5.17
YOUR FUTURE RIDE
LakeBallin ger
LakeWashington
King-SnohomishCounty Line
Includes accommodationsfor a future station
Includes accommodationsfor a future station
NE 185th St
N 145th St
N 130th St
236th St SW
244th St SW
220th St SW
200th St SW
52nd
Ave
W
44th
Ave
W
5th
Ave N
E
Edmonds
Shoreline
MountlakeTerrace
Lynnwood
Seattle
Transit Center
Shoreline Conference Center
Jackson ParkGolf Course
Northgate MallNorth SeattleCommunity College
Transit Center
NorthgateTransit Center
P
P
P
P
P
NE 185th
NE 145th
Lynnwood
Mountlake Terrace
Stations: at NE 145th, NE 185th, Mountlake Terrace Transit Center and Lynnwood Transit Center
P Park & Rides: at NE 145th, NE 185th, Mountlake Terrace Transit Center and Lynnwood Transit Center
Accommodation for potential future stations at NE 130th and 220th St SW, should future funding become available
Light rail under construction
Elevated routes
Surface route
5.17
How long will my trip from Lynnwood take?
LYNNWOOD MOUNTLAKE TERRACE
NE 185TH
U DISTRICT
NE 145TH
NORTHGATE
4 MINUTES
3 MINUTES
3 MINUTES
3 MINUTES
5 MINUTES
8 MINUTES
SEA-TAC AIRPORT
STADIUM
7 MINUTES
27 MINUTES
DOWNTOWN SEATTLE
DOWNTOWN BELLEVUE
24 MINUTES
9MINUTES
OVERLAKE TRANSIT CENTER
Ride Link and save
14-16 minutes on peak morning commutes T
hat’
s 65 HOURS per year
In that time you could watch
32 movies
BENEFITS OF YOUR FUTURE RIDE
4 bicycles 200 riders4 wheelchairs Multiple suitcasesEACH LINK CAR CAN HOLD...
One train every4MINUTES
during peak weekday commutes
5.17
PROJECT SCHEDULE
Subject to change
OPEN FOR SERVICE
SAFETY AND SYSTEMS TESTING
CONSTRUCTION
FINAL DESIGNAND PERMITTING
• Develop and then finalize project design through 30%, 60% and 90% milestones
• Obtain permits
• Pre-construction activities
1. Utility relocation
2. Clearing
3. Field work investigations
2016-2018
2018-2023
LATE 2023
ENVIRONMENTAL REVIEW
EVALUATED POTENTIAL
ROUTE AND MODE ALTERNATIVES
2013-2015
2010-2012
WE
ARE
HERE
NE 145TH STATION SITE PLAN
5
NE 145TH STATION AERIAL VIEW
12
3
3
4
4
5
58
6
7
1 Bike racks
2 Parking garage
3 Bus drop-off
4 Station entrance
5 Elevator
6 Elevated platform
7 Noise wall
8 Drop-off/Public gathering
5
NE 145TH ST
NE 145TH STATION EXTERIOR VIEWS
NE 145th Station street view (looking south)
NE 145th Station street view (looking north)
1 Parking garage
2 Bus drop-off
3 Station entrance
4 Elevator
5 Elevated platform
1
2
2
3
3
4
5
5
NE 145TH STATION INTERIOR AND PLATFORM VIEWS
NE 145th Station platform view
NE 145th Station concourse view
1
2
3
1 Elevator
2 Escalator
3 Ticket vending machine & information
5 4
4 Stairs
5 Public restrooms
LEGEND
PUBLIC SPACE
VERTICAL CIRCULATION
EGRESS STAIRS
ANCILLARY SPACE
NE 145TH STATION PLAZA AND PLATFORM LEVEL PLANS
5
Sound Transit Art ProgramNE 145th Station Artwork | Buster Simpson
Simpson writes “the Helical Sine Wave Truss is a metaphoric sculptural conveyance storm water coming off the station garage’s roof into a mitigating bog and moss landscape. The form’s curving rivulets suggest the dynamics of the
Local luminary Buster Simpson is developing two sculptures which he is calling “Helical Sine Wave Trusses.” Simpson’s projects for the station are a continuation of his long practice of exposing and celebrating institutional
Concept sketch showing the movement of storm water from the station garage.
View of the west garage façade looking towards southeast. View of the west and south garage façades looking NE.
Examples of the artist’s past work related to this project at the NE 145th Station garage.
infrastructure. He is particularly drawn to the way water is controlled and used in urban places. Related artwork can be in Seattle along Vine Street in the Belltown neighborhood, at the Brightwater Treatment Plant in Snohomish County and, within the next few years, along Seattle’s Central Waterfront.
water’s meander, making transparent, legible and instructive the respectful journey of water at this, one of the sources of Thornton Creek.”
Whole Flow (2009)Pasadena, California
Beckoning Cistern (2003)Seattle, Washington
Water Glass (2001)Seattle, Washington
EDGE OF GUIDEWAYBELOW
FIRE LANE
NE
189T
H S
T
BIORETENTION PLANTING
NE
185T
H S
T
BUS LIVE ZONE
BUS LAYOVERBUS LAYOVER BUS LAYOVER
BUS LIVE ZONE
BUS LIVE ZONE
BUS LIVE ZONE
BUS LIVE ZONE
8TH AVE NE
NE
185T
H S
T
5TH AVE NE
I-5 SB
I-5 NB
GARAGE ENTRANCE/EXIT
RETAINING WALL, TYPICAL
NEW TRAFFIC SIGNAL AT INTERSECTION
IMPROVEDBRIDGE CONNECTION
BIORETENTION PLANTING
BUS ONLY ENTRANCE & EXIT
ENHANCED CONCRETE PAVING
BUFFER PLANTING
ADA RAMP
NEW TRAFFIC SIGNAL AT INTERSECTION
LAWN
PASSENGER DROP-OFF
PARATRANSIT
BIKE LOCKERS (2)BUS SHELTER & BENCH
PLATFORM BELOW
BENCH, TYPICALBIKE RACKS (5)
BIKE LOCKERS (3)
TREE IN GRATE, TYPICAL
STATION ENTRANCE, TYPICALSEAT WALLEDGE OF GUIDEWAY
BELOW
RETAINING WALL
STREETSCAPE PLANTING
5TH AVE NE
PARKING GARAGE
STATION
COVERED WALKWAY
FUTURE DEVELOPMENT
BIKE RACKS (5)
BIKE CAGE
NE 185TH STATION SITE PLAN
5
NE 185TH STATION AERIAL VIEW
1 Bike racks
2 Parking
3 Drop-off
4 ADA parking
5 Bus drop-off
6 Station entrance
7 Platform
8 Noise wall
9 Covered pedestrian walkway
1
3
4
29
5
6
67
8 5
NE 185TH ST
5
NE 185TH STATION EXTERIOR VIEWS
NE 185th Station street view (looking south)
NE 185th Station street view (looking north)
12
2 3
4
1 Bus drop-off
2 Station entrance
3 Ticket vending machines
4 Bike racks
NE 185TH STATION INTERIOR AND PLATFORM VIEWS
NE 185th Station concourse view
NE 185th Station platform view (looking north)
1
24
1 Elevator
2 Escalator
3 Stairs
4 Bike racks
3
NE 185TH STATION PLAZA AND PLATFORM LEVEL PLANS
Sound Transit Art ProgramNE 185th Station Artwork | Mary Lucking
Arizona-based artist Mary Lucking is working on a series of murals and cut metal screens populated with images of imagined birds and plants. She thinks of the birds as stand-ins for the station’s neighbors and writes “in some places, the birds are
Cut metal plant forms concept on south entrance building.
hanging out in a group, like people waiting for a train. Their postures and gazes suggest that they are talkative, bored, shy, sleepy, curious or wistful – the emotions of the daily commute. Like real birds, they share our physical space, but experience it in a different way.”
Concept sketch of mosaic technique on ticketing wall in south entrance.
Detail of mosaic fabrication technique. Concept sketch showing cut metal bird and plant forms on north entrance building.
Lucking’s inspiration comes from a variety of sources, including her exploration of local neighborhoods set amid tall trees, the forests of folktales and the notion of nests as a metaphor for home.
MOUNTLAKE TERRACE SITE PLAN
5
MOUNTLAKE TERRACE STATION AERIAL VIEW
1
2
34
5
5
8
6
67
1 Bike racks
2 Bike storage
3 Existing parking garage
4 Bus drop-off
5 Station entrance
6 Elevator
7 Platform
8 Drop-off
5
MOUNTLAKE TERRACE STATION EXTERIOR VIEWS
Mountlake Terrace Station street view (south entrance looking west)
Mountlake Terrace Station street view (looking north)
1 Existing parking garage
2 Bike storage
3 Bus drop-off
4 Station entrance
5 Platform
6 Bike racks
7 Elevators
12
23
3
3
4
4
5
6
7
MOUNTLAKE TERRACE STATION LOBBY VIEWS
Mountlake Terrace Station south lobby
Mountlake Terrace Station north lobby
1
2
3
1 Elevator
2 Escalator
3 Stairs
4
4 Ticket vending machine & information
5 Public restrooms
6 Bus drop-off
556
2
1
4 6
MOUNTLAKE TERRACE STATION PLATFORM VIEW
Mountlake Terrace Station platform view
MOUNTLAKE TERRACE STATION PLAZA AND PLATFORM LEVEL PLANS
SPACE
Sound Transit Art ProgramMountlake Terrace Station Artist: Kipp Kobayashi
ABOUT THE ARTIST As an artist and urban designer, Kipp Kobayashi has a keen interest in the nature of human interaction in our public environments and is in constant search for ways to initiate dialogue and to promote sociability within these spaces. His
combinations that are unique to each project. By focusing on these intersections of the human, cultural and natural factors, he aims to create artwork that can continue to change, grow and evolve along with the world around it; forever changing how we perceive a particular place or thing.
At the entrance to a multi story mixed-use project in Pasadena, Kobayashi chose to explore different types of social connectivity abstractly through a project winding up through an outdoor courtyard.
In 2016, Kobayashi was invited to create 6 unique street crossings as part of the Southern California Vision Zero street safety improvements. The initial process involved the tracing of the actual movement of people as they crossed the street.
The artwork also refers to natural systems of migration and
breakwater, serving as an analogy to the rejuvenation of this redeveloping downtown area.
project in Southern California. Here, Kobayashi photographed local skaters, turning those images into silhouettes.
Rendered life-size onto the park’s surfaces, the silhouettes create the impression that the entire deck is like the surface of a pool of water full of blue rippling waves.
Containing the layers of stories that ultimately form each company’s unique identity, the objects and tools collected by
hallways provided inspiration for this suspended sculptural composition.
Over 200 scanned and printed objects were arranged in sequential strands. Reminiscent of hoses hanging within traditional drying towers, they serve as an archive of past events while implying multiple combinations of narratives in a lyrical and playful way.
EXAMPLES OF THE ARTIST’S PAST WORK
Imagining what future activities and dialogue might occur here, hundreds of folded “aerogami” shapes were envisioned swirling whimsically above the plaza.
Fluid Dynamics, Alondra Park, California, 2012
Connecting Flights, Pasadena, California, 2016
Natural Flow, Long Beach, California, 2016
Story Lines, Station 143, Castaic, California, 2016
5.17
Below are types of noise mitigation that Sound Transit can use to help reduce noise along Link light rail alignments.
Elevated sound walls• Installed close to the track
• Made of stainless steel or aluminum
• Inside surface absorbs sound
• Wall heights range from four feet to 10 feet over the elevated deck
• Provide noise reduction up to 15 decibels
• Audible emergency messages at platform
Elevated sound barriers• Thick plastic/rubber sheets used on elevated guideway
• Used when less than 10 decibels noise reduction is needed
At-grade sound walls• Typical sound walls seen along freeways
• Made of concrete or engineered composites
• Wall heights can range from eight feet to 26 feet
• Provide noise reduction up to 15 decibels
UNDERSTANDING NOISE WALLS AND NOISE MITIGATION
TREE MITIGATION
Trees removed for construction and future operationsConstruction of the guideway and stations requires removal of trees along the corridor. Trees will be planted to mitigate those being removed. Sound Transit continues to work with local jurisdictions to maximize planting opportunities and will plant more trees than those being affected.
Tree placement strategiesSound Transit continues to work with local jurisdictions to determine where new trees will be planted. Plans may include strategic replacement plantings and community engagement opportunities. The Roadside Master Plan also outlines the future restoration and vegetation landscaping along Interstate 5 where light rail will be constructed.
Jurisdiction
Number of trees to be removed
Required replacement plantings
Proposed plantings
Seattle properties 66 67 931
Shoreline properties 253 567 9,474
Mountlake Terrace properties
255 462 1,690
Lynnwood properties 425 426 1,761
WSDOT property corridor wide
4,213 53,037 53,037
*Projected numbers as of May 1, 2017
TREE SAFETY ASSESSMENT
Primary clearing and grading limits All trees and vegetation in this area are removed for construction access and guideway operations.
LEGEND
Secondary clearing and grading limitsTrees that could fall into the primary area are removed. Branches that reach into the primary area are pruned. Vegetation and trees could be removed for construction or guideway access.
Peripheral limits Trees and vegetation are monitored for potential future safety risks and are pruned accordingly.
Secondary clearing
and grading limits
Peripheral limits
Secondary clearing
and grading limits
Primary clearing and grading limits
Clearing and
Grading Limits
Maintaining a clear area around the Link light rail guideway ensures a safe and reliable space for trains to travel. Removing trees and vegetation minimizes the chance for branches to fall onto the tracks and disrupt service.
RONALD BOG MITIGATION PROJECT
5
NE 151st St
NE 152nd St
NE 153rd St
NE 155th St
2nd
Ave
NE
4th
Ave
NE
1st A
ve N
E
1st P
l NE
5
Area of wetland impacts
Wetland impacts are mitigated through reestablishment of wetlands at Ronald Bog Park.
The Lynnwood Link Extension project will permanently impact approximately 0.42 acres of wetlands along I-5 in the City of Shoreline. Sound Transit will mitigate these impacts by reestablishing approximately one acre of wetlands at Ronald Bog Park, which will increase ecological functions and values. Outside of the wetland mitigation areas, new and improved trails will enhance pedestrian access.