zaterdag 16 juni 12 - IRSE Nederland · Per-Erik Ingels, the Swedish ERTMS Programe Onboard...
Transcript of zaterdag 16 juni 12 - IRSE Nederland · Per-Erik Ingels, the Swedish ERTMS Programe Onboard...
zaterdag 16 juni 12
ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS ProgrameSpeaker:
ERTMS Regional – The Swedish pilot
implementation project
1. What is ERTMS Regional?2. Project background and goals3. Radio block system in operation4. UIC and international cooperation5. Status and time plan 6. Pilot line7. Economy 8. Technical concept of ERTMS R9. Film, 7 minutes10. Perspectives for the future
ERTMS Regional – The Swedish pilot
implementation project
zaterdag 16 juni 12
ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe
• Cost effective control command system for regional lines
• Based on ERTMS specifications
• The first ERTMS level 3 application, fixed block
• Onboard ERTMS adopted without changes
• New development for track-side equipment
Radio block system at Västerviksbanan, Björka - Säby
1. What is ERTMS Regional?
zaterdag 16 juni 12
ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe
… eliminates the need for trackside equipment,
ETMS Regional…
zaterdag 16 juni 12
ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe
• Lower operational cost
• Increased capacity
• Increased flexibility
• Increased safety
• Open supplier market
• Inter- and intraoperability
Radio block system at Västerviksbanan, Björka - Säby
2. Project background and goals
ERTMS Regional is extending the ERTMS market to include also the regional lines
zaterdag 16 juni 12
ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe
• 2 116 km (21%) of the Swedish network are still manually operated (pink lines)
• 20–30% of the European network can be regarded as Regional lines
Manually operated regional lines
zaterdag 16 juni 12
ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe
• Old interlocking
• No line block-systems
• No ATP
•Manual dispatching by
telephone
Legacy systems on regional lines
zaterdag 16 juni 12
ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe
• Commissioned 1995
• 16 years of successful experience
• Dramatically improved safety
• Considerable increase in capacity and flexibility
• Reduction of staff, theoretically from 16 to 2
3. ERTMS Regional is based on the experience
from the ”radio-block” system
zaterdag 16 juni 12
ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe
point signal board
Track worker
balises
radio station radio station
CONTROL
Interlocking/RBC system
radio systemdispatcher
radio station
train
L 10 000 Ansaldo
EbilockBombardier
EbicosBombardier
Swedish Radio Block System
zaterdag 16 juni 12
ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe
4. UIC and international cooperation
UIC project started in
The railways needed to be
Common specifications developed
Participationin the Swedish
Contract with Bombardier 2005
Participationin the Swedish development /implementation
13 years!
zaterdag 16 juni 12
ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe
5. Status and time plan
Specifikation och riskanalys 2006-2007System development 2008-2009Installation Pilot line 2009Testning 2010-2011Commissioning 2011
zaterdag 16 juni 12
ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe
6. Västerdalsbanan – Pilotline for ERTMS Regional
• 135 km Single track, Repbäcken-Malung • Manually operated line. • 6 stations• 16 trains/day (50/50)• 9 dispatchers• Max speed 100 km/h• GSM/R will be used for both voice and signalling
zaterdag 16 juni 12
ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe
7. Economy
The strategy to obtain cost efficiency:
The goal is to reduce the investment cost to 50 % of a conventional traffic control system
• Create supplier competition• No interlockings are needed at stations
• Create a larger market • No train detection system is needed
• The use of cables is minimized
• No optical signals are needed
zaterdag 16 juni 12
ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe
Investment cost
• Conventional control command system on the pilot line = 16 million Euro
• Project goal 50% = 8 million E
• Payback time less then 15 years 0
4
8
12
16
Conventional system 16 M€ Project goal 8 M€
zaterdag 16 juni 12
ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe
8. Technical concept
zaterdag 16 juni 12
ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe
Euro-balis
zaterdag 16 juni 12
ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe
Centralized and integrated interlocking and RBC
Handles the hole line
Communicates with the onboard ETCS, the object controllers and the CTC-system
zaterdag 16 juni 12
ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe
Object controllers
One kiosk per station
Communicates with, the centralized RBC and IL computer
The object controllers handles points and level crossings at the station
zaterdag 16 juni 12
ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe
Onboard presentation
ERTMS onboardsystem
zaterdag 16 juni 12
ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe
ADSLconnection
ISDN-modem
TCC
WAN
TCP/IP
TCP/IP
OCOC
OC
OC
OCOC
OC
GSM-RGPRS
GSM-RGPRS
HHT
Malu
ng
Rågsv
eden
Vans
bro
Dala-J
ärna
Björ
bo
Moc
kfjär
d
Gagne
f
Repbä
cken
Borlä
nge
Borlä
nge
Gävle
GSM-REuroradio
CMI
Vehicle Communication
WAN
OC Communication
Architecture
zaterdag 16 juni 12
ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe
Architecture
zaterdag 16 juni 12
ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe
9. Film (7 minutes)
zaterdag 16 juni 12
ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe
• 20 – 30% of the European network are Regional lines
• Inter- and Intraoperability
• Increased capacity
• Increased flexibility
• Increased safety
• Extends the ERTMS market to include the regional lines
• Open supplier market• Investment cost of 50% of
a conventional system• Lower operational cost
Trafikverket will be the first to implement a pilot line with ERTMS Regional. Who is next?
10. Perspectives for the future for Trafikverket and
other railways
zaterdag 16 juni 12
ERTMS Regional – The Swedish pilot implementation projectPer-Erik Ingels, the Swedish ERTMS Programe
Questions?
zaterdag 16 juni 12