Zig Zag Segment - Welcome to MassDOT _… · Zig Zag Alternatives March 2, 2016 Full Access •...

40
INSERT Segment Map June 30, 2016 Zig Zag Segment

Transcript of Zig Zag Segment - Welcome to MassDOT _… · Zig Zag Alternatives March 2, 2016 Full Access •...

INSERT Segment Map

June 30, 2016

Zig Zag Segment

Zig Zag Alternatives

March 2, 2016

Full Access • Signalization of First Street at

Swampscott Road • Improve signal coordination • Reallocate green time to better

accommodate the zig-zag movement • Consider for short term improvement

Legend

Existing Traffic Signal

Potential Traffic Signal

June 30, 2016

Options to Review Further

Zig Zag Alternatives

June 30, 2016

Zig Zag Segment Zig Zag Considerations

Bicycle an d pedestrian accommodations Swampscott Intersection

Thomas Circle Ledge

Marlborough Intersection Private businesses Ledge

Zig Zag Alternative 1 Dual Left Turn at Swampscott and Marlborough

June 30, 2016

Legend

Building Taken

Land Impacted

X

Traders Way

North ShoreMazda

North Shore Vapors/Red Carpet Repairs/Metro PCS Salem Wireless

Residential

June 30, 2016

Zig Zag Alternative 1

Dual Left Turn at Swampscott Rd and Marlborough Rd

June 30, 2016

Zig Zag Alternative 1 Dual Left Turn at Swampscott and Marlborough

Back of sidewalk/roadway edge expanded by 35’ Extra left-turn lane (11’) Buffer lanes (2 lanes at 3’) Bike lanes (2 lanes at 5’) Sidewalk (8’)

Reconfiguration of Marlborough intersection and expansion of Marlborough Road width for second NB lane

June 30, 2016

Zig Zag Alternative 1 Level of Service Tables

Zig Zag Alternative 2 Marlborough Rd Roundabout and Dual Left Turn

Lanes at Swampscott Rd

June 30, 2016

June 30, 2016

Legend

Building Taken

Land Impacted

X

North Shore Mazda

North Shore Mazda

Sleepy’s Salem &Supercuts

Residential

Zig Zag Alternative 2

Marlborough Rd Roundabout and Dual Left Turn Lanes at Swampscott Rd

June 30, 2016

Zig Zag Alternative 2 Marlborough Rd Roundabout and Dual Left Turn Lanes at Swampscott Rd

Back of sidewalk/roadway edge expanded by 35’ near Swampscott Rd

Extra left-turn lane (11’) Buffer lanes (2 lanes at 3’) Bike lanes (2 lanes at 5’) Sidewalk (8’)

Roundabout at Ma rlborough requires property impacts into Sleepy’s/Supercuts & 2 residential properties to better align with Traders Way

June 30, 2016

Zig Zag Alternative 2 Level of Service Table

Zig Zag Alternative 3

Marlborough Rd Roundabout Shifted Toward CVS with NB & SB By-Pass Lanes and Dual Left Turn Lanes at Swampscott Rd

June 30, 2016

June 30, 2016

Legend

Building Taken

Land Impacted

X

North Shore Mazda

North Shore Mazda

North Shore Vapors/Red Carpet Repairs/MetroPCSSalem Wireless

McDonald’s

Zig Zag Alternative 3Marlborough Rd Roundabout Shifted toward CVS with NB & SB By-Pass Lanes and Dual

Left Turn Lanes at Swampscott Rd

June 30, 2016

Zig Zag Alternative 3 Marlborough Rd Roundabout Shifted Toward CVS with NB & SB By-Pass Lanes and Dual Left Turn Lanes at Swampscott Rd

Back of sidewalk/roadway edge expanded by 35’ near Swampscott Rd

Extra left-turn lane (11’) Buffer lanes (2 lanes at 3’) Bike lanes (2 lanes at 5’) Sidewalk (8’)

Shifting of roundabout toward CVS su bsequently requires shift of Traders Way into McDonald’s property

June 30, 2016

Zig Zag Alternative 3 Level of Service Tables

June 30, 2016

LegendBuilding Taken

Land ImpactedX

Circle K Gas Station/North Shore Bank

Northside Carting, Inc.

North Shore Mazda

Zig Zag Alternative 4

Swampscott Rd at Highland Ave Intersection Relocation

June 30, 2016

Zig Zag Alternative 4 Swampscott Road at Highland Road Relocation

Environmental Impacts Significant Property Impacts Not recommended

June 30, 2016

Zig Zag Alternatives

Options to Review Further

June 30, 2016

Zig Zag Alternatives No Co nnection Between Marlborough Rd & Swampscott Rd via Route 107

• Shortens left-turn queues onto Marlborough Road and Swampscott Road

• Continued consideration

XX X

Legend

Prohibited Movement

Rerouted Movement

June 30, 2016

Zig Zag Alternatives

June 30, 2016

Zig Zag Alternatives Marlborough Rd Roundabout & No Left Turn onto Swampscott Rd • Additional left turns within roundabout • Removes left-turn queue onto

Swampscott Road • Continued consideration

XX X

Legend

Prohibited Movement

Rerouted Movement

June 30, 2016

Zig Zag Alternatives

June 30, 2016

Route 107 at Hawthorne SquareMall Existing Conditions

June 30, 2016

Route 107 at Hawthorne Square Mall Proposed Improvements

/

legend:

c::::::J Sidewalk

c::::::J Pavement

Crosswalk

c::::::J Planted Median

- Bikelane

G;> Existing Bus Stop

Hignland Ave (Rto 107)

-

ROUTE~

107~ Corridor Study

60 0 60 120 r-..--SC.A.LE II\ FEET

mass DOT :7§~~0

Route 107 Corridor Transition

June 30, 2016

.,.

/

ROUTE~

107~ Corridor Study

Essex street a BOSion Street

7SO

mass DOT :7§~~0

Northern Corridor Segment

June 30, 2016

June 30, 2016

Northern Corridor Segment

June 30, 2016

Northern Corridor Segment Summary of Changes

Added bicycle provisions throughout segment Improved pedestrian accommodations by replacing sidewalks Enriched transit accommodations by providing ADA compliant bus stops Increased safety by reducing lane width Improved vehicle operations by adding capacity via exclusive turn lanes, two-way left-turn lane, installing a signal at Salem Hospital and optimizing signal timing/coordination.

June 30, 2016

Route 107 at Willson St Existing Conditions

June 30, 2016

Route 107 at Willson St Proposed Improvements

June 30, 2016

Route 107 at Salem Hospital Lower Entrance Existing Conditions

June 30, 2016

Route 107 at Salem Hospital Lower Entrance Proposed Improvements

June 30, 2016

Route 107 at Dalton Pkwy and Jackson St Existing Conditions

June 30, 2016

Route 107 at Dalton Pkwy and Jackson St Proposed Improvements

June 30, 2016

Route 107 at Boston St Existing Conditions

June 30, 2016

Route 107 at Boston St Proposed Improvements

June 30, 2016

Route 107 at Boston St Shared Street Examples

Next Steps

June 30, 2016

June 30, 2016

Next Steps

Draft Report this Summe r Public Meeting 2 in September

To be held in both Lynn and Salem Final Report in Oct ober