns
11 Foor %all Bell Shall be of standard ma&e and provided for ;-
(a) %ivilian type E to # 5!!n
(b) Dd offi!er,s 5!!n
5ll stns
12 5ntenna 5ntenna Bra!&et is to be provided with hole and
3#% %onduit in in external wall of the building forfollowing a!!n.(a) Dd a!!n for all ran&(b) %ivilian type E to #
5ll stns
19 'ight /itting *he following lifht fittings shall be used for thelo!ations as shown against ea!h;-
(a) 1x6:< Box type /*' fitting(i) Dd offi!ers in!ldg %iv offrs uarters in it!hensFrawing room and dinning rooms.(ii) O*D a!!m
(b) 1x6:< 3atti type /*' fittingDd Offrs Ctrs in rooms ex!ept mentioned at (a) (i)above Dd H%O0O a!!n 0 %iv a!!n *ype E to EEE in allrooms and &it!hen servant trs and garages of offrstrs basements et!
5ll stns
ZONAL SPECIFICATIONS - 66 - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
45/92
1 2 9 6 7
16%/' /ittings. En ea!h rooms of md a!!n toilets0bath0e shall be provided for allDd a!!n Desses 5dm0*e!h a!!n and all importantbuildings. Overhead servi!e !onne!tion with weatherproof !able of suitable si>e shall be provided forstorage a!!n hutted a!!n garages @ buildings oftemporary spe!ifi!ation.
5ll stns
1A *esting On !ompletion of installation the testing shall be!arried out as per !lause 1I.16? of SS 3art E.
5ll stns
ZONAL SPECIFICATIONS - 67 - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
46/92
1 2 9 6 7
1A Obstru!tion 'ight Obstru!tion light will be provided on high risestru!tures for air !raft warning wherever !onsideredessential.
5ll stns
1G. 'ighting 3rote!tion 'ightning prote!tion shall be provided in maga>inesand explosive stores bul& petrol installations signaland !omputer installations air !raft hangers 5*%building missile a!!ommodation and other importantbuildings and tall stru!tures as per provisions ofEndian Standard spe!ifi!ations.
5ll stns
-
ZONAL SPECIFICATIONS - 6? - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
47/92
E4TERNAL ELECTRIFICATION
SerNo
Ite S#e$i!i$%tion St%tion& Re%rk&
1 8eneral (a) 5ll materials fittings and euipments used inele!tri!al reuirement wor& shall !omply with thereuirements of relevant Endian Standard spe!ifi!ation.*he ma&es shall be standardi>ed0approved by this +Cfrom time to time.(b) En all ma4or ele!tri!al installations su!h as mainre!eiving and distribution sub stations industrialestablishments transmission and distribution lines and!able networ&s safety pro!edures instru!tion forwor&ing on low medium and high voltage lines andapparatus and safety pra!ti!es listed out in ES 721?
shall be followed to the extent appli!able.(! ) *he system0Enstallation shall !onform to S-A92 andshall be as per ES 721? shall be followed to the extentappli!able.(d) 5ll ele!tri!al euipments provided shall satisfy thereuirement laid down in ES ; 1?6? %ode of pra!ti!efor fire safety bldgs (8eneral) ele!tri!al installation andES 9:96 %ode of 3ra!ti!e for fire safety of industrialbuildings ele!tri!al generating and distributionstations to the extent appli!able.
5ll stns *he swit!h boards shall beprovided with two separateearthing wherever 9 phasesupply being provided.
2 Steel *ublar poles
swaged type
*hese shall !onform to ES-2A19 5ll stns *hese will be used as red
basis9 3re-stressed !on!rete
poles*hese shall !omply with the reuirement of ES M 1?AG 5ll stns
ZONAL SPECIFICATIONS - 6A - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
48/92
1 2 9 6 7
6 Over head lines (a) %ondu!tor used shall be 5%S and shall !onfirmto ES-9IG (3art E)
(b) Hoints on O+ !ondu!tor at tapping points and4umper points shall be sealed with epoxy sealing!ompound.
5ll stns
(! ) +eat shrin& or !old shrin& !able 4oint0boxes for +*Q'3 !ables shall be used in pla!e of %E !able andboxes both or indoor and !ut door 4oints.
(d) 5ll non-galvanised steel stru!ture shall be paintedwith anti !orrosive paint @ further with 2 !oat of
syntheti! enamel paint or aluminum paint.
(e) 'ightning arresters shall be provided at terminatingends on +* and '* overhead lines at all two0four polestru!ture mounted with +* air brea& swit!hes @ shouldbe of distibution !lass expulsion type 7 5 dis!harge!urrent.
7 %ables +* !able shall be Q'3. '* !ables shall be 3#%0Q'3 insulated. Both shall be armoured and as perES with aluminum !ondu!tors.
5ll stns
ZONAL SPECIFICATIONS - 6G - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
49/92
1 2 9 6 7
? *ransformers (a) =nless otherwise spe!ified transformers upto 27:#5 shall be aluminum winding and above 27: #5 of!opper winding.
(b) Out door transformers shall be upto 27: #5!apa!ity. /or higher !apa!ities indoor transformersshall be provided ex!ept 99011 # transformers. Outdoor transformers upto 1:: #5 !apa!ity shall n bepole mounted. /or areas where wind velo!ity is highthese out door transformers shall be installed on a3%% platform on ground with prote!tive fen!ing.(! ) *ransformer must have its neutral brought out forearthing
5ll stns
(d)*ransformer must be earthed by two independentearthing with 8E strips for body and by another twoindependent earths with 8E strips for neutral.
(e) *ransformers shall be installed as des!ribed in ES-1::2G (3art EE).
A Swit!h 8ears (a) Esolating arrangement will be made for both +* and'* systems. *he '* isolation being effe!tive forneutral as well. Oil or va!uum !ir!uit brea&er (#%B)should be provided for +* system for !apa!ity 6::
#5 and above.
(b) 5 pad lo!& must be provided for lo!&ing theoperating handle of gang operated air brea& swit!hes.
5ll stns
ZONAL SPECIFICATIONS - 6I - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
50/92
1 2 9 6 7
(! ) Swit!h fuses shall be provided for all '* main!ontrols upto 6:: 5mps. Beyond this it should be
5%Bs0 O%Bs.
(d) D%Bs %%Bs or D%%Bs shall be provided for!ontrol of out going !ir!uits.
(e) 5ll metal swit!h gears and boards shall be fa!torymade and shall be painted prior to er!etion with one!oat of anti!orrosive primer and after ere!tion with two!oats of approved enamel or alluminium paints .
(f) D%%B upto G:: 5mps load ('* system) shall be
used.
(g) 5%B0O%B above G:: 5mps load ('* system) shallbe used
(h) #%B for 99 # @ 11# system shall be used
G Fistribution pillar boxes(
-
7/26/2019 Zonal Specifications of Ceaf Delhi
51/92
1 2 9 6 7
1: *esting 0 !ommissioning 5ll ele!tri!al installations shall be systemati!ally testedas per E rules 0 relevant ES0SS and re!ordsmaintained. 3re-!ommissioning tests shall be !arriedout by le!tri!al Enspe!tor.
5ll stns
11 8OF Et should be mounted on 12 insulators( 6 insulators onea!h phase) @ min 2:: 5 at 11 #.
5ll stns
ZONAL SPECIFICATIONS - 71 - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
52/92
Mi&$ell%neou& Work&
SerNo
Etem of wor& Spe!ifi!ations Stations emar&s
1 /ire /ighting wor&s /ire fighting wor&s in this >one mainly pertains to amnrelated wor&s ie Dags @ S+s +angers @ some otherte!hni!al buildings as per user remt. *he fire fightings!hemes are to de!ided as per the re!ommendation of/ire 5dvisor of DOF.
5ll
En other buildings /ire fighting wor&s shall be planned allas per ES ; 1?6G M 1I?1.
2. ain e the surplusmonsoon run-off whi!h otherwise goes waste.
5ll *he s!heme is to be drawnup in !onsultation with%entral 8round
-
7/26/2019 Zonal Specifications of Ceaf Delhi
53/92
1 2 9 6 7
few lights in remote areas or imp bldgs from se!urity pointof view may be provided as de!ided by the planner.
6. 5rbori!ulture 5rbori!ulture wor&s are to be planned and exe!uted interms of poli!y letter issued by 8OE DOF letter No9(6)0IA0FO-EE0F(
-
7/26/2019 Zonal Specifications of Ceaf Delhi
54/92
1 2 9 6 7
xe!uting 5gen!y M *he arbori!ulture wor&s san!tioned asa part of the pro4e!t will be exe!uted through DS in!onsultation with lo!al +orti!ulture or /orest Fepartment.
7. /urniture*imber
*imber shall be Est !lass seasoned hard wood(tea&) for allwooden furniture arti!les or as shown on standard drgs.
(i) 3ly wood 3lywood shall be of B
-
7/26/2019 Zonal Specifications of Ceaf Delhi
55/92
1 2 9 6 7
(vi) %otton Newar Best uality of !otton tread shall be used in newar of si>e7:.77 mm wide !losely woven.
-
7/26/2019 Zonal Specifications of Ceaf Delhi
56/92
A ##3 5A6
Coon Burnt Cl% Bri$k&
%ommon burnt !lay building bri!&s (here after termed as bri!&s) shall !onform to the reuirements laid down in ES 1:AA-1IG?. Bri!&s
shall have minimum !ompressive strength 1:: g0%D2
(%lass designation 1::).
*he bri!& shall have smooth re!tangular fa!es with sharp !orner @ slight round edges and shall be well burnt uniform in !olourfree from !ra!&s flaws nodules of lime and emit !lear ringing sound when stru!&.
S%#ling %nd te&t&7Samples of bri!&s shall be sub4e!ted to the following tests.
Fimensional toleran!e.
e of lot agiven in *able 1 below. *he sample thus ta&en shall be stored in a dry pla!e until tests are made.
Samples shall be ta&en as per details given below;-
S%#ling !ro % &t%$k.*he bri!& sta!& the sta!& shall be divided in to a number of real or imaginary se!tions and the reuirednumber of real and imaginary se!tions and the reuired number of bri!&s drawn from ea!h se!tion. Sampling from tru!&s shall beas per ES; 7676.S!ale of sampling and !riteria for !onformity for visual and dimensional !hara!teristi!s; -
ZONAL SPECIFICATIONS - 7? - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
57/92
No. of bri!&s in a lot
/or !hara!teristi!s spe!ified for individual bri!&s No. of bri!&s to besele!ted fordimensional!hara!teristi!s 2:bri!&s
No. of bri!&s to be sele!ted 3ermissible no. of defe!tive in thesample
2::1-1:::: 2: 1 6:
1::::-97::: 92 2 ?:
97::1-7:::: 7: 9 G:
b) 8i&u%l $'%r%$teri&ti$&. *he number of bri!&s to be sele!ted from a lot and shall be in a!!ordan!e of !ol. 1 @ 2 of *able forvisual !hara!teristi!s in all !ases and dimensional !hara!teristi!s if spe!ified for individual bri!&s. 5ll the bri!&s sele!ted abovein a!!ordan!e with !ol. 1 @ 2 of *able shall be examined for visual !hara!teristi!s as spe!ified in !ol 2. Ef the number of defe!tivebri!&s found in the sample is less than or eual to the !orresponding number as spe!ified in !ol. 9 of table the lot shall be!onsidered as satisfying the reuirements of visual !hara!teristi!s otherwise the lot shall be deemed as not having met thevisual reuirements.
!) -ien&ion%l $'%r%$teri&ti$&7*he number of bri!&s to be sele!ted for inspe!ting the dimensions and toleran!e shall be in
a!!ordan!e with !ol. 1 @ 6 of *able 1. *hese bri!&s will be divided into groups of 2: bri!&s thus formed will be tested as per ES;1:AA for all the dimensions and toleran!e as given below
i) *ype of bri!&s M Non modular bri!&s
ii) Nominal si>e T 29:Q116QA7mm
iii) 5!tual si>e M 29:Q111QA: mm
iv) Fimensional for group of 2: bri!&s
'ength 662 to 6AG !m (6?: U 1G !m)
-
7/26/2019 Zonal Specifications of Ceaf Delhi
58/92
(d) 5 lot shall be !onsidered having found meeting the reuirements of dimensions and toleran!e if none of groups of bri!&sinspe!ted fails to meet the spe!ified reuirements.
(e) S!ale of sampling and !riteria for physi!al !hara!teristi!s shall be as per ES; 7676.
(f) *he 'ot whi!h has been found satisfa!tory in respe!t of visual and dimensional reuirements shall be next tested for
physi!al !hara!teristi!s li&e !ompressive strength water absorption and efflores!en!e.
(g) V*he physi!al reuirements of the bri!&s shall be tested as per ES; 96IG (3art E to E#)
(h) *he bri!&s shall have physi!al !hara!teristi!s as spe!ified here under;-
-
7/26/2019 Zonal Specifications of Ceaf Delhi
59/92
A##3 5B6RCC WOR9S
*he minimum grade of !on!rete for %% wor& shall be as follows depending on type of !onstru!tion and importan!e ofstru!ture; -
(a) 5ll %% wor& will be in D27 (Fesign Dix) for moderate exposure
(b) e of aggregate - 2: mm for all se!tions more than A7 mm thi!&
1: mm for se!tion A7mm
(d) Dinimum !ement !ontent - 5s ES 67?
(e) Daximum water !ement ratio - :. 67 for D9: and :.7: for D27
(f)
-
7/26/2019 Zonal Specifications of Ceaf Delhi
60/92
(4) Dax temperature of !on!rete at the time of pla!ing of !on!rete 6:%.
(&) *ype of aggregate. %oarse aggregates will be !rushed stone graded aggregate !onforming to ES 9G9 @ fine aggregates!onforming to ES 9G9 and 8rading one E EE and EEE.
(l) Fegree of !ontrol - #ery good ( ef table 6: of S3 29 M1IG2)
(m)
-
7/26/2019 Zonal Specifications of Ceaf Delhi
61/92
e
En !ase of !olumns of minimum dimension of 2:: mm or under whose reinfor!ing bars do not ex!eed 12mm a nominal
!over may be of 27 mm
L xposure !onditions as per table 9 of ES 67?-2:::
/or further details !lause 2?.6 :f ES 67?-2::: be referred
G. *ransporting pla!ing !ompa!tion and !uring of !on!rete shall be as per !lause 19 of ES 67?; 2:::.
I. Furing hot and !old weather the !on!reting should be done as per the pro!edure set out in ES AG?1 part EE and part E.
1:.Sampling and strength of designed !on!rete mix shall be as per !lause 17 of ES 67?; 2:::.
11.*he !on!rete may be a!!epted as per !lause 1? of ES 67?; 2:::.
12. Enspe!tion of !on!rete stru!ture shall be as per !lause 1A of ES 67?; 2:::.
19.*he following do!umentation shall be maintained at site; -
*est reports and manufa!turers !ertifi!ate for material%on!rete mix design details3our !ards for site organi>ation and !learan!e for !on!rete pla!ement.e!ord of site inspe!tion of wor&manship and field test.Non !onforman!e reports !hange ordersCuality !ontrol !harts andStatisti!al analysis.
16. Errespe!tive what ever mentioned in SS regarding %% wor&s all %% wor& shall be exe!uted as per ES 67- 2:::.
ZONAL SPECIFICATIONS - ?1 - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
62/92
A##3 5C6
WATER PROOFING TREATMENT TO RCC ROOF : S;N9EN FLOOR
1
-
7/26/2019 Zonal Specifications of Ceaf Delhi
63/92
shall be !leaned of all foreign matter su!h as fungus moss dust et! by wire brushing and dusting. /or !ast iron drainout lets a grove shall be !ut around to tu!& in the treatment. %on!rete angle-fillets shall be provided at 4un!tionsbetween roofs and verti!al fa!es of walls (parapet and other walls) around obsta!les su!h as pipes !himneysta!&set!. and other similar situation to ease up about !orners.
(iii) 5pply 3rimer !onforming to ES; 99G6-1I?7 L :.9 g0SD to be applied on prepared surfa!e till the surfa!e is
properly impregnated .
(iv) 5fter the primer has dried the membrane will be laid by tor!hing to the surfa!e .
(v) *opping of polymeri! membrane
(i) oof slab -- Bri!& tiles 6: mm thi!& bedding layer of %D 1;6 and 4ointed @ pointed in %D 1;6 . 'inseed oil L7P by weight of !ement shall be mixed in !ement mortar for s!reed and pointing to the bri!& tiles laid over 7: mmthi!& 3%% padding type Bo . 5fter laying the !uring shall be !ured with water ponding.
(vi) 'aying of polymeri! water proofing membrane and bonded !ompletely to the substrate @ the overlaps are thens!aled0fused by flame as per manufa!ture instru!tions.
7. L%ing #ro$edure %re %& under ed out at the ends
shall be removed as laying pro!eeds.
(b)
-
7/26/2019 Zonal Specifications of Ceaf Delhi
64/92
(!) *he minimum overlaps of 1:: mm shall be allowed at the ends and sides of strips polymeri! membrane. 5lloverlaps shall be firmly bonded by heating and fusing the layer of asphalt and melting the prote!tive plasti! film butta&ing !are not to over heat this as too mu!h heat !an harm the !entral polyethylene !ore whi!h is essential for waterproofing fun!tion.
?. O/erl%# !u&ing et'odolog
(i) eep the overlap open with the help of trowel and the dire!t the flame uniformly inside and towards bothmembranes. ontal or verti!al depending on whether they aresituated in the floor or in the parapet walls. En either !ase the treatment is the same although the diffi!ulty ofappli!ation may vary. *he !orre!t exe!ution of a drain should in!lude the following steps.
(a) %ut a strip of polymeri! membrane 27 !m in width and length eual to the perimeter of the drain adding 1: !m forthe overlapping. /lame bonds the part of the strip to be inserted into the drain. i.e. approx. 17 !m.
(b) %ut the protruding end of the drain strip verti!ally upwards with the aid of a heated trowel into as may slits as are
ne!essary to then be able to press it downwards and flame bond it to the surrounding roof de!&. *hen with thehelp of the trowel and tor!h go over the exterior of the drain to obtain an even spread of the asphalt and fill in allthe pores.
ZONAL SPECIFICATIONS - ?6 - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
65/92
(!) %ut a suare pie!e of polymer membrane about 17 !m larger than the diameter of the drain. /lame bonds thissuare over the drain opening as !entered as possible.
(d) *hen using the heated trowel !ut the part that !overs the opening of the drain in to the shape of a star with Gpea&s. /old the pea&s outwards and heat them one by one with the tor!h and then insert them into the drain.3ressing them down with your fingers to ensure perfe!t adheren!e.
(e) *he last step is to go over the inside of the drain leveling of the surfa!e. *he drains shall be at least 17 mm lowerthan the substrata so that the extra thi!&ness !aused by the various layers of the polymeri! membrane do not!ause unne!essary ponding of water.
G. ontally and bonded effe!tively withpolymeri! membrane as explained above. *he membrane shall be prote!ted with 17 mm thi!& !ement mortar 1;6plaster and 3%% !oping at top of the parapet.
I. Te&ting
/reuen!y of test M 5t least one test !onsist of three sample spe!imen at random from ea!h lot. *he 3olymeri!membrane shall be got tested from the test house as mentioned here under;-
(a)%hemi!al @ Deetallurgi!al servi!es *.S No. ?9 SEF%O Endustrial state
&&aduthangal %hennai M ?:::IA /ax No. 66 M 2912I66
ZONAL SPECIFICATIONS - ?7 - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
66/92
(b) %N*5' ENS*E*=* O/ 3'5S*E% N8ENEN8 @ *%+NO'O8 (Dinistry of %hemi!al and /ertili>ers8ovt. of Endia) 8undy %hennai M ?:::92 /ax No. I1 M 66 M 2966?A9
(! ) National *est +ouse 5lipore %al!utta
1:. xe!ution of wor&
*he wor& will be got exe!uted through authori>ed appli!ator of the manufa!ture under stri!t supervision of ngineer-in-%harge.
11. 8uarantee
8uarantee for 1: years will be given by the !ontra!tor and submitted to the 8.
ZONAL SPECIFICATIONS - ?? - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
67/92
Re$oended Fini&'e& A##d3 =-
S7No7 T#e o! Bldg Flooring W%ll& Windo"& -oor& Re%rk&
B%&e Int E3t
:1. Offrs Dess -/oyer M Darble with
borders.-Dain stair!aseDarble.-%orridors and otherstair!aseota stone withmarble bounders.-5nte room0Fining0Bar.Darble0#itrified withborders.
-Other rooms
%erami!tiles.6::x6::mm
-*erra!es (if
any)ota stone
-it!hen
!omplexota stone withgranite tops onwor&ing shelf,s.
-*oilets
Non s&id !erami!tiles.
-8uest rooms
#itrified tiles.
edtiles with
borders.
(a)
Fholpur!ladding.(b) 8ritfinish.(!)ed).
(a) *ea& paneled
doors with et!hedglass at mainentran!e door.
/or other rooms.(b) /lush doorswith de!orativefinish (3olished).
(a) /alse !eiling to
be provided in5ntiroom diningBar 3vt Fining.
(b) 5ll internal roadsbe made of3%%0interlo!&ingpavers.
(!) ailing to stair!ase be of stainlesssteel0DS pipes.
(d) /orpar&ing0paved area
M Enterlo!&ingpavers.(e) 'ight fitting!ombination ofde!orativefillings0%/'.(f) Semi stall urinals
oval type
-
7/26/2019 Zonal Specifications of Ceaf Delhi
68/92
S7No7 T#e o! Bldg Flooring W%ll& Windo"& -oor& Re%rk&
B%&e Int E3t
(h) 5ll drain in frontand around to be!overed.
:2 Single 5!!n for
Offrs
ooms
#itrified *iles?::x?:: mm%orridor0 Stair+all0Stair %aseota Stone withmarble border
e2::x9:: .
%ement
basepaint
olled form
pre!oatedsteelwindows
/lush doors
Sold panel 3#%doorsFurosam /ly proofdoors
xt doors with
Dorti!e 'o!&s
:9. Dess forH%O,s0O
ntran!e hallDarble0ota stone%orridors @ stair!aseota with borders ofmarble.%lub room0Fining%erami! tiles6::x6::.it!hen !omplexota stone withgranite top on shelf.*oilets.Non s&id !erami!
tiles.3vt dining0%ards0 BarNon s&id !erami!tiles 6::x6:: mm*erra!e M ota
e2::x9::upto lintellevel.
%ementbasedpaint
olled
formpre!oatedsteelwindows.
ntran!e door5nte oom.5nodi>ed0powder!oated alu se!tionwith Gmm th glass.Others/lushed doorswith de!orativeviewer (3olished)
1. 3aved area to beprovided withinterlo!&ing paver.
2. =rinal-Semi stallwith !ensor basedflushing !istern.
9.
-
7/26/2019 Zonal Specifications of Ceaf Delhi
69/92
S7No7 T#e o! Bldg Flooring W%ll& Windo"& -oor& Re%rk&
B%&e Int E3t
:6. 'iving in a!!nforSN%Os05irmen
oomsota Stone.*oiletNon s&id !erami! tile.
Stair !aseota stone#erandahota with marble
-
7/26/2019 Zonal Specifications of Ceaf Delhi
70/92
in por!h.
S7No7 T#e o!Bldg
Flooring W%ll& Windo"& -oor& Re%rk&
B%&e Int E3t
(f) ailing of DSiron0stainless steelpipes depending upon
importan!e of bldg.
(g) 3#% door in bathrooms.
(h) e mirror over
-
7/26/2019 Zonal Specifications of Ceaf Delhi
71/92
'ES* O/ 3OF=%*S0E*DS5ppx
S No Etems @ Da&es0 Danufa!tures S No Etems @ Da&es0 Danufa!tures
1
2
9
6
3ly wood
(i) itply(ii) Dysore %hip board(iii) %entury plywood(iv) 8reen ply(v) Furian
3lain03relaminated 3arti!le Board
(i) itply(ii) Bhutan board(iii) Nepal board(iv) Dysore !hipboard(v) Novapan
DF/ Board(a) N=
-
7/26/2019 Zonal Specifications of Ceaf Delhi
72/92
S No Etems @ Da&es0 Danufa!tures S No Etems @ Da&es0 Danufa!tures
A. 3#% Foors(a) Solid 3#% 3anels(i) a4shri 3lastiwood
(ii) Sintex Endustries(iii) 5!!ura 3olyte!h 5hmedabad
(iv) Cuite xtrusions
I. =3#%
-
7/26/2019 Zonal Specifications of Ceaf Delhi
73/92
S No Etems @ Da&es0 Danufa!tures S No Etems @ Da&es0 Danufa!tures
19
16.
17
5% Sheets
(i) D0S am!o 5%% Sheets
"S
-
7/26/2019 Zonal Specifications of Ceaf Delhi
74/92
Nerola!S No Etems @ Da&es0 Danufa!tures S No Etems @ Da&es0 Danufa!tures
2:.
21
22
29
5!ryli!
-
7/26/2019 Zonal Specifications of Ceaf Delhi
75/92
S No Etems @ Da&es0 Danufa!tures S No Etems @ Da&es0 Danufa!tures
2G.
2I
9:
91
92
S8S< 3ipes(i) 3erfe!t Habalpur
(ii) Fevra4 End 8a>iabad
DS 3ipes @ fittings(i) BS*(ii) *5*5(iii) *E=35*E(iv) Hindal
8E 3ipes @ fittings(i) Hindal(ii) *5*5(iii) 3ra&ash Surya
%E #alves @ fittings(i) D0S BE
(ii) D0S =padhyay
Sanitary fittings( E
-
7/26/2019 Zonal Specifications of Ceaf Delhi
76/92
S No Etems @ Da&es0 Danufa!tures S No Etems @ Da&es0 Danufa!tures
9A.
9G
9I
6:
61
-
7/26/2019 Zonal Specifications of Ceaf Delhi
77/92
S No Etems @ Da&es0 Danufa!tures S No Etems @ Da&es0 Danufa!tures
6?.
6A
6G
6I
/alse !eiling
(i) 8ypboard(ii) 5rmstrong(iii) +ilux
(iv) 5erolite
8lass Dosai! tile
(i) %oral(ii) Bisa>a(iii) Opio
3aving0
-
7/26/2019 Zonal Specifications of Ceaf Delhi
78/92
(v) 5-ON *iles
S No Etems @ Da&es0 Danufa!tures S No Etems @ Da&es0 Danufa!tures
7:
71
72
79
*ransformer ?? # Step down0Step up
(i) 5'S*OD(ii) B+'(iii) E'OS5(iv) %OD3*ON 85#S
*ransformer 99 # Step down0step up
(i) 5'S*OD(ix) B+'(x) E'OS5(xi) %OD3*ON 85#S
*ransformer 11 # step down0step up 6::#5 above and in!luding 6:: #5
(i) 5'S*OD(ii) B+'(iii) E'OS5(iv) %OD3*ON 85#S
*ransformer 11 # step down0step up upto
6:: #5
(i) E'OS5(ii) ENFE5N *5NS/OD @ '%*E%5' 8=85ON
76.
77
7?
(vi) Bharat Bi4 lle(vii) SEDNS
(viii) %OD3*EON 85#S
8OF (8ang operated Fevi!e0Esolator 11# and above.
(i) 35%*E'(ii) H5E3=E5(iii) 5lston(iv) %romption
+* Swit!h 8ear 99 # #%B +* swit!h8ear0??#.#%B
(i) B+'(ii) 5BB(iii) S%+NEF(iv) SEDNS(v) %OD3*ON 85#S(vi) 5'S*OD
+* Swit!h 8ear 11 # #%B (i) B+' (ii) 5BB (iii) S%+NEF (iv)SEDNS
ZONAL SPECIFICATIONS - AG - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
79/92
(iii) 5H5S*+5N *5NS/OD '*F (v)%OD3*ON 85#S
S No Etems @ Da&es0 Danufa!tures S No Etems @ Da&es0 Danufa!tures
7A.
7G
7I
?:
+* Swit!h gear prote!tion relayle!trome!hani!al0Numeri!al
(i) B+'(ii) 5BB
(iii) S%+NEF
+* ing Dain unitS/?0#%B11 #
5BBS%+NEFSEDNS%OD3*EON
5'S*OD
3a!&age0unified Sub Station
5BBS%+NEFSEDNSB+'E'OS5%OD3*ON
+* %able Q'3(i) %5B' %O3O5*EON O/ ENFE5(iv) =NE#S5'(v) 5SE5N %5B'S (38)(vi) ENF=S*E5' %5B'S '*F
?1.
?2.
?9.
?6.
+* %able Hoints %old Shrin&able
BE'5 9DFNSON5 %+D
+* #oltage stabili>er
E'OS5%OD3*EON
5NF< #' 53'5B
%* @ 3* 11 #
(i) 5(ii) N8'ES+ '%8*E%(iii) %OD3*ON
%* @ 3*99#0??#
(i) 5
(ii) N8'ES+ '%*E%(iii) %OD3*ON
ZONAL SPECIFICATIONS - AI - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
80/92
(v) 3O' %5B
S No Etems @ Da&es0 Danufa!tures S No Etems @ Da&es0 Danufa!tures
?7. +* %able Hoints +eat Shrin&able
(i) 5%+D(ii) FNSON
(iii) 3'
?I. Fis! Ensulator 3in Ensulator 11#0??#
(i) B+' (ii) H5S+
??.
?A.
?G.
+*0'* Steel tubular swaged pole
(i) 5F#5N% S*' *=BS(ii) N5*EON5' *=BEN8 %O(iii) #E5D ENF=S*ES DO+5'E(iv) B%< 5N3=(v) =NE*F N8ENS 5N3=
+*0'* 3%% 3oles
(i) +ENF=S*5N 3/5B(ii) %DN* /5BE% %+5NFE85+(iii) 3%*O %+5NFE85+(iv) D0S %ON%* =FO8 H+5NSE(v) D0S DO+5N
'ightning 5rrestor
(i) OB'=D(ii) 5'S*OD 'D%OS %O(iii) %OD3ON(iv) S%+NEF
A:.
A1.
A2.
'* 5ir %ir!uit Brea&er upto 2::: 5mps(i) %OD3*ON(ii) ' @ *(iii) S%+NEF(iv) S35%58(v) '85NF
'* O%B upto 2::: 5mps
(i) % @ S 8
-
7/26/2019 Zonal Specifications of Ceaf Delhi
81/92
S No Etems @ Da&es0 Danufa!tures S No Etems @ Da&es0 Danufa!tures
A9.
(v) 8 3O
-
7/26/2019 Zonal Specifications of Ceaf Delhi
82/92
(iii) %ON%OF
S No Etems @ Da&es0 Danufa!tures S No Etems @ Da&es0 Danufa!tures
AG Sele!tor Swit!h
(i) ' @ *(ii) 55S(iii) %ON%OF(iv) 5%(v) SEDNS
G1. '* %ables 11:: #olts Q'3
(i) ENF=S*E5' %5B' (ENFE5) '*F(ii) 5H3=5 (35*E5'5)(iii) 3'55(iv) NE%%O(v) =NE#S5'(vi) %5B' %O3O5*EON O/
ENFE5(vii) /O* 8'OS*(viii) 5SE5N %5B'S (38)(ix) +5#''S
AI.
G:.
Endi!ating 'amps
(i) ' @ *(ii) 55S(iii) %ON%OF(iv) #5ES+NO(v) SEDNS
Dain Swit!h0 %hange over Swit!h (i) 5#''S
(ii) %ON*O' @ S
-
7/26/2019 Zonal Specifications of Ceaf Delhi
83/92
(vii)S%+NEF
S No Etems @ Da&es0 Danufa!tures S No Etems @ Da&es0 Danufa!tures
G9. F8 Sets
N8EN
(i) %=DDENS(ii) E'OS5(iii) %OD3*ON(iv) 5S+O ''5NF(v) =S*ON(vi) 85#S %O**ON
5'*N5*OE'OS5 '%*E%
5'S*ODS*5D/OFHO*+E
G7.
G?.
-
7/26/2019 Zonal Specifications of Ceaf Delhi
84/92
S No Etems @ Da&es0 Danufa!tures S No Etems @ Da&es0 Danufa!tures
GG.
GI.
'%B0 %%B
(i) '85NF(ii) 8 3O
-
7/26/2019 Zonal Specifications of Ceaf Delhi
85/92
(vii) /ENO'Q
S No Etems @ Da&es0 Danufa!tures S No Etems @ Da&es0 Danufa!tures
I7
I?
3#% igid pipe (+eavy Futy)
(i) /ENO'Q(ii) 3EN%(iii) *E3=*E(iv) F=*ON(v) S=3D
D%B M FB (S30*3)
(i) ENFO 5SE5N(ii) '85NF(iii) 5'S*OD
(iv) 3'55(v) +88 ('@*)(vi) S*5NF5F(vii) +3'(viii) 83%
IG
II
Dodular swit!hes0so!&ets
(i) '85NF(ii) %5B*(iii) 5N%+O(iv) SS(v) %ON5(vi) SEDNS
%eiling ose
Ii) 5N%+O'85NF
%5B*SS%ON5
IA /ittings @ 5!!essories M +3S#(A:017:027:06::)
(i) 3+E'E3S(ii) %O3*ON(iii) B5H5H(iv) S'% S%+F(v) 8 'E8+*EN8
1:: Box type tube light fitting
(i) 3+E'E3S
(ii) %O3*ON(iii) B5H5H(iv) S'% S%+F(v) 8 'E8+*EN8(vi)
-
7/26/2019 Zonal Specifications of Ceaf Delhi
86/92
(vi)
-
7/26/2019 Zonal Specifications of Ceaf Delhi
87/92
(iii) +5E*5N
S No Etems @ Da&es0 Danufa!tures S No Etems @ Da&es0 Danufa!tures
1:I
11:
111.
112.
(iii) B5H5H(iv) 3O'5
(v) 5'DON5F =3S
(i)(ii) 53'5B(iii) '5BO*(iv) EN#NSS
xhaust /ans(i) 8%(ii) %OD3O*N %+N5E*5N(iii) B5H5H
(iv) 3O'5
S /ittings
(i) #E5S(ii) 355S+(iii) F55'(iv) #S+EN(v)
-
7/26/2019 Zonal Specifications of Ceaf Delhi
88/92
(iv) *E=35*E
S No Etems @ Da&es0 Danufa!tures S No Etems @ Da&es0 Danufa!tures
11?.
11A.
11G.
11I.
Slui!e valve
(i) E'OS5(ii) '5F(iii) 5*5
Non eturn #alve
(i) E'OS5(ii) '5F(iii) 5*5
3ump Sets M Dono Blo!&
(i) E'OS5(ii) %OD3*ON(iii) HO*+E(iv) B%ON
%entrifugal 3umps
(i) E'OS5
(ii) %OD3*ON(iii) B%ON(iv) HO*+E
12:.
121.
122.
129.
Submersible 3ump
(i) SB(ii) BS(iii) S=(iv) %OD3*ON 85#S
Submersible !able
+5#''S5'EN853'55
/ENO'Q
Dotor starter
(i) ' @ *(ii) B%+(iii) +5#''S(iv) *'D%+5NEC= 5NF
%ON*O'
#* 3ump
(i) E'OS5(ii) HO+NSON(iii) HO*+E
ZONAL SPECIFICATIONS - GG - CE (AF) WAC PALAM
-
7/26/2019 Zonal Specifications of Ceaf Delhi
89/92
S No Etems @ Da&es0 Danufa!tures S No Etems @ Da&es0 Danufa!tures
126
127
12?
-
7/26/2019 Zonal Specifications of Ceaf Delhi
90/92
S No Etems @ Da&es0 Danufa!tures S No Etems @ Da&es0 Danufa!tures
191
192
199
196
197
Dotor Starter
(i) ' @ *(ii) B%+(iii) *'D%+5NEC= @ %ON*O'(iv) SEDNS
%ooling !oil0 5+=
(i) #O'*5S(ii) %5E(iii) B'= S*5(iv)
%ondenser(i) #O'*5S
(ii) B'= S*5 (iii)%5E
Non %hemi!al type water softening plant (i) S%5' 8=5F (ii) 5C=5D58 (iii)F'*5
+umidistat
(i) F5N/OSS(ii) +ON
-
7/26/2019 Zonal Specifications of Ceaf Delhi
91/92
(iii) ENF/OSS
S No Etems @ Da&es0 Danufa!tures S No Etems @ Da&es0 Danufa!tures
16:.
161
162
169
166
+30'3 !ut off
(i) F5N/OSS (ii) 5N%O (iii) ENF/OSS
*hermometers
(i) N=*O' (ii) +.8== (iii) S%EN*E/E%
Butterfly valve
(i) 5=F%O (ii) %5S*' (ii) S%O3 (iv) 5F#5N%
ubber mat
(i) HO*+ (ii) F=N'O3
+ot water generator
(i) *+DQ (ii) 53EF %ON*O'
167
16?
16A
16G
Shut off valve
(i) F5N/OSS(ii) ENF/OSS(iii) %5S*5'
Split type 5% 0
-
7/26/2019 Zonal Specifications of Ceaf Delhi
92/92
(iii)NE*+