Zilele Biz 2015 - Antreprenoriat - Valentin Boldeiu, UniCredit Bank Romania
-
Upload
gabriel-barliga -
Category
Business
-
view
208 -
download
4
Transcript of Zilele Biz 2015 - Antreprenoriat - Valentin Boldeiu, UniCredit Bank Romania
Fondurile europene: de la Bruxelles la antreprenor in... 20 de minute
Valentin Boldeiu, Coordonator Departament Fonduri Europene
Bucuresti, 9 noiembrie 2015
2
Perioada de programare 2007 – 2013
si tranzitia la 2014 – 2020
Studiu de caz: UniCredit Bank
3 http://www.fonduri-ue.ro/ pentru 2009-2014 siestimare UniCredit Bank pentru 2015
EVOLUTIE RATA CONTRACTARE SI RATA ABSORBTIE– INSTRUMENTE STRUCTURALE –
PNDR
2007 – 2013 ACUMULARE
2014 – 2020 INOVARE
2009 2010 2011 2012 2013 2014 2015 (Sept) 2015 (est. UniCredit)
0%
20%
40%
60%
80%
100%
120%
16.2%
42.4%
64.9%
77.6%
92.9%
103.0%
97.0%
0.9% 2.5% 5.6% 8.5%
33.5%
51.8%
55.5%70.0%
Rata contractare si rata curenta de absorbtie
Rata contractare % Rata absorbtie %
4
2014 2015
Rata de contractare estimata 103 % 97%
Rata de absorbtie 52 % 70 %
Semnare Acord Parteneriat Romania – Uniunea Europeana
Aprobare PO si lansare primele sesiuni de depunere proiecte 2014-2020
UniCredit Bank Septembrie 2015: depasirea pragului de un miliard EUR facilitati aprobate pentru proiecte cu fonduri nerambursabile europene si nationale
2007 – 2013
2009 2010 2011 2012 2013 2014 2015 (Sep.)
-
200
400
600
800
1,000
1,200
135
281
1,125
754 664
855 750
Approvals (RON mil)
5
2014-2020
Fonduri alocate Romaniei: peste 30 de miliarde euro, la care se adauga si
peste 10 miliarde euro subventii in agricultura
Fonduri alocate pentru companii – estimare: 3 miliarde euro (sub 10 % din total
fonduri alocate)
Simplificare arhitectura institutionala (reducere numar AM)
UNICREDIT BANK
Focus pe IMM – PNDR, POC, POR
Domenii strategice: agricultura, cercetare-dezvoltare si inovare, eficienta
energetica
Sprijinirea exploatatiilor agricole (proiecte de investitii, prefinantare subventii)
Expertiza nationala si europeana in implementarea schemelor de grant si
instrumentelor financiare
2014 - 2020
6
Alocarea fondurilor in cadrul
Programelor Operationale 2014 – 2020
7
TOTAL EU FUNDS ALLOCATIONS 2014 – 2020(CUMULATED COHESION + DIRECT SUBSIDIES + RURAL DEVELOPMENT)
EU-28 level: Poland could receive more than EUR 100 bln for the entire period, followed by France, Italy, Spain, and Germany.
CEE level: For Romania have been allocated more than EUR 40 bln, followed by Hungary, Czech Rep, Slovakia, and Bulgaria.
Poland
Franc
eIta
lySpa
in
German
y
Roman
ia
United
King
dom
Hunga
ry
Greec
e
Czech
Rep
Portug
al
Slovak
ia
Bulgar
ia
Croati
a
Lithu
ania
Irelan
d
Austria
Sweden
Finlan
dLa
tvia
Denmar
k
Nether
lands
Belgium
Estonia
Sloven
ia
Cypru
sMalt
a
Luxe
mbour
g0
20,000
40,000
60,000
80,000
100,000
120,000
COMPARATIE ALOCARI FONDURI 2014-2020 vs. 2007-2013
8
2007 - 2013 mld. € 2014 - 2020 mld. € Evolutie(+/- %)
POS Transport 4.4 PO Infrastructura Mare 9.4 7%
POS Mediu 4.4
PO Regional 4.0 PO Regional 6.7 69%
POS Dezvoltarea Resurselor Umane 3.5 PO Dezvoltarea Capitalului Uman 4.3 25%
POS Cresterea Competivitatii Economice 2.6 PO Competitivitate 1.3 -48%
PO Dezvoltarea Capacitatii Administrative 0.2 PO Dezvoltarea Capacitatii Administrative 0.6 164%
PO Asistenta Tehnica 0.2 PO Asistenta Tehnica 0.2 24%
TOTAL POLITICA DE COEZIUNE 19.2 TOTAL POLITICA DE COEZIUNE (rezerva de performanta 7% inclusa) 22.5 17%
Programul National de Dezvoltare Rurala 8.2 Programul National de Dezvoltare Rurala (rezerva de performanta 6% inclusa) 8.0 -2%
PO Pescuit 0.2 PO Pescuit 0.2 -26%
TOTAL ROMANIA (fara subventii agricultura) 27.7 TOTAL ROMANIA
(fara subventii agricultura) 30.7 11%
Subventii pentru agricultura (Pilonul I) 5.6 Subventii pentru agricultura (Pilonul I) 10.5 88%
TOTAL GENERAL ROMANIA* 33.2 TOTAL GENERAL ROMANIA* (rezerva de performanta inclusa) 41.2 24%
* nu sunt incluse programele de cooperare teritoriala
9
Finantari nerambursabile disponibile in perioada
2014 – 2020
pentru intreprinderi si institutii publice
OPORTUNITATI DE FINANTARE – MEDIUL PRIVAT
10
2014 - 2020 mld. €
PO Infrastructura Mare 9.4
PO Regional 6.7
PO Dezvoltarea Capitalului Uman 4.3
PO Competitivitate 1.3
PO Dezvoltarea Capacitatii Administrative 0.6
PO Asistenta Tehnica 0.2
TOTAL POLITICA DE COEZIUNE (rezerva de performanta 7% inclusa) 22.5
Programul National de Dezvoltare Rurala (rezerva de performanta 6% inclusa) 8.0
PO Pescuit 0.2
TOTAL ROMANIA(fara subventii agricultura) 30.7
Subventii pentru agricultura (Pilonul I) 10.5
TOTAL GENERAL ROMANIA* (rezerva de performanta inclusa) 41.2
Cursuri de formare angajatiStart-up-uri si IMM-uri existente
Activitate productiva agricolaActivitate non-agricola in mediul ruralStart-up-uri si IMM-uri existente
Activitate piscicolaStart-up-uri si IMM-uri existente
Subventie pe suprafata + viticulturaIntre 160-200 euro / ha – fermieri
Cercetare-dezvoltareStart-up-uri si IMM-uri existente
Activitate productiva non-agricolaStart-up-uri si IMM-uri existente
11
Structura unui proiect, de la cererea de finantare la
implementare
12
Etapele unui proiect cu finantare nerambursabila
Depunerea proiectului,
eligibilitatea proiectului
eligibilitatea beneficiarului
Aprobarea proiectului
Semnarea contractului de finantare
Implementarea proiectului
conturile proiectului
eligibilitatea cheltuielilor
metode de implementare: rambursare vs. decontare directa
Monitorizarea implementarii la banca
Etapa post-implementare
2014 - 2020
13
2014 – 2020
14
Puncte critice in implementarea proeictelor2014 – 2020
Abordarea Bancii este aceea de a fi alaturi de client pe termen mediu si lung; de aceea se analizeaza cresterea sustenabila a afacerii, nu doar investitia decupata din cadrul general de activitate al intreprinderii