ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS ProgrameSpeaker:

ERTMS Regional – The Swedish pilot

implementation project

1. What is ERTMS Regional?2. Project background and goals3. Radio block system in operation4. UIC and international cooperation5. Status and time plan 6. Pilot line7. Economy 8. Technical concept of ERTMS R9. Film, 7 minutes10. Perspectives for the future

ERTMS Regional – The Swedish pilot

implementation project

zaterdag 16 juni 12

Page 3: zaterdag 16 juni 12 - IRSE Nederland · Per-Erik Ingels, the Swedish ERTMS Programe Onboard presentation m zaterdag 16 juni 12. ERTMS Regional – The Swedish pilot implementation

ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe

• Cost effective control command system for regional lines

• Based on ERTMS specifications

• The first ERTMS level 3 application, fixed block

• Onboard ERTMS adopted without changes

• New development for track-side equipment

Radio block system at Västerviksbanan, Björka - Säby

1. What is ERTMS Regional?

zaterdag 16 juni 12

Page 4: zaterdag 16 juni 12 - IRSE Nederland · Per-Erik Ingels, the Swedish ERTMS Programe Onboard presentation m zaterdag 16 juni 12. ERTMS Regional – The Swedish pilot implementation

ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe

… eliminates the need for trackside equipment,

ETMS Regional…

zaterdag 16 juni 12

Page 5: zaterdag 16 juni 12 - IRSE Nederland · Per-Erik Ingels, the Swedish ERTMS Programe Onboard presentation m zaterdag 16 juni 12. ERTMS Regional – The Swedish pilot implementation

ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe

• Lower operational cost

• Increased capacity

• Increased flexibility

• Increased safety

• Open supplier market

• Inter- and intraoperability

Radio block system at Västerviksbanan, Björka - Säby

2. Project background and goals

ERTMS Regional is extending the ERTMS market to include also the regional lines

zaterdag 16 juni 12

Page 6: zaterdag 16 juni 12 - IRSE Nederland · Per-Erik Ingels, the Swedish ERTMS Programe Onboard presentation m zaterdag 16 juni 12. ERTMS Regional – The Swedish pilot implementation

ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe

• 2 116 km (21%) of the Swedish network are still manually operated (pink lines)

• 20–30% of the European network can be regarded as Regional lines

Manually operated regional lines

zaterdag 16 juni 12

Page 7: zaterdag 16 juni 12 - IRSE Nederland · Per-Erik Ingels, the Swedish ERTMS Programe Onboard presentation m zaterdag 16 juni 12. ERTMS Regional – The Swedish pilot implementation

ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe

• Old interlocking

• No line block-systems

• No ATP

•Manual dispatching by

telephone

Legacy systems on regional lines

zaterdag 16 juni 12

Page 8: zaterdag 16 juni 12 - IRSE Nederland · Per-Erik Ingels, the Swedish ERTMS Programe Onboard presentation m zaterdag 16 juni 12. ERTMS Regional – The Swedish pilot implementation

ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe

• Commissioned 1995

• 16 years of successful experience

• Dramatically improved safety

• Considerable increase in capacity and flexibility

• Reduction of staff, theoretically from 16 to 2

3. ERTMS Regional is based on the experience

from the ”radio-block” system

zaterdag 16 juni 12

Page 9: zaterdag 16 juni 12 - IRSE Nederland · Per-Erik Ingels, the Swedish ERTMS Programe Onboard presentation m zaterdag 16 juni 12. ERTMS Regional – The Swedish pilot implementation

ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe

point signal board

Track worker

balises

radio station radio station

CONTROL

Interlocking/RBC system

radio systemdispatcher

radio station

train

L 10 000 Ansaldo

EbilockBombardier

EbicosBombardier

Swedish Radio Block System

zaterdag 16 juni 12

Page 10: zaterdag 16 juni 12 - IRSE Nederland · Per-Erik Ingels, the Swedish ERTMS Programe Onboard presentation m zaterdag 16 juni 12. ERTMS Regional – The Swedish pilot implementation

ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe

4. UIC and international cooperation

UIC project started in

The railways needed to be

Common specifications developed

Participationin the Swedish

Contract with Bombardier 2005

Participationin the Swedish development /implementation

13 years!

zaterdag 16 juni 12

Page 11: zaterdag 16 juni 12 - IRSE Nederland · Per-Erik Ingels, the Swedish ERTMS Programe Onboard presentation m zaterdag 16 juni 12. ERTMS Regional – The Swedish pilot implementation

ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe

5. Status and time plan

Specifikation och riskanalys 2006-2007System development 2008-2009Installation Pilot line 2009Testning 2010-2011Commissioning 2011

zaterdag 16 juni 12

Page 12: zaterdag 16 juni 12 - IRSE Nederland · Per-Erik Ingels, the Swedish ERTMS Programe Onboard presentation m zaterdag 16 juni 12. ERTMS Regional – The Swedish pilot implementation

ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe

6. Västerdalsbanan – Pilotline for ERTMS Regional

• 135 km Single track, Repbäcken-Malung • Manually operated line. • 6 stations• 16 trains/day (50/50)• 9 dispatchers• Max speed 100 km/h• GSM/R will be used for both voice and signalling

zaterdag 16 juni 12

Page 13: zaterdag 16 juni 12 - IRSE Nederland · Per-Erik Ingels, the Swedish ERTMS Programe Onboard presentation m zaterdag 16 juni 12. ERTMS Regional – The Swedish pilot implementation

ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe

7. Economy

The strategy to obtain cost efficiency:

The goal is to reduce the investment cost to 50 % of a conventional traffic control system

• Create supplier competition• No interlockings are needed at stations

• Create a larger market • No train detection system is needed

• The use of cables is minimized

• No optical signals are needed

zaterdag 16 juni 12

Page 14: zaterdag 16 juni 12 - IRSE Nederland · Per-Erik Ingels, the Swedish ERTMS Programe Onboard presentation m zaterdag 16 juni 12. ERTMS Regional – The Swedish pilot implementation

ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe

Investment cost

• Conventional control command system on the pilot line = 16 million Euro

• Project goal 50% = 8 million E

• Payback time less then 15 years 0

4

8

12

16

Conventional system 16 M€ Project goal 8 M€

zaterdag 16 juni 12

Page 15: zaterdag 16 juni 12 - IRSE Nederland · Per-Erik Ingels, the Swedish ERTMS Programe Onboard presentation m zaterdag 16 juni 12. ERTMS Regional – The Swedish pilot implementation

ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe

8. Technical concept

zaterdag 16 juni 12

Page 16: zaterdag 16 juni 12 - IRSE Nederland · Per-Erik Ingels, the Swedish ERTMS Programe Onboard presentation m zaterdag 16 juni 12. ERTMS Regional – The Swedish pilot implementation

ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe

Euro-balis

zaterdag 16 juni 12

Page 17: zaterdag 16 juni 12 - IRSE Nederland · Per-Erik Ingels, the Swedish ERTMS Programe Onboard presentation m zaterdag 16 juni 12. ERTMS Regional – The Swedish pilot implementation

ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe

Centralized and integrated interlocking and RBC

Handles the hole line

Communicates with the onboard ETCS, the object controllers and the CTC-system

zaterdag 16 juni 12

Page 18: zaterdag 16 juni 12 - IRSE Nederland · Per-Erik Ingels, the Swedish ERTMS Programe Onboard presentation m zaterdag 16 juni 12. ERTMS Regional – The Swedish pilot implementation

ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe

Object controllers

One kiosk per station

Communicates with, the centralized RBC and IL computer

The object controllers handles points and level crossings at the station

zaterdag 16 juni 12

Page 19: zaterdag 16 juni 12 - IRSE Nederland · Per-Erik Ingels, the Swedish ERTMS Programe Onboard presentation m zaterdag 16 juni 12. ERTMS Regional – The Swedish pilot implementation

ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe

Onboard presentation

ERTMS onboardsystem

zaterdag 16 juni 12

Page 20: zaterdag 16 juni 12 - IRSE Nederland · Per-Erik Ingels, the Swedish ERTMS Programe Onboard presentation m zaterdag 16 juni 12. ERTMS Regional – The Swedish pilot implementation

ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe

ADSLconnection

ISDN-modem

TCC

WAN

TCP/IP

TCP/IP

OCOC

OC

OC

OCOC

OC

GSM-RGPRS

GSM-RGPRS

HHT

Malu

ng

Rågsv

eden

Vans

bro

Dala-J

ärna

Björ

bo

Moc

kfjär

d

Gagne

f

Repbä

cken

Borlä

nge

Borlä

nge

Gävle

GSM-REuroradio

CMI

Vehicle Communication

WAN

OC Communication

Architecture

zaterdag 16 juni 12

Page 21: zaterdag 16 juni 12 - IRSE Nederland · Per-Erik Ingels, the Swedish ERTMS Programe Onboard presentation m zaterdag 16 juni 12. ERTMS Regional – The Swedish pilot implementation

ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe

Architecture

zaterdag 16 juni 12

Page 22: zaterdag 16 juni 12 - IRSE Nederland · Per-Erik Ingels, the Swedish ERTMS Programe Onboard presentation m zaterdag 16 juni 12. ERTMS Regional – The Swedish pilot implementation

ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe

9. Film (7 minutes)

zaterdag 16 juni 12

Page 23: zaterdag 16 juni 12 - IRSE Nederland · Per-Erik Ingels, the Swedish ERTMS Programe Onboard presentation m zaterdag 16 juni 12. ERTMS Regional – The Swedish pilot implementation

ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe

• 20 – 30% of the European network are Regional lines

• Inter- and Intraoperability

• Increased capacity

• Increased flexibility

• Increased safety

• Extends the ERTMS market to include the regional lines

• Open supplier market• Investment cost of 50% of

a conventional system• Lower operational cost

Trafikverket will be the first to implement a pilot line with ERTMS Regional. Who is next?

10. Perspectives for the future for Trafikverket and

other railways

zaterdag 16 juni 12

Page 24: zaterdag 16 juni 12 - IRSE Nederland · Per-Erik Ingels, the Swedish ERTMS Programe Onboard presentation m zaterdag 16 juni 12. ERTMS Regional – The Swedish pilot implementation

ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe

Questions?